Project Objectives: Continue to establish a comprehensive trail network by connecting Zim Smith trail to NY Route 9 and beyond Utilize existing trail alignments Evaluate potential for pedestrian, bike, and equestrian accommodations Minimize environmental impacts Proposed Zim Smith Connection Trail Project Contact Information Audrey Ball Director of Parks and Recreation Town of Malta One Bayberry Drive Malta, NY 12020 (518) 8994411 ext. 303 dirparksrec@maltatown.org Kevin King Comptroller Town of Malta 2540 Route 9 Malta, NY 12020 (518) 8992502 comptroller@maltatown.org Don Adams Project Manager Creighton Manning Engineering, LLP 17 Computer Drive West Albany, NY 12205 (518) 4460396 [email protected] Welcome to the Zim Smith Trail Connection Project Public Informat ion Meet ing October 26, 2010 7:00 PM Locat ion: Town of Malta Recreat ion Center Existing Trolley Trail Project Schedule: Fall/Winter 2010: Preliminary Design Winter/Spring 2011: Final Design Summer 2011: Construction Begins Fall 2011: Construction Completion

Welcome to the Zim Smith Trail Connection Project Information · Project Objectives: Continue to establish a comprehensive trail network by connecting Zim Smith trail to NY Route

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Welcome to the Zim Smith Trail Connection Project Information · Project Objectives: Continue to establish a comprehensive trail network by connecting Zim Smith trail to NY Route

Project Objectives:  Continue to establish a 

comprehensive trail network by connecting Zim Smith trail to NY Route 9 and beyond 

Utilize existing trail alignments  Evaluate potential for 

pedestrian, bike, and equestrian accommodations 

Minimize environmental impacts 

Proposed Zim Smith Connection Trail 

Project Contact Information Audrey Ball Director of Parks and Recreation Town of Malta One Bayberry Drive Malta, NY 12020 (518) 899‐4411 ext. 303 dirparksrec@malta‐town.org 

Kevin King Comptroller 

Town of Malta 2540 Route 9 

Malta, NY 12020 (518) 899‐2502 

comptroller@malta‐town.org 

Don Adams Project Manager 

Creighton Manning Engineering, LLP 17 Computer Drive West 

Albany, NY 12205 (518) 446‐0396 

[email protected] 

Welcome to the Zim Smith Trail Connect ion Project Public Information Meeting 

 

October 26, 2010 7:00 PM 

Location: Town of Malta Recreat ion Center

Existing Trolley Trail 

Project Schedule:  Fall/Winter 2010: 

Preliminary Design   Winter/Spring 2011: 

Final Design  Summer 2011: 

Construction Begins  Fall 2011: 

Construction Completion