Transportation Improvement Study Hylan Boulevard Welcome to the Hylan Boulevard Transportation Improvement Study Public Meeting

Welcome to the Hylan Boulevard Transportation Improvement

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Welcome to the Hylan Boulevard Transportation Improvement

Transportation Improvement StudyHylan Boulevard

Welcome to theHylan Boulevard Transportation

Improvement Study Public Meeting

Page 2: Welcome to the Hylan Boulevard Transportation Improvement

TransportationÊImprovementÊStudyHylanÊBoulevard

Study Corridor Map

Hylan Boulevard/Richmond AvenueSelect Bus Service

0 0.6 1.20.3

Miles

- Proposed SBS Route

- Staten Island Railway

- Staten Island Railway Station

- Typical Study Location

- Subway Station

- Bus Transit Hub

R

T

Typical Location 2 - Large, Big Box Retail Properties

- High Levels of Congestion during Peak Periods

- On-Street Parking Prohibited at All Times

Typical Location 4 - Mainly Residential and Home Offices

- Elementary School on South Side

- On-Street Parking Permitted on North Side

Typical Location 3 - Small- to Mid-Sized Businesses

- Some Residential Properties

- On-Street Parking Permitted during AM and

PM Peak Periods

Typical Location 1 - Mid- to Large-Sized Retail Properties

- Business and Retail Parking Accommodated

in Off-Street Lots

- On-Street Parking Prohibited in AM & PM

Peak Periods

TYSENS LN

EBBITTS STBEA

CH

AV

GU

YON

AV

SEAVIEW

AV

SEAVER AV

MID

LAN

D AV

JEFFERSON

AV

NELSO

N A

V

KEEG

NA

S LN

BAY

TERR

HY

LAN

BLV

D &

RICH

MO

ND

AV

ARTHUR KILL RD

YUKON AV

GENESEE AV

AMBOY RD

OLD

TOW

N RD

STEUBEN

ST

FING

ERBOA

RD RD

McC

LEAN

AV &

LILY PND

AV

CLO

VE RD

BENTO

N AV

NEW

DO

RP LN

BRYAN

T AV

LINCO

LN AV

86 ST92 ST

HYLAN BLVD

RICHM

OND AV

STATEN ISLANDMALL

R

T

T

Eltingville

Great Kills

Bay Terra

ce

Oakwood Hts

New Dorp

Grant City

Je�erso

n Av

Dongan Hills

Old Town Grasm

ere

Clifton

Stapelton

Tompkinsville

St. George Ferry Terminal

Page 3: Welcome to the Hylan Boulevard Transportation Improvement

Transportation Improvement StudyHylan Boulevard

Toolbox of Improvements

• Left-Turn Lane Improvement Projects

• Signal Timing Optimization

• Advanced Signals• Pedestrian Islands• Sidewalks• Wider Medians

• Curb Bus Lane or Offset Bus Lane

• Simplified Service Pattern

• Longer Stop Spacing• Streamlined Route Path

• Transit Signal Priority

• Real-time Bus Information

• Advanced Payment System

Traffic and Safety

Bus Service

Technology

Left-Turn Lane Improvement Projects

Pedestrian Islands Wider Medians

Longer Stop Spacing

Advanced Payment System

Transit Signal Priority

Curb Bus Lane

Station

Station

Station

Station

Station

Station

Station

Station

Station

Station

SBS

Station

Local

Real-time Bus Information

Page 4: Welcome to the Hylan Boulevard Transportation Improvement

Transportation Improvement StudyHylan Boulevard

Project Issues and Goals

Corridor IssuesTraffic Congestion on Hylan Blvd• HylanBlvdistheonlycontinuousNorth-Southrouteonthesouthshore

• 28,000vehiclespassthroughthecorridoronatypicalweekday

• Congestedintersectionscausetraveltimedelays• Safetycanbeimprovedforallcorridorusers,includingmotorists,transitridersandpedestrians

Long Transit Commute Times• 72%oftransitcommutershaveatriplongerthan60minutes• 20%ofpeopleintheHylanBlvdcorridorcommutebytransit• OnethirdofallSIbuscommuterslivealongHylanBlvd• 16,000trips/dayonS78andS79localbuses• 15,000trips/dayon8expressbusroutes• Congestioncausesdelaysandreducesreliabilityoflocalandexpressbusservices

Project Goals• Improvesafetyforallcorridorusers• Improvetrafficflow• Reducebustraveltimeandimprovebustraveltimereliability• ImprovetransitaccesstoManhattan,BrooklynandtoSIdestinations

• MaintainaccesstoHylanBlvdbusinesses

Page 5: Welcome to the Hylan Boulevard Transportation Improvement

Transportation Improvement StudyHylan Boulevard

Project Timeline

June 2010

July 2010

August 2010

September 2010

October 2010

November 2010

December 2010

January 2011

February 2011

March 2011

April 2011

May 2011

June 2011

July 2011

August 2011

September 2011

October 2011

November 2011

December 2011

2012

2013

We Are Here

Meeting with Community Boards 1, 2 & 3, and Staten Island Elected Officials(June 18, 2010)

Implementation(Target 2012 or 2013)

CAC Meeting #1(October 25, 2010)

Public Meeting(December 2, 2010)

Assess Baseline Conditions(Fall 2010 - Winter 2011)

Develop & Review 2-3 Draft Concepts(Winter 2011- Spring 2011)

Develop & Refine Preferred Alternative(Summer 2011)

Develop Implementation Plan(Fall 2011)

Public Meeting

Public Meeting(June 8, 2011)

Public Meetings*CAC Meeting #3*

* Exact dates to be determined

CAC Meeting #2(June 2, 2011)