1 WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR REI SERVICES CONTRACT HBCR00A FOR COMPONENT REHABILITATION OF TWELVE BRIDGES CITYWIDE NYC DEPARTMENT OF TRANSPORTATION DIVISION OF BRIDGES

WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR REI SERVICES CONTRACT HBCR00A FOR

  • Upload
    senona

  • View
    39

  • Download
    0

Embed Size (px)

DESCRIPTION

NYC DEPARTMENT OF TRANSPORTATION DIVISION OF BRIDGES. WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR REI SERVICES CONTRACT HBCR00A FOR COMPONENT REHABILITATION OF TWELVE BRIDGES CITYWIDE. COMPONENT REHABILITATION OF TWELVE BRIDGES. - PowerPoint PPT Presentation

Citation preview

Page 1: WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR  REI SERVICES CONTRACT HBCR00A FOR

1

WELCOME TO PRE-PROPOSAL CONFERENCEON RFP FOR

REI SERVICES CONTRACT HBCR00A FOR

COMPONENT REHABILITATION OF TWELVE BRIDGES CITYWIDE

NYC DEPARTMENT OF TRANSPORTATION DIVISION OF BRIDGES

Page 2: WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR  REI SERVICES CONTRACT HBCR00A FOR

2

COMPONENT REHABILITATIONOF TWELVE BRIDGES

LOCATION BOROUGH RAILROAD PARKS

174TH ST. PED. BRIDGE OVER (N) SHERIDAN BRONX - -174TH ST. PED. BRIDGE OVER (S) SHERIDAN BRONX - -

13TH AVE. BRIDGE OVER LIRR & NYCT BROOKLYN LIRR/NYCT -15TH AVE. BRIDGE OVER LIRR (BAY RIDGE) BROOKLYN LIRR -EAST DR. BRIDGE OVER EASTWOOD ARCH BROOKLYN - YES

W 148TH ST. PED. BRIDGE OVER AMTRAK MANHATTAN AMTRAK YESW 181ST STREET RAMP TO GW BRIDGE MANHATTAN - -INWOOD HILL PARK BR. OVER AMTRAK MANHATTAN AMTRAK YES

37TH STREET BRIDGE OVER BQE/GCP QUEENS - -SUPERIOR ROAD BRIDGE OVER CROSS IS. QUEENS - -JACKIE ROBINSON PKWAY OVER AUSTIN QUEENS - -

ALBEE AVENUE BRIDGE OVER SIRT STATEN IS. SIRT -

Page 3: WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR  REI SERVICES CONTRACT HBCR00A FOR

3

BRIEF DESCRIPTION OF CONSTRUCTIONSCOPE OF WORK PERFORMED UNDER

COMPONENT REHABILITATION UNIT* CONCRETE REPAIR / REPLACE: DECK, UNDERDECK, SIDEWALK, CURB,

PARAPET, FASCIA, PIER, PEDESTAL, BRIDGE SEAT, ABUTMENT, WINGWALL AND APPROACH

* STEEL REPAIR / REPLACE: GIRDER, BEAM, STRINGER, RAILING,DIAPHRAGM & FENCE

* PAINTING: LIMITED TO REPLACED COMPONENTS OR PAINT OVER GRAFFITI

* REPAIR / REPLACE: BEARING, ANCHOR BOLTMASONRY, BRICK AND STONEELECTRICAL LIGHTING, BRACKETSSTAIRWAY AND LANDINGJOINTMISCELLANEOUS INCLUSIVE OF COMPLETESUPERSTRUCTURE

* DRAINAGE: CLEARING, CLEANING & IMPROVEMENT

* MILLING, RESURFACING, WATERPROOFING:

AS REQUIRED

Page 4: WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR  REI SERVICES CONTRACT HBCR00A FOR

4

SCOPE OF WORK• IMPLEMENT WORK ZONE TRAFFIC CONTROL PROVISIONS AS REQUIRED

• REPAIR TOP OF DECK AND UNDERDECK

• REPLACE AND PAINT PEDESTRIAN FENCING PANELS

• REPAIR AND PAINT BRICK FACING

• CLEAN AND REPLACE SCUPPER

• REPAIR STONE COPING

174TH STREET PEDESTRIAN BRIDGE OVER (NORTH) SHERIDAN

Page 5: WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR  REI SERVICES CONTRACT HBCR00A FOR

5

SCOPE OF WORK• IMPLEMENT WORK ZONE TRAFFIC CONTROL PROVISIONS AS REQUIRED

• FIELD PAINT PEDESTRIAN FENCING

• REPAIR AND PAINT BRICK FACING

• CLEAN SCUPPER AND REPLACE SCUPPER GRATING

• REPAIR STONE COPING

174TH STREET PEDESTRIAN BRIDGE OVER (SOUTH) SHERIDAN

Page 6: WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR  REI SERVICES CONTRACT HBCR00A FOR

6

SCOPE OF WORK• OBTAIN RAILROAD PERMIT TO ENTER AND FLAGGING SERVICE SCHEDULE

• IMPLEMENT WORK ZONE TRAFFIC CONTROL PROVISIONS AS REQUIRED

• REPAIR CONCRETE ENCASEMENT OF SUPERSTRUCTURE ELEMENTS

• REPAIR CONCRETE DECK OVERLAY

• REPLACE DECK JOINT SEALANTS

• REPAIR PIERS AND CRASH WALLS

• REPAIR PARAPETS

13TH AVENUE OVER LIRR BAY RIDGE LINE & NYCT

Page 7: WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR  REI SERVICES CONTRACT HBCR00A FOR

7

SCOPE OF WORK• OBTAIN RAILROAD PERMIT AND FLAGGING SERVICE SCHEDULE

• IMPLEMENT WORK ZONE TRAFFIC CONTROL PROVISIONS AS REQUIRED

• REPAIR DECK OVERLAY

• REPLACE JOINT SEALANT IN DECK JOINT

• REPAIR ABUTMENTS AND WINGWALLS

• RESET BEARING AND SEAL CRACKS IN PEDESTALS

• PAINT OVER GRAFFITI ON PARAPETS

15TH AVENUE OVER LIRR BAY RIDGE LINE

Page 8: WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR  REI SERVICES CONTRACT HBCR00A FOR

8

SCOPE OF WORK• IMPLEMENT WORK ZONE PEDESTRIAN TRAFFIC CONTROL PROVISIONS

• REPAIR STONE MASONRY

• REPAIR CRACKS AND SPALLS IN FASCIA

• TUCK POINT BRICK FACING

• REPLACE UNDERDECK LIGHTING FIXTURES

EAST DRIVE OVER EAST WOOD ARCH

Page 9: WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR  REI SERVICES CONTRACT HBCR00A FOR

9

SCOPE OF WORK

• OBTAIN RAILROAD PERMIT AND FLAGGING SERVICE SCHEDULE

• IMPLEMENT WORK ZONE PEDESTRIAN TRAFFIC CONTROL PROVISIONS

• REPAIR GIRDERS AND UNDERDECK

• INSTALL AND REMOVE TEMPORARY SUPPORT STRUCTURE

• REPLACE AND REPAIR BEARINGS

• REPAIR ABUTMENTS AND STONE MASONRY

• REMOVE AND REPLACE SOUTH STAIRCASE

• INSTALL AND REMOVE CLASS B CONTAINMENT SYSTEM

• PAINT STEEL STRUCTURE LOCALLY

• INSTALL BICYCLE RAILING ON STAIRCASE

W 148TH STREET PEDESTRIAN BRIDGE OVER AMTRAK WEST

Page 10: WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR  REI SERVICES CONTRACT HBCR00A FOR

10

SCOPE OF WORK

• IMPLEMENT WORK ZONE TRAFFIC CONTROL PROVISIONS

• REPAIR UNDERDECK SLAB

• REMOVE AND REPLACE 75 mm OF ASPHALT OVERLAY ON BRIDGE DECK

• CONSTRUCT NEW CURBS, SIDEWALKS, BRIDGE RAILING, AND CORRUGATED GUIDE RAIL WITHIN PROJECT LIMITS

• REPLACE UNDERDECK LIGHTING FIXTURES

• REINSTALL PAVEMENT STRIPING AND PAVEMENT EMBEDDED TRAFFIC LOOPS

WEST 181ST STREET RAMP TO GW BRIDGE

Page 11: WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR  REI SERVICES CONTRACT HBCR00A FOR

11

SCOPE OF WORK• OBTAIN RAILROAD PERMIT AND FLAGGING SERVICE SCHEDULE

• IMPLEMENT WORK ZONE PEDESTRIAN TRAFFIC CONTROL PROVISIONS

• REPAIR STEEL GIRDERS AND STAIRCASES

• REPAIR DECK AND UNDERDECK

• INSTALL AND REMOVE TEMPORARY SUPPORT

• REPLACE AND REPAIR BEARINGS

• REPAIR ABUTMENT AND PIER

• INSTALL AND REMOVE CLASS B CONTAINMENT SYSTEM

• PAINT STEEL GIRDERS, FENCING, AND STAIRCASES LOCALLY

• INSTALL BICYCLE RAILING ON STAIRCASE

INWOOD HILL PARK PEDESTRIAN BRIDGE OVER AMTRAK WEST

Page 12: WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR  REI SERVICES CONTRACT HBCR00A FOR

12

37TH STREET BRIDGE OVER BQE/ GCP - QUEENS

SCOPE OF WORK• IMPLEMENT WORK ZONE TRAFFIC CONTROL PROVISIONS

• REPAIR UNDERDECK

• FIELD CLEAN AND PAINT BRIDGE RAILING AND FENCE POST

• REMOVE AND REPLACE CHAIN LINK FENCE

• REPAIR ABUTMENTS

• PAINT ABUTMENT AND WINGWALLS

Page 13: WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR  REI SERVICES CONTRACT HBCR00A FOR

13

SCOPE OF WORK• IMPLEMENT WORK ZONE TRAFFIC CONTROL PROVISIONS

• REPAIR UNDERDECK AND ABUTMENTS

• REPLACE ASPHALT PATCHING LOCALLY

• REPLACE DECK JOINT

JACKIE ROBINSON PARKWAY OVER AUSTIN STREET

Page 14: WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR  REI SERVICES CONTRACT HBCR00A FOR

14

SCOPE OF WORK• IMPLEMENT WORK ZONE TRAFFIC CONTROL PROVISIONS

• REPAIR UNDERDECK, PIER AND ABUTMENTS

• REPAIR BRIDGE DECK LOCALLY

• RESEAL SIDEWALK AND PAVEMENT JOINTS

SUPERIOR ROAD OVER CROSS ISLAND PARKWAY

Page 15: WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR  REI SERVICES CONTRACT HBCR00A FOR

15

SCOPE OF WORK• OBTAIN RAILROAD PERMIT AND FLAGGING SERVICE SCHEDULE

• IMPLEMENT WORK ZONE TRAFFIC CONTROL PROVISIONS AS REQUIRED

• REPAIR UNDERDECK AND CONCRETE ENCASEMENT

• CLEAN AND RESEAL THE DETERIORATED TRANSVERSE JOINTS

• REPAIR THE PIERS AND CRASH WALLS

• REPAIR THE CURBS, SIDEWALKS, AND PARAPETS

ALBEE AVENUE OVER SIRT

Page 16: WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR  REI SERVICES CONTRACT HBCR00A FOR

16

Q.1. Addendum #2 indicates a second revised scope of work with 12 different items that could be a part of each bridge rehab.; will further detail be issued as to which items of work will be performed on each of the structures in order to more accurately propose the amount of staffing and hours required for each structure?

A.1. Plans at pre-90% ADP are available for review at 2 Rector Street, 8th Floor.

Q.2. Since no drawings are being made available for review – can a pre-proposal meeting be held to discuss some of the details of this project which haven’t been explored in the RFP (i.e. – staging of work / multiple inspection crews / multiple resident engineers / day vs. night work / permit stipulations from OCMC, etc.)?

A.2. This is one Construction Contract and will have one Resident Engineer and one rented field office location for the entire construction duration (1095 CCD’s). It can be anticipated that there may be some night time work depending on the Railroad and Lane Closures permits.

Q.3. In the two prior scopes of work, environmental monitoring was a part of the REI’s scope of work. In Addendum #2, that has been removed from the scope. I would like DOT to clarify / confirm that the REI will not be required to provide any Environmental monitoring / hazardous waste management services as part of their scope for any of the 12 bridge rehabs.

A.3. This was answered in Addendum #2. Proposers are advised to review the plans to determine extent of work. However, likelihood of environmental monitoring work is very minimal.

QUESTIONS AND ANSWERS

Page 17: WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR  REI SERVICES CONTRACT HBCR00A FOR

17

Q.4. The revised scope of work in Addendum #2 states that “Community liaison as directed by Bridges shall be part of REI services.” This direction needs to be provided now during the RFP stage, so that the appropriate approach and staffing can be considered for the technical and staffing portions of the RFP – please clarify for which projects / structures the Community Liaison needs to be provided and if for the entire duration of the reconstruction of the said structures?

A.4. Consultant is required to propose staffing and or approach towards needed community liaison based on their experience and judgment. However full time services will not be necessary.

Q.5. Will these 12 bridges be part of one construction contract or will multiple contracts be let for the reconstruction of these structures?

A.5. Yes, this will be let as one construction contract.

Q.6. Will these 12 bridges be reconstructed concurrently (at the same time) or consecutively (one after the other)?

A.6. Construction scheduling / sequencing of bridges will be provided by the Construction Contractor.

Q.7. If the answer to #6 is concurrently, will there be a constraint as to how many bridges can be re-constructed by a contractor at the same time?

A.7. Yes, there is a constraint, the contractor will not be allowed to work on more than four bridges concurrently.

QUESTIONS AND ANSWERS (CONT’D)

Page 18: WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR  REI SERVICES CONTRACT HBCR00A FOR

18

• ANTICIPATED NTP DATE OF CONSTRUCTION CONTRACT: JUNE 2009

• STAFFING SHOULD BE SOLELY BASED ON EXPERIENCE AND JUDGMENT – ONE FULL TIME RESIDENT ENGINEER FOR ENTIRE DURATION OF

CONSTRUCTION– NO CONSTRUCTION WORK WILL BE ALLOWED WITHOUT THE PRESENCE

OF A SENIOR INSPECTOR / INSPECTOR– PROJECT MANAGER’S SERVICES SHOULD BE AVAILABLE AS NEEDED– OFFICE ENGINEER’S SERVICES SHOULD BE PROVIDED AS NEEDED– COMMUNITY LIAISON’S INVOLVEMENT IS ANTICIPATED TO BE MINIMAL

OTHER ISSUES

Page 19: WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR  REI SERVICES CONTRACT HBCR00A FOR

19