Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Welcome to Forum XV
• Format – – Group Sessions – Breakouts
• Tools – – Workout Facilitation
• Goals – – Advance the State of Fertilizer Methodology – Learn – Be More Efficient – Make Everyone’s Lab Better
4
Fast-Start Meeting
5
Fast-Start Meeting Method Development Initiatives (Pavilion VI)
ISO Developments– Hugh Rodriguez
AOAC Developments - Bill Hall Validation of Analysis of P & K by ICP-OES - James Bartos Validation of Nutritive and Non-Nutritive Metals Method– Sharon Webb Validation of Total Sulfur by Combustion Method – Tyson Rowland Evaluation of Free Urea in Water-Soluble Liquid Fertilizers Containing Urea & Urea forms
– Michel Hojjatie Validation of SR/CR Methods– Bill Hall
Break
Resource Presentations Material Sizing, Sampling & Sample Preparation – How They Impact Methods & Data– Bill What Do You Want To Get Out Of Check Samples & Reference Materials? – Frank Sikora Developing Lab Training Videos; Current & Future – Wade Foster
Open Forum - Potential Topics – Bill Hall Analyzing Microbial/Humic/Organic Guarantees – Method, Matrix & Safety Issues What To Do About Soluble Guarantees – Mn, Zn… Developing a Universal Nutrient Extraction Procedure
Workout® Format Presentation & Use – Bill Hall
6
Fast-Start Meeting
5:00 – 5:10 Break WG Breakouts - Identifying Issues N-P-K Methods, ICP Analysis of P & K – James Bartos
(Pavilion V) Secondary Nutrients - Ca, Mg, S, Organic & Humic
Matrices, Beneficial Substances, Microbials– Hugh Rodrigues (Pavilion III)
Micronutrients, Trace Metals & Contaminants – Sharon Webb (Pavilion I-II)
Sizing Analysis, Sampling, Sample Preparation, Slow/Controlled Release Extraction Techniques – Bill Hall (Pavilion VI)
6:30pm - Dinner & Presentation – “We Are Clear!” – Bill Hall (Enchantment C-D)
7
Fast-Start Meeting Thursday 2/23 7:30am Continental Breakfast
8:30am Breakouts Cont. – Developing Action Plans N-P-K Methods, ICP Analysis of P & K – James (V) Secondary Nutrients - Ca, Mg, S, Organic & Humic Matrices,
Beneficial Substances, Microbials– Hugh (III) Micronutrients, Trace Metals & Contaminants – Sharon (I-II) Sizing Analysis, Sampling, Sample Preparation, Slow/Controlled
Release Extraction Techniques – Bill (VI) 10:00am Break 10:15am General Session - Group Reports & Group Discussion – Bill Tasks Identified and Action Plan Recaps 11:45am Lunch on Your Own 1:30am Breakouts Resume – Define Tasks, Timelines & Accountability 3:00pm Break 3:15pm General Session - Reports & Assignments - Capturing Ideas/Action Items /Follow-Up Assignments (VI) Identifying Future Issues – Bill Hall 4:30pm Adjourn
Los Alamos National Laboratory
9
Fast-Start Meeting
10
Fast-Start Meeting AOAC International Activity
• Four Funded Methods • Four Champions • ERP Convened • Four Sets of Evaluations • Four Separate Paths • Great Help & Support From Nancy Thiex • Three are Approved and One Still In-Process • Forum Is Great Place To Take Next Steps • Validation Will Continue With Your Support
11
Fast-Start Meeting AOAC Status of Four Methods
12
Fast-Start Meeting
Methods Being Evaluated by the Fertilizer ERP
13
Fast-Start Meeting
14
Fast-Start Meeting
Methodology for Slow & Controlled Release Fertilizers
• A Result of the Slow & Controlled Release Taskforce/Committee Efforts for over 20 Years
• Methodology Needed for Control Officials to Assess Products Making Claims of Longevity
• Two Separate Methods, One Characterizing Release in an Ambient Temperature Soil and an Accelerated Laboratory Rapid Assessment
• Correlating the Data of the Two Methods • Used to Assess Products Under Controlled
Conditions to Verify Longevity Claims
15
Fast-Start Meeting
Slow Release Validation To Do List • Draft Protocol
– Candidate Labs – Collect Samples – Tweak Methods
• Prepare Statistically Sound – – Homogeneity Testing – Replicates, Youden Pairs, # Samples to
Represent Broad Group of Materials/Blends • Reference Material? • Correlate Accelerated & Ambient Method Data • Prepare Journal Article
17
Fast-Start Meeting
18
Fast-Start Meeting FFAA Sizing/Sampling Study
• Champion/Study Director – Bill Hall • Support From:
– Mosaic – Equipment, Manpower and Raw Materials – CPS – Raw Materials – FL DACS Lab – Analytical Support – Project Timeline
• Phase I Results By January 2014 • Phase II work to be completed by July 2016
– Scope The Project • State – FLDACS/FFAA – Mosaic • Inform National Interests – AAPFCO, AAFCO & TFI • Inform International – AOACI/ISO/IFA
19
Fast-Start Meeting
Open Forum • Analyzing Materials with Microbial/Humic/Organic
Guarantees – Method, Matrix and Safety Issues
• What To Do About Soluble Guarantees – Mg, Mn, Zn…
• Developing a Universal Nutrient Extraction Procedure
• State Centers Of Excellence – Can/Should Every State Be Good At Every Analysis?
• ????????
21
Fast-Start Meeting
22
Fast-Start Meeting
Rapid Action Lean Six Sigma Teams
Leveraging the Know-How & Creativity of
People Closest to the Action!
Speed to Results
23
Fast-Start Meeting
3
A Tool To Guide Teams
Reengineering
Validating Methods
Vision & Values
Quality Tools
Improvement Suggestions
Process Improvement Teams
24
Fast-Start Meeting
Action Killer
WHY GOOD IDEAS NEVER CONVERT TO ACTION …
Debating the merit of ideas too quickly!
No one takes PERSONAL RESPONSIBILITY
for doing the work to actually implement the idea!
25
Fast-Start Meeting
KEY TOOL: THE ACTION CHAMPION
The one person who will make sure the work is done to PUSH A PRIORITY IDEA INTO ACTION!
Key Responsibilities:
1. Lead the development of an Action Accelerator.
2. Complete assignments between meetings to execute the action plan.
3. Document results from implementation.
4. Lead the design and implementation of a control plan to sustain results.
26
Fast-Start Meeting
KEY TOOL: IDEA SORTER
PUSH-UP PUSH-UP/PULL-IN
ACT-NOW PULL-IN
Clear Solution Study Required
Outside our Team Within our Team
Require Support
Within our
Control
All ideas are good, but …
Not all ideas have the same “actionability”
Sort ideas (before debating merit) to get organized for fast action
27
Fast-Start Meeting CREATE THE “SPRINT” CALENDAR
AND COMMIT TO ACTION ASSIGNMENTS
Develop a list of action items through brainstorming.
Determine what resources are needed and available
“Lock-in” the assignments to be completed by the team.
“Tie-up any loose wires” and wrap-up the meeting.
Our Agenda
28
Fast-Start Meeting
Action Idea: Champion: Date Started:
Target Completion:
WHAT needs to be done?
WHO will do it?
WHEN will it be done?
√
29
Fast-Start Meeting Work Group Tasks By Breakout Session
• Choose a scribe & presenter - Breakout #1 • Brainstorm to identify issues & solutions – Breakout #1 • Stakeholders prioritize possible solutions – Breakout #2 • Identify resources (or lack thereof) – Breakout #2 • Identify champions to lead topic work areas - Breakout #2 • Identify tasks to be completed - Breakout #2 • Decide how & when to communicate – Session #2 • Discuss how to work outside/after session – Breakout #2 • Set timelines for completion – Breakout #3 • Tools for follow-up & accountability – Breakout #3 • Provide a record of & report actions – Breakout #3
30
Fast-Start Meeting
Sizing Analysis, Sampling,
Sample Preparation,
Slow/Controlled Release
Extraction Techniques
N-P-K Methods, ICP Analysis of
P & K
Micronutrients, Trace Metals & Contaminants
Secondary Nutrients, Organic & Humic
Matrices, Beneficial Substances, Microbials