WELCOME TO DURI KOSAMBI STP
MAYORS AND DEPUTY MAYORS OF NEPAL
WASTEWATER MANAGEMENT IN DKI JAKARTA
AUGUST 7th, 2019
Outline
Performance of Off-site and On-site System
Introduction
Jakarta Sewerage System (JSS)
Product Innovation of On-site System
Outline
Introduction
Water Cycle in Jakarta
“Ciliwung River is contaminated with E.Coli bacteria reaching 35.000.000/ 100 cc, while standard quality is 2.000/ 100 cc (Quality standards for raw water : Kepgub DKI Jakarta 582/1995)” Quality of river, June 2016 – BPLHD DKI Jakarta
51,64
%48,36%
• Sewerage : 12,37% (PD PAL Jaya, June 2019)
• ITP : 25% (JICA, 2012)
• IPLT : 10,99% (PD PAL Jaya, June 2019)
Wastewater Management in Jakarta
Total Unsafely Managed
51,64%
25%
12,37%
10,99%
Source : PD PAL Jaya, June 2019
Source : PD PAL Jaya, June 2019
Source : JICA, 2012
48,36%
46,66%
SEPTICTANK
(57,65%)
Source : Monev STBM Kemenkes,
July 20194,98%
Future Business of PD PAL Jaya
Off-site
On-site• Desludging
Services• Sludge treatment
services Others :• ITP Operator • Laboratory
Off-site
Zone Operator
On-site
Subzone/ Communal Operator :
- Waste water
- Recycle water
- Energy
Desludging service
Sludge Treatment: 1.Service
2. Product
ITP Operator ITP & Septic
tank Production
Existing business
laboratory
Future business
Outline
Performance of Off-site and On-site Systems
SETIABUDI WWTP
DURI KOSAMBI STP
PULO GEBANG STPCapacity : 42.000 m3/day
Capacity : 900 m3/day
Capacity : 900 m3/day
WWTP AND STP IN DKI JAKARTA
Service Area of Zone 0
IPAL Setiabudii - MBBR
IPAL Krukut – MBBR 100 Lt/detik
IPAL Setiabudi – MBBR 250 lt/detik
Schematic of the Distribution System of Setiabudi WWTP
MBBR of Setiabudi
WWTP (250 liter/sec)
MBBR of Krukut WWTP (100 liter/sec)------GENDONG RIVER------
start operating in 2019
start construction in 2019
40,663 41,732 42,787 43,860 46,085 48,048 48,408
50,369
76,470 81,255 81,590 82,908 83,847
89,928 94,359 95,704
99,892 102,956
35,000
45,000
55,000
65,000
75,000
85,000
95,000
105,000
115,000
20022003
20042005
20062007
20082009
20102011
20122013
20142015
20162017
2018
TW II…
(meter)
Pipe Sewer Length s.d June 2019 = 103 KM
Performance of Sewer Pipe Length (m)
Customers of Off-site System
Commercial (small)
Household
Commercial (Big)
Social
Industry (domestic waste)
Units m2Category Units m2
TOTAL 2.703 12.834.346 2.684 12.252.064
2088
292
276
46
1
181.096
199.085
12.084.073
369.092
1.000
June 2019
4,996,321
5,224,792
5,582,956
6,063,326
6,297,828
7,021,113
10,181,788
11,286,264
12,071,477
12,653,250
4,500,000 6,500,000 8,500,000 10,500,000 12,500,000 14,500,000
2010
2011
2012
2013
2014
2015
2016
2017
2018
TW II 2019
Non Rumah Tangga
Area of Piping Customer Building (m2)
Non Household (m2)134,130
156,425150,738151,647
165,149178,905
180,894180,902180,587181,096
120,000 130,000 140,000 150,000 160,000 170,000 180,000 190,000
2010
2011
2012
2013
2014
2015
2016
2017
2018
TW II 2019
Rumah TanggaHousehold (m2)
Flowchart of SAP System - Duri Kosambi STP
Maturation Pond
Faecal Sludge Truck
Sludge Acceptance Plant (SAP)
Grit Chamber
Sludge Pond
Dosing Pump Dryer Hangar
Break Tank
Sedimentation & Aerated Pond
2
Dewatering 6
7
Neutralization Pond
8
1 3 4
5
2016 2017 201896.204 m3 97.001 m3 99.301 m3 2019 49.564 m3
20,495
23,696 23,279
28,734
24,388
22,803 23,504
26,306 25,382
22,048
24,993
26,878 25,779
23,785
20,000 21,000 22,000 23,000 24,000 25,000 26,000 27,000 28,000 29,000 30,000
TW I TW II TW III TW IV TW I TW II TW III TW IV TW I TW II TW III TW IV TW I TW II
Volume of Wastewater Treatment (m3) (PD PAL Jaya & Privat Trucks)Performance of Onsite System
2016 2017 20188.259 m3 13.486 m3 14.693 m3 2019 9.628 m3
1,115 1,120
2,245
3,779
2,813 2,966 3,548
4,159
3,213 2,652
4,057 4,771
4,421 5,207
700 1,200 1,700 2,200 2,700 3,200 3,700 4,200 4,700 5,200 5,700
TW I TW II TW III TW IV TW I TW II TW III TW IV TW I TW II TW III TW IV TW I TW II
Volume of Desludging (m3) (PD PAL Jaya Trucks)
Wastewater Service Tariff
Category offsiteTariff (IDR/m²)
(Gub. Decree no. 991/2012)
Average tariff
Average Square meter
Average Monthly bill
Household 131 – 289 231 87 20.097
Commercial (small) 525 525 739 387.975
Commercial (big) 578 - 840 634 37.000 23.459.000
Category – Onsite IDR/m³
Desludging service for office hour 150.000
Desludging service for after office hour 275.000
Sludge treatment charges 25.000
Outline
Product Innovation of On-site System
Product Innovation of On-site System
Colaboration with IUWASH PLUS, WATER.ORG & BMT-BUS
BIOPAL
GREBEG L2T2
PD PAL JAYA GOES TO SCHOOL
CSR
CONTAINMENT EMPTYING TRANSPORT TREATMENT DISPOSALUSER
INTERFACE
Smart Toilet
PAL - ANDRICH
Briket (Black Gold)
Public Toilet BIOPAL
BIOPAL
+
+
+
Modified Septic Tank (BIOPAL) – Production by PD PAL Jaya
Packet 4
Size P x L x T = 2,0 x 1 x 1,5 mCap : 2 m3Anaerobic & Aerobic Process
Type 1
Size P x L x T = 1,5 x 0,75 x 1,3 mCap : 1,125 m3Anaerobic Process
Type 2
Size P x L x T = 2,5 x 1,120 x 1,55 mCap : 3,3 m3Proses Anaerobic dan Aerobic
PaHe
Size P x L x T = 1,5 x 0,75 x 1,3 mCap : 1,125 m3Anaerobic Process (2 Layers)
Smart Toilet
DIFABLE FRIENDLY
CLEAN AND FRAGRANT
ENVIRONMENTAL FRIENDLY
MINIMALIST DESIGN
• October 9th, 2017, the launching of Smart Toilet at the City Hall and Monas Transjakarta Shelter
Public Toilet
• Construction of public toilets at the Jembatan Multiguna Tanah Abang (JPM Tanah Abang)
• Cooperation of PD PAL Jaya - PD Sarana Jaya
• Implement the concept of "Smart”
• Construction of public toilets in the parking area of the Kenari Market
• Cooperation of PD PAL Jaya - Perumda Pasar Jaya
CSR of PD PAL JAYA in 2018
CSR of PD PAL JAYA in 2019
Giving of 2 units of type 2 BIOPAL to be instal led at the Lenteng Agung DLH Dormitory
Funding for repairing public toilets and 2 units of BIOPAL septic tanks (type 2 and type 3) on RT 10/005 Kel. Pisangan Timur
Before After
Before After
Construction of MCK and 1 unit of BIOPAL Septic Tank type 2 di Kel. Petamburan, Kec. Tanah Abang, Jakarta Pusat
CSR 2017 - PT. Pembangunan Sarana JayaConstruction of BIOPAL and Public Toilet in Kel.
Bukit Duri
CSR 2018 - PT. BANK DKI Construction of 3 location of Public Toilet in Kel.
Kelapa Gading Timur
CSR 2018 - PT. KBNGiving BIOPAL in Kel. Cakung Barat
CSR Cooperation
Kel. Pekojan
Kec. Koja
Kel. Pademangan Barat
Kel. Duri Utara
GREBEG (Gerakan Bersih Lingkungan
dengan Gotong Royong) L2T2
Area Launch Time Cooperation TargetRealization until June
2019%
Kel. Pekojan 20 Jan 2017 Bank sampah 225 227 101
Kel. Pademangan Barat 27 Mar 2017 POKJA L2T2 225 185 82,2
Kel. Duri Utara 07 Sept 2017 POKJA STBM 225 51 22,67
Kec. Koja 01 Nov 2017 BMT-BUS 225 153 68
PD PAL JAYA GOES TO SCHOOLSchool Awareness building program
PAL Jaya Goes To School in SDN 01 Kampung MelayuPAL Jaya Goes To School in SDK Penabur 9 Halimun
OPENING Overall introducing
of PD PAL Jaya
PHOTOTAKINGDocumentation
SANITATION EDUCATION
Educate the children about the sanitation
TALE TELLING
Children storyabout sanitation
COLORING
Sanitation themes coloring activity
INFLUENT
EFFLUENT
PAL-ANDRICH
• Design Capacity : 80 m3/hari• Processing result (Clean Water) : 46 m3/hari• Area of PAL-Andrich: 10 x 4 m2
• Location : Duri Kosambi STP• Launching : 23 Mei 2018 oleh Wagub DKI
Jakarta Sandiaga Uno
Sludge of IPLT (BG) Peyeumisasi process Sieving Sludge
mix briquettes with garbageadd starch solutionBriquettes printing
the briquette was successfully litBurning Test
Briket (Black Gold)
Calorific value : 3500 - 4500 kcal / kg
In July 31st, 2017 – Research collaboration processed sludge utilization IPLT between PD PAL Jaya - STT PLN.The Goal : handling the amount of sludge processing results and being used as fuel / alternative energy.
Outline
Jakarta Sewerage System (JSS)
DED Pumping Station Process
DED Process
Off-Site System Development Plan (JICA 2012 & Acceleration of Jakarta Capital City Government 2016)
System Year Zone % Service
OFF-SITE Short Term (2012 – 2020) 0,1,6 23,11
OFF-SITE(Mid Term)
Master Plan 2012 4, 5, 8 & 10 30,03
DKI Jakarta Provincial Government's
Acceleration Plan2016
2,3, 5,7, 8,(4 + 10) 36,03
OFF-SITE Long Term (2031 – 2050)
9, 11, 12, 13 & 14
20,86
Zones of Jakarta Sewerage System Masterplan
River
Sea
Septic Tank64 %
Individual Treatment Plant
25%
Sewerage4%
(people equivalent)
Slum area7%
Condition 2012
Sewerage 12,37%People equivalent
June 2019
Sewerage80%
On Site
Direct Disposal20 % IPLT
Masterplan 2050
On Site
Off Sit
e
9,57%People
equivalent
Masterplan of Wastewater Management in DKI Jakarta, 2012
June 2019
Off Sit
e
OFF SITE SYSTEM
Year Zone % Service
2012– 2020 0,1,6 23
2016 – 2022 2,3,4,5,7,8,10 42
Total 65
ON SITE SYSTEM (Reguler Basis)
Year Zona % Service
2014 – 2030 ALL 35
System Year Zone % Service
OFF SITE SHORT TERM (2012 – 2020) 0,1,6 23,11
OFF SITE MEDIUM TERM (2021 – 2030)
4, 5, 8 & 10 30,03
OFF SITE LONG TERM (2031 – 2050)
2, 3, 7, 9, 11, 12, 13
& 1426,86
TOTAL 80
Pergub DKI Jakarta 41(2016)
WASTEWATER MASTER PLAN (2012)
Acceleration Program
• Investation to coverage 80% = 68 Trillion Rupiah (Basis 2012)
• Investation to coverage 65 % = 43 Trillion Rupiah (Basis 2012)
KSD (Kegiatan Strategis Daerah)(Kepgub No. 1042 Tahun 2018)
OFF SITE SYSTEM
Year Zone % Service
2012– 2020 0,1,6 23
2018 – 2022 2,5,8 16
Total 39
ON SITE SYSTEM (Reguler Basis)
Year Zona % Service
2014 – 2030 ALL 61
*Data DED Zona 2,5, & 8
720.000 People served
3.250.000 People served
ZONEInvestment (Billon IDR),
Masterplan 20121 (Pluit) 6.2716 (Kosambi) 8.4682 (Muara Angke) 1.1583 (Srenseng) 3.7254 (P. Gebang) 6365 (Sunter) 4.1577 (Kamal) 3.9918 (Marunda) 5.65110 ( P. Gebang) 8.962
43.023
On Site 35%
Off Site 65%
Acceleration Program (KSD)
ZONE (KSD)Investment (Billion IDR),
Masterplan 20121 (Pluit) 6.2716 (Kosambi) 8.4682 (Muara Angke) 1.1585 (Sunter) 4.1578 (Marunda) 5.651
25.705
720.000 People served
3.250.000 People served
100 % (11 Juta)People served
ZONAInvestment (Billion IDR),
Master Plan 2012
1 6,2716 8,468
2 1,1583 3,725
4 6365 4,157
7 3,991
8 5,65110 8,962
43,023
LOAN JapanLOAN Japan
APBN, APBDAPBN, APBD
APBN, APBDAPBN, APBD, PPP (Perlu study)
APBN, APBDAPBN, APBD, PPP (Perlu Study)
APBN, APBD
Financing Scenario
Financing Scenario
Acceleration Scenario: Using Modular or Subzone Approach with funding alternative from Public Private Partnership (PPP) or Business to Business (B to B), etc.
Coverage Service of PD PAL Jaya (% PE)
10.08 11.05 11.81 12.37
3.32 3.46 3.53 3.63 3.68 3.97 4.59 4.82 5.40 5.66 5.80 6.29 6.47 7.13
13.26
17.26
21.21 21.94
2.00
7.00
12.00
17.00
22.00
27.00
20022003
20042005
20062007
20082009
20102011
20122013
20142015
20162017
2018
TW II
2019
OFF-SITE SYSTEM
ON-SITE SYSTEM
% PE
THANK YOU