WELCOME
WELCOMES
IFFCO AONLA UNIT, BAREILLY (U.P.)
HONOURABLE FICCI-NDMA
OFFICIALS,CHIEF EXECUTIVES
& DELEGATES
AT
HOTEL TAJ VIVANTA,LUCKNOW
4
Presentation By :
N P RAO
IFFCO AONLA ,BAREILLY, UP
CHEMICAL DISASTER
MANAGEMENT
EMERGENCY PLANNING
STATUTORY FRAME-WORK
NATION-WIDE FRAME WORK FOR EMERGENCY PLANNING AND PREPAREDNESS
Under The Environment Protection Act, 1986, rule framed " Chemical Accidents ( Emergency
Planning, Preparedness, and Response ) Rules,1996 for Management of Hazardous Substances
provision of constitution of CRISIS GROUPS at four levels is made along with their duties and
functions:-
L-3 NATIONAL
LEVEL
CENTRAL
CRISIS
GROUP
Vide Order No. 3-15/91-HSMD Dated 27th September,
1996 by Ministry of Environment & Forest, Govt. of
India
L-2 STATE LEVEL STATE
CRISIS
GROUP
Vide Notification No. 5721/55-97-163 Parya/96 Dated
18th December,1997 by Uttar Pradesh Government
L-1 (i)
DISTRICT LEVEL
DISTRICT
CRISIS
GROUPS
Vide Notification No. 5744/55-97-163 Parya/96 Dated
22nd December,1997 by Uttar Pradesh Government
L-1(ii)
LOCAL LEVEL
LOCAL
CRISIS
GROUP
Vide Notification No. 5745/55-97-163 Parya/96 Dated
22nd December,1997 by Uttar Pradesh Government
L- 0 NO DISASTER SITUATION MAINLY FOCUSING ON
SURVILLANCE, PREPAREDNESS, MITIGATION ACTIVITIES
UNDER CONTROL OF RELIEF COMMISSIONER
jkT; ladV fLFkfr lewg
'kklukns'k la[;k % 5721@44&97&163&i;kZ@96]
y[kuÅ] fnukad % 18 fnlEcj] 1997• 1- eq[; lfpo] m0iz0 'kklu v/;{k
• 2- izeq[k lfpo] Je foHkkx] m0iz0 'kklu lnL; lfpo
• 3- izeq[k lfpo] x`g foHkkx] m0iz0 'kklu lnL;
• 4- izeq[k lfpo@lfpo] i;kZoj.k foHkkx] m0iz0 'kklu lnL;
• 5- izeq[k lfpo@lfpo] LokLF; foHkkx] m0iz0 'kklu lnL;
• 6- izeq[k lfpo@lfpo] m|ksx foHkkx] m0iz0 'kklu lnL;
• 7- izeq[k lfpo@lfpo] ifjogu foHkkx] m0iz0 'kklu lnL;
• 8- izeq[k lfpo@lfpo] uxj fodkl foHkkx] m0iz0 'kklu lnL;
• 9- v/;{k] m0iz0 iznw"k.k fu;a=.k cksMZ] y[kuÅ lnL;
• 10- iqfyl egkfuns'kd] m0iz0] y[kuÅ lnL;
• 11- iqfyl egkfuns'kd ¼vfXu'keu½] m0iz0 'kklu] y[kuÅ lnL;
• 12- funs'kd dkj[kkuk] m0iz0] dkuiqj lnL;
• 13- jkT; ljdkj }kjk ukefufnZ"V fd;s tkus okys pkj
fo'ks"kK ¼vkS|ksfxd lqj{kk vkSj LokLF;½ lnL;
• 14- jkT; ljdkj }kjk uke fufnZ"V fd;s tkus okys m|ksx dk ,d izfrfuf/k
lnL;
jkT; ladV fLFkfr lewg dk fu;a=.k d{k x`g foHkkx ds
fu;a=.k d{k esa gksxkA
vkS|ksfxd nq?kZVuk dh lwpuk izkIr gksrs gh ladV fLFkfr
lewg dh cSBd vk;ksftr dh tk;sxh rFkk vkdfLed dh
tk;sxh] ftlds vk/kkj ij fofHkUu foHkkxksa ,oa ,tsafl;ksa }kjk
fu;e esa fu/kkZfjr d`R;ksa dk ikyu djk;k tk;sxkA
jkT; ladV fLFkfr lewg ds d`R;
1- O;kid jlk;u nq?kZVukvksa ls fuiVus ds fy, vkSj O;kid jlk;u
nq?kZVukvksa ls fuiVus esa fo'ks"kK ekxZn'kZu nsus ds fy, jkT; ladV
fLFkfr lewg f'k[kj fudk; gksxkA
2- mifu;e ¼1½ ds v/khu fofufnZ"V&d`R;ksa ij izfrdwy izHkko Mkys fcuk
jkT; ladV fLFkfr lewg %
d- ifjladVe; jlk;uksa ds fofuekZ.k] Hk.Mkj.k vkSj vk;kr fu;eksa
ds vuqlkj lHkh ftyk ;kstukvksa dh i;kZIrrk dh ijh{kk djus
dh n`f"V ls mudk iqujh{k.k djsxk vkSj rhu ekl esa ,d ckj
dsUnzh; ladV fLFkfr lewg dks viuh fjiksVZ HkstsxkA
[k- fdlh LFky ij jlk;u nq?kZVukvksa ds izcU/k esa jkT; ljdkj
dh lgk;rk djsxkA
Xk- jkT; LFky ij fdlh O;kid jlk;u nq?kZVukvksa ls lEcfU/kr ;kstuk
(Planning)] rS;kjh (Preparedness) vkSj vo'keu (Mitigation) esa jkT; ljdkj
dh lgk;rk djsxkA
?k- jkT; esa O;kid jlk;u nq?kZVuk ls mRHkwr gksus okyh nq?kZVuk ds i'pkr~
fLFkfr dh fujUrj ekuhVfjax djsxk vkSj dsUnzh; ladV fLFkfr lewg dks
viuh fjiksVZ HkstsxkA
³- ftyk ladV fLFkfr lewg }kjk Hksth x;h izxfr fjiksVZ dk iqujh{k.k djsxkA
p- ftyk ladV fLFkfr lewg }kjk mls lEcfU/kr iz'uksa ds mRrj nsxkA
N- jkT; esa ,sls fo'ks"kKksa vkSj vf/kdkfj;ksa] tks jlk;u nq?kZVukvksa ds izcU/k ls
lEcfU/kr gksa] dh ,d lwph izdkf'kr djsxkA
ftyk ladV fLFkr lewg
'kklukns'k la[;k % 5744@55&97&163&i;kZ@96
y[kuÅ] fnukad % 22 fnlEcj] 1997
• 1- ftykf/kdkjh v/;{k
• 2- iqfyl v/kh{kd lnL;
• 3- ftyk vkikr vf/kdkjh@mi ftykf/kdkjh lnL;
• 4- izeq[k vfXu'keu vf/kdkjh lnL;
• 5- ftyk lwpuk vf/kdkjh lnL;
• 6- foLQksVd fu;a=d lnL;
• 7- izeq[k] ukxfjd lqj{kk lnL;
• 8- ftykf/kdkjh }kjk uke fufnZ"V fd;s tkus okyk
O;kikj la?k dk ,d izfrfuf/k lnL;
• 9- eq[; fpfdRlkf/kdkjh lnL;
• 10- eq[; uxj vf/kdkjh@vf/k'kk"kh vf/kdkjh] uxj
fuxe@uxj iapk;r lnL;
• 11- ty fuxe dk izfrfuf/k lnL;
• 12- m0iz0 iznw"k.k fu;a=.k cksMZ dk izfrfuf/k lnL;
• 13- ftyk d`f"k vf/kdkjh lnL;
• 14- ftykf/kdkjh }kjk uke fufnZ"V fd;s tkus okys
• pkj fo'ks"k ¼vkS|ksfxd lqj{kk ,oa LokLF;½ lnL;
• 15- lEHkkxh; ifjogu vf/kdkjh lnL;
• 16- ftykf/kdkjh }kjk uke fufnZ"V fd;s tkus
• okys m|ksx dk ,d izfrfuf/k lnL;
• 17- LFkkuh; ladV fLFkr lewg dk v/;{k@lnL; lfpo lnL;
• 18- lgk;d funs'kd dkj[kkuk lnL;@ la;kstd
ftyk ladV fLFkr lewg ds d`R;
•¼d½ ftyk LFky ls nwj vkikr ;kstuk dh rS;kj esa lgk;rk djsxkA
•¼[k½ O;kid nq?kZVuk ifjladV laLFkkiu ds vf/k"Bkrk }kjk rS;kj dh x;h
LFky ij dh lHkh vkikr ;kstukvksa (On-site Emergency
Plans) dk ftyk LFky ls nwj vkikr ;kstuk (Off-site
Emergency Plans) dh rS;kjh ds fy, iqujh{k.kA
•¼x½ ftys ds Hkhrj fdlh LFky ij O;kid nq?kZVukvksa ds izcU/k esa ftyk
iz'kklu dh lgk;rk djsxkA
•¼?k½ izR;sd jlk;u nq?kZVuk dk fujUrj vuqJo.k djsxkA
¼M½ ;g lqfupr djsxk fd nq?kZVuk fLFkr vkSj vo'keu
(Mitigation) iz;klksa ls lacaf/kr tkudkjh dsUnzh; vkSj jkT;
ladV fLFkr lewg dks fujUrj Hksth tk;sA
¼p½ jlk;u nq?kZVuk dh fjiksVZ jkT; ladV fLFkr lewg dks iUnzg
fnu ds Hkhrj HkstsxkA
¼N½ izR;sd o"kZ LFky ij jlk;u nq?kZVuk dh de ls de ,d
lEiw.kZ ØhM+k dok;n (Mock-Drill) djok;sxk vkSj jkT;
ladV fLFkr lewg dh ;kstuk dh etcwrh (Strength)
vkSj detksjh (Weakness) dh fjiksVZ HkstsxkA
LFkkuh; ladV fLFkr lewg
'kklukns'k la[;k % 5745@55&97&163 i;kZ@96
y[kuÅ] fnukad % 22 fnlEcj] 1997
1- mi ftykf/kdkjh@ftyk vkikr vf/kdkjh v/;{
2- ftyk vk|ksfxd {ks=@vkS|ksfxd ikdsV esa m|ksx ds
izfrfuf/k lnL;
3- [krukd jlk;uksa ds ifjokgd (Transporters)
¼la[;k nks esa½ lnL;
4- vfXu'keu vf/kdkjh lnL;
5- lacaf/kr Fkkuk/;{k lnL;
6- [k.M fodkl vf/kdkjh lnL;
7- ukxfjd lqj{kk dk ,d izfrfuf/k lnL;
8- izHkkjh fpfdRlkf/kdkjh] izkFkfed LokLF; dsUnz lnL;
9- LFkkuh; lekpkj i= dk lEiknd lnL;
10- v/;{k }kjk uke fufnZ"V leqnk; usrk] ljiap@
xzke iz/kku lnL;
11- v/;{k }kjk uke fufnZ"V fd;s tkus okys xSj
ljdkjh laxBu dk ,d izfrfuf/k lnL;
12- v/;{k }kjk uke fufnZ"V fd;s tkus okys LFkkuh;
{ks= esa nks izfl) MkDVj lnL;
13- v/;{k }kjk uke fufnZ"V fd;s tkus okys nks
lkekftd dk;ZdrkZ lnL;
14- lgk;d funs'kd dkj[kkuk lnL;
LFkkuh; ladV fLFkr lewg ds fuEu d`R;
¼d½ vkS|ksfxd ifjladV ds fy, LFkkuh; vkikr ;kstuk rS;kj
djsxkA
¼[k½ LFkkuh; vkikr ;kstuk vkSj ftyk LFky ls nwj vkikr ;kstuk
(District Off-site Emergency Plan) esa lkeatL; lqfuf'pr djsxkA
¼x½ jlk;u nq?kZVuk izcU/k esa vUroZfyr dkfeZdksa dks izf'k{k.k nsxkA
¼?k½ izR;sd N% ekl ij LFky ij jlk;u nq?kZVuk dh de ls de ,d
lEiw.kZ ØhM+k dok;n (Mock-Drill) lapkfyr djsxk vkSj ftyk
ladV fLFkr lewg dks fjiksVZ HkstsxkA
¼M½ jlk;u nq?kZVuk esa lEHkor% izHkkfor gksus okys tu leqnk; ds
mipkjksa vkSj {ks= esa fo|eku rS;kjh (Existing Preparedness) ds
lEcU/k esa f'kf{kr djsxkA
PRESENT STATUS STATE OF UTTAR PRADESH
Total no.
of MAH
units
Notification
of Site
Submitted
On Site
Emergency
Plan
Submitted
Safety
Report
Applicable
/Submitted
Safety
Audit
Applicable
/Submitted
118 92 113 52/54
NA 64
54/02
COMPLIANCE OF MSIHC RULES,1996 ( AMENDED 2000)
Year-2010
COMPLIANCE OF On Site Emergency Plan
Rehearsal
under
MSIHC RULES,1996 ( AMENDED 2000)
STATUS OF OFF-SITE EMERGENCY PLAN
Under Chemical Accident (EPPR) Rules,1996
IN UTTAR PRADESH
DCG
to be Constituted(No. of Districts)
DCG Constituted(No. of Districts)
LCG Required/
Constituted
Off-Site Emergency
Plan Develpoed*
Draft**
Off-Site Emergency Plan under
development
37 36 49/18 37/15* 37/10
Off-Site Emergency Plan
IFFCO PHULPUR
REHEARSED ON 16-01-2014 &
17-01-2014
IN COLLABORATION
WITH
National Disaster Management Authority (NDMA)
Critical Issues to be addressed in Off-Site Emergency Planning
• Most credible accident scenario and worst casescenario should be a criteria of the plan.
• ½ LFL and 1/10th of the IDLH scenarios should alsobe considered for plotting risk contours.
• Response planning at tertiary level i.e. at local level
• Availability of scaled maps to identify exactvulnerable area
• Awareness and capacity building of DCG/ LCGmembers (Key stakeholders)
• Assesment of existing resouces of serviceorganisations at District/Local Level and itsaugmentation in view of demand of risks.
Off-Site Emergency Planning - Issues
• Defining the most credible accident scenario based on real time situation for HAZAN
• Constitution of committees at local level along with their response plan to be formed with following sub-committees
- Law and Order Committee
- Rescue committee
- Traffic Control committee
- Advisory Committee
- Fire control committee
- Health and Welfare Committee
- Water supply committee
- Transportation committee
- Awareness/ education committee
- Onsite emergency committee
Off-Site Emergency Planning - Issues
• Technical Support for identification of Hazardous pockets andmatching GIS based Emergency response System from NIC/Other agency
• Periodical Sensitization workshops for members of DCGand LCG.
• Awareness, Education, and Training for the vulnerable
community through local opinion makers, Civil Defence,Panchayat Raj Institution etc. at Local Level.
• Assistance from MoEF/ NDMA for capacity building ofStatutory Authorities.
Off-Site Emergency Planconsists of three parts :-
1- TECHNICAL PLAN2- MANAGEMENT PLAN3- CONTINGENCY PLAN
TECHNICAL PLAN
1- Information about the site including likelylocations of dangerous substances,personnel and emergency control rooms.
2- Technical information such as chemical andphysical characteristics and dangers of thesubstances and plant.
3- The types of accidents and release to betaken into account.
MANAGEMENT PLAN
4- Organizations involved including key personnel and responsibilitiesand liaison arrangements between them.
5- Details of emergency response procedures.
6- Evacuation Arrangements.
7- Identify the facilities and transport routes.
8- Communication links including telephones, radios and standbymethods.
9- Contact for further advice e.g. metrological information, transport,temporary food and accommodation, first aid and hospital services,water and agricultural authorities.
10- Special equipment including the fire fighting, materials damage,control and repair items .
11- Notify the public.
CONTINGENCY PLAN
12- Arrangements for dealing with the press and other media interests.
13- Longer term clean-up.
Districts which need utmost attention in view of no. of MAH Units
DISTRICT
ALLAHABAD
MATHURA
KANPUR NAGAR
MEERUT
GHAZIABAD
GAUTAMBUDH NAGAR
BULANDSHAHAR
BAREILLY
MORADABAD
Disaster Management Plan
Introduction
Emergency planning is an integral part ofthe overall loss control program. It isimportant for effective management of anaccident/incident to minimize losses topeople and property, both in and aroundthe facility.
Main objectives – Emergency Preparedness
1.To control events and prevent escalation.
2.To minimize the effect on people, propertyand the environment.
3.Effective rehabilitation of the affectedpersons.
Critical elements – Emergency Plan
1.Reliable and early detection of anemergency and careful planning.
2.The command, coordination andorganization structure along withefficient trained personnel.
3.Resources for handling emergencies.
4.Appropriate emergency responseactions.
Critical elements – Emergency Plan
5. Effective notification and communicationfacilities.
6. Identification of emergency isolationvalves.
7. Proper training of concerned personnel.
8. Regular mock drill / rehearsal.
9. Regular review and updation of plan.
Disaster Management Plan
On-site Emergency
Plan
Off-site Emergency
Plan
For incident which could
affect people and the
environment outside the
works as well
For incident which could
affect people and the
environment inside the
works only
On-site Emergency Plan
On-site Emergency Plan
Incident
MCP T/Phone, Walkie-Talkie Personal Approach
Plant C/RFire C/R
Detection Sys
Minor Emergency Disaster
Rush to site & act
All clear
Give Walkie-
Talkie , blow
siren as per
need
Situation
controlled
On-site Emergency Plan
Radio Room
Emergency Disaster
Offsite Emergency Plan
Activated Information to
Main Incident
ControllerFirst Aid F&S Officer
Rush
Ambulance to
site
Report to
FCR
Each
Area/HOD ECC
HOD (Affected plant/Sec/
F&S) rush to the site
Onsite Emergency Plan
Activated
On-site Emergency Plan
Mutual Aid
Member
called
Disaster
DMP
Activated
Siren blown
accordinglyCorporate
Office
informed
District
administration
informed
Information to
media
Information to
affected persons
relatives
On-site Emergency Plan Rehearsal
Highlights:o Well equipped Emergency Control Centre.
o Assembly Points identified and displayed.
o Likely emergency Scenarios identified and rehearsed
o Observers from senior management
o Well laid out / written mock drill assessment sheet
o Review of rehearsal by Executive Director with seniormanagement officials and observers, for identifyingimprovement areas.
o Review immediately after the rehearsal.
On-site Emergency Plan Rehearsal Assessment by observers :
o Communicationo Response Timeo Action by
o Plant Staffo F&S Staffo Security
o Assembly Pointo Use of PPEs
contd…
On-site Emergency Plan Rehearsal Assessment by observers is done w.r.t.:
o Transport
o ECC (Emergency Control Centre)
o Mutual Aid
Off-site Emergency Plan
Rule 14 (1): It shall be the duty of the concernedauthority as identified in Column 2 of Schedule 5to prepare and keep up-to-date an adequate off-site emergency plan containing particularsspecified in Schedule 12 and detailing howemergencies relating to a possible major accidenton that site will be dealt with and in preparingthat plan the concerned authority shall consultthe occupier and such other persons as it maydeem necessary.
The Manufacture, Storage and Import of Hazardous
Chemical Rules, 1989
The Responsibility – provisions of the constitution
Column 2 of Schedule 5; Sl. No. 9:
Concerned authority: District Collector orDistrict Emergency Authority designated bythe State Government (for preparation ofoff-site emergency plans as per rule 14.).
Rule 14 (4): The concerned authority shallensure that a rehearsal of the off-siteemergency plan is concluded at least oncein a calendar year.
Offsite Emergency Plan additionally consists of following information:
Shelters Details
Telephone Numbers of District / Civil Authorities
Evacuation plan
Ammonia Leakage scenario
Fire & Safety drill
2013 IFA Global Safety Summit & Technical Symposium
Fire & Rescue Drill