DESCRIPTION
Welcome page. Outline. Introduction Status on each role Special topic. Brief Intro. Team 2 McCabe C yclomatic Complexity A nalyzer. Planning. Planning. Team Earned Value. Why are we behind schedule. The team didn’t close some of the 1st week tasks because the plan was delayed - PowerPoint PPT Presentation
Citation preview
1
Welcome page
Outline- Introduction- Status on each role- Special topic
2
3
Brief Intro
Team 2
McCabe Cyclomatic Complexity Analyzer
4
Planning
5
Planning
6
Team Earned Value
7
Why are we behind schedule
• The team didn’t close some of the 1st week tasks because the plan was delayed
• Some examples are:– Risk meeting X 6– LogD-LogT week_1 X6
8
Team Planned Hours versus Actual Hours
9
Team SUMS Estimates versus Actual
Main Loop DLD Lines LOC Counter DLD Lines
McCabe Complexity DLD Lines
Internal Data Binding DLD Lines
Coupling/Strength Ratio DLD Lines
Report DLD Lines0
10
20
30
40
50
60
70
SUMS Estimate vs. Actual
EstimatedActual
10
How are we spending our time?
Manage
ment a
nd Misc
ellan
eous
Launch
and St
rateg
y
Planning
Require
ments
System
Test P
lan
Require
ment In
spection
High Le
vel Desi
gn
Integrati
on Test P
lan
High Le
vel Desi
gn In
specti
on
Detailed
Design
Detailed
Design
Review
Test D
evelopmen
t
Detailed
Design
Insp
ection
Code
Code Rev
iew
Compile
Code Insp
ection
Unit Test
Build an
d Integ
ration Te
st
System
Test
Documentati
on
Postmorte
m0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
Estimate vs Actual by Phase
EstimateActual
11
Quality
12
AnalysisReport DLD
Coupling Strenth Ratio
InternalDataBinding
LOCCounter
MainLoop
McCabe DLD v2
0 3 6 9
DLD defect Removal rate Goal: >3 defects/hour
DLD defects/hour
Part
s of t
he S
yste
m
Quality - Goal
• In 66% of inspections we meet our goal to find more than 3 defects/hour
Goal
13
Quality - Inspections
W2 W3 W50
5
10
15
Average #defects found in each inspection by type
Doc-InformationDoc-StyleDoc-Typos
Inspection Week
Aver
age
Num
ber o
f Def
ects
• We were able to almost eliminate typo defects• We get an overall defect reduction over time
14
Quality - goal
• Almost all inspections achieved our goal
AnalysisReport DLD
Coupling Strenth Ratio
InternalDataBinding
LOCCounter
MainLoop
McCabe DLD v2
0 100 200
153 ps_code/h
104 ps_code/h
93 ps_code/h
72 ps_code/h
45 ps_code/h
92 ps_code/h
DLD Inspection Goal: < 100 pseudo-code lines/hour
DLD pseudo-code per Hour
Part
s of t
he S
yste
m
Goal
15
Main Loop
Coupling/Strength Ratio
Report
Internal Data Binding
McCabe Complexity
LOC Counter
0.0 0.5 1.0 1.5 2.0 2.5
Develop. time ratio goal: DLD Insp/DLD > 0.5
Ratio
Part
s of t
he S
yste
mQuality - Goal
• In 66% of inspections we meet our goal to spend at least half of DLD time inspecting it.• Concern: are we spending too much? Maybe the goal must be upper bounded too.i.e.
0.5<x<1
Goal
16
Process
17
Process• Process Analysis
– Meeting Process• 75% of times, the planned time for the meetings have been exceeded.
• But, we have improved the meeting process comparing to the first cycle.
– Risk Management Process• Risk Management formally started during the 2nd cycle• Planned :Risk Meetings on every Status Meeting• Actual: Risk Meetings 50 % of times
Cycle Amount of time slipped
1st cycle 55.1%2nd cycle 25.8%
18
Development
19
Development contd. Development Report
Task Function Progress Estimate LOC Actual LOC Reuse
Req LOC counter 210 168
Req McCabe Finished the detailed design
152 N/A
Req Internal data binding Finished the detailed design
150 N/A
Req External data binding 178.5 136
Req Coupling Strength Ratio 20 32
Additional Report 50 140
Additional File Parser 120 68 Reused part
20
Support
21
Top RisksCondition Consequence Probab. Impact
We did not meet our cycle one code deliverables
We might not be able to deliver all must-have requirements at end of cycle 2.
High High
Mitigation: Review the quality plan; Increase inspections efficiency for the functionalities developed; Renegotiate scope with the client.
We will only know that we missed our quality goal at the end of cycle 2
We might miss our quality plan. Medium High
Mitigation: Change the quality plan to include ratios for the defects found in unit test and system test; this will allow us know if a code meets our quality standards before the end
We are not basing our estimations on solid data We might miss the estimates. Medium Medium
Mitigation: Use Cycle 1 data; Use Wideband Delphi; Ask instructor for information.
22
Configuration and ReuseCentral Repository - Subversion
Document and Code conventions
After Code Baseline for client delivery – only Configuration Manager is allowed to change code
PSP LOC Counter – 72 LOC
File Parser developed in the first cyle – 68 LOC
Configuration Reuse
23
Special Topic: Peer Reviews
Helped us to:Objectively understand roles’ goals Promote team jellying (candid environment)
24
Special Topic: Peer Reviews. cont
Great for constant improvement We want to get better so we measure
“You cannot improve what you cannot measure” (Rosso-Llopart, 2009)
25
Questions?
26
Backup Slides
27
Team Earned Value By Week
28
Role: Team Lead
29
Role: Process Manager
30
Process• Process Analysis
– Meeting Process• Meetings: LAUNCH, STRAT, PLANNING, Weekly STATUS• 2 of 14 meetings have no planned time for the entire project.• But, none of meetings for the 2nd cycle had no planned time. • 75% of times, the planned time for the meetings have been exceeded.• But, we have improved the meeting process comparing to the first cycle.
– Risk Management Process• Risk Management starts from the 2nd cycle.• 4 risks • Planned to have Risk Meetings after every Status Meeting, but actually have the Risk Meetings
50 % of times
Cycle Amount of time slipped
1st cycle 55.1%2nd cycle 25.8%
31
Process
• PIPs– 3 PIPs from the 1st cycle
PIP No. Problem Description Proposal Description
Status
1 It was not easy for all the team members to follow the processes exactly in the same way.
Make checklists for the inspection and the usage of SVN
Done
2 Most of defects among Document are typo, which are not actual defects.
Make sub-categorization of the defect types
Done
3 There are the duplication of the files in the subversion server.
Make the baseline of SVN
OnGoing
32
Quality Overview
• Our inspections are meeting our quality goals• Adjust quality goals according with our current
data• It’s dificult to track quality without updated
data
33
Development contd. Strategy Changes• Task planning– Adjust plan according to Cycle 1 data
• Detailed Design– Write pseudo codes in the design– Designers = implementer
• Experiments on critical functionality to design more objectively/accurately
• Alternative Strategy– McCabe: use tree parser
34