28
Welcome all of you participating the first workshop on MFE development strategy in China

Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

Welcome all of you

participating the first workshop on

MFE development strategy in China

Page 2: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

Tasks and working schedule

of

China MFR integration design group

Y. X. Wan

School of Nuclear Science and Technology (USTC)

Institute of Plasma Physics, CAS

5-6 January 2012

Beijing China

Page 3: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

Background information

Page 4: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

ITER in China:

in kind contribution

related domestic projects

HL-2A tokamak in SWIP;

HT-7 and EAST superconducting tokamak in ASIPP;

University Programs: theory, experiments and

education.

The current fusion research projects

Page 5: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

Budget for ITER-CN (10 years)

Domestic sub-project for:

Improving the basic

conditions;

Development for key tech.

Fusion materials;

Theory and education;

Reactor intergration

design.

ITER in China

Total is 0.6 billion US dollars ~ 0.6 billion US dollars

Contribution by in kind

Page 6: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

2. TF Magnet Conductor

215.0 (kIUA)

CN: 7%

6. Blanket-First Wall

87.0:(kIUA)

CN : 10%

5. Magnet Supports

22.85:(kIUA)

CN : 100%

3. Correction Coils

5.51:(kIUA)

CN : 100%

9. Gas Injector Valve Boxes + Glow

Discharge Cleaning Conditioning

7.7: (kIUA)

CN : 88%

11. AC/DC Converters

82.2: (kIUA)

CN : 62%

12. Diagnostics

137.5: (kIUA)

CN : 3.3%

7. Blanket-Shield Block

58.0:(kIUA)

CN : 40%

4. Feeders

48.38: (kIUA)

CN : ~100%

1. Poloidal Magnet Conductors

74.25 (kIUA)

CN: 69%

8. High Voltage Substation Materials

21.0: (kIUA)

CN : 100%

10.Conductor of CC & FEEDER

CN: 50%

CN contributions in kind

Page 7: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

HL-2A tokamak-present status• R: 1.65 m

• a: 0.40 m

• Bt: 1.2~2.8 T

• Configuration:

Limiter, LSN divertor

• Ip: 150 ~ 480 kA

• ne: 1.0 ~ 6.0 x 1019 m-3

• Te: 1.5 ~ 5.0 keV

• Ti: 0.5 ~ 1.5 keV

Auxiliary heating:

ECRH/ECCD: (3+2 )MW

(6/68 GHz/500 kW/1 s)

modulation: 10~30 Hz; 10~100 %

NBI(tangential): 1.5 MW

LHCD: 1 MW

(2/2.45 GHz/500 kW/1 s)

Fueling system (H2/D2):

Gas puffing (LFS, HFS, divertor)

Pellet injection (LFS, HFS)

SMBI (LFS, HFS)LFS: f =1~80 Hz, pulse duration > 0.5 ms

gas pressure < 3 MPa

HL-2ASWIP Status of HL-2A

Page 8: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

R = 1.22m, a = 0.27m

Ip = 100~250 kA (250)

BT = 1~2.5T(2.5)

ne = 1~8x1013cm-3 (6.5)

Te = 1~5 KeV (4.5)

Ti = 0.2~1.5K eV (1.5)

ICRF:

f = 15~30MHz, P = 0.3MW(0.35)

f = 30~110MHz, P = 1.5MW

LHCD:

f = 2.45GHz, P = 1.2MW(0.8)

Pellet injector

Supersonic beam injection

Main Goal: Advanced Steady-state

operation and related physics

( Ip > 100kA, Ne>1.0x13cm-3, t=60s)

HT-7 Superconducting Tokamak in ASIPP

Page 9: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

EAST Superconducting Tokamak in ASIPP

Page 10: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

• More than 10 universities are involved in

10-15 tasks (40-60M$/per year) with 200 Staff

200 students in MCF project;

• 3 theoretical research centers (Hefei, Zhejiang,

Beijing )

• School of NST in USTC has been created:

100 undergraduate/year

100-150 (MS+Ph.D)/year

KT-5 in USTC

SUNIST in Tsinghua Univ.

J-TEXT in Huazhong Univ.

University programs

Page 11: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

Why China joint ITER ?

What is the next step and goals

of fusion research in China ?

Very Strong Support with Questions from Top Leaders and Public

Page 12: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

Budget for ITER-CN (10 years)

Domestic sub-project for:

Improving the basic

conditions;

Development for key tech.

Fusion materials;

Theory and education;

Reactor intergration

design.

ITER in China

Total is 0.6 billion US dollars ~ 0.6 billion US dollars

Contribution by in kind

Page 13: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

China MFR integration design group has been founded

Page 14: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

Members

of the MFR integration design group

Wan,Yuanxi USTC, ASIPP

Li, Jiangang ASIPP

Liu, Yong SWIP

Wang, Xiaolin CAEP

Ye, Minyou USTC

Wan, Baonan ASIPP

Duan, Xuerun SWIP

Yu, Qin quang Germany

Zhuang, Ge HUST

Yang, Qinwei SWIP

Wu, Songtao ITER

Li, Qiang SWIP

Weng, Pede ITER, ASIPP

Guo, Huoyang USA

Feng, Kaiming SWIP

Wan, Farong BUST

Fu, Pen ASIPP

Wu,Yican USTC, ASIPP

Gong, Jun INS

Page 15: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

Now - 2014:

providing two options of engineering concept design of

CFETR which should include in:

• Missions

• Type

• Main physics basis

• Main technique basis to be taken

• The concept engineering design for all sub-systems• Important R&D items

• Budget & Schedule and Location

• Management system

2015: proposal to government to try to get permission

for construction;(because the preliminary first proposal has been ranked No.1 in the

national next 5Y plan—started at 2016)

Tasks of the National MFR Integration Design Group

Page 16: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

Within next 6 months: the mission, type and main physic,

technic & engineering basis for one option of CFETR

should be determined

The second option also should be determined preliminarily

From medial of this year the activities of the conceptual

desing both on physics and engineering will be started

It is hoped that at around end of 2014 or ealy of 2015 the

engineering conceptual desing of CFETR can be completed.

The proposal for constructon of CFETR should be sent to

government to try to get permission at 2015;

Working scheduleof the National MFR Integration Design Group

Page 17: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

Mission:

It is a series of workshops;

It is expected that the workshops will give us the

advisory suggestion, opinion, comments or proposals for

next step of MFE development in China;

The two design options will be determined by our

design group finally after two or three workshops and

series of internal expert meetings within next six months

from now.

About this workshops

Page 18: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

Topic-1: Suggestion or advisory opinion on what the mission and strategy of

MFE development in China should or could be.

Topic-2: Tokamaks option

• Types (AT, ST, Hybrid?)

• The basis of physics can or should be taken.

• The basis of technologies can or should be taken.

• Challenges and risks

Topic-3: Alternative options

• Stellarator ?

Types

The basis of physics can or should be taken.

The basis of technologies can or should be taken.

Challenges and risks

• Any Other attractive options?

About this workshops

Page 19: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

DEMO

ITER

FPP

2015~2025 2030~2040 2050Now~2015

Concept & Eng. design

EAST

JET

What is Possible Road map

of Fusion to DEMO in China

HL-2A

Under discussion final option ?

?

Page 20: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

Welcome you to give us advisory

suggestion, opinion, comments or

proposals on next step of MFE

development in China!!

Page 21: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

Thanks !

Page 22: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

DEMO

ITER

FPP

2015~2025 2030~2040 2050Now~2015

Hybrid or what ?Concept & Eng. design

EAST

JET

What is Possible Road map

of Fusion to DEMO in China

HL-2A

Under discussion final option ?

?~15 yr earlier

Page 23: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

Integration Design Group

for Magnetic Confinement Fusion Reactor

1. Layout Design and System

Integration

2. Plasma Physics and Technology

3. Superconducting Magnet and

Cryostat System

4. Vacuum Vessel & Vacuum

System

5. In-vessel Components & Blanket

System

6. Heating & Current Drive

System

7. Diagnosis & CODAC

8. Electrical Power & Control

System

9. Fuel Circulation System &

Waste Disposal

10. Radiation Protection & Safety

11. Remote Control and

Maintenance System

12. Auxiliary Supporting System

13. Project Management

Page 24: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

Fusion support system in China

NSFC

Premier

CNNC MOE

ITER and Related

CASMOST

National project

NDRC

byFusion

supported

National Development and Reform Commission – NDRC

Ministry of Science and Technology – MOST

Ministry of Education – MOE

Chinese Academy of Sciences – CAS ;

China National Nuclear Corporation – CNNC

Natural Science Foundation of China – NSFC

Page 25: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

G-IV Reactor:

Fast Breeder

65MW (now)

800MW(2015)

HTGR

10MW (now)

200MW (2015)

Melt-salt fission (100MW at 2020)

Z-pinch and Laser hybrid reactor configurations also proposed

ADS starts for NWT

Competitions to Fusion in China

Page 26: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

SS operation and related issues:

SS CD and Heating

SSO control technologies;

Disruption mitigation and prevented

T and it’ self – sustainable

Materials

Improving confinement further

Key issues for fusion energy research

Page 27: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working

Practical energy resources should be SSO !!

Efusion∝ ( n × T ×τE ) × t burning

Steady-State Operation (SSO)

Pfusion∝ n﹡T﹡τE > 10 21 m-3﹡s﹡kev

Page 28: Welcome all of you participating the first workshop on MFE ...€¦ · Welcome all of you participating the first workshop on MFE development strategy in China . Tasks and working