Welcome. NIH Bethesda Campus Master Plan And Environmental Impact Statement National Environmental Policy Act Scoping Meeting February 28, 2012. NIH Representatives and Consultants. NEPA Management Valerie Nottingham , Chief, Environmental Quality Branch - PowerPoint PPT Presentation
Citation preview
1
Welcome
NIH Bethesda Campus Master Plan And
Environmental Impact Statement
National Environmental Policy ActScoping Meeting
February 28, 2012
2
NIH Representatives and Consultants
NEPA Management Valerie Nottingham, Chief, Environmental Quality Branch
Division of Environmental Protection/ORF/NIHMark Radtke, Environmental Protection Specialist
Division of Environmental Protection/ORF/NIH
Facilities Planning Ricardo C. Herring, Director,
Division of Facilities Planning /ORF/NIHPhillip Neuberg, Chief, Facility Planning and Programming Branch
Division of Facilities Planning /ORF/NIH
EIS Consultant Sara O’Neil-Manion, Principal, O’Neil & Manion Architects P.A.Demian Wincele, Senior Project Geologist, ECS Mid-Atlantic, LLC
3
NIH Bethesda Campus Master Plan would guide campus development over a 20-year period.
A Plan would assure that research and research support facilities are provided at the appropriate time, as need dictates, and as resources permit, taking into consideration local and community planning objectives.
The Master Plan
4
Why Does the NIH Bethesda Campus Need a Master Plan?
A Master Plan would establish a physical framework which:
• Allows NIH to continue to fulfill its biomedical research needs by defining the program based on research goals, and priorities.
• Results in a consistent and appropriate physical appearance for the site.
• Is in accord with local and regional planning and environmental objectives.
• Defines the priorities for new building construction and renovation of current facilities.
• Ensure accordance with Department of Health and Human Services facility planning policy.
5
Master Planning Process
Vision•Formulate goals and planning principles
Data•Data collection
Concept•Develop Preliminary Master Plan for agency and public review
Master Plan
•Develop Master Plan•Issue Draft NIH Bethesda Campus Master Plan for agency and public review•Issue Final NIH Bethesda Campus Master Plan
Master Plan/EIS Timeline
Assemble planning information on the Bethesda Campus and Winter 2011 project campus population and space
Issue Notice of Intent to Prepare EIS and Master Plan Winter 2012
Hold Scoping Meeting to Receive Comments and Concerns February 28, 2012 Comments will also be received during the 45-day public comment period ending March 26, 2012.Prepare Draft Master Plan and Draft EIS Spring 2012
Hold Draft EIS Public Meeting Summer 2012 Receive Comments on Draft EIS and Master Plan
Prepare Final EIS Fall 2012
Issue Record of Decision Winter 2012/2013
6
7
NIH Mission
The NIH mission is to seek fundamental knowledge about the nature and behavior of living systems and the application of that knowledge to enhance health, lengthen life, and reduce the burdens of illness and disability.
8
Master Plan Goals
Goal 1: Foster innovative research to improve the nation’s health.
Goal 2: Support the evolving requirements for biomedical research
Goal 3: Provide secure and supportive campus for staff & visitors
Goal 4: Respect the integrity of the surrounding community.
Goal 5: Protect the environment of campus and the region.
Goal 6: Foster communication about NIH goals and policies.
Goal 7: Meet the Federal Real Property Council’s PerformanceMeasures
9
Current Land Use
Land Use Acres Percentage of SiteBuffer Zone 66 21%Open Space 115 37%Sub Total Open Space 181 58%Parking 32 10%Roads/Walks/Service 54 18%Sub Total Circulation 86 28%Buildings 44 14%Total Land Area 310 100%
Potential Areas for Redevelopment
10
Replace Building 31
Adapt and reuse historic laboratories with administrative space
Re-locate Building 21
Re-siting the Animal Research Center from south of the Central Utility Plant
Replace Building 12 & 12 A with new laboratory and support space
Replace old buildings with new laboratories, parking garages and support space
Improve pedestrian safety
Improve use of mass transit
11
Master Planning Issues
The Master Plan will study and address:• Campus Development• Land Use Compatibility• Traffic• Parking• Security• Noise• Lighting• Utilities• Other issues to be determined
EIS Consultants
ECS MID-ATLANTIC, LLC
12
O’NEIL & MANION ARCHITECTS P.A.
Corporate Background and NEPA Experience
• ECS, Mid-Atlantic, LLC is one of several consulting/contracting firms on subcontract to O’Neil & Manion Architects P.A.
• Our interdisciplinary team includes scientists, industrial hygienists, engineers, and planners
• We offer a wide range of NEPA and other environmental services– Federal NEPA Environmental Assessments for construction and demolition
projects– Programmatic NEPA support to various federal agencies (DoD, FBI, GSA)– Communications support (public meetings, coordinating public comments)
• ECS staff have prepared and reviewed several EAs, EISs, and EIRs– Examples include the Federal Reserve Building, University of Mary Washington,
and Northern Virginia Community College Campus
• ECS and other consulting firms will coordinate to perform analyses independently of NIH
13
Scope and Content of an EIS
Notice of Intent & Scoping
Draft EIS Public Review & Comment Final EIS Public Availability
and ROD
•EIS Content:
Purpose and need
Alternatives being considered
Affected environment
Consequences
Mitigation measures
Cumulative impacts14
ECS’s Technical Approach for Preparing an EIS
• Objectively evaluate reasonable alternatives
• Perform environmental analyses– Use existing, relevant studies and/or data– Conduct site investigations– Apply modeling tools– Consult with subject matter experts– Consult with federal, state, and local agencies
• Identify mitigation measures to minimize impacts
• Perform regulatory analyses to identify compliance requirements
• Consider and respond to public comments
15
16
What is NEPA?
• National Environmental Policy Act (1969)
• Defines procedural elements– The NEPA Process– Council on Environmental Quality regulations 40 CFR 1500-1508– Department of Health and Human Services General Administration Manual
Chapter 30, Environmental Protection
• Purpose of this Environmental Impact Statement for the NIH Master Plan is to examine potential impacts and mitigation
17
Why Perform NEPA?
• It is Federal Law
• Allows for the agency to consider the environmental impacts of its actions
• Allows for public participation
• Ensures the agency makes an informed decision on its action
18
NEPA Process
• Issue Notice of Intent (NOI) • Hold Public Scoping Meeting • Issue Draft EIS
- Copies of draft are given to the Environmental Protection Agency and
a Notice of Availability (NOA) is posted in the Federal Register- There is at least a 45 day comment period on the draft EIS
• Hold public comment meeting on DEIS• Issue Final EIS
- The final EIS must respond to relevant comments received from other
agencies and the public- The final EIS is given to the EPA and a NOA is published in the
federal register- 30 day waiting period
• Record of Decision- Final step for the EIS process
19
Effective Public Commenting
You can make a difference
Comments may be the most important contribution from citizens
Effective Comments:• Early in the NEPA process• Clear, concise and relevant to the analysis• Solution oriented and provide specific examples• Suggest additional alternatives• Suggest sources of relevant data or information for consideration
How Do I Get Information on the Bethesda Campus Master Plan and Provide Comments
on the EIS?
Scoping comments should be directed to:
Valerie NottinghamChief, Environmental Quality BranchDivision of Environmental Protection
National Institutes of Health, ORFB13/2S11, 9000 Rockville Pike,
Bethesda, Maryland 20892
telephone 301-496-7775
e-mail: [email protected]
20