ODOT. WELCOME!. District 1 & District 2. Purpose of toDAY’s meeting. Provide a project overview Present Update for HAN-224-11.81 Present MOT for HAN-75-14.39 & Proposed Roundabouts on Lima Ave. Present D2 update on I-75 north of Findlay Listen to your input. HAN-224-11.81. - PowerPoint PPT Presentation

Citation preview

Page 1: WELCOME!

WELCOME!

October 28, 2013

ODOTDistrict 1

& District 2

Page 2: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v2 October 28, 2013

PURPOSE OF TODAY’S MEETING

Provide a project overview Present Update for HAN-224-11.81 Present MOT for HAN-75-14.39 &

Proposed Roundabouts on Lima Ave. Present D2 update on I-75 north of Findlay Listen to your input

Page 3: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v3 October 28, 2013

HAN-224-11.81

$11.5 Million funded with Turnpike Funding

Independent project

2014 construction

IR-75/US-224 interchange status:

Page 4: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v4 October 28, 2013

PROJECT OVERVIEW – HAN-224-11.81

Reconstruct of I-75 interchange with USR 224

Reconstruction and widen of bridge Adding lanes Turn Lanes on and off bridge Replacing existing signals

Page 5: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v5 October 28, 2013

MAINTENANCE OF TRAFFIC HAN-224-11.81

Part-width construction One lane in each direction Closures/Detours: Short duration closures of ramps and USR

224 Short term use of ramps to maintain I-75

traffic

Page 6: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v6 October 28, 2013

PROJECT OVERVIEW – HAN-75-14.39

Page 7: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v7 October 28, 2013

PROJECT OVERVIEW – HAN-75-14.39

Construction scheduled for 2017 but could begin as early as 2015

Reconstruct & widen I-75 to 6 lanes New Right-of-Way Required Began to purchase R/W Feb. 2013 Current Estimated Construction Cost: $150

Million

Page 8: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v8 October 28, 2013

PROJECT OVERVIEW – HAN-75-14.39

Harrison St overpass reconstructed Lima Ave interchange reconstructed with

US68/SR15/IR75 interchange New Service Rd near ODNR Roundabouts on Lima Ave at ramps

Page 9: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v9 October 28, 2013

PROJECT OVERVIEW – HAN-75-14.39

The following overpasses will not be replaced as part of this project:

CR 88 – Sandusky Street SR 12 – Main Cross Street US 224 – Construction 2014 CR 95 – Bigelow Avenue CR 99

Page 10: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v10 October 28, 2013

MAINTENANCE OF TRAFFIC HAN-75-14.39

MOT is preliminary at this time Project separated into Four Zones 3 MOT Methods Maintaining 2 lanes each direction on I-75

and 1 lane each direction on US68/SR15 Hybrid Method – System to System

Interchange

Page 11: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v11 October 28, 2013

MAINTENANCE OF TRAFFIC HAN-75-14.39 – MOT ZONES

Page 12: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v12 October 28, 2013

MOT - TYPICAL SECTIONS(ZONE 3 – PART-WIDTH)

Page 13: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v13 October 28, 2013

HAN-75-14.39 – HYBRID MOT

Page 14: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v14 October 28, 2013

I-75 NORTH TO US68/SR15 & LIMA AVE

Page 15: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v15 October 28, 2013

I-75 SOUTH TO US68/SR15 & LIMA AVE

Page 16: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v16 October 28, 2013

US68/SR15 & LIMA AVE TO I-75 NORTH

Page 17: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v17 October 28, 2013

US68/SR15 & LIMA AVE TO I-75 SOUTH

Page 18: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v18 October 28, 2013

LIMA AVE TO & FROM US68/SR15

Page 19: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v19 October 28, 2013

LIMA AVE TO & FROM US68/SR15

Page 20: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v20 October 28, 2013

I-75 AREA NORTH OF US68/SR15

Page 21: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v21 October 28, 2013

LIMA AVE - ROUNDABOUTS

Page 22: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v22 October 28, 2013

I-75 NORTH OF FINDLAY

Multiple projects funded with turnpike revenue

Reconstruction & widen of I-75 from two to three lanes in each direction

From County Road 99 in Hancock County to I-475 in Wood County

Distance of 31.6 Miles Estimated Total Cost: $220 Million

Page 23: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v23 October 28, 2013

I-75 NORTH OF FINDLAY

Page 24: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v24 October 28, 2013

I-75 NORTH OF FINDLAY Widening will take place in the

existing median Median width 84’ for the north

2/3 of the project length and 50’ - 60’ for south 1/3 of the project

Cable barrier north of Cygnet Road, concrete barrier south of Cygnet Road

Two lanes of traffic will be maintained throughout the duration of the project

Page 25: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v25 October 28, 2013

I-75 NORTH OF FINDLAY: North Baltimore

CR 95 to Oil Center Rd.

Design Build Project

Estimated Cost: $55M

Page 26: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v26 October 28, 2013

I-75 NORTH OF FINDLAY: Oil Center Rd. to Portage Rd.

Estimated Cost: $50M

Page 27: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v27 October 28, 2013

I-75 NORTH OF FINDLAY: Bowling Green

Portage Rd. to Devil’s Hole Rd. Estimated Cost: $55M

Page 28: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v28 October 28, 2013

I-75 NORTH OF FINDLAY: Bowling Green – US 6 & I-75 ABC

Page 29: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v29 October 28, 2013

I-75 NORTH OF FINDLAY: Bowling Green

Devil’s Hole Rd. to I-475 Estimated Cost: $60M

Page 30: WELCOME!

w w w. t r a n s p o r t a 6i o n . o h i o . g o v30 October 28, 2013

I-75 NORTH OF FINDLAY: Construction: Start 2014 Construction complete: 2016 I-75 North of Findlay District 2 Contacts:

– Aaron Behrman, ODOT District 2, Design Engineer• Phone No.: (419) 373-4402

– Mike Stormer, ODOT District 2, Planning Engineer• Phone No.: (419) 373-4472