ODOT. WELCOME!. District 1 & District 2. Purpose of toDAY’s meeting. Provide a project overview Present Update for HAN-224-11.81 Present MOT for HAN-75-14.39 & Proposed Roundabouts on Lima Ave. Present D2 update on I-75 north of Findlay Listen to your input. HAN-224-11.81. - PowerPoint PPT Presentation
Citation preview
WELCOME!
October 28, 2013
ODOTDistrict 1
& District 2
w w w. t r a n s p o r t a 6i o n . o h i o . g o v2 October 28, 2013
PURPOSE OF TODAY’S MEETING
Provide a project overview Present Update for HAN-224-11.81 Present MOT for HAN-75-14.39 &
Proposed Roundabouts on Lima Ave. Present D2 update on I-75 north of Findlay Listen to your input
w w w. t r a n s p o r t a 6i o n . o h i o . g o v3 October 28, 2013
HAN-224-11.81
$11.5 Million funded with Turnpike Funding
Independent project
2014 construction
IR-75/US-224 interchange status:
w w w. t r a n s p o r t a 6i o n . o h i o . g o v4 October 28, 2013
PROJECT OVERVIEW – HAN-224-11.81
Reconstruct of I-75 interchange with USR 224
Reconstruction and widen of bridge Adding lanes Turn Lanes on and off bridge Replacing existing signals
w w w. t r a n s p o r t a 6i o n . o h i o . g o v5 October 28, 2013
MAINTENANCE OF TRAFFIC HAN-224-11.81
Part-width construction One lane in each direction Closures/Detours: Short duration closures of ramps and USR
224 Short term use of ramps to maintain I-75
traffic
w w w. t r a n s p o r t a 6i o n . o h i o . g o v6 October 28, 2013
PROJECT OVERVIEW – HAN-75-14.39
w w w. t r a n s p o r t a 6i o n . o h i o . g o v7 October 28, 2013
PROJECT OVERVIEW – HAN-75-14.39
Construction scheduled for 2017 but could begin as early as 2015
Reconstruct & widen I-75 to 6 lanes New Right-of-Way Required Began to purchase R/W Feb. 2013 Current Estimated Construction Cost: $150
Million
w w w. t r a n s p o r t a 6i o n . o h i o . g o v8 October 28, 2013
PROJECT OVERVIEW – HAN-75-14.39
Harrison St overpass reconstructed Lima Ave interchange reconstructed with
US68/SR15/IR75 interchange New Service Rd near ODNR Roundabouts on Lima Ave at ramps
w w w. t r a n s p o r t a 6i o n . o h i o . g o v9 October 28, 2013
PROJECT OVERVIEW – HAN-75-14.39
The following overpasses will not be replaced as part of this project:
CR 88 – Sandusky Street SR 12 – Main Cross Street US 224 – Construction 2014 CR 95 – Bigelow Avenue CR 99
w w w. t r a n s p o r t a 6i o n . o h i o . g o v10 October 28, 2013
MAINTENANCE OF TRAFFIC HAN-75-14.39
MOT is preliminary at this time Project separated into Four Zones 3 MOT Methods Maintaining 2 lanes each direction on I-75
and 1 lane each direction on US68/SR15 Hybrid Method – System to System
Interchange
w w w. t r a n s p o r t a 6i o n . o h i o . g o v11 October 28, 2013
MAINTENANCE OF TRAFFIC HAN-75-14.39 – MOT ZONES
w w w. t r a n s p o r t a 6i o n . o h i o . g o v12 October 28, 2013
MOT - TYPICAL SECTIONS(ZONE 3 – PART-WIDTH)
w w w. t r a n s p o r t a 6i o n . o h i o . g o v13 October 28, 2013
HAN-75-14.39 – HYBRID MOT
w w w. t r a n s p o r t a 6i o n . o h i o . g o v14 October 28, 2013
I-75 NORTH TO US68/SR15 & LIMA AVE
w w w. t r a n s p o r t a 6i o n . o h i o . g o v15 October 28, 2013
I-75 SOUTH TO US68/SR15 & LIMA AVE
w w w. t r a n s p o r t a 6i o n . o h i o . g o v16 October 28, 2013
US68/SR15 & LIMA AVE TO I-75 NORTH
w w w. t r a n s p o r t a 6i o n . o h i o . g o v17 October 28, 2013
US68/SR15 & LIMA AVE TO I-75 SOUTH
w w w. t r a n s p o r t a 6i o n . o h i o . g o v18 October 28, 2013
LIMA AVE TO & FROM US68/SR15
w w w. t r a n s p o r t a 6i o n . o h i o . g o v19 October 28, 2013
LIMA AVE TO & FROM US68/SR15
w w w. t r a n s p o r t a 6i o n . o h i o . g o v20 October 28, 2013
I-75 AREA NORTH OF US68/SR15
w w w. t r a n s p o r t a 6i o n . o h i o . g o v21 October 28, 2013
LIMA AVE - ROUNDABOUTS
w w w. t r a n s p o r t a 6i o n . o h i o . g o v22 October 28, 2013
I-75 NORTH OF FINDLAY
Multiple projects funded with turnpike revenue
Reconstruction & widen of I-75 from two to three lanes in each direction
From County Road 99 in Hancock County to I-475 in Wood County
Distance of 31.6 Miles Estimated Total Cost: $220 Million
w w w. t r a n s p o r t a 6i o n . o h i o . g o v23 October 28, 2013
I-75 NORTH OF FINDLAY
w w w. t r a n s p o r t a 6i o n . o h i o . g o v24 October 28, 2013
I-75 NORTH OF FINDLAY Widening will take place in the
existing median Median width 84’ for the north
2/3 of the project length and 50’ - 60’ for south 1/3 of the project
Cable barrier north of Cygnet Road, concrete barrier south of Cygnet Road
Two lanes of traffic will be maintained throughout the duration of the project
w w w. t r a n s p o r t a 6i o n . o h i o . g o v25 October 28, 2013
I-75 NORTH OF FINDLAY: North Baltimore
CR 95 to Oil Center Rd.
Design Build Project
Estimated Cost: $55M
w w w. t r a n s p o r t a 6i o n . o h i o . g o v26 October 28, 2013
I-75 NORTH OF FINDLAY: Oil Center Rd. to Portage Rd.
Estimated Cost: $50M
w w w. t r a n s p o r t a 6i o n . o h i o . g o v27 October 28, 2013
I-75 NORTH OF FINDLAY: Bowling Green
Portage Rd. to Devil’s Hole Rd. Estimated Cost: $55M
w w w. t r a n s p o r t a 6i o n . o h i o . g o v28 October 28, 2013
I-75 NORTH OF FINDLAY: Bowling Green – US 6 & I-75 ABC
w w w. t r a n s p o r t a 6i o n . o h i o . g o v29 October 28, 2013
I-75 NORTH OF FINDLAY: Bowling Green
Devil’s Hole Rd. to I-475 Estimated Cost: $60M
w w w. t r a n s p o r t a 6i o n . o h i o . g o v30 October 28, 2013
I-75 NORTH OF FINDLAY: Construction: Start 2014 Construction complete: 2016 I-75 North of Findlay District 2 Contacts:
– Aaron Behrman, ODOT District 2, Design Engineer• Phone No.: (419) 373-4402
– Mike Stormer, ODOT District 2, Planning Engineer• Phone No.: (419) 373-4472
w w w. t r a n s p o r t a 6i o n . o h i o . g o v31 October 28, 2013