Upload
daniella-parks
View
216
Download
2
Tags:
Embed Size (px)
Citation preview
WELCOME
11th Meeting of the National Food Security Mission Executive Committee
(NFSM-EC)
18 January, 2013
DEPARTMENT OF AGRICULTURERAJASTHAN, JAIPUR
Agenda No. 1- Crop-wise comparative Productivity 2006-07 to 2012-13
(Area lac ha., Prod. lac tones & Productivity kg/ha)
Crop2006-07 2007-8 2008-09 2009-10
A P Y A P Y A P Y A P Y
Kharif Pulses
Moong 7.51 2.71 361 10.59 4.16 393 8.86 3.73 421 9.23 4.40 48
Moth 11.51 1.91 166 12.52 3.93 314 12.21 3.25 266 12.73 3.97 31
Cowpea 1.10 0.45 409 1.26 0.45 358 1.18 0.62 529 1.24 0.12 94
Urd 1.08 0.32 293 1.45 0.77 530 1.37 0.41 296 1.16 0.31 263
Arhar 0.19 0.09 501 0.18 0.16 878 0.19 .0.15 770 0.18 0.07 380
Others 0.05 0.03 561 0.03 0.03 920 0.03 0.01 400 0.02 0.001 19
Total 21.43 5.50 257 26.03 9.50 365 23.84 8.17 343 24.57 1.32 54
Rabi Pulses
Gram 10.11 8.73 863 12.31 5.74 466 12.59 9.81 779 8.84 5.35 605
Other 0.49 0.60 1226 0.34 0.28 842 0.29 0.28 960 0.30 0.29 975
Total 10.60 9.33 880 12.65 6.03 476 12.88 10.08 783 9.14 5.64 617
Wheat 25.65 77.56 3024 25.91 71.25 2749 22.95 72.87 3175 23.94 75.01 3133
Crop-wise comparative Productivity 2006-07 to 2012-13
(Area lac ha., Prod. lac tones & Productivity kg/ha)
Crop2010-11 2011-12 2012-13
A P Y A P Y A P Y
Kharif Pulses
Moong 10.50 6.52 621 12.72 6.47 509 7.90 3.47 439
Moth 15.93 7.75 486 13.18 4.47 339 8.37 2.26 270
Cowpea 1.22 0.64 529 1.05 0.73 697 0.65 0.34 529
Urd 1.28 0.94 737 2.55 1.32 516 2.18 1.56 716
Arhar 0.21 0.16 758 0.19 0.13 666 0.17 0.15 879
Others 0.02 0.02 834 0.02 0.01 720 0.02 0.014 711
Total 29.16 16.03 550 29.71 13.13 442 19.28 7.79 404
Rabi Pulses
Gram 17.83 16.00 898 14.34 9.91 691 14.80 13.08 884
Other 0.55 0.50 905 0.41 0.51 1246 0.30 0.36 1205
Total 18.39 16.51 898 14.75 10.42 707 15.10 13.45 890
Wheat 30.36 104.24 3433 29.35 101.60 3484 28.20 98.31 3486
Area, Production & Productivity of Wheat and Pulses during
2011-12 to 2012-13 (Area lac ha., Prod. lac tones & Yield kg/ha)
Kharif Pulses Rabi Pulses Wheat
YEAR A P Y A P Y A P Y
2011-12
29.71
13.13 442 14.75 10.42 707 29.35 101.60 3461
2012-13 19.28* 7.79* 404* 15.10** 13.47** 890** 28.20** 98.31** 3486**
*II Advance Estimate **I Advance Estimate
Note- Less area coverage during 2012-13 due to late onset of monsoon.
Agenda No.2- Crop-wise Estimated Production of Kharif, 2012-13 (Own Assessment II Advance Estimate)
(Area lac ha., Prod. lac tones & Productivity kg/ha)
Crop Target Estimate (II Advance)
Area Prod. Yield Area Prod. Yield
Moong 9.80 3.92 400 7.90 3.47 439
Moth 13.00 3.90 300 8.37 2.26 270
Urd 1.35 0.61 450 2.18 1.56 716
Cowpea 1.23 0.84 685 0.65 0.34 529
Arhar 0.22 0.22 1018 0.17 0.15 879
O. Pulses 0.02 0.02 800 0.02 0.014 711
Total Pulses 25.62 9.51 371 19.28 7.79 404
Rice 1.30 2.86 2203 1.25 3.43 2726
Sorghum 6.60 3.70 560 6.80 4.11 605
Bajra 51.50 38.63 750 39.44 32.46 823
Maize 11.00 19.80 1800 9.78 14.13 1445
S.Millets 0.16 0.08 484 0.12 0.067 545
Total Cereals 70.56 65.06 922 57.39 54.20 944Guar 29.50 11.80 400 44.24 18.27 413
Crop-wise Estimated Production of Rabi, 2012-13 (Own Assessment I Advance Estimate)
(Area lac ha., Prod. lac tones & Productivity kg/ha)
Crop Target Estimate (I Advance)
Area Prod. Yield Area Prod. Yield
Wheat 28.00 98.00 3500 28.20 98.31 3486
Barley 3.70 11.10 3000 3.75 11.24 2997
Total Cereals 31.70 109.10 3442 31.95 109.55 3429
Gram 16.50 11.88 720 14.80 13.08 884
Other rabi Pulses
0.40 0.56 1400 0.30 0.36 1205
Total Pulses 16.90 12.44 736 15.10 13.44 890
Rape seed & Mustard
29.00 37.70 1300 26.74 38.18 1428
Taramira 5.00 2.00 400 1.12 0.67 595
Linseed 0.02 0.03 1390 0.01 0.01 1064
Total 34.02 39.72 1168 27.87 38.86 1394
Agenda No. 3- Financial Statement of NFSM, 2012-13
(Rs. in lacs)
CompApprov.
Plan
O. B. as on
1.4.2012
Funds Received
Total Avail. Funds
Exp. (upto
Dec,12)
Likely Exp. Upto
31/3/13
Funds Required
Wheat 2764.67 804.50 1555.42 2359.92 1141.77 2764.67 404.75
Pulses 8229.50 1334.55 4838.51 6173.06 3469.35 8229.50 2056.44
Media & Publi.
- -54.24 - -54.24 - - -
A3P 2600.00 -77.41 1950.00 1872.592037.45(Booked)
2600.00 727.41
Total 13594.17 2007.40 8343.93 10351.33 6648.57 13594.17 3188.60
Agenda No. 4- Physical and Financial Progress of NFSM-Wheat for 2012-13
(Fin. Rs. In lac)
S. No.
Approved Interventions Unit
Target Approved by GOI
Achievement up to Dec,2012
Phy. Fin. Phy. Fin.
1 Cluster Demonstrations Ha 10530 526.50 10370 248.23
2Distribution of Certified Seeds
Qtls 200000 1000.00 170550 594.10
3Need Based Plant/Soil Management
(a) Micronutrients Ha 50000 250.00 17569 21.41
(b) Gypsum Ha 30000 150.00 24530 70.62
(C) PP Chemicals & bio-agents
Ha 32120 160.60 1010 0.00
Physical and Financial Progress of NFSM-Wheat for 2012-13
(Fin. Rs. In lac)
S. No.
Approved Interventions Unit
Target Approved by GOI
Achievement up to Dec,2012
Phy. Fin. Phy. Fin.
4 Machineries/Energy Management
(a) Knap Sack Sprayers Nos 1800 54.00 1888 10.01
(b) Seed Drills/ SCFD Nos 1800 270.00 1372 101.34
(c) Rotavators Nos 100 30.00 56 16.80
5Cropping System based trainings
Nos. 200 14.00 84 1.10
Physical and Financial Progress of NFSM-Wheat for 2012-13
(Fin. Rs. In lac)
S. No.
Approved Interventions Unit
Target Approved by
GOI
Achievement up to Dec,2012
Phy. Fin. Phy. Fin.
6 Miscellaneous Expenses
(a) PMT & Other Misc. Exp. at District
No. of District
15 95.70 13 44.02
(b) PMT & Oher Misc. Exp. at State
No. of State
1 13.87 1 1.74
7Local Initiatives (Construction of Water Storage Tank (size 40' X 30' X 6')
Nos. 400 200.00 103 32.40
TOTAL FINANCIAL (1 to 7) 2764.67 1141.77
Physical and Financial Progress of NFSM-Pulses for 2012-13
(Fin. Rs. In lac)
S. No.
Approved Interventions Unit
Target Approved by GOI
Achievement up to Dec,2012
Phy. Fin. Phy. Fin.
1 Distribution of Certified Seeds.
(a) Varieties less than 10 years Qtl 22500 495.00 9148 201.25
(b) Varieties more than 10 years old
Qtl 67500 810.00 7462 89.54
2 Demonstrations
Cluster Demonstrations Ha 70000 3500.00 64283 2005.10
3 INM
(b) Micro-nutrients. Ha 50000 250.00 20162 57.70
(b) Gypsum Ha 50000 375.00 45576 251.36
(c ) Rizobium Culture/PSB Ha 60000 60.00 38903 4.00
Physical and Financial Progress of NFSM-Pulses for 2012-13
(Fin. Rs. In lac)
S. No.
Approved Interventions Unit
Target Approved by GOI
Achievement up to Dec,2012
Phy. Fin. Phy. Fin.
4 IPM (a) IPM Package Ha 40000 300.00 9060 33.00 (b) Distribution of NPV Ha 5000 12.50 340 2.00 (c) Distribution of PP Chemicals Ha 50000 250.00 3100 6.20 (d) Weedicide Ha 10000 50.00 1262 4.485 Resource Conservation Tech. (a) Knap Sack Sprayers. Nos. 3000 90.00 7177 41.83 (b) Zero Till Seed Drills. Nos. 50 7.50 0 0.00 (c) Multi-crop Planters. Nos. 50 7.50 0 0.00
(d) Seed Drills/Seed cum Fertilizer Drill
Nos. 3000 450.00 2051 231.03
(e) Zero Till Multi Crop Planters Nos. 50 7.50 0 0.00 (f) Ridge Furrow Planters Nos. 50 7.50 0 0.00 (g) Rotavators. Nos. 100 30.00 59 16.80 (h) Laser Land levelers Nos. 10 15.00 0 0.00
Physical and Financial Progress of NFSM-Pulses for 2012-13
(Fin. Rs. In lac)
S. No.
Approved Interventions Unit
Target Approved by GOI
Achievement up to Dec,2012
Phy. Fin. Phy. Fin.
6 Efficient Water Application Tools: (a ) Incentive for Pump Sets Nos. 2500 250.00 160 16.00 (b) Pipe for carrying water Nos. 5800 870.00 4737 439.93
7Cropping System based trainings
Nos. 700 98.00 325 12.19
8 Miscellaneous Expenses
(a) PMT& other Misc. Expenses at District level
No. of District
16 71.52 16 22.54
(b) PMT& other Misc. Expenses at State level
No. of State
1 6.28 1 3.41
(c ) Misc. Expenses to State for other Districts (Districts of ISOPOM)
No. of District
17 17.00 0 4.59
9Local Initiatives (Construction of Farm Pond of size 20 M x 20 M X3 M for rain water harvesting)
Nos. 332 199.20 315 26.40
Total Financial (1 to 9) 8229.50 3469.35
Agenda No. 5- Major focus on Inputs under NFSM
• Application of Gypsum• Demonstrations on Improved technologies.• Resource Conservation Technologies/ Farm
Machinery.
-Knapsack Sprayer, Seed drill/ Seed cum Fertilizer drill and Rotavator.
• Efficient Water Application Tools- Irrigation Pipeline
Agenda No. 6- Physical and Financial Progress of Accelerated Pulses Production Programme (A3P) 2012-13
CropApproved Target
Achievement
(upto Dec.12)
Physical (Units
and Area)
Financial (Rs. in lacs)
Physical (Units
and Area)
Financial (Rs. in lacs)
Kharif Moong200 units
(20000 ha)960.00
200 units
(20000 ha)615.20
Moth*50 units
(5000 ha)240.00
50 units
(5000 ha)127.23
Total 250 units
(25000 ha)1200.00
250 units
(25000 ha)742.43
RabiGram 250 units
(25000 ha)1400.00
250 units
(26850 ha1295.02
Grand Total
500 units (50000 ha)
2600.00500 units (51860 ha)
2037.45
Agenda No. 7- Status of Pest Surveillance in
A3P during 2011-12 & 2012-132011-12• Training of Master Trainers has been organized in the state with the
help of NCIPM experts.• Formation of Disaster Management Groups has been completed in 12
A3P districts.• Login ID & Password of e-Pest Surveillance allotted to the districts and
KVKs.• Training of level 2 and 3 has been organized by the Master Trainers for
chickpea crop.• Advisory Report received from NCIPM was communicated to farmers.
2012-13• Training of Master Trainers is to be organized in the last week of
January, 2013.• Formation of Disaster Management Groups has been completed in 10
A3P districts• Organization of level 2 and 3 Training is under process.
Agenda No. 8- 19+ Million Tones Pulses production Special Plan, 2012-13
(Fin. Rs. in lacs)
S.
No
InterventionUnit
TargetFunds
Received
Achievement
(upto Dec.12)
Phy.
Fin.Phy.
Fin.
1Intercropping of Pulses with Cotton/cereals/Oilseeds
Ha132520 1173.92
1200.91
95412 683.06
2Critical inputs-Sulphur, plant growth regulator and nutrient mixture
Ha 7715 27.00 0 0.00
Total Cost Under NFSM
1200.92 1200.91 683.06
3Micro Irrigation Scheme-Sprinkler Set
Ha 7000 70.49 * 300 15.68
Grand Total 1271.41 1200.91 698.74 *To be met out from NMMI Scheme funds.
Note-Less interest of farmers for critical inputs because kharif pulses are grown under rainfed conditions.
Agenda No. 9- Physical and Financial Progress under Action Plan of Additional Area coverage of Pulses, 2012-13
Intervention
Additional TargetFunds
Received
(Rs in lacs)
Achievement
(upto Dec.12)
Physical (ha)
Financial
(Rs in lacs)
Physical (ha)
Financial
(Rs in lacs)
INM-Gypsum Application
14000 105.00 105.00 14000 79.80
Agenda No. 10- Planning of Summer Rice and Pulse Crops
Nil Information.
Agenda No. 11- Status of online submission of Progress Report
1. State Level Progress Report of NFSM- Wheat
and Pulses up to December, 2012 is online.
2. District Level Progress Report of NFSM-Wheat
up to 2011-12 from districts is online and for
2012-13 is under process.
3. District Level Progress Report of NFSM-Pulses
from districts is under process.
Agenda No. 12- Status of Project Management Team
S. No.
Position Provision Status
1. State Consultant 2 2
2. District Consultant 24 7
3. Senior Technical Assistant 2 0
4. Technical Assistant 78 31
Total 106 40
Agenda No. 13- Concurrent Evaluation of NFSM
• Concurrent Evaluation was conducted by
NABARD Consultancy Services during the
year 2010-11 and Report was submitted
and sent to GOI.
Agenda No. 14- Specific Issues
• Pending liabilities of subsidies on Foundation and Certified Pulses
seeds production during 2011-12 may be permitted from the
saving of NFSM Pulses, 2012-13.
• Additional demand of Irrigation pipeline and Farm machinery
received from field. Hence, utilization of saving (Certified seed
distribution, micronutrient, Biofertilizers, IPM and P.P. Chemicals)
may be permitted for Irrigation pipeline and Farm machinery.
• Increase the allocation to SFCI & NSC to fulfill State requirement
of certified seed distribution under NFSM- Pulses.
• Subsidy on Foundation and Certified seed Production of Pulses
may be restarted.
Action Points of 10th Meeting of NFSMEC
• Indent for new varieties of Wheat-• State submitted indent as per details-
• Reasons for non submission of Indent for following wheat varieties-
HI 1531 is suitable for rainfed & restricted irrigation condition, having less yield (23.26 qnt/ha) compared to HI 8498 (44.30 qnt/ha).
HI 1544 and HD 3043 varieties are suitable only for Southern part and less popular.
Quantity in Qntls.
Varieties
Year
2012-13 2013-14 2014-15
Indent Allotment Indent Indent
HD 2967 70 0 70 250
HI 8498 37 30 5 25
Thanks