Sno. Date Client Location Manned by
1 7/31/2010 Vandana Ispat Ltd. Raipur Sunny Dayal
2 7/31/2010 R S Steels Chennai Devendra Singh
Himanshu
3 7/31/2010 Jai Ambe Iron & Steel Ltd. Kolhapur Sumit Nigam
7/31/2010 Mohit Steel Wada Ramesh Kumar
4
5 Shiv Kumar
6 7/31/2010 Radiant casting Nalagarh Sumit Nigam
7
8 Asish Singh
9 7/31/2010 Sanvijai Nagpur Manoj
Ramesh Kumar
WEEKLY REPORT OF GASIFIERS
client.
He is manning the site.
Shiv kumar is on leave
Remarks
The work is progressing fevereshly.. Sunny along with Mr. Panikar had asked for an ammen
to the existing drg. The same was discussed with Mr. Rahuel and Mr. Praveen and the
ammened drg. Has been sent.
Both have been pulled out from the site as the procurement of the water softener has
been delayed and the soft water tank has not yet been taken up. They are now beeing
deputed to Patna to manage the site at Dina and Balmukand
I would be going to petropol in the 2nd. To erect the load cell
Gasifier is working OK
Has resigned
REPORTS OF ALL THE GASIFIERS UPDATED UPTO 15TH OF THIS MONTH IS ATTACHED.
The work on the automation is progressing well and communication is estabhlished. Vinod has taken a dry run and able to acctuate the elements manually by PLC
si back at Hd. Qrs. As the party wants to delay the commissioning of the gasifier. He slated to
Mr. Amit is at the site the work has not beeing hastened.Due to rains and utter apathy of the
the probable date of the restart has been shifted to 21st of this month. However,
go to Patna to replace Mr. Devendra, who would eventually go to R S Steels
WEEKLY REPORT OF GASIFIERS
client.
He is manning the site.
Shiv kumar is on leave
Remarks
The work is progressing fevereshly.. Sunny along with Mr. Panikar had asked for an ammen
to the existing drg. The same was discussed with Mr. Rahuel and Mr. Praveen and the
ammened drg. Has been sent.
Both have been pulled out from the site as the procurement of the water softener has
been delayed and the soft water tank has not yet been taken up. They are now beeing
deputed to Patna to manage the site at Dina and Balmukand
I would be going to petropol in the 2nd. To erect the load cell
Gasifier is working OK
Has resigned
REPORTS OF ALL THE GASIFIERS UPDATED UPTO 15TH OF THIS MONTH IS ATTACHED.
The work on the automation is progressing well and communication is estabhlished. Vinod has taken a dry run and able to acctuate the elements manually by PLC
si back at Hd. Qrs. As the party wants to delay the commissioning of the gasifier. He slated to
Mr. Amit is at the site the work has not beeing hastened.Due to rains and utter apathy of the
the probable date of the restart has been shifted to 21st of this month. However,
go to Patna to replace Mr. Devendra, who would eventually go to R S Steels
Sno. Date Client Location Manned by
1 9/18/2010 Vandana Ispat Ltd. Raipur Devendra Singh
Brij Bhushan
2 9/18/2010 R S Steels Chennai
3 9/18/2010 Radiant Casting Baddi Ramesh Kumar
9/18/2010 Jai Ambe Steel Kolhapur
4 9/18/2010 Petropol Bhiwadi Vinod Deswal
5
6
7 9/18/2010 Dina Iron Patna
8
9
9/18/2010 Balmukand Patna
REPORTS OF ALL THE GASIFIERS UPDATED UPTO18th of Sept is attached.
The gasifier is working fine The monitoring is already attached
Ramesh Yadav is at the site and monitoring the working fine.
the gasifier is working properly. Please refer to the monitoring repotrs
The gasifier is ready for commissioning, Mr Nirmal Yadav is at the site for commissionig. There are few leaks
Automation is complete and has presented to Md and C, Try Hd. The automation is under observation for amonth
He is absent therefore no progress can be reported
which are being set right
WEEKLY REPORT OF GASIFIERSRemarks
Devendra Singh and Brij Bhushan.The ducting is on the way to finish.Detail report is attached
The latest from the site is the entire work is over. However they have been asked to wait till the end of this
for commissioning of the gasifier
I HAVE BEEN WORKING ON THE ANALYSIS AND MONITORING OF THE GASIFIER AND HAS BEEN FINISHED. THE WORK ENCOMPASSES THE ANALYSIS OF GAS THUS BEING PRODUCED
AT VARIOUS SITES WOULD BE ANALYSED AND COMPONENT OF ANALYSIS WOULD CONTAIN THE FOLLOWING: THE ACTUAL AIR REQUIREMENT BASED ON THE PERCENTAGES OF VARIOUS
GASES AT ACTUALS: VOLUME OF FLUE GASES:CALORIFIC VALUE OF THE GAS AT ACTUALS: CALOMETRIC TEMPERATURE OF THE PRODUCER GAS THUS PRODUCED. AND MANY MORE
I AM EAGER TO DISCUSS WITH YOUR GOODSELVES WITH MANUSCRIPT TO FINE TUNE IT AND PUT IT ON THE POWER POINT. AS HAD ALREADY REQUESTED, WE WOULD BE NEEDING AN
GAS ANALYSER OR OXYGEN ANALYSER. MD HAS PLACED AN ORDER FOR THE SAME. The Presentation of the conference is being done.
WORK DONE BY GOVIND RAO
REPORTS OF ALL THE GASIFIERS UPDATED UPTO18th of Sept is attached.
The gasifier is working fine The monitoring is already attached
Ramesh Yadav is at the site and monitoring the working fine.
the gasifier is working properly. Please refer to the monitoring repotrs
The gasifier is ready for commissioning, Mr Nirmal Yadav is at the site for commissionig. There are few leaks
Automation is complete and has presented to Md and C, Try Hd. The automation is under observation for amonth
He is absent therefore no progress can be reported
which are being set right
WEEKLY REPORT OF GASIFIERSRemarks
Devendra Singh and Brij Bhushan.The ducting is on the way to finish.Detail report is attached
The latest from the site is the entire work is over. However they have been asked to wait till the end of this
for commissioning of the gasifier
I HAVE BEEN WORKING ON THE ANALYSIS AND MONITORING OF THE GASIFIER AND HAS BEEN FINISHED. THE WORK ENCOMPASSES THE ANALYSIS OF GAS THUS BEING PRODUCED
AT VARIOUS SITES WOULD BE ANALYSED AND COMPONENT OF ANALYSIS WOULD CONTAIN THE FOLLOWING: THE ACTUAL AIR REQUIREMENT BASED ON THE PERCENTAGES OF VARIOUS
GASES AT ACTUALS: VOLUME OF FLUE GASES:CALORIFIC VALUE OF THE GAS AT ACTUALS: CALOMETRIC TEMPERATURE OF THE PRODUCER GAS THUS PRODUCED. AND MANY MORE
I AM EAGER TO DISCUSS WITH YOUR GOODSELVES WITH MANUSCRIPT TO FINE TUNE IT AND PUT IT ON THE POWER POINT. AS HAD ALREADY REQUESTED, WE WOULD BE NEEDING AN
GAS ANALYSER OR OXYGEN ANALYSER. MD HAS PLACED AN ORDER FOR THE SAME. The Presentation of the conference is being done.
WORK DONE BY GOVIND RAO