Project Name: KBK Project Project Location: Kyee Myin Daing, Yangon
Report Date : Report No.
Contract Period
Remain Period
Sr No Description 16 17 18 19 20 21 22 Total Sr No Description 16 17 18 19 20 21 22 Total
PM 1 1 1 3 ExcavatorPE Dozer
SSE Mobile Crane
JE 2 2 2 2 1 9 Water Boxer
QS 1 1 1 1 1 1 1 7 Generator 1 1 1 1 1 1 1 7
M&E 2 2 2 2 2 1 2 13 Hydraulic Jack
Admin 1 1 1 1 1 1 1 7 Air Compressor 1 1 1 1 1 1 1 7
Safety 2 2 2 2 2 1 2 13 Silent Piler 1 1 1 1 1 1 1 7
Site Store 1 1 1 1 1 1 6
Office Labour 3 3 3 4 4 4 21
Security 2 2 2 2 2 2 2 14
Surveyer
Geotech - - - 3 - 3
Mason 5 3 - 8
Carpenter - 4 - - 4
Rebar - - 3 - 3
Smith
Operator 1 1 1 1 1 1 6
Helper 4 4 4 4 4 4 24
Steel Erector
Roofing worker
Painter 0
Welder
Water Stopper - -
ACP
JI Piling 4 4 4 4 4 4 24
Total 28 26 28 27 27 6 23 165 3 3 3 3 3 3 3 21
Description
Foundation
Substructure
Min Dhama Co., Ltd.
Weekly Progress Report
Project Code: 03 YG 00400 Friday WPR-036
Machine & Equipments onsite
0% 100%
Ccmmulative
Sheet Pile Removal
83%83%83%
Brick work (for 400mm thk; RC wall)
RC retaining wall casting0%
43.4%23.4%
16-05-16
438
2016-10-12
Instrument Monitoring
Earthwork Excavation
Progress Detail
Previous
% %
0% 100%
0% 100%
PreviousDescription
Work Force
Proj Start Date 2015-8-1 Calendar Day
Estimate Completion Date
%
Strutting System
80%
0% 100%
0% 100%
100%
100%
0% 80%
100% 100%
Pile Hacking Work
Foundation Slab casting
Box Column Installation
0%
Period From
16-05-16
This Wk
149
Total
Ccmmulative
Calendar Day
0%
Encased Column casting
RC Staircase B F/W & Rebar - 25% 25%
22-05-16
100%
100%
This Wk
83%
20%
100%
7/25/2019 Weekly Progress (16-05-2016~22-05-2016)
2/4
7/25/2019 Weekly Progress (16-05-2016~22-05-2016)
3/4
PHOTO RECORD
Project: KBK Tower Project
7/25/2019 Weekly Progress (16-05-2016~22-05-2016)
4/4
PHOTO RECORD
Project: KBK Tower Project