    Project Name: KBK Project Project Location: Kyee Myin Daing, Yangon

    Report Date : Report No.

    Contract Period

    Remain Period

    Sr No Description 16 17 18 19 20 21 22 Total Sr No Description 16 17 18 19 20 21 22 Total

    PM 1 1 1 3 ExcavatorPE Dozer

    SSE Mobile Crane

    JE 2 2 2 2 1 9 Water Boxer

    QS 1 1 1 1 1 1 1 7 Generator 1 1 1 1 1 1 1 7

    M&E 2 2 2 2 2 1 2 13 Hydraulic Jack

    Admin 1 1 1 1 1 1 1 7 Air Compressor 1 1 1 1 1 1 1 7

    Safety 2 2 2 2 2 1 2 13 Silent Piler 1 1 1 1 1 1 1 7

    Site Store 1 1 1 1 1 1 6

    Office Labour 3 3 3 4 4 4 21

    Security 2 2 2 2 2 2 2 14

    Surveyer

    Geotech - - - 3 - 3

    Mason 5 3 - 8

    Carpenter - 4 - - 4

    Rebar - - 3 - 3

    Smith

    Operator 1 1 1 1 1 1 6

    Helper 4 4 4 4 4 4 24

    Steel Erector

    Roofing worker

    Painter 0

    Welder

    Water Stopper - -

    ACP

    JI Piling 4 4 4 4 4 4 24

    Total 28 26 28 27 27 6 23 165 3 3 3 3 3 3 3 21

    Description

    Foundation

    Substructure

    Min Dhama Co., Ltd.

    Weekly Progress Report

    Project Code: 03 YG 00400 Friday WPR-036

    Machine & Equipments onsite

    0% 100%

    Ccmmulative

    Sheet Pile Removal

    83%83%83%

    Brick work (for 400mm thk; RC wall)

    RC retaining wall casting0%

    43.4%23.4%

    16-05-16

    438

    2016-10-12

    Instrument Monitoring

    Earthwork Excavation

    Progress Detail

    Previous

    % %

    0% 100%

    0% 100%

    PreviousDescription

    Work Force

    Proj Start Date 2015-8-1 Calendar Day

    Estimate Completion Date

    %

    Strutting System

    80%

    0% 100%

    0% 100%

    100%

    100%

    0% 80%

    100% 100%

    Pile Hacking Work

    Foundation Slab casting

    Box Column Installation

    0%

    Period From

    16-05-16

    This Wk

    149

    Total

    Ccmmulative

    Calendar Day

    0%

    Encased Column casting

    RC Staircase B F/W & Rebar - 25% 25%

    22-05-16

    100%

    100%

    This Wk

    83%

    20%

    100%

  • 7/25/2019 Weekly Progress (16-05-2016~22-05-2016)

    2/4

  • 7/25/2019 Weekly Progress (16-05-2016~22-05-2016)

    3/4

    PHOTO RECORD

    Project: KBK Tower Project

  • 7/25/2019 Weekly Progress (16-05-2016~22-05-2016)

    4/4

    PHOTO RECORD

    Project: KBK Tower Project