East Delta WTP

page 1/12

WTP Water Hammer - Damage Sphere

Checking the water hammer vessel water rise andnot go down so that mean sphere damaged and to Checked

Page 2: Week  report

East Delta WTP

page 2/12

WTP Water Hammer - Damage Sphere

Sphere Welding Carck and fll with water

Page 3: Week  report

East Delta WTP

page 3/12

WTP Water Hammer - Damage Sphere

Sphere Welding Carck and fll with water

Page 4: Week  report

East Delta WTP

page 4/12

Spare Parts

No new for Spare parts

Page 5: Week  report

East Delta WTP

page 5/12

Flash Mixer Dry Run damage

Dry Run damage because of twisted a round the mixer

Page 6: Week  report

East Delta WTP

page 6/12

Flash Mixer Dry Run damage

They assembly the switch but not connected yet

Page 7: Week  report

East Delta WTP

page 7/12

Filter 03,04 Refill with New Filter Media

The empty 03 and refill 04

Page 8: Week  report

East Delta WTP

page 8/12

Filter 03,04 Refill with New Filter Media

The empty 03 and refill 04

Page 9: Week  report

East Delta WTP

page 9/12

Chlorine

Sherkia CO take Drum valve to mainten , till now not installed

Page 10: Week  report

East Delta WTP

page 10/12

Thickener

Thickener empty or full and pipe blocked and pumps stopped

Page 11: Week  report

Regular CheckNo Unit Activates

1Intake 1- Checking Raw Water Pump pressure,temprature,power and gland packing leakage.

2- Checking water hammer system working or not.2 Distribution Shift Checking flow, pressure, chlorine dosing and float fix or not.

3 Chlarifier Checking sludge pumping units, cleaning and greasing of knife,air pressure, bridge and mixers.

4 Thickener Checking pump pressure, pipeline blocking and thickener level.

5Filters 1- Checking backwash , backwash waste ,boosters and dewatering.

2- Air system ,compressors,dryer,pressure,…,etc. 3- Checking filters flow , levels , backwash tank level.

6 Under Ground Reservoir Checking rediusal chlorine smaple plan and tanks levels

7

1- Checking pump priming system. 2- Checking Treated Water Pump pressure,temprature,power and mechanical seal leakage.

3- Checking water hammer system working or not. 4- Checking measurement devices.

8Chlorine 1- Checking drums, vacuum units , changeover unit and piping.

2- Checking dosing cabient, dosing , feeding pressure. 3- checking Caustic Soda Pump.

9 Chemical 1- Checking dosing pumps, strianers, pressure , flow and piping. 2- Checking Tanks levels and cleaning.

10 Evaporation ponds 1- Checking air pressure , cleaning and greasing of knife.

Activites and Remarks for week

No Unit Remaks1 Intake

2 Distribution Shaft

3 Clarifier1- Fixing of the flash mixer dry run was bad and cause damage to it.

3 Thickener 1- Thickener empty or full and piping blocked and pumps stopped

4 Filters 1- Filter 03,04 Refill with New Filter Media2- Backwash pumps was stopped because someone played by button.3- Backwash pump 42 coupling extension handed over to AC till install new H-Shape rubber

5 Chlorine1- Sherkia CO take Drum valve to mainten , till now not installed2- General cleaning of drum store

7 Chemical 1- Plastic fall in tanks during filling.

8

9 Evaporation ponds 1-opened valve closed and operation shloud from panel.

Treated Water Pump Station

Central dewatering Station

Page 12: Week  report

10 Under Ground Reservoir Rediusal Chlorine sample pump not working.

11 Water hammer maintenance

12 Insturctions .lenieregyp

Treated Water Pump Station