154
The complete STA Board Meeting Packet is available on STA’s Website at www.sta.ca.gov (Note: STA Board Meetings are held at Suisun City Hall, 6:00 p.m. on the 2 nd Wednesday of every month except August (Board Summer Recess) and November (Annual Awards Ceremony.) STA BOARD MEETING AGENDA 4:00 p.m., Regular Meeting Wednesday, July 12, 2017 Suisun City Council Chamber 701 Civic Center Blvd. Suisun City, CA 94585 Mission Statement: To improve the quality of life in Solano County by delivering transportation system projects to ensure mobility, travel safety, and economic vitality. Public Comment: Pursuant to the Brown Act, the public has an opportunity to speak on any matter on the agenda or, for matters not on the agenda, issues within the subject matter jurisdiction of the agency. Comments are limited to no more than 3 minutes per speaker unless modified by the Board Chair, Gov’t Code § 54954.3(a). By law, no action may be taken on any item raised during the public comment period although informational answers to questions may be given and matters may be referred to staff for placement on a future agenda of the agency. Speaker cards are required in order to provide public comment. Speaker cards are on the table at the entry in the meeting room and should be handed to the STA Clerk of the Board. Public comments are limited to 3 minutes or less. Americans with Disabilities Act (ADA): This agenda is available upon request in alternative formats to persons with a disability, as required by the ADA of 1990 (42 U.S.C. §12132) and the Ralph M. Brown Act (Cal. Govt. Code §54954.2). Persons requesting a disability related modification or accommodation should contact Johanna Masiclat, Clerk of the Board, at (707) 399-3203 during regular business hours at least 24 hours prior to the time of the meeting. Translation Services: For document translation please call: Para la llamada de traducción de documentos: 對於文檔翻譯電話 Đối vi tài liu gi dch: Para sa mga dokumento tawag sa pagsasalin: 707-399-3239 Staff Reports: Staff reports are available for inspection at the STA Offices, One Harbor Center, Suite 130, Suisun City during regular business hours, 8:00 a.m. to 5:00 p.m., Monday-Friday. You may also contact the Clerk of the Board via email at [email protected] Supplemental Reports: Any reports or other materials that are issued after the agenda has been distributed may be reviewed by contacting the STA Clerk of the Board and copies of any such supplemental materials will be available on the table at the entry to the meeting room. Agenda Times: Times set forth on the agenda are estimates. Items may be heard before or after the times shown. ITEM BOARD/STAFF PERSON 1. CALL TO ORDER/ PLEDGE OF ALLEGIANCE Chair Spering (4:00 p.m.) 2. CONFIRM QUORUM/ STATEMENT OF CONFLICT Chair Spering An official who has a conflict must, prior to consideration of the decision; (1) publicly identify in detail the financial interest that causes the conflict; (2) recuse himself/herself from discussing and voting on the matter; (3) leave the room until after the decision has been made. Cal. Gov’t Code § 87200. 3. APPROVAL OF AGENDA STA BOARD MEMBERS Jim Spering (Chair) Pete Sanchez (Vice Chair) Elizabeth Patterson Thom Bogue Harry Price Norman Richardson Len Augustine Bob Sampayan County of Solano City of Suisun City City of Benicia City of Dixon City of Fairfield City of Rio Vista City of Vacaville City of Vallejo STA BOARD ALTERNATES Erin Hannigan Lori Wilson Tom Campbell Steve Bird Chuck Timm Ronald Kott Dilenna Harris Robert McConnell 1

Wednesday, July 12, 2017 Suisun City Council Chamber Board Packet_07-12-17.pdfCounty of Solano City of Suisun City City of Benicia City of Dixon City of Fairfield City of Rio Vista

Embed Size (px)

Citation preview

  The complete STA Board Meeting Packet is available on STA’s Website at www.sta.ca.gov (Note:  STA Board Meetings are held at Suisun City Hall, 6:00 p.m. on the 2nd Wednesday of every month 

except August (Board Summer Recess) and November (Annual Awards Ceremony.) 

STA BOARD MEETING AGENDA

4:00 p.m., Regular Meeting Wednesday, July 12, 2017

Suisun City Council Chamber 701 Civic Center Blvd.

Suisun City, CA 94585

Mission Statement: To improve the quality of life in Solano County by delivering transportation system projects to ensure mobility, travel safety, and economic vitality.

Public Comment: Pursuant to the Brown Act, the public has an opportunity to speak on any matter on the agenda or, for matters not on the agenda, issues within the subject matter jurisdiction of the agency. Comments are limited to no more than 3 minutes per speaker unless modified by the Board Chair, Gov’t Code § 54954.3(a). By law, no action may be taken on any item raised during the public comment period although informational answers to questions may be given and matters may be referred to staff for placement on a future agenda of the agency. Speaker cards are required in order to provide public comment. Speaker cards are on the table at the entry in the meeting room and should be handed to the STA Clerk of the Board. Public comments are limited to 3 minutes or less.

Americans with Disabilities Act (ADA): This agenda is available upon request in alternative formats to persons with a disability, as required by the ADA of 1990 (42 U.S.C. §12132) and the Ralph M. Brown Act (Cal. Govt. Code §54954.2). Persons requesting a disability related modification or accommodation should contact Johanna Masiclat, Clerk of the Board, at (707) 399-3203 during regular business hours at least 24 hours prior to the time of the meeting. Translation Services: For document translation please call: Para la llamada de traducción de documentos: 對於文檔翻譯電話 Đối với tài liệu gọi dịch: Para sa mga dokumento tawag sa pagsasalin: 707-399-3239

Staff Reports: Staff reports are available for inspection at the STA Offices, One Harbor Center, Suite 130, Suisun City during regular business hours, 8:00 a.m. to 5:00 p.m., Monday-Friday. You may also contact the Clerk of the Board via email at [email protected] Supplemental Reports: Any reports or other materials that are issued after the agenda has been distributed may be reviewed by contacting the STA Clerk of the Board and copies of any such supplemental materials will be available on the table at the entry to the meeting room.

Agenda Times: Times set forth on the agenda are estimates. Items may be heard before or after the times shown.

ITEM

BOARD/STAFF PERSON

1. CALL TO ORDER/ PLEDGE OF ALLEGIANCE Chair Spering (4:00 p.m.)

2. CONFIRM QUORUM/ STATEMENT OF CONFLICT Chair Spering An official who has a conflict must, prior to consideration of the decision; (1) publicly identify in detail the financial interest that causes the conflict; (2) recuse himself/herself from discussing and voting on the matter; (3) leave the room until after the decision has been made. Cal. Gov’t Code § 87200.

3. APPROVAL OF AGENDA

STA BOARD MEMBERS Jim Spering

(Chair) Pete Sanchez (Vice Chair)

Elizabeth Patterson Thom Bogue Harry Price Norman Richardson Len Augustine

Bob Sampayan

County of Solano City of Suisun City City of Benicia City of Dixon City of Fairfield City of Rio Vista City of Vacaville City of Vallejo

STA BOARD ALTERNATES

Erin Hannigan

Lori Wilson

Tom Campbell

Steve Bird

Chuck Timm

Ronald Kott

Dilenna Harris

Robert McConnell

1

  The complete STA Board Meeting Packet is available on STA’s Website at www.sta.ca.gov (Note:  STA Board Meetings are held at Suisun City Hall, 6:00 p.m. on the 2nd Wednesday of every month 

except August (Board Summer Recess) and November (Annual Awards Ceremony.) 

4. OPPORTUNITY FOR PUBLIC COMMENT

5. EXECUTIVE DIRECTOR’S REPORT – Pg. 7

Daryl Halls

6. REPORT FROM THE METROPOLITAN TRANSPORTATION COMMISSION (MTC)

Jim Spering, MTC Commissioner

7. REPORT FROM CALTRANS

8. STA PRESENTATIONS (4:05 – 4:15 p.m.)

A. Directors Reports: 1. Projects – Regional Transportation Improvement Fee (RTIF)

Program Update 2. Planning 3. Programs – Office of Traffic Safety Grants

Robert Guerrero

Robert Macaulay

Lloyd Nadal

9. CONSENT CALENDAR Recommendation: Approve the following consent items in one motion. (Note: Items under consent calendar may be removed for separate discussion.) (4:15- 4:20 p.m.)

A. Minutes of the STA Board Meeting of June 14, 2017 Recommendation: Approve the Minutes of the STA Board Meeting of June 14, 2017. Pg. 13

Johanna Masiclat

B. Draft Minutes of the STA Technical Advisory Committee (TAC) Meeting of June 28, 2017 Recommendation: Receive and file. Pg. 21

Johanna Masiclat

C. Fiscal Year (FY) 2017-18 Transportation Development Act (TDA) Matrix – July 2017 – Solano County Transit and revised Solano Transportation Authority (STA) Recommendation: Approve the July FY 2017-18 Solano TDA Matrix as shown in Attachment B that includes SolTrans and revised TDA claim for STA. Pg. 27

Liz Niedziela

D. Safe Routes to School – Contract with Bay Area Children’s Theatre for SR2S Presentations for FY 2017-18 School Year Recommendation: Authorize the Executive Director to enter into an agreement with Bay Area Children’s Theatre for an amount not-to-exceed $42,000 for up to 25 Rock the Block educational theatre shows at Solano County schools. Pg. 35

Lloyd Nadal

2

  The complete STA Board Meeting Packet is available on STA’s Website at www.sta.ca.gov (Note:  STA Board Meetings are held at Suisun City Hall, 6:00 p.m. on the 2nd Wednesday of every month 

except August (Board Summer Recess) and November (Annual Awards Ceremony.) 

E. STA’s Title VI Program - Title VI of the Civil Rights Act of 1964 Recommendation: Approve the following:

1. Adopt the STA’s 2017 Title VI Program as shown in Attachment A; and

2. Authorize the Executive Director to submit the STA’s Title VI Program to Caltrans.

Pg. 39

Brandon Thomson

F. Amendment to Contract with Nelson/Nygaard Consulting Associates for Intercity Taxi Scrip Phase 2 ProgramRecommendation: Authorize the Executive Director to:

1. Amend Nelson/Nygaard Consulting Associates contract for implementation of the Intercity Taxi Scrip – Phase 2 Program for an amount not to exceed $35,936 and to include the new scope of work as shown in Attachment A; and

2. Extend Nelson/Nygaard Consulting Associates contract to June 30, 2018.

Pg. 41

Brandon Thomson

G. 2017 Regional Transportation Impact Fee (RTIF) Update and Project Recommendations Recommendation: Approve the RTIF Working Groups project recommendations as specified in Attachment B. Pg. 49

Robert Guerrero

H. SR 37/Fairgrounds Drive SolanoExpress Bus Stop Environmental and Design Project Recommendation: Authorize the STA Executive Director to

1. Finalize the SR 37/Fairgrounds Drive SolanoExpress Bus Stop Project scope of work; and

2. Execute an amendment for $200,000 with HQE’s agreement to include the scope.

Pg. 53

Robert Guerrero

I. Contract Amendment with Project Finance Advisory Limited (PFAL) for SR 37 Corridor Financial Opportunities Analysis Recommendation: Authorize the STA Executive Director to enter into a contract amendment with PFAL for an amount not-to-exceed $50,000 to accomplish Scope of Work as specified in Attachment A. Pg. 59

Robert Guerrero

3

  The complete STA Board Meeting Packet is available on STA’s Website at www.sta.ca.gov (Note:  STA Board Meetings are held at Suisun City Hall, 6:00 p.m. on the 2nd Wednesday of every month 

except August (Board Summer Recess) and November (Annual Awards Ceremony.) 

J. State Route 37 (SR 37) Environmental Liaison Consultant Recommendation: Authorize the Executive Director to:

1. Finalize the scope of work for the project; and 2. Enter into a contract with Alta Planning for an amount not-to-

exceed $25,000 to assist STA in the development of the environmental document for SR 37 Segments B and C.

Pg. 63

Robert Guerrero

K. I-80 Corridor Economic Analysis Recommendation: Authorize the STA Executive Director to enter into an agreement with Solano Economic Development Corporation for an amount not to exceed $25,000 to complete the I-80 Corridor Economic Analysis as outlined in Attachment A. Pg. 67

Robert Guerrero

L. I-80/I-680/State Route (SR) 12 Interchange Project Recommendation: Approve the Resolution 2017-06 and Funding Allocation Transfer Request from Metropolitan Transportation Commission (MTC) to transfer $185,000 in Regional Measure 2 or Bridge Toll funds to the I-80/I-680/SR 12 Interchange – ICP Final Design Phase and $400,000 to the CP2 Right-of-Way Phase. Pg. 73

Janet Adams

M. One Bay Area Grant Cycle 2 (OBAG 2) Surface Transportation Program (STP), Revised Funding Recommendations Recommendations: Authorize the Executive Director to program federal STP funds as specified:

1. $518,481 in STP to Vallejo’s Sacramento St. Overlay; 2. $1,556,793 from Vallejo’s STP shares to STA to cover the costs

of Vallejo’s Waterline Relocation for I-80/I-680/SR12 Interchange Project; and

3. $1,407,095 Fairfield’s STP shares to STA for repayment of Right-of-Way costs for Jepson Parkway Phase 3; and

4. Authorize the Executive Director to continue to work with the City of Vallejo and the City of Fairfield if alternative funding options are identified for these projects.

Pg. 91

Daryl Halls

10. ACTION FINANCIAL ITEMS

A. STA’s Fiscal Year (FY) 2017-18 Proposed Budget Revision and FY 2018-19 Proposed Budget Recommendations: Approve the following:

1. Adopt the STA’s FY 2017-18 Proposed Budget Revision as shown in Attachment A;

2. FY 2017-18 Cost of Living Adjustment of 2.7% effective July 1, 2017;

Daryl HallsSusan Furtado

4

  The complete STA Board Meeting Packet is available on STA’s Website at www.sta.ca.gov (Note:  STA Board Meetings are held at Suisun City Hall, 6:00 p.m. on the 2nd Wednesday of every month 

except August (Board Summer Recess) and November (Annual Awards Ceremony.) 

3. Approve STA’s Salary Schedule for FY 2017-18 as shown in Attachment B; and

4. Adopt the STA’s FY 2018-19 Proposed Budget as shown in Attachment C.

(4:20 – 4:25 p.m.) Pg. 101

11. ACTION NON FINANCIAL ITEMS

A. SolanoExpress Operations Implementation Plan Recommendations: Authorize the Executive Director to:

1. Implement two phases of SolanoExpress service changes as shown in Attachment A:

A. On July 1, 2018: Phase 1, Blue, Green Express and Yellow Lines

i. Routes 20, 30, and 40 merged into Blue Line ii. Route 90 merged into Green Line Express

iii. Route 78 merged into Yellow Line B. On July 1, 2019: Phase 2, Green Line

i. Routes 80 and 85 merged into Green Line 2. Work with the two SolanoExpress transit providers to implement a

new unified fare structure across all SolanoExpress services, as generally identified in this agenda item;

3. Work with the two SolanoExpress providers to proceed with public hearings and outreach to comply with regulatory and funding regulations and laws; and

4. Develop and implement outreach and marketing plans to promote the SolanoExpress service changes.

(4:25 – 4:45 p.m.) Pg. 115

Jim McElroy

B. Approval of SolanoExpress Bus Stop Locations as Part of SolanoExpress Operations Implementation Plan Recommendation: Approve the SolanoExpress Bus Stop Locations for the new SolanoExpress Operations Implementation Plan as follows:

1. Fairfield Solano Community College Main Campus as shown in Attachment A;

2. Vacaville Solano Community College Satellite Campus as shown in Attachment B;

3. Fairgrounds Drive/State Route 37 as shown in Attachment C; and 4. The new Green Line SolanoExpress Bus Route extension to the

Suisun City Capitol Corridor Train Depot. (4:45 – 4:55 p.m.) Pg. 129

Robert Guerrero

12. INFORMATIONAL ITEMS – NO DISCUSSION

A. Office of Traffic Safety (OTS) Grant Update Pg. 137

Anthony Adams

5

  The complete STA Board Meeting Packet is available on STA’s Website at www.sta.ca.gov (Note:  STA Board Meetings are held at Suisun City Hall, 6:00 p.m. on the 2nd Wednesday of every month 

except August (Board Summer Recess) and November (Annual Awards Ceremony.) 

B. Legislative Update Pg. 139

Jayne Bauer

C. Summary of Funding Opportunities Pg. 149

Drew Hart

D. STA Board and Advisory Committee Meeting Schedule for Calendar Year 2017 Pg. 153

Johanna Masiclat

13. BOARD MEMBERS COMMENTS

14. ADJOURNMENT The next regularly scheduled meeting of the STA Board is at 6:00 p.m., Wednesday, September 13, 2017, Suisun Council Chambers.

STA Board Meeting Schedule for the Remainder of 2017

6:00 p.m., Wednesday, September 13, 2017 6:00 p.m., Wednesday, October 11, 2017

STA’s Annual Awards - 5:30 p.m., Wed., November 8, 2017 6:00 p.m., Wednesday, December 13, 2017

6

Agenda Item 6 July 12, 2017

DATE: July 5, 2017 TO: STA Board FROM: Daryl K. Halls RE: Executive Director’s Report – July 2017 The following is a brief status report on some of the major issues and projects currently being advanced by the Solano Transportation Authority (STA). An asterisk (*) notes items included in this month’s Board agenda. Approval of STA’s Updated Budget for FY 2017-18 and New Budget for FY 2018-19 * Susan Furtado and STA’s budget managers have prepared the revised budget for Fiscal Year (FY) 2017-18 and the new budget for FY 2018-19. The STA’s updated two year budget is based on the updated two year Overall Work Program adopted by the STA on June 14th. The FY 2017-18 budget has been modified from $15.05 million to $17.29 million. The majority of this change is within the Project Development Department budget with the addition of project funding for SR 37, SR12/Church, SolanoExpress Bus Stops, Jepson Parkway, I-80/I-680/SR 12 Interchange, and SR 37/Fairgrounds. The FY 2018-19 budget totals $12.9 million. SolanoExpress Operations Implementation Plan and Bus Stop Locations * STA staff and the SolanoExpress Transit Consortium is recommending the STA Board authorize modifications to the structure of the SolanoExpress intercity service that would consolidate the seven SolanoExpress Routes (20, 30, 40, 78, 80, 85 and 90) into three more streamlined SolanoExpress Routes (Blue Line, Yellow Line and Green Line) that will provide better transit access, frequency and connections to employment and activity locations within Solano County while maintaining access to BART, UC Davis and Sacramento. This service change is being recommended for implementation in two phases with Phase 1 scheduled to occur July 1, 2018 with the merging of Routes 20, 30 and 40 into the new Blue Line, Route 78 becoming the Yellow Line, and Route 90 becoming the Green Line Express. This is scheduled to coincide with capital bus stop improvement at Suisun Valley near the Fairfield Solano College Campus and Vaca Valley near the Vacaville Solano College Campus. Phase 2 is recommended to take place on July 1, 2019 with the merging of Routes 80 and 85 into the new Green Line. This is scheduled to coincide with new bus stops located on the on-ramps located at the SR37/Fairgrounds Interchange in close proximity to Six Flags Discovery Kingdom and the Solano 360 Development Site. Updated Projects for 4th Year of Regional Transportation Impact Fee (RTIF) Program * The Regional Transportation Impact Fee Program (RTIF) started collecting a share of the County’s Public Facility Fee for transportation in February of 2014. The RTIF is now in its fourth year and passed during the 3rd quarter the $4 million milestone in total RTIF funds collected since the inception of the program. STA staff has meet with all the RTIF Working Groups to update the RTIF projects to be funded through the remainder of this current RTIF five year cycle and what projects are to be funded preparation for the next five years cycle of the RTIF program. The RTIF 4th Annual Report is scheduled for STA Board consideration on September 13, 2017 in order to be forwarded to the Solano County Board of Supervisors as an information item.

7

Executive Director’s Memo July 5, 2017 Page 2 of 4

Suisun City’s McCoy Creek Project to Receive Full Funding from ATP With the recent passage by the State Legislature and the Governor of Senate Bill 1, there will be an additional $100 million annually in statewide Active Transportation Program (ATP) funds. In response, the California Transportation Commission (CTC) has adopted guidelines for this program going forward. This included funding some of the remaining projects included in round 3 of ATP. This included Suisun City’s McCoy Creek Bike Project that was at the cut off of for funding and was slated to only receive $1.8 million of the $4.0 million requested to fund the Project. With the recent adoption by the CTC of their guidelines to include program flexibility requested by STA at the regional level and with the support of MTC staff, the McCoy Creek project will be recommended for the full $4 million requested. This will enable Suisun City to utilize their One Bay Area Grant 2 funds for a second ATP project, the Lotz Way Bike Project, which is located within their recently developed downtown Priority Development Area (PDA). STA Lands Two State Office of Traffic Safety (OTS) Grants * This past month, STA learned it was successful in obtaining two statewide competitive OTS grants each totaling approximately $170,000. The first grant is to establish/improve traffic safety records in partnership with local law enforcement agencies. The second grant is to increase pedestrian, bicycling and motorist safety awareness in partnership with STA’s Safe Routes to School Program. Congratulations to STA’s Anthony Adams and Lloyd Nadal for their efforts in support of obtaining these OTS grants. STA Staff Update Drew Hart, STA’s Associate Planner, has accepted a positon with the City of Sacramento and will be departing STA on July 6th. Drew did an outstanding job landing Active Transportation Program (ATP) grants, started the implementation of the EV Readiness Program, coordinated STA’s bicycle planning efforts, and developed the STA’s Priority Conservation Area (PCA) plan. He will be missed. On July 3rd, Corbin (Cory) Peterson was promoted from the Solano Mobility Call Center to fill a vacant position of Planning Assistant. Cory is a resident of the City of Vacaville and has a BA in Urban Planning/Geography from California State University at Sacramento. Also effective on July 3rd, Amy Antunano was promoted from part-time Senior Customer Service Representative (CSR) to the new position of Program Coordinator for the Solano Mobility Call Center. Amy is a Fairfield resident. During the month of July, STA will look to fill the vacant part-time Senior CSR and CSR positions with the Solano Mobility Call Center. STA Update This is a summary of countywide and regional meetings that I attended during the month of June: June 6

- Meeting with Sandy Person, Solano EDC, to Discuss EDC Budget, Moving Solano Forward Economic Strategy, and EDC Priorities

June 7 - Meeting with Mike Scnalon, SolTrans Interim General Manager, in Benicia to discuss Soltrans Executive Recruitment, Solano Express Service Plan, and Transit Priorities and Funding

June 9 - Meeting with Soltrans and FAST staff to discuss SolanoExpress Service Changes

- Meeting at MTC in San Francisco to discuss financing proposal for SR 37

8

Executive Director’s Memo July 5, 2017 Page 3 of 4

June 12 - Meeting with Birgitta Corsello, County Administrator, to discuss SR

37/Fairgrounds Project, Moving Solano Forward, SR 37 Corridor Environmental Process, and Countywide Adaption and Flood Protection Priorities

- Meeting with Dan Keen, Vallejo City Manager, and staff and legal counsel, to discuss I-80 Interchange/Waterline relocation funding agreement

June 13 - Board briefing with Fairfield Mayor Harry Price - Conference Call with Solano EDC Investors Committee - Board Briefing with Vallejo Mayor Bob Sampayan

June 14 - Attended Memorial event for former STA Board Chair and Member

Steve Hardy - Board briefing with Dixon Mayor Thom Bogue - Attended STA Board meeting

June 15 - Attended North Bay MTC Commissioners Meeting in Napa with

Supervisor Spering

June 16 - Conference call with Susan Branson, Executive Director, California Transportation Commission (CTC) regarding SB 1 guidelines and implementation, ATP Funds for McCoy Creek project, and attendance at June CMA Directors Meeting.

June 19 - Meeting with staff and consultant on Scope of Work for Intercity Taxi Scrip Phase 2

June 20 Served on Recruitment Panel for Soltrans Executive Director

June 21 - Meeting with Solano EDC’s Sean Quinn to discuss I-80 Economic Analysis study

- Taped Cable TV show with Tom Bartee for Comcast Channel 27 – Vallejo) on Solano Mobility Issues at Jesse Bethel HS in Vallejo

June 23 - Regional conference call on freight priorities with MTC and Alameda CTC

June 27 - Attended SolanoExpress Consortium Meeting with Discuss SolanoExpress service plan

9

Executive Director’s Memo July 5, 2017 Page 3 of 4

June 28 - Provided presentation at Solano City Managers Meeting on Solano

Express Service Plan and SB 1 guidelines and implementation - Chaired STA TAC meeting - Attended Regional Leaders Reception in Sacramento and met with CTC

and Caltrans staff and CTC Commissioners

June 29 - Participated in conference call with United Bridge Partners to Discuss their SR 37 Proposal

- Meeting with STA Board Executive Committee - Attended STA’s Arterials, Highways and Freeways Subcommittee

Meeting

June 30 - Conference Call with Michael Cunningham, Bay Area Council (BAC), to discuss future presentation to the BAC on SR 37

- Traveled to San Carlos, San Mateo County, to Moderate Bay Area CMA Directors meeting with CTC’s Susan Branson as guest speaker

- Attended Meeting with MTC’s Executive Director, Steve Heminger, on expenditure plan/legislation for RM3 (bridge tolls).

Attachment:

A. STA Acronyms List of Transportation Terms (Updated April 2017)

10

STAACRONYMSLISTOFTRANSPORTATIONTERMSLastUpdated:April2017

 

 

A               

AADT  Average Annual Daily Traffic 

ABAG  Association of Bay Area Governments 

ACTC  Alameda County Transportation Commission 

ADA  American Disabilities Act 

ADT  Average Daily Traffic 

APDE            Advanced Project Development Element (STIP) 

AQMD  Air Quality Management District 

ARRA  American Recovery and Reinvestment Act 

ATP  Active Transportation Program 

ATWG  Active Transportation Working Group 

AVA  Abandoned Vehicle Abatement 

BAAQMD  Bay Area Air Quality Management District 

BABC  Bay Area Bicycle Coalition 

BAC  Bicycle Advisory Committee 

BAIFA  Bay Area Infrastructure Financing Authority 

BART  Bay Area Rapid Transit 

BATA  Bay Area Toll Authority 

BCDC  Bay Conservation & Development Commission 

CAF  Clean Air Funds 

CalSTA  California State Transportation Agency 

CALTRANS  California Department of Transportation 

CARB  California Air Resources Board 

CCAG  City‐County Association of Governments (San Mateo) 

CCCC (4’Cs)  City County Coordinating Council 

CCCTA (3CTA)  Central Contra Costa Transit Authority 

CCJPA  Capitol Corridor Joint Powers Authority 

CCTA  Contra Costa Transportation Authority 

CEQA  California Environmental Quality Act 

CHP  California Highway Patrol 

CIP  Capital Improvement Program 

CMA  Congestion Management Agency 

CMIA  Corridor Mobility Improvement Account 

CMAQ  Congestion Mitigation & Air Quality Program 

CMP  Congestion Management Plan 

CNG  Compressed Natural Gas 

CTA   California Transit Agency 

CTC  California Transportation Commission 

CTP  Comprehensive Transportation Plan 

CTSA  Consolidated Transportation Services Agency 

DBE  Disadvantaged Business Enterprise 

DOT  Department of Transportation 

ECMAQ  Eastern Solano Congestion Mitigation Air Quality Program 

EIR  Environmental Impact Report 

EIS  Environmental Impact Statement 

EPA  Environmental Protection Agency 

EV  Electric Vehicle 

FAST  Fairfield and Suisun Transit 

FAST Act   Fixing America’s Surface Transportation Act 

FASTLANE  Fostering Advancements in Shipping and Transportation for the 

  Long‐term Achievement of National Efficiencies  

FEIR  Final Environmental Impact Report 

FHWA  Federal Highway Administration 

FPI  Freeway Performance Initiative  

FTA  Federal Transit Administration 

 

GARVEE  Grant Anticipating Revenue Vehicle 

GHG  Greenhouse Gas 

GIS  Geographic Information System 

 

HIP  Housing Incentive Program 

HOT  High Occupancy Toll 

HOV  High Occupancy Vehicle 

ISTEA  Intermodal Surface Transportation Efficiency Act 

ITIP  Interregional Transportation Improvement Program 

ITS  Intelligent Transportation System 

JARC  Jobs Access Reverse Commute Program 

JPA  Joint Powers Agreement 

LATIP  Local Area Transportation Improvement Program 

LCTOP  Low Carbon Transit Operations Program (LCTOP) 

LEV  Low Emission Vehicle 

LIFT  Low Income Flexible Transportation Program 

LOS  Level of Service 

LS&R  Local Streets & Roads 

LTR   Local Transportation Funds 

 

MAP‐21  Moving Ahead for Progress in the 21st Century 

MAZ  Micro Analysis Zone 

MIS  Major Investment Study 

MOU  Memorandum of Understanding 

MPO  Metropolitan Planning Organization 

MTAC  Model Technical Advisory Committee 

MTC  Metropolitan Transportation Commission 

MTS  Metropolitan Transportation System 

NCTPA  Napa County Transportation & Planning Agency 

NEPA  National Environmental Policy Act 

NHS  National Highway System 

NOP  Notice of Preparation 

NVTA  Napa Valley Transportation Authority 

OBAG  One Bay Area Grant 

OTS  Office of Traffic Safety 

 

PAC  Pedestrian Advisory Committee 

PCA  Priority Conservation Area 

PCC  Paratransit Coordinating Council 

PCRP  Planning & Congestion Relief Program 

PDS  Project Development Support 

PDA  Priority Development Area 

PDT  Project Delivery Team 

PDWG  Project Delivery Working Group 

PMP  Pavement Management Program 

PMS  Pavement Management System 

PNR  Park & Ride 

11

STAACRONYMSLISTOFTRANSPORTATIONTERMSLastUpdated:April2017

 

 

POP   Program of Projects 

PPM  Planning, Programming & Monitoring 

PPP (P3)  Public Private Partnership 

PS&E  Plans, Specifications & Estimate 

PSR  Project Study Report 

PTA  Public Transportation Account 

PTAC  Partnership Technical Advisory Committee (MTC) 

RABA  Revenue Alignment Budget Authority 

RBWG   Regional Bicycle Working Group 

REPEG   Regional Environmental Public Education Group 

RFP  Request for Proposal 

RFQ  Request for Qualification 

RM 2  Regional Measure 2 (Bridge Toll) 

RORS  Routes of Regional Significance 

RPC   Regional Pedestrian Committee 

RRP  Regional Rideshare Program 

RTEP  Regional Transit Expansion Policy 

RTIF  Regional Transportation Impact Fee 

RTP  Regional Transportation Plan 

RTIP  Regional Transportation Improvement Program 

RTMC   Regional Transit Marketing Committee 

RTPA  Regional Transportation Planning Agency 

 

SACOG  Sacramento Area Council of Governments 

SAFETEA‐LU  Safe, Accountable, Flexible, Efficient     

  Transportation Equality Act‐a Legacy for Users 

SCS  Sustainable Community Strategy  

SCTA  Sonoma County Transportation Authority 

SFCTA  San Francisco County Transportation Authority 

SGC  Strategic Growth Council 

SJCOG  San Joaquin Council of Governments   

SHOPP  State Highway Operations & Protection Program 

SMAQMD  Sacramento Metropolitan Air Quality 

  Management District 

SMCCAG  San Mateo City‐County Association of Governments 

SNABM  Solano‐Napa Activity‐Based Model 

SNCI  Solano Napa Commuter Information 

SoHip  Solano Highway Partnership 

SolTrans  Solano County Transit 

SOV  Single Occupant Vehicle  

SPOT  Solano Projects Online Tracking 

SP&R  State Planning & Research 

SR  State Route 

SR2S  Safe Routes to School 

SR2T  Safe Routes to Transit 

SRTP   Short Range Transit Plan 

SSPWD TAC  Solano Seniors & People with Disabilities Transportation 

Advisory Committee 

STAF  State Transit Assistance Fund 

STA  Solano Transportation Authority 

STBG  Federal Surface Transportation Block Grant Program 

STIA   Solano Transportation Improvement Authority 

STIP  State Transportation Improvement Program 

STP  Federal Surface Transportation Program 

TAC  Technical Advisory Committee 

TAM  Transportation Authority of Marin 

TANF   Temporary Assistance for Needy Families 

TAZ  Transportation Analysis Zone 

TCI  Transportation Capital Improvement 

TCIF  Trade Corridor Improvement Fund 

TCM  Transportation Control Measure 

TCRP  Transportation Congestion Relief Program 

TDA  Transportation Development Act 

TDM  Transportation Demand Management 

TE  Transportation Enhancement  

TEA   Transportation Enhancement Activity 

TEA‐21  Transportation Efficiency Act for the 21st Century 

TFCA  Transportation Funds for Clean Air  

TIF  Transportation Investment Fund 

TIGER  Transportation Investment Generating Economic Recovery 

TIP  Transportation Improvement Program 

TLC  Transportation for Livable Communities 

TMA  Transportation Management Association 

TMP  Transportation Management Plan 

TMS  Transportation Management System 

TMTAC  Transportation Management Technical Advisory Committee 

TOD  Transportation Operations Systems 

TOS  Traffic Operation System 

T‐Plus  Transportation Planning and Land Use Solutions 

TRAC  Trails Advisory Committee 

TSM  Transportation System Management 

U, V, W, Y, & Z 

UZA  Urbanized Area 

VHD  Vehicle Hours of Delay 

VMT  Vehicle Miles Traveled 

VTA  Valley Transportation Authority (Santa Clara) 

W2W  Welfare to Work 

WCCCTAC  West Contra Costa County Transportation Advisory  

  Committee 

WETA  Water Emergency Transportation Authority  

YCTD  Yolo County Transit District 

YSAQMD  Yolo/Solano Air Quality Management DistrictZ 

ZEV  Zero Emission Vehicle 

12

Agenda Item 9.A July 12, 2017

SOLANO TRANSPORTATION AUTHORITY

Board Minutes for Meeting of June 14, 2017

1. CLOSED SESSION

PERSONNEL MATTERS (Gov’t Code §549547): Public Employee Performance Evaluation: Executive Director

Chair Spering recommended that after an outstanding review of the Executive Director that the STA Board approve a 3-year extension to the Executive Director employment agreement through June 30, 2020 with 2% increase to his salary as of July 1, 2017 and an additional 2% each subsequent year, subject to the Executive Director’s acceptable annual performance evaluation by the STA Board. On a motion by Board Member Price and a second by Vice Chair Sanchez, the STA Board unanimously approved the recommendation.

2. CALL TO ORDER Chair Spering called the regular meeting to order at 6:00 p.m. A quorum was confirmed.

MEMBERS PRESENT:

Jim Spering, Chair

County of Solano

Pete Sanchez, Vice Chair City of Suisun City Tom Campbell for

Elizabeth Patterson City of Benicia

Thom Bogue City of Dixon Harry Price City of Fairfield Norman Richardson City of Rio Vista Len Augustine City of Vacaville Bob Sampayan City of Vallejo MEMBERS

ABSENT: Elizabeth Patterson

City of Benicia

STAFF PRESENT:

Daryl Halls

Executive Director

Bernadette Curry Legal Counsel Janet Adams Deputy Executive Director/Director of Projects Robert Macaulay Director of Planning Johanna Masiclat Clerk of the Board/Office Manager Robert Guerrero Senior Project Manager Anthony Adams Project Manager Liz Niedziela Transit Program Manager Judy Leaks Rideshare and SR2S Program Manager Lloyd Nadal Safe Routes to School Program Administrator Drew Hart Associate Planner Brandon Thomson Transit Mobility Coordinator Melissa Rojas Customer Service Representative

13

ALSO PRESENT: (In alphabetical order by last name.) Nathaniel Atherstone Fairfield and Suisun Transit (FAST) Jack Batchelor District Rep. for Congressman John Garamendi Shawn Cunningham City of Vacaville Joe Green-Heffern Resident, Fairfield George Gwynn, Jr. Resident, Suisun City Richard Kerrigan Project Finance Advisory Limited (PFAL) Ronald Kott City of Rio Vista Vice Mayor and STA Alternate

Board Member Mike Lohman HDR Jose Luis Moscovich PFAL Matt Tuggle County of Solano

3. CONFIRM QUORUM/STATEMENT OF CONFLICT A quorum was confirmed by the Clerk of the Board. There was no Statement of Conflict declared at this time.

4. APPROVAL OF AGENDA On a motion by Board Member Price, and a second by Board Member Augustine, the STA Board approved the agenda. (8 Ayes)

5. OPPORTUNITY FOR PUBLIC COMMENT None presented.

6. EXECUTIVE DIRECTOR’S REPORT Daryl Halls introduced new Customer Service Representative, Melissa Rojas and provided an update on the following items: Approval of STA’s Overall Work Program for FY 2017-18 and FY 2018-19 I-80/I-680/SR 12 Interchange Implementation Plan Modification SB 1 Funding Categories and Priorities Development of 2018 State Transportation Improvement Program (STIP) One Bay Area Grant (OBAG) Cycle 2 Funding Strategy and Recommendations Regional Transportation Impact Fee (RTIF) Program Update Renewal of Consolidated Transportation Services Agency (CTSA) Designation Solano Express Service Report and Funding Agreement for FY 2017-18 Solano Community College Transportation Fee Pilot First Last Mile Lyft Pilot Begins STA Staff Update STA Update

7. REPORT FROM THE METROPOLITAN TRANSPORTATION COMMISSION (MTC)

MTC Commissioner and STA Board Chair Spering reported that there has been a lot of discussion on SB 1. In addition, there has also been a lot of regional discussion on the development of a RM 3 expenditure plan. He noted that competing Solano County projects will be monitored closely.

8. REPORT FROM CALTRANS Janet Adams commented that Caltrans District Director, Bijan Sartipi, met with STA staff today to discuss the District and STA’s implementation priorities for SB 1.

14

9. STA PRESENTATIONS A. Presentation on State Route (SR) 37 Financial Assessment presented by Jose Luis

Moscovich, PFAL Mr. Moscovich provided a presentation on options for financing improvements to the SR 37 Corridor. He noted financing this corridor was feasible if tolling of corridor was considered.

B. Directors Reports: 1. Projects: Update on SR 37 Project Delivery presented by Janet Adams

Board Member Sampayan cited that he appointed Vallejo Vice Mayor Robert McConnell and Councilmember Jessie Malgapo to serve on the STA SR 37 Environmental Task Force Subcommittee. Daryl Halls provided a summary of STA’s approach for initiating the first phase of SR 37.

2. Planning: Bicycle Classifications presented by Drew Hart 3. Programs:

- SolanoExpress Mid-Year Report presented by Brandon Thomson - 2017 Team Bike Challenge Winner presented by Judy Leaks

10. CONSENT CALENDAR

On a motion by Board Member Bogue, and a second by Board Member Augustine, the STA Board approved Consent Calendar Items A through L. (8 Ayes)

A. Minutes of the STA Board Meeting of May 10, 2017 Recommendation: Approve the Minutes of the STA Board Meeting of May 10, 2017.

B. Draft Minutes of the STA Technical Advisory Committee (TAC) Meeting of May 31, 2017 Recommendation: Receive and file.

C. Fiscal Year (FY) 2016-17 Third Quarter Budget Report Recommendation: Receive and file.

D. STA’s Fiscal Year (FY) 2016-17 Proposed Modifications to the Final-Year Budget Revision Recommendation: Adopt the STA’s FY 2016-17 Proposed Modifications to the Final-Year Budget Revision as shown in Attachment A.

E. Fiscal Year (FY) 2017-18 Transportation Development Act (TDA) Matrix - June 2017 – CVacaville and Solano Transportation Authority (STA) Recommendation: Approve the following:

1. The FY 2017-18 Solano TDA Matrix as shown in Attachment B for the City of Vacaville; and

2. STA Resolution No. 2017-05 authorizing the STA’s filing of a claim with MTC for the allocation of TDA and STAF funds for FY 2017-18.

F. SolanoExpress Service Mid-Year Report for FY 2016-17

Recommendation: Receive and file. 15

G. One Bay Area Grant (OBAG) Cycle 2 Funding Agreements and Checklist Recommendation: Approve the following:

1. Updated OBAG Cycle 2 Funding Agreement as shown in Attachment C; and 2. Authorize the Executive Director to enter into Funding Agreements for all OBAG 2

funds.

H. Mobility Management Contract Amendment - Faith in Action Volunteer Drive Program for Seniors Recommendation: Authorize the Executive Director to extend the renewal option and enter into a one-year contract with Faith in Action for an amount not-to-exceed $40,000 to provide Transportation Services by Volunteer Caregivers.

I. Mobility Management: Consolidated Transportation Services Agency (CTSA) Re-Designation Recommendation: Approve the following:

1. Approval of the STA being re-designated as the CTSA for Solano County; and 2. Authorize the Executive Director to submit a letter to MTC requesting CTSA Re-

Designation.

J. Website Services Contracts Recommendation: Authorize the Executive Director to execute the following:

1. Contract amendment with MIG to extend website maintenance and hosting services through June 30, 2018, in an amount not-to-exceed $14,200; and

2. Contract for website redesign and development for STA in an amount not to exceed $25,000 based on consultant selection for RFP 2017-04; and

3. Contract for website redesign and development for SR2S in an amount not to exceed $20,000 based on consultant selection for RFP 2017-04.

K. Solano Community College (SCC) Student Transportation Fee Update – Phone

Application Pilot Program Recommendation: Approve the following:

1. Authorize the Executive Director to issue a Request for Qualifications (RFQ) to develop an automated phone application for transit users; and

2. Authorize $10,000 in FY 2017-18 STAF funds for this pilot program.

L. Rio Vista Delta Breeze Service Management Contract Extension for Fiscal Year (FY) 2017-18 Recommendation: Approve the following:

1. Authorize the Executive Director to execute a contract with the City of Rio Vista, for STA to provide Transit Management for the Rio Vista Delta Breeze for an amount not-to-exceed $94,490 for FY 2017-18; and

2. Allocate $61,200 in State Transit Assistance Fund (STAF) for FY 2017-18 for the City of Rio Vista Transit Finance & Compliance.

Pg.

16

M. Comprehensive Transportation Plan (CTP) Committee Membership Recommendation: Confirm the CTP Committee members as shown in Attachment A. Pg.

11. ACTION – FINANCIAL ITEMS

A. One Bay Area Grant (OBAG) Cycle 2 Priority Conservation Areas (PCA) Priorities Daryl Halls noted that last month, the STA Board recommended five projects for $4.6 million in federal Congestion Mitigation and Air Quality (CMAQ) funds in follow up to previous Board actions for Federal Surface Transportation Program (STP) funds. He explained the next task is authorization for STA to enter into funding agreements with each of the One Bay Area Grant (OBAG2) 2 project sponsors and to approve the specific funding allocations.

Recommendation: Approve the following:

1. $731,123 in STP to Benicia’s Park Rd.; 2. Authorize the Executive Director to enter into a Funding Agreement with the Cities of

Dixon and Benicia to swap $245,214 of STP funds for $245,214 of local funds in FY 2019-20;

3. Authorize the Executive Director to enter into a Funding Agreement with the Cities of Rio Vista and Benicia to swap $89,496 of STP funds for $89,496 of local funds in FY 2017-18;

4. $1,192,222 in STP to Vacaville’s 2018 Roads Overlay Project, with project locations as shown in Attachment B;

5. $1,075,274 in STP to Vallejo’s Sacramento St. Overlay; 6. $1,000,000 in STP to Vallejo’s Spring Rd. Overlay; 7. If no additional funds from SB-1 are available to McCoy Creek, then program

$491,314 in STP to Suisun City’s McCoy Creek ATP Cycle 3 Project; if additional funds from SB-1 are available to McCoy Creek, then program $491,314 to Suisun City’s Lotz Way project;

8. $2,050,000 in PCA (STP) funds and $1,000,000 in FAS (STP) funds to Solano County’s Suisun Valley Farm to Market Phase 2;

9. $500,000 in FAS (STP) funds to Solano County’s 2019 Road Maintenance project, with project locations included in Attachment B; and

10. $1,407,095 STP to Fairfield’s Travis Blvd project.

On a motion by Board Member Price, and a second by Board Member Bogue, the STA Board approved the recommendation. (8 Ayes)

12. ACTION – NON FINANCIAL ITEMS

A. STA’s Overall Work Plan (OWP) for Fiscal Years (FY’s) FY 2017-18 and 2018-19 Daryl Halls presented the STA’s Overall Work Program for Fiscal Year 2017-18 and FY 2018-19 which contains an updated list of 47 plans, projects and programs. He noted that once adopted by the STA Board, this work plan will provide the basis for preparation of the STA’s updated budget for Fiscal Year 2017-18.

Recommendation: Approve the STA OWP for FY 2017-18 and FY 2018-19.

17

On a motion by Board Member Richardson, and a second by Vice Chair Sanchez, the STA Board approved the recommendation. (8 Ayes)

B. I-80/I-680/SR 12 Interchange – Implementation Plan Modification Janet Adams provided an update to the implementation plan modification to advance improvements to the I-80/I-680/SR 12 Interchange. She cited that following the approval of the project’s environmental document, the project is being implemented in seven distinct phases as funding for each phase is obtained. She noted that with the passage of Senate Bill 1 this year, the project could be eligible for two new, competitive program funding categories, Trade Corridors and Solutions for Congested Corridors. STA staff has identified a smaller phase as part of Phases 2 and 3 of the project that would be more competitive for some of the funding and would link the recently completed SR 12 Jameson Canyon widening project to the I-80 Corridor in the eastbound direction.

Recommendation: Approve the following:

1. The new Implementation Plan for the I-80/I-680/SR12 Interchange Project, with the addition of Construction Package 2A as shown in Attachment A; and

2. Authorize the Executive Director to issue a Request for Proposal (RFP) to retain a consultant to provide design services for CP2A to advance the project to a greater state of readiness to better compete for available transportation.

On a motion by Board Member Price, and a second by Board Member Bogue, the STA Board

approved the recommendation. (8 Ayes)

13. INFORMATIONAL – DISCUSSION

A. Senate Bill 1 (SB 1) Funding Categories and STA Priorities Anthony Adams provided an overview of the program and a draft list of STA priorities for the various SB 1 funding categories. He noted that SB 1 will provide for an estimated $5.2 billion in annual transportation funding for a variety of transportation programs, projects and priorities which includes funding for a range of programs via formulas (such as Local Street and Roads, State Highway Maintenance and Rehabilitation, the State Transportation Improvement Program, and public transit), to augment or restore an existing programs (Transit and Intercity Rail, Active Transportation Program, and State Local Partnership) or to implement a new competitive programs (Trade Corridors and Solutions for Congested Corridors).

B. Schedule for 2018 Surface Transportation Improvement Program (STIP) Janet Adams explained that the passage of SB 1 will reset the gas tax at 17.3 cents/gallon which will help restore the State Transportation Improvement Program (STIP). She outlined the next STIP cycle which STA is scheduled to program by October of 2017. She noted that Solano County currently has only $3.3 million remaining its County Regional Transportation Improvement Program (RTIP) with the balance of $33 million in STIP funds programmed allocated last year to two segments of the Jepson Parkway project in Fairfield and Vacaville that are now under construction. She concluded by noting that the California Transportation Commission (CTC) is scheduled to adopt its 2018 STIP Fund Estimate (FE) on June 29th, with STA scheduled to program any new STIP capacity by October of 2017.

18

C. Regional Transportation Impact Fee (RTIF) Update Robert Guerrero reported that RTIF is now in its fourth year and just passed during the 3rd quarter the $4 million milestone in total RTIF funds collected since the inception of the program. To date, he noted that the RTIF program has invested in six projects contained in seven working groups. STA staff continues to administer the program and is preparing the 4th RTIF Annual Report for the STA Board and the Solano County Board of Supervisors in September.

NO DISCUSSION

D. Fiscal Year (FY) 2016-17 Abandoned Vehicle Abatement (AVA) Program Second Quarter Report

E. Summary of Funding Opportunities

F. STA Board and Advisory Committee Meeting Schedule for Calendar Year 2017

G. Project Delivery Update

H. Bicycle Infrastructure Classifications

I. Legislative Update

14. BOARD MEMBER COMMENTS

15. ADJOURNMENT The meeting was adjourned at 7:30 p.m. in memory of City of Vacaville’s former Mayor Steve Hardy. The next regularly scheduled meeting of the STA Board is at 4:00 p.m., Wednesday, July 12, 2017, Suisun Council Chambers.

Attested by: Johanna Masiclat Clerk of the Board

19

This page intentionally left blank.

20

Agenda Item 9.B July 12, 2017

TECHNICAL ADVISORY COMMITTEE DRAFT Minutes for the meeting of

June 28, 2017

1.

CALL TO ORDER The regular meeting of the STA’s Technical Advisory Committee (TAC) was called to order by Daryl Halls at approximately 1:30 p.m. in the Solano Transportation Authority (STA)’s Conference Room 1.

TAC Members Present: Graham Wadsworth City of Benicia Jason Riley for Joe Leach City of Dixon Dave Melilli City of Rio Vista Tracy Rideout for Shawn Cunningham City of Vacaville Gary Cullen for Jill Mercurio City of Vallejo TAC Members Absent: Joe Leach City of Dixon George Hicks City of Fairfield Tim McSorley City of Suisun City Shawn Cunningham City of Vacaville Jill Mercurio City of Vallejo Matt Tuggle Solano County STA Staff and Others

Present: (In Alphabetical Order by Last Name)

Anthony Adams STA James Bloesch STA Intern Ramil Chettfour STA Intern Daryl Halls STA Erika Hansen STA Drew Hart STA Robert Macaulay STA Johanna Masiclat STA Lloyd Nadal STA Jim McElroy STA Project Manager John McKenzie Caltrans Liz Niedziela STA Brandon Thomson STA

2. APPROVAL OF THE AGENDA On a motion by Graham Wadsworth, and a second by Jason Riley, the STA TAC unanimously approved the agenda. (5 Ayes)

21

3.

OPPORTUNITY FOR PUBLIC COMMENT None presented.

4. REPORTS FROM CALTRANS, MTC AND STA STAFF

Presentations: 1. Caltrans SHOPP Update presented by Daryl Halls 2. SB 1 Update presented by Daryl Halls

John McKenzie, Caltrans District 4, announced that Caltrans nominated the I-80 High Occupancy Vehicle (HOV) and High Occupancy Toll (HOT) Conversion Projects for consideration for SB 1 corridor funding project. Anthony Adams announced that the CTC is holding a workshop on July 18, 2017 on Local Streets and Roads (LS&R) Implementation on SB 1 to be held at Caltrans Headquarters in Sacramento.

5. CONSENT CALENDAR On a motion by Dave Melilli, and a second by Jason Riley, the STA TAC approved the Consent Calendar A and B. (5 Ayes)

A. Minutes of the TAC Meeting of May 31, 2017 Recommendation: Approve TAC Meeting Minutes of May 31, 2017.

B. Fiscal Year (FY) 2017-18 Transportation Development Act (TDA) Matrix – July 2017 – Solano County Transit and revised Solano Transportation Authority (STA) Recommendation: Forward a recommendation to the STA Board to approve the July FY 2017-18 Solano TDA Matrix as shown in Attachment B that includes SolTrans and revised TDA claim for STA.

6. ACTION FINANCIAL ITEMS

A. 2017 Regional Transportation Impact Fee (RTIF) Update and Project Recommendations Anthony Adams summarized the funding allocation process of the RTIF revenue generated by Working Group 6 through FY 2017-18 and *FY 2018-19 FY 2023-24. He noted that the Working Group 6 RTIF funding commitment toward the Benicia Bus Hub project is nearing completion with a remaining balance of $75,388 (anticipated to be collected in FY 2017-18) and that any additional RTIF revenue collected for RTIF Working Group 6 for FY 2017-18 through *FY 2018-19 FY 2023-24 be applied toward the Fairgrounds Drive/SR 37 SolanoExpress Bus Stop. *At the June 28th, 2017 meeting, the SolanoExpress Intercity Transit Consortium requested to extend the revenue generated by Working Group 6 from two (FY 2017-18 to FY 2018-19) to six (FY 2017-18 to FY 2023-24) fiscal years as noted above in strikethrough bold italics.

Recommendation: Forward a recommendation to the STA Board to approve the RTIF Working Group project recommendations as specified in Attachment B.

On a motion by Graham Wadsworth and a second by Jason Riley, the STA TAC unanimously approved the recommendation. (5 Ayes)

22

7. ACTION NON FINANCIAL ITEMS

A. SolanoExpress Operations Implementation Plan Jim McElroy presented the implementation process of the two phases of SolanoExpress service changes based on the capital project timing. He noted that the proposed fare structure is not intended to be a fare increase, but is designed to make fares consistent across the entire SolanoExpress network. He added that the STA has budgeted for the marketing and promotion of this service and this will be covered in more detail at the August meeting of the Consortium. Mr. McElroy also reviewed the timeline for the Highway 37 at Fairgrounds Drive bus stop which determines the implementation date for the Red Line. He noted that staff is recommending a two-phase implementation that defers the consolidations of the Route 80 and Route 85 into the Green Line until January 2019 or when the new stop at Highway 37 and Fairgrounds is completed. At the June 28th, 2017 meeting, the SolanoExpress Intercity Transit Consortium requested to modify the recommendation as shown below in strikethrough bold italics. The STA TAC concurred.

Recommendations: Forward a recommendation to the STA Board to authorize the Executive Director to:

1. Implement two phases of SolanoExpress service changes as shown in Attachment A:

A. About January 1, 2018 July 1, 2018: Phase 1, Yellow, Green Express and Blue Lines

B. About July 1, 2018 July 1, 2019: Phase 2, Green Line 2. Work with the SolanoExpress providers to implement a new unified fare structure

across all SolanoExpress services, as generally identified in this agenda item; 3. Work with the SolanoExpress providers to proceed with hearings and outreach to

comply with regulatory and funding regulations and laws; and 4. Develop and implement outreach and marketing plans to promote the

SolanoExpress service changes.

On a motion by Dave Melilli and a second by Jason Riley, the STA TAC unanimously approved the recommendation as amended shown above in strikethrough bold italics. (8 Ayes)

B. Approval of SolanoExpress Bus Stop Locations as Part of SolanoExpress Operations Implementation Plan Anthony Adams cited that the STA Board authorized Funding Agreements with the cities of Fairfield and Vacaville to construct the stops at the Solano Community College sites; however, the formal action to approve the stop locations will be recommended at their July Board meeting. He noted that STA staff is seeking a formal approval of the three bus locations to begin developing the project with the goal to have the three sites constructed by Fall 2018. He explained that all three stops are integral to streamlining the SolanoExpress Bus Service by reducing service times with focused stop locations serving Solano County residents and employers.

23

Recommendation: Forward a recommendation to the STA Board to approve the SolanoExpress Bus Stop Locations for the new SolanoExpress Operations Implementation Plan as specified in Attachment C and included locations at:

1. Fairfield Solano Community College Main Campus as shown in Attachment A; 2. Vacaville Solano Community College Satellite Campus as shown in Attachment B; and 3. Fairgrounds Drive/State Route 37 as shown in Attachment C.

On a motion by Dave Melilli, and a second by Graham Wadsworth, the STA TAC unanimously

approved the recommendation. (5 Ayes)

Daryl Halls left the meeting.

C. Solano Active Transportation Plan (ATP) – Element of the Comprehensive Transportation Plan Robert Macaulay noted that as the scope of work for consultant services is being developed, STA staff would like the TAC members to weigh in on an opening statement/purpose that lays out the STA vision for the ATP. He cited that some comments on the proposed purpose have already been submitted by planning staff. Graham Wadsworth, City of Benicia, suggested adding the following information to the Scope of Work during the Request for Proposal (RFP) process:

1. Targeting Younger People 2. Transit Oriented Development 3. Carefree Tourism 4. ADA Accessibility 5. STA Staff’s Task List

Anthony Adams also mentioned that additional funding may be obtained through the expansion of Caltrans Planning Grants of SB 1 which would allow to expand the scope.

Recommendation: Review and provide comments on the proposed purpose of the Solano Active Transportation Plan - Element of the Comprehensive Transportation Plan as shown in Attachment A.

8. INFORMATIONAL – DISCUSSION

A. Office of Traffic Safety (OTS) Grant Update Anthony Adams and Lloyd Nadal provided a brief explanation of two grants (Traffic Records and Pedestrian and Bicycle Safety) totaling $171,000 preliminary awarded by the OTS. Mr. Adams reported that the traffic records grant will be focused on procurement of collision data software and standardization of data reporting techniques. This data will help to identify the types and locations of collisions, and will have this data available and analyzed automatically. In consultation with the commanders of each police department within Solano County, all data will be collected and made available through an online portal. Mr. Nadal also reported that the pedestrian and bicycle safety grant will be focused on reducing injuries of middle and high school children within Solano County. He commented that the Solano Safe Routes to School Program launched a youth engagement program in January 2017 and with the potential support from this OTS grant, youth teams across the county will engage in Youth-led Participatory Action Research (YPAR) projects that can lead to sustainable solutions in transportation, safety and increasing physical activity.

24

NO DISCUSSION

B. Legislative Update

C. Summary of Funding Opportunities

D. Draft Meeting Minutes of STA Board & Advisory Committees

E. STA Board and Advisory Committee Meeting Schedule for Calendar Year 2017

9. FUTURE STA TAC AGENDA ITEMS A summary of the agenda items for August/September/October 2017 were presented.

10. ADJOURNMENT The meeting was adjourned at 2:45 p.m.

The next regular meeting of the Technical Advisory Committee is scheduled at, 1:30 p.m. on Wednesday, August 30 2017.

25

This page intentionally left blank.

26

Agenda Item 9.C July 12, 2017

DATE: July 5, 2017 TO: STA Board FROM: Liz Niedziela, Transit Program Manager RE: Fiscal Year (FY) 2017-18 Transportation Development Act (TDA) Matrix – July

2017 – Solano County Transit and revised Solano Transportation Authority (STA) ______________________________________________________________________________

Background: The Transportation Development Act (TDA) was enacted in 1971 by the California Legislature to ensure a continuing statewide commitment to public transportation. This law imposes a one-quarter-cent tax on retail sales within each county for this purpose. Proceeds are returned to counties based upon the amount of taxes collected, and are apportioned within the county based on population. To obtain TDA funds, local jurisdictions must submit requests to regional transportation agencies that review the claims for consistency with TDA requirements. Solano County agencies submit TDA claims to the Metropolitan Transportation Commission (MTC), the Regional Transportation Planning Agency (RTPA) for the nine Bay Area counties. The Solano FY 2017-18 TDA fund estimates by jurisdiction are shown on the attached MTC Fund Estimate (Attachment A). TDA funds are shared among agencies to fund joint services such as SolanoExpress intercity bus routes and Intercity Taxi Scrip Program. To clarify how the TDA funds are to be allocated each year among the local agencies and to identify the purpose of the funds, the STA works with the transit operators and prepares an annual TDA matrix. The TDA matrix is approved by the STA Board and submitted to MTC to provide MTC guidance when reviewing individual TDA claims. The July TDA matrix for FY 2017-18 (Attachment B) is scheduled to be submitted to the STA Board for approval on July 12, 2017. The cost share for the intercity routes per the Intercity Funding Agreement is reflected in the TDA Matrix. The intercity funding formula is based on 20% of the costs shared on population and 80% of the costs shared and on ridership by residency. Population estimates are updated annually using the Department of Finance population estimates and ridership by residency is based on on-board surveys conducted in April 2014. The intercity funding process includes a reconciliation of planned (budgeted) intercity revenues and expenditures to actual revenues and expenditures. In this cycle, FY 2015-16 audited amounts were reconciled to the estimated amounts for FY 2015-16. The reconciliation amounts and the estimated amounts for FY 2017-18 are merged to determine the cost per funding partner. Discussion: The reconciling calculations for FY 2015-16 planned versus actual subsidies from the local jurisdictions are approximately $440,000 less than had been budgeted for. Each of the local jurisdictions, except Dixon, will receive a credit toward the subsidy required for the FY 2017-18 Solano Express operations. Solano County’s contribution does not change. Dixon’s subsidy requirement increased by $5,666, primarily due to lower than anticipated fare revenue on Route 30.

27

For FY 2017-18, the following two TDA claims are being brought forward for review: Solano Transportation Authority TDA Revision STA previously requested $1,033,696 in FY 2017-18 TDA funds which was approved by the STA Board. TDA funds in the amount of $521,046 will be used for transit programs, administration, coordination, and planning. TDA funds in the amount of $141,845 will be claimed against the Suisun City TDA share for operating and maintenance cost for the Suisun City AMTRAK station for FY 2013-14, FY 2014-15, FY 2015-16, and FY 2016-17. Solano County TDA funds in the amount of $512,650 are to be claimed for the Intercity Taxi Scrip Program ($472,650) and Faith in Action’s program ($40,000) to provide medical transportation for seniors. This amount may be subject to future modification pending discussions with the Consortium regarding Intercity Taxi Scrip Program contributions from each jurisdiction and implementation of Phase 2 of the program. The revised TDA amount includes an additional $65,000 to be claimed against Rio Vista’s TDA to pay back a funding swap from 5311 funding. The $65,000 will be used as capital to fund the SolanoExpress bus stop project. The second revision is the $141,845 TDA claim against Suisun City. The total claim amount has not changed, but $63,548 of the $141,845 is the Suisun City’s loan repayment which will be used for the Fairground Transit Facility Study. STA is requesting a revised amount of $1,098,696 in TDA funds, an addition of $65,000. STA’s TDA claim amounts are included in Attachment B the TDA matrix. Solano County Transit (SolTrans) SolTrans requested $8,335,741 in their local TDA funds. TDA funds in the amount of $5,310,570 will be used for operating, and $3,025,171 will be used for capital projects. SolTrans’ capital projects include:

• $270,000 for vehicle maintenance • $200,000 for facility maintenance • $82,771 for information technology • $1,600,000 for bus replacements • $872,400 for compressed natural gas (CNG) fueling facility

SolTrans TDA claim amounts are included in Attachment B, the TDA Matrix. Both the SolTrans and revised STA TDA claims are scheduled for the July 12th meeting of the STA Board. Additional TDA claims from agencies will be brought to the Consortium meeting of August 29th and added to the TDA Matrix in preparation for the STA Board meeting on September 13, 2017. At the Consortium meeting on June 27th and at the STA TAC meeting on June 28th, the members unanimously approved to forward a recommendation to the STA Board to approve the FY 2017-18 Solano July TDA Matrix for SolTrans and the revised STA. Fiscal Impact: The STA is a recipient of TDA funds from each jurisdiction for the purpose of countywide transit planning, and coordination, and programs. STA claims Suisun City TDA for maintenance of the Suisun Amtrak Station and County TDA for the Intercity Taxi Scrip Program. The STA Board approval of the July 2017 TDA matrix provides the guidance needed by MTC to process the TDA claim submitted by SolTrans from their local TDA funds and by STA from various local TDA funds.

28

Recommendation: Approve the July FY 2017-18 Solano TDA Matrix as shown in Attachment B that includes SolTrans and revised TDA claim for STA. Attachments:

A. FY 2017-18 TDA Fund Estimate for Solano County dated February 22, 2017 B. FY 2017-18 Solano TDA Matrix for July 2017

29

This page intentionally left blank.

30

Attachment ARes No. 4268Page 9 of 172/22/2017

   FY2016‐17 TDA Revenue Estimate  FY2017‐18 TDA Revenue EstimateFY2016‐17 Generation Estimate Adjustment  FY2017‐18 County Auditor's Generation Estimate1. Original County Auditor Estimate (Feb, 16) 17,773,436 13. County Auditor Estimate 18,508,5682. Revised Estimate (Feb, 17) 18,508,568 FY2017‐18  Planning and Administration Charges3. Revenue Adjustment (Lines 2‐1) 735,132  14. MTC Administration (0.5% of Line 13) 92,543 

FY2016‐17 Planning and Administration Charges Adjustment 15. County Administration (0.5% of Line 13) 92,543 4. MTC Administration (0.5% of Line 3) 3,676    16. MTC Planning (3.0% of Line 13) 555,257 5. County Administration (Up to 0.5% of Line 3)1 3,676  17. Total Charges (Lines 14+15+16) 740,3436. MTC Planning (3.0% of Line 3) 22,054    18. TDA Generations Less Charges (Lines 13‐17) 17,768,2257. Total Charges (Lines 4+5+6) 29,406  FY2017‐18  TDA Apportionment By Article8. Adjusted Generations Less Charges (Lines 3‐7) 705,726  19. Article 3.0 (2.0% of Line 18) 355,365 

FY2016‐17 TDA Adjustment By Article 20. Funds Remaining  (Lines 18‐19) 17,412,8609. Article 3 Adjustment (2.0% of line 8) 14,115  21. Article 4.5 (5.0% of Line 20) 0 10. Funds Remaining  (Lines 8‐9) 691,611  22. TDA Article 4 (Lines 20‐21) 17,412,86011. Article 4.5 Adjustment (5.0% of Line 10) 0 12. Article 4 Adjustment (Lines 10‐11) 691,611 

Column A B C=Sum(A:B) D E F G H=Sum(C:G) I J=Sum(H:I)6/30/2016 FY2015‐16 6/30/2016 FY2015‐17 FY2016‐17 FY2016‐17 FY2016‐17 6/30/2017 FY2017‐18 FY2017‐18

Apportionment Jurisdictions

Balance (w/o interest)

InterestBalance 

(w/ interest)2Outstanding

Commitments3Transfers/ Refunds

OriginalEstimate

RevenueAdjustment

ProjectedCarryover

RevenueEstimate

Available for Allocation

Article 3 454,872  3,633  458,505  (307,353) 0  341,250  14,115  506,517  355,365  861,882 Article 4.5SUBTOTAL 454,872  3,633  458,505  (307,353) 0  341,250  14,115  506,517  355,365  861,882 

Article 4/8Dixon 1,057,683  4,549  1,062,232  (501,795) 0  745,767  31,104  1,337,308  776,613  2,113,921 Fairfield 2,644,836  19,059  2,663,895  (6,121,099) 0  4,355,601  180,058  1,078,456  4,535,754  5,614,210 Rio Vista 409,992  2,440  412,432  (335,741) 0  318,930  12,985  408,606  332,122  740,728 Solano County 1,158,796  6,193  1,164,989  (598,596) 0  753,163  31,407  1,350,963  784,315  2,135,278 Suisun City 42,081  246  42,328  (1,166,611) 0  1,124,528  46,724  46,969  1,171,040  1,218,009 Vacaville 7,141,004  39,952  7,180,956  (2,967,211) 0  3,686,482  153,209  8,053,436  3,838,959  11,892,395 Vallejo/Benicia4 7,990,922  29,989  8,020,911  (9,945,605) 0  5,736,777  236,124  4,048,206  5,974,057  10,022,263 

SUBTOTAL 20,445,313  102,429  20,547,742  (21,636,658) 0  16,721,249  691,611  16,323,944  17,412,860  33,736,804 GRAND TOTAL $20,900,186  $106,061  $21,006,247  ($21,944,012) $0  $17,062,499  $705,726  $16,830,461  $17,768,225  $34,598,686 1. Balance as of 6/30/16 is from MTC FY2015‐16 Audit, and it contains both funds available for allocation and funds that have been allocated but not disbursed.2. The outstanding commitments figure includes all unpaid allocations as of 6/30/16, and FY2016‐17 allocations as of 1/31/17.3. Where applicable by local agreement, contributions from each jurisdiction will be made to support the Intercity Transit Funding Agreement.4. Beginning in FY2012‐13, the Benicia apportionment area is combined with Vallejo, and available for SolTrans to claim.

FY 2017‐18 FUND ESTIMATETRANSPORTATION DEVELOPMENT ACT FUNDSSOLANO COUNTY

TDA APPORTIONMENT BY JURISDICTION

31

This page intentionally left blank.

32

FY 2017-18 TDA Matrix July 2017 Attachment B

19-Jun-17 FY 2017-18

FAST FAST FAST SolTrans SolTrans SolTrans FAST FAST SolTrans

AGENCY TDA Est from MTC, 2/22/17

Projected Carryover

2/22/17

Carryover Adjustment

2/28/17

Available for

Allocation 2/22/17

FY2016-17 Allocations / Returns after

1/31/17

ADA Subsidized

Intercity Taxi

Paratransit Dixon Readi-Ride

FAST Rio Vista Delta

Breeze

Vacaville City

Coach

SolTrans Rt 20 Rt 30 Rt 40 Rt. 78 Rt. 80 Rt 85 Rt. 90 Intercity Subtotal

Intercity Subtotal

STA Planning

Other Swaps

Transit Capital

Total Balance

(1) (1) (2) (1) (3) (4) (5) (6) (6) (7) (8) (9)

Dixon 776,613 1,337,308 2,113,921 5,000 4,911$ 112,848$ 3,705$ 8,685$ 2,982$ 6,020$ 3,026$ 124,491$ 17,687$ 22,700$ 169,878$ 1,944,043Fairfield 4,535,754 1,078,456 5,614,210 40,000 96,554$ 135,088$ 167,970$ 40,714$ 25,114$ 107,924$ 93,684$ 493,295$ 173,752$ 132,533$ 839,580$ 4,774,630Rio Vista 332,122 408,606 740,728 5,000 -$ -$ -$ -$ -$ -$ -$ 0 -$ 9,699$ 65,000 79,699$ 661,029Suisun City 1,171,040 46,969 1,218,009 0 17,216$ 37,135$ 58,085$ 9,104$ 6,059$ 27,599$ 33,897$ 146,333$ 42,761$ 46,463$ 141,845$ 377,403$ 840,606Vacaville 3,838,959 8,053,436 11,892,395 172,853 70,000 475,291 905,260 139,981$ 192,801$ 131,387$ 30,552$ 16,440$ 35,576$ 31,455$ 495,624$ 82,568$ 112,196$ 1,329,000 3,642,792$ 8,249,603Vallejo/Benicia (SolTrans) 5,974,057 4,048,206 39,810 10,062,073 85,000 1,346,163 2,472,761 31,729$ 90,533$ 31,941$ 541,986$ 266,902$ 291,623$ 12,772$ 166,976$ 1,100,511$ 174,530$ 186,830$ 3,025,171 8,557,941$ 1,504,132Solano County 784,315 1,350,963 -39,810 2,095,468 512,650 17,335$ 34,895$ 23,647$ 36,799$ 13,841$ 23,727$ 8,219$ 84,095$ 74,367$ 22,925$ 694,037$ 1,401,431

Total 17,412,860 16,323,944 0 33,736,804 172,853 717,650 1,821,454 0 0 0 905,260 2,472,761 307,726$ 603,300$ 416,735$ 667,839$ 331,337$ 492,470$ 183,053 1,510,814$ 1,491,645$ 521,046$ 328,675$ 4,419,171$ 14,361,330$ 19,375,474

NOTES:Background colors on Rt. Headings denote operator of intercity routeBackground colors denote which jurisdiction is claiming funds

(1) MTC February 22, 2017 Fund Estimate; Reso 4268; columns I, H, J(2) Correction from MTC on 2/28/17 for Solano County apportionment mistakenly attirbuted to the Vallejo apportionment. (3) Vacaville return of $7,146.65, per MTC 4/18/17 and $180,000 route planning allocation, per MTC 5/8/17.(4) STA will be claimant. Amounts subject to change. $40,000 will go to Faith In Action.(5) Includes flex routes, paratransit, local subsidized taxi(6) Consistent with FY2017-18 Intercity Transit Funding Agreement and FY 2015-16 Reconciliation(7) Claimed by STA from all agencies per formula; presented to STA Board on May 10, 2017. Suisun City amount includes $12,240 unclaimed from FY16-17 and $34,223 for FY17-18.

(9) Transit Capital purchases include bus purchases, maintenance facilities, etc. As part of a funding swap, STA will claim $65,000 against Rio Vista TDA and use the funding for SolanoExpress bus stops

Paratransit Local Transit Intercity

(8) Suisun City item to be claimed by STA for Suisun Amtrak station maintenance (includes FY16-17 $50,000 unclaimed and FY17-18 $50,000 and $41,845 return). STA will use $63,548 for STAF Loan Repayment for Fairground Transit Facility Study (9). SolTrans item includes LCTOP fund swap with Dixon ($30,216), Rio Vista ($12,543), and Vacaville ($144,070) for FY15-16 and FY16-17.

(0) TDA Matrix33

This page intentionally left blank.

34

Agenda Item 9.D July 12, 2017

DATE: July 12, 2017 TO: STA Board FROM: Lloyd Nadal, SR2S Program Administrator RE: Safe Routes to School – Contract with Bay Area Children’s Theatre for SR2S

Presentations for FY 2017-18 School Year Background: The Solano Safe Routes to School (SR2S) Program works to increase the number of students walking and bicycling to school by helping to make the journey safe, fun and healthy. Using a comprehensive approach, the program includes 6 “E’s”: education, encouragement, enforcement, engagement, engineering and evaluation. The program is available to all schools countywide and focuses on activities and programs that educate students on safety, health awareness and identifying improvements within communities countywide to enhance active student travel safety.

The Bay Area Children’s Theatre was founded in 2004 to enrich children’s lives, inspire their imagination, and introduce them to lifelong enjoyment of theatre. They currently serve more than 90,000 children and adults each year with the goal of bringing high-quality artistic experiences to the families of the Bay Area. They specifically provide professional productions especially designed to engage young audiences and theatre education for students in more than 10 East Bay communities.

One of the theatre education productions they developed is called “Rock the Block: A Walk and Roll Musical” for elementary school students. The show features singing, dancing, comedy, and lessons about safely walking and bicycling to and from school. The show has been performed at schools in Alameda County, San Francisco and San Mateo County and STA’s SR2S staff is interested in having them work with us in Solano County this upcoming school year.

Discussion: Over the past few years, interest from schools in our SR2S safety assemblies has gradually decreased. During the 2015-16 school year, there were only 7 requests for safety assemblies and only 1 done this past year. Upon recent conversations with the Bay Area Children’s Theatre, they are able to perform the Rock the Block educational theatre show for up to 25 schools in Solano County. This aligns with STA’s SR2S 6 E’s goals to provide an education and encouragement assembly that will address pedestrian and bicycle safety making it safer for youth to walk and bike to school. They are the only group in the bay area that does an educational theatre production addressing Safe Routes to School activities and the show itself can be tailored specifically to meet the needs of our schools and communities in Solano County. Rock the Block has gotten great reviews from our Safe Routes to School partners in Alameda County and San Francisco.

35

Financial Impact: A maximum amount of $42,000 through June 30, 2018, has been identified for this contract, which will provide up to 25 Rock the Block Educational Theatre shows in Solano County schools. The funding is in the SR2S program budget and will be paid for through TDA Article 3, CMAQ and Yolo Solano Air Quality Management District (YSAQMD) Clean Air Funds. Recommendation: Authorize the Executive Director to enter into an agreement with Bay Area Children’s Theatre for an amount not-to-exceed $42,000 for up to 25 Rock the Block educational theatre shows across Solano County. Attachment:

A. Bay Area Children’s Theatre Scope of Work and Proposed Budget for 2017-18 School Year

36

   

 

ORGANIZATION NAME: Bay Area Children’s Theatre PROJECT TITLE: Solano Safe Routes to School (SR2S) Program Contract for Fiscal Year (FY) 2017-2018

SR2S PROGRAM GOALS:

Increase the number of Solano County students walking & biking to school safely, reduce traffic congestion & improve air quality around schools. Improve the PA environment surrounding schools to make it easier and safer to walk and bike to school while increasing student’s daily physical activity levels and reducing obesity and other health risks.

BACKGROUND:

Solano Transportation Authority (STA) and the SR2S Program requests the Bay Area Children’s Theatre to perform the “Rock the Block – a Walk and Roll Musical” educational theatre assembly for up to 25 schools in Solano County during the 2017-2018 School Year. They are the only group in the bay area that does an educational theatre production addressing Safe Routes to School and this assembly aligns with our 6 E’s goals that teaches pedestrian and bicycle safety to encourage youth to walk and bike to school.

SCOPE OF SERVICES TIMELINE OUTPUTS

1) Project Kick-off Meeting with STA and Bay Area Children’s Theatre to discuss logistics, plan for evaluation, finalize task budget and create a school schedule with milestones to complete the assemblies.

2) Deliver up to 12 Rock the Block educational theatre shows in 2017 with elementary schools across Solano County

3) Midpoint Check-in Meeting with STA and Bay

Area Children’s Theatre to discuss how shows are going and if there’s any feedback, issues or modifications that need to take place

4) Deliver the remaining Rock the Block

educational theatre shows to elementary schools in 2018

5) Final Check-in Meeting or Call with STA and Bay Area Children’s Theatre to finalize all invoices

Proposed Schools (25) Benicia: Matthew Turner, Mary Farmer, Henderson, Mary Semple, St. Dominic's Dixon: Anderson Fairfield: Anna Kyle, B. Gale Wilson, Cleo Gordon, David Weir, K.I. Jones, Laurel Creek, Tolenas Rio Vista: DH White Elementary Suisun City: Suisun Elementary, Dan O. Root Vacaville: Callison, Fairmont, Markham, Padan Vallejo: Cooper, Lincoln, Pennycook, Steffan Manor, Widenmann,

July 2017

August –December

2017

January 2018

January- May 2018

May 2018

Finalized Budget, Post Evaluation Survey or Methodology and School Assembly Schedule Completed Rock the Block shows in at least 12 different elementary schools in Solano County Meeting Agenda and Modified School Assembly Schedule (if needed) Completed Rock the Block shows at 25 different elementary schools across Solano County Meeting Agenda, Final Student Participation List of Schools and Evaluation Feedback Report from Schools

                SOLANO SAFE ROUTES TO SCHOOL PROGRAM

Scope of Work and Timeline August 2017 - June 2018

37

This page intentionally left blank.

38

Agenda Item 9.E July 12, 2017

DATE: June 29, 2017 TO: STA Board FROM: Brandon Thomson, Transit Mobility Coordinator RE: STA’s Title VI Program - Title VI of the Civil Rights Act of 1964 Background: On October 1, 2012, the Federal Transit Administration (FTA) released an update to guidance regarding Title VI of the Civil Rights Act of 1964 that provides compliance direction to recipients receiving federal funds. Title VI of the Civil Rights Act of 1964 prohibits discrimination on the basis of race, color, or national origin in any program or activity receiving federal financial assistance. The guidance seeks to ensure:

1) The level and quality of service is provided in a nondiscriminatory manner 2) The agency promotes full and fair participation in decision making without regard to

race, color and national origin 3) Meaningful access to programs by persons with Limited English Proficiency (LEP)

One component of the guidance contained in FTA circular C4702.1B is the requirement of direct recipients to monitor and report on the compliance activities of sub-recipients to whom they allocate funds. In November, 2014, Caltrans notified STA that the Authority would be responsible for complying with the requirements and established a June 30, 2014 deadline for report submittal. In response to Caltrans and the FTA’s request, STA retained Nancy Whelan Consulting (NWC) to develop STA’s Title VI Program. The 2014 Title VI Program update represented the first Title VI Program that STA has completed. The Title VI compliance guidance dictates that the STA must adopt and submit a Title VI Program every 3 years. Caltrans notified STA that their second Title VI Program is due by July 30, 2017. STA, retained Nancy Whelan Consulting (NWC) to develop a Title VI Program Update. The 2017 Title VI Program update represents the second Title VI Program that STA has completed. The third update to the Title VI Program will be conducted in 2020. Discussion: FTA Circular C4702.1B provides recipients and sub-recipients of federal financial assistance with guidance and instruction necessary to carry out the U.S. Department of Transportation regulations on Title VI of the Civil Rights Act of 1964. STA receives federal funds for a number of programs and activities, including its general administrative operation, Solano Commuter Information, Safe Routes to School, and the Mobility Management program. However, management of projects in Caltrans or the local jurisdictions’ right of way would not be included, as STA is an “implementing agency” not a “project sponsor.” For those activities, Caltrans or the local jurisdictions would be responsible for Title VI compliance.

39

This program includes documentation that demonstrates compliance with the following required general elements:

1) Title VI notice to the public that indicates that the recipient complies with Title VI, and informs members of the public of the protections against discrimination afforded to them by Title VI.

2) Title VI Complaint Policy and instructions to the public on how to file a Title VI complaint, including a copy of the complaint form.

3) List of any Title VI Investigations, lawsuits or complaints filed in the last three years. 4) Public Participation Plan that includes an outreach plan to engage minority and

limited English proficient populations along with a summary of recent outreach or engagement efforts.

5) Language Assistance Plan to provide important information for persons with Limited English Proficiency (LEP).

6) Report on racial breakdown of non-elected boards or advisory committees. 7) Board minutes that document board adoption of Title VI program.

An important aspect of the Title VI Program is that it must be adopted by the agency’s board and integrated in policy and in practice by the agency. As such, the Title VI Program and its associated Complaint Policy, Language Assistance Plan, and Public Participation Plan must become a tenet under which STA operates in order to ensure federal compliance. The Title VI Program commits the agency to undertake activities related to Title VI along with monitoring those activities. This includes updating the Title VI Program every three years that should be included in agency and staff work-plans. Following approval by the STA Board, these Title VI Program requirements will be implemented or phased in over the next year. Recommendation: Approve the following:

1. Adopt the STA’s 2017 Title VI Program as shown in Attachment A; and 2. Authorize the Executive Director to submit the STA’s Title VI Program to Caltrans.

Attachment:

A. For immediate review and printing; click here: STA 2017 Title VI Program Update (July 2017)

40

Agenda Item 9.F July 12, 2017

DATE: June 29, 2017 TO: STA Board FROM: Brandon Thomson, Transit Mobility Coordinator RE: Amendment to Contract with Nelson/Nygaard Consulting Associates for

Intercity Taxi Scrip Phase 2 Program Background: On February 1, 2015, management of the Solano Intercity Taxi Scrip Program transitioned to the Solano Transportation Authority (STA) from Solano County. The Solano Intercity Taxi Program continues to be a popular program, with nearly all booklets available selling out each month. Phase II of this program will seek to incorporate non-ambulatory into the program. Nelson\Nygaard Consulting Associates have analyzed options for a new service delivery model and had recommended using the centralized reservation model for implementing Phase II of the Solano Intercity Taxi Scrip Program. The STA Board adopted the recommendation of utilizing a Centralized Reservation Agent, with the Solano Mobility being the implement agent on March 8, 2017. Discussion: The STA is currently under contract with Nelson\Nygaard Consulting Associates until December 31, 2017. The current contract is to assess and develop a model for the addition of non-ambulatory patrons on the Solano Intercity Taxi Scrip Program, Phase II. Nelson\Nygaard has completed these tasks and there is an unused balance of $71,974 remaining on their contract. Now that Nelson\Nygaard Consulting Services has assessed and developed the model for the Solano Intercity Taxi Scrip Program, Phase II, STA staff will begin the implementation phase. The implementation of the Centralized Reservation Agent for Solano Intercity Taxi Scrip, Phase II is slated to begin January 1, 2018. STA staff is recommending to amend Nelson\Nygaard Consulting Services’ contract to include an updated Scope of Work (Attachment A) to assist STA Staff in the implementation phase. Additionally, Nelson\Nygaard Consulting Services has estimated that their share of work for the implementation process would cost $107,900 (Attachment B), which means that STA would need to add $35,936 to the contract amendment and extend to time to June 30, 2018. Fiscal Impact: Solano County TDA in the amount of $107,900 will be used to cover this cost. Recommendation: Authorize the Executive Director to:

1. Amend Nelson/Nygaard Consulting Associates contract for implementation of the Intercity Taxi Scrip – Phase 2 Program for an amount not to exceed $35,936 and to include the new scope of work as shown in Attachment A; and

2. Extend Nelson/Nygaard Consulting Associates contract to June 30, 2018. Attachments:

A. Solano Intercity Taxi Scrip Phase II Scope of Work B. Solano Intercity Taxi Scrip Phase II Implementation Budget

41

This page intentionally left blank.

42

Implementation Steps for Intercity Taxi with Central Call Taking

Tasks NN Role STA Role

1. Develop detailed call center procedures including use of a database, a script for receiving trip requests from customers, forwarding requests to providers, whether and when to have customers wait on hold while the provider is contacted, procedures for monitoring or following up on in-process trips, and checking rider accounts; procedures when accounts are insufficient for a requested ride, etc.

Meet with call center staff to discuss procedures and script. Produce a draft. Revise per STA comments.

Review and test. Continuing revision as needed.

2. Develop procedures for customers to buy credit / replenish their accounts. Eventually riders should be able to buy credit on-line, but as in interim step, and for customers who prefer not to go online, payment will need to be received either on the phone or by mail. Develop procedures for local operators to establish limits on customer purchases according to their budgetary arrangements. Develop procedures to implement those limits. Ensure the call center has procedures for receiving and processing checks and credit card payments. Confer with operators and decide on phase-in schedule, including whether to phase some operators before others.

Advise on requirements. Ensure the database is compatible with whatever arrangements are established. Participate in discussions.

Work with operators and STA finance to determine roles and procedures. Final decision on phasing.

3. Create a database with: 1) records for all participants, their eligibility, residential address, number of trips taken, credit in their account, trip history etc.; 2) data for each provider including trips provided, estimated fare, total amount due and status of payment. Ideally the database should be implemented “in the cloud” so it is automatically backed up and can be seamlessly accessed from multiple locations. Will probably require contracting with a software developer. The database must be developed in

Create database working with a subcontractor. Facilitate call center involvement.

Identify any hardware, connectivity, staffing constraints that affect database design.

43

Nelson\Nygaard Consulting Associates, Inc. | 2

Tasks NN Role STA Role tandem with procedures for the call center, so call takers are instructed how to interact with both the customer and the database

4. Determine how best to convey trip requests to providers. Assuming that providers are low-tech operations, they may want to receive faxes (physical pieces of paper for the dispatchers to look at) or they may be comfortable with email. (Eventually, a cloud-based database could eliminate the need for either faxes or email.)

Meet with providers and work out procedures.

Facilitate and participate in provider meetings.

5. Establish procedures for trip fares and paying providers. Taxi companies may prefer to continue to rely on taximeters rather than STA calculations for the trip based on mileage and estimated wait time. Frequency of payment and trip data reconciliation need to be determined. An interim approach may be to send companies STA’s estimate of the amount due based on an estimated fare calculated from map mileage and approximate waiting times, and give them the choice of: 1) accepting payment based STA’s calculations, or 2) waiting to send STA an invoice with documentation for each trip and then waiting for STA to check their trip billings.

Determine preferences of STA finance and call center. Ensure database includes needed functionality.

Determine preferences of operators. Resolve any legal issues regarding fares based on city ordinances.

6. Amend taxi agreements to include all of the above. Suggest amendment text. Participate in discussions with operators.

Work with operators to conclude amendments.

7. Identify a taxi company or other entity to receive calls when the STA call center is closed, establish procedures and guidelines for how it works with STA and other providers, and negotiate an agreement including rates of payment.

Identify requirements and realistic rates. Participate in discussion with potential vendors.

Negotiate agreement.

44

Nelson\Nygaard Consulting Associates, Inc. | 3

Tasks NN Role STA Role

8. Identify providers of wheelchair accessible service, determine a basis of payment (rates), what response time they can commit to, procedures for transmitting and monitoring trips, reimbursement procedures.

Participate in discussions with potential providers. Draft procedures.

Participate in discussions with potential providers. Review, test, and finalize procedures.

9. Negotiate agreements with wheelchair accessible service providers based on the above. (May be part of second phase.)

Draft a scope of services. Advise.

Negotiate agreements.

10. Develop public information materials and conduct a public information campaign. Public education will need to assure riders that they will not “lose their scrip” and help them make a seamless transition to a completely new way of arranging and paying for trips. Develop program branding that emphasizes continuity, for example ‘Intercity Taxi v-Scrip’. Public education will need to include public meetings, mailings, receiving and responding to telephone requests for information, education of local staff who communicate with customers, and education of taxi drivers to ensure that they provide accurate information to their riders.

Advise. Contribute draft text if needed. Participate in meetings if needed.

Lead.

11. Train call center operators. Also offer training to provider dispatchers and drivers.

Participate in training. Call center take the lead in training dispatchers and drivers?

12. Provide interim program management in the month leading up to the start of service and one month thereafter.

Provide an interim program manager.

Coordinate to ensure smooth transition to permanent staff.

45

Nelson\Nygaard Consulting Associates, Inc. | 4

Target implementation date: January 2018

46

Implementatation Tasks NN Role DK RW Staff

Meet with call center staff to discuss procedures and script

8 8 8

Produce call center draft procedures and script. Revise per STA comments

16 2 8

Develop procedures for customers to buy credit / replenish their accounts. Eventually riders should be able to buy credit on-line, but as in interim step, and for customers who prefer not to go online, payment will need to be received either on the phone or by mail.

Advise on requirements for customer trip-credit purchases

4

Develop procedures for local operators to establish limits on customer purchases according to their budgetary arrangements.

Incorporate procedures into database design.

8 4

Ensure the call center has procedures for receiving and processing checks and credit card payments.

Ensure the database is compatible with whatever arrangements are established for customer trip-credit purchases

4 4

Confer with operators and decide on phase-in schedule, including whether to phase some operators before others.

Participate in discussions. 8 8

Create database software working with a subcontractor

20 8

Facilitate call center involvement in database design, installation, and testing

16 8

Determine how best to convey trip requests to providers. Assuming that providers are low-tech operations, they may want to receive faxes (physical pieces of paper for the dispatchers to look at) or they may be comfortable with email. (Eventually, a cloud-based database could eliminate the need for either faxes or email.)

Meet with providers and work out procedures for communicating trip info

16 8

Determine preferences of STA finance and call center for provider invoicing and payment

4

Ensure database includes needed functionality for provider invoicing and payment

4

Amend taxi agreements to include all of the above.

Suggest text for taxi provider amendments.Participate in discussions with providers.

8

Identify requirements and realistic rates for after-hours call center

4

Participate in discussion with potential vendors for after-hours call center

8

Participate in discussions with potential wheelchair-accessible providers

8

Draft procedures for wheelchair accessible service

6

Negotiate agreements with wheelchair accessible service based on the above. (May be part of second phase.)

Draft a scope of services. Advise.

8 4

Advise on public information / education

4

Contribute draft text for public information / education if needed

4

Participate in public meetings if needed

16 12

Train call center operators. Also offer training to provider dispatchers and drivers.

Train call center staff, possibly dispatchers and drivers

24 8 24

Provide interim program management for the month leading up to implementation and one month thereafter.

Provide one half-time staff person to work onsite at STA.

8 8 176

Total hours 206 54 244Staff billing rates: $225 $225 $100Cost $46,350 $12,150 $24,400

Total labor $82,900Database Programming $25,000Total cost $107,900

Develop detailed call center procedures including use of a database, a script for receiving trip requests from customers, forwarding requests to providers, whether and when to have customers wait on hold while the provider is contacted, procedures for monitoring or following up on in-process trips, and checking rider accounts; procedures when accounts are insufficient for a requested ride, etc.

Develop public information materials and conduct a public information campaign. Public education will need to assure riders that they will not “lose their scrip” and help them make a seamless transition to a completely new way of arranging and paying for trips.Develop program branding that emphasizes continuity, for example "Intercity Taxi v-Scrip." Public education will need to include public meetings, mailings, receiving and responding to telephone requests for information, education of local staff who communicate with customers, and education of taxi drivers to ensure that they provide accurate information to their riders.

Identify a taxi company or other entity to receive calls when the STA call center is closed, establish procedures and guidelines for how it works with STA and other providers, and negotiate an agreement including rates of payment.

Identify providers of wheelchair accessible service, determine a basis of payment (rates), what response time they can commit to, procedures for transmitting and monitoring trips, reimbursement procedures.

Create a database with: 1) records for all participants, their eligibility, residential address, number of trips taken, credit in their account, trip history etc.; 2) data for each provider including trips provided, estimated fare, total amount due and status of payment. Ideally the database should be implemented “in the cloud” so it is automatically backed up and can be seamlessly accessed from multiple locations. Will probably require contracting with a software developer. The database must be developed in tandem with procedures for the call center, so call takers are instructed how to interact with both the customer and the database

Establish procedures for trip fares and paying providers. Taxi companies may prefer to continue to rely on taximeters rather than STA calculations for the trip based on mileage and estimated wait time. Frequency of payment and trip data reconciliation need to be determined. An interim approach may be to send companies STA’s estimate of the amount due based on an estimated fare calculated from map mileage and approximate waiting times, and give them the choice of: 1) accepting payment based STA’s calculations, or 2) waiting to send STA an invoice with documentation for each trip and then waiting for STA to check their trip billings.

47

This page intentionally left blank.

48

Agenda Item 9.G July 12, 2017

  

DATE: July 3, 2017 TO: STA Board FROM: Robert Guerrero, Senior Project Manager RE: 2017 Regional Transportation Impact Fee (RTIF) Update and Project

Recommendations Background: The STA and the County of Solano coordinates on the collection and management of the Regional Transportation Impact Fee (RTIF), a transportation component of the County’s Public Facilities Fee (PFF). The County Board of Supervisors added a $1,500 per dwelling unit equivalent dedicated to the RTIF program as part of the PFF at on December 3, 2013. The RTIF collection formally began on February 3, 2014 with $3.6 million collected as of the 2nd Quarter of Fiscal Year 2017-18. Seven RTIF Working Groups were created to administer the RTIF funds for transportation projects that address development growth. Five of the seven RTIF Working Groups are geographically situated with the City of Fairfield (3 of 5) and the County of Solano (5 of 5) located in multiple Working Groups. Attachment A illustrates the five RTIF Working Group boundaries. The remaining two working groups were created separately with a 10% off the top revenue dedication (5% each) for both the unincorporated County area and transit related projects. The selected RTIF eligible transportation projects for each Working Group are the following:

1. Working Group District 1- Jepson Parkway 2. Working Group District 2- Hwy 12/Church Road Project 3. Working Group District 3- Fairgrounds Drive/Fairgrounds 4. Working Group District 4- Green Valley Overcrossing 5. Working Group District 5- Intersection Safety Improvements at Midway, Pedrick, Pitt

School and Porter Roads 6. Transit Working Group District 6- Benicia Bus Hub 7. County Unincorporated Working Group District 7- Midway and Vaca Valley Roads

The RTIF Working Groups meet at least once annually to provide a status update on the program and the selected project. Discussion: All seven RTIF Working Groups met between the March and June this year. All of the Working Groups are making progress on their projects with three completed or nearing completion:

1. Working Group 1 – Jepson Parkway – 2 phases under construction 2. Working Group 2- Hwy 12 Church Road Environmental Documents and completed

design phase agreement under development 3. Working Group 3- Benicia Bus Hub – construction nearing completion 4. Working Group 4 – Green Valley Overpass - construction nearing completion

49

With the completion of the Benicia Bus Hub Project, Working Group 3 recommended the remaining RTIF revenue collected through FY 2017-18 for the Solano County/Vallejo Fairgrounds Drive Project. However, STA staff is recommending modification to this by dedicating the funds toward the SR 37/Fairgrounds Drive SolanoExpress Bus Stop project (a multimodal component of the Fairgrounds Drive Project) for the next 6 fiscal years to match Working Group 6’s RTIF recommendation. Working Group 6 also recommended their revenue be dedicated to the SR 37/Fairgrounds Drive SolanoExpress Bus Stop project for the next 6 years as part of a finance plan to fully fund the $1.8 million project with $1 million being provided by MTC based on a request by STA. The estimated RTIF revenue from Working Groups 3 and 6 over the next 6 years is $450,000. The project is currently in the Environmental/Design Phase. Working Group 2 agreed to recommend to continue allocating RTIF funds for the SR 12/Church Road Project as part of the Design and Right of Way phase. The Working Group recommended $20k to fund a SR 113 Corridor Study in the City of Dixon and a small section of unincorporated Solano County (South of the City of Dixon). No other changes were recommended by the other Working Groups. Attachment B includes all current and recommended changes to each RTIF Working Group’s projects. STA staff will be preparing the 4th Annual RTIF Report and will provide present it for approval at the August or September Board meeting. Fiscal Impact: None to the STA Budget. Funding is provided by the STA’s Regional Transportation Impact Fee (RTIF). Recommendation: Approve the RTIF Working Groups project recommendations as specified in Attachment B. Attachments:

A. Regional Transportation Impact Fee (RTIF) Working Group Boundaries B. RTIF Working Group Recommendations

50

51

ATTACHMENT B 2017 RTIF Working Group Recommendations Working Group 1 (Members: Matt Tuggle, Sean Cunningham, and George Hicks)

Jepson Parkway Priority No New Projects requested

Working Group 2 (Members: Matt Tuggle,George Hicks, David Mellilli, Tim McSorley)

Church Road/SR 12 Intersection Priority No New Projects requested

Working Group 3 (Members: Jill Mercurio, Matt Tuggle, Graham Wadsworth)

Benicia Bus Hub Completed Add Fairgrounds Drive/SR 37 SolanoExpress Bus Stop. – STA staff recommends 6

year allocation- Estimated to be $150k Working Group 4 (Members: Matt Tuggle and George Hicks)

Green Valley Overcrossing Priority No New Projects requested

Working Group 5 (Members: Matt Tuggle and Jason Riley)

Intersection Safety Improvements at Midway, Pedrick, Pitt School and Porter Roads Add SR 113 Corridor Study - $20k

Working Group 6 (Members: SolanoExpress Consortium Transit Operators)

Benicia Bus Hub Completed Add Fairgrounds Drive/SR 37 SolanoExpress Bus Stop. – STA staff recommends 6

year allocation- Estimated to be $300k Working Group 7 (Members: Matt Tuggle and Bill Emlen)

Midway and Vaca Valley Roads No New Projects requested

52

Agenda Item 9.H July 12, 2017

DATE: July 3, 2017 TO: STA Board FROM: Robert Guerrero, Senior Project Manager RE: SR 37/Fairgrounds Drive SolanoExpress Bus Stop Environmental and

Design Project Background: The Solano Transportation Authority (STA) prepared the I-80/I-680/I-780/State Route 12 Transit Corridor Study to identify strategies to increase operating speeds for the SolanoExpress bus service. Improvements identified in the study included the use of On-Line Stations, facilities that allow the bus to stop without leaving the freeway right of way. In order to begin implementing this strategy, the STA intends to construct bus pullouts near the on-ramp terminals at the SR 37/Fairgrounds Drive interchange. This will allow the planned SolanoExpress Green Line bus service to remain on SR 37 and reduce running times between stops by allowing buses to remain on freeway ramps and avoid city streets. The pullouts will accommodate the planned Green Line service on SR 37 for ridership to/from Six Flags Discovery Kingdom, the Solano County Fairgrounds, and residential neighborhoods north of SR 37. In addition, the planned Green Line service will connect riders from the SR 37/Fairgrounds Drive stop to the Vallejo Ferry, El Cerrito/Del Norte BART, Solano Community College and the Suisun City Capitol Corridor Train Station. The scope of the SR 37/Fairgrounds Drive SolanoExpress Bus Stop also includes pedestrian and bicycle access to the stops. This is the first improvement planned for the larger Fairgrounds Drive Project which spans from SR 37 to I-80/Redwood Drive Interchange. Discussion: STA staff is recommending a continuation of HQE’s consultant contract to complete the Environmental and Design phase of the project. HQE previously managed the Project Study Report (PSR) for the I-80 High Occupancy Vehicle (HOV) Lanes between the Carquinez Bridge and the Columbus Parkway (Route 37), the improvements to the Redwood Parkway eastbound off-ramp, and the new Turner Parkway Extension Overcrossing. The PSR is comprised of the following primary components: the I-80 HOV Lanes, Park-and-Ride Lot, improvements to the Redwood Parkway Interchange, reasons for eliminating the alternative for a new Turner Parkway Overcrossing/Interchange, and improvements at the Route 37/Fairgrounds Drive Interchange. Estimated construction cost is $120 million; $10 million R/W. HQE’s responsibilities for the project included:

Project Management/Administration Geometric Approval Drawings

53

Design Exception Fact Sheets Conceptual Approval (Caltrans) Conceptual Modified Access Approval (FHWA) Project Study Report Coordination with Caltrans, FHWA, STA, Solano County and City of Vallejo

Through a continuation of HQE’s contract with STA, HQE can build on their knowledge and expertise of their previous scope of work and apply it toward the SR 37/Fairgrounds Drive SolanoExpress Bus Stop Project. Details of the Scope of Work is included as Attachment A. Fiscal Impact: The Environmental and Design Phase of the project is estimated to cost $200,000. STA has budgeted $100,000 from State Transit Assistance Funds and $100,000 from Regional Transportation Impact Fee (RTIF) to complete this project. Recommendation: Authorize the STA Executive Director to finalize the SR 37/Fairgrounds Drive SolanoExpress Bus Stop Project scope of work and execute an amendment for $200,000 with HQE’s agreement to include the scope. Attachment:

A. SR 37/Fairgrounds Drive SolanoExpress Bus Stop Project Scope of Work

54

Attachment A State Route 37/Fairgrounds Drive SolanoExpress Bus Stop Environmental and Design Project Scope of Work Task 1 – Project Management

100.10QualityAssurance/QualityControlImplement a Quality Control Plan within one month after notice to proceed. It will be tailored to the specific needs of the project and will include prescriptive approaches to contract monitoring, budget and schedule reviews, interim technical reviews, and procedures for checking design calculations/drawings and reports.

100.20AdministrationPerform agency and subconsultant coordination, prepare Monthly Progress Reports to accompany invoices, process subconsultant invoices, and ensure contract compliance. The Monthly Progress Reports will list tasks completed during the reporting period, anticipated tasks to be completed during the following period, and any outstanding issues requiring resolution. Potential impacts to the schedule and budget will be identified and recommendations to address these impacts will be provided.

100.30ScheduleA draft schedule will be submitted to Caltrans and STA for review, concurrence and approval. Once approved the initial schedule will become the baseline schedule. The baseline schedule will be maintained and updated as necessary.

100.40 Technical Meetings Technical meetings will be held as often as necessary during the course of the project to ensure comprehensive interdisciplinary coordination. Deliverables: Monthly Progress Reports Schedule Task 2 – PS&E

160 Traffic Operational Analysis The surface street signalized intersections have already been coded by DKS into Synchro files. The phasing and geometry for each signal will be compared with current operations, and any required changes incorporated into the files. The volumes will be updated to reflect existing conditions. The existing conditions analysis will be calibrated against observations of existing queue length and travel times.

Synchro will be run for the AM and PM peak periods, for current volumes. It is assumed that horizon year volumes will not be required. The existing conditions analysis will include two scenarios for each period, the No Build and Build Alternatives. The performance parameters provided by Synchro will include delay, LOS, and queue length. Deliverables: AM and PM Intersection LOS

Meeting Agendas and Minutes

55

185.10 Design Surveys Field surveys will be conducted to gather all information required for design of the facility. Perform surveys at project conforms, determine horizontal and vertical locations of existing surface features, and determine storm drainage and sanitary sewer system grate/cover and invert elevations. The base topographic mapping is available from the STA’s Redwood Parkway project. No additional aerial mapping is required. Deliverables: Survey notes and survey information

185.15 Preliminary Designs (35%) Prepare Layouts showing geometric design of bus pull outs. Identify and prepare any required Design Exception Fact Sheets. Obtain conceptual approval of Design Exceptions at 35% design. Deliverables: 35% Design Plans Design Exception Fact Sheets

200.15 Approved Utility Relocation Plans Review the utility relocation plans from utility companies. This effort includes determining the need for and obtaining utility encroachment exceptions, and obtaining exceptions to high-low risk policy if required. Deliverables: Comments on utility relocation plans, if any Encroachment Exceptions, if required 200.20 Utility Relocation Package Prepare a Report of Investigation for each utility that needs to be relocated. The report will identify estimated costs, claims of liability by the owner, rights for which the utility will be installed and the estimated date of completion of the relocation, and documents facts and circumstances that support the liability determination. In conformance with Streets and Highways Code Sections 673, 680 and 720, prepare the required Notice to Owner for each utility to be relocated and submit them to the STA for their signature and delivery to the utility owners. Deliverables: Notice to Owners Utility clearance letter required for right of way certification.

56

205 Permits, Licenses, Agreements and Certifications (PLACs) Obtain encroachment permits from Caltrans and the City of Vallejo to perform all field work necessary for the development of the PS&E. In addition, all technical data required to obtain Agency permits and agreements will be provided to STA. An Environmental Commitments Record will also be prepared if necessary. Deliverables (Technical Data required for the following): Revised Freeway Agreements Maintenance Agreements Encroachment Permits for Design

255 Prepare Final PS&E Package - 95% Submittal 255.05 Review/Incorporate 35% PS&E Comments Review the comments received on the 35% submittal, prepare responses, and incorporate as appropriate into the 95% submittal package. A comment-response form (CRF) will be used to document the disposition of all comments received. Deliverables: CRF - 35% PS&E 255.10 Update PS&E Package Perform a check on all the design calculations and cross-reference the plans to assure coordination among all disciplines. A complete coordination check will also be performed among the plans, specifications, and engineer’s estimate to assure consistency and completeness. Work closely with Caltrans and the STA to provide clarifications and resolve any outstanding issues prior to submitting this package.

Deliverables:

95% Roadway Plans 95% Standard Special Provisions (SSPs) Final Roadway Cross Sections Draft Engineer’s Estimate 255.40 Resident Engineer’s Pending File Documents and information required for the RE’s Pending file include the Environmental Commitments Record (ECR) and Right of Way Certification. Deliverables: RE’s Pending File

260 Prepare Contract Documents Any remaining comments received during the 95% review stage will be addressed and incorporated into the bid package as required. Caltrans and STA will perform a final review, and any remaining comments will be incorporated. It is assumed that STA will administer the construction contract.

Deliverables: Complete Bid Package (All RTL Documents including RE File)

NPDES Statewide Permit (RWQCB)

57

Task 3 – Encroachment Permit Application and CEs 300 Encroachment Permit Application Review Form Prepare the encroachment permit application (form TR-0110) for submittal with the PS&E. 320 Categorical Exemption (CEQA)/Categorical Exclusion (NEPA) Prepare CE/CE forms for environmental clearance. It is assumed that STA will be the CEQA lead and the Federal Transit Administration (FTA) will be the NEPA lead.

58

Agenda Item 9.I July 12, 2017

DATE: July 3, 2017 TO: STA Board FROM: Robert Guerrero, Senior Project Manager RE: Contract Amendment with Project Finance Advisory Limited (PFAL) for

SR 37 Corridor Financial Opportunities Analysis Background: On October 14, 2015, the STA Board authorized STA staff to seek and fund a Public Private Partnership (P3) Consultant Firm to evaluate potential P3 financial solutions to improve the SR 37 corridor. The STA Board’s authorization was just prior to the formation of a Memorandum of Understanding (MOU) partnership between the transportation authorities of Marin, Napa, Sonoma and Solano. In recognition of the benefits of a corridor-wide financial evaluation approach, the MOU group members agreed to share the cost and contribute financially towards a P3 Consultant Firm for a total budget not to exceed $85,000. The STA Board authorized a contribution of up to $50,000; however, as the new partnerships were formed and additional contributions were made by the other participating Transportation Authorities, STA’s contribution for the P3 financial consultant was reduced to $30,000. Project Finance Advisory Limited (PFAL) was selected as a result of a Request for Proposal selection process that included consultant interviews. The Scope of Work, titled “SR 37 Corridor Financial Opportunities Analysis”, included the following tasks and an initial budget of $65,000 with a $20,000 contingency:

1. Case Studies of similarly financed large capital transportation projects; 2. Decision Making Finance Toolbox to assist in decision making strategies with relevant

time schedules; 3. Toll Revenue Forecast & Affordability Analysis with preliminary estimates based on

similar toll pricing structures in the Bay Area with exiting and forecasted corridor traffic conditions; and

4. Final Report summarizing results from each previous tasks. PFAL satisfactorily concluded the majority of their tasks by March 2016; however, additional outreach and staff meetings were needed to conclude their scope of work. Their agreement was amended (PFAL Phase 2 scope) in May 2017 to include the remaining $20,000 contingency budget in order to accommodate additional outreach and completion of their final report. PFAL is anticipated to complete Phase 2 scope of work by July 31st. While PFAL’s effort was largely concluding over the last two months, the four North Bay Transportation Authorities and Metropolitan Transportation Commission (MTC) started to ramp up their efforts to develop a Design Alternative Assessment (DAA) of SR 37. The DAA is a Project Initiation Document (PID) equivalent report that is a necessary precursor document to an environmental document. The SR 37’s DAA is being developed in two phases. Phase 1 focuses

59

on the concept level improvements for the entire SR 37 corridor from I-80 in Solano County to SR101 in Marin County. Phase 2 is a more detailed analysis that focuses on near term, mid- term and long term improvements for the most vulnerable segment of the corridor, likely the segment between Mare Island in Vallejo and SR 121 in Sonoma County. The most vulnerable segment will be determined as part of MTC’s Phase 1 analysis and will be based on a combination of sea level rise impacts and traffic congestion. Discussion: STA staff is recommending an amendment to PFAL’s agreement for a third phase of work. On May 10, 2017, the STA Board approved a recommendation for STA from STA Chair Jim Spering and Vallejo Mayor Bob Sampayan to be the lead agency for Segments B and C of the SR 37 Corridor. This action allows the STA to be the lead agency responsible for working with Caltrans, the Bay Area Toll Authority (BATA), and the SR 37 Policy Committee to advance the initial set of projects on SR 37 that will be identified in MTC’s SR 37 Corridor Study. Designation of a lead agency for the project also enables more meaningful consideration on various options for financing the first set of SR 37 Corridor projects. This would include discussions with BATA, Caltrans, CalSTA, and potential private sector funding partners. STA staff is recommending that PFAL continue advising the STA Board as these financial discussions continue based on the most recent financial assessment of the corridor and their expertise in these type of discussions. In addition, the SR 37 Corridor DAA is anticipated to conclude next year with new traffic analysis and more project level design and cost details. PFAL’s current work is based on a study completed by UC Davis and Caltrans in 2015 that included high level planned project concepts. STA staff is recommending PFAL prepare a project market assessment and review and discuss the MTC SR 37 corridor financing options and key assumptions provided by BATA, Caltrans, CalSTA, and potential private sector partners. Additionally, PFAL assist with public outreach in presenting toll options and financial feasibility based on PFAL Phase 1 scope of work analysis. STA staff recommends amending PFAL contract to add Phase 3 scope of work is included as Attachment A. Fiscal Impact: STA staff is recommending $50,000 to complete the additional scope of work; however, there is $20,000 in budget authority remaining from the STA Board’s action on October 14, 2015. Member Contribution funds are being recommended for the remaining $30,000. Recommendation: Authorize the STA Executive Director to enter into a contract amendment with PFAL for an amount not-to-exceed $50,000 to accomplish Scope of Work as specified in Attachment A. Attachment:

A. SR 37 Corridor Financial Opportunities Analysis Phase 3 Draft Scope of Work

60

Attachment A SR 37 Corridor Financial Opportunities Analysis Draft Phase 3 Scope of Work

Task 1: Public Outreach- Assist in presenting Toll options and Financial Feasibility based on Phase 1 analysis. Maximum of up to four public meetings.

Task 2: Consultant Resource for Evaluating Financial Options - Assist in evaluating other financial options and key assumptions to improve the SR 37 Corridor as provided by private and public agencies (e.g. United Bridge Partners, Bay Area Toll Authority and Caltrans).

Task 3: Project Market Assessment and Corridor Financial Plan Options based on MTC SR 37 Preliminary Design Alternatives Assessment and Corridor Plan Outcome Options

Prepare SR 37 case study with known project information; Initiate and summarize findings from market sounding discussions; Develop project goals & objectives; Develop project risk allocation alternative delivery scenarios; Summarize project delivery and financing alternatives with associated risks/benefits; Identify alternative funding sources (i.e. beyond tolls), magnitude range, timing of

availability and conditions necessary to obtain funding for financial plan options; Summarize key threshold market conditions and key public sector issues; Develop action plan and path forward to address key market conditions/issues; Review findings and action plan document with STA staff and Project Development

Team; Prepare final report of findings and action plan; Present final report to STA Board.

(Optional) Task 4: Corridor Financial Plan Update toll revenue affordability feasibility analysis based on recommended Design

Alternatives Assessment and Corridor Plan Outcome (e.g. with new construction costs, phases and schedules);

Update Operations & Maintenance costs to reflect new technical alternatives; Develop risk analysis; Update Traffic & Revenue analysis; Develop additional funding alternatives (i.e. beyond tolls); Develop financing alternatives; Develop project delivery alternatives; Review findings and action plan document with STA staff and Project Development

Team Prepare Corridor Financial Plan Report; Present final report to STA Board;

(Optional) Task 5: Request for Information

Develop questions and threshold issues for market sounding feedback; Develop RFI document content; Develop screening criteria for participant shortlist; Follow-up interview/ one-on-one meetings with participants; Review findings and action plan document with STA staff and Project Development

Team Prepare summary memo of market sounding findings; Present final report to STA Board

61

This page intentionally left blank.

62

Agenda Item 9.J July 12, 2017

DATE: June 30, 2017 TO: STA Board FROM: Robert Guerrero, Senior Project Manager RE: State Route 37 (SR 37) Environmental Liaison Consultant Background: The past ten years, STA staff has developed extensive experience in the various phases of project delivery. This has included completing nine environmental documents, 10 design documents, right of way activities for seven projects, and managed six construction projects. Equally important, the STA Board has exhibited the political leadership to provide policy direction and take action in support of these efforts. On May 10, 2017, the STA Board approved a recommendation from STA Chair Jim Spering and Vallejo Mayor Bob Sampayan for STA to be the lead agency for project delivery on SR 37 for the corridor segments B (SR 121 to Mare Island Interchange) and C (Mare Island Interchange to I-80). The lead agency is responsible for working with Caltrans, the Bay Area Toll Authority (BATA), and the SR 37 Policy Committee to advance the initial set of projects on SR 37 that will be identified in the Metropolitan Transportation Commission’s (MTC) SR 37 Corridor Study. The STA as the lead agency for the project will now be enable to have more meaningful consideration on various options for financing the first set of SR 37 Corridor projects. This would include discussions with BATA, Caltrans, CalSTA, and potential private sector partners. It also includes preparing to transition from SR 37 Corridor Study, being undertaken by STA, the other three North Bay Transportation Authorities and MTC, to initiate the environmental document for Segments B and C. On June 14th, the STA Board provided direction to STA staff regarding the process for moving the project forward. This includes establishment of an environmental task force. Discussion: The environmental task force for SR 37 is comprised of decision makers from the STA Board, Solano County Board of Supervisors, Bay Conservation and Development Commissioners, Vallejo Council and Napa and Sonoma Counties. The SR 37 Environmental Task Force will be responsible for developing Guiding Principles related to:

Flood Protection Sea Level Adaptation Environmental Justice and Equity Environmental Mitigation Transit Alternatives Corridor Congestion

63

The Task Force will work in parallel with the SR 37 Corridor Study. The Study is currently underway and is anticipated to be completed in Spring 2018. The Task Force’s guiding principles are intended to assist in the evaluation of the initial set of projects anticipated from the Corridor Study, as part of the environmental phase of the project. The Task Force’s recommendations will be reviewed by a Project Delivery Group and ultimately the STA Board. STA staff will also report on any actions the STA Board takes, based on the Task Force’s recommendations, to the SR 37 Policy Committee. Given the complexity of this task, STA staff is recommending consultant support services to assist in managing coordination with the Task Force and other environmental agencies. In addition, STA staff is seeking expertise in developing a Project Definition and Implementation Plan, necessary for a future environmental document. Steve Kinsey from Alta Planning is recommended to be retained based on his familiarity with the SR 37 Corridor and his experience in working with MTC and other agencies and counties involved in the process. The budget for this scope of work is $25,000. Fiscal Impact: STA staff recommends $25,000 from local gas tax available to complete this scope of work. Recommendation: Authorize the Executive Director to:

1. Finalize the scope of work for the project; and 2. Enter into a contract with Alta Planning for an amount not to exceed $25,000 to assist

STA in the development of the environmental document for SR 37 Segments B and C.

64

Attachment A STA Environmental Coordination Consultant Draft Scope of Work

1-Review existing background information related to the PROJECT. This work will also include any authorized field visits. STA shall provide Alta with both a printed and electronic file of documents and maps that currently relate to the project. 2- Strategic engagement recommendations to help inform STA develop its Project Definition and Implementation Plan, prior to the Environmental Review Phase. Primary Alta will primarily consider: a- North Bay public agencies- re: transportation, economic development, land use, and climate change. b- Potential funding and construction partners c.- Environmental agencies and Organizations d.- Business Organizations e.- Consultants- I.E.- Communications, Adaptation, Engineering, Finance 3- Prepare for and attend PROJECT meetings in person or by phone, when authorized by STA management. These may include meetings with: a. STA staff, b. STA Policy Committee, c. The SR 37 MOU Group d. Potential funding and/ or construction partners, e. SR 37 Project Delivery Executive Committee, f. STA Environmental Task Force, g. SR 37 Project Delivery Group, h. Other Federal, State, and Regional public agencies, i. Project Consultants, j. Stakeholder organizations, k. Legislators and other community leaders, and l. the general public.,

65

This page intentionally left blank.

66

Agenda Item 9.K July 12, 2017

DATE: June 30, 2017 TO: STA Board FROM: Robert Guerrero, Senior Project Manager RE: I-80 Corridor Economic Analysis Background: The STA Board unanimously approved the I-80 Express Lanes, the I-80/I-680/SR 12 Interchange, and the I-80 Westbound Truck Scales as Solano County’s top priority transportation projects for SB 1 freight and congested corridors and future toll funds. All three projects are in various stages of advanced project readiness and ready for construction funds.  I-80 Express Lanes The Project will consist of both new High Occupancy Vehicle (HOV) Lanes and conversion of existing HOV to Express Lanes on I-80 between Red Top Road in Fairfield and I-505 in Vacaville for a total of 18-miles in Solano County. The project will enhance travel options of carpools, buses and Express Bus. It will also increase travel time savings and reliability for all motorist and freight on the I-80 corridor. Status: The project is environmentally cleared and is under design. 100% PS&E will be by end of 2017. No R/W acquisition and utility relocations required. I-80/I-680/SR 12 Interchange (Construction Packages 2A, 2B and 3) The Project will improve safety, freight capacity and travel times on I-80, I-680, SR 12 and adjacent city streets. Project features include a realignment of I-680, an improved direct connector route between I-80 and Highway 12, construction of new interchange overcrossings, new entrance/exit ramps, bike and pedestrian safety improvements and the extension of some local streets leading to I-80 and Highway 12. Status: The project is being implemented through seven individual construction packages, each with independent utility. CEQA/NEPA Completed. Project Permitted. Construction Packages 2A is ready for a CMCG advertising, 2B is designed and ready to begin R/W and Package 3 is 65% designed. I-80 Westbound Cordelia Truck Scales Relocation The Project will replace the existing Cordelia Truck Scales along Westbound I-80 in Solano County. Project features include state of the art freight weigh-in-motion and camera technology, replacement of two dynamic and one static scale, four inspection bays which will increase security and capacity for truck inspections. The current facility is outdated and under capacity, causing frequent closures and no weight or inspections of by-passed trucks. Status: The project has CEQA clearance, is currently seeking funding for design, R/W and construction.

67

Discussion: With the passage of the California Transportation Senate Bill 1, two substantial funding opportunities have become available: Trade Corridors ($280 million annually) and Solutions for Congested Corridors ($250 million annually). The STA’s top three transportation priority projects are ideal candidates for both State funding programs. The California Transportation Commission (CTC) is currently developing program guidelines for the two programs and are anticipated to complete them by Fall of 2017. STA staff and MTC staff will coordinate with Caltrans and CTC staff as part of the program guidelines development; however, one key early component for both programs is economic impact/benefit. Given the importance of economic impact to both upcoming funding programs, STA staff proposes to partner with Solano Economic Development Corporation (EDC) to analyze the economic impact to all three STA transportation priorities. With Solano EDC’s recent completion of the “Moving Solano Forward” Economic Strategy, funded by the County of Solano, Solano EDC has access to recent economic data. The two main objectives are to analyze the immediate economic impact of the project’s construction or project phase and the economic impact of the project after completion and the infrastructure is used. Data obtained by this economic analysis will be instrumental in the upcoming SB 1 Grant Program’s call for projects. The proposed scope of work is included as Attachment A. STA is a member of the Solano EDC, which is the most qualified agency to conduct this analysis given their role and network with Solano cities and county governments as well as the Solano business community. The Solano EDC has also conducted a similar economic analysis, in partnership with the STA, for the Hwy 12 Corridor. The economic analysis would be conducted by Sean Quinn, the Project Manager for “Moving Solano Forward” and Dr. Robert Tyler, Professor of Economics and Director of the Center for Regional Economic Analysis at Sonoma State. STA staff is recommending a budget of $25,000 to complete this task. Fiscal Impact: $25,000 from Planning, Programming and Monitoring (PPM) funds is recommended to complete the I-80 Corridor Economic Analysis for the STA’s top three transportation projects. Recommendation: Authorize the STA Executive Director to enter into an agreement with Solano Economic Development Corporation for an amount not to exceed $25,000 to complete the I-80 Corridor Economic Analysis as outlined in Attachment A. Attachment:

A. I-80 Corridor Economic Analysis Scope of Work

68

ATTACHMENT A  

Scope of Work ‐  

Solano Transportation Authority (STA) Projects 

I‐80 Corridor Economic Analyses 

 

Preamble 

 

  This is a scope of work for a study on improvement to Interstate 80 for Solano 

Transportation Authority (STA).  These improvements have economic impacts during 

construction and afterward based on how the improvements support economic 

development in Solano County and beyond.  Three infrastructure improvements and 

augmentations in Solano County include: 

 

1. I�80 Westbound Cordelia Truck Scales Improvements; 

2. I‐80/I‐680/SR12 Interchange Project; and 

3. I‐80 Express Lanes: West of Red Top Road to East of I‐505. 

 

Scope of Work  

 

This report covers all three improvements and provides a general economic analyses. 

These projects have different, individual requirements in terms of estimating potential 

economic effects; projects differ in length of time to final construction, changing the 

number of years before any economic development support takes place beyond 

construction.  The different time lengths are addressed in the report.   

There are two categorical phases of economic impacts.  The first is the 

construction or project phase.  Hiring workers and spending on materials and other 

resources begin effects that lead to more spending throughout Solano County.   Given 

the funding a mix of sources, there is net inbound resources that act like economic 

stimulus to the county economy.  Pro forma budgets are needed for the improvements’ 

costs as input to the economic impact model to measure these impacts.   

The second phase of economic impacts is after construction is complete and the 

infrastructure is used.  Gains such as increased productivity and traffic/accident 

mitigation with this expansion of Solano County’s corridor assets are discussed, as is 

new net tourism flows.  There may also be some negative impacts, likely relatively 

small, such as reduced revenue based on traffic forcing consumers off the corridor 

infrastructure; in net these effects are likely very positive.  A literature review provides 

the basis by which such improvements can be logically linked to future economic 

benefits for economic and workforce development regionally. 

69

A comprehensive economic development strategy (CEDS) report is on the way in 

Solano County, and these results should be tied to that study such that how federal 

dollars may be pursued for these three projects.  A proposed project outline is below. 

 

Project Outline 

 

1. Introduction and overview of issue 

2. Data description  

a. Construction phases and costs 

b. Commuting workers and the recent history for Solano County 

c. ABAG data on laborshed as a beginning (2010 – 2040) from Plan Bay Area 

i. Assumption that traffic patterns likely to follow changes in housing 

and overall employment 

d. Other data on traffic flows, truck use of scales in both directions, and other 

data as germane to the individual study 

3. Project Descriptions 

a. I‐80 Westbound Cordelia Truck Scales Improvements 

i. A valuation of increasing processing capacity from 500‐700 trucks 

per day to 1,000 per hour given truck traffic estimates over a five‐

year timeline  

a. Reduction in congestion 

b. Reduction of accidents ii. Construction benefits (short‐term) while project dollars are spent 

b. I‐80/I‐680/SR12 Interchange Project i. Construction efforts and infusion of state and federal dollars for 

improvements. 

ii. Productivity gains from reduce travel times given 2035 estimates 

iii. Based on wages of workers moving across corridors, the marginal 

change in people moving and also time reduction from home to 

work means more worker productivity in theory 

iv. Analysis would be done by looking as phases and over time from 

2018 to 2035 

a. Use ABAG data to derive laborshed and commute patterns 

as a way to analyze gains in productivity. 

b. Gains outside construction are more limited and speculative 

due to longer completion timeline 

c. I‐80 Express Lanes 

i. This would be a construction effort to extend the HOV lanes in 

eastern Solano County to an 18‐mile stretch.   

70

ii. The additional 9 miles would have a toll based on Fastrak, and 

provide revenue for maintenance and other roadway needs.   

iii. The goal is to reduce congestion and delays otherwise, leading to 

gains to productivity and worker budgets by using less gas and 

having less wear and tear.   

iv. Safety and reduced congestion make for more productive workers 

and flow of commerce across I‐80 by freeing up other lanes for 

truck traffic 

a. Productivity gains depends on the number of workers 

moving across the new nine miles (as well as the original 9 

miles) 

b. Wages and reduced times becomes the estimated gains 

c. There may be some offsets from tourism retail (as well as 

worker retail), if traffic provides an incentive to pull off I‐80 

and shop will traffic is reduced. 

4. Economic Impact Analysis  

a. Use of construction cost estimates and projected gains in worker 

productivity and reduced delays/congestion and possible net tourism 

gains acts as inputs to the model 

i. There may be other gains and losses in net discovered through the 

literature review 

b. Direct impacts and estimated employment changes from budgeted dollars 

to be spent 

c. Induced and indirect impacts on business revenues and employment 

d. State and local tax gains e. Other gains due to toll road or other revenues generated 

i. Tourism: more business revenue and transient occupancy tax 

revenue 

f. Possible long‐term costs as reductions to economic impacts 

5. Qualitative issues and caveats 

a. Productivity in the aggregate an estimate and not easy to measure 

b. Commuting workers difficult to estimate 

i. ABAG data provides some estimate on employment by county, and 

recent data provides some estimates on commute flow 

ii. No knowledge on wages in 2020, 2030 or beyond 

6. Conclusions and recommendations 

 

71

This page intentionally left blank.

72

Agenda Item 9.L July 12, 2017

DATE: June 30, 2017 TO: STA Board FROM: Janet Adams, Deputy Executive Director/Director of Projects RE: I-80/I-680/State Route (SR) 12 Interchange Project Background: Since 2001, STA staff has been working with project consultants, Caltrans and the Federal Highway Administration (FHWA) to complete improvements to the I-80/I-680/SR 12 Interchange Complex. In order to advance improvements to the Interchange in a timely fashion, four separate projects were identified for delivery including the I-80 High Occupancy Vehicle (HOV) Lanes Project, the North Connector Project, the I-80 Eastbound Cordelia Truck Scales Relocation Project and the I-80/I-680/SR 12 Interchange Project. The I-80 HOV Lanes Project has been completed, the North Connector (east portion) Project has been completed (with the exception of the mitigation monitoring), the I-80 Eastbound Cordelia Truck Scales Relocation Project has been completed and the Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the I-80/I-680/SR 12 Interchange (subject of this staff report) was approved in December 2012, with Construction Packages 1-3 now in various phases of implementation. The Initial Construction Package (ICP) is under construction and scheduled to be fully opened to traffic in August 2017, Construction Package 2 (CP2) is in the final design phase, and Construction Package 3 (CP3) has been designed to the 65% level. Discussion: Initial Construction Package As mentioned above, the Initial Construction Package (ICP), which reconstructs the Westbound (WB) I-80 to SR 12 (West) Connector and Green Valley Road Interchange, is now under construction. The construction is expected to be completed over the next few months and the project will need to be closed out. Remaining design services during construction and closeout activities for ICP is estimated at $185,000. As such, staff is recommending $185,000 be transferred from the I-80 Eastbound Truck Scales Project Construction Phase to the I-80/I-680/SR12 Interchange – ICP project Final Design (PS&E) Phase. Construction Package 2 Construction Package 2 (CP2), which consists of constructing a new partial interchange on I-680 at Red Top Road, is in the design phase, with the Final PS&E submitted to Caltrans for review in June 2017. During the design process, it was necessary to have PG&E perform design services for the relocation of gas transmission and distribution facilities. The total estimated cost for PG&E design services are estimated at $400,000, which are funding out of the Right of Way phase. As such, staff is recommending $400,000 be transferred from the I-80 Eastbound Truck Scales Project Construction Phase to the I-80/I-680/SR12 Interchange – CP2 project Right of Way Phase. 73

As part of the standard process, in order to process an allocation transfer request from MTC, STA is required to approve the attached resolution, the Initial Project Report (IPR) for RM2 Project 7 and cash flow plan (attachments to resolution) (Attachment A). Fiscal Impact: With this approach, the $585,000 of Regional Measure 2 or Bridge Toll funds will be transferred from the I-80 Eastbound Truck Scales Project to the I-80/I-680/SR 12 Interchange – ICP Final Design Phase and the CP2 Right-of-Way Phase. Recommendation: Approve the Resolution 2017-06 and Funding Allocation Transfer Request from Metropolitan Transportation Commission (MTC) to transfer $185,000 in Regional Measure 2 or Bridge Toll funds to the I-80/I-680/SR 12 Interchange – ICP Final Design Phase and $400,000 to the CP2 Right-of-Way Phase. Attachment:

A. STA Resolution 2017-06

74

SOLANO TRANSPORTATION AUTHORITY RESOLUTION No. 2017-06

A RESOLUTION OF THE SOLANO TRANSPORTATION AUTHORITY

AUTHORIZING THE AB1171 ALLOCATION TRANSFER REQUEST FOR REGIONAL MEASURE 2 FUNDS FROM THE METROPOLITAN

TRANSPORTATION COMMISSION TO THE I-80/I-680/SR12 INTERCHANGE PROJECT – INITIAL CONSTRUCTION PACKAGE (ICP) AND CONSTRUCTION

PACKAGE 2 (CP2) WHEREAS, the Metropolitan Transportation Commission (“MTC”) is the regional transportation planning agency for the San Francisco Bay Area pursuant to Government Code Sections 66500 et seq; and WHEREAS, Streets and Highway Code Sections 30950 et seq. created the Bay Area Toll Authority (“BATA”), which is a public instrumentality governed by the same board as that governing MTC; and WHEREAS, pursuant to Streets and Highways Code (“SHC”) Section 31010 (b), funds (generally referred to as “AB1171 funds”) generated in excess of those needed to meet the toll commitments as specified in paragraph (4) or subdivision (b) of section 188.5 of the SHC shall be available to BATA for funding projects consistent with SHC Code Sections 30913 and 30914; and WHEREAS, SB 916 (Chapter 715; Statutes 2004), commonly referred to as Regional Measure 2 (“RM2”) identified projects eligible to receive funding under the Regional Traffic Relief Plan; and WHEREAS, MTC is responsible for funding projects eligible for RM2 funds pursuant to Streets and Highways Code Section 30914 (c) and (d); and WHEREAS, MTC has established a process whereby eligible transportation project sponsors may submit allocation requests for RM2 and AB1171 bridge toll funding; and WHEREAS, allocations to MTC must be submitted consistent with procedures and conditions; and WHEREAS, Solano Transportation Authority is the sponsor of the I-80/I-680/SR12 Interchange Project, which is eligible for RM2 and AB 1171 funding; and WHEREAS, the AB1171 allocation transfer request, attached hereto in the Initial Project Report and incorporated herein as though set forth at length, lists the project, purpose, schedule, budget, expenditure and cash flow plan for which Solano Transportation Authority is requesting that MTC allocate funds; and NOW, THEREFORE, BE IT: RESOLVED, that Solano Transportation Authority certifies the PROJECT is consistent with the Regional Transportation Plan (“RTP”); and be it further

75

RESOLVED, that the year of funding for any design, right-of-way and/or construction phases has taken into consideration the time necessary to obtain environmental clearance and permitting approval for the project; and be it further RESOLVED, that Solano Transportation Authority approves the updated Initial Project Report, attached to this resolution; and be it further RESOLVED, that Solano Transportation Authority approves the cash flow plan, attached to this resolution; and be it further RESOLVED, that Solano Transportation Authority has reviewed the project needs and has adequate staffing resources to deliver and complete the project within the schedule set forth in the updated Initial Project Report, attached to this resolution; and be it further RESOLVED, Solano Transportation Authority is an eligible sponsor of projects in the RM2 Regional Traffic Relief Plan, Capital Program, in accordance with California Streets and Highways Code 30914 (c); and be it further RESOLVED, the PROJECT is eligible for receipt of AB1171 funds consistent with California Streets and Highway Code section 31010 (b); and be it further RESOLVED, that Solano Transportation Authority is authorized to submit an application for RM2 and AB1171 funds for PROJECT in accordance with California Streets and Highways Code sections 30913 and 30914(c) as applicable; and be it further RESOLVED, that there is no legal impediment to Solano Transportation Authority making allocation requests for RM2 and AB1171 funds; and be it further RESOLVED, that there is no pending or threatened litigation which might in any way adversely affect the proposed project, or the ability of Solano Transportation Authority to deliver such project; and be it further RESOLVED that Solano Transportation Authority indemnifies and holds harmless MTC, its Commissioners, representatives, agents, and employees from and against all claims, injury, suits, demands, liability, losses, damages, and expenses, whether direct or indirect (including any and all costs and expenses in connection therewith), incurred by reason of any act or failure to act of Solano Transportation Authority, its officers, employees or agents, or subcontractors or any of them in connection with its performance of services under this allocation of RM2 and AB1171 funds. In addition to any other remedy authorized by law, so much of the funding due under this allocation of RM2 and AB1171 funds as shall reasonably be considered necessary by MTC may be retained until disposition has been made of any claim for damages; and be it further RESOLVED, that Solano Transportation Authority shall, if any revenues or profits from any non-governmental use of property (or project) that those revenues or profits shall be used exclusively for the public transportation services for which the project was initially approved, either for capital improvements or maintenance and operational costs, otherwise the Metropolitan Transportation Commission is entitled to a proportionate share equal to MTC’s percentage participation in the projects(s); and be it further

76

RESOLVED, that assets purchased with RM2 and AB1171 funds including facilities and equipment shall be used for the public transportation uses intended, and should said facilities and equipment cease to be operated or maintained for their intended public transportation purposes for its useful life, that the Metropolitan Transportation Commission (MTC) shall be entitled to a present day value refund or credit (at MTC’s option) based on MTC’s share of the Fair Market Value of the said facilities and equipment at the time the public transportation uses ceased, which shall be paid back to MTC in the same proportion that RM2 and AB1171 funds were originally used; and be it further

RESOLVED, that Solano Transportation Authority shall post on both ends of the construction site(s) at least two signs visible to the public stating that the PROJECT is funded with AB1171 Toll Revenues; and be it further

RESOLVED, that Solano Transportation Authority authorizes its Executive Director, or his/her designee, to execute and submit an allocation transfer request to MTC to transfer $185,000 in Regional Measure 2 or AB1171 funds to the I-80/I-680/SR12 Interchange – ICP Final Design Phase and $400,000 to the CP2 Right-of-Way Phase, purposes and amounts included in the project application attached to this resolution. The total of $585,000 will be transferred from the previous allocation of $870,000 for the Construction Phase of the I-80 Eastbound Truck Scales Project; and be it further RESOLVED, that Solano Transportation Authority authorizes its Executive Director, or his designee, has been delegated the authority to make non-substantive changes or minor amendments to the IPR as he deems appropriate; and be it further

RESOLVED, that a copy of this resolution shall be transmitted to MTC in conjunction with the filing of the Solano Transportation Authority application referenced herein.

__________________________________ Jim Spering, Chair Solano Transportation Authority

I, Daryl K. Halls, the Solano Transportation Authority Executive Director, do hereby certify that the above and foregoing resolution was introduced, passed and adopted by said Authority at the regular meeting thereof held this day of July 12, 2017.

__________________________________ Daryl K. Halls, Executive Director Solano Transportation Authority

Passed by the Solano Transportation Authority (STA) Board on this 12th day of July, 2017 by the following vote:

Ayes: ________ Nos: ________ Absent: ________ Abstain: ________ Attest: ______________________ Johanna Masiclat Clerk of the Board

77

This page intentionally left blank.

78

Regional Measure 2 Initial Project Report (IPR)

July 2017

Project Title: RM2 Project No.

Allocation History:

MTC Approval Date Amount Phase

#4 October 2007 $8,300,000 PA/ED for I-80/I-680/SR12 Interchange (Original allocation was $13.2M and $5.2M was transferred to I-80 EB Truck Scales per Allocation #6)

#11 September 2009 $5,200,000 PA/ED for I-80/I-680/SR12 Interchange

#12 February 2010 $2,309,000 Utility Relocation for I-80/I-680/SR12 Interchange; $591,096 transferred to Allocation #28

#15 December 2010 $ 7,000,000 PA/ED for the I-80/I-680/SR12 Interchange

#18 July 2011 $7,000,000 PA/ED for the I-80/I-680/SR12 Interchange

#19 February 2012 $13,138,000

R/W Phase for the I-80/I-680/SR12 Interchange – Initial Construction Package; Reduced by $1,142,000 that was transferred as part of Allocation #31

#20 June 2012 $1,500,000 PA/ED for the I-80/I-680/SR12 Interchange

#21 October 2012 $5,980,000 R/W Phase for the I-80/I-680/SR12 Interchange – Initial Construction Package

#22 December 2012 $5,796,000 R/W Phase for the I-80/I-680/SR12 Interchange – Initial Construction Package

#23 March 2013 $882,008

Final Design (PS&E) Phase for the I-80/I-680/SR12 Interchange – Initial Construction Package

#24 May 2013 $10,400,000 R/W Phase for the I-80/I-680/SR12 Interchange – Initial Construction Package

Solano County Corridor Improvements near Interstate 80/Interstate 680 Interchange

7

79

Regional Measure 2 – INITIAL PROJECT REPORT

- 2 -

#25 June 2013 $1,597,000 Final Design (PS&E) Phase for the I-80/I-680/SR12 Interchange –Construction Package 2

#26 June 2013 $3,916,000 Final Design (PS&E) Phase for the I-80/I-680/SR12 Interchange –Construction Package 3

#27 August 2013 $27,259,000

Construction Phase for the I-80/I-680/SR12 Interchange – Initial Construction Package (ICP) – Reduced by $2,189,000 that was transferred as part of Allocation #30

#28 August 2013 $2,469,096

Right of Way Phase for the I-80/I-680/SR12 Interchange – Initial Construction Package (ICP) – new allocation of $77,992; transfer of $591,096 from Gordon Waterline allocation; transfer of $600,000 from I-80 HOV Lanes PS&E allocation; transfer of $1,200,000 from I-80 Express Lanes PA/ED allocation. TRANSFERRED $1,142,000 to CP3 for Final Design.

#29 February 2014 < $1,000,000>

Transfer from Construction Phase of the I-80/I-680/SR12 Interchange – Initial Construction Package (ICP) to the Construction Phase of the I-80 FPI Project

#30 December 2015 $2,189,000

Right of Way Phase for the I-80/I-680/SR12 Interchange – Construction Package 2 (CP2) – transfer of $2,189,000 from ICP Construction Phase allocation to the CP2 Right of Way Phase.

#31 April 2016 $1,142,000

Final Design (PS&E) Phase for the I-80/I-680/SR12 Interchange – Construction Package 3 (CP3) – transfer of $1,142,000 from ICP Right-of-Way Phase allocation to the CP3 Final Design (PS&E) Phase.

#32 September 2016 $376,813

Right of Way Phase for the I-80/I-680/SR12 Interchange – Construction Package 2 (CP2) – transfer of $125,206 from the Right of Way Phase from the I-80/I-680/SR12 Interchange - ICP and $251,607 from Final Design (PS&E) Phase for the I-80/I-680/SR12 Interchange – Construction Package 3 (CP3).

Total: $105,453,917

Current Allocation Request:

IPR Revision Date Amount Being Requested

Phase Requested

July 2017 $585,000

Transfer $185,000 in Regional Measure 2 or AB1171 funds to the I-80/I-680/SR12 Interchange – ICP Final Design Phase and $400,000 to the CP2 Right-of-Way Phase. The total of $585,000 will be transferred from the previous allocation of $870,000 for the Construction Phase of the I-80 Eastbound Truck Scales Project

80

Regional Measure 2 – INITIAL PROJECT REPORT

- 3 -

I. OVERALL PROJECT INFORMATION

Project Sponsor / Co-sponsor(s) / Implementing Agency

Project Purpose

Project Description (please provide details, expand box as necessary)

Project Graphics to be sent electronically with This Application

Impediments to Project Completion

Operability

Solano Transportation Authority is the project sponsor and implementing agency.

The I-80/I-680/SR-12 Interchange experiences traffic congestion due to San Francisco Bay Area commuter traffic, regional traffic using the interstate system, and recreational traffic traveling between the San Francisco Bay Area and Lake Tahoe. The objectives of the proposed project are to alleviate congestion, improve safety, and provide for existing and proposed traffic demand by upgrading the capacity of the freeway and completing a local roadway system that will provide local travelers alternatives to using the freeways for local trips.

The I-80/I-680/State Route (SR) 12 Interchange Project proposes improvements to address traffic operations and congestion in the existing interchange complex, which is located in Solano County. Improvements being considered or cleared in the Environmental Impact Statement/Environmental Impact Report (EIS/EIR) and other environmental documents include the following components: modification of existing interchanges, adding freeway lanes, constructing new interchanges, auxiliary lanes, high-occupancy vehicle (HOV) lanes and frontage roads within and adjacent to existing freeway rights of way, relocation of the existing westbound truck scales within the interchange area to improve ingress and egress of the truck traffic.

Caltrans will be responsible for owning and operating the mainline I/C and I-80 WB Truck Scale improvements.

The major impediment to accomplish the project completion will be securing necessary funds to complete the interchange improvements. However, there are deliverable phases of this project that are serviceable, provide independent utility and have logical termini. Some of these phases (as discussed below) can be and are being delivered by currently identified fund sources. The STA is currently delivering the I-80/I-680/SR12 I/C improvements, with the expectation that the I/C improvements will need to be constructed with multiple construction packages.

81

Regional Measure 2 – INITIAL PROJECT REPORT

- 4 -

II. PROJECT PHASE DESCRIPTION and STATUS Environmental – Does NEPA Apply: X Yes No

Design –

Right-of-Way Activities / Acquisition –

Construction / Vehicle Acquisition -

III. PROJECT BUDGET

Project Budget (Escalated to year of expenditure)

Phase: I-80/I-680/SR12 I/C Improvements – CP 1, 2, 3 Total Amount - Escalated

(Thousands) Environmental Studies & Preliminary Eng (ENV / PE / PA&ED) $37,800Design - Plans, Specifications and Estimates (PS&E) 7,488Right-of-Way Activities /Acquisition (R/W) 99,349Construction / Rolling Stock Acquisition (CON) 193,457

Total Project Budget (in thousands) $338,094

I-80/I-680/SR12 Interchange Project -The environmental document (EIR/EIS) for the I-80/I-680/SR12 I/C Project was approved in December 2012. The document covers the entire project and as such, a Notice of Determination (NOD) has been approved for the entire project. However, a Record of Decision (ROD) has been issued for the fundable first phase.

Final Design for the first construction package (Initial Construction Package (ICP) was completed in May 2013. Final Design for I-80/I-680/SR12 Interchange - Construction Packages 2 is underway. Preliminary Design for Construction Package 3 has been completed, but sufficient funding is not available for Construction Package 3 to proceed with Final Design.

Right-of-way acquisition for ICP started in spring 2012 and was completed. Activities required to transfer the right-of-way to Caltrans is underway. Closeout of utility relocations are underway. Although right-of-way acquisition for Construction Package 2 and 3 has not started, the developer of the Goldhill Village Development has dedicated easements for the relocation of the Benicia NBA water pipeline and the Fairfield-Suisun Sanitation District sewer pipeline.

It is currently envisioned that the fundable phase of the I-80/I-680/SR12 Interchange will be implemented with 7 construction packages. The first construction package (Initial Construction Package (ICP)) started construction in spring/summer 2014 and is expected to be completed in late summer/early fall 2017. Construction of Construction Packages 2 and 3 has not been scheduled at this time.

82

Regional Measure 2 – INITIAL PROJECT REPORT

- 5 -

Project Budget (Escalated to year of expenditure) Phase: I-80/I-680/SR12 I/C Improvements – Initial Const Package, aka, ICP or CP1

Total Amount - Escalated (Thousands)

Environmental Studies & Preliminary Eng (ENV / PE / PA&ED) $27,400Design - Plans, Specifications and Estimates (PS&E) 1,085Right-of-Way Activities /Acquisition (R/W) 40,092Construction / Rolling Stock Acquisition (CON) 60,676

Total Project Budget (in thousands) $129,253 Project Budget (Escalated to year of expenditure)

Phase: I-80/I-680/SR12 I/C Improvements – Const Package 2 (CP2) Total Amount - Escalated

(Thousands) Environmental Studies & Preliminary Eng (ENV / PE / PA&ED) $3,696Design - Plans, Specifications and Estimates (PS&E) 1,597Right-of-Way Activities /Acquisition (R/W) 10,529Construction / Rolling Stock Acquisition (CON) 40,403

Total Project Budget (in thousands) $56,225 Project Budget (Escalated to year of expenditure)

Phase: I-80/I-680/SR12 I/C Improvements – Const Package 3 (CP3) Total Amount - Escalated

(Thousands) Environmental Studies & Preliminary Eng (ENV / PE / PA&ED) $6,704Design - Plans, Specifications and Estimates (PS&E) 4,806Right-of-Way Activities /Acquisition (R/W) 48,728Construction / Rolling Stock Acquisition (CON) 92,378

Total Project Budget (in thousands) $152,616

IV. OVERALL PROJECT SCHEDULE

Phase: I-80/I-680/SR12 I/C Improvements – Initial Const Package, aka, ICP or CP1 Phase-Milestone

Planned (Update as Needed)

Start Date Completion Date

Environmental Document 06/02 (A) 12/12 (A)

Environmental Studies, Detailed Preliminary Eng. (ENV / PE / PA&ED) 06/02 (A) 12/12 (A)

Final Design - Plans, Specs. & Estimates (PS&E) 08/12 (A) 05/13 (A)

Right-of-Way Activities /Acquisition and Transfer (R/W) 04/12 (A) 06/17

Construction (Begin – Open for Use) / Acquisition / Operating Service (CON) – ICP 05/14 (A) 09/17

83

Regional Measure 2 – INITIAL PROJECT REPORT

- 6 -

Phase: I-80/I-680/SR12 I/C Improvements – Const Package 2 (CP2) Phase-Milestone

Planned (Update as Needed)

Start Date Completion Date

Environmental Document 06/02 (A) 12/12 (A)

Environmental Studies, Detailed Preliminary Eng. (ENV / PE / PA&ED) 06/02 (A) 06/13 (A)

Final Design - Plans, Specs. & Estimates (PS&E) 07/13 (A) 12/16

Right-of-Way Activities /Acquisition (R/W) TBD TBD

Construction (Begin – Open for Use) / Acquisition / Operating Service (CON) – CP2 TBD TBD

Phase: I-80/I-680/SR12 I/C Improvements – Const Package 3 (CP3) Phase-Milestone

Planned (Update as Needed)

Start Date Completion Date

Environmental Document 06/02 (A) 12/12 (A)

Environmental Studies, Detailed Preliminary Eng. (ENV / PE / PA&ED) 06/02 (A) 06/13 (A)

Final Design - Plans, Specs. & Estimates (PS&E) TBD TBD

Right-of-Way Activities /Acquisition (R/W) TBD TBD

Construction (Begin – Open for Use) / Acquisition / Operating Service (CON) – CP3 TBD TBD

V. ALLOCATION REQUEST INFORMATION

Detailed Description of Allocation Request

Amount being requested (in escalated dollars) $ 585,000

Project Phase being requested Final Design and R/W

Are there other fund sources involved in this phase? Yes X No

Date of anticipated Implementing Agency Board approval the RM2 IPR Resolution for the allocation being requested July 2017

Month/year being requested for MTC Commission approval of allocation July 2017

Status of Previous Allocations (if any) Work is progressing well with the previous allocations.

FY 2016-17: Final Design Phase for I-80/I-680/SR12 Interchange Project – ICP and R/W Phase for the Construction Package 2 (CP2) for Utility Relocations for CP2.

84

Regional Measure 2 – INITIAL PROJECT REPORT

- 7 -

Workplan Workplan in Alternate Format Enclosed

TASK NO Description Deliverables

Completion Date

1 I-80/I-680/SR12 I/C – ICP or CP1 Draft ED 08/10 (A) 2 I-80/I-680/SR12 I/C – ICP or CP1 Final ED 12/12 (A) 3 I-80/I-680/SR12 I/C – ICP or CP1 Final Design 05/13 (A)

4 I-80/I-680/SR12 I/C – ICP or CP1 Right of Way Acquisition and Transfer 06/18

5 I-80/I-680/SR12 I/C – CP2 Draft ED 08/10 (A) 6 I-80/I-680/SR12 I/C – CP2 Final ED 12/12 (A) 7 I-80/I-680/SR12 I/C – CP2 Final Design 12/16 8 I-80/I-680/SR12 I/C – CP2 Right of Way Acquisition TBD

9 I-80/I-680/SR12 I/C – CP3 Draft ED 08/10 (A) 10 I-80/I-680/SR12 I/C – CP3 Final ED 12/12 (A) 11 I-80/I-680/SR12 I/C – CP3 Final Design TBD 12 I-80/I-680/SR12 I/C – CP3 Right of Way Acquisition TBD

(A) = Actual Date

Impediments to Allocation Implementation

. RM-2 FUNDING INFORMATION

RM-2 Funding Expenditures for funds being allocated X The companion Microsoft Excel Project Funding Spreadsheet to this IPR is included. Next Anticipated RM-2 Funding Allocation Request

VII. GOVERNING BOARD ACTION

Check the box that applies: X Governing Board Resolution attached

Governing Board Resolution to be provided on or before:

No impediments. The STA, in cooperation with Caltrans, is prepared to move expeditiously to complete the construction and closeout of ICP and PG&E design services for utility relocations for Construction Package 2 (CP2) project.

N/A

85

Regional Measure 2 – INITIAL PROJECT REPORT

- 8 -

VIII. CONTACT / PREPARATION INFORMATION Contact for Applicant’s Agency Name: Janet Adams Phone: (707) 424-6010 Title: Director of Projects E-mail: [email protected] Information on Person Preparing IPR Name: Dale Dennis Phone: (925) 595-4587 Title: STA Project Management Consultant E-mail: [email protected] Applicant Agency’s Accounting Contact Name: Susan Furtado Phone: (707) 424-6075 Title: Accounting Manager E-mail: [email protected] Revised IPR 09.28.07.doc

86

Regional Measure 2 – INITIAL PROJECT REPORT

- 1 -

Instruction Sheet Cover Page

Project Title and Number - Project name familiar with project sponsor, as displayed in the federal Transportation Improvement Program (TIP) or other funding/planning documents. Provide RM2 project number for the individual project(s).

Allocation History and Current Allocation Request- Include information on past allocations and current allocation request. Add additional entries as necessary.

I. Overall Project Information

Project Title- Project name familiar with project sponsor, as displayed in the federal Transportation Improvement Program (TIP) or other funding documents. If this project is subset of a larger RM2 project, please state and summarize overall project but fill out this report for the individual project(s). Project Sponsor/ Co-sponsor(s)/Implementing Agency- Identify Project Sponsor and any co-sponsor(s) as specified in statute. Identify a Lead Sponsor responsible for ensuring the delivery of the RM-2 project and responsible for addressing any funding shortfalls. If different from the sponsor, identify the Implementing Agency responsible for delivering the project. If multiple agencies identify agency responsibilities for delivering the project or project elements, and if necessary, specify the agency responsible for seeking and processing the RM2 allocation(s). Project Purpose- Describe the project purpose, including the problem being addressed and specific accomplishment to be achieved and resulting benefits, as well as the value of the project to the region or corridor, and an explanation of the project as a worthy transportation investment. Project Description- Highlight any differences or variations from the RM-2 legislated project description, or changes in project scope since the previous IPR. If the RM-2 funding is for a deliverable phase or useable segment of the larger project, the RM-2 segment should be described separately as a subset of the overall project description. It must be demonstrated that the RM-2 funded component or phase will result in an operable or useable segment. Include a summary of any prior completed phases and/or future phases or segments associated with the RM-2 segment. Check off whether project graphics information is included in the application.

Impediments to Project Completion - Discussion should include, but not be limited to, the following potential issues that may adversely affect the proposed project or the ability of the sponsor or implementing agency to carry out such projects:

- Any uncommitted future funding needs - Significant foreseeable environmental impacts/issues - Community or political opposition - Relevant prior project funding and implementation experience of sponsor/implementing agency - Required public or private partnerships - Right of way constraints - Timeliness of delivery of related transportation projects - Availability and timeliness of other required funding - Ability to use/access other funding within required deadlines - Legal impediments and any pending or threatened litigation.

87

Regional Measure 2 – INITIAL PROJECT REPORT

- 2 -

Operability- Discuss ability to operate and maintain the transportation investment once completed, including timeframe and expected fund source and amount needed to support the continued operations and maintenance of the delivered project.

II. Project Phase and Status

Describe the status of each phase of the RM-2 funded phase or operable/useable segment.

Environmental – Discuss status and type of environmental document (indicate if NEPA applies by checking the correct box), scheduled date of circulation of draft document and expected final document date. Explanation of environmental issues requiring special attention. Identification of Lead Agency under CEQA.

Design – Discuss status of project design, including identification of special design considerations,

such as design-build or design sequencing, and any special circumstances for the design of the RM-2 funded operable/useable segment.

Right-of-Way Activities / Acquisition – Discuss status of right of way acquisition including any

right of way constraints for the RM-2 funded operable/useable segment.

Construction / Vehicle Acquisition / Operating Service - Discuss status or special circumstances for project construction, equipment / vehicle acquisition or service operations for the RM-2 funded operable/useable segment.

III. Total Project Budget Information

Provide the total cost estimates for the four phases (ENV, PS&E, R/W and CON / Operating). The estimate shall be in both escalated (to the year of expenditure including prior expenditures) and current (at time of the preparation of the IPR) dollars. If the project is for planning activities, include the amount in environmental phase.

IV. Project Schedule

Provide planned start and end dates for key milestones of project phases (as applicable). The RM-2 funded phase or component must result in a useable or operable segment. Information shall be provided by month and year.

V. Allocation Request Information

Provide a description of the phase; include an expanded description outlining the detailed scope of work, status of work, work products. Include any prior completed phases and/or future phases or segments associated with the RM-2 segment. Indicate whether there are non-RM2 funds in the phase by checking the correct box. It must be demonstrated that the RM-2 funded component or phase will be fully funded and result in an operable or useable segment. Include details such as when the board of the Implementing Agency will approve the allocation request and the month/year being requested for the MTC to approve the request noting that this will normally take sixty days from the submission of the request.

Status of Previous Allocations - Please provide an update of the previous allocations for this project or subproject, referencing the outcome, approval dates of important actions, and pertinent completed documents.

88

Regional Measure 2 – INITIAL PROJECT REPORT

- 3 -

Workplan - Either populate the table below or attach a workplan in a comparable format. If a consultant is being hired to complete the workplan, please indicate such and enclose a copy of that plan to MTC. If the workplan is to be detailed out by the Regional Measure 2 allocation, please fill out the work plan to the best of your knowledge and indicate when a more detailed workplan will be submitted.

Impediments to Allocation Implementation - Include a summary of any impediments to complete the phase. Summary should include, but not be limited to, discussion of any potential cost increases, significant environmental impacts/issues, community or political opposition, viability of the project sponsor or implementing agency, relevant prior project funding and implementation experience, required public or private partnerships, potential project implementation issues including right of way constraints, timeliness of delivery of related transportation projects, availability and timeliness of other required funding, ability to use/access other funding within required deadlines, legal impediments, and any pending or threatened litigation which might in any way adversely affect the proposed project or the ability of the sponsor or implementing agency to carry out such projects.

VI. RM-2 FUNDING INFORMATION

RM-2 Funding Spreadsheet - To capture the funding data for your project, you will need to refer to the Microsoft Excel spreadsheet that is part of this IPR. The spreadsheet comprises of five tabs that needs to be completed or updated. Instructions are included on the accompanying Excel file to the IPR. Confirm that the required fundingspreadsheet (Microsoft Excel) is completed and enclosed by checking the box.

Next Anticipated RM-2 Funding Allocation Request - Summarize the approximate timing of the RM-2 funding need. If previously allocated RM-2 funds were not fully expended in the year for which an allocation was made, or there is a balance of unexpended RM-2 allocations, provide a status of the non-expenditure of RM-2 allocations, and the expected expenditure date(s). Explain any impacts to RM-2 funding needs as a result of any project delays or advances.

VII. GOVERNING BOARD ACTION

The IPR must be approved by the board or governing body of the agency responsible for preparing and submitting the IPR prior to MTC approval of the IPR and allocation of funds. Check the box on whether verification of the governing board action is attached. If not, indicate when the verification will be available

VIII. CONTACT / PREPARATION INFORMATION

Provide applicable contact information including agency, contact/project manager names, phone numbers, e-mail, and mailing addresses. Also provide the date the report was prepared, agency and name of person preparing this report.

89

Project Title: I-80/I-680 Interchange Complex - I-80/I-680/SR12 Interchange Initial Construction Packages (ICP, CP2, and CP3) Project ID: 7

Agency: Plan Date: 30-Jun-17

Fund Source Phase Prior 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17Future

Committed TOTAL

TCRP - I-80/I-680/SR12 Interchange - Overall ENV 8,400 8,400

STIP - I-80/I-680/SR12 Interchange - Overall ENV 400 400

RM2 - I-80/I-680/SR12 Interchange - Overall ENV 8,300 5,200 13,500

AB1171 - Interchange (ICP, CP2, CP3) ENV 7,000 7,000 1,500 15,500

RM2 - Interchange (ICP) PS&E 78 185 263

AB1171 - Interchange (ICP, CP2, CP3) PS&E 822 5,513 1,142 (252) 7,225

RM2 - Interchange (ICP) R/W 2,900 (591) 2,309

RM2 - Interchange (ICP) R/W 12,791 12,791

AB1171 - Interchange (ICP) R/W 14,280 11,854 (1,142) (125) 24,867

RM2 - Interchange (ICP) R/W 400 400

AB1171 - Interchange (CP2) R/W 2,189 377 2,566

AB1171 - Interchange (ICP) CON 27,259 27,259

AB1171 - Interchange (ICP) CON (1,000) (1,000)

CMAQ CON 1,000 1,000

STIP (ICP) CON 10,570 10,570

TCIF (ICP) CON 22,847 22,847

Br Tolls/Fed/STIP/Local ( CP 2) R/W 7,688 7,688

Br Tolls/Fed/STIP/Local ( CP 3) R/W 48,728 48,728

Br Tolls/Fed/STIP/Local ( CP 2) CON 40,403 40,403

Br Tolls/Fed/STIP/Local ( CP 3) CON 92,378 92,378

Prior 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15Future

Committed TOTAL

8,800 8,300 8,100 7,000 21,280 2,400 90,243 2,189 585 189,197 338,094

Comments:

RM-2 Initial Project Report

(Amounts Escalated in Thousands)

I-80_I-680_SR12 InterchangeDELIVERABLE SEGMENT FUNDING PLAN AND CASH FLOW

Solano Transportation Agency

Enter only funds Committed to the RM-2 Funded Segment and only if different from Total Project. Enter amounts in thousands and escalated to the year of funding. DO NOT enter uncommitted funding - The RM-2 Phase or Segment must be fully funded.

Enter funds on the RM-2 Deliverable Phase or Segment, ONLY if the RM-2 Phase or Segment is different from the overall total project. The RM-2 Segment must be Fully Funded and result in a operable or useable segment.

Eligible Phases: ENV (or PA&ED), PS&E, R/W or CON. For planning activites use ENV. For Vehicles, Equipment or Operating use CON. OK to use CT R/W SUP or CT CON SUP for Caltrans support, but not necessary (optional).

RM-2 DELIVERABLE SEGMENT - Fully Funded Phase or Segment of Total Project

RM-2 SEGMENT FUNDING TOTAL

(Complete this spreadsheet only if RM-2 funds are dedicated to deliver a specific phase or deliverable segment of the overall total project)

UNCOMMITTED FUNDING PLAN (NON-PROGRAMMED/ALLOCATED, BUT PLANNED FUNDING)

RM-2 Initial Project ReportCommitted Funding Plan Page 1 of 1

RM-ver 02Date Printed: 7/7/2017

90

Agenda Item 9.M July 12, 2017

DATE: July 5, 2017 TO: STA Board FROM: Daryl Halls, Executive Director

Anthony Adams, Project Manager RE: One Bay Area Grant Cycle 2 (OBAG 2) Surface Transportation Program (STP),

Revised Funding Recommendations

Background: Every four to five years, federal cycle funds are available for distribution at the regional level. In the San Francisco Bay Area, the Metropolitan Transportation Commission (MTC) calls these federal cycle funds the One Bay Area Grant (OBAG). MTC has now set out policies and established funding amounts for the second cycle of OBAG called OBAG 2. This covers Fiscal Years (FYs) 2017-18 through 2021-22. Based on MTC’s criteria for distribution, population and housing production, STA was allocated a total $21.17M over the next five years.

At its meeting on September 14, 2016, the STA Board programmed $2.75 million in Congestion Mitigation and Air Quality (CMAQ) funds to sustain the Solano Safe Routes to School and Solano Mobility/Rideshare Programs, $6.86 million in OBAG 2 Surface Transportation Program (STP) funds to fund STA’s planning, project delivery and fund programming efforts over the five year cycle. At this meeting $4.64 million was set aside for CMAQ call for projects, $5.9 million in STP funds were set aside to the cities by formula distribution for eligible activities (such as road maintenance and safety projects) and $1.506 million in Federal Aid Secondary (FAS) and $2.05 million of North Bay Priority Conservation Area (PCA) funds have been set aside to the County of Solano.

At the June 14, 2017 STA Board meeting, $5.9 million in STP funds, $1.056 million in FAS funds, and $2.05 million in PCA funds were programmed to STA’s member agency projects.

Discussion: Delayed Programming At the June 14, 2017 STA Board meeting, the staff report identified that STP programming for two cities, Fairfield and Vallejo, may need to be redirected by the STA Board to help resolve two separate and unresolved funding agreements. Reprogramming of STP funds for Fairfield and Vallejo In consultation with STA Board’s Executive Committee and legal counsel, STA staff has been meeting with the cities of Fairfield and Vallejo to attempt to resolve two separate and unresolved financial obligations with the STA due to a I-80/I-680/SR 12 water line relocation (Vallejo) and the Jepson Parkway Phase 2 project (Fairfield.) These unresolved financial obligations must be addressed, and it is the responsibility of the STA, as the CMA for Solano County, to program federal funds within the County. STA’s options for addressing these funding obligations are limited without negatively impacting other projects or financially impacting the other six member agencies.

91

Jepson Parkway/City of Fairfield The Jepson Parkway Funding Agreement Amendment between the City of Fairfield and the STA has been in discussion since early 2016. An Amendment is required as the project has been spilt into two construction projects and the project costs for segments managed by the City of Fairfield have significantly increased. The two parties have been meeting, but have been unable to resolve the funding agreement. STA staff is seeking to have the City of Fairfield repay STA for the loan advanced from the STA’s Project Contingency Reserve Account (PCRA) of $1.6 million and have its State Transportation Improvement Program (STIP) funds that were obligated by the City, fully credited to the STA. STA staff is also recommending to have the funding obligations to the project conclude with this current construction project. Staff is seeking to conclude its funding obligation as the costs have significantly increased and the STA’s funding abilities through the STIP are limited with the California Transportation Commission (CTC) push to move STIP funding to the on-system projects, like I-80. In addition, STA staff is planning to recommend the STA Board utilize future STIP funds as match to leverage future SB 1 and RM 3 funds for three major I-80 projects. Interchange Waterline/City of Vallejo As part of the I-80/I-680/State Route (SR) 12 Interchange Initial Construction Package, a major waterline for the City of Vallejo was relocated due to conflicts with the improvements. In order to avoid losing millions of dollars in construction funding, the two parties executed a Disputed Relocation Agreement. This Agreement was executed in February 2013. Since that time, the STA has not been able to resolve the financial liability with the City. The construction cost of this relocation is $1,556,793. This amount includes the bid items and Contract Change Orders issued during construction. The City and its legal counsel have disputed their financial liability for the portion outside of the State Right-of-Way (57%), stating that they have prior rights, they just have been unable to locate the documentation of this. 43% of the utility was within State Right-of-Way and is not being disputed, but the City has yet to provide payment for this portion. Recommendation to Resolve Funding Agreement The OBAG 2 programming deadline into the Transportation Improvement Plan (TIP) is August 2017. These funds are one of the only source of funding that can be used by STA to off-set the financial obligations of one or both cities, should they not be able to use other local funds. On June 29th, staff presented an update on both funding agreements to the STA Board Executive Committee. The Executive Committee is recommending these STP funds be re-programmed to cover the costs of these unresolved funding obligations by the two cities. A portion of the City of Vallejo’s STP distribution, $1,556,793 will be programmed to STA for the Vallejo waterline relocated associated with the I-80/I-680/SR12 Interchange Project and the remaining amount of $518,481 will be programmed to Vallejo’s Sacramento St. Overlay Project. The Executive Committee is recommending that the City of Fairfield’s entire STP formula distribution amount of $1,407,095 be re-programmed to STA for Phase 3 of the Jepson Parkway (along Leisure Town Rd. from Elmira to I-80) to repay the STA’s loan of PCRA funds for right-of-way. STA staff and legal counsel are continuing to meet with both Fairfield and Vallejo to attempt to resolve both separate funding agreements and have added recommendation #4 to provide flexibility in the event agreement can be resolved for one or both agreements prior to the August 2018 deadline for programming the STP funds in the TIP. Fiscal Impact: There is an 11.47% non-Federal match required for OBAG 2 projects.

92

Recommendation: Authorize the Executive Director to program federal STP funds as specified:

1. $518,481 in STP to Vallejo’s Sacramento St. Overlay; 2. $1,556,793 from Vallejo’s STP shares to STA to cover the costs of Vallejo’s Waterline

Relocation for I-80/I-680/SR12 Interchange Project; and 3. $1,407,095 Fairfield’s STP shares to STA for repayment of Right-of-Way costs for Jepson

Parkway Phase 3; and 4. Authorize the Executive Director to continue to work with the City of Vallejo and the City

of Fairfield if alternative funding options are identified for these projects. Attachments:

A. Summary of Fairfield/Jepson Parkway Funding Agreement B. Map of Jepson Parkway Segments C. Summary of Vallejo/Vacaville Funding Agreement D. Map of Vallejo Relocated Waterline

93

This page intentionally left blank.

94

Jepson Parkway Phase 2A City of Fairfield Construction: FY 2016‐17 $13.8M STIP

Jepson Parkway Phase 2B City of Fairfield Construction:  Pending$32.6M Total Cost

Jepson Parkway Phase 1City of VacavilleConstruction: FY 2016‐17$19.38M STIP

Jepson Parkway Phase 3ACity of VacavilleConstruction: FY 2018‐19$3.3M STIP

Jepson Parkway Phase 3BCity of VacavilleConstruction: Future$30M 

Jepson Parkway Project Phasing Plan 

Leisure Town Rd

95

jmasiclat
Typewritten Text
ATTACHMENT A

This page intentionally left blank.

96

ATTACHMENT B

Fairfield STP Swap and Jepson Parkway Funding Agreement Summary

What are STA’s Issues?: STA originally agreed to pay 50% of the costs for Phase 2 of Jepson Parkway. Since that time the project has been split into 2 phases, Phase 2A and Phase 2B. Project costs for this Phase has escalated from $34.3M to $64.8M. STA would like to conclude its agreement with Fairfield on Jepson Parkway and no longer be a funding partner with Fairfield on Phase 2B. The STA does not have the financial resources available to cover these increased costs, as the STIP programming in future years will likely be limited by the CTC to on-system projects.

What did the original funding agreement say?: This funding agreement was between the City of Fairfield and STA. STA agreed to pay 50% of the costs of the project for Phase 2 (now called Phase 2A and 2B). If STA contributed more than 50% of the total project cost, then the difference would be paid back by the City of Fairfield to STA.

How much did STA Contribute to Jepson Parkway Phase 2?: STA contributed $19,501,813 in total to Phase 2A of Jepson Parkway. This includes $13,822,000 in STIP funds that Fairfield obligated for CON in FY 2016-17.

How much is owed to STA?: The total project cost for Phase 2A is now estimated at $35,287,450; 50% is $17,643,725. Therefore, the STA is seeking that the City of Fairfield pay the STA the difference between $19,501,813 - $17,643,725 = $1,858,088. Of the funding contributed by the STA, it includes a loan from the STA Project Contingency Fund of $1.1 million. Additionally with the right-of-way relocation services not yet completed for a business in the Phase 2A, there will be the need for cash on hand to pay for these expenses. Therefore, the STA has urgency to resolve this issue.

How will these funds be paid back?: STA is requesting a payment of $1.686M payable in two installments with an agreement to pay back the remaining $172,088. Since Fairfield has yet to satisfy this request, STA is recommending reprogramming their OBAG Cycle 2 STP shares to Jepson Parkway Phase 3.

What are Fairfield’s Issues?: Fairfield’s construction bids were lower than estimated, at only $11M, less than the $13.8M that was obligated by the City from the STIP funds. Fairfield wants STA to only receive credit for the actual costs, not the obligated amount. Note: STIP funds obligated, but not utilized on a project, are not able to be reprogrammed and are therefore lost.

Fairfield would also like STA to honor the original commitment to split 50% of the future costs of Jepson Parkway Phase 2B.

What is the product going forward?: It is the goal of STA to conclude its financial partnership with Fairfield on the future phase of Jepson Parkway 2B. STA is seeking to recover its over-investment in Phase 2A by programming Fairfield’s STP shares to Jepson Parkway Phase 3.

97

ATTACHMENT C

Vallejo STP Swap and Relocation of Waterlines at Green Valley Road Summary

What are STA’s Issues?: During the design of the I-80/I-680/SR 12 Interchange Project, it was determined that both the City of Benicia and the City of Vallejo had existing waterlines (30” and 39” water mains respectively) that were in conflict with Project improvements, a portion of which would need to be relocated. The cost associated with the City of Vallejo water line relocation is $1,556,793. STA completed a funding agreement with Benicia for their waterline relocation.

What did the original funding agreement say?: If the utility owner’s interest in the property falls within another jurisdiction’s ROW, the law presumes that the utility owner does not have prior/superior rights and therefore, the owner is required to pay the cost of the utility relocations.

What is Vallejo’s Response?: Vallejo has argued that the City of Fairfield owns a Public Service Easement (PSE) in one of the locations in dispute (orange area attached map) and that Vallejo has a superior right since Fairfield could have apportioned the easement to Vallejo to allow the installation of its 39” waterline. However, a review of the public records indicates that neither Benicia nor Vallejo have any record of a grant of an easement or encroachment permit from Fairfield to establish their superior right. Because Vallejo’s 39” waterline was installed prior to the Project, Vallejo has argued that it has superior rights and should not be liable for the costs of relocation. Additionally for the portion of the utility in green, Vallejo argues that the since its 39” waterline was installed adjacent to a City of Fairfield street, it holds an implied secondary easement which is superior in right to the Project.

STA’s Legal Counsel’s Opinion?: While the City of Fairfield had the authority to apportion a portion of the PSE to Vallejo, there is nothing in the public record to indicate that it in fact did apportion it, thereby disproving Vallejo’s argument. STA also disagrees with Vallejo’s argument that it has an implied secondary easement in the designated orange area for the sole reason that per Caltrans Right-of-Way Manual section 13.04.04.03, implied secondary easements only apply to the city-owned facilities that lie within that city’s own streets. In other words, the argument would only apply to Fairfield utilities, since this is a Fairfield right-of-way. In summary, since there is no record of the City of Fairfield apportioning any of the PSE rights to the City of Vallejo, then Vallejo has no superiority on ownership.

What is the product going forward?: It is the goal of STA to recover the costs associated with the relocation of the waterline owned by the City of Vallejo. STA is seeking to reprogram $1,556,793 from Vallejo’s STP shares to the I-80/I-680/SR12 Interchange Project.

98

OLD GREEN VALLEY ROAD RIGHT OF WAY

RIGHT OF WAYVALLEY ROAD

OLD GREEN

x

x

x

x

x

LA

ST

RE

VISI

ON

ST

AT

E

OF

CA

LIF

OR

NI

A -

DE

PA

RT

ME

NT

OF

TR

AN

SP

OR

TA

TI

ON

TI

ME

PL

OT

TE

D

=>

DA

TE

PL

OT

TE

D

=>

CH

EC

KE

D

BY

DE

SI

GN

ED

BY

CA

LC

UL

AT

ED-

RE

VIS

ED

BY

DA

TE

RE

VIS

ED

CO

NS

UL

TA

NT

FU

NC

TI

ON

AL

SU

PE

RVIS

OR

RR

01-13-12

USERNAME => $USER

DGN FILE => $REQUEST

RELATIVE BORDER SCALE

IS IN INCHES

0 1 2 3UNIT 0741 PROJECT NUMBER & PHASE 04000211311BORDER LAST REVISED 7/2/2010

TS

PIP

EPIP

E

TS

SP

TS

PO

LE

PIP

E

PIP

E

PIP

E

GREEN VALLEY CREEK

GREEN VALLEY Rd

IN

TE

RS

TA

TE 80

10'

P.U.E.Exist

39" RAW WATER MAIN

EXISTING CITY OF VALLEJO

39" RAW WATER MAIN

EXISTING CITY OF VALLEJO

APN 0148-280-290

SAFEWAY, INC.

LANDS OF

APN 0148-280-300

ASSOCIATES, LP

WATT & FAIRFIELD

LANDS OF

APN 0148-280-310

CALIFORNIA, INC.

LONGS DRUG STORES

LANDS OF

APN 0148-280-280

ASSOCIATES, LP

WATT & FAIRFIELD

LANDS OF

CALIFORNIA

STATE OF

LANDS OF

AGENCY OF FAIRFIELD

REDEVELOPMENT

LANDS OF

FAIRFIELD

CITY OF

LANDS OF

FAIRFIELD

CITY OF

LANDS OF

APN 0148-280-130

FAIRFIELD

CITY OF

LANDS OF

WALNUT CREEK, CA 94597

MARK THOMAS & COMPANY, INC.

SUISUN CITY, CA 94585

ONE HARBOR CENTER, SUITE 130

AUTHORITY

SOLANO TRANSPORTATION

CIVIL

Sol04

Dist COUNTY ROUTEPOST MILES

TOTAL PROJECT

SHEET

No.

TOTAL

SHEETS

No.

Exp.

RE

GI

ST

ER

E

DP

ROFESSIONAL

EN

GI

NE

ER

S

TATE

OF CALIFORN

IA

REGISTERED CIVIL ENGINEER

$TI

ME

$D

AT

E

PLANS APPROVAL DATE

DATE

COPIES OF THIS PLAN SHEET.

THE ACCURACY OR COMPLETENESS OF SCANNED

OR AGENTS SHALL NOT BE RESPONSIBLE FOR

THE STATE OF CALIFORNIA OR ITS OFFICERS

3000 OAK ROAD, SUITE 650

12/80 12.0/12.92.5/2.8

WITHIN CITY LAND

WITHIN CITY OF FAIRFIELD PUBLIC SERVICE EASEMENT

WITHIN STATE LAND

SCALE 1"=100'

LEGEND

JULY 2015

FIGURE 1

39" & 30" RAW WATER MAINS

CITY OF VALLEJO & CITY OF BENICIA

I-80/I-680/SR-12 INTERCHANGE

99

This page intentionally left blank.

100

Agenda Item 10.A July 12, 2017

DATE: June 30, 2017 TO: STA Board FROM: Daryl Halls, Executive Director Susan Furtado, Accounting & Administrative Services Manager RE: STA’s Fiscal Year (FY) 2017-18 Proposed Budget Revision and FY 2018-19 Proposed Budget Background: The Solano Transportation Authority (STA) has an adopted budget policy requiring a two-year annual fiscal year budget plan for its proposed expenditures and the proposed means of financing them. The budget is usually revised mid-year and finalized at the end of the fiscal year. When necessary, these budgets are revised to provide STA the basis for appropriate budgetary control of its financial operations for the fiscal year. In July 2016, the STA Board adopted the FY 2017-18 Budget as part of the two-year annual fiscal year budget plan. Subsequently, in January 2017, the STA Board adopted the modification to the FY 2017-18 Budget due to projected carryover funds for the continuation of projects and programs initiated in FY 2016-17. Discussion: Attachment A is the Proposed Budget Revision for FY 2017-18 and Attachment C is the FY 2018-19 Proposed Budget. The FY 2017-18 Budget Revision is balanced, with the proposed changes to the approved budget modified from $15.05 million to $17.29 million, an increase of $2.24 million. These changes are primarily due to the carryover funds for the continuation of projects, and new projects and programs: the Safe Routes to School (SR2S) Program and Capital Projects, the Transit Coordination/Implementation for the Rio Vista Transit (Delta Breeze), the State Route (SR) 37 Improvement Project, the Local Project Delivery for the SR 12/Church Road Project, the Jepson Parkway Project, the I-80/I-680/.SR 12 Interchange Project, and three new projects - SolanoExpress Bus Stops, the Fairgrounds Transit Facility Study, and the Phase B Design for the Parking Structure in Vallejo. Revenue Budget changes are summarized as follows:

1. The Members Contribution is also known as the Gas Tax Fund. In 2004, the STA Board adopted a policy to index the local gas tax subventions provided by member agencies to STA. In May 2016, the STA Board approved the modification to the calculations for contributions from Member Agencies. The modified calculation is based on the average contribution received by STA from Member Agencies in FY 2004-05 through FY 2015-16 in the amount of $276,223 plus the FY 2017-18 annual adjustment for the Consumer Price Index (CPI) at 2.7% in the amount of $7,458. In May 2017, the STA Board was presented with the total FY 2017-18 Members Contribution in the amount of $283,681. The Members Contribution fund is a percentage of STA’s funding for its core operations, Strategic Planning, and Project Development not covered by other planning grants and project revenues, such as the State Route 37 Improvement Project.

101

2. Concurrently, in May 2017, the STA Board was presented with the FY 2017-18 annual local Transportation Development Act (TDA) fund in the amount of $508,806, an increase in the amount of $27,384 from the previously estimated revenue budget.

3. TDA Article 3 funding in the amount of $50,000 for the Solano Community College Path to Campus Project for the installation of multi-use paths, American Disability Act (ADA) ramps, crosswalks, site lighting, and signage leading from the main south entry driveway at Suisun Valley Road to the campus entry plaza near the Administration Building.

4. The TDA Funds from a combination of the County and Cities’ local TDA funds (City of Dixon, FAST, City Rio Vista, SolTrans, City of Vacaville) in the amount of $677,650 is programmed for the continuation of the countywide Solano Intercity Taxi Scrip/Paratransit Program under the Memorandum of Understanding (MOU) agreement dated May 2016. Concurrently, TDA funds in the amount of $40,000 is added to the budget for the continuation of transportation services by the Volunteer Caregivers operated by Faith In Action to provide volunteer driver transportation services for medical appointments for seniors 60 years and older, which is a component of the Intercity Paratransit program. TDA funds are also allocated for the Suisun Amtrak Operation & Maintenance ($49,519), SolanoExpress Bus Stops ($65,000), and the initials start of the Fairground Transit Facility Study ($63,548). 

5. The FY 2017-18 One Bay Area Grant Cycle 2 (OBAG 2) Surface Transportation Program (STP) funding allocation in the amount of $1,245,049 for STA’s Operation Management & Administration, Project Development, and Strategic Planning. OBAG 2 funds are also allocated for the Solano Mobility Program in the amount of $247,309 and the Safe Routes to School (SR2S) Program of $206,091 for their continuation of program services and activities. 

6. The Congestion Mitigation and Air Quality (CMAQ) from the OBAG 1 Grant carried over from FY 2016-17 in the amount of $389,069 for the Safe Route to School (SR2S) Program is reprogrammed for the continuation of its program activities.

7. The MTC’s Regional Rideshare Program (RRP) funding in the amount of $105,000 is carried over from FY 2016-17 for the 511 Rideshare contract which is phased out as of March 31, 2018. Between Solano County and the STA, RRP Funds have been received for over 30 years to leverage funding to provide a full service rideshare program in Solano and Napa County.

8. The Active Transportation Program (ATP) 1 ($88,743) & ATP 2 ($24,692) funds are programmed for the SR2S Program, as part of the $3 million grant awarded by MTC. This funding is for the combined infrastructure and non-infrastructure SR2S Program, providing infrastructure improvements at seven (7) Benicia and Vallejo schools, while providing education and outreach to twenty six (26) schools throughout the Cities of Benicia, Vallejo, and Rio Vista. The budget for the infrastructure project is modified to reflect the capital portion of the funding to directly allocate to the cities passed through the City of Vallejo.

9. The Transit Performance Initiative (TPI) Program fund initially funding the SolanoExpress Bus Stops is being swapped for STAF funds, as part of the SolanoExpress Bus Replacement program; and the City of Fairfield will claim the TPI for the Bus Replacement.

10. The Yolo Solano Air Quality Management District (YSAQMD) funding is increased to include funding in the amount of $75,000 for the SolanoExpress Bus Stops.

11. The FY 2017-18 State Transit Assistance Funds (STAF) budget allocations in the amount of $1,714,422 (Population Based/Solano), the amount of $208,995 (STA Regional Paratransit), and the amount of $100,000 (Lifeline) is programmed for continuation of the Transit Management & Administration, Solano Countywide Taxi Scrip/Paratransit Program, American Disability Act (ADA) in Person Eligibility Program, the Consolidated Transportation Service Agency (CTSA)/Mobility Management Program Administration, and the Solano Senior & People with Disabilities Management/Committee. The FY 2016-17 STAF (Population-Based/Solano) allocations is estimated to carryover funds in the amount of $317,012 and the Regional Paratransit of $120,000 is reprogrammed for the continuation of transit administration and coordination.

102

Additional STAF allocation is added to the budget in the amount of $394,000 for the SolanoExpress Bus Stops, the initial start of the Fairground Transit Facility Study ($37,000), and the Phase B Design for Parking Structure ($100,000) for the City of Vallejo.

12. The California Office of Traffic Safety (OTS) grant is added to the budget for the Road Safety Analysis and Data Collection ($107,022) for traffic records standardization of data reporting techniques and the SR2S Program ($106,285) for pedestrian and bicycle safety awareness among pedestrians, bicyclists and motorists through various approaches including education, enforcement and engineering.

13. The Regional Transportation Impact Fee (RTIF) funds from District 1 in the amount of $640,189 will be utilized for the Jepson Parkway Project. The amount of $200,000 from the City of Vacaville is anticipated for final phase of the right of way and relocation activities of the project.

14. The Regional Measure (RM) 2 funds for the I-80/I-680/SR 12 Interchange Project ($2,262,053) for the ongoing mitigation and construction activities, the I-80 Express Lanes Project ($3,048,680) preliminary engineering activities, the North Connector Project ($50,000) for the annual maintenance for long term vegetation monitoring, and the I-80 East Bound Truck Scales Project ($50,000) final and closeout phase of the project.

15. The State Transportation Improvement Program (STIP) fund for the SR 12/Jameson Canyon Project in the amount of $20,000 is added for the final closeout and accounting of the construction activities.

16. The Solano County’s Federal Earmark in the amount of $250,000 and $100,000 local match for the Vallejo Redwood Parkway Fairgrounds Drive Improvement Project budget is adjusted to reflect the anticipated work on the design phase of the project.

Other revenue changes are made to reflect the anticipated expenditures and activities for the fiscal year.

FY 2017-18 Expenditure Changes Changes to the approved budget are reflective of funds carryover and revenue changes as described above. The budget expenditure revisions are as follows:

1. The Operation and Management budget is increased by $9,880. The STA Operation &

Administration budget expenditures were reviewed and adjusted to reflect the expenditures and activities for the fiscal year. Changes include the slight increase in the general liability insurance with no issuance of dividend from the California State Association of Counties (CSAC) Excess Insurance Authority (EIA), and the anticipated increase in the STA Board membership fee from $7,500 to $15,000 for Solano Economic Development Corporation (EDC).

2. The Transit/Mobility Management/SR2S budget is increased by $685,320. Changes to the budget are due to the carryover funds for the continuation of programs and implementation, such as the SR2S Program non-infrastructure projects, Transit Coordination/Implementation for the Rio Vista Transit, ADA in Person Eligibility Program, and Solano Senior & People with Disabilities Plan Implementation. The Solano Intercity Taxi Scrip/Paratransit Program budget in the amount of $927,650 is adjusted to reflect anticipated program expenditures.

3. The Project Development budget is increased by $1,434,716 to reflect the continued relocation activities for the Jepson Parkway Project; the I-80/I-680/SR12 Interchange Project ongoing final utility relocation activities and the new Implementation Plan with the addition of Construction Package 2A and to advance the project to a greater state of readiness to better compete for available transportation funding; the I-80 Express Lanes Project ongoing preliminary engineering activities; the North Connector Project annual maintenance for long term vegetation monitoring; and I-80 East Bound Truck Scales Relocation Project close out accounting for all project phases except the joint concrete claim pending arbitration.

103

The Redwood Parkway Drive/Fairgrounds Improvement Project ongoing activities ($350,000), the new projects, such as the SolanoExpress Bus Stops ($656,000), the Fairground Transit Facility Study ($100,548), and the Phase Design Parking Structure in Vallejo ($100,000). The SR2S Capital Project, which was originally in STA’s budget is now modified to reflect the new lead agency for the project, City of Vallejo, for the management and implementation of the capital projects for both Vallejo and Benicia school districts.

4. The Strategic Planning budget is increased by $114,942. The planning activities and studies are adjusted to reflect anticipated budget costs for the fiscal year and the carryover of funds for the continuation of the Model Development Maintenance Update, including the peer review of the transit model, the Comprehensive Transportation Plan (CTP) follow up, the Countywide Active Transportation Plan, final phase of the Electric Vehicle (EV) Readiness Program, and the Water Transportation Plan.

Cost of Living Adjustment (COLA) for STA Staff: The STA Board has an established policy for calculating cost of living adjustments for STA staff using the average of the Consumer Price Index (CPI): United States cities, Western Urban areas, and the San Francisco/Oakland/San Jose urban area. Using the STA’s COLA policy cost calculations, the average annual change in CPI for 2016 for the three areas is 2.7 %. The proposed FY 2017-18 Budget Revision includes a cost of living adjustment of 2.7 %. The total fiscal impact for the FY 2017-18 COLA effective July 1, 2017 is $52,830. The FY 2017-18 Salary Schedule, Attachment B, is updated to reflect the COLA adjustment for all job classifications. With STA staff departure, the budget is reflective of staffing changes to job classification that is in the budget, such as the Planning Assistant and the Customer Service Representative as full time positions. Retirement Plan Under the new Public Employees’ Pension Reform Act of 2013 (PEPRA), new hires fall under two categories: “Classic” and “New”. New hires in the category of “Classic” are covered under STA’s retirement plan and receive benefits under the 2% @ 55 retirement benefit formula. Under the category of “New”, a new hire is covered under the 2% @ 62 retirement benefit formula with a 50% member contribution. The FY 2017-18 STA’s employer contribution rate under the “New” category is 6.533% of reportable compensation at a total cost of approximately in the amount of $29,811 plus the annual discounted unfunded liability in the amount of $156. The STA’s employer contribution rate for staff under the “Classic” for FY 2017-18 is 8.418% of reportable compensation (an increase of .041%), plus the annual discounted unfunded liability in the amount of $68,500. The STA pays seven percent (7%) of Classic employee contribution rate to CalPERS, making the STA’s total Classic CalPERS contribution rate of 15.418% at a total cost of approximately in the amount of $319,758. In FY 2017-18, STA has fourteen (14) Classic Members and seven (7) PEPRA members. The CalPERS contribution is included in the FY 2017-18 Budget. STA has a supplemental retirement plan under the Public Agencies Retirement System (PARS). In January 1, 2013, this Plan was closed to new members in conformance with the pension reform. This Plan currently has eleven (11) active participants and two (2) retirees. The actuarial assumption of this Plan is updated every two (2) years. In April 2017, the updated actuarial valuation for FY 2017-18 and FY 2018-19 was prepared by Robert S. Dezube of Milliman, Inc. The FY 2017-18 and FY 2018-19 PARS Plan Employer Contribution rate is 3.95%, a total cost for FY 2017-18 of approximately $53,729. The PARS contribution is included in the FY 2017-18 Budget. Attachment D is the CalPERS and the PARS retirement plan status as issued under the Government Accounting Standard Board (GASB) 68 report.

104

Reserve Funds: The STA’s Contingency Reserve Fund (CRF) was established in 1999 (Attachment E). In 2007, the CRF was targeted to cover project cost for the six (6) months limited Administration and Operation budget plan. This limited cost would cover STA’s core operating cost, such as the office lease, accounting services, audit, legal cost, general liability insurance, and limited staffing. In FY 2016-17, the STA’s CRF has an amount of $1.11 million. In FY 2017-18, contribution towards the CRF is continued for the amount of $50,000 to continue to maintain STA’s adequate financial level necessary to provide for contingencies for STA’s core functions in case of unforeseen operating needs. Subsequently, in February 2008, the STA Board adopted the creation of the Insurance Reserve Fund (IRF) and directed staff to fund the IRF up to $300,000. This IRF has fully meet the Self-Insured Retention (SIR) in the amount of $100,000 per occurrence. In FY 2014-15, the Project Contingency Reserve Fund (PCRF) was established by the STA to help finance future project implementation. The Jepson Parkway Project was approved by the STA Board to be loaned PCRF funds to the City of Fairfield in the amount of $1,100,000, which will be paid back with the future reimbursements to the Jepson Parkway Project by the Cities of Fairfield and Vacaville that started in FY 2015-16. As of June 30, 2017, the PCRF balance has all been loaned to the Jepson Parkway Project to successfully complete the right of way phase for two segments of the project. STA is still negotiating repayment of the PCRF loan with the City of Fairfield. The total FY 2017-18 Budget revenue and expenditure is $17.29 million. The FY 2017-18 Proposed Budget Revision is balanced for the continued delivery of STA’s priority projects. Budget highlights for FY 2018-19 is summarized as follow: FY 2018-19 Revenues The Members Contribution (Gas Tax) and the TDA funds are STA’s core revenues. With the modification to the calculation of the Members Contribution, the FY 2018-19 contributions is anticipated to increase with the annual adjustment based on the average annual Consumer Price Index (CPI). The FY 2018-19 CPI is anticipated at 2% ($5,524) for a total Members Contribution of approximately in the amount of $281,747. The TDA funding is anticipated to be at the same funding level. The STA’s transit administration, project, and planning fund from MTC’s under the OBAG 2 has allocation amount through FY 2021-22. In FY 2018-19 the OBAG 2 funding allocation for Administration and Planning is in the amount of $1,256,934. The Mobility Program Management and Administration funding from MTC’s Regional Rideshare Program (RRP) for all County Rideshare Programs is no longer available in FY 2018-19. This fund along with the Transportation Funds for Clean Air (TFCA) and the Congestion Mitigation Air Quality (CMAQ) is the program’s core revenue. With the loss of the RRP program funding, the OBAG 2 funds allocated for the Mobility Program Management and Administration the amount of $247,309 and the Safe Routes to School Program the amount of $206,091 for the continuation and delivery of transit mobility services. The Solano Intercity Taxi Scrip/Paratransit Program funded by the TDA Funds from the County and Cities’ local TDA funds (City of Dixon, FAST, City Rio Vista, SolTrans, City of Vacaville) is programmed for the continuation of the countywide taxi based programmed under the Memorandum of Understanding (MOU) Agreement. The budget for this Program is increased with the approved increase in the fare box and expansion of the program. The CTSA/Mobility Management Program, the Countywide Travel Training/Ambassador Program, American Disability Act (ADA) in Person Eligibility Program, and the Solano Mobility Transportation Call Center Program are ongoing programs with funding from the STAF (Population Based/Solano, Lifeline, and Regional Paratransit).

105

In FY 2018-19, the I-80/I-680/SR 12 Interchange Project and the Jepson Parkway Project are anticipated to be in its final mitigation and construction project phase. The I-80 Express Lanes Project is ongoing, which is primarily funded by RM 2. The North Connector Project is in the budget for its 7th annual cost of the ten-year term on vegetation monitoring. The County Public Facility Fee (PFF) fund for the STA’s RTIF Program projects is ongoing with an estimated budget for FY 2018-19 in the amount of $870,516. FY 2018-19 Expenditure

1. Health Benefits premium rates historically increases annually, hence, the budget has been increased to reflect a projected 10% increase for FY 2018-19.

2. Retirement benefits from CalPERS for Classic Members is projected at a total rate of 15.4% plus the annual unfunded liability of $85,647 and for the PEPRA Members at 6.5% plus the annual unfunded liability of $340. The PARS Plan is in its second year of actuarial valuation at the same level from prior fiscal year of 3.95%.

3. Contribution to the Contingency Reserve Fund is at the same level of $50,000 to continue to maintain STA’s adequate financial level necessary to provide for contingencies for core STA functions in case of unforeseen operating needs,

4. The transit programs, such as the Solano Intercity Taxi Scrip/Paratransit Program, CTSA/Mobility Management Program, the ADA in Person Eligibility Program, the Countywide Travel Training/Ambassador Program, and the One Stop Transportation Call Center Program activities are ongoing.

5. Projects such as the I-80/I-680/SR 12 Interchange Project and the Jepson Parkway Project are expected to be in its final mitigation and construction phases. The I-80 Express Lanes Project Preliminary Engineering is anticipated to be ongoing. The SolanoExpress Bus Stops, the SR 12/Church Road Project, and the SR 37 Improvement Project are ongoing for the delivery of projects.

The total FY 2018-19 revenue and expenditure is $12.9 million. The proposed balanced budget has Members Contribution, TDA, and STAF funding, and the OBAG 2 Grant funds for the continued delivery of STA’s priority projects, planning and programs. To ensure conformance with the Office of Management and Budget (OMB) Uniform Guidance (Cost Principles of State, Local, and Indian Tribal Government) and the STA’s Accounting Policies and Procedures, the two-year budget FY 2017-18 and FY 2018-19 is presented with revision to the approved budget for FY 2017-18 to reflect changes in the budget revenue and expenditures. Fiscal Impact: The STA’s overall FY 2017-18 budget is $17.29 million, an increase of $2.24 million. The increase in the revenues and expenditures is based on a combination of the anticipated project construction activities and with new project studies and programs. The FY 2017-18 fiscal impact of the COLA policy at 2.7% for all STA employees effective July 1, 2017 is approximately in the amount of $52,830. The FY 2018-19 Budget is balanced at $12.9 million to reflect the carryover funds and OBAG 2 funds for the continuation of programs and projects. Recommendation: Approve the following:

1. Adopt the STA’s FY 2017-18 Proposed Budget Revision as shown in Attachment A; 2. FY 2017-18 Cost of Living Adjustment of 2.7% effective July 1, 2017. 3. Approve STA’s Salary Schedule for FY 2017-18 as shown in Attachment B; and 4. Adopt the STA’s FY 2018-19 Proposed Budget as shown in Attachment C.

106

Attachments (Provided to the STA Board Members under separate enclosure):

A. STA FY 2017-18 Proposed Budget Revision dated July 12, 2017; B. STA’s FY 2017-18 Salary Schedule; C. STA FY 2018-19 Proposed Budget dated July 12, 2017; D. STA’s CalPERS and PARS Retirement Plans status as of June 30, 2016 E. STA’s Reserve Account Balances; F. FY 2017-18 Budget and Fiscal Reporting Calendar.

107

This page intentionally left blank.

108

FY 2017-18 PROPOSED BUDGET REVISIONJuly 12, 2017

STA Fund Adopted FY 17-18

Proposed FY 17-18 Operations & Administration Adopted

FY 17-18Proposed FY 17-18

Members Contribution/Gas Tax (Reserve Accounts) 50,000 50,000 Operations Management 1,749,871 1,752,851Members Contribution/Gas Tax 245,710 200,400 STA Board of Directors/Administration 44,000 50,900

Transportation Dev. Act (TDA) Art. 4/8 306,158 508,806 Expenditure Plan 50,000 50,000TDA Article 3 150,000 200,000 Contributions to STA Reserve Account 50,000 50,000

TDA Article 4/4.5 839,592 895,717 Subtotal $1,893,871 $1,903,751

One Bay Area Grant 2 (OBAG 2): Program 453,400 341,867One Bay Area Grant 1 (OBAG 1): Program 305,243 389,069 Commuter Program Management & Administration 338,922 258,794

Regional Rideshare Program (RRP) 0 105,000 Employer Program 91,280 232,457Active Transportation Program (ATP) 2,568,797 113,435 SNCI Marketing - Vanpool/Carpool 81,050 123,050

STIP Planning, Programming and Monitoring (PPM) 210,367 206,863 Rideshare Services - Napa Valley Transportation Authority 17,500 35,000RM 2 - I-80 Express Lanes 75,840 70,376 Van Pool Services - Napa Valley Transportation Authority 59,638 71,505

RM 2 - I-80 Interchange Project 64,115 62,053 Safe Route to School Program (SR2S) 554,225 892,406Transit Performance Initiative (TPI) Program 233,716 0

Highway Safety Improvement Program (HSIP) 400,000 400,000 Transit Management Administration 162,694 164,201Transportation for Clean Air (TFCA) 229,633 367,060 Solano Express Marketing 150,000 150,000

TFCA - NVTA 17,500 35,000 Transit Corridor Study/Implementation 165,644 136,249FTA - NVTA 59,638 71,505 Suisun/Fairfield Amtrak Operation/Maintenance 50,000 49,519

Yolo/Solano Air Quality Management District (YSAQMD) 75,268 159,923 Solano Intercity Taxi Scrip/Paratransit Program 999,592 927,650FTA 5310 300,000 190,337 Transit Coordination/Implementation 180,167 323,344

State Transit Assistance Fund (STAF) 1,493,210 2,460,429FTA 5304/5403 120,000 0 Lifeline Program 18,000 16,000

California Office of Traffic Safety (OTS) 0 284,000 Paratransit Coordinating Council (PCC) 30,000 25,000California Energy Commission (CEC) 67,676 67,676 ADA in Person Eligibility Program 250,000 293,570

Abandoned Vehicle Abatement (AVA) Program/DMV 10,000 10,000 CTSA/Mobility Management Program 145,000 138,902Local Funds - Cities/County 165,600 673,789 Countywide Travel Training/Transit Ambassador Program 176,496 190,337

Taxi Scrip Farebox Revenue 150,000 150,000 One Stop Transportation Call Center Program 304,356 341,475Sponsors 15,500 15,500

Subtotal $9,803,941 $9,222,403

Transportation for Clean Air (TFCA) 360,068 360,068Subtotal $360,068 $360,068

Abandoned Vehicle Abatement (AVA) Program Project Management/Administration 141,858 101,433Department of Motor Vehicle (DMV) 320,000 350,000 Local Streets & Roads Annual Report 18,206 22,343

Subtotal $320,000 $350,000 Solano Projects Online Tracker (SPOT) 15,342 15,340

SR 37 Improvement Project 0 206,736Safe Routes to School (SR2S) Program Capital Project 2,540,257 7,150

Local Fund - RTIF 100,000 640,189 Road Safety Analysis & Data Collection 450,873 549,022

Local Fund - Cities/County 100,000 200,000 Local Project Delivery (SR 12/Church Rd) 0 250,000

Subtotal $200,000 $840,189 Solano Express Bus Stops 233,716 656,000

I-80/I-680/SR 12 Interchange Project SR 12/Jameson Canyon Project 0 20,000RM 2 Funds 200,000 2,200,000 Jepson Parkway Project 200,000 840,189

Subtotal $200,000 $2,200,000 I-80/I-680/SR 12 Interchange Project 200,000 2,200,000I-80 Express Lanes Project 2,992,177 2,978,304

North Connector-East Project 50,000 50,000

RM 2 Funds 2,992,177 2,978,304 I-80 East Bound Truck Scales Project 0 50,000

Subtotal $2,992,177 $2,978,304 Redwood Parkway Drive/Fairgrounds Improvement Project 250,000 350,000

I-80 East Bound Truck Scales Project Fairgrounds Transit Facility Study 0 100,548RM 2 Funds 0 50,000 Phase Design Parking Structure-Vallejo 0 100,000

Subtotal $0 $50,000

North Connector East Project Closeout/MitigationRM 2 Funds 50,000 50,000

Subtotal $50,000 $50,000 Subtotal $8,282,865 $9,717,581

SR 12/Jameson Canyon Project

STIP/TCRP - Jameson Canyon Project 0 20,000

Subtotal $0 $20,000 Planning Management/Administration 253,547 200,524

Events 12,500 14,596

Model Development/Maintenance 39,695 106,140Federal Earmark 250,000 250,000 Comprehensive Transportation Plan (CTP) Follow Up 208,146 231,091

Local Funds - County/Vallejo 0 100,000 Countywide Active Transportation Plan 125,000 161,479

Subtotal $250,000 $350,000 Solano Online Bike Map 8,690 8,690

Electric Vehicle (EV) Readiness 67,676 67,676

Water Transportation Plan 0 40,000Regional Impact Fee 870,436 870,516 Transportation Funds for Clean Air (TFCA) Programs 360,068 360,068

Subtotal $870,436 $870,516 Subtotal $1,075,322 $1,190,264

TOTAL, ALL REVENUE $15,046,622 $17,291,480 TOTAL, ALL EXPENDITURES $15,046,622 $17,291,480

Regional Transportation Impact Fee (RTIF) Program 870,436 870,516

I-80 Express Lanes Project

Transportation Funds for Clean Air (TFCA) Program

Jepson Parkway Project

Regional Transportation Impact Fee (RTIF) program

Redwood Parkway Drive/Fairgrounds Improvement Project

Strategic Planning

DMV Abandoned Vehicle Abatement (AVA) Program 320,000 350,000

REVENUES EXPENDITURES

One Bay Area Grant 2 (OBAG 2)/(STP): Planning/ProgrammingPrograms

1,196,978 1,193,598

Project Development

Solano Senior & People with Disabilities Plan Implementation/Committee

20,000 110,425

Subtotal $3,794,564 $4,479,884

109

sfurtado
Typewritten Text
ATTACHMENT A
sfurtado
Typewritten Text
sfurtado
Typewritten Text

Job TitleFLSAStatus

Position Code

MinimumMonthly

MaximumMonthly

Accounting & Administrative Services Manager E 91020 $8,231 - $10,006

Accounting Technician N 91016 $4,434 - $5,389

Administrative Assistant I N 91014-1 $3,519 - $4,277

Administrative Assistant II N 91014-2 $3,960 - $4,814

Administrative Clerk N 91035 $2,927 - $3,559

Assistant Program Manager N 91028 $5,446 - $6,620

Assistant Project Manager N 91023 $5,446 - $6,620

Associate Planner N 91004 $5,718 - $6,951

Clerk of the Board/Office Manager E 91025 $7,126 - $8,663

Commute Consultant I N 91012-1 $3,879 - $4,715

Commute Consultant II N 91012-2 $4,655 - $5,658

Deputy Executive Director/Director for Projects E 91007 $15,671 - $19,047

Director for Planning E 91008 $11,595 - $14,092

Director of Transit and Rideshare Services E 91022 $9,408 - $11,436

Executive Director E 90001 $17,257 - $20,975

Marketing and Legislative Program Manager E 91021 $7,134 - $8,670

Planning Assistant N 91032 $4,434 - $5,389

Program Coordinator N 91024 $3,695 - $4,490

Program Services Administrator E 91034 $6,809 - $8,276

Program Services Division Manager E 91017 $7,483 - $9,096

Project Assistant N 91019 $4,434 - $5,389

Project Engineer E 91026 $8,825 - $10,728

Project Manager E 91030 $6,486 - $7,882

Senior Planner E 91027 $6,486 - $7,882

Senior Project Manager E 91036 $7,483 - $9,096

Transit Mobility Coordinator N 91031 $4,655 - $5,658

Transit Program Manager E 91029 $7,483 - $9,096

Customer Service Representative (PT) N 92007 $16.90 - $20.53

Program Coordinator (PT) N 92005 $21.32 - $25.90

Senior Customer Service Representative (PT) N 92009 $19.42 - $23.61

All full time classifications may have an equivalent part time salary range.

FY 2017-18 SALARY SCHEDULESalary Adjustments + COLA (2.7%)

Effective July 1, 2017Proposed July 12, 2017

Salary Range

110

sfurtado
Typewritten Text
ATTACHMENT B
sfurtado
Typewritten Text

FY 2018-19 PROPOSED BUDGET July 12, 2017

STA Fund Proposed FY 17-18 Operations & Administration Proposed

FY 17-18Members Contribution/Gas Tax (Reserve Accounts) 50,000 Operations Management 1,810,128

Members Contribution/Gas Tax 267,188 STA Board of Directors/Administration 50,000Transportation Dev. Act (TDA) Art. 4/8 508,806 Expenditure Plan 50,000

TDA Article 3 147,665 Contributions to STA Reserve Account 50,000TDA Article 4/4.5 898,194 Subtotal $1,960,128

One Bay Area Grant 2 (OBAG 2): Program 470,023One Bay Area Grant 1 (OBAG 1): Program 215,427 Commuter Program Management & Administration 276,725

Employer Program 144,926MTC - Community Based Transportation Plan (CBTP) 47,500 SNCI Marketing - Vanpool/Carpool 70,300

Active Transportation Program (ATP) 273,183 Safe Route to School Program (SR2S) 694,957STIP Planning, Programming and Monitoring (PPM) 201,473 Transit Management Administration 164,201

RM 2 - I-80 Express Lanes 65,578 Solano Express Marketing 150,000RM 2 - I-80 Interchange Project 64,154 Transit Corridor Study/Implementation 261,249

Transportation for Clean Air (TFCA) 216,864 Suisun/Fairfield Amtrak Operation/Maintenance 20,000Yolo/Solano Air Quality Management District (YSAQMD) 97,650 Solano Intercity Taxi Scrip/Paratransit Program 1,058,194

State Transit Assistance Fund (STAF) 2,400,816 Transit Coordination/Implementation 313,344California Office of Traffic Safety (OTS) 57,000 Lifeline Program 16,000

Abandoned Vehicle Abatement (AVA) Program/DMV 10,000 Paratransit Coordinating Council (PCC) 25,000Local Funds - Cities/County 455,789 ADA in Person Eligibility Program 300,681Taxi Scrip Farebox Revenue 150,000 CTSA/Mobility Management Program 170,874

Sponsors 15,500 Countywide Travel Training/Transit Ambassador Program 193,954One Stop Transportation Call Center Program 257,757

Subtotal $7,837,420 Solano Senior & People with Disabilities Plan Implementation/Committee 103,993

Transportation for Clean Air (TFCA) 360,725Subtotal $360,725

Abandoned Vehicle Abatement (AVA) ProgramDepartment of Motor Vehicle (DMV) 350,000

Subtotal $350,000 SR 37 Improvement Project 67,351

Road Safety Analysis & Data Collection 57,000

Local Streets & Roads Annual Report 20,821

Local Fund - RTIF 0 Solano Projects Online Tracker (SPOT) 14,044

Local Fund - Cities/County 168,569 Local Project Delivery (SR 12/Church Rd) 250,000

Subtotal $168,569

I-80/I-680/SR 12 Interchange Project Jepson Parkway Project 168,569

RM 2 Funds 1,128,308 I-80/I-680/SR 12 Interchange Project 1,128,308

Subtotal $1,128,308 North Connector-East Project 50,000

I-80 Express Lanes Project 1,140,753

Redwood Parkway Drive/Fairgrounds Improvement Project 1,000,000RM 2 Funds 1,140,753 Regional Transportation Impact Fee (RTIF) Program 870,516

Subtotal $1,140,753 DMV Abandoned Vehicle Abatement (AVA) Program 350,000

North Connector East Project Closeout/MitigationRM 2 Funds 50,000

Subtotal $50,000

Planning Management/Administration 222,319

Events 14,596

Model Development/Maintenance 50,000

Local Funds - County/Vallejo 750,000

Subtotal $1,000,000 Countywide Active Transportation Plan 163,626

Solano Online Bike Map 8,904

Regional Impact Fee 870,516

Subtotal $870,516 Subtotal $1,059,400

TOTAL, ALL REVENUE $12,906,291 TOTAL, ALL EXPENDITURES $12,906,291

Federal Earmark 250,000

Transportation Funds for Clean Air (TFCA) Programs 360,725

Subtotal $5,664,608

Strategic Planning

Comprehensive Transportation Plan (CTP) Follow Up 239,230

Project Development

Subtotal $4,222,155

REVENUES EXPENDITURES

One Bay Area Grant 2 (OBAG 2)/(STP): Planning/ProgrammingPrograms

1,224,610

Regional Transportation Impact Fee (RTIF) program

Project Management/Administration 141,246

Solano Express Bus Stops 406,000

I-80 Express Lanes Project

Transportation Funds for Clean Air (TFCA) Program

Jepson Parkway Project

Redwood Parkway Drive/Fairgrounds Improvement Project

111

sfurtado
Typewritten Text
ATTACHMENT C
sfurtado
Typewritten Text

June 30, 2015 June 30, 2016CalPERS Plan:

Classic: Entry Age Normal Accrued Liability $4,945,957 5,301,574 Plan’s Market Value of Assets $4,051,146 4,336,833 Unfunded Liability $894,811 $964,741 Funded Ratio 82% 82%

PEPRA: Entry Age Normal Accrued Liability $10,093 65,877 Plan’s Market Value of Assets $10,242 61,739 Unfunded Liability ($149) $4,138 Funded Ratio 101% 94%

PARS Plan:

Entry Age Normal Accrued Liability $644,289 742,723 Plan’s Market Value of Assets $437,439 547,564 Net Unfunded Liability $206,850 $195,159 Funded Ratio 67.89% 73.72%

The Table below is the Governmental Accounting Standard Board (GASB 68) report issued by CalPERS and PARS:

112

sfurtado
Typewritten Text
ATTACHMENT D
sfurtado
Typewritten Text

FY BalanceInterest Earned Total

% at Target

Target Amount

1999 - 2007 324,443 324,4437/07 - 6/08 58,801 14,925 398,169 96% 413,318 YR 17/08 - 6/09 58,801 11,673 468,643 91% 515,161 YR 27/09 - 6/10 58,000 13,851 540,494 87% 622,736 YR 37/10 - 6/11 58,000 7,664 606,158 82% 735,364 YR 47/11 - 6/12 108,000 3,595 717,753 84% 852,424 YR 57/12 - 6/13 108,000 2,705 828,458 93% 895,045 YR 67/13 - 6/14 108,000 1,515 937,973 100% 939,797 YR 77/14 - 6/15 100,000 6,492 1,044,465 101% 1,033,777 YR 87/15 - 6/16 0 8,526 1,052,991 93% 1,137,155 YR 97/16 - 6/17 50,000 8,412 1,111,403 89% 1,250,870 YR 10

$1,032,045 $79,358 $1,111,403

Project Contingency Reserve Fund (PCRF):

06/30/14 1,100,000

07/09/14 (500,000)

02/10/16 (600,000)

$0

Insurance Reserve: Self Insured Retention (SIR) $100,000 per occurrence

7/07 - 6/08 50,000 50,000 100% 50,000 YR 17/08 - 6/09 50,000 100,000 100% 100,000 YR 27/09 - 6/10 50,000 150,000 100% 150,000 YR 37/10 - 6/11 50,000 200,000 100% 200,000 YR 47/15 - 6/16 100,000 300,000 100% 300,000 YR 4

$300,000

$1,332,045 $79,358 $1,411,403

June 30, 2017

Contingency Reserve:

FY 2015-16 Jepson Parkway Project Loan (2/10/16 staff report: Jepson Parkway Interfund Loan)

FY 2014-15 Jepson Parkway Project Loan (7/9/14 staff report: FY 2014-15 Budget Revision)

Total STA Reserve Account

Total PCRF Balance 6/30/2016

Reserve Account Balances

Total Contingency Reserve

Funds from North Connector Project: Solano County & Solano Water Agency (SWA)

Established FY 2007-08

Total Insurance Reserve

Account 31119-23001

113

sfurtado
Typewritten Text
ATTACHMENT E
sfurtado
Typewritten Text

STA Board Meeting Schedule:

JULY 2017 FY 2017-18 Budget Revision and FY 2018-19 Proposed Budget Adoption

FY 2016-17 AVA Third Quarter Program Activity Report

FY 2017-18 Provisionary Indirect Cost Rate Application

FY 2016-17 Fourth Quarter Budget Report

FY 2016-17 AVA Fourth Quarter Program Activity Report

FY 2017-18 First Quarter Budget Report

FY 2016-17 Annual Audit

STA Employee 2018 Benefit Summary Update

FY 2017-18 Mid-Year Budget Revision

FY 2017-18 AVA First Quarter Program Activity Report

FEBRUARY 2018 FY 2017-18 Second Quarter Budget Report

MARCH 2018 FY 2017-18 AVA Second Quarter Program Activity Report

APRIL 2018 Local Transportation Development Act (TDA) and Members Contribution for FY 2018-19

May 2018 FY 2017-18 Third Quarter Budget Report

JANUARY 2018

JUNE 2018 FY 2017-18 Final Budget Revision

FY 2017-18 Budget and Fiscal Reporting Calendar

SEPTEMBER 2017

OCTOBER 2017

DECEMBER 2017

114

sfurtado
Typewritten Text
ATTACHMENT F

Agenda Item 11.A July 12, 2017

DATE: June 29, 2017 TO: SolanoExpress Intercity Transit Consortium FROM: Brandon Thomson, Transit Mobility Coordinator Jim McElroy, Project Manager RE: SolanoExpress Operations Implementation Plan Background/Discussion: The STA Board, staff, and two intercity transit operators (Fairfield and Suisun Transit (FAST) and Solano County Transit (SolTrans) is engaged in a process to revamp the SolanoExpress system. The last system review was completed in 2004. The I-80/I-680/I-780/SR 12 Transit Corridor Study, which is the basis of the proposed changes, was completed in December 2014. That Study made findings about the current system that included:

1. Built upon expedience and opportunity. 2. Not clear or easy to understand 3. There are areas of duplication 4. Except for the Route 80, the service does not meet key performance standards 5. Connections between Solano cities are slow and infrequent

The December 2014 study analyzed the existing service and selected a preferred alternative. Since that time the following key activities have been completed:

1. Refined the preferred alternative 2. Implementation planning 3. Developed schedules and operating framework 4. Identified key capital projects 5. Initiated funding and implementation plans for capital projects

This agenda item is to act on implementing the service changes. Following is an overview of key project components.

Consolidated Routing The routes network is consolidated from the existing seven disparate routes into three routes plus a temporary transition commute route. Route consolidation is the most significant outcome of the implementation since it makes for easier travel between destinations within and outside of Solano County. Further, the consolidation builds a framework upon which more frequency and extended hours can be added as new funding and demand are generated. Attachment A is an overview of the consolidation. Change from Route Numbers to Colors Originally, STA had recommended modifying the seven route numbers (20, 30, 40, 78, 80, 85, and 90) to route colors to coincide with connecting BART transfers (red and yellow). Subsequently, both FAST and SolTrans staff requested shifting the three colors to coincide to current colors of the SolanoExpress buses. Blue and Green for FAST and Green and Yellow for SolTrans.

115

New Schedules New draft schedules have been created based on current congestion issues and potential for attracting and retaining riders. Here are some examples:

Access to Solano Community College – VacaValley and Suisun Valley is added with direct service to Dixon and Fairfield.

Faster access to and from Vallejo and Fairfield is added. More frequent and improved on-time performance is added to and from Sacramento. Direct service to the Amtrak Station in Suisun is added from Vallejo and Fairfield. Dixon and Vacaville will have direct service to BART.

Attachment B is the current iteration of schedules for weekdays. Weekend schedules are in final development. Implementation Components Implementation of the Green Line requires a new bus stop on Highway 37 at Fairgrounds Drive to gain time savings needed for on-time performance and to extend service to the Amtrak station in Suisun. The Green Line consolidation cannot occur until the stop is implemented which is scheduled to by Spring of 2019. Implementation of the new Blue Line only needs implementation of new bus stops near the Solano Community College campuses in Suisun Valley and VacaValley. These are expected to be completed by Spring of 2018. There are other issues that need to be resolved, but these capital projects are the “critical path” tasks. Based on the capital project timing, staff is proposing a two-step implementation

A. Phase 1: On July 1, 2018: Phase 1, Blue, Green Express and Yellow Lines

i. Routes 20, 30, and 40 merged into Blue Line ii. Route 90 merged into Green Line Express

iii. Route 78 merged into Yellow Line B. Phase 2:

On July 1, 2019: Phase 2, Green Line i. Routes 80 and 85 merged into Green Line

Marketing and Outreach Staff is proposing a three-element approach to marketing and outreach:

1. Outreach to broader Solano County population who may or may not be current riders: The goal is a deep penetration generating broad public awareness and understanding of the new service.

2. Information to share with boards, institutions, and news providers: This is a broader perspective of the service such as an overview of how system works, who owns and operates the systems, how decisions get made, and funding.

3. Materials for riding the bus to users and those interested in using the service: Schedule or set of schedules, with maps, and a system map that shows how routes interact. How to use the bus, fares, and how to pay fare. Unified material will apply across both operators so the public will see a single network.

Fare Structure Staff recommends that the Board adopt a target fare structure as shown below and more thoroughly in Attachment C. The proposed fare structure is not intended to be a fare increase, but is designed to make fares consistent across the entire SolanoExpress network. Under the proposal, there would be four basic fares:

116

Capital Plans There are three capital projects key to implementing the entire network:

1. New Bus Stop at near Solano Community College – Suisun Valley: Estimated completion is by April 2018 – Essential to Blue Line and Green Line

2. New Bus Stop at Solano Community College – VacaValley: Estimated completion is by January 2018 – Essential to Blue Line

3. New Bus Stop on Highway 37 at Fairgrounds Drive: Estimated completion January 2019 Essential to Green Line

STA has budgeted for the marketing and promotion of this service and this will be covered in more detail at the October meeting of the STA Board. The time line for the Highway 37 at Fairgrounds Drive bus stop determines the implementation date for the Green Line. Therefore, staff recommends a two-phases implementation that defers the consolidations of the Route 80 and Route 85 into the Green Line until July 2019 or when the new stop at Highway 37 and Fairgrounds is completed. Other Key Tasks Public Hearings and Outreach required by funding agencies and local plans: Each of the two operators, FAST and SolTrans, has frameworks for hearings for outreach and hearing related to service, schedule, and fare changes. Staff expects to work with the operators to identify and complete their requirements. STA does plan to hold a public hearing at a future STA Board meeting targeted for October 2017. Operations issues: Schedules will be refined as we move closer to implementation dates. Schedules will be incorporated into the operators’ systems for allocating buses and drivers to the service.  

This item was reviewed by the Consortium Committee on June 27, 2017 and SolTrans made a motion to change the implementation date of the Yellow and Blue Express Line from January 1, 2018 to July 1, 2018. Additionally, SolTrans motioned to change the implementation date of the Green Line from July 1, 2018 to July 1, 2019. This motion was seconded by FAST and supported unanimously by the Consortium.

Current SolanoExpress Basic Individual 31‐Day

1:  Vallejo/Benicia‐BART 5.00               114.00         

2:  All Other to/from Outside County ‐ One County Line 5.75               130.00         

3:  Intercity (between jurisdictions) 2.75               70.00           

4:  Within City (within service area of individual operator) 1.75               70.00           

Samples

BART to Sacramento (Crosses 2 County Lines) 11.50            130.00         

BART to Vallejo 5.00               114.00         

BART to Fairfield/Vacaville/Dixon (Long intraregional) 5.75               130.00         

Vallejo to Fairfield 2.75               130.00         

Vallejo to Benicia 1.75               56.00           

Fairfield to Vacaville or Dixon 2.75               70.00           

Sacramento/UCD to Solano County Destination 5.75               130.00         

FTC to Solano Community College ‐ Suisun Valley 1.75               70.00           

117

On June 28, 2018, the STA Technical Advisory Committee reviewed these recommendations and they were passed unanimously. Fiscal Impacts: The service improvements are intended to be implemented within existing resources and performance targets, as adopted by the Board for the SolanoExpress service. Recommendations: Authorize the Executive Director to:

1. Implement two phases of SolanoExpress service changes as shown in Attachment A: C. On July 1, 2018: Phase 1, Blue, Green Express and Yellow Lines D. On July 1, 2018: Phase 1, Blue, Green Express and Yellow Lines

i. Routes 20, 30, and 40 merged into Blue Line ii. Route 90 merged into Green Line Express

iii. Route 78 merged into Yellow Line E. On July 1, 2019: Phase 2, Green Line

i. Routes 80 and 85 merged into Green Line 2. Work with the two SolanoExpress transit providers to implement a new unified fare

structure across all SolanoExpress services, as generally identified in this agenda item; 3. Work with the two SolanoExpress providers to proceed with public hearings and outreach

to comply with regulatory and funding regulations and laws; and 4. Develop and implement outreach and marketing plans to promote the SolanoExpress

service changes. Attachments:

A. Consolidation Framework B. Weekday Proposed Schedules – Step 1 (Preliminary) C. Proposed Unified Fare Schedule Compared to Current Fare Structure

118

119

jmasiclat
Typewritten Text
jmasiclat
Typewritten Text
ATTACHMENT A

120

jmasiclat
Typewritten Text
ATTACHMENT B

121

122

123

124

125

This page intentionally left blank.

126

Regional Fare Structure - Proposed

Base Fares - Solano Express

Current SolanoExpress Basic Individual 31-Day

Soltrans - Intracounty, Outside Jurisdiction 5.00 114.00

SolTrans - Outside County 5.00 114.00

SolTrans 78 - within jurisdiction 1.75 56.00

FAST - Intracounty 5.75 70.00

FAST - Outside County 5.75 130.00

FAST - within jurisdiction (30/40 Short) 2.75 70.00

Local Fares - Current

SolTrans 1.75 56.00

FAST 1.75 60.00

Propsed Unified Fare Structure

1: Vallejo/Benicia-BART 5.00 114.00

2: All Other to/from Outside County - One County Line 5.75 130.00

3: Intercity (between jurisdictions) 2.75 70.00

4: Within City (within service area of individual operator) 1.75 70.00

Examples of Costs

BART to Sacramento (Crosses 2 County Lines) 11.50 130.00

BART to Vallejo 5.00 114.00

BART to Fairfield/Vacaville/Dixon (Long intraregional) 5.75 130.00

Vallejo to Fairfield 2.75 130.00

Vallejo to Benicia 1.75 56.00

Fairfield to Vacaville or Dixon 2.75 70.00

Sacramento/UCD to Solano County Destination 5.75 130.00

FTC to Solano Community College - Suisun Valley 1.75 70.00

127

jmasiclat
Typewritten Text
ATTACHMENT C

This page intentionally left blank.

128

Agenda Item 11.B July 12, 2017

DATE: July 3, 2017 TO: STA Board FROM: Robert Guerrero, Senior Project Manager RE: Approval of SolanoExpress Bus Stop Locations as Part of SolanoExpress Operations Implementation Plan Background: STA staff has met with the cities of Fairfield, Vacaville and Vallejo, as well as the County of Solano and Caltrans to discuss the construction of SolanoExpress bus stops at three locations:

1. Fairfield Solano Community College Main Campus 2. Vacaville Solano Community College Satellite Campus 3. Fairgrounds Drive/State Route 37 SolanoExpress Bus Stop

These three locations are being planned in conjunction with the new SolanoExpress Bus Service Plan with frequent service to local and regional transit such as Bay Area Regional Transit (BART), Capitol Corridor Train Service and Vallejo Ferry Terminal. In April, STA staff presented a draft financial plan for funding each station which included a combination of State Transit Assistance Funds (STAF), Yolo Solano Air Quality Management District (YSAQMD) Clean Air Funds and Solano County Regional Transportation Impact Fee (RTIF). Another critical SolanoExpress Bus stop is the Suisun City Capitol Corridor Train Depot. Suisun City staff renovated the station with modernized features and passenger amenities such as free wifi, work stations, cross walk improvements, signs and furniture. In addition, STA has provided direct customer service as part of the Solano Mobility Call Center at the Train Depot since 2014. Discussion: The STA Board authorized Funding Agreements with the cities of Fairfield and Vacaville to construct the stops at the Solano Community College sites; however, the formal action to approve the stop locations is now being recommended to the STA Board. The Fairfield Solano Community College SolanoExpress Bus Stop is proposed to be located along the Suisun Valley Parkway just southeast of the West America Drive intersection. This stop is within a half mile radius from the Solano Community College Campus, multi-family and single family homes and several employers. Attachment A provides a map of the proposed stop location and the employers located with a ½ mile radius. Attachment B provides a similar map illustrating the Vacaville Solano Community College SolanoExpress Bus Stop location. This stop also services the Solano Community College, multi-family and single family homes and several employers. Fairfield Public Works and Vacaville Public Works staff are the project leads for implementing these improvements as soon as the sites are formally approved. The SR 37/Fairgrounds Dr. site is proposed to be located on the westbound off and on ramps of SR 37 and Fairground Drive. This innovative stop will provide the most travel time savings for

129

the SolanoExpress Bus service by remaining on the highway and eliminating travel time on local streets. This stop is anticipated to service Six Flags’ Discovery Kingdom (City of Vallejo’s largest employer), Solano Fairgrounds and Vallejo’s Crest Residential Neighborhood. Attachment C illustrates the SR 37/Fairgrounds Dr. SolanoExpress Bus Stop location. These three Express Bus locations have been discussed throughout the development of the SolanoExpress Service Implementation Plan development. STA staff is seeking a formal approval of these locations by the STA Board to begin developing the project with the goal to have the two college sites constructed by Spring of 2018 and the Fairgrounds site completed by Spring of 2019. All three stops are integral to streamlining the SolanoExpress Bus Service by reducing service times with focused stop locations serving Solano County residents and employers. Lastly, STA staff is recommending that the new Green Line Service, be extended to service the Suisun City Capitol Corridor Train Depot. The proposed new Green Line Service, as described in a separate staff report “SolanoExpress Bus Service Implementation”, will be implemented in 2 phases and will consolidate Routes 85 and 80. This will allow for a more stream lined connection to the Train Depot from the El Cerrito BART station, Vallejo Ferry Terminal and Solano Fairgrounds. The existing service requires at least one transfer connection to access all four regional stops. The SolanoExpress Transit Consortium and STA Technical Advisory Committee reviewed and approved STA staff’s recommendation at their June 27th and June 28th meetings respectively. Fiscal Impact: None to the STA General Fund. The estimated cost to construct the Solano Express Bus Stops at the Fairfield and Vacaville Solano Community College locations is $400k. STA Board has approved $325k in State Transit Assistance Fund (STAF) (this STAF is from the Transit Performance Initiative (TPI) swap of the SolanoExpress Bus Replacement) and $75k from Yolo Solano Air Quality Management District (YSAQMD) for a total of $400k to fund the bus stop construction at these locations. The SR 37/Fairgrounds Dr. Solano Express Bus Stop cost estimate for completion is $1.825 million with $1 million identified through Congestion Mitigation and Air Quality Program (CMAQ) funds provided by the Metropolitan Transportation Commission (MTC) funding. A separate staff report will be prepared following the recommendation by RTIF Working Groups 3 and 6 to apply their revenue towards this project. As noted in the separate SolanoExpress Service Operations Implementation Plan staff report, the Green Line SolanoExpress Bus Service extension is intended to be implemented within existing resources and performance targets, as adopted by the Board for the SolanoExpress service. Recommendation: Approve the SolanoExpress Bus Stop Locations for the new SolanoExpress Operations Implementation Plan as follows:

1. Fairfield Solano Community College Main Campus as shown in Attachment A; 2. Vacaville Solano Community College Satellite Campus as shown in Attachment B; 3. Fairgrounds Drive/State Route 37 as shown in Attachment C; and 4. The new Green Line SolanoExpress Bus Route extension to the Suisun City Capitol

Corridor Train Depot.

130

Attachments: A. Fairfield Solano Community College Main Campus Location Map B. Vacaville Solano Community College Satellite Campus Location Map C. Fairgrounds Drive/State Route 37 Location Map

131

This page intentionally left blank.

132

Employers• Westamerica Bank• Westamerica Commercial Credit• Cars With Heart

Westamerica Center

Employers• NorthBay Green Valley Admin Building• NorthBay Center for Primary Care

NorthBay Center

Executive Court North

Employers• Colliers International• SCC Small Business Center• Solano Economic Development Corp.• Solano Family & Children’s Services• Sylvan Identix• Solano County Child Support Services• Crossfit Solano• Rent a Kit• Workforce Investment Board• Solano Employment Connection• Aim Higher• Laborer’s Trust Funds

Solano Community College

Faculty and Students

Employers within half a mile from new Suisun Valley Solano Express Stop133

Kaiser Permanente Medical Center

3333 & 3777 Vaca Valley Parkway Employers

Employers:• Apricot Lane• The Father’s House office• Kids Gone Wild• Cross Fit Vacaville North• Bliss Urban Arts Center• Vacaville Indoor Soccer

Complex• Pace Solano

Solano College Vacaville Center

Genentech

Employers within half a mile from new Vaca Valley Solano Express Stop 134

Sola

no C

ount

y Fa

irgro

unds

Cour

tyar

d by

Mar

riott

Hot

el

Loca

tions

with

in ½

mile

of n

ew

Fairg

roun

ds D

rive

Sola

noEx

pres

ssto

p

Six

Flag

s Dis

cove

ry K

ingd

om

Nor

th V

alle

jo R

esid

entia

l Are

a

135

This page intentionally left blank.

136

Agenda Item 12.A July 12, 2017

DATE: June 30, 2017 TO: STA Board FROM: Anthony Adams, Project Manager RE: Office of Traffic Safety (OTS) Grant Update Background: The California Office of Traffic Safety (OTS) is a state agency whose goal is to eliminate traffic deaths and injuries. It seeks to accomplish this goal by making available grants to local and state public agencies for programs that help them enforce traffic laws, educate the public in traffic safety, and provide varied and effective means of reducing fatalities, injuries and economic losses from collisions. OTS draws from several federal government funding sources for its grants. OTS also mounts public awareness campaigns and acts as a primary traffic safety resource in order to enlist the help of the general public and the media encouraging traffic safety.

OTS has numerous “areas of concentration” for grant applications. All of these areas of concentration have no local match requirement, no minimum or maximum grant amount, and funds must be expended within one fiscal year. The call for projects was on December 5, 2016. This year, STA applied, on a countywide basis, for two separate OTS areas of concentration for grant funding: Traffic Records: The program goal is to establish/improve record systems that aid in identifying existing and emerging traffic safety problems and aid in evaluating program performance. Accurate and current records are needed to support problem identification and to evaluate countermeasure effectiveness. Pedestrian and Bicycle Safety: The program goal is to increase safety awareness among pedestrians, bicyclists and motorists through various approaches including education, enforcement and engineering. Discussion: On June 6th, OTS contacted STA to inform us that STA have been preliminarily awarded $171,000 for each application. OTS informed STA that the next steps will be to finalize a budget, timeline, and sign a contract. Work can begin on the proposed projects by October 1st, 2018. Below is a brief explanation of both of the OTS grants. The Traffic Records Grant will be focused on procurement of collision data software and standardization of data reporting techniques. This data will help to identify the types and locations of collisions, and will have this data available and analyzed automatically. In consultation with the commanders of each police department within Solano County, all data will be collected and made available through an online portal.

137

The Pedestrian and Bicycle Safety Grant will be focused on promoting safety and reducing injuries of elementary, middle and high school children in Solano County. The Solano Safe Routes to School (SR2S) Program will develop an in-depth and comprehensive evaluation strategy addressing safety and efficacy of the program working with up to 5 schools within the county (primarily those nearest identified high collision areas). Through the OTS grant, SR2S staff will evaluate schools within these high-collision areas performing bicycle and pedestrian safety audits and strategize and implement community-driven solutions in order to decrease the amount of pedestrian/bike fatalities and injuries surrounding the schools. Fiscal Impact: No matching funds are required for this OTS grant. Recommendation: Informational.

138

Agenda Item 12.B July 12, 2017

DATE: June 29, 2017 TO: STA Board FROM: Jayne Bauer, Marketing and Legislative Program Manager RE: Legislative Update

Background: Each year, STA staff monitors state and federal legislation that pertains to transportation and related issues. On February 8, 2017, the STA Board approved its 2017 Legislative Platform to provide policy guidance on transportation legislation and the STA’s legislative activities during 2017. Monthly legislative updates are provided by STA’s State and Federal lobbyists and are attached for your information (Attachments A and B). An updated Legislative Bill Matrix listing state bills of interest is available at http://tiny.cc/staleg. Discussion: State Transportation Funding Information on the 2017-18 State Budget Bill, workshops for the “Road Repair and Accountability Act of 2017” state transportation funding package (SB 1), Cap and Trade Ruling, update on RM3 legislation (SB 595) and more, are outlined in Attachment A, State Legislative Update from Shaw/Yoder/Antwih (STA’s state lobbyist). The following lists STA-supported bill status to date: AB 28 (Frazier) - Department of Transportation: environmental review process: federal pilot program. This bill would re-enact, until January 1, 2020, the California Department of Transportation's (Caltrans') authority to waive its 11th Amendment right to sovereign immunity from lawsuits brought in federal court thereby allowing Caltrans to continue assuming the role of the United States Department of Transportation (U.S. DOT) for National Environmental Policy Act (NEPA) decision making. STA Position: Support. Chaptered on March 29th. AB 1113 (Bloom) – State Transit Assistance Program Formula Clarification This bill amends the statutes governing the State Transit Assistance (STA) program to clarify several ambiguities in law that led to administrative changes made in 2016 by the State Controller’s Office. STA Position: Support. On Senate Consent Calendar 2nd day June 29th. AB 1324 (Gloria) – Local Sales Taxes for Transportation This bill would authorize a Metropolitan Planning Organization or Regional Transportation Planning Agency authorized to levy a sales tax to levy that tax in only a portion of the jurisdiction, as an alternative to the entire jur4isdiction, in which the organization or agency has authority if approved by the required percentage of the voters in that portion of the jurisdiction. The bill would require the revenues derived from the sales tax to be used only within the area for which the tax was approved by the voters. AB 1324 would benefit counties that have transportation needs that differ between rural and suburban areas, and that have difficulty obtaining the required 2/3

139

voter support countywide for local transportation sales tax measures. STA Position: Support. Failed deadline, may be acted upon in January 2018. ACA 4 (Aguiar-Curry) - Local government financing: affordable housing and public infrastructure: voter approval. This measure would lower the voter threshold to 55 percent for special taxes for purposes of funding the construction, rehabilitation or replacement of public infrastructure or affordable housing, which specifically includes improvements to transit and streets & highways, as well as protection from impacts of sea-level rise. This measure would also reduce the threshold to 55 percent for local governments to increase property taxes to cover bonded indebtedness to fund similar project-types. STA Position: Support. Referred to Committees on Local Government & Appropriations April 24th. ACA 5 (Frazier and Newman) – Protection of Transportation Revenues Assembly Member Jim Frazier introduced Assembly Constitutional Amendment (ACA) 5 to dedicate for transportation purposes all vehicle fee and gasoline or diesel tax revenues raised by SB 1. STA Position: Support. ACA 5 has already been chaptered and will be on the June 2018 statewide ballot. SB 1 (Beall) - Transportation funding. Comprehensive $52.4 billion transportation funding bill. STA Position: Support. Chaptered. SB 595 (Beall) – Regional Measure 3 This bill is the Senate placeholder for Regional Measure 3 and would authorize the nine counties in the Bay Area to vote on an unspecified increase in tolls on the Bay Area’s bridges to be used for transportation projects throughout the region. Bay Area leaders in both houses are working on the legislation, which could take shape in the coming weeks. STA Position: Support. Schedule for hearing in Assembly Transportation Committee July 10th. SCA 6 (Wiener) – Lower Vote Threshold for Local Transportation Taxes The California Constitution subjects the imposition of a special tax by a city, county, or special district upon the approval of two-thirds of the voters. This measure would lower that threshold to 55 percent of voters for taxes for transportation purposes. STA Position: Support. Held in Appropriations Committee and under submission May 25th. Federal Legislative Update (Akin Gump): STA’s federal legislative advocate (Susan Lent of Akin Gump) continues to work with STA staff to refine the STA’s strategic objectives to align with those of the new administration. Topics covered in the federal legislative update include: the House and Senate Appropriations Committees work on the 2018 appropriations bill, President Trump’s infrastructure proposal, freight legislation and the third round of the FASTLANE grant program (which has been rebranded as INFRA – Nationally Significant Freight and Highway Projects). Fiscal Impact: None. Recommendation: Informational. Attachments:

A. State Legislative Update B. Federal Legislative Update

140

June 29, 2017 TO: Board of Directors, Solano Transportation Authority FM: Joshua W. Shaw, Partner

Matt Robinson, Legislative Advocate RE: STATE LEGISLATIVE UPDATE – July 2017

Legislative Update The Legislature passed the 2017-18 Budget Bill on June 15 and it now awaits Governor Brown’s signature. As of this writing, some budget trailer bills related to the implementation of SB 1 (trade corridors and advanced mitigation) remain in the Legislature. We anticipate these bills will be sent to the Governor shortly. The Legislature will break for Summer Recess on July 21 and reconvene on August 21. We highlight bills of note affecting STA under Bills of Interest, below. SB 1 Workshops Underway On June 8 and 9, the California Transportation Commission (CTC) kicked off a series of workshops on the implementation of SB 1 (Beall and Frazier), highlighting the timeframe for a number of programs the CTC oversees, including the Solutions for Congested Corridors Program. The CTC will be hosting several additional workshops for each specific program, with the hope of adopting guidelines in late-2017/early-2018. Additionally, the California State Transportation Agency (CalSTA) will begin to host workshops on the transit and rail programs in late June. STA staff has been and will continue to participate in the SB 1 workshops. Transportation Funding Repeal As we reported last month, on May 5, Assembly Member Travis Allen (R-Huntington Beach) filed an initiative to repeal SB 1. Before the initiative, entitled “Repeal the Gas Tax,” can be circulated for signature it must first be given a Title and Summary by the Attorney General. Once it has been issued a Title and Summary the initiative must receive approximately 360,000 valid signatures to qualify for the next General Election ballot, slated for November, 2018. We will update the Board as this initiative progresses. RM3 Update For the last several months, members of the Bay Area Caucus have been meeting to discuss the potential for legislation authorizing a toll increase on the Bay Area’s bridges. Commonly referred to as Regional Measure 3, the increased toll(s) could fund a number of Bay Area transportation improvements across all nine counties. Senator Beall has legislation moving through the process, but it lacks details. Currently, SB 595 does not specify the amount of the toll increase, nor does it speak to the distribution of funds. The members of the Bay Area Caucus continue to meet regularly to hone in on a path forward for RM3 and have held several briefings with the Metropolitan Transportation Commission, local agencies, and other stakeholder groups. We have been involved in the effort to craft an RM3 path

141

jmasiclat
Typewritten Text
ATTACHMENT A

forward. STA Board members and staff have been working with the legislative delegation to ensure Solano County’s priorities are included. We will continue to engage as the RM3 legislation takes shape. The bill may be heard in the Assembly Transportation Committee on July 10. Cap and Trade Ruling On April 6, the Third District Court of Appeal ruled 2-1 to uphold the State of California’s – specifically, the California Air Resources Board’s – authority to operate the Cap and Trade program. On June 28, after months of review, the California Supreme Court upheld that ruling by declining to consider an appeal of that ruling, thus putting to rest the current legal challenge to the Cap and Trade program. As you may recall, the Cap and Trade program was under attack by the California Chamber of Commerce and Morning Star Packing Company (a regulated food processor in the cap and trade program), asserting the following: 1) that ARB’s distribution system for allowances, which includes some free distributions and some distributions via auction and reserve sales, is not authorized because AB 32 does not explicitly call for the sale of emission allowances as a means of operating a carbon control program; and, 2) that the auction and price containment reserve sales constitute “taxes” for purposes of Proposition 13 (Article XIIIA of the California Constitution), and thus are unlawful because the Legislature did not approve AB 32 by a two-thirds majority. On the first matter, the Court of Appeal agreed with the trial court, arguing that “the Legislature gave broad discretion to the [California Air Resources] Board to design a distribution system, and a system including the auction of some allowances did not exceed the scope of legislative delegation. Further, the Legislature ratified the auction system by specifying how to use the proceeds directed therefrom.” On the second matter, the Court of Appeal again agreed with the trial court that the auction sales do not equate to a tax. More specifically, the Court of Appeal found that “…because the [California Air Resources] Board’s cap-and-trade regulations do not compel anybody to buy emissions allowances, and confer on voluntary buyers a valuable commodity, they do not create a “tax” as that term is generally understood. The auction sales program does not violate Proposition 13.” The Court of Appeal’s April ruling, and the California Supreme Court’s decision not to consider the appeal from business groups shore up the Cap and Trade program, and may help stabilize the quarterly auctions of cap and trade allowances, which generate the auction proceeds that support the Transit and Intercity Rail Capital Program, the Low-Carbon Transit Operations Program, the Affordable Housing and Sustainable Communities Program, and other Low Carbon Transportation programs. Bills of Interest

SB 1 (Beall) – Transportation Funding Package (Signed by Governor on April 28) This bill would increase several taxes and fees to address issues of deferred maintenance on state highways and local streets and roads, as well as provide new funding for public transit. Specifically, this bill would increase both the gasoline (over three years) and diesel excise taxes by 12 and 20 cents, respectively; increase the vehicle registration fee by $38; create a new $100 vehicle registration fee applicable to zero-emission motor vehicles; increase Cap and Trade funding for transit; increase the rate of sales tax on diesel by another 4% for the State Transit Assistance Program and intercity rail, limit the borrowing of weight-fee revenues, and repay outstanding transportation loans. As a result, transportation funding would increase by approximately $6 billion per year. The STA Board SUPPORTS this bill (Board Action: 12/14/16).

142

SB 4 (Mendoza) – Goods Movement (This bill was amended to address an unrelated issue) This bill would do two things:

Places on the June 5, 2018, statewide primary election ballot the Goods Movement and Clean Trucks Bond Act to authorize $600 million in general obligation bonds, as follows –

o $200 million to the California Transportation Commission for projects and programs eligible for funding from the Trade Corridors Improvement Fund (TCIF);

o $200 million to the State Air Resources Board for projects and programs consistent with the Goods Movement Emission Reduction Program; and,

o $200 million to the State Air Resources Board for projects and programs to expand the use of zero- and near-zero emission trucks.

Directs an estimated $580 million in FAST Act formula funding for goods movement to the TCIF, and divides the revenue as follows:

o $150 million to improvements to California’s existing or planned land ports of entry on the border with Mexico;

o $70 million for projects for the elimination, alteration, or improvement of hazardous railroad-highway grade crossings; and,

o $360 million for projects nominated by regional transportation agencies and other public agencies, including counties, cities, and port authorities.

SB 595 (Beall) – Regional Measure 3 This bill is the Senate placeholder for Regional Measure 3 and would authorize the nine counties in the Bay Area to vote on an unspecified increase in tolls on the Bay Area’s bridges to be used for transportation projects throughout the region. Bay Area leaders in both houses are working on the legislation, which could take shape in the coming weeks. The STA Board SUPPORTS this bill (Board Action 6/14/17). SCA 6 (Wiener) – Lower Vote Threshold for Local Transportation Taxes (2-Year Bill) The California Constitution subjects the imposition of a special tax by a city, county, or special district upon the approval of two-thirds of the voters. This measure would lower that threshold to 55 percent of voters for taxes for transportation purposes. The STA Board SUPPORTS this bill (Board Action: 4/12/17). AB 28 (Frazier) – Caltrans NEPA Delegation (Signed by the Governor on March 29) This bill would grant Caltrans the authority to continue performing federal environmental responsibilities for highway projects under the National Environmental Policy Act (NEPA) and other federal laws until January 1, 2020. The STA Board SUPPORTS this bill (Board Action: 2/8/17). AB 1113 (Bloom) – State Transit Assistance Program Formula Clarification This bill amends the statutes governing the State Transit Assistance (STA) program to clarify several ambiguities in law that led to administrative changes made in 2016 by the State Controller’s Office; these changes implemented new calculation and allocation methodologies for the STA program, suddenly changing the way these funds are distributed to transit agencies. The STA Board SUPPORTS this bill (Board Action: 5/10/17). AB 1121 (Chiu) – WETA Board Existing law establishes the San Francisco Bay Area Water Emergency Transportation Authority, composed of 3 members appointed by the Governor, one member appointed by the Senate Committee

143

on Rules, and one member appointed by the Speaker of the Assembly. This bill would increase the membership of the authority to 9 members, with 5 members to be appointed by the Governor, 2 members appointed by the Senate Committee on Rules, and 2 members appointed by the Speaker of the Assembly. AB 1324 (Gloria) – Local Sales Taxes for Transportation (2-Year Bill) This bill would authorize a metropolitan planning organization or regional transportation planning agency authorized to levy a sales tax to levy that tax in only a portion of the jurisdiction, as an alternative to the entire jurisdiction, in which the organization or agency has authority if approved by the required percentage of the voters in that portion of the jurisdiction. The bill would require the revenues derived from the sales tax to be used only within the area for which the tax was approved by the voters. The STA Board SUPPORTS this bill (Board Action: 5/10/17). ACA 4 (Aguiar-Curry) – Lower Vote Threshold for Local Infrastructure Taxes The California Constitution subjects the imposition of a special tax by a city, county, or special district upon the approval of two-thirds of the voters. This measure would lower that threshold to 55 percent of voters for taxes for purposes of funding the construction, rehabilitation or replacement of public infrastructure or affordable housing, which specifically includes improvements to transit and streets & highways, as well as protection from impacts of sea-level rise. This measure would also reduce the threshold to 55 percent for local governments to increase property taxes to cover bonded indebtedness to fund similar project-types. The STA Board SUPPORTS this bill (Board Action: 4/12/17). ACA 5 (Frazier and Newman) – Protection of Transportation Revenues This measure would prohibit the state from borrowing revenues from fees and taxes imposed on vehicles or their use, and from using those revenues other than as specifically permitted by Article XIX. This measure would prohibit vehicle revenues and fuel tax revenues from being pledged or used for the payment of principal and interest on general obligation bonds issued by the state, except for vehicle weight fee revenues used to pay bond approved prior to January 1, 2017. The STA Board SUPPORTS this bill (Board Action: 5/10/17).

144

M E M O R A N D U M

June 28, 2017

To: Solano Transportation Authority

From: Akin Gump Strauss Hauer & Feld LLP

Re: June Report

During the month of June we monitored developments regarding transportation policies and funding.

Fiscal Year 2018 Budget and Appropriations

The House and Senate Appropriations Committees have begun the process of developing and marking up the fiscal year 2018 appropriations bills despite the fact that neither chamber has adopted a fiscal year 2018 budget. The House Appropriations Committee has allocated funding among the 12 appropriations committees using a top line number of $511 billion for non-defense programs, which is a $7 billion cut from fiscal year 2017. The Committee has released six bills so far and will complete subcommittee mark-ups of four bills (Agriculture, Defense, Energy & Water, Commerce-Justice-Science) and full committee mark-ups of two bills (Legislative Branch and Military Construction) before the July 4 recess. The Transportation-Housing and Urban Development (THUD) bill likely will come up in July.

Majority Leader Mitch McConnell (R-KY) has told the Senate Appropriations Committee to temporarily rely on fiscal year 2017 spending limits for the fiscal year 2018 bills. He stated that the levels may be adjusted once a bipartisan spending agreement has been reached.

Democratic Leadership sent a letter to Leader McConnell and Senate Appropriations Committee Chairman Thad Cochran (R-MS) on June 26 urging them to reach an agreement on fiscal year 2018 spending that would replace sequestration and maintain parity between non-defense and defense spending. The letter noted the importance of investing in infrastructure, including roads, bridges, transit and railroad systems, ports, airports and waterways.

The Senate Appropriations Committee has held a series of hearings on fiscal year 2018 spending, but has not advanced any bills from Subcommittee. If the House and Senate fail to reach an agreement regarding appropriations by September 30, Congress is likely to adopt a continuing resolution to extend federal spending at the current level through the first few months of fiscal year 2018.

Trump’s Infrastructure Proposal

President Trump and Administration officials promoted his plan to invest $1 trillion in US infrastructure over 10 years during the week of June 5. Trump attended a number of events and

145

jmasiclat
Typewritten Text
ATTACHMENT B

Solano Transportation Authority June 28, 2017 Page 2 forums in Ohio and in Washington DC to meet with stakeholders and describe some of the features of his plan. The White House also published an infographic to explain how the $200 billion in federal spending would be utilized, announcing that $100 billon would be used to prioritize local needs, $25 billion would be spent on rural infrastructure, and $15 billion on transformative projects.

The Administration has emphasized the need to streamline the permitting process to reduce project costs and risk. Trump announced a new White House council that will establish an online “dashboard” to track major projects through the federal permitting process, similar to a management tool established under the Obama Administration. Transportation Secretary Elaine Chao has said that the Administration is considering enforcing a page limit on environmental reviews of infrastructure projects in an attempt to "cut red tape and reduce time delays and cost burdens.”

The Trump Administration has said it will develop a more detailed infrastructure proposal, but it may not do so until the fall. Secretary Chao has said it is unlikely that the plan will be advanced as part of the Administration’s tax plan. During her June 15 testimony before the House Appropriations THUD Subcommittee, she said that there are over a dozen revenue proposals under discussion and that nothing – including a possible increase in the gas tax – is off the table.

The Transportation Department opened a 45-day comment period on June 9, requesting that stakeholders identify statutes, rules, regulations, and interpretations in policy statements or guidance “that unjustifiably delay or prevent completion of surface, maritime, and aviation transportation infrastructure projects.” The notice requested that commentators focus on requirements that either lack a statutory mandate or could be accomplished through reasonable alternatives, and legislative remedies if non-statutory changes are insufficient to address a specific obstacle to transportation infrastructure projects. The request was made as part of the Administration’s effort to reduce regulations and in response to Executive Orders 13771 and 13777, which directed agencies throughout the federal government to scrutinize regulatory burdens.

House Highway and Transit Subcommittee Chairman Sam Graves (R-MO) and 250 House Members sent a letter to House Ways and Means Committee Chairman Kevin Brady (R-TX) requesting that a portion of the revenue from proposed tax reform be directed to establishing solvency for the Highway Trust Fund. In a press release that accompanied the letter, Chairman Graves suggested that a long-term fix for the HTF would be a better solution to the country’s long-term infrastructure problems than a one-time, trillion dollar investment.

146

Solano Transportation Authority June 28, 2017 Page 3 Freight Legislation

On June 22, Rep. Rep. Alan Lowenthal (D-CA) re-introduced The National Multimodal and Sustainable Freight Infrastructure Act (H.R. 3001) to create a Freight Transportation Infrastructure Trust Fund. The Trust Fund would be funded with revenues generated from a national 1% “waybill fee” on the transportation cost of goods. The tax would generate about $8 billion in annual revenue a portion of which would be distributed to states by formula and a portion of which would be used to make competitive grants to state and local governments. The bill was referred to the House Committees on Transportation and Infrastructure, with subsequent referral to the Ways & Means Committees. It has 11 cosponsors, including 5 California members.

Rep. Adam Smith (D-WA) is expected to reintroduce The Freight Infrastructure Reinvestment Act, which would also use the revenue generated from a 1 percent fee on cargo shipments. The program would to work in conjunction with, the FASTLANE grant program to provide competitive grants to states and designated entities for projects that would improve rail and roadway capacity and safety.

INFRA Grants

DOT is expected to issue a Notice of Funding Availability for its new “INFRA” grants tomorrow. They have renamed the FASTLANE grant program and changed its focus slightly. DOT has updated the evaluation criteria to evaluate projects to align them with national and regional economic vitality goals and to leverage more non-federal funding: projects that use innovative approaches to make each federal dollar go further and encourage more parties to put skin in the game through higher leverage, are willing implement innovative approaches to permitting and project delivery, and project sponsors willing to measure their performance and hold themselves accountable.

147

This page intentionally left blank.

148

Agenda Item 12.C July 12, 2017

DATE: June 19, 2017 TO: STA Board FROM: Drew Hart, Associate Planner RE: Summary of Funding Opportunities Discussion: Below is a list of funding opportunities that will be available to STA member agencies during the next few months, broken up by Federal, State, and Local. Attachment A provides further details for each program.

FUND SOURCE

AMOUNT AVAILABLE

APPLICATION DEADLINE

Regional

1. Carl Moyer Memorial Air Quality Standards Attainment Program (for San Francisco Bay Area)

Approximately $15 million

Due On First-Come, First Served Basis

2. **Bay Area Air Quality Management District (BAAQMD) Bikeways Program

Anticipated $5 million June 30, 2017

3. Carl Moyer Off-Road Equipment Replacement Program (for Sacramento Metropolitan Area)

Approximately $10 million

Due On First-Come, First-Served Basis

4. Air Resources Board (ARB) Clean Vehicle Rebate Project (CVRP)

Up to $2,500 rebate per light-duty vehicle

Due On First-Come, First-Served Basis (Waitlist)

5. Bay Area Air Quality Management District (BAAQMD) Hybrid Electric Vehicle Purchase Vouchers (HVIP) (for fleets)

Approximately $10,000 to $45,000 per qualified request

Due On First-Come, First-Served Basis

State

1. Environmental Enhancement and Mitigation (EEM) Grant Program

$7 million June 30, 2017

Federal

1. AARP Livable Communities - Community Challenge Unknown July 15, 2017

2. People For Bikes Community Grant Up to $10,000 per applicant

October 13, 2017

Fiscal Impact: None. Recommendation: Informational. Attachment:

A. Detailed Funding Opportunities Summary

149

This page intentionally left blank.

150

ATTACHMENT A

The following funding opportunities will be available to the STA member agencies during the next few months. Please distribute this information to the appropriate departments in your jurisdiction.

Fund Source Application Contact**

ApplicationDeadline/Eligibility

Amount Available

Program Description Proposed Submittal

Additional Information

Regional Grants1 Carl Moyer Memorial Air Quality Standards Attainment Program (for San Francisco Bay Area)

Anthony Fournier Bay Area Air Quality Management District (415) 749-4961 [email protected]

Ongoing. Application Due On First-Come, First Served Basis Eligible Project Sponsors: private non-profit organizations, state or local governmental authorities, and operators of public transportation services

Approx. $15 million

Carl Moyer Memorial Air Quality Standards Attainment Program provides incentive grants for cleaner-than-required engines, equipment, and other sources of pollution providing early or extra emission reductions.

N/A Eligible Projects: cleaner on-road, off-road, marine, locomotive and stationary agricultural pump engines http://www.baaqmd.gov/Divisions/Strategic-Incentives/Funding-Sources/Carl-Moyer-Program.aspx

*BAAQMD Bikeways Program

Grants Programs Information Request Line 415 749-4994

June 30, 2017 Must be in BAAQMD boundaries (western Solano County)

$5 million The 2017 Bikeways Program is a resurrection of BAAQMD’s old Bikeways Program. The details and guidelines for this iteration has not yet been released at the time of this writing but is expected to be posted on their website the week of April 17, 2017.

N/A Please contact Drew Hart at STA who will be tracking this program closely. [email protected]

Carl Moyer Off-Road Equipment Replacement Program (for Sacramento Metropolitan Area)

Gary A. Bailey Sacramento Metropolitan Air Quality Management District (916) 874-4893 [email protected]

Ongoing. Application Due On First-Come, First-Served Basis Eligible Project Sponsors: private non-profit organizations, state or local governmental authorities, and operators of public transportation services

Approx. $10 million, maximum per project is $4.5 million

The Off-Road Equipment Replacement Program (ERP), an extension of the Carl Moyer Program, provides grant funds to replace Tier 0, high-polluting off-road equipment with the cleanest available emission level equipment.

N/A Eligible Projects: install particulate traps, replace older heavy-duty engines with newer and cleaner engines and add a particulate trap, purchase new vehicles or equipment, replace heavy-duty equipment with electric equipment, install electric idling-reduction equipment http://www.airquality.org/mobile/moyererp/index.shtml

1 Regional includes opportunities and programs administered by the Solano Transportation Authority and/or regionally in the San Francisco Bay Area and greater Sacramento

151

Fund Source Application Contact**

ApplicationDeadline/Eligibility

Amount Available

Program Description Proposed Submittal

Additional Information

Regional Grants1 Air Resources Board (ARB) Clean Vehicle Rebate Project (CVRP)*

Graciela Garcia ARB (916) 323-2781 [email protected]

Application Due On First-Come, First-Served Basis (Currently applicants are put on waitlist)

Up to $5,000 rebate per light-duty vehicle

The Zero-Emission and Plug-In Hybrid Light-Duty Vehicle (Clean Vehicle) Rebate Project is intended to encourage and accelerate zero-emission vehicle deployment and technology innovation. Rebates for clean vehicles are now available through the Clean Vehicle Rebate Project (CVRP) funded by the Air Resources Board (ARB) and implemented statewide by the California Center for Sustainable Energy (CCSE).

N/A Eligible Projects: Purchase or lease of zero-emission and plug-in hybrid light-duty vehicles http://www.arb.ca.gov/msprog/aqip/cvrp.htm

Bay Area Air Quality Management District (BAAQMD) Hybrid Electric Vehicle Purchase Vouchers (HVIP)*

To learn more about how to request a voucher, contact: 888-457-HVIP [email protected]

Application Due On First-Come, First-Served Basis

Approx. $10,000 to $45,000 per qualified request

The California Air Resources Board (ARB) created the HVIP to speed the market introduction of low-emitting hybrid trucks and buses. It does this by reducing the cost of these vehicles for truck and bus fleets that purchase and operate the vehicles in the State of California. The HVIP voucher is intended to reduce about half the incremental costs of purchasing hybrid heavy-duty trucks and buses.

N/A Eligible Projects: Purchase of low-emission hybrid trucks and buses http://www.californiahvip.org/

Statewide Grants Environmental Enhancement and Mitigation (EEM) Grant Program

[email protected] or call (916) 653-2812

June 30, 2017 $7 million Approx $500,000 per project

Every EEM project must mitigate, either directly or indirectly, the environmental impacts of the modification of an existing Transportation Facility or the environmental impacts of the construction of a new Transportation Facility. Eligible EEM projects must fit one of the following categories:

Urban Forestry Resource Lands Mitigation Projects Beyond the Scope of the

Lead Agency

N/A http://resources.ca.gov/grants/environmental-enhancement-and-mitigation-eem/

Federal Grants AARP Community Challenge

[email protected] July 15, 2017 Unknown ARP Community Challenge will fund projects to help build momentum. If your idea is big, no project is too small. Projects can range from short-term activities costing a few hundred dollars to sizable efforts that might need thousands. Projects need to deliver on one or all of the following drivers for change: Improve a community's built environment, Expand opportunities for all residents, Drive community engagement and interaction across diverse community residents

N/A http://www.aarp.org/livable-communities/

People For Bikes Community Grant

Zoe Kircos 303-449-4893 x106 [email protected]

October 13, 2017 Up to $10,000 per applicant

The PeopleForBikes Community Grant Program supports bicycle infrastructure projects and targeted advocacy initiatives that make it easier and safer for people of all ages and abilities to ride.

N/A Must have at least a 50% match. http://www.peopleforbikes.org/pages/grant-guidelines

*New Funding Opportunity **STA staff, Drew Hart, can be contacted directly at (707) 399-3214 or [email protected] for assistance with finding more information about any of the funding opportunities listed in this report

152

Agenda Item 12.D July 12, 2017

DATE: July 5 2017 TO: STA Board FROM: Johanna Masiclat, Clerk of the Board RE: 2017 STA Board and Advisory Committees Meeting Schedule Discussion: Attached is the 2017 STA Board and Advisory Committees Meeting Schedule that may be of interest to the STA Board. Fiscal Impact: None. Recommendation: Informational. Attachment:

A. STA Board and Advisory Committees Meeting Schedule for Calendar Year 2017

153

STABOARDANDADVISORYCOMMITTEEMEETINGSCHEDULEREMAINDEROFCALENDARYEAR2017

DATE TIME DESCRIPTION LOCATION STATUS

Thurs.,July6 6:30p.m. BicycleAdvisoryCommittee(BAC) STAConferenceRoom ConfirmedWed.,July12 4:00p.m. STABoardMeeting SuisunCityHall ConfirmedThurs.,July20 1:00p.m. ParatransitCoordinatingCouncil(PCC) TheKROCCenter TentativeJuly26(NoMeeting) SUMMER

RECESSIntercityTransitConsortium N/A N/A

July27(NoMeeting) TechnicalAdvisoryCommittee(TAC) N/A N/AThurs.,July27 9:30a.m. ConsolidatedTransportationServicesAgency(CTSA‐AC) CountyMulti‐purposeRoom ConfirmedThurs.,July27 10:00a.m. BeniciaSenior/DisabledMobilitySummit BeniciaCommunityCenter Tentative

Thurs.,August3 6:00p.m. PedestrianAdvisoryCommittee(PAC) STAConferenceRoom ConfirmedAugust10(NoMeeting) SUMMER

RECESSSTABoardMeeting N/A N/A

Wed.,August16 1:30p.m. SafeRoutestoSchoolAdvisory(SR2S‐AC) STAConferenceRoom ConfirmedTues.,August29 1:30p.m. IntercityTransitConsortium STAConferenceRoom ConfirmedWed.,August30 1:30p.m. TechnicalAdvisoryCommittee(TAC) STAConferenceRoom Confirmed

Thurs.,September7 9:30a.m. StateRoute(SR)37PolicyCommittee TBD TBDThurs.,September7 6:30p.m. BicycleAdvisoryCommittee(BAC) STAConferenceRoom ConfirmedWed.,September13 6:00p.m. STABoardMeeting SuisunCityHall ConfirmedThurs.,September21 1:00p.m. ParatransitCoordinatingCouncil(PCC) SolanoCommunityCollege TentativeTues.,September26 1:30p.m. IntercityTransitConsortium STAConferenceRoom Confirmed

Wed.,September27 1:30p.m. TechnicalAdvisoryCommittee(TAC) STAConferenceRoom Confirmed

Thurs.,October5 6:00p.m. PedestrianAdvisoryCommittee(PAC) STAConferenceRoom ConfirmedWed.,October11 6:00p.m. STABoardMeeting SuisunCityHall ConfirmedNomeetingduetoSTA’sAnnualAwardsinNovember(NoSTABoardMeeting)

IntercityTransitConsortium N/A N/ATechnicalAdvisoryCommittee(TAC) N/A N/A

Thurs.,October26 9:30a.m. ConsolidatedTransportationServicesAgency(CTSA‐AC) CountyMulti‐purposeRoom Confirmed

Thurs.,November2 9:30a.m. StateRoute(SR)37PolicyCommittee FarragutInn,TouroUniversity ConfirmedThurs.,November2 6:30p.m. BicycleAdvisoryCommittee(BAC) STAConferenceRoom ConfirmedWed.,November8 6:00p.m. STA’s20thAnnualAwards TBD ConfirmedWed.,November15 11:30a.m. SafeRoutestoSchoolAdvisory(SR2S‐AC) STAConferenceRoom ConfirmedThurs.,November16 1:00p.m. ParatransitCoordinatingCouncil(PCC) SolTransOperationsFacility TentativeTues.,November28 1:30p.m. IntercityTransitConsortium STAConferenceRoom ConfirmedWed.,November29 1:30p.m. TechnicalAdvisoryCommittee(TAC) STAConferenceRoom Confirmed

Fri.,December1 9:30a.m. ConsolidatedTransportationServicesAgency(CTSA‐AC) CountyMulti‐purposeRoom TentativeThurs.,December7 6:00p.m. PedestrianAdvisoryCommittee(PAC) STAConferenceRoom ConfirmedWed.,December13 6:00p.m. STABoardMeeting SuisunCityHall ConfirmedTues.,December19 1:30p.m. IntercityTransitConsortium STAConferenceRoom ConfirmedWed.,December20 1:30p.m. TechnicalAdvisoryCommittee(TAC) STAConferenceRoom Confirmed

SUMMARY:STABoard: Meets2ndWednesdayofEveryMonthConsortium : MeetsLastTuesdayofEveryMonthTAC: MeetsLastWednesdayofEveryMonthBAC: Meets1stThursdayofeveryOddMonthPAC: Meets1stThursdayofeveryEvenMonthPCC: Meets3rdThursdayofeveryOddMonth

154