Reserve Study Proposal for Fairway Estates Property Owners
Association
Wednesday, July 03, 2019 Level 1, Premium Reserve Analysis
Final Version
Report Period – 01/01/20 – 12/31/20
Client Reference Number – 10063-19
Property Type – Patio Homes & Townhomes
Fiscal Year End – December 31st
Number of Units – 130
Date of Property Observation – April 18th, 2019
Property Observation Conducted by- Justin Huggins
Project Manager – Justin Huggins
Main Contact Person – Don Morgan, Community Manager
Brennan Lifestyle Community AssociationN. 119th St. & Austin Ave.
Erie, CO. 80516
Table of Contents SECTION 1:
Introduction to Reserve Analysis ............................................................ page 1
General Information and Answers to FAQ’s ........................................... page 2-3
Summary of Reserve Analysis ................................................................. page 4
SECTION 2:
Physical Analysis (Photographic) ........................................................... page 1-47 SECTION 3:
Financial Analysis a) Funding Summary ....................................................................................... page 1 b) Percent Funded – Graph ............................................................................. page 2 c) Asset Inventory List ..................................................................................... page 3 d) Significant Components Table..................................................................... page 4 e) Significant Components – Graph ................................................................ page 5 f) Yearly Summary Table ................................................................................ page 6 g) Yearly Contributions – Graph ...................................................................... page 7 h) Component Funding Information ................................................................. page 8 i) Yearly Cash Flow Table .............................................................................. page 9 j) Projected Expenditures Year by Year – Graph ........................................... page 10 k) Projected Expenditures Year by Year ......................................................... page 11-13
SECTION 4: Glossary of Terms and Definitions .......................................................... page 1-2
1
Introduction to the Reserve Analysis – The elected officials of this association made a wise decision to invest in a Reserve Analysis to get a better understanding of the status of the Reserve funds. This Analysis will be a valuable tool to assist the Board of Directors in making the decision to which the dues are derived. Typically, the Reserve contribution makes up 15% - 40% of the association’s total budget. Therefore, Reserves is considered to be a significant part of the overall monthly association payment. Every association conducts its business within a budget. There are typically two main parts to this budget, Operating and Reserves. The Operating budget includes all expenses that are fixed on an annual basis. These would include management fees, maintenance fees, utilities, etc. The Reserves is primarily made up of Capital Replacement items such as asphalt, landscaping, concrete work, irrigation, etc., that do not normally occur on an annual basis. The Reserve Analysis is also broken down into two different parts, the Physical Analysis and the Financial Analysis. The Physical Analysis is information regarding the physical status and replacement cost of major common area components that the association is responsible to maintain. It is important to understand that while the Component Inventory will remain relatively “stable” from year to year, the Condition Assessment and Life/Valuation Estimates will most likely vary from year to year. You can find this information in the Asset Inventory Section (Section 2) of this Reserve Analysis. The Financial Analysis Section is the evaluation of the association’s Reserve balance, income, and expenses. This is made up of finding the clients current Reserve Fund Status (measured as Percent Funded) and a recommendation for an appropriate Reserve Allocation rate (also known as the Funding Plan). You can find this information in Section 3 of this Reserve Analysis. The purpose of this Reserve Analysis is to provide an educated estimate as to what the Reserve Allocation needs to be. The detailed schedules will serve as an advanced warning that major projects will need to be addressed in the future. This will allow the Board of Directors to have ample timing to obtain competitive estimates and bids that will result in cost savings to the individual homeowners. This will also ensure the physical well being of the property and ultimately enhance each owner’s investment, while limiting the possibility of unexpected major projects that may lead to Special Assessments. It is important for the client, owners, and potential future owners to understand that the information contained in this analysis is based on estimates and assumptions gathered from various sources. Estimated life expectancies and cycles are based upon conditions that were readily visible and accessible at time of the inspection. No destructive or intrusive methods (such as entering the walls to inspect the condition of electrical wiring, plumbing lines, and telephone wires) were performed. In addition, environmental hazards (such as lead paint, asbestos, radon, etc.), construction defects, and acts of nature have also been excluded from this report. If problem areas were revealed, a reasonable effort has been made to include these items within the report. While every effort has been made to ensure accurate results, this report reflects the judgement of Aspen Reserve Specialties and should not be construed as a guarantee or assurance of predicting future events.
2
General Information and Answers to Frequently Asked Questions – Why is it important to perform a Reserve Study? As previously mentioned, the Reserve allocation makes up a significant portion of the total monthly dues. This report provides the essential information that is needed to guide the Board of Directors in establishing the budget in order to run the daily operations of your association. It is suggested that a third party professionally prepare a Reserve Study since there is no vested interest in the property. Also, a professional knows what to look for and how to properly develop an accurate and reliable component list. Now that we have “it”, what do we do with “it”? Hopefully, you will not look at this report and think it is too cumbersome to understand. Our intention is to make this Reserve Analysis very easy to read and understand. Please take the time to review it carefully and make sure the “main ingredients” (asset information) are complete and accurate. If there are any inaccuracies, please inform us immediately so we may revise the report. Once you feel the report is an accurate tool to work from, use it to help establish your budget for the upcoming fiscal year. The Reserve allocation makes up a significant portion of the total monthly dues and this report should help you determine the correct amount of money to go into the Reserve fund. Additionally, the Reserve Study should act as a guide to obtain proposals in advance of pending projects. This will give you an opportunity to shop around for the best price available. How often do we update or review “it”? Unfortunately, there is a misconception that these reports are good for an extended period of time since the report has projections for the next 30 years. Just like any major line item in the budget, the Reserve Analysis should be reviewed each year before the budget is established. Invariably, some assumptions have to be made during the compilation of this analysis. Anticipated events may not materialize and unpredictable circumstances could occur. Deterioration rates and repair/replacement costs will vary from causes that are unforeseen. Earned interest rates may vary from year to year. These variations could alter the content of the Reserve Analysis. Therefore, this analysis should be reviewed annually, and a property inspection should be conducted at least once every three years. Is it the law to have a Reserve Study conducted? The Government requires reserve analyses in approximately 20 states for homeowners associations. Even if it is not currently governed by your state, the chances are very good that the documents of the association require the association to have a Reserve fund established. This doesn’t mean a Reserve Analysis is required, but how are you going to know you have enough funds in the account if you don’t have the proper information? Hypothetically, some associations look at the Reserve fund and think that $50,000 is a lot of money and they are in good shape. What they don’t know is a major expense is going to occur within 5 years, and the cost of the project is going to exceed $75,000. So while $50,000 sounds like a lot of money, in reality it won’t even cover the expense, let alone all the other amenities the association is responsible to maintain.
3
What makes an asset a “Reserve” item versus an “Operating” item? A “Reserve” asset is an item that is the responsibility of the association to maintain, has a limited Useful Life, predictable Remaining Useful Life expectancies, typically occurs on a cyclical basis that exceeds 1 year, and costs above a minimum threshold cost. An “operating” expense is typically a fixed expense that occurs on an annual basis. For instance, minor repairs to a roof for damage caused by high winds or other weather elements would be considered an “operating” expense. However, if the entire roof needs to be replaced because it has reached the end of its life expectancy, then the replacement would be considered a Reserve expense. The GREY area of “maintenance” items that are often seen in a Reserve Study – One of the most popular questions revolves around major “maintenance” items, such as painting the buildings or seal coating the asphalt. You may hear from your accountant that since painting or seal coating is not replacing a “capital” item, then it cannot be considered a Reserve issue. However, it is the opinion of several major Reserve Study providers that these items are considered to be major expenses that occur on a cyclical basis. Therefore, it makes it very difficult to ignore a major expense that meets the criteria to be considered a Reserve component. Once explained in this context, many accountants tend to agree and will include any expenses, such as these examples, as a Reserve component. The Property Inspection – The Property Inspection was conducted following a review of the documents that were established by the developer identifying all common area assets. In some cases, the Board of Directors at some point may have revised the documents. In either case, the most current set of documents was reviewed prior to inspecting the property. In addition, common area assets may have been reported to Aspen Reserve Specialties by the client, or by other parties. Estimated life expectancies and life cycles are based upon conditions that were readily accessible and visible at the time of the inspection. We did not destroy any landscape work, building walls, or perform any methods of intrusive investigation during the inspection. In these cases, information may have been obtained by contacting the contractor or vendor that has worked on the property. The Reserve Fund Analysis – We projected the starting balance from taking the most recent balance statement, adding expected Reserve contributions for the rest of the year, and subtracting any pending projects for the rest of the year. We compared this number to the ideal Reserve Balance and arrived at the Percent funded level. Measures of strength are as follows: 0% - 30% Funded – Is considered to be a “weak” financial position. Associations that fall into this category are subject to Special Assessments and deferred maintenance, which could lead to lower property values. If the association is in this position, actions should be taken to improve the financial strength of the Reserve Fund. 31% - 69% Funded – The majority of associations are considered to be in this “fair” financial position. While this doesn’t represent financial strength and stability, the likelihood of Special Assessments and deferred maintenance is diminished. Effort should be taken to continue strengthening the financial position of the Reserve fund. 70% - 99% Funded – This indicates financial strength of a Reserve fund and every attempt to maintain this level should be a goal of the association. 100% Funded – This is the ideal amount of Reserve funding. This means that the association has the exact amount of funds in the Reserve account that should be at any given time.
4
Summary of Brennan Lifestyle Community Association - Association ID # - 10063-19 Projected Starting Balance as of January 1, 2020 - $207,490 Ideal Reserve Balance as of January 1, 2020 - $281,596 Percent Funded as of January 1, 2020 - 74% Recommended Reserve Allocation (per month) - $14,300 Minimum Reserve Allocation (per month) - $12,900 Recommended Special Assessment - $0 Information to complete this Reserve Analysis was gathered during a property evaluation of the common area elements on April 18th, 2019. In addition, we obtained information by contacting local vendors and contractors, as well as communicating with the property representative (Community Manager). To the best of our knowledge, the conclusions and suggestions of this report are considered reliable and accurate insofar as the information obtained from these sources. This property contains 130 units (patio homes and townhomes) as part of a community that was constructed between 2016 and 2019. Common area components the association is responsible to maintain include roofs and gutters on the townhomes, exterior painting of townhomes and patio homes, private alleys for townhomes, common sidewalks, mailboxes, landscaped areas, and an irrigation system. Please refer to the Projected Reserve Expenditure table in the Financial Analysis section for a list of when components are scheduled to be addressed. In comparing the projected balance of $207,490 versus the ideal Reserve Balance of $281,596 we find the association Reserve fund to be in an above average financial position at this point in time (approximately 74% funded of ideal). Despite this position, based on the information contained in this report, we find the current budgeted Reserve allocation ($10,493.50 per month) to be less than adequate in maintaining the strength of the Reserve fund to prepare for future projects. Therefore, we are recommending an increase of the Reserve contribution to $14,300 per month starting in 2020, followed by nominal annual increases of 4.00% thereafter to help offset the effects of inflation. By following the recommendation, the plan will maintain the Reserve account in a positive manner, while gradually increasing to a fully funded position within the thirty-year period. In the percent Funded graph, you will see we have also provided a “minimum Reserve contribution” of $12,900 per month. If the Reserve contribution falls below this rate, then the Reserve fund will fall into a situation where Special Assessments, deferred maintenance, and lower property values are likely at some point in the near future. The minimum Reserve allocation follows the “threshold” theory of Reserve funding where the ”percent funded” status is not allowed to dip below 30% funded at any point during the thirty-year period. This was provided for one purpose only, to show the association how small the difference is between the two scenarios and how it would not make financial sense to contribute less money (approximately $10.77 per unit per month in this case) to the Reserve fund to only stay above a certain threshold. As you can see, the difference between the two scenarios is considered to be minimal, and based on the risk, we strongly suggest the recommended Reserve Allocation is followed.
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 105
Source of Information: Cost Database
Best Cost: $176,400$176,400$176,400$176,400
Worst Cost: $205,800$205,800$205,800$205,800
Location: Unit Building RoofsUnit Building RoofsUnit Building RoofsUnit Building Roofs
Quantity: Approx. 392 SquaresApprox. 392 SquaresApprox. 392 SquaresApprox. 392 Squares
Observations:
- It appears this roof material is rated as a 40 - 50 year product. Despite this rating, a life expectancy of 18 - 22 years is expected in this environment. - Due to the potentially harsh winters, extensive freeze/thaw cycle, and likelihood of hail events over the useful life of the roof, we typically see associations replacing roofs sooner than the manufacturer's suggested useful life. - Remaining life is based on age of roof and observed conditions.
Life Expectancy: 22222222 Remaining Life: 19191919
$450/square; Estimate to remove and replace
$525/square; Higher estimate for better quality
Comp Shingle Roof - Replace (PH1)
General Notes:
501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539: - Approx. 98 Sqs x 4 = Approx. 392 Squares - Approx. 98 Sqs x 4 = Approx. 392 Squares - Approx. 98 Sqs x 4 = Approx. 392 Squares - Approx. 98 Sqs x 4 = Approx. 392 Squares
Wednesday, July 03, 2019Page 1 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 106
Source of Information: Cost Database
Best Cost: $169,650$169,650$169,650$169,650
Worst Cost: $197,925$197,925$197,925$197,925
Location: Unit Building RoofsUnit Building RoofsUnit Building RoofsUnit Building Roofs
Quantity: Approx. 377 SquaresApprox. 377 SquaresApprox. 377 SquaresApprox. 377 Squares
Observations:
- It appears this roof material is rated as a 40 - 50 year product. Despite this rating, a life expectancy of 18 - 22 years is expected in this environment. - Due to the potentially harsh winters, extensive freeze/thaw cycle, and likelihood of hail events over the useful life of the roof, we typically see associations replacing roofs sooner than the manufacturer's suggested useful life. - Remaining life is based on age of roof and observed conditions.
Life Expectancy: 22222222 Remaining Life: 20202020
$450/square; Estimate to remove and replace
$525/square; Higher estimate for better quality
Comp Shingle Roof - Replace (PH2)
General Notes:
541/547: Approx. 83 Squares541/547: Approx. 83 Squares541/547: Approx. 83 Squares541/547: Approx. 83 Squares
549/557, 559/567, 569/577:549/557, 559/567, 569/577:549/557, 559/567, 569/577:549/557, 559/567, 569/577: - Approx. 98 Sqs x 3 = Approx. 294 Squares - Approx. 98 Sqs x 3 = Approx. 294 Squares - Approx. 98 Sqs x 3 = Approx. 294 Squares - Approx. 98 Sqs x 3 = Approx. 294 Squares
Wednesday, July 03, 2019Page 2 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 107
Source of Information: Cost Database
Best Cost: $219,150$219,150$219,150$219,150
Worst Cost: $255,675$255,675$255,675$255,675
Location: Unit Building RoofsUnit Building RoofsUnit Building RoofsUnit Building Roofs
Quantity: Approx. 487 SquaresApprox. 487 SquaresApprox. 487 SquaresApprox. 487 Squares
Observations:
- It appears this roof material is rated as a 40 - 50 year product. Despite this rating, a life expectancy of 18 - 22 years is expected in this environment. - Due to the potentially harsh winters, extensive freeze/thaw cycle, and likelihood of hail events over the useful life of the roof, we typically see associations replacing roofs sooner than the manufacturer's suggested useful life. - Remaining life is based on age of roof and observed conditions.
Life Expectancy: 22222222 Remaining Life: 21212121
$450/square; Estimate to remove and replace
$525/square; Higher estimate for better quality
Comp Shingle Roof - Replace (PH3)
General Notes:
623/629: Approx. 110 Squares623/629: Approx. 110 Squares623/629: Approx. 110 Squares623/629: Approx. 110 Squares
579/587, 589/597, 613/621:579/587, 589/597, 613/621:579/587, 589/597, 613/621:579/587, 589/597, 613/621: - Approx. 98 Sqs x 3 = Approx. 294 Squares - Approx. 98 Sqs x 3 = Approx. 294 Squares - Approx. 98 Sqs x 3 = Approx. 294 Squares - Approx. 98 Sqs x 3 = Approx. 294 Squares
601/611: Approx. 83 Squares601/611: Approx. 83 Squares601/611: Approx. 83 Squares601/611: Approx. 83 Squares
Wednesday, July 03, 2019Page 3 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 120
Source of Information: Cost Database
Best Cost: $24,500$24,500$24,500$24,500
Worst Cost: $28,000$28,000$28,000$28,000
Location: Unit Building RoofsUnit Building RoofsUnit Building RoofsUnit Building Roofs
Quantity: Approx. 3,500 LFApprox. 3,500 LFApprox. 3,500 LFApprox. 3,500 LF
Observations:
- It is typical to replace gutters and downspouts at the same time as roofing materials. - Therefore, the remaining life reflects the remaining life of the roof as well. - We recommend cleaning debris out of lines at least once a year to prevent clogging and moisture retention that can lead to advanced deterioration.
Life Expectancy: 22222222 Remaining Life: 19191919
$7.00/LF; Estimate to replace
$8.00/LF: Higher estimate for larger lines
Gutters/Downspouts - Replace (PH1)
General Notes:
501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539: - Approx. 875 LF x 4 = Approx. 3,500 LF - Approx. 875 LF x 4 = Approx. 3,500 LF - Approx. 875 LF x 4 = Approx. 3,500 LF - Approx. 875 LF x 4 = Approx. 3,500 LF
Wednesday, July 03, 2019Page 4 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 121
Source of Information: Cost Database
Best Cost: $23,275$23,275$23,275$23,275
Worst Cost: $26,600$26,600$26,600$26,600
Location: Unit Building RoofsUnit Building RoofsUnit Building RoofsUnit Building Roofs
Quantity: Approx. 3,325 LFApprox. 3,325 LFApprox. 3,325 LFApprox. 3,325 LF
Observations:
- It is typical to replace gutters and downspouts at the same time as roofing materials. - Therefore, the remaining life reflects the remaining life of the roof as well. - We recommend cleaning debris out of lines at least once a year to prevent clogging and moisture retention that can lead to advanced deterioration.
Life Expectancy: 22222222 Remaining Life: 20202020
$7.00/LF; Estimate to replace
$8.00/LF: Higher estimate for larger lines
Gutters/Downspouts - Replace (PH2)
General Notes:
541/547: Approx. 700 LF541/547: Approx. 700 LF541/547: Approx. 700 LF541/547: Approx. 700 LF
549/557, 559/567, 569/577:549/557, 559/567, 569/577:549/557, 559/567, 569/577:549/557, 559/567, 569/577: - Approx. 875 x 3 = Approx. 2,625 LF - Approx. 875 x 3 = Approx. 2,625 LF - Approx. 875 x 3 = Approx. 2,625 LF - Approx. 875 x 3 = Approx. 2,625 LF
Wednesday, July 03, 2019Page 5 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 122
Source of Information: Cost Database
Best Cost: $30,350$30,350$30,350$30,350
Worst Cost: $34,700$34,700$34,700$34,700
Location: Unit Building RoofsUnit Building RoofsUnit Building RoofsUnit Building Roofs
Quantity: Approx. 4,335 LFApprox. 4,335 LFApprox. 4,335 LFApprox. 4,335 LF
Observations:
- It is typical to replace gutters and downspouts at the same time as roofing materials. - Therefore, the remaining life reflects the remaining life of the roof as well. - We recommend cleaning debris out of lines at least once a year to prevent clogging and moisture retention that can lead to advanced deterioration.
Life Expectancy: 22222222 Remaining Life: 21212121
$7.00/LF; Estimate to replace
$8.00/LF: Higher estimate for larger lines
Gutters/Downspouts - Replace (PH3)
General Notes:
623/629: Approx. 700 LF623/629: Approx. 700 LF623/629: Approx. 700 LF623/629: Approx. 700 LF
579/587, 589/597, 613/621:579/587, 589/597, 613/621:579/587, 589/597, 613/621:579/587, 589/597, 613/621: - Approx. 875 x 3 = Approx. 2,625 - Approx. 875 x 3 = Approx. 2,625 - Approx. 875 x 3 = Approx. 2,625 - Approx. 875 x 3 = Approx. 2,625
601/611: Approx. 1,010 LF601/611: Approx. 1,010 LF601/611: Approx. 1,010 LF601/611: Approx. 1,010 LF
Wednesday, July 03, 2019Page 6 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 204
Source of Information: Cost Database
Best Cost: $35,000$35,000$35,000$35,000
Worst Cost: $40,000$40,000$40,000$40,000
Location: Unit Building ExteriorsUnit Building ExteriorsUnit Building ExteriorsUnit Building Exteriors
Quantity: (20) Units(20) Units(20) Units(20) Units
Observations:
- In this climate, it is recommended that exterior surfaces are painted every 5 - 7 years. - The exact timeframe depends on the color chosen and the level of exposure to elements, as well as the quality of past paint jobs. - The remaining life is based on the observed conditions.
Life Expectancy: 6666 Remaining Life: 3333
$1,750/unit; Estimate to repaint buildings
$2,000/unit; Higher estimate for more prep work
Bldg Ext Surfaces - Repaint (TH PH1)
General Notes:
501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539: - Approx. 9,115 GSF x 4 = Approx. 36,460 GSF - Approx. 9,115 GSF x 4 = Approx. 36,460 GSF - Approx. 9,115 GSF x 4 = Approx. 36,460 GSF - Approx. 9,115 GSF x 4 = Approx. 36,460 GSF
Wednesday, July 03, 2019Page 7 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 205
Source of Information: Cost Database
Best Cost: $33,250$33,250$33,250$33,250
Worst Cost: $38,000$38,000$38,000$38,000
Location: Unit Building ExteriorsUnit Building ExteriorsUnit Building ExteriorsUnit Building Exteriors
Quantity: (19) Units(19) Units(19) Units(19) Units
Observations:
- In this climate, it is recommended that exterior surfaces are painted every 5 - 7 years. - The exact timeframe depends on the color chosen and the level of exposure to elements, as well as the quality of past paint jobs. - The remaining life is based on the observed conditions.
Life Expectancy: 6666 Remaining Life: 4444
$1,750/unit; Estimate to repaint buildings
$2,000/unit; Higher estimate for more prep work
Bldg Ext Surfaces - Repaint (TH PH2)
General Notes:
541/547: Approx. 8,045 GSF541/547: Approx. 8,045 GSF541/547: Approx. 8,045 GSF541/547: Approx. 8,045 GSF549/557, 559/567, 569/577:549/557, 559/567, 569/577:549/557, 559/567, 569/577:549/557, 559/567, 569/577: - Approx. 9,115 GSF x 3 = Approx. 27,345 GSF - Approx. 9,115 GSF x 3 = Approx. 27,345 GSF - Approx. 9,115 GSF x 3 = Approx. 27,345 GSF - Approx. 9,115 GSF x 3 = Approx. 27,345 GSF
Wednesday, July 03, 2019Page 8 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 206
Source of Information: Cost Database
Best Cost: $43,750$43,750$43,750$43,750
Worst Cost: $50,000$50,000$50,000$50,000
Location: Unit Building ExteriorsUnit Building ExteriorsUnit Building ExteriorsUnit Building Exteriors
Quantity: (25) Units(25) Units(25) Units(25) Units
Observations:
- In this climate, it is recommended that exterior surfaces are painted every 5 - 7 years. - The exact timeframe depends on the color chosen and the level of exposure to elements, as well as the quality of past paint jobs. - The remaining life is based on the observed conditions.
Life Expectancy: 6666 Remaining Life: 5555
$1,750/unit; Estimate to repaint buildings
$2,000/unit; Higher estimate for more prep work
Bldg Ext Surfaces - Repaint (TH PH3)
General Notes:
623/629: Approx. 8,045 GSF623/629: Approx. 8,045 GSF623/629: Approx. 8,045 GSF623/629: Approx. 8,045 GSF
579/587, 589/597, 613/621:579/587, 589/597, 613/621:579/587, 589/597, 613/621:579/587, 589/597, 613/621: - Approx. 9,115 GSF x 3 = Approx. 27,345 GSF - Approx. 9,115 GSF x 3 = Approx. 27,345 GSF - Approx. 9,115 GSF x 3 = Approx. 27,345 GSF - Approx. 9,115 GSF x 3 = Approx. 27,345 GSF
601/611: Approx. 10,720 GSF601/611: Approx. 10,720 GSF601/611: Approx. 10,720 GSF601/611: Approx. 10,720 GSF
Wednesday, July 03, 2019Page 9 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 207
Source of Information: Client provided cost information
Best Cost: $88,000$88,000$88,000$88,000
Worst Cost: $110,000$110,000$110,000$110,000
Location: Unit Building ExteriorsUnit Building ExteriorsUnit Building ExteriorsUnit Building Exteriors
Quantity: (22) Units(22) Units(22) Units(22) Units
Observations:
- In this climate, it is recommended that exterior surfaces are painted every 5 - 7 years. - The exact timeframe depends on the color chosen and the level of exposure to elements, as well as the quality of past paint jobs. - The remaining life is based on the observed conditions.
Life Expectancy: 6666 Remaining Life: 3333
$4,000/unit; Estimate to repaint buildings
$5,000/unit; Higher estimate for more prep work
Bldg Ext Surfaces - Repaint (Patio PH1)
General Notes:
Wednesday, July 03, 2019Page 10 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 208
Source of Information: Client provided cost information
Best Cost: $88,000$88,000$88,000$88,000
Worst Cost: $110,000$110,000$110,000$110,000
Location: Unit Building ExteriorsUnit Building ExteriorsUnit Building ExteriorsUnit Building Exteriors
Quantity: (22) Units(22) Units(22) Units(22) Units
Observations:
- In this climate, it is recommended that exterior surfaces are painted every 5 - 7 years. - The exact timeframe depends on the color chosen and the level of exposure to elements, as well as the quality of past paint jobs. - The remaining life is based on the observed conditions.
Life Expectancy: 6666 Remaining Life: 4444
$4,000/unit; Estimate to repaint buildings
$5,000/unit; Higher estimate for more prep work
Bldg Ext Surfaces - Repaint (Patio PH2)
General Notes:
Wednesday, July 03, 2019Page 11 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 209
Source of Information: Client provided cost information
Best Cost: $88,000$88,000$88,000$88,000
Worst Cost: $110,000$110,000$110,000$110,000
Location: Unit Building ExteriorsUnit Building ExteriorsUnit Building ExteriorsUnit Building Exteriors
Quantity: (22) Units(22) Units(22) Units(22) Units
Observations:
- In this climate, it is recommended that exterior surfaces are painted every 5 - 7 years. - The exact timeframe depends on the color chosen and the level of exposure to elements, as well as the quality of past paint jobs. - The remaining life is based on the observed conditions.
Life Expectancy: 6666 Remaining Life: 5555
$4,000/unit; Estimate to repaint buildings
$5,000/unit; Higher estimate for more prep work
Bldg Ext Surfaces - Repaint (Patio PH3)
General Notes:
Wednesday, July 03, 2019Page 12 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 212
Source of Information:
Best Cost: $0$0$0$0
Worst Cost: $0$0$0$0
Location: Townhome ExteriorsTownhome ExteriorsTownhome ExteriorsTownhome Exteriors
Quantity: See General NotesSee General NotesSee General NotesSee General Notes
Observations:
- Funding for this line item has been included with Building Exterior Surfaces line items. - Separate Reserve Funding is not necessary for this component.
Life Expectancy: N/AN/AN/AN/A Remaining Life:
Fencing and Deck/Stair Railing - Repaint
General Notes:
Aluminum Fencing:Aluminum Fencing:Aluminum Fencing:Aluminum Fencing:501/509, 511/519, 521/529, 531/539, 549/557, 559/567, 501/509, 511/519, 521/529, 531/539, 549/557, 559/567, 501/509, 511/519, 521/529, 531/539, 549/557, 559/567, 501/509, 511/519, 521/529, 531/539, 549/557, 559/567, 569/577, 579/587, 589/597, 613/621:569/577, 579/587, 589/597, 613/621:569/577, 579/587, 589/597, 613/621:569/577, 579/587, 589/597, 613/621: - Approx. 90 LF x 10 = Approx. 900 LF - Approx. 90 LF x 10 = Approx. 900 LF - Approx. 90 LF x 10 = Approx. 900 LF - Approx. 90 LF x 10 = Approx. 900 LF
541/547, 623/629: 541/547, 623/629: 541/547, 623/629: 541/547, 623/629: - Approx. 60 LF x 2 = Approx. 120 LF - Approx. 60 LF x 2 = Approx. 120 LF - Approx. 60 LF x 2 = Approx. 120 LF - Approx. 60 LF x 2 = Approx. 120 LF
601/611: Approx. 130 LF601/611: Approx. 130 LF601/611: Approx. 130 LF601/611: Approx. 130 LF
Wood Railing: Wood Railing: Wood Railing: Wood Railing: 501/509, 511/519, 521/529, 531/539, 549/557, 559/567, 501/509, 511/519, 521/529, 531/539, 549/557, 559/567, 501/509, 511/519, 521/529, 531/539, 549/557, 559/567, 501/509, 511/519, 521/529, 531/539, 549/557, 559/567, 569/577, 579/587, 589/597, 613/621:569/577, 579/587, 589/597, 613/621:569/577, 579/587, 589/597, 613/621:569/577, 579/587, 589/597, 613/621: - Approx. 80 LF x 10 = Approx. 800 LF - Approx. 80 LF x 10 = Approx. 800 LF - Approx. 80 LF x 10 = Approx. 800 LF - Approx. 80 LF x 10 = Approx. 800 LF
541/547, 623/629: 541/547, 623/629: 541/547, 623/629: 541/547, 623/629: - Approx. 55 LF x 2 = Approx. 110 LF - Approx. 55 LF x 2 = Approx. 110 LF - Approx. 55 LF x 2 = Approx. 110 LF - Approx. 55 LF x 2 = Approx. 110 LF
601/611: Approx. 140 LF601/611: Approx. 140 LF601/611: Approx. 140 LF601/611: Approx. 140 LF
Wednesday, July 03, 2019Page 13 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 304
Source of Information: Cost Database
Best Cost: $8,500$8,500$8,500$8,500
Worst Cost: $11,000$11,000$11,000$11,000
Location: Unit Building ExteriorsUnit Building ExteriorsUnit Building ExteriorsUnit Building Exteriors
Quantity: (20) Units(20) Units(20) Units(20) Units
Observations:
- As the property ages, this type of material has been known to start delaminating if not painted and caulked on a proper cycle. - We suggest establishing Reserve funds for major repairs every other painting cycle. - The remaining life is based on the observed conditions at the time of our site evaluation and the timing of the next paint job.
Life Expectancy: 12121212 Remaining Life: 9999
$425/Unit: Allowance for major repairs
$550/Unit/ Higher allowance for more repairs
Fiber Cement Siding - Major Repairs (PH1)
General Notes:
501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539: - Approx. 9,115 GSF x 4 = Approx. 36,460 GSF - Approx. 9,115 GSF x 4 = Approx. 36,460 GSF - Approx. 9,115 GSF x 4 = Approx. 36,460 GSF - Approx. 9,115 GSF x 4 = Approx. 36,460 GSF
Wednesday, July 03, 2019Page 14 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 305
Source of Information: Cost Database
Best Cost: $8,075$8,075$8,075$8,075
Worst Cost: $10,450$10,450$10,450$10,450
Location: Unit Building ExteriorsUnit Building ExteriorsUnit Building ExteriorsUnit Building Exteriors
Quantity: (19) Units(19) Units(19) Units(19) Units
Observations:
- As the property ages, this type of material has been known to start delaminating if not painted and caulked on a proper cycle. - We suggest establishing Reserve funds for major repairs every other painting cycle. - The remaining life is based on the observed conditions at the time of our site evaluation and the timing of the next paint job.
Life Expectancy: 12121212 Remaining Life: 10101010
$425/Unit: Allowance for major repairs
$550/Unit/ Higher allowance for more repairs
Fiber Cement Siding - Major Repairs (PH2)
General Notes:
541/547: Approx. 8,045 GSF541/547: Approx. 8,045 GSF541/547: Approx. 8,045 GSF541/547: Approx. 8,045 GSF549/557, 559/567, 569/577:549/557, 559/567, 569/577:549/557, 559/567, 569/577:549/557, 559/567, 569/577: - Approx. 9,115 GSF x 3 = Approx. 27,345 GSF - Approx. 9,115 GSF x 3 = Approx. 27,345 GSF - Approx. 9,115 GSF x 3 = Approx. 27,345 GSF - Approx. 9,115 GSF x 3 = Approx. 27,345 GSF
Wednesday, July 03, 2019Page 15 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 306
Source of Information: Cost Database
Best Cost: $10,625$10,625$10,625$10,625
Worst Cost: $13,750$13,750$13,750$13,750
Location: Unit Building ExteriorsUnit Building ExteriorsUnit Building ExteriorsUnit Building Exteriors
Quantity: (25) Units(25) Units(25) Units(25) Units
Observations:
- As the property ages, this type of material has been known to start delaminating if not painted and caulked on a proper cycle. - We suggest establishing Reserve funds for major repairs every other painting cycle. - The remaining life is based on the observed conditions at the time of our site evaluation and the timing of the next paint job.
Life Expectancy: 12121212 Remaining Life: 11111111
$425/Unit: Allowance for major repairs
$550/Unit/ Higher allowance for more repairs
Fiber Cement Siding - Major Repairs (PH3)
General Notes:
623/629: Approx. 8,045 GSF623/629: Approx. 8,045 GSF623/629: Approx. 8,045 GSF623/629: Approx. 8,045 GSF
579/587, 589/597, 613/621:579/587, 589/597, 613/621:579/587, 589/597, 613/621:579/587, 589/597, 613/621: - Approx. 9,115 GSF x 3 = Approx. 27,345 GSF - Approx. 9,115 GSF x 3 = Approx. 27,345 GSF - Approx. 9,115 GSF x 3 = Approx. 27,345 GSF - Approx. 9,115 GSF x 3 = Approx. 27,345 GSF
601/611: Approx. 10,720 GSF601/611: Approx. 10,720 GSF601/611: Approx. 10,720 GSF601/611: Approx. 10,720 GSF
Wednesday, July 03, 2019Page 16 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 309
Source of Information:
Best Cost: $0$0$0$0
Worst Cost: $0$0$0$0
Location: Unit Building ExteriorsUnit Building ExteriorsUnit Building ExteriorsUnit Building Exteriors
Quantity: Approx. 7,455 GSFApprox. 7,455 GSFApprox. 7,455 GSFApprox. 7,455 GSF
Observations:
- Typically, these stones have an extended life expectancy and complete replacement is unlikely. - There are times where some stones will loosen and fall off, but this is unpredictable when and how much would occur. - Repairs should be handled as a maintenance issue on an as needed basis. - If it later turns out that frequent repairs are necessary, then funding could be added in future Reserve Study updates.
Life Expectancy: N/AN/AN/AN/A Remaining Life:
Stone/Rock Siding - Major Repairs
General Notes:
501/509, 511/519, 521/529, 531/539, 549/557, 559/567, 501/509, 511/519, 521/529, 531/539, 549/557, 559/567, 501/509, 511/519, 521/529, 531/539, 549/557, 559/567, 501/509, 511/519, 521/529, 531/539, 549/557, 559/567, 569/577, 579/587, 589/597, 613/621:569/577, 579/587, 589/597, 613/621:569/577, 579/587, 589/597, 613/621:569/577, 579/587, 589/597, 613/621: - Approx. 575 GSF x 10 = Approx. 5,750 GSF - Approx. 575 GSF x 10 = Approx. 5,750 GSF - Approx. 575 GSF x 10 = Approx. 5,750 GSF - Approx. 575 GSF x 10 = Approx. 5,750 GSF
541/547, 623/629: 541/547, 623/629: 541/547, 623/629: 541/547, 623/629: - Approx. 430 GSF x 2 = Approx. 860 GSF - Approx. 430 GSF x 2 = Approx. 860 GSF - Approx. 430 GSF x 2 = Approx. 860 GSF - Approx. 430 GSF x 2 = Approx. 860 GSF
601/611: Approx. 845 GSF601/611: Approx. 845 GSF601/611: Approx. 845 GSF601/611: Approx. 845 GSF
Wednesday, July 03, 2019Page 17 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 403
Source of Information: Cost Database
Best Cost: $31,100$31,100$31,100$31,100
Worst Cost: $36,250$36,250$36,250$36,250
Location: Townhome Alleys and ParkingTownhome Alleys and ParkingTownhome Alleys and ParkingTownhome Alleys and Parking
Quantity: Approx. 25,910 GSFApprox. 25,910 GSFApprox. 25,910 GSFApprox. 25,910 GSF
Observations:
- Since it is unlikely that all concrete surfaces will fail at the same time, we suggest establishing a Reserve fund for periodic repairs and replacement to approximately 10% of the total area (2,590 GSF) every 4 years. - Repairs should be coordinated with other concrete surfaces and asphalt for best cost estimate since most asphalt companies can also perform concrete work.
Life Expectancy: 4444 Remaining Life: 3333
Allowance to replace 10% of area every 4 yrs.
Higher allowance for more repairs
Concrete - Partial Replace
General Notes:
Alleys:Alleys:Alleys:Alleys:623/629: Approx. 2,920 GSF623/629: Approx. 2,920 GSF623/629: Approx. 2,920 GSF623/629: Approx. 2,920 GSF601/611 - 613/621: Approx. 5,890 GSF601/611 - 613/621: Approx. 5,890 GSF601/611 - 613/621: Approx. 5,890 GSF601/611 - 613/621: Approx. 5,890 GSF579/587 - 589/597: Approx. 3,040 GSF579/587 - 589/597: Approx. 3,040 GSF579/587 - 589/597: Approx. 3,040 GSF579/587 - 589/597: Approx. 3,040 GSF569/577 - 559/567: Approx. 3,000 GSF569/577 - 559/567: Approx. 3,000 GSF569/577 - 559/567: Approx. 3,000 GSF569/577 - 559/567: Approx. 3,000 GSF541/547 - 549/557: Approx. 3,185 GSF541/547 - 549/557: Approx. 3,185 GSF541/547 - 549/557: Approx. 3,185 GSF541/547 - 549/557: Approx. 3,185 GSF521/529 - 531/529: Approx. 3,000 GSF521/529 - 531/529: Approx. 3,000 GSF521/529 - 531/529: Approx. 3,000 GSF521/529 - 531/529: Approx. 3,000 GSF501/509 - 511/519: Approx. 3,000 GSF501/509 - 511/519: Approx. 3,000 GSF501/509 - 511/519: Approx. 3,000 GSF501/509 - 511/519: Approx. 3,000 GSF
Parking: Parking: Parking: Parking: 621: Approx. 1,515 GSF621: Approx. 1,515 GSF621: Approx. 1,515 GSF621: Approx. 1,515 GSF541: Approx. 360 GSF541: Approx. 360 GSF541: Approx. 360 GSF541: Approx. 360 GSF
Wednesday, July 03, 2019Page 18 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 502
Source of Information:
Best Cost: $0$0$0$0
Worst Cost: $0$0$0$0
Location: Townhome BuildingsTownhome BuildingsTownhome BuildingsTownhome Buildings
Quantity: (64) 16x7 Doors(64) 16x7 Doors(64) 16x7 Doors(64) 16x7 Doors
Observations:
- According to the Maintenance Chart provided, the replacement of garage doors is the responsibility of the individual homeowner. - Unless otherwise noted, Reserve funding will not be included based on the rules stated in the declarations. - We suggest the association establish a design guideline so that when an owner goes to replace a door, it will match and be consistent with the others.
Life Expectancy: N/AN/AN/AN/A Remaining Life:
Garage Doors - Replace
General Notes:
Wednesday, July 03, 2019Page 19 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 601
Source of Information: Cost Database
Best Cost: $25,100$25,100$25,100$25,100
Worst Cost: $29,450$29,450$29,450$29,450
Location: See General NotesSee General NotesSee General NotesSee General Notes
Quantity: Approx. 22,825 GSFApprox. 22,825 GSFApprox. 22,825 GSFApprox. 22,825 GSF
Observations:
- Similar to other concrete surfaces, it is unlikely that all concrete surfaces will fail and need to be replaced at the same time. - Therefore, we suggest establishing a Reserve fund for frequent repairs and replacement to a percentage of the area (10% or 2,280 GSF) every 4 years. - Coordinate repairs with other concrete surfaces for best cost estimate.
Life Expectancy: 4444 Remaining Life: 3333
Allowance to repair 10% of area every 4 years
Higher allowance for more repairs
Concrete Flatwork - Partial Replace (Common)
General Notes:
Common Area Sidewalks: Approx. 22,825 GSFCommon Area Sidewalks: Approx. 22,825 GSFCommon Area Sidewalks: Approx. 22,825 GSFCommon Area Sidewalks: Approx. 22,825 GSF
Wednesday, July 03, 2019Page 20 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 601
Source of Information: Cost Database
Best Cost: $27,400$27,400$27,400$27,400
Worst Cost: $32,375$32,375$32,375$32,375
Location: See General NotesSee General NotesSee General NotesSee General Notes
Quantity: Approx. 24,910 GSFApprox. 24,910 GSFApprox. 24,910 GSFApprox. 24,910 GSF
Observations:
- Similar to other concrete surfaces, it is unlikely that all concrete surfaces will fail and need to be replaced at the same time. - Therefore, we suggest establishing a Reserve fund for frequent repairs and replacement to a percentage of the area (10% or 2,490 GSF) every 4 years. - Coordinate repairs with other concrete surfaces for best cost estimate.
Life Expectancy: 4444 Remaining Life: 3333
Allowance to repair 10% of area every 4 years
Higher allowance for more repairs
Concrete Flatwork - Partial Replace (TH)
General Notes:
TH Porches: Approx. 7,995 GSFTH Porches: Approx. 7,995 GSFTH Porches: Approx. 7,995 GSFTH Porches: Approx. 7,995 GSF
TH Sidewalks: Approx. 16,915 GSFTH Sidewalks: Approx. 16,915 GSFTH Sidewalks: Approx. 16,915 GSFTH Sidewalks: Approx. 16,915 GSF
Wednesday, July 03, 2019Page 21 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 609
Source of Information: Cost Database
Best Cost: $76,800$76,800$76,800$76,800
Worst Cost: $86,400$86,400$86,400$86,400
Location: Unit Decks and StairsUnit Decks and StairsUnit Decks and StairsUnit Decks and Stairs
Quantity: See General NotesSee General NotesSee General NotesSee General Notes
Observations:
- However, over a period of time, the material begins to fade and scratch and eventually will become aesthetically unpleasing. - Therefore, due to the level of use and exposure to the elements, we recommend establishing a replacement cycle of 20 - 25 years. - We recommend replacing the rail and decking at the same time.
Life Expectancy: 25252525 Remaining Life: 22222222
Estimate to replace
Higher estimate for more labor
Composite Deck/Stairs - Replace (PH1)
General Notes:
501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539:Stairs/Porch: Approx. 760 GSFStairs/Porch: Approx. 760 GSFStairs/Porch: Approx. 760 GSFStairs/Porch: Approx. 760 GSF - Rails: Approx. 180 LF - Rails: Approx. 180 LF - Rails: Approx. 180 LF - Rails: Approx. 180 LF - Stringer: Approx. 170 LF - Stringer: Approx. 170 LF - Stringer: Approx. 170 LF - Stringer: Approx. 170 LF
Decks: Approx. 1,160 GSFDecks: Approx. 1,160 GSFDecks: Approx. 1,160 GSFDecks: Approx. 1,160 GSF - Rail: Approx. 140 LF - Rail: Approx. 140 LF - Rail: Approx. 140 LF - Rail: Approx. 140 LF
Wednesday, July 03, 2019Page 22 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 610
Source of Information: Cost Database
Best Cost: $71,200$71,200$71,200$71,200
Worst Cost: $80,100$80,100$80,100$80,100
Location: Unit Decks and StairsUnit Decks and StairsUnit Decks and StairsUnit Decks and Stairs
Quantity: See General NotesSee General NotesSee General NotesSee General Notes
Observations:
- However, over a period of time, the material begins to fade and scratch and eventually will become aesthetically unpleasing. - Therefore, due to the level of use and exposure to the elements, we recommend establishing a replacement cycle of 20 - 25 years. - We recommend replacing the rail and decking at the same time.
Life Expectancy: 25252525 Remaining Life: 23232323
Estimate to replace
Higher estimate for more labor
Composite Deck/Stairs - Replace (PH2)
General Notes:
541/547, 549/557, 559/567, 569/577:541/547, 549/557, 559/567, 569/577:541/547, 549/557, 559/567, 569/577:541/547, 549/557, 559/567, 569/577:Stairs/Porch: Approx. 720 GSFStairs/Porch: Approx. 720 GSFStairs/Porch: Approx. 720 GSFStairs/Porch: Approx. 720 GSF - Rails: Approx. 165 LF - Rails: Approx. 165 LF - Rails: Approx. 165 LF - Rails: Approx. 165 LF - Stringer: Approx. 155 LF - Stringer: Approx. 155 LF - Stringer: Approx. 155 LF - Stringer: Approx. 155 LF
Decks: Approx. 1,060 GSFDecks: Approx. 1,060 GSFDecks: Approx. 1,060 GSFDecks: Approx. 1,060 GSF - Rail: Approx. 130 LF - Rail: Approx. 130 LF - Rail: Approx. 130 LF - Rail: Approx. 130 LF
Wednesday, July 03, 2019Page 23 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 611
Source of Information: Cost Database
Best Cost: $104,600$104,600$104,600$104,600
Worst Cost: $117,675$117,675$117,675$117,675
Location: Unit Decks and StairsUnit Decks and StairsUnit Decks and StairsUnit Decks and Stairs
Quantity: See General NotesSee General NotesSee General NotesSee General Notes
Observations:
- However, over a period of time, the material begins to fade and scratch and eventually will become aesthetically unpleasing. - Therefore, due to the level of use and exposure to the elements, we recommend establishing a replacement cycle of 20 - 25 years. - We recommend replacing the rail and decking at the same time.
Life Expectancy: 25252525 Remaining Life: 24242424
Estimate to replace
Higher estimate for more labor
Composite Deck/Stairs - Replace (PH3)
General Notes:
579/587, 589/597, 601/611, 613/621, 623/629:579/587, 589/597, 601/611, 613/621, 623/629:579/587, 589/597, 601/611, 613/621, 623/629:579/587, 589/597, 601/611, 613/621, 623/629:Stairs/Porch: Approx. 1,170 GSFStairs/Porch: Approx. 1,170 GSFStairs/Porch: Approx. 1,170 GSFStairs/Porch: Approx. 1,170 GSF - Rails: Approx. 260 LF - Rails: Approx. 260 LF - Rails: Approx. 260 LF - Rails: Approx. 260 LF - Stringer: Approx. 220 LF - Stringer: Approx. 220 LF - Stringer: Approx. 220 LF - Stringer: Approx. 220 LF
Decks: Approx. 1,445 GSFDecks: Approx. 1,445 GSFDecks: Approx. 1,445 GSFDecks: Approx. 1,445 GSF - Rail: Approx. 180 LF - Rail: Approx. 180 LF - Rail: Approx. 180 LF - Rail: Approx. 180 LF
Wednesday, July 03, 2019Page 24 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 803
Source of Information: Cost Database
Best Cost: $19,000$19,000$19,000$19,000
Worst Cost: $23,000$23,000$23,000$23,000
Location: See General NotesSee General NotesSee General NotesSee General Notes
Quantity: (10) Assorted CBUs(10) Assorted CBUs(10) Assorted CBUs(10) Assorted CBUs
Observations:
- According to several manufacturers, the typical life expectancy for this type of mailbox is 15 - 20 years in this environment. - Remaining life is based on average age of all units. - Per new Postal regulations effective 2012, "all customers are responsible for repairs and replacement of keys, locks, or the boxes/cluster units themselves".
Life Expectancy: 20202020 Remaining Life: 16161616
$1900/CBU; Estimate to replace
$2300/CBU; Higher estimate for better quality
Mailboxes - Replace
General Notes:
By 670 Brennan Place:By 670 Brennan Place:By 670 Brennan Place:By 670 Brennan Place: - (4) 16-Box w/outgoing, 2 parcels - 2016 - (4) 16-Box w/outgoing, 2 parcels - 2016 - (4) 16-Box w/outgoing, 2 parcels - 2016 - (4) 16-Box w/outgoing, 2 parcels - 2016 - (1) 8-Box w/outgoing, 2 parcels - 2016 - (1) 8-Box w/outgoing, 2 parcels - 2016 - (1) 8-Box w/outgoing, 2 parcels - 2016 - (1) 8-Box w/outgoing, 2 parcels - 2016
By 601/611:By 601/611:By 601/611:By 601/611: - (3) 16-Box w/outgoing, 2 parcels - 2016 - (3) 16-Box w/outgoing, 2 parcels - 2016 - (3) 16-Box w/outgoing, 2 parcels - 2016 - (3) 16-Box w/outgoing, 2 parcels - 2016
521/519:521/519:521/519:521/519: - (1) 12-Box w/outgoing, 1 parcel - 2016 - (1) 12-Box w/outgoing, 1 parcel - 2016 - (1) 12-Box w/outgoing, 1 parcel - 2016 - (1) 12-Box w/outgoing, 1 parcel - 2016 - (1) 8-Box w/outgoing, 2 parcel - 2016 - (1) 8-Box w/outgoing, 2 parcel - 2016 - (1) 8-Box w/outgoing, 2 parcel - 2016 - (1) 8-Box w/outgoing, 2 parcel - 2016
Wednesday, July 03, 2019Page 25 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 1002
Source of Information: Cost Database
Best Cost: $16,200$16,200$16,200$16,200
Worst Cost: $18,000$18,000$18,000$18,000
Location: Unit BuildingsUnit BuildingsUnit BuildingsUnit Buildings
Quantity: Approx. 360 GSFApprox. 360 GSFApprox. 360 GSFApprox. 360 GSF
Observations:
- The average life expectancy for metal fences ranges between 25 - 30 years, depending on maintenance schedules and exposure to elements. - The remaining life is based on age of fence and observed conditions.
Life Expectancy: 30303030 Remaining Life: 27272727
$45/LF; Estimate to replace
$50/LF: Higher estimate
Aluminum Fencing - Replace (PH1)
General Notes:
501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539: - Approx. 90 LF x 4 = Approx. 360 GSF - Approx. 90 LF x 4 = Approx. 360 GSF - Approx. 90 LF x 4 = Approx. 360 GSF - Approx. 90 LF x 4 = Approx. 360 GSF
Wednesday, July 03, 2019Page 26 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 1003
Source of Information: Cost Database
Best Cost: $14,850$14,850$14,850$14,850
Worst Cost: $16,500$16,500$16,500$16,500
Location: Unit BuildingsUnit BuildingsUnit BuildingsUnit Buildings
Quantity: Approx. 330 LFApprox. 330 LFApprox. 330 LFApprox. 330 LF
Observations:
- The average life expectancy for metal fences ranges between 25 - 30 years, depending on maintenance schedules and exposure to elements. - The remaining life is based on age of fence and observed conditions.
Life Expectancy: 30303030 Remaining Life: 28282828
$45/LF; Estimate to replace
$50/LF: Higher estimate
Aluminum Fencing - Replace (PH2)
General Notes:
549/557, 559/567, 569/577:549/557, 559/567, 569/577:549/557, 559/567, 569/577:549/557, 559/567, 569/577: - Approx. 90 LF x 3 = Approx. 270 LF - Approx. 90 LF x 3 = Approx. 270 LF - Approx. 90 LF x 3 = Approx. 270 LF - Approx. 90 LF x 3 = Approx. 270 LF
541/547: Approx. 60 LF541/547: Approx. 60 LF541/547: Approx. 60 LF541/547: Approx. 60 LF
Wednesday, July 03, 2019Page 27 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 1004
Source of Information: Cost Database
Best Cost: $21,825$21,825$21,825$21,825
Worst Cost: $24,250$24,250$24,250$24,250
Location: Unit BuildingsUnit BuildingsUnit BuildingsUnit Buildings
Quantity: Approx. 485 LFApprox. 485 LFApprox. 485 LFApprox. 485 LF
Observations:
- The average life expectancy for metal fences ranges between 25 - 30 years, depending on maintenance schedules and exposure to elements. - The remaining life is based on age of fence and observed conditions.
Life Expectancy: 30303030 Remaining Life: 29292929
$45/LF; Estimate to replace
$50/LF: Higher estimate
Aluminum Fencing - Replace (PH3)
General Notes:
579/587, 589/597, 613/621:579/587, 589/597, 613/621:579/587, 589/597, 613/621:579/587, 589/597, 613/621: - Approx. 90 LF x 3 = Approx. 270 LF - Approx. 90 LF x 3 = Approx. 270 LF - Approx. 90 LF x 3 = Approx. 270 LF - Approx. 90 LF x 3 = Approx. 270 LF
623/629: Approx. 60 LF623/629: Approx. 60 LF623/629: Approx. 60 LF623/629: Approx. 60 LF
601/611: Approx. 125 LF601/611: Approx. 125 LF601/611: Approx. 125 LF601/611: Approx. 125 LF
Common Area: Approx. 30 LFCommon Area: Approx. 30 LFCommon Area: Approx. 30 LFCommon Area: Approx. 30 LF
Wednesday, July 03, 2019Page 28 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 1008
Source of Information: Cost Database
Best Cost: $8,800$8,800$8,800$8,800
Worst Cost: $9,900$9,900$9,900$9,900
Location: Townhome Air ConditioningTownhome Air ConditioningTownhome Air ConditioningTownhome Air Conditioning
Quantity: Approx. 220 LFApprox. 220 LFApprox. 220 LFApprox. 220 LF
Observations:
- Similar to other vinyl fences, these are subject to damage during winter months from becoming frozen and brittle, and during summer from landscaping equipment. - This type of fence has a realistic life expectancy of 20 - 25 years in this environment according to several local companies.
Life Expectancy: 25252525 Remaining Life: 22222222
$40/LF: Estimate to replace
$45/LF: Higher estimate for more labor
Vinyl Fencing - Replace (PH1)
General Notes:
501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539: - Approx. 55 LF x 4 = Approx. 220 LF - Approx. 55 LF x 4 = Approx. 220 LF - Approx. 55 LF x 4 = Approx. 220 LF - Approx. 55 LF x 4 = Approx. 220 LF
Wednesday, July 03, 2019Page 29 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 1009
Source of Information: Cost Database
Best Cost: $8,400$8,400$8,400$8,400
Worst Cost: $9,450$9,450$9,450$9,450
Location: Townhome Air ConditioningTownhome Air ConditioningTownhome Air ConditioningTownhome Air Conditioning
Quantity: Approx. 210 LFApprox. 210 LFApprox. 210 LFApprox. 210 LF
Observations:
- Similar to other vinyl fences, these are subject to damage during winter months from becoming frozen and brittle, and during summer from landscaping equipment. - This type of fence has a realistic life expectancy of 20 - 25 years in this environment according to several local companies.
Life Expectancy: 25252525 Remaining Life: 23232323
$40/LF: Estimate to replace
$45/LF: Higher estimate for more labor
Vinyl Fencing - Replace (PH2)
General Notes:
549/557, 559/567, 569/577:549/557, 559/567, 569/577:549/557, 559/567, 569/577:549/557, 559/567, 569/577: - Approx. 55 LF x 3 = Approx. 165 LF - Approx. 55 LF x 3 = Approx. 165 LF - Approx. 55 LF x 3 = Approx. 165 LF - Approx. 55 LF x 3 = Approx. 165 LF
541/547: Approx. 45 LF541/547: Approx. 45 LF541/547: Approx. 45 LF541/547: Approx. 45 LF
Wednesday, July 03, 2019Page 30 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 1010
Source of Information: Cost Database
Best Cost: $11,000$11,000$11,000$11,000
Worst Cost: $12,375$12,375$12,375$12,375
Location: Townhome Air ConditioningTownhome Air ConditioningTownhome Air ConditioningTownhome Air Conditioning
Quantity: Approx. 275 LFApprox. 275 LFApprox. 275 LFApprox. 275 LF
Observations:
- Similar to other vinyl fences, these are subject to damage during winter months from becoming frozen and brittle, and during summer from landscaping equipment. - This type of fence has a realistic life expectancy of 20 - 25 years in this environment according to several local companies.
Life Expectancy: 25252525 Remaining Life: 24242424
$40/LF: Estimate to replace
$45/LF: Higher estimate for more labor
Vinyl Fencing - Replace (PH3)
General Notes:
579/587, 589/597, 613/621:579/587, 589/597, 613/621:579/587, 589/597, 613/621:579/587, 589/597, 613/621: - Approx. 55 LF x 3 = Approx. 165 LF - Approx. 55 LF x 3 = Approx. 165 LF - Approx. 55 LF x 3 = Approx. 165 LF - Approx. 55 LF x 3 = Approx. 165 LF
623/629: Approx. 45 LF623/629: Approx. 45 LF623/629: Approx. 45 LF623/629: Approx. 45 LF
601/611: Approx. 65 LF601/611: Approx. 65 LF601/611: Approx. 65 LF601/611: Approx. 65 LF
Wednesday, July 03, 2019Page 31 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 1306
Source of Information: Cost Database
Best Cost: $3,200$3,200$3,200$3,200
Worst Cost: $4,000$4,000$4,000$4,000
Location: Park AreaPark AreaPark AreaPark Area
Quantity: (2) Picnic Tables(2) Picnic Tables(2) Picnic Tables(2) Picnic Tables
Observations:
- Depending on the level of use, expect to replace equipment every 10 - 16 years. - Factors that contribute to a shorter replacement cycle include abuse, vandalism, and effects from weather. - While pieces can be replaced on an as needed basis, we suggest replacing all at the same time to get the best replacement cost possible and to ensure types of equipment matches in design.
Life Expectancy: 16161616 Remaining Life: 14141414
Estimate to replace
Higher estimate for upgraded materials
Picnic Tables - Replace
General Notes:
Wednesday, July 03, 2019Page 32 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 1307
Source of Information: Cost Database
Best Cost: $5,000$5,000$5,000$5,000
Worst Cost: $7,500$7,500$7,500$7,500
Location: See General NotesSee General NotesSee General NotesSee General Notes
Quantity: (5) Benches(5) Benches(5) Benches(5) Benches
Observations:
- Depending on the level of use, expect to replace equipment every 10 - 15 years. - Factors that contribute to a shorter replacement cycle include abuse, vandalism, and effects from weather. - While pieces can be replaced on an as needed basis, we suggest replacing all at the same time to get the best replacement cost possible and to ensure types of equipment matches in design.
Life Expectancy: 16161616 Remaining Life: 14141414
Estimate to replace
Higher estimate for upgraded materials
Benches - Replace
General Notes:
Park Area: (4) Park Area: (4) Park Area: (4) Park Area: (4)
By 577/569: (1)By 577/569: (1)By 577/569: (1)By 577/569: (1)
Wednesday, July 03, 2019Page 33 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 1308
Source of Information: Cost Database
Best Cost: $1,600$1,600$1,600$1,600
Worst Cost: $2,200$2,200$2,200$2,200
Location: Park AreaPark AreaPark AreaPark Area
Quantity: (2) Trash Cans(2) Trash Cans(2) Trash Cans(2) Trash Cans
Observations:
- Depending on the level of use, expect to replace equipment every 10 - 15 years. - Factors that contribute to a shorter replacement cycle include abuse, vandalism, and effects from weather. - While pieces can be replaced on an as needed basis, we suggest replacing all at the same time to get the best replacement cost possible and to ensure types of equipment matches in design.
Life Expectancy: 16161616 Remaining Life: 14141414
Estimate to replace
Higher estimate for upgraded materials
Trash Receptacles - Replace
General Notes:
Wednesday, July 03, 2019Page 34 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 1318
Source of Information: Cost Database
Best Cost: $7,200$7,200$7,200$7,200
Worst Cost: $8,800$8,800$8,800$8,800
Location: See General NotesSee General NotesSee General NotesSee General Notes
Quantity: (8) Bike Racks(8) Bike Racks(8) Bike Racks(8) Bike Racks
Observations:
- Depending on the level of use, expect to replace equipment every 10 - 15 years. - Factors that contribute to a shorter replacement cycle include abuse, vandalism, and effects from weather. - While pieces can be replaced on an as needed basis, we suggest replacing all at the same time to get the best replacement cost possible and to ensure types of equipment matches in design.
Life Expectancy: 16161616 Remaining Life: 14141414
Estimate to replace
Higher estimate for upgraded materials
Bike Racks - Replace
General Notes:
Open Space North of Brennan Place: (1) Open Space North of Brennan Place: (1) Open Space North of Brennan Place: (1) Open Space North of Brennan Place: (1) Park Area: (2) Park Area: (2) Park Area: (2) Park Area: (2) Between 623/629: (1)Between 623/629: (1)Between 623/629: (1)Between 623/629: (1)Between 601/621: (1)Between 601/621: (1)Between 601/621: (1)Between 601/621: (1)Between 597/579: (1)Between 597/579: (1)Between 597/579: (1)Between 597/579: (1)Between 557/559: (1)Between 557/559: (1)Between 557/559: (1)Between 557/559: (1)Between 519/521: (1)Between 519/521: (1)Between 519/521: (1)Between 519/521: (1)
Wednesday, July 03, 2019Page 35 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 1320
Source of Information:
Best Cost: $0$0$0$0
Worst Cost: $0$0$0$0
Location: Park AreaPark AreaPark AreaPark Area
Quantity: See General NotesSee General NotesSee General NotesSee General Notes
Observations:
- Due to the unpredictable life of these components, and the relatively low individual cost, we do not recommend reserving for this line item. - These games should be maintained on an as needed basis.
Life Expectancy: N/AN/AN/AN/A Remaining Life:
Outdoor Games - Replenish
General Notes:
(1) Horseshoe Pit(1) Horseshoe Pit(1) Horseshoe Pit(1) Horseshoe Pit(1) Bocce Ball Court(1) Bocce Ball Court(1) Bocce Ball Court(1) Bocce Ball Court(1) Shuffleboard Court(1) Shuffleboard Court(1) Shuffleboard Court(1) Shuffleboard Court
Wednesday, July 03, 2019Page 36 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 1321
Source of Information: Cost Database
Best Cost: $2,000$2,000$2,000$2,000
Worst Cost: $3,000$3,000$3,000$3,000
Location: Park AreaPark AreaPark AreaPark Area
Quantity: Approx. 100 GSFApprox. 100 GSFApprox. 100 GSFApprox. 100 GSF
Observations:
- This line item is for major maintenance (including repairs and staining) every 6 years. - Remaining life is based on the observed conditions of the structure.
Life Expectancy: 6666 Remaining Life: 5555
Allowance for majore maintenance
Higher allowance for more labor
Wood Pergola - Major Maintenance
General Notes:
Wednesday, July 03, 2019Page 37 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 1322
Source of Information: Client provided cost information
Best Cost: $4,500$4,500$4,500$4,500
Worst Cost: $5,500$5,500$5,500$5,500
Location: ParkParkParkPark
Quantity: Approx. 255 GSFApprox. 255 GSFApprox. 255 GSFApprox. 255 GSF
Observations:
- This line item is for major maintenance for the metal gazebo in the park. - Remaining life is based on the observed conditions.
Life Expectancy: 7777 Remaining Life: 6666
Allowance for major maintenance
Higher allowance for more labor
Metal Gazebo - Major Maintenance
General Notes:
Wednesday, July 03, 2019Page 38 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 1602
Source of Information: Cost Database
Best Cost: $5,600$5,600$5,600$5,600
Worst Cost: $6,600$6,600$6,600$6,600
Location: Unit BuildingsUnit BuildingsUnit BuildingsUnit Buildings
Quantity: (40) Lights(40) Lights(40) Lights(40) Lights
Observations:
- While replacement can occur on an as needed basis, it is our opinion and recommendation to replace all lights at the same time every 15 - 20 years to maintain a consistent appearance throughout the property. - In addition, by replacing multiple fixtures, the association will be able to obtain a quantity discount for the fixtures.
Life Expectancy: 18181818 Remaining Life: 15151515
$140/light; Estimate to replace
$165/light; Higher estimate for better quality
Exterior Wall Mount - Replace (PH1)
General Notes:
501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539:501/509, 511/519, 521/529, 531/539: - Approx. (10) Lights x 4 = (40) Lights - Approx. (10) Lights x 4 = (40) Lights - Approx. (10) Lights x 4 = (40) Lights - Approx. (10) Lights x 4 = (40) Lights
Wednesday, July 03, 2019Page 39 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 1603
Source of Information: Cost Database
Best Cost: $5,475$5,475$5,475$5,475
Worst Cost: $6,450$6,450$6,450$6,450
Location: Unit BuildingsUnit BuildingsUnit BuildingsUnit Buildings
Quantity: (39) Lights(39) Lights(39) Lights(39) Lights
Observations:
- While replacement can occur on an as needed basis, it is our opinion and recommendation to replace all lights at the same time every 15 - 20 years to maintain a consistent appearance throughout the property. - In addition, by replacing multiple fixtures, the association will be able to obtain a quantity discount for the fixtures.
Life Expectancy: 18181818 Remaining Life: 16161616
$140/light; Estimate to replace
$165/light; Higher estimate for better quality
Exterior Wall Mount - Replace (PH2)
General Notes:
541/547: (9) Lights541/547: (9) Lights541/547: (9) Lights541/547: (9) Lights
549/557, 559/567, 569/577:549/557, 559/567, 569/577:549/557, 559/567, 569/577:549/557, 559/567, 569/577: - Approx. (10) Lights x 3 = (30) Lights - Approx. (10) Lights x 3 = (30) Lights - Approx. (10) Lights x 3 = (30) Lights - Approx. (10) Lights x 3 = (30) Lights
Wednesday, July 03, 2019Page 40 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 1604
Source of Information: Cost Database
Best Cost: $7,150$7,150$7,150$7,150
Worst Cost: $8,425$8,425$8,425$8,425
Location: Unit BuildingsUnit BuildingsUnit BuildingsUnit Buildings
Quantity: (51) Lights(51) Lights(51) Lights(51) Lights
Observations:
- While replacement can occur on an as needed basis, it is our opinion and recommendation to replace all lights at the same time every 15 - 20 years to maintain a consistent appearance throughout the property. - In addition, by replacing multiple fixtures, the association will be able to obtain a quantity discount for the fixtures.
Life Expectancy: 18181818 Remaining Life: 17171717
$140/light; Estimate to replace
$165/light; Higher estimate for better quality
Exterior Wall Mount - Replace (PH3)
General Notes:
623/629: (9) Lights623/629: (9) Lights623/629: (9) Lights623/629: (9) Lights
579/587, 589/597, 613/621:579/587, 589/597, 613/621:579/587, 589/597, 613/621:579/587, 589/597, 613/621: - Approx. (10) Lights x 3 = (30) Lights - Approx. (10) Lights x 3 = (30) Lights - Approx. (10) Lights x 3 = (30) Lights - Approx. (10) Lights x 3 = (30) Lights
601/611: (12) Lights601/611: (12) Lights601/611: (12) Lights601/611: (12) Lights
Wednesday, July 03, 2019Page 41 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 1608
Source of Information:
Best Cost: $0$0$0$0
Worst Cost: $0$0$0$0
Location: Townhome Unit BuildingsTownhome Unit BuildingsTownhome Unit BuildingsTownhome Unit Buildings
Quantity: Approx. (38) Can LightsApprox. (38) Can LightsApprox. (38) Can LightsApprox. (38) Can Lights
Observations:
- No expectation to replace all lights at one time. - Replace individual lights as necessary as an operating expense. - No reserve funding necessary.
Life Expectancy: N/AN/AN/AN/A Remaining Life:
Can Lights - Replace
General Notes:
Wednesday, July 03, 2019Page 42 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 1701
Source of Information: Cost Database
Best Cost: $15,000$15,000$15,000$15,000
Worst Cost: $22,500$22,500$22,500$22,500
Location: Throughout PropertyThroughout PropertyThroughout PropertyThroughout Property
Quantity: ModerateModerateModerateModerate
Observations:
- This line item is for repairs and replacement that lies outside the scope of routine maintenance: bulk sprinkler head replacement, bulk valve replacement, rerouting lateral lines, rewiring, etc. - In order to ensure the funds are available for major repairs, we recommend reserving funds for these projects every 5 - 10 years. - The funding on this line item is for major repairs and is not to be interpreted as complete irrigation system replacement.
Life Expectancy: 10101010 Remaining Life: 7777
Allowance for major repairs
Higher allowance for more repairs
Irrigation System - Major Repairs
General Notes:
Wednesday, July 03, 2019Page 43 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 1703
Source of Information: Cost Database
Best Cost: $5,000$5,000$5,000$5,000
Worst Cost: $6,500$6,500$6,500$6,500
Location: North Entrance of PropertyNorth Entrance of PropertyNorth Entrance of PropertyNorth Entrance of Property
Quantity: (2) RainBird Controllers(2) RainBird Controllers(2) RainBird Controllers(2) RainBird Controllers
Observations:
- The overall life expectancy of irrigation controllers typically ranges between 10 - 12 years if properly maintained and under normal conditions. - Remaining life is based on the age of the controllers
Life Expectancy: 12121212 Remaining Life: 8888
Estimate to replace with a similar controller
Higher estimate for upgraded controller
Irrigation Controllers - Replace
General Notes:
(2) RainBird ESP-LXD(2) RainBird ESP-LXD(2) RainBird ESP-LXD(2) RainBird ESP-LXD - S/N: 0442282, 10MY16, 6 zones - S/N: 0442282, 10MY16, 6 zones - S/N: 0442282, 10MY16, 6 zones - S/N: 0442282, 10MY16, 6 zones - S/N: 0442283, 10MY16, 2 zones - S/N: 0442283, 10MY16, 2 zones - S/N: 0442283, 10MY16, 2 zones - S/N: 0442283, 10MY16, 2 zones
Wednesday, July 03, 2019Page 44 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 1706
Source of Information:
Best Cost: $0$0$0$0
Worst Cost: $0$0$0$0
Location: North Entrance of PropertyNorth Entrance of PropertyNorth Entrance of PropertyNorth Entrance of Property
Quantity: (2) Devices(2) Devices(2) Devices(2) Devices
Observations:
- Devices can be rebuilt and repaired when needed as a maintenance issue. - It is very seldom that a complete system would need to be replaced due to normal wear and tear. - Replacement would be as a result of freezing conditions if system is not winterized properly or in a timely manner. - No Reserve funding is required due to difficulty of predicting a life expectancy and the fact that systems can be rebuilt an a minimal cost, as opposed to being replaced.
Life Expectancy: N/AN/AN/AN/A Remaining Life:
Backflow Devices - Replace
General Notes:
Wednesday, July 03, 2019Page 45 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 1801
Source of Information: Cost Database
Best Cost: $16,200$16,200$16,200$16,200
Worst Cost: $19,800$19,800$19,800$19,800
Location: Throughout PropertyThroughout PropertyThroughout PropertyThroughout Property
Quantity: ExtensiveExtensiveExtensiveExtensive
Observations:
- This line item, similar to irrigation repairs, is for projects that lie outside the scope of routine maintenance. - In order to preserve an attractive curb appeal and to maintain the health of the plants and shrubs, we recommend reserving for refurbishment projects every 2 - 3 years. - This line item is for cyclical refurbishment and should not be considered as complete landscaping replacement.
Life Expectancy: 3333 Remaining Life: 1111
Allowance for major replenishment
Higher allowance for more material
Groundcover - Replenish
General Notes:
Wednesday, July 03, 2019Page 46 of 47
Client Reference #Client Reference #Client Reference #Client Reference # 10063100631006310063Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.Component Inventory for Brennan Lifestyle Community Assoc.
Comp #: 1804
Source of Information:
Best Cost: $0$0$0$0
Worst Cost: $0$0$0$0
Location: Throughout PropertyThroughout PropertyThroughout PropertyThroughout Property
Quantity: Numerous Types and SizesNumerous Types and SizesNumerous Types and SizesNumerous Types and Sizes
Observations:
- It is very difficult to predict a replacement cycle for trees as there are several factors such as disease, infestation of insects, heavy snow storms, etc. can all attribute to eventual tree replacement. - Since it is difficult to predict when the replacement will be necessary, Reserve funding is typically not a factor. - Therefore, unless requested by the association, Reserve funding will not be included as part of the study for this component.
Life Expectancy: N/AN/AN/AN/A Remaining Life:
Tree - Replacement/Major Maintenance
General Notes:
Wednesday, July 03, 2019Page 47 of 47
Funding Summary For Brennan Lifestyle Community Assoc.
Beginning AssumptionsFinancial Information Source Research With Client# of units 130Fiscal Year End December 31, 2020Monthly Dues from 2019 budget $27,189.83Monthly Reserve Allocation from 2019 Budget $10,493.50Projected Starting Reserve Balance (as of 1/1/2020) $207,490
Reserve Balance: Average Per Unit $1,596Ideal Starting Reserve Balance (as of 1/1/2020) $281,596
Ideal Reserve Balance: Average Per Unit $2,166
Economic FactorsPast 20 year Average Inflation Rate (Based on CCI) 3.75%Current Average Interest Rate 1.00%
Current Reserve StatusCurrent Balance as a % of Ideal Balance 74%
Recommendations for 2020 Fiscal YearMonthly Reserve Allocation $14,300
Per Unit $110.00Minimum Monthly Reserve Allocation $12,900
Per Unit $99.23Primary Annual Increases 4.00%
# of Years 30Special Assessment $0
Per Unit $0
Changes From Prior Year (2019 to 2020)Increase/Decrease to Reserve Allocation $3,807
as Percentage 36%Average Per Unit $29.28
1
Percent Funded Graph For Brennan Lifestyle Community Assoc.
0%
20%
40%
60%
80%
100%
120%
2020
2022
2024
2026
2028
2030
2032
2034
2036
2038
2040
2042
2044
2046
2048
2050
% L
evel
of
Fu
nd
ing
Year
Percent FundedRecommended
Monthly Reserve Allocation from 2019Budget
Minimum
2
Component Inventory for Brennan Lifestyle Community Assoc.
Category Asset # Asset Name UL RUL Best Cost Worst Cost
Roofing 105 Comp Shingle Roof - Replace (PH1) 22 19 $176,400 $205,800
106 Comp Shingle Roof - Replace (PH2) 22 20 $169,650 $197,925
107 Comp Shingle Roof - Replace (PH3) 22 21 $219,150 $255,675
120 Gutters/Downspouts - Replace (PH1) 22 19 $24,500 $28,000
121 Gutters/Downspouts - Replace (PH2) 22 20 $23,275 $26,600
122 Gutters/Downspouts - Replace (PH3) 22 21 $30,350 $34,700
Painted Surfaces 204 Bldg Ext Surfaces - Repaint (TH PH1) 6 3 $35,000 $40,000
205 Bldg Ext Surfaces - Repaint (TH PH2) 6 4 $33,250 $38,000
206 Bldg Ext Surfaces - Repaint (TH PH3) 6 5 $43,750 $50,000
207 Bldg Ext Surfaces - Repaint (Patio PH1) 6 3 $88,000 $110,000
208 Bldg Ext Surfaces - Repaint (Patio PH2) 6 4 $88,000 $110,000
209 Bldg Ext Surfaces - Repaint (Patio PH3) 6 5 $88,000 $110,000
212 Fencing and Deck/Stair Railing - Repaint N/A $0 $0
Siding Materials 304 Fiber Cement Siding - Major Repairs (P 12 9 $8,500 $11,000
305 Fiber Cement Siding - Major Repairs (P 12 10 $8,075 $10,450
306 Fiber Cement Siding - Major Repairs (P 12 11 $10,625 $13,750
309 Stone/Rock Siding - Major Repairs N/A $0 $0
Drive Materials 403 Concrete - Partial Replace 4 3 $31,100 $36,250
Property Access 502 Garage Doors - Replace N/A $0 $0
Walking Surfaces 601 Concrete Flatwork - Partial Replace (Co 4 3 $25,100 $29,450
601 Concrete Flatwork - Partial Replace (TH) 4 3 $27,400 $32,375
609 Composite Deck/Stairs - Replace (PH1) 25 22 $76,800 $86,400
610 Composite Deck/Stairs - Replace (PH2) 25 23 $71,200 $80,100
611 Composite Deck/Stairs - Replace (PH3) 25 24 $104,600 $117,675
Prop. Identification 803 Mailboxes - Replace 20 16 $19,000 $23,000
Fencing/Walls 1002 Aluminum Fencing - Replace (PH1) 30 27 $16,200 $18,000
1003 Aluminum Fencing - Replace (PH2) 30 28 $14,850 $16,500
1004 Aluminum Fencing - Replace (PH3) 30 29 $21,825 $24,250
1008 Vinyl Fencing - Replace (PH1) 25 22 $8,800 $9,900
1009 Vinyl Fencing - Replace (PH2) 25 23 $8,400 $9,450
1010 Vinyl Fencing - Replace (PH3) 25 24 $11,000 $12,375
Recreation Equip. 1306 Picnic Tables - Replace 16 14 $3,200 $4,000
1307 Benches - Replace 16 14 $5,000 $7,500
1308 Trash Receptacles - Replace 16 14 $1,600 $2,200
1318 Bike Racks - Replace 16 14 $7,200 $8,800
1320 Outdoor Games - Replenish N/A $0 $0
1321 Wood Pergola - Major Maintenance 6 5 $2,000 $3,000
1322 Metal Gazebo - Major Maintenance 7 6 $4,500 $5,500
Light Fixtures 1602 Exterior Wall Mount - Replace (PH1) 18 15 $5,600 $6,600
1603 Exterior Wall Mount - Replace (PH2) 18 16 $5,475 $6,450
1604 Exterior Wall Mount - Replace (PH3) 18 17 $7,150 $8,425
1608 Can Lights - Replace N/A $0 $0
Irrig. System 1701 Irrigation System - Major Repairs 10 7 $15,000 $22,500
1703 Irrigation Controllers - Replace 12 8 $5,000 $6,500
1706 Backflow Devices - Replace N/A $0 $0
Landscaping 1801 Groundcover - Replenish 3 1 $16,200 $19,800
1804 Tree - Replacement/Major Maintenance N/A $0 $0
3
Significant Components For Brennan Lifestyle Community Assoc.
(Curr Cost/UL)ID Asset Name UL RUL As $ As %
105 Comp Shingle Roof - Replace (PH1) 22 19 $191,100 $8,686 5.6732%106 Comp Shingle Roof - Replace (PH2) 22 20 $183,788 $8,354 5.4561%107 Comp Shingle Roof - Replace (PH3) 22 21 $237,413 $10,791 7.0480%120 Gutters/Downspouts - Replace (PH1) 22 19 $26,250 $1,193 0.7793%121 Gutters/Downspouts - Replace (PH2) 22 20 $24,938 $1,134 0.7403%122 Gutters/Downspouts - Replace (PH3) 22 21 $32,525 $1,478 0.9656%204 Bldg Ext Surfaces - Repaint (TH PH1) 6 3 $37,500 $6,250 4.0820%205 Bldg Ext Surfaces - Repaint (TH PH2) 6 4 $35,625 $5,938 3.8779%206 Bldg Ext Surfaces - Repaint (TH PH3) 6 5 $46,875 $7,813 5.1024%207 Bldg Ext Surfaces - Repaint (Patio PH1) 6 3 $99,000 $16,500 10.7764%208 Bldg Ext Surfaces - Repaint (Patio PH2) 6 4 $99,000 $16,500 10.7764%209 Bldg Ext Surfaces - Repaint (Patio PH3) 6 5 $99,000 $16,500 10.7764%304 Fiber Cement Siding - Major Repairs (PH1) 12 9 $9,750 $813 0.5307%305 Fiber Cement Siding - Major Repairs (PH2) 12 10 $9,263 $772 0.5041%306 Fiber Cement Siding - Major Repairs (PH3) 12 11 $12,188 $1,016 0.6633%403 Concrete - Partial Replace 4 3 $33,675 $8,419 5.4984%601 Concrete Flatwork - Partial Replace (Comm 4 3 $27,275 $6,819 4.4534%601 Concrete Flatwork - Partial Replace (TH) 4 3 $29,888 $7,472 4.8800%609 Composite Deck/Stairs - Replace (PH1) 25 22 $81,600 $3,264 2.1318%610 Composite Deck/Stairs - Replace (PH2) 25 23 $75,650 $3,026 1.9763%611 Composite Deck/Stairs - Replace (PH3) 25 24 $111,138 $4,446 2.9034%803 Mailboxes - Replace 20 16 $21,000 $1,050 0.6858%
1002 Aluminum Fencing - Replace (PH1) 30 27 $17,100 $570 0.3723%1003 Aluminum Fencing - Replace (PH2) 30 28 $15,675 $523 0.3413%1004 Aluminum Fencing - Replace (PH3) 30 29 $23,038 $768 0.5015%1008 Vinyl Fencing - Replace (PH1) 25 22 $9,350 $374 0.2443%1009 Vinyl Fencing - Replace (PH2) 25 23 $8,925 $357 0.2332%1010 Vinyl Fencing - Replace (PH3) 25 24 $11,688 $468 0.3053%1306 Picnic Tables - Replace 16 14 $3,600 $225 0.1470%1307 Benches - Replace 16 14 $6,250 $391 0.2551%1308 Trash Receptacles - Replace 16 14 $1,900 $119 0.0776%1318 Bike Racks - Replace 16 14 $8,000 $500 0.3266%1321 Wood Pergola - Major Maintenance 6 5 $2,500 $417 0.2721%1322 Metal Gazebo - Major Maintenance 7 6 $5,000 $714 0.4665%1602 Exterior Wall Mount - Replace (PH1) 18 15 $6,100 $339 0.2213%1603 Exterior Wall Mount - Replace (PH2) 18 16 $5,963 $331 0.2163%1604 Exterior Wall Mount - Replace (PH3) 18 17 $7,788 $433 0.2826%1701 Irrigation System - Major Repairs 10 7 $18,750 $1,875 1.2246%1703 Irrigation Controllers - Replace 12 8 $5,750 $479 0.3129%1801 Groundcover - Replenish 3 1 $18,000 $6,000 3.9187%
Significance:Ave Curr
Cost
4
(Curr Cost/UL)
Asset ID Asset Name UL RUL As $As %
207 Bldg Ext Surfaces - Repaint (Patio PH1 6 3 $99,000 $16,500 11%207 Bldg Ext Surfaces - Repaint (Patio PH1 6 3 $99,000 $16,500 11%207 Bldg Ext Surfaces - Repaint (Patio PH1 6 3 $99,000 $16,500 11%107 Comp Shingle Roof - Replace (PH3) 22 21 $237,413 $10,791 7%
All Other See Expanded Table on Page 4 For Additional Breakdown $92,822 61%
Significant Components Graph For Brennan Lifestyle Community Assoc.
Average Curr. Cost
Significance:
11% 11%
11%
7%60%
207 Bldg Ext Surfaces - Repaint (Patio PH1)
207 Bldg Ext Surfaces - Repaint (Patio PH1)
207 Bldg Ext Surfaces - Repaint (Patio PH1)
107 Comp Shingle Roof - Replace (PH3)
All Other
5
Yearly Summary For Brennan Lifestyle Community Assoc.
2020 $281,596 $207,490 74% $171,600 $0 $2,946 $02021 $451,011 $382,037 85% $178,464 $0 $4,641 $18,6752022 $613,360 $546,466 89% $185,603 $0 $6,422 $02023 $807,354 $738,491 91% $193,027 $0 $7,113 $253,8842024 $751,629 $684,746 91% $200,748 $0 $6,999 $176,8392025 $780,402 $715,654 92% $208,778 $0 $7,342 $178,3622026 $815,576 $753,412 92% $217,129 $0 $8,628 $6,2362027 $1,037,811 $972,933 94% $225,814 $0 $10,079 $165,0922028 $1,110,996 $1,043,735 94% $234,846 $0 $11,626 $7,7192029 $1,357,907 $1,282,488 94% $244,240 $0 $13,087 $203,6992030 $1,418,746 $1,336,117 94% $254,010 $0 $13,523 $233,9352031 $1,458,794 $1,369,716 94% $264,170 $0 $13,194 $376,9072032 $1,360,618 $1,270,173 93% $274,737 $0 $14,140 $02033 $1,658,732 $1,559,050 94% $285,727 $0 $16,911 $37,1172034 $1,938,783 $1,824,571 94% $297,156 $0 $19,656 $33,0672035 $2,243,151 $2,108,315 94% $309,042 $0 $20,696 $405,5012036 $2,182,506 $2,032,551 93% $321,404 $0 $20,408 $323,6582037 $2,214,847 $2,050,705 93% $334,260 $0 $20,637 $327,0532038 $2,255,615 $2,078,548 92% $347,630 $0 $22,627 $02039 $2,648,367 $2,448,806 92% $361,535 $0 $23,119 $656,5102040 $2,386,275 $2,176,950 91% $375,997 $0 $21,456 $458,2972041 $2,331,990 $2,116,106 91% $391,037 $0 $18,694 $901,6532042 $1,828,127 $1,624,183 89% $406,678 $0 $15,505 $568,3032043 $1,664,125 $1,478,063 89% $422,945 $0 $13,038 $783,4902044 $1,284,107 $1,130,556 88% $439,863 $0 $12,074 $297,1672045 $1,408,288 $1,285,326 91% $457,458 $0 $14,983 $45,1832046 $1,812,974 $1,712,583 94% $475,756 $0 $19,594 $02047 $2,294,665 $2,207,934 96% $494,786 $0 $21,026 $724,6322048 $2,058,129 $1,999,114 97% $514,577 $0 $20,298 $471,7932049 $2,091,139 $2,062,197 99% $535,161 $0 $20,901 $498,537
Percent Funded
Annual Reserve Contribs
Interest Income
Reserve Expenses
Rec. Special Ass'mnt
Fiscal Year Start
Fully Funded Balance
Starting Reserve Balance
6
Reserve Contributions For Brennan Lifestyle Community Assoc.
$-
$5,000
$10,000
$15,000
$20,000
$25,000
$30,000
$35,000
$40,000
$45,000
$50,000
2020
2022
2024
2026
2028
2030
2032
2034
2036
2038
2040
2042
2044
2046
2048
2050
Mo
nth
ly C
on
trib
uti
on
Year
Reserve Contributions
Recommended Current Minimum
7
ID Component Name Monthly105 Comp Shingle Roof - Replace (PH1) $191,100 $26,059 $12,893 $811.26106 Comp Shingle Roof - Replace (PH2) $183,788 $16,708 $0 $780.22107 Comp Shingle Roof - Replace (PH3) $237,413 $10,791 $0 $1,007.87120 Gutters/Downspouts - Replace (PH1) $26,250 $3,580 $0 $111.44121 Gutters/Downspouts - Replace (PH2) $24,938 $2,267 $0 $105.87122 Gutters/Downspouts - Replace (PH3) $32,525 $1,478 $0 $138.08204 Bldg Ext Surfaces - Repaint (TH PH1) $37,500 $18,750 $18,750 $583.72205 Bldg Ext Surfaces - Repaint (TH PH2) $35,625 $11,875 $11,875 $554.53206 Bldg Ext Surfaces - Repaint (TH PH3) $46,875 $7,813 $7,813 $729.65207 Bldg Ext Surfaces - Repaint (Patio PH1) $99,000 $49,500 $49,500 $1,541.02208 Bldg Ext Surfaces - Repaint (Patio PH2) $99,000 $33,000 $33,000 $1,541.02209 Bldg Ext Surfaces - Repaint (Patio PH3) $99,000 $16,500 $16,500 $1,541.02304 Fiber Cement Siding - Major Repairs (PH1) $9,750 $2,438 $2,438 $75.88305 Fiber Cement Siding - Major Repairs (PH2) $9,263 $1,544 $1,544 $72.09306 Fiber Cement Siding - Major Repairs (PH3) $12,188 $1,016 $1,016 $94.85403 Concrete - Partial Replace $33,675 $8,419 $8,419 $786.27601 Concrete Flatwork - Partial Replace (Common) $27,275 $6,819 $6,819 $636.84601 Concrete Flatwork - Partial Replace (TH) $29,888 $7,472 $7,472 $697.84609 Composite Deck/Stairs - Replace (PH1) $81,600 $9,792 $0 $304.84610 Composite Deck/Stairs - Replace (PH2) $75,650 $6,052 $0 $282.61611 Composite Deck/Stairs - Replace (PH3) $111,138 $4,446 $0 $415.19803 Mailboxes - Replace $21,000 $4,200 $4,200 $98.061002 Aluminum Fencing - Replace (PH1) $17,100 $1,710 $0 $53.241003 Aluminum Fencing - Replace (PH2) $15,675 $1,045 $0 $48.801004 Aluminum Fencing - Replace (PH3) $23,038 $768 $0 $71.721008 Vinyl Fencing - Replace (PH1) $9,350 $1,122 $0 $34.931009 Vinyl Fencing - Replace (PH2) $8,925 $714 $0 $33.341010 Vinyl Fencing - Replace (PH3) $11,688 $468 $0 $43.661306 Picnic Tables - Replace $3,600 $450 $450 $21.011307 Benches - Replace $6,250 $781 $781 $36.481308 Trash Receptacles - Replace $1,900 $238 $238 $11.091318 Bike Racks - Replace $8,000 $1,000 $1,000 $46.701321 Wood Pergola - Major Maintenance $2,500 $417 $417 $38.911322 Metal Gazebo - Major Maintenance $5,000 $714 $714 $66.711602 Exterior Wall Mount - Replace (PH1) $6,100 $1,017 $1,017 $31.651603 Exterior Wall Mount - Replace (PH2) $5,963 $663 $663 $30.941604 Exterior Wall Mount - Replace (PH3) $7,788 $433 $433 $40.411701 Irrigation System - Major Repairs $18,750 $5,625 $5,625 $175.121703 Irrigation Controllers - Replace $5,750 $1,917 $1,917 $44.751801 Groundcover - Replenish $18,000 $12,000 $12,000 $560.37
Component Funding Information For Brennan Lifestyle Community Assoc.Current Fund Balance
Ideal Balance
Ave Current Cost
8
Year 2020 2021 2022 2023 2024Starting Balance $207,490 $382,037 $546,466 $738,491 $684,746 Reserve Income $171,600 $178,464 $185,603 $193,027 $200,748 Interest Earnings $2,946 $4,641 $6,422 $7,113 $6,999 Special Assessments $0 $0 $0 $0 $0Funds Available $382,037 $565,141 $738,491 $938,631 $892,493Reserve Expenditures $0 $18,675 $0 $253,884 $176,839Ending Balance $382,037 $546,466 $738,491 $684,746 $715,654
Year 2025 2026 2027 2028 2029Starting Balance $715,654 $753,412 $972,933 $1,043,735 $1,282,488 Reserve Income $208,778 $217,129 $225,814 $234,846 $244,240 Interest Earnings $7,342 $8,628 $10,079 $11,626 $13,087 Special Assessments $0 $0 $0 $0 $0Funds Available $931,774 $979,169 $1,208,826 $1,290,207 $1,539,816Reserve Expenditures $178,362 $6,236 $165,092 $7,719 $203,699Ending Balance $753,412 $972,933 $1,043,735 $1,282,488 $1,336,117
Year 2030 2031 2032 2033 2034Starting Balance $1,336,117 $1,369,716 $1,270,173 $1,559,050 $1,824,571 Reserve Income $254,010 $264,170 $274,737 $285,727 $297,156 Interest Earnings $13,523 $13,194 $14,140 $16,911 $19,656 Special Assessments $0 $0 $0 $0 $0Funds Available $1,603,650 $1,647,080 $1,559,050 $1,861,688 $2,141,382Reserve Expenditures $233,935 $376,907 $0 $37,117 $33,067Ending Balance $1,369,716 $1,270,173 $1,559,050 $1,824,571 $2,108,315
Year 2035 2036 2037 2038 2039Starting Balance $2,108,315 $2,032,551 $2,050,705 $2,078,548 $2,448,806 Reserve Income $309,042 $321,404 $334,260 $347,630 $361,535 Interest Earnings $20,696 $20,408 $20,637 $22,627 $23,119 Special Assessments $0 $0 $0 $0 $0Funds Available $2,438,052 $2,374,362 $2,405,602 $2,448,806 $2,833,460Reserve Expenditures $405,501 $323,658 $327,053 $0 $656,510Ending Balance $2,032,551 $2,050,705 $2,078,548 $2,448,806 $2,176,950
Year 2040 2041 2042 2043 2044Starting Balance $2,176,950 $2,116,106 $1,624,183 $1,478,063 $1,130,556 Reserve Income $375,997 $391,037 $406,678 $422,945 $439,863 Interest Earnings $21,456 $18,694 $15,505 $13,038 $12,074 Special Assessments $0 $0 $0 $0 $0Funds Available $2,574,403 $2,525,836 $2,046,366 $1,914,046 $1,582,493Reserve Expenditures $458,297 $901,653 $568,303 $783,490 $297,167Ending Balance $2,116,106 $1,624,183 $1,478,063 $1,130,556 $1,285,326
Year 2045 2046 2047 2048 2049Starting Balance $1,285,326 $1,712,583 $2,207,934 $1,999,114 $2,062,197 Reserve Income $457,458 $475,756 $494,786 $514,577 $535,161 Interest Earnings $14,983 $19,594 $21,026 $20,298 $20,901 Special Assessments $0 $0 $0 $0 $0Funds Available $1,757,766 $2,207,934 $2,723,746 $2,533,990 $2,618,258Reserve Expenditures $45,183 $0 $724,632 $471,793 $498,537Ending Balance $1,712,583 $2,207,934 $1,999,114 $2,062,197 $2,119,721
Yearly Cash Flow For Brennan Lifestyle Community Assoc.
9
Yearly Expenditures Graph For Brennan Lifestyle Community Assoc.
$-
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
$700,000
$800,000
$900,000
$1,000,00020
20
2022
2024
2026
2028
2030
2032
2034
2036
2038
2040
2042
2044
2046
2048
2050
An
nu
al T
ota
ls
Year
Reserve Expenditures
10
Year Asset ID Asset Name Projected Cost2020 No Expenditures Projected $02021 1801 Groundcover - Replenish $18,675 $18,6752022 No Expenditures Projected $02023 204 Bldg Ext Surfaces - Repaint (TH PH1) $41,879
207 Bldg Ext Surfaces - Repaint (Patio PH1) $110,560403 Concrete - Partial Replace $37,607601 Concrete Flatwork - Partial Replace (Common)$30,460601 Concrete Flatwork - Partial Replace (TH) $33,378 $253,884
2024 205 Bldg Ext Surfaces - Repaint (TH PH2) $41,277208 Bldg Ext Surfaces - Repaint (Patio PH2) $114,7061801 Groundcover - Replenish $20,856 $176,839
2025 206 Bldg Ext Surfaces - Repaint (TH PH3) $56,348209 Bldg Ext Surfaces - Repaint (Patio PH3) $119,0081321 Wood Pergola - Major Maintenance $3,005 $178,362
2026 1322 Metal Gazebo - Major Maintenance $6,236 $6,2362027 403 Concrete - Partial Replace $43,574
601 Concrete Flatwork - Partial Replace (Common)$35,292601 Concrete Flatwork - Partial Replace (TH) $38,6731701 Irrigation System - Major Repairs $24,2621801 Groundcover - Replenish $23,291 $165,092
2028 1703 Irrigation Controllers - Replace $7,719 $7,7192029 204 Bldg Ext Surfaces - Repaint (TH PH1) $52,231
207 Bldg Ext Surfaces - Repaint (Patio PH1) $137,889304 Fiber Cement Siding - Major Repairs (PH1) $13,580 $203,699
2030 205 Bldg Ext Surfaces - Repaint (TH PH2) $51,480208 Bldg Ext Surfaces - Repaint (Patio PH2) $143,059305 Fiber Cement Siding - Major Repairs (PH2) $13,3851801 Groundcover - Replenish $26,011 $233,935
2031 206 Bldg Ext Surfaces - Repaint (TH PH3) $70,277209 Bldg Ext Surfaces - Repaint (Patio PH3) $148,424306 Fiber Cement Siding - Major Repairs (PH3) $18,272403 Concrete - Partial Replace $50,487601 Concrete Flatwork - Partial Replace (Common)$40,892601 Concrete Flatwork - Partial Replace (TH) $44,8081321 Wood Pergola - Major Maintenance $3,748 $376,907
2032 No Expenditures Projected $02033 1322 Metal Gazebo - Major Maintenance $8,069
1801 Groundcover - Replenish $29,048 $37,1172034 1306 Picnic Tables - Replace $6,027
1307 Benches - Replace $10,4641308 Trash Receptacles - Replace $3,1811318 Bike Racks - Replace $13,394 $33,067
2035 204 Bldg Ext Surfaces - Repaint (TH PH1) $65,141207 Bldg Ext Surfaces - Repaint (Patio PH1) $171,972403 Concrete - Partial Replace $58,496601 Concrete Flatwork - Partial Replace (Common)$47,379601 Concrete Flatwork - Partial Replace (TH) $51,9171602 Exterior Wall Mount - Replace (PH1) $10,596 $405,501
2036 205 Bldg Ext Surfaces - Repaint (TH PH2) $64,204208 Bldg Ext Surfaces - Repaint (Patio PH2) $178,421803 Mailboxes - Replace $37,8471603 Exterior Wall Mount - Replace (PH2) $10,7461801 Groundcover - Replenish $32,440 $323,658
Total Per Annum
Projected Reserve Expenditures For Brennan Lifestyle Community Assoc.
11
2037 206 Bldg Ext Surfaces - Repaint (TH PH3) $87,647209 Bldg Ext Surfaces - Repaint (Patio PH3) $185,1111321 Wood Pergola - Major Maintenance $4,6751604 Exterior Wall Mount - Replace (PH3) $14,5611701 Irrigation System - Major Repairs $35,059 $327,053
2038 No Expenditures Projected $02039 105 Comp Shingle Roof - Replace (PH1) $384,623
120 Gutters/Downspouts - Replace (PH1) $52,833403 Concrete - Partial Replace $67,777601 Concrete Flatwork - Partial Replace (Common)$54,896601 Concrete Flatwork - Partial Replace (TH) $60,1541801 Groundcover - Replenish $36,228 $656,510
2040 106 Comp Shingle Roof - Replace (PH2) $383,776121 Gutters/Downspouts - Replace (PH2) $52,0731322 Metal Gazebo - Major Maintenance $10,4411703 Irrigation Controllers - Replace $12,007 $458,297
2041 107 Comp Shingle Roof - Replace (PH3) $514,344122 Gutters/Downspouts - Replace (PH3) $70,464204 Bldg Ext Surfaces - Repaint (TH PH1) $81,242207 Bldg Ext Surfaces - Repaint (Patio PH1) $214,479304 Fiber Cement Siding - Major Repairs (PH1) $21,123 $901,653
2042 205 Bldg Ext Surfaces - Repaint (TH PH2) $80,074208 Bldg Ext Surfaces - Repaint (Patio PH2) $222,522305 Fiber Cement Siding - Major Repairs (PH2) $20,819609 Composite Deck/Stairs - Replace (PH1) $183,4121008 Vinyl Fencing - Replace (PH1) $21,0161801 Groundcover - Replenish $40,459 $568,303
2043 206 Bldg Ext Surfaces - Repaint (TH PH3) $109,312209 Bldg Ext Surfaces - Repaint (Patio PH3) $230,867306 Fiber Cement Siding - Major Repairs (PH3) $28,421403 Concrete - Partial Replace $78,530601 Concrete Flatwork - Partial Replace (Common)$63,605601 Concrete Flatwork - Partial Replace (TH) $69,697610 Composite Deck/Stairs - Replace (PH2) $176,4151009 Vinyl Fencing - Replace (PH2) $20,8131321 Wood Pergola - Major Maintenance $5,830 $783,490
2044 611 Composite Deck/Stairs - Replace (PH3) $268,8901010 Vinyl Fencing - Replace (PH3) $28,277 $297,167
2045 1801 Groundcover - Replenish $45,183 $45,1832046 No Expenditures Projected $02047 204 Bldg Ext Surfaces - Repaint (TH PH1) $101,323
207 Bldg Ext Surfaces - Repaint (Patio PH1) $267,494403 Concrete - Partial Replace $90,988601 Concrete Flatwork - Partial Replace (Common)$73,696601 Concrete Flatwork - Partial Replace (TH) $80,7551002 Aluminum Fencing - Replace (PH1) $46,2041322 Metal Gazebo - Major Maintenance $13,5101701 Irrigation System - Major Repairs $50,662 $724,632
2048 205 Bldg Ext Surfaces - Repaint (TH PH2) $99,867208 Bldg Ext Surfaces - Repaint (Patio PH2) $277,5251003 Aluminum Fencing - Replace (PH2) $43,9411801 Groundcover - Replenish $50,459 $471,793
2049 206 Bldg Ext Surfaces - Repaint (TH PH3) $136,332209 Bldg Ext Surfaces - Repaint (Patio PH3) $287,9321004 Aluminum Fencing - Replace (PH3) $67,002
Total Per AnnumAsset Name
Projected CostYear Asset ID
12
1321 Wood Pergola - Major Maintenance $7,271 $498,5372050 1306 Picnic Tables - Replace $10,863
1307 Benches - Replace $18,8591308 Trash Receptacles - Replace $5,7331318 Bike Racks - Replace $24,140 $59,595
Total Per AnnumAsset Name
Projected CostYear Asset ID
13
1
Glossary of Commonly used Words and Phrases (provided by the National Reserve Study Standards of the Community Associations Institute) Asset or Component – Individual line items in the Reserve Study, developed or updated in the Physical Analysis. These elements form the building blocks for the Reserve Study. Components typically are: 1) Association Responsibility, 2) with limited Useful Life expectancies, 3) have predictable Remaining Life expectancies, 4) above a minimum threshold cost, and 5) required by local codes. Cash Flow Method – A method of developing a Reserve Funding Plan where contributions to the Reserve fund are designed to offset the variable annual expenditures from the Reserve fund. Different Reserve Funding Plans are tested against the anticipated schedule of Reserve expenses until the desired Funding Goal is achieved. Component Inventory – The task of selecting and quantifying Reserve Components. This task can be accomplished through on-site visual observations, review of association design and organizational documents, a review of established association precedents, and discussion with appropriate association representatives. Deficit – An actual (or projected) Reserve Balance, which is less than the Fully Funded Balance. Effective Age – The difference between Useful Life and Remaining Useful Life. Not always equivalent to chronological age, since some components age irregularly. Used primarily in computations. Financial Analysis – The portion of the Reserve Study where current status of the Reserves (Measured as cash or Percent Funded) and a recommended Reserve contribution rate (Reserve Funding Plan) are derived, and the projected Reserve income and expense over time is presented. The Financial Analysis is one of the two parts of the Reserve Study. Component Full Funding – When the actual (or projected) cumulative Reserve balance for all components is equal to the Fully Funded Balance. Fully Fund Balance (aka – Ideal Balance) – An indicator against which Actual (or projected) Reserve Balance can be compared. The Reserve balance that is in direct proportion to the fraction of life “used up” of the current Repair or Replacement cost. This number is calculated for each component, and then summed together for an association total. FFB = Replacement Cost X Effective Age / Useful Life Fund Status – The status of the Reserve Fund as compared to an established benchmark, such as percent funding. Funding Goals – Independent of methodology utilized, the following represent the basic categories of Funding Plan Goals.
• Baseline Funding: Establishing a Reserve funding goal of keeping the Reserve Balance above zero.
• Component Full Funding: Setting a Reserve funding goal of attaining and maintaining cumulative Reserves at or near 100% funded.
• Threshold Funding: Establishing a Reserve funding goal of keeping the Reserve balance above a specified dollar or Percent Funded amount. Depending on the threshold, this may be more or less conservative than the “Component Fully Funding” method.
2
Funding Plan – An association's plan to provide income to a Reserve fund to offset anticipated expenditures from that fund. Funding Principles –
• Sufficient Funds When Required • Stable Contribution Rate over the Years • Evenly Distributed Contributions over the Years • Fiscally Responsible
Life and Valuation Estimates – The task of estimating Useful Life, Remaining Useful Life, and Repair or Replacement Costs for the Reserve components. Percent Funded – The ratio, at a particular point of time (typically the beginning of the Fiscal Year), of the actual (or projected) Reserve Balance to the accrued Fund Balance, expressed as a percentage. Physical Analysis – The portion of the Reserve Study where the Component Inventory, Condition Assessment, and Life and Valuation Estimate tasks are performed. This represents one of the two parts of the Reserve Study. Remaining Useful Life (RUL) – Also referred to as “Remaining Life” (RL). The estimated time, in years, that a reserve component can be expected to continue to serve its intended function. Projects anticipated to occur in the initial year have “0” Remaining Useful Life. Replacement Cost – The cost of replacing, repairing, or restoring a Reserve Component to its original functional condition. The Current Replacement Cost would be the cost to replace, repair, or restore the component during that particular year. Reserve Balance – Actual or projected funds as of a particular point in time (typically the beginning of the fiscal year) that the association has identified for use to defray the future repair or replacement of those major components in which the association is obligated to maintain. Also known as Reserves, Reserve Accounts, Cash Reserves. This is based upon information provided and is not audited. Reserve Provider – An individual that prepares Reserve Studies. Also known as Aspen Reserve Specialties. Reserve Study – A budget-planning tool that identifies the current status of the Reserve fund and a stable and equitable Funding Plan to offset the anticipated future major common area expenditures. The Reserve Study consists of two parts: The Physical Analysis and the Financial Analysis. Special Assessment – An assessment levied on the members of an association in addition to regular assessments. Special Assessments are often regulated by governing documents or local statutes. Surplus – An actual (or projected) Reserve Balance that is greater that the Fully Funded Balance. Useful Life (UL) – Also known as “Life Expectancy”, or “Depreciable Life”. The estimated time, in years, that a Reserve component can be expected to serve its intended function if properly constructed and maintained in its present application or installation.