2
Agenda
• BECCM COI Road Map Review
• Procure to Pay (P2P) Heat Map Update
• Address Status Update
• HRM Program Status Update
• Unit of Measure (UoM) Update
• Action Item Review
Address topic assigned to WG
BECCM RoadmapOct Nov Dec Jan Feb Apr May Jun JulMarTopic Lead/Domain Current Status
Unit of Measure
Jerry Cole, John
Garbarino (DCMO)
Developed Final Functional Requirements / Recommendations, Data Analysis & Technical Recommendations; Requirements Package due 30 Dec 2010
Address Jerry Cole, Zack Waltz (RP&ILM)
Summary view prepared for FGDC Standard. Coordinated with SCI
Program Jerry Cole, Brian
Jackson (HRM/WSLM/
FM)
HRM to present Program definition/recommendation at December BECCM. HRM still holding WGs. FM COI request to be involved with Program initiative
Heat Map 2: P2P
Jerry Cole, Mark King (DCMO)
Weekly workshops for P2P Process Models
Heat Map 3: O2C
Jerry Cole, John
Garbarino (DCMO)
Coordinating with SCI and DLA J3/J8 for final O2C scope and minimum essential data elements
Heat Map 4: H2R
Jerry Cole, Amy Anda(DCMO)
Ongoing WG’s between P&RIM, DCMO, BTA addressing Level 1 & 2 Processes
Ad-Hoc Action Items
N/A Currently no action items
IFA Assessment Completion
Off
icia
lIn
itia
tive
s
Pla
nn
ed
Init
iati
ves
Info
rmat
ion
al D
iscu
ssio
ns
and
Gen
eral
Bu
sin
ess BEA Workshops
Workshop w/DLA / DLMSO
Brief Federal Standard
Finalize Minimum Data Standard
H2R Workshops
Aug
BEA 7.2 Content Lockdown
BEA 8.0 Update
Tech Syntax Phase Approval
Approval of Enterprise Data Solution
Complete Requirements Package
HRM Program WG
Stakeholder Review Workshops
Q1 FY11
Sep
Q3 FY11 Q4 FY11
HRM Definition
H2R Workshops
O2C BEA 8.1 Pre-Workshops
Final Stakeholder Review
H2R Workshops
UoM BEA 8.1 Pre- Workshops
LegendActual BECCM Escalation
Estimated BECCM Escalation
Milestone Actual BECCM Exit
Estimated BECCM Exit
Associated Action Item
Sub-Milestone
Q2 FY11
UoM BEA 8.1 Workshops
UoM BEA 8.1 Update
UoM BEA 8.1 Workshops
UoM BEA 8.1 Update
Status Update
UoM Update
HRM Program Status Update
3
Approval of Functional Approach
HRM Program Informational Brief
Informational Brief: Acquisition Program
Approval of Enterprise Data Solution
Business Vocabulary Alignment
Draft Intended Use Cases
Draft Technical Results
Mr. Jerry ColeBTA Enterprise Standards, Transformation Priorities
and RequirementsSupply Chain Management
Address Status Informational Update
4
Dec 8, 2010
5
Agenda
• Address Problem Statement - Draft
• Overview of Federal Geographic Data Committee (FGDC) United States Thoroughfare, Landmark, and Postal Address Data Standard
• Next Steps
Address Problem Statement - DRAFT
• Government entities define address differently resulting in lack of interoperability
• Address lacks an enterprise wide data Governance process in DoD• Address is a master data concept that should
be shared across the DoD enterprise
6
6
FGDC Data Standard Overview
• The Federal Geographic Data Committee (FGDC) United States Thoroughfare, Landmark, and Postal Address Data Standard provides DoD the raw materials that the Functional Requirements will use to build out exchange solutions
• The FGDC Data Standard will become a Federal Data Standard in February 2011
• Currently known adoptees• U.S Census Bureau • Environmental Protection Agency (EPA)
• The intent is not to require all systems to store data in the same format. Instead, the intent is to enable each system to exchange information in a common vocabulary
• This Federal Standard enables the normal BECCM Process to be accelerated
7
7
88
Completion Date
Milestone
12/08/10 Assign Address to a Working Group
12/14/10 Identify SMEs
12/22/10 Agreed to Problem Statement and Problem Scope
12/31/10 Business vocabulary alignment
01/10/11 Proposed Functional Approach
01/18/11 Revised Functional Approach
01/31/11 Approval of Functional Approach
02/28/11 Draft intended use cases
03/31/11 Draft technical results
04/14/11 Finalize documentation
04/29/11 Approval of Enterprise Data Solution