Liverpool City Region Strategic Investment Fund – Skills Capital Strand 2 – Improved Facilities Guidance Note 1

€¦  · Web viewSponsors are reminded that a key element of the assessment will be the deliverability of the project. Whilst it is recognised that at initial submission stage,

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: €¦  · Web viewSponsors are reminded that a key element of the assessment will be the deliverability of the project. Whilst it is recognised that at initial submission stage,

Liverpool City Region

Strategic Investment Fund – Skills Capital

Strand 2 – Improved Facilities

Guidance Note

1

Page 2: €¦  · Web viewSponsors are reminded that a key element of the assessment will be the deliverability of the project. Whilst it is recognised that at initial submission stage,

1. Introduction

This Guidance note sets out detailed information for applicants to the Liverpool City Region Skills Capital Investment Fund (the Fund).

Investment Strand 2: Improved Facilities

Strand 2 (Improved Facilities) is focused on smaller scale capital development or re-configuration projects to improve skills and learning facilities. Funding awards will prioritise improvements that: support demonstrable apprenticeship growth and reasonable adjustments to engage under-represented learners e.g. those with learning difficulties and/or disabilities including autism and enhance facilities to widen the accessibility and support diversity and life chances. Proposals involving work that normally constitute the usual “summer works‟ or planned maintenance and redecoration will not be considered eligible.

Investment Strand 2

Indicative Allocation

Description Minimum -Maximum Value of Grant

Eligibility

ImprovedFacilities

£3.5m Smaller scale capitaldevelopment or reconfigurationprojects toimprove sites andpremises

Min£100,000Max£500,000

All eligible applicants listed in Section 2.2

In brief, the Fund is made up of 5 strands as follows:

Investment Strand

1. Sites and Premises2. Improved Facilities3. Equipment4. Maintenance of Further Education Facilities5. Low Carbon Reinvestment Fund

This guidance note relates to Strand 2 only. Further guidance will be made available on the application process for the other strands.

For Strand 2 – Improved Facilities is a two stage competitive application process. This opens from 31 May 2019 and will remain open where funding is available until 31 August 2019.

2

Page 3: €¦  · Web viewSponsors are reminded that a key element of the assessment will be the deliverability of the project. Whilst it is recognised that at initial submission stage,

It is strongly recommended that potential applicants read in full the Skills Capital Prospectus and review the other strategic documents referenced within this document via the web links. Potential applicants should do this before they consider making an application to the Skills Capital SIF Fund.

2. Scheme Overview and Eligibility

2.1 Strand 2 Overview

Strand 2 (Improved Facilities) is focused on smaller scale capital development or reconfiguration projects to improve skills and learning facilities.

Funding awards will prioritise improvements that: Support apprenticeship growth in line with the priorities set out in the Liverpool

City Region Apprenticeship Growth Plan (2018-2020); Support reasonable adjustments to engage under-represented learners e.g. those

with learning difficulties and/or disabilities including autism friendly learning environments; and

Enhance facilities to widen the accessibility and quality of skills and employment provision to support diversity and life chances for those furthest away from the labour market including pre-employment training environments.

Proposals involving work that normally constitute the usual “summer works‟ or planned maintenance and redecoration will not be considered eligible.

2.2 Overall Eligibility Criteria

This Skills Capital call is open to individual or consortia applications led by the following organisations based within the constituent six Local Authority areas within Liverpool City Region:

General Further Education (FE) Colleges; Specialist Colleges operating within Liverpool City Region; Sixth Form Colleges (and academies formerly designated as Sixth Form

Colleges); Liverpool City Region devolved Adult Education Budget providers; Liverpool City Region based Education and Skills Funding Agency (ESFA) funded

Independent Training Providers with direct contracts for Apprenticeships, Traineeships or 16-18 study programmes;

Universities (who deliver or plan to deliver Higher and Degree Apprenticeships); Employer Providers who offer apprenticeships (listed on the Register of

Apprenticeship Training Providers); and Liverpool City Region based training providers who are in receipt of European

Social Fund contracts.

Please note the following: Sub-contractors to the above organisations are not eligible to apply within their own right but can form part of a prime contractor consortia application.

3

Page 4: €¦  · Web viewSponsors are reminded that a key element of the assessment will be the deliverability of the project. Whilst it is recognised that at initial submission stage,

2.3 Strand 2 – Improved Facilities

The Improved Facilities strand is designed as follows:

Description

Improve the facilities offered by providers through funding major items/packages of maintenance work and or improvements to the quality of the learning environment for students.

Eligibility See section 2.2.

Consortia bids welcomed

Minimum Total Project Value

Minimum £100,000 Total Package Value – (although cash and in-kind leverage of funding is expected except in exceptional circumstances)

Minimum value of grant considered Minimum grant of £100,000

Maximum value of grant considered Maximum grant of £500,000

Intervention rate Cash and in-kind leverage of funding is expected except in exceptional circumstances.

Ineligible ItemsTypically items such as software, general IT and telephony equipment are classed as ineligible under Strand 2.

3. Appraisal Criteria

3.1 Appraisal Process

Section Four of the Combined Authority’s Investment Strategy (see website) describes the overarching SIF investment process. Project sponsors may refer to this section, and to the accompanying appendices, to understand the Combine Authority’s process in greater detail.

Outline submissions for Skills Capital should be completed using the submission form set out in Appendix 1 of the prospectus. The form and accompanying guidance notes are available electronically for download on the Combined Authority website: http://liverpoolcityregion-ca.gov.uk/documents

Completed submissions together with any supporting information should be emailed to [email protected]

Sponsors are reminded that a key element of the assessment will be the deliverability of the project. Whilst it is recognised that at initial submission stage, further work is

4

Page 5: €¦  · Web viewSponsors are reminded that a key element of the assessment will be the deliverability of the project. Whilst it is recognised that at initial submission stage,

likely to be required – sponsors are requested not to make a submission until they are ready to do so. Support from the SIF Investment Team is available to assist in this regard.

Sponsors are invited to identify in any application the information which they consider to be commercially confidential and the CA will treat such information accordingly. However, this cannot override the CA’s obligations under the Freedom of Information Act 2000 and/or Environmental Information Regulations 2004 (SI 2004 No. 3391).

Wherever possible, the Combined Authority wishes to see co-investments made through the Skills Capital fund achieve collaboration between local skills providers (and between local providers and employers) to ensure maximum usage and value for money. In turn, the Fund will seek to avoid capital co-investments in infrastructure for specific courses or curriculum areas at a Liverpool City Region level, which would create any unnecessary duplication or over-provision within the skills system.

3.2 Property and Estate Considerations

The Combined Authority would normally expect to see a minimum of 20 years remaining on the leasehold or that the freehold to the site/ premises is held by the applicant.

The Combined Authority expects applicants to use match funding from other sources including their own reserves unless there is a compelling case regarding affordability and impact. Other government-funding may be used as part of their private/funding contribution where the use of such funding as co-investment has already been agreed with the relevant government department or other funder directly.

Sponsors should state in writing whether the company/organisation owns the freehold to the sites and premises to which their submission relates.

Where the sponsor is applying to improve a leasehold site or premises, please provide written confirmation of the length of the leasehold agreement for these site/ premises and the term remaining on this lease.

The Combined Authority will take a risk based approach in determining whether investment in a leasehold property represents good value for money and will take into consideration the likelihood that the public investment in learning facilities can be safeguarded in the medium term.

4. Application Process and Notices

Each application/sponsor should complete no more than one Application through this Strand.

The Combined Authority will expect capital maintenance/improvement projects to seek to deliver high levels of environmental performance.

Applicants should not enter into any agreements to undertake maintenance work until they have been advised that their application has been successful and have been made a formal funding offer by the Combined Authority.

5

Page 6: €¦  · Web viewSponsors are reminded that a key element of the assessment will be the deliverability of the project. Whilst it is recognised that at initial submission stage,

Applicants are reminded that the SIF Skills Capital funding will not provide increased capital grant should project costs exceed the approved amount. Furthermore, the Fund may not be in a position to pay grant for any costs incurred after 31 March 2021. However, this position will be clarified during the due diligence phase when an expenditure profile will be formally agreed. For the purposes of submitting your proposal, applicants must work on the principle that the majority of grant expenditure will be incurred and evidenced by 31 March 2021.

In all cases, applicants must comply with the current Public Contracts Regulations and European Commission (EC) Procurement Directives and adhere to their own procurement rules and regulations for the engagement of consultants and contractors and the purchasing of equipment.

All applicants need to take steps including a letter of state aid legal opinion to satisfy themselves and the Combined Authority that any grant support funding payable under the Fund does not breach State Aid rules.

Before applicants receive any grant they will need to provide the Combined Authority with a formal written State Aid opinion from a solicitor, regulated in England and Wales who specialises in the EU State Aid rules, confirming in detail how the project complies with the EU State Aid rules, or a declaration to show that the grant is compatible State Aid as it is to be provided as De Minimis aid in compliance with the De Minimis Regulations.

5. Application Requirements

In addition to this guidance note, information on how to complete the form is included within the Combined Authority Strategic Investment Fund – Skills Capital Prospectus itself. Sponsors / Applicants are required to meet the word limits that apply to each section of the form.

Taking into account the limited time available to carry out assessments and approvals of the Applications, sponsors / applicants are required to keep answers brief and to the point – word limits apply to certain sections of the form to help keep the process manageable.

The Combined Authority will assess Applications only on the information submitted in the required format.

Applicants should complete the ‘Outline Submission for Support from the Liverpool City Region Combined Authority Strategic Investment Fund – Skills Capital Prospectus’ using the following tables within this section as a guide for completion.

Project Summary5.1 Project Summary Please provide a short summary of the project (Guide 200 words)

5.2 Strategy and Purpose Please describe your objectives in completing this project. How does fit into the Skills Capital Prospectus? (Guide 250 words).

6

Page 7: €¦  · Web viewSponsors are reminded that a key element of the assessment will be the deliverability of the project. Whilst it is recognised that at initial submission stage,

What are your organisation and other project participants/stakeholders trying to achieve? What will count as success? What financial objectives do you wish to reach? What learners will you engage and what volumes of learning will the increased capacity from

investment allow you to deliver per academic year.

Eligible applicants should consider and provide evidence of how their project clearly:

Contributes to meeting Liverpool City Region Skills Strategy 2018 and the needs set out in the current Skills for Growth Action Plans summarised in the Skills Capital Prospectus (any projects seeking support outside of these skills needs will require a compelling business case with evidence from named supporting employers);

Supports an ambition for greater volumes, a broader offer and a more diverse range of vocational and technical skills including those delivered through Apprenticeships and Traineeships;

Supports the Liverpool City Region Area Based Review (2017) recommendations for structural changes and strategic planning/curriculum activity to bring about better curriculum alignment with employer and learner needs;

Narrows gaps in the participation and achievement of underrepresented groups including: Unemployed Learners engaged in learning; Learners aged 50 and over with lower level skills needs; BAME (Black and Minority Ethnic) learners who are under-represented or those with Special Educational Needs and/or Disabilities (SEND) or other learning difficulties and learners who are over age 50 with lower level skills needs.

5.3 Development and Operation - Please provide details of the scope, scale and timing of project development, describe its operation on completion and what plans you have, if any, to exit the project after completion. Please include a table of costs. Guide 350 words.

Where you are considering more than one project delivery option, you may provide 150 additional words on each alternative and summarise the differences in a table. You may include maps, plans and graphics by appendix.

Applicants may consider and set out:

How the works will ensure the future sustainability of the estate, ensuring it is fit for purpose, reduces operating costs over an investment period of 20 years and is versatile enough to efficiently accommodate changes in curriculum, social and economic needs and/or educational delivery;

A statement setting out the low carbon benefits of the project; A construction exit strategy and transition plan from construction to operation within

appropriate timescales. An independent RICS accredited surveyor’s report where available and applicable; A self-assessment from the applicant of the impact of the works on the buildings that

are planned to be refurbished; Provision for a major item/s of work and could also include other eligible planned

maintenance works; For major items of maintenance work only, project design information to include

7

Page 8: €¦  · Web viewSponsors are reminded that a key element of the assessment will be the deliverability of the project. Whilst it is recognised that at initial submission stage,

sketches and floor plans; A detailed flow chart (e.g. Gantt) setting out the project programme including key

milestones for delivery against each substantive item of work.

5.4 Approvals, Consents and Authorisations - Please provide the material approvals, consents and authorisations you need to deliver and operate the project. You make provide brief commentary on your approach to securing these, including in relation to timing and dependencies / conditions.

Approvals, consents and authorisations may be internal (funding and resource) approval as well as external (like planning permission). For projects involving land and property; confirm ownership of land or route to ownership and confirm land value contribution Please provide letters of support (non-binding) from key stakeholders and detail the level of engagement with other public and private organisations and agencies.

Applicants may consider and set out:

A timescale for planning permission; State aid legal letters of assurance and/or a timescale for provision of this; Internal governance approval for the commitment of co-investment; Confirmation that the site/premises is owned or has a long term (20 year plus lease)

on a sustainable location for learning delivery Letters of support from employers and other strategic stakeholders; Supporting evidence for any third-party project funding (if applicable) – for example if

available, award letters or formal letters of confirmation; The Principal / Chief Executive or his/her designated deputy must sign the

Application Form.

Development and Operation

5.5 Market, context and value Please describe the market in which the project will operate. The response to this question will differ across sectors. Skills projects are aimed at learners. There is no correct answer, responding will simply help the CA place your project in context.

For Skills Capital investment, the response may differ across sectors and the revenue source that will be accessed to support learners e.g. apprenticeships/levy, 16-18 ESFA Study programme, AEB funded delivery. There is no correct answer, responding will simply help the CA place your project in context.

You may consider:

What/who are its end user learners, and/or other beneficiaries? What/who are its competitors and how duplication of provision will be avoided? What is the demand for the project and how competitive is the supply? What are its competitive advantages? If your project has a commercial value, what do you expect it to be and how did you arrive at this

value? If you expect the value to fall below the cost of delivery, why and by how much? You may submit by appendix market analysis and valuation work completed to date, noting that

the CA is likely to reach its own view. Guide. 300 words plus tables.

8

Page 9: €¦  · Web viewSponsors are reminded that a key element of the assessment will be the deliverability of the project. Whilst it is recognised that at initial submission stage,

Applicants should develop and articulate a clear delivery operational case and provide supporting evidence of how their project will:

Deliver curriculum area of learning aligned to local demand for skills and economic needs, detailing the age of learners to be targeted and employer support for further capacity to deliver training in the locality where applicable;

Demonstrate versatility to efficiently accommodate changes in curriculum, social and economic needs and/or educational delivery;

Demonstrate access to appropriate recurrent revenue funding to ensure learning can take place over a sustained period;

Engage residents with skills needs at levels at Level 2, Level 3 and higher level skills, progression opportunities;

Engage learners who are NEET (Not in Education Employment or Training); Engage learners with English, maths and Digital learning entitlements needs; Lead to greater employer engagement in Apprenticeships (including higher level) and

Traineeships delivered progressing into employment and further training; Engage learners aged 50 and over with lower level skills needs.

5.6 Learning Volumes and Outcomes Please describe the learning volumes and outcomes that will be achieved by the project and your current baseline volumes of delivery for this provision if applicable.

Learner funding

Baseline - Learner numbers before project [1]

Expected Learner Outputs per Academic Year

Total Learner numbers after project per annum after 3 years [2]

Change in learner numbers = [2-1]

Yr 1 (Additional learner enrolments)

Yr 2 Additional learner enrolments)

Yr 3 (Additional learner enrolments)

2018 - 2019

Insert Year 1 academic year

Insert Year 2 academic year

Insert Year 3 academic year

16-18 Apprenticeships (levy and non levy)Adult (19+) Apprenticeships (levy and non levy)Adult Education Budget funded learners

Level 3 and above learners trained (not including apprentices)

9

Page 10: €¦  · Web viewSponsors are reminded that a key element of the assessment will be the deliverability of the project. Whilst it is recognised that at initial submission stage,

Traineeships delivered progressing into employment and further training (16-18 and 19-24)ESFA funded Study Programme learners (16-18)Higher Education (Office for Students funded) learnersOther technical skills delivered to learners

Total

5.7 Other Outcomes – Employment The total number of newly created and safeguarded permanent full-time equivalent jobs as a direct result of the intervention at predetermined employment sites. Employment sites include occupied newly developed commercial premises, the premises of supported enterprises, and any FE space directly improved or constructed by the intervention. Created and safeguarded jobs exclude those created solely to deliver the intervention (e.g. construction). A job is deemed as permanent if it lasts at least a year. Please include the number of apprenticeship positions created as a direct result of the intervention.

Employment Outcomes

Baseline - Learner numbers before project [1]

Expected Employment Outputs per Academic Year

Total employment number after project per annum after 3 years [2]

Change in employment numbers = [2-1]

Yr 1 (Additional learner enrolments)

Yr 2 Additional learner enrolments)

Yr 3 (Additional learner enrolments)

2018 - 2019

Insert Year 1 academic year

Insert Year 2 academic year

Insert Year 3 academic year

Short terms construction jobs created / safeguarded

Delivery jobs created/ safeguarded

Apprenticeship posts created

10

Page 11: €¦  · Web viewSponsors are reminded that a key element of the assessment will be the deliverability of the project. Whilst it is recognised that at initial submission stage,

5.8 Other Skills and Education outcomes

Area of new or improved learning/training floorspace (m2)

The amount of "new build" training/learning floorspace constructed. Figures to be provided following completion.

The amount of training/learning floorspace refurbished to improve building condition and/or fitness for purpose. For FE

Colleges, this should be by estate grading. Figures to be provided following completion.

Prior Estate Grade (if applicable)

Condition graded by surveyor – A, B, C, D

Post Completion Estate Grade (if applicable)

Condition graded by surveyor – A, B, C, D

Floorspace rationalisation (m2)

The amount of overall floorspace reduced following completion of the project through, for example, demolition or disposal.

Figures to be provided following completion.

Number of New Learners Assisted (in courses leading to a full qualification)

The number of new learners assisted as a direct result of the intervention, in courses leading to a full qualification.

Specialist Capital Equipment

Type of new specialist equipment -

Specialist equipment:

Resources specific to a particular sector or industry, and which are required in connection with that sector or industry’s production of goods and services.

These resources will usually comprise specific mechanical devices, but may include bespoke software, or a combination. Includes resources used to produce goods and services, as well as training resources unique

11

Page 12: €¦  · Web viewSponsors are reminded that a key element of the assessment will be the deliverability of the project. Whilst it is recognised that at initial submission stage,

to the industry (e.g. simulators). Does NOT include general equipment, IT infrastructure or resources used for several curriculum areas.

Other Capital EquipmentNon-specialist capital equipment (see above).

5.9 Funding – to establish value for money and affordability - Sources of funding – please complete the following table, adding lines and providing background information as necessary.

Where you are considering different options, please repeat this table for each option, noting that, if the CA accepts your project beyond the outline stage, its investment team will engage directly with you to structure a heads of terms for SIF financing.

You may also describe the key terms of the funding to be provided. Guide 200 words excluding tables

Applicants should use the following table to demonstrate their project:

Delivers co-investment both cash and in-kind – unless there is a compelling business case including evidenced affordability;

Evidences that the necessary matched funding requirements can and will be met.

Type of Funding Provided/Sourced by Sponsor

Request from SIF Total

[Item 1] £ %

[Item 2] £ %

Total £ £ %

Proportion of Total

% % 100%

More advanced applications may also consider and evidence how their project:

Demonstrates financial value for money; Estimated costs of each aspect of the planned project completing the embedded

building cost breakdown analysis –

How the project meets the value for money in terms of its building costs through cost / benefit analysis;

Where costs exceed planned estimates or the minimum cost option considered how project cost changes will be managed and mitigated against, where cost

12

Page 13: €¦  · Web viewSponsors are reminded that a key element of the assessment will be the deliverability of the project. Whilst it is recognised that at initial submission stage,

reductions could be made to allow completion; Provide a Planned Expenditure profile – required for the construction period from

2019 to 2021;

Demonstrates a positive return on investment, in terms of the investment appraisal for the proposed project compared with the base case (do the minimum) option;

Operating cost savings, evidenced by implementing projects which result in lower premises costs (£/m2) over an investment period of 20 years.

An Investment Appraisal for the preferred option and for the base case (do the minimum) option.

5.10 Organisation and Personnel Please provide, with brief appendices if necessary, an organisation chart for the project including funders and key stakeholders, the proposed legal structure of the project and the biography of key project team members. Please also provide summary evidence, whether by reference to previous projects, case studies, corporate performance or other, of the sponsor’s and its team’s previous experience in delivering comparable and equivalent projects. Guide. 400 words plus charts. Please attach most recent Annual Accounts for your organisation (not required for public authorities).

5.11 Risks Please focus on the quality of risk assessment above the quantity of risks listed. Max.400 words. Applicants will need to provide details and clear evidence of:

The deliverability of the project and effective risk management procedures. Where costs exceed planned estimates or the minimum cost option considered how

project cost changes will be managed and mitigated against, where cost reductions could be made to allow completion;

The current state of the infrastructure that they wish to improve and how the proposed project will address these conditions in terms of improving the individual area to be refurbished and impact on the overall condition and the quality of the learning environment.

Please provide a brief summary table of the main project delivery risks per the below:

Risk Probability & Impact Potential Mitigation

[Risk 1] Select [low/medium/high] probability of risk occurring

Select [low/medium/high] negative impact on project delivery if risk occurs

[Risk 2]

13

Page 14: €¦  · Web viewSponsors are reminded that a key element of the assessment will be the deliverability of the project. Whilst it is recognised that at initial submission stage,

[Risk 3]

[Risk 4]

5.12 Declaration

Please complete by appending your (the project lead’s) electronic signature below or by copying the declaration into the email submission of this form.

Signature...........................................................................

Name.................................................................................

Company name.................................................................

Position.............................................................................

Date....................................................................................

6. Application Submission

STAGE 1: CALL

Applicants are invited to respond to the calls by completing the outline submission application form.

The Adult Education Budget (AEB) Commissioning Team and Investment Team will arrange meetings throughout the process to agree in principle the approach to various aspects of the potential project. This includes an exploration of funding options and Monitoring and Evaluation approaches.

6.1 Outline application submitted to SIF mailbox [email protected].

Submission Requirements: Important Information

General FE Colleges in Liverpool City Region must return one electronic copy of the signed and completed:

Application Form; Supporting information required, (as set out in the guidance note at Section 5 and

contained in the Application Form).

14

Page 15: €¦  · Web viewSponsors are reminded that a key element of the assessment will be the deliverability of the project. Whilst it is recognised that at initial submission stage,

All documentation must be received by 4.00pm on 31 August 2019. (Please compress emails to less than 5Mb or send several emails and reference and number them clearly ensuring the organisations name is in the title of the e-mail).

For Strand 2, the Liverpool City Region Combined Authority does not initially require any hard copy information.

Without exception, the Liverpool City Region Employment and Skills Team will not accept any documentation that is submitted after the deadline of 4.00pm on 31 August 2019, or that fail to provide the information requested in full, as set out in this guidance document.

The SIF mailbox is managed and routinely checked by the Project Management Office (PMO) team. All applications receive an acknowledgement email by reply. The PMO will create a new Project file for each new application received. The PMO will check the application submission for completeness. And will go back to the applicant if needed.

The AEB Commissioning Team and Investment Team will solicit additional information from the applicant as required and will perform early checks as deemed necessary.

STAGE 2: CONCEPT

6.2 Outline Paper presented to the Internal Investment Panel

The AEB Commissioning Team and Investment Team Lead will produce an Outline Paper to be presented to the Internal Investment Panel meeting with judgements made against the criteria established in Appendix 1 of the investment strategy.

The applicant will receive an email providing relevant feedback. This may be accompanied by a phone call between the applicant and the AEB Commissioning Team and Investment Team project lead. The project may be rejected at this stage or allowed to pass back though the outline review stage once more.

6.3 Delivery Options assessed

The AEB Commissioning Team and Investment Team Lead will put in place arrangements to agree in principle the approach to the project including an exploration of funding options and Monitoring and Evaluation approaches, delivery options/ alternative delivery models as a part of the appraisal process and assurance that these reflect the SIF assurance framework.

6.4 Draft Heads of Terms

The AEB Commissioning Team and Investment Team Lead will commence a process of negotiation with the applicant including a delivery timeline consulted on with PMO to ensure achievability.

6.5 Agree Due Diligence Approach and Commission ‘light touch’ economic appraisal and review results

15

Page 16: €¦  · Web viewSponsors are reminded that a key element of the assessment will be the deliverability of the project. Whilst it is recognised that at initial submission stage,

The AEB Commissioning Team and Investment Team Lead to lead the scrutiny of a business plan, financial model and funding documents to review and raise concerns or omissions with the applicant. The Investment Team and procurement colleagues confirm scope/ requirements to procure an economic appraisal which will inform the prioritisation of projects.

6.6 Produce Concept Paper for External Investment Panel

The AEB Commissioning Team and Investment Team Lead to develop paper which is presented to the External Panel. The AEB Commissioning Team and Investment Team Lead share detailed and constructive feedback with applicant via letter (email). A follow up call may be necessary. If progressing to the next stage, and if not already raised, CA cost recovery details should be agreed with the applicant at this stage. The project may be rejected at this stage or allowed to pass back though the Concept review stage once more.

STAGE 3: INTERIM REVIEW

6.7 External (Interim) Investment Panel Review (Dependent on size of project)

For projects that are unusually large, complex, novel or protracted in negotiation. Where, following a Concept Review at the External Investment Panel, there are additional information requirements, new developments or other items to be explored, an Interim Review will be held to decide on whether to progress the project. What is presented at an interim review will constitute the project Outline Business Case (OBC).

STAGE 4: FINAL REVIEW

6.8 Full Business Case (FBC) & Full Appraisal - Final Review

Projects with satisfactory diligence, heads of terms and external appraisal will be submitted for consideration at the final stage by the Investment Panel, which will provide final commentary to the Combined Authority on the project’s merits. The AEB Commissioning Team and Investment Team lead will liaise with Procurement and the legal team to draft contracts.

The final submission will be shared with External Panel for a final review. Detailed and constructive feedback shared with the applicant via letter (email) from the Investment Team Lead. A follow up call may be necessary. The project may be rejected at this stage.

STAGE 5: COMBINED AUTHORITY APPROVAL

6.9 Combined Authority final consideration

Projects recommended for approval by the Investment Panel will be submitted to the Combined Authority for final consideration. Projects approved, in principal, by the CA will receive delegated authority for officers of the CA to enter into legal documentation

16

Page 17: €¦  · Web viewSponsors are reminded that a key element of the assessment will be the deliverability of the project. Whilst it is recognised that at initial submission stage,

and proceed to disbursing the SIF commitment. Projects that are rejected will receive reasoned feedback.

17