TURKANA COUNTY GOVERNMENT
OFFICE OF THE COUNTY EXECUTIVE FOR FINANCEANDPLANNING
PROGRAMME BASED BUDET 2014/2015
Working towards achieving a prosperous, peaceful and just county with an empowered community enjoying equal
opportunities.
JUNE2014
SUMMARY OF EXPENDITURE BY VOTE AND CATEGORY 2014/2015 (KSHS)
VOTE CODE TITLE GROSS CURRENT ESTIMATES
GROSS CAPITAL
ESTIMATES
GROSS TOTAL ESTIMATES
FY 2014/2015- KSHs.OFFICE OF THE GOVERNOR 251,080,156.99 458,528,877.00 709,609,033.99 OFFICE OF THE DEPUTY GOVERNOR 78,171,978.44 0 78,171,978.44 NAIROBI LIAISON OFFICE 23,233,786.72 0 23,233,786.72 FINANCE AND ECONOMIC PLANNING 405,209,070.34 946,053,644.00 1,351,262,714.34
WATER IRRIGATION AND AGRICULTURE 160,153,249.78 968,570,000.00 1,128,723,249.78
HEALTH 915,751,246.62 1,210,511,600.00 2,126,262,846.62 TRADE, TOURISM AND INDUSTRY 82,847,350.00 446,900,000.00 529,747,350.00 EDUCATION 203,952,922.52 1,284,300,509.03 1,488,253,431.55 PUBLIC SERVICE, DECENTRALISED SERVICES AND DISASTER MANAGEMENT
501,094,611.76 876,000,001.00 1,377,094,612.76
TRANSPORT, ROADS, HOUSING AND PUBLIC WORKS 91,956,767.20 1,065,078,573.04 1,157,035,340.24
PASTORAL ECONOMY 87,992,004.96 643,541,560.00 731,533,564.96 ENERGY, ENVIRONMENT AND NATURAL RESOURCES 110,000,000.00 361,237,417.20 471,237,417.20
LANDS, PHYSICAL PLANNING AND URBAN AREAS MANAGEMENT 99,529,734.89 452,634,798.68 552,164,533.57
COUNTY ASSEMBLY 967,300,234.00 235,000,000.00 1,202,300,234.00
PUBLIC SERVICE BOARD 68,176,051.44 0 68,176,051.44
TOTAL VOTED EXPENDITURE 4,046,449,165.66 8,948,356,979.95 12,994,806,145.61
SUMMARY OF EXPENDITURE BY VOTE, PROGRAMMES, 2014/2015 (KSHS)
VOTE CODE TITLE PROGRAMME CODE AND TITLE
GROSS CURRENT ESTIMATES
GROSS CAPITAL ESTIMATES
GROSS TOTAL ESTIMATES
FY 2014/2015- KSHs.OFFICE OF THE GOVERNOR TOTAL 251,080,156.99 458,528,877.00 709,609,033.99
P1 General Administration, Planning and Support Services
251,080,156.99 0 251,080,156.99
P2 Governor’s Residence - 218,528,877 218,528,877.00
P3 Donor/ Investor engagement - 100,000,000 100,000,000.00
P4 Security and Peace Building - 130,000,000 130,000,000.00
P5 Government Communication and Media relations
- 10,000,000 10,000,000.00
OFFICE OF THE DEPUTY GOVERNOR TOTAL 78,171,978.44 0.00 78,171,978.44
P1 General Administration, Planning and Support Services
78,171,978.44 0 78,171,978.44
NAIROBI LIAISON OFFICE TOTAL 23,233,786.72 0 23,233,786.72
P1 General Administration, Planning and Support Services
23,233,786.72 0 23,233,786.72
FINANCE AND ECONOMIC PLANNING TOTAL 405,209,070.34 946,053,644.00 1,351,262,714.34
P1 General Administration, Planning and Support Services
405,209,070.34 438,000,000.00 843,209,070.34
P2 Revenue Collection Systems - 254,053,644.00 254,053,644.00
P3 Accountability and Transparency - 41,000,000.00 41,000,000.00
P4 Social and Financial Security - 10,000,000.00 10,000,000.00
P5 Planning and Policy - 64,000,000.00 64,000,000.00P6 Development coordination Programme
- 22,000,000.00 22,000,000.00
P7 Monitoring and Evaluation - 24,500,000.00 24,500,000.00
P8 Public Partcipation and Access to Information
- 41,000,000.00 41,000,000.00
P9 County Statistical Unit - 23,000,000.00 23,000,000.00
P10 Service Delivery- ISO Certification - 8,500,000.00 8,500,000.00
P11 County Internship Programme - 20,000,000.00 20,000,000.00
WATER IRRIGATION AND AGRICULTURE TOTAL 160,153,249.78 968,570,000.00 1,128,723,249.78
P1 General Administration, Planning and Support Services
160,153,249.78 0 160,153,249.78
P2 Water Programmes - 663,500,000.00 663,500,000.00P3 Irrigation and Schemes Programmes - 200,000,000.00 200,000,000.00
P4 Turkana Agriculture Programme - 70,070,000.00 70,070,000.00
P4 Turkana Rehabilitation Project - 35,000,000.00 35,000,000.00
HEALTH TOTAL 915,751,246.62 1,210,511,600.00 2,126,262,846.62P1 General Administration, Planning and Support Services
915,751,246.62 0 915,751,246.62
P2 Health Facilities 964,177,434.00 964,177,434.00P3 Health Utility Improvement Programme
28,000,000.00 28,000,000.00
P4 Provision of office space 39,808,110.00 39,808,110.00
P5 County Health Supply System 15,000,000.00 15,000,000.00
P6 Sub-Counties Public Communications Programme
1,050,000.00 1,050,000.00
P7 Support to Health Programmes 162,476,056.00 162,476,056.00
TRADE, TOURISM AND INDUSTRY TOTAL 82,847,350.00 446,900,000.00 529,747,350.00
P1 General Administration, Planning and Support Services
82,847,350.00 40,900,000.00 123,747,350.00
P2 SME Credit Scheme & Economic Empowerment Programme
- 67,000,000.00 67,000,000.00
P3 Cooperative Societies Development & Performance Improvement Programme
- 40,000,000.00 40,000,000.00
P4 Modern Physical Markets Infrastructure - 80,000,000.00 80,000,000.00
P5 Turkana Business Marketing Programme - 55,000,000.00 55,000,000.00
P6 Tourism and Cultural Products Development Programme.
- 158,250,000.00 158,250,000.00
P7 Provision of Legal Metrology Services - 5,750,000.00 5,750,000.00
EDUCATION TOTAL 203,952,922.52 1,284,300,509.03 1,488,253,431.55P1 General Administration, Planning and Support Services
203,952,922.52 - 203,952,922.52
P2 Access to Education for All - 914,319,531.03 914,319,531.03
P3 Human Resource Development - 2,500,000.00 2,500,000.00
P4 Social Protection programmes/ Affirmative Action
- 279,000,000.00 279,000,000.00
P5 Sports and Arts Programme - 48,680,978.00 48,680,978.00
P6 Cultural Values/ Initiatives - 39,800,000.00 39,800,000.00
PUBLIC SERVICE, DECENTRALISED SERVICES AND DISASTER
TOTAL 501,094,611.76 876,000,001.00 1,377,094,612.76
MANAGEMENTP1. General Administration Planning and Support Services
501,094,611.76 0 501,094,611.76
P2. Capacity Development - 114,000,001.00 114,000,001.00
P3 Decentralised Policies - 22,000,000.00 22,000,000.00
P4 Mainstream Public Sector Integrity programme, Accountability and anti corruption strategies
- 5,000,000.00 5,000,000.00
P5. Disaster Risk Reduction - 710,000,000.00 710,000,000.00
P6 Human resource - 25,000,000.00 25,000,000.00
TRANSPORT AND INFRASTRUCTURE TOTAL 91,956,767.20 1,065,078,573.04 1,157,035,340.24
P1 General Administration, Planning and Support Services
91,956,767.20 5,600,000.00 97,556,767.20
P2 Develop and Maintain Roads - 873,398,193.00 873,398,193.00
P3 Develop and Maintain Staff Housing and Public Offices
- 28,480,380.04 28,480,380.04
P4 Develop and Maintain Other Public Works
- 152,600,000.00 152,600,000.00
P5 Capacity Building for the Public Sector - 5,000,000.00 5,000,000.00
PASTORAL ECONOMY TOTAL 87,992,004.96 643,541,560.00 731,533,564.96P1. General Administration Planning and Support Services
87,992,004.96 0 87,992,004.96
P2 Fisheries Production and Development - 168,541,560.00 168,541,560.00
P3 Livestock Production and Development
- 327,500,000.00 327,500,000.00
P4 Veterinary Services and development - 147,500,000.00 147,500,000.00
ENERGY, ENVIRONMENT AND NATURAL RESOURCES
TOTAL 110,000,000.00 361,237,417.20 471,237,417.20
P1 General Administration Planning and Support Services
110,000,000.00 0 110,000,000.00
P2 Turkana Greening Programme - 50,000,000.00 50,000,000.00
P3 Urban Beautification - 5,000,000.00 5,000,000.00
P4 Gazettement and protection of Game Reserve
- 100,000,000.00 100,000,000.00
P5 Research and Management of Tree Species
- 22,000,000.00 22,000,000.00
P6 Micro mining - 21,237,417.20 21,237,417.20P7 Development of policy and legal frameworks
- 23,000,000.00 23,000,000.00
P8 Development of CFAs and community scout
- 5,000,000.00 5,000,000.00
P 9 Renewable Energy Program - 110,000,000.00 110,000,000.00
P10 Construction of office - 20,000,000.00 20,000,000.00
P11 Mapping and Gazettment of Natural Resources
- 5,000,000.00 5,000,000.00
LANDS, PHYSICAL PLANNING AND URBAN AREAS MANAGEMENT
TOTAL 99,529,734.89 452,634,798.68 552,164,533.57
P1 General Administration, Planning and Support Services
99,529,734.89 0 99,529,734.89
P2 Lands Development Programme - 134,150,000.00 134,150,000.00
P3 Urban Areas Management and Improvement Programme
- 202,351,320.77 202,351,320.77
P4 Lodwar Town Management Committee :
- 116,133,477.91 116,133,477.91
COUNTY ASSEMBLY TOTAL 967,300,234.00 235,000,000.00 1,202,300,234.00P1 General Administration, Planning and Support Services
967,300,234.00 0 967,300,234.00
P2 Construction of New Assembly Building
175,000,000 175,000,000.00
P3 Construction of Speaker's Residence - 60,000,000 60,000,000.00
PUBLIC SERVICE BOARD TOTAL 68,176,051.44 0.00 68,176,051.44
P1 General Administration Planning and Support Services
68,176,051.44 0 68,176,051.44
OFFICE OF THE GOVERNOR
A. Vision
A county government responsive to the needs and demands of the her residents
B. Mission
To provide leadership for the transformation of Turkana County.
C. Strategic Overview And Context for Budget Interview
The office has these key strategic objectives in this fiscal year 2014/15:
i. To facilitate an enabling work environment and promote effective and efficient service
deliveryamongst all staff.
ii. Enhance the county investment levels through PPP initiatives
iii. Promote peace within the county and among neighbouring communities
iv. To enhance proper coordination of government activities
v. Enhance linkages with stakeholders in both county and national government
vi. Enhance effective and timely communication/dissemination of government policies and
programs
Achievements for the period under review
i. The construction of the first phase of the governor’s official county residence underway.
The tender has already been awarded.
ii. The office has reached out to many development partners and donors including the UN to
prioritize the county in development funds and this will culminate in the donor/investor
round table to be held in July, 2014 in the county. Many partnerships are at an advanced
stage of consultations and will be finalized soon.
iii. The office has finalized the recruitment and swearing-in of CECs and Chief Officers. The
Advisors for the office and the chief of staff were also recruited and are in office. In the
entire process, the public has been participating accordingly and are well informed.
iv. The office has conducted regular cabinet meetings. Intergovernmental coordination
between the county government of Turkana and the National government has been on-
going and there is mutual understanding and relations.
v. To facilitate Internal Audit and ICT, the office recruited the director Audit and the
County ICT officer who are now in office and undertaking their duties accordingly.
D. STRATEGIC OBJECTIVES AND THEIR PROGRAMMES
Office of the Governor
Strategic Objectives Programmes Sub ProgrammeTo facilitate an enabling work environment and promote effective and efficient service delivery
P1 General
Administration, Planning
and Support Services
SP1.1 General Administration ServicesSP1.2 Government CoordinationSP1.3 Purchase of Motor Vehicles
To provide an official county residence for the Governor
P2 Governor’s Residence
SP2.1 Construction of Governor’s residence
Enhance the county investment levels to reduce unemployment and increase the county GDP
P3 Donor/ Investor engagement
SP3.1 Public-Private Partnership Initiatives (PPPs)
Promote peace within and outside the county
P4 Security and Peace Building
SP4.1 CPMR Local Initiatives and ResettlementSP 4.2 CPMR Cross Border Initiatives
Enhance effective and timely communication/dissemination of government policies and programs
P5 Government Communication and Media relations
SP5.1 Acquiring and development of communication systems/ equipment/materials
Office of the Deputy Governor
Strategic Objectives Programme Sub ProgrammesTo facilitate an enabling work environment and promote effective and efficient service delivery among office staff.
P1 General
Administration, Planning
and Support Services
SP1.1 General Administration, Planning and Support Services
Nairobi Liaison Office
STRATEGIC OBJECTIVE(S) PROGRAMME SUB-PROGRAMME1. To facilitate an enabling work
environment and promote effective and efficient service delivery among office staff.
P1 General
Administration, Planning
and Support Services
SP1.1 General Administration, Planning and Support Services
E. SUMMARY OF PROGRAMME OUTPUTS AND PERFORMANCE INDICATORS FOR 2014/2015- 2016/2017
OFFICE OF THE GOVERNOR
Programme: P1 General Administration, Planning and Support Services
Outcome: An enhanced institutional framework for efficient and effective service delivery
Sub Programme: SP1.1 General Administration, Planning and Support Services
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Office of the Governor
Delivery of quality, effective and efficient services by the Department of Infrastructure and Roads
Ability to achieve on agreed deliverables
100% 100% 100%
Sub Programme:SP1.2 Government Coordination
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Office of the Governor
Cabinet Affairs/Meetings
Number of Cabinet meetings
20 20 20
Sub Programme:SP1.3 Purchase of Motor Vehicles
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Office of the Governor
Utility vehicles Number of vehicles procured
4 0 0
Programme: P2 Governor’s Residence
Outcome: A conducive and quality accommodation environment to enhance efficient and
effective service delivery
Sub Programme:SP2.1 Construction of Governor’s residence
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Office of the Governor
Quality and spacious accommodation
Governor’s residence
Main house Guest wing Amenities
Programme: P3 Donor/ Investor engagement
Outcome: Increased County GDP
Sub Programme:SP3.1 Public-Private Partnership Initiatives (PPPs)
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Office of the Governor
PPP Initiatives Number of PPPs engaged
10 10 10
Programme: P4 Security and Peace Building
Outcome: Increased safety of the county
Sub Programme:SP4.1 CPMR Local Initiatives and Resettlement
Delivery Unit
Key Output(KO) Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016
2016/2017
Office of the Governor
Meetings/Resettlements
Number of meetingsReport
20 20 20
Sub Programme:SP4.2 CPMR Cross Border Initiatives
Delivery Unit
Key OutputbKO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Office of the Governor
Enhanced Cross border peace
Number of meetingsReport
10 10 10
Programme: P5 Government Communication and Media relations
Outcome: Effective communication and dissemination
Sub Programme:SP5.1 Acquiring and development of communication systems/ equipment/materials
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Communications Directorate
Systems/Materials/ Equipment
Number of Systems/materials/equipment
PAS systemTV stationRadio stationCounty newspaper
Media/Communication Equipment
Media/Communication Equipment
OFFICE OF THE DEPUTY GOVERNORProgramme: P1 General Administration, Planning and Support Services
Outcome: An enhanced institutional framework for efficient and effective service delivery
Sub Programme: SP1.1 General Administration, Planning and Support Services
Delivery Key Key Targets
Unit Output(KO) Performance Indicators(KPIs)
2014/2015 2015/2016 2016/2017
Office of the Governor
Delivery of quality, effective and efficient services
Ability to achieve on agreed deliverables
100% 100% 100%
NAIROBI LIAISON OFFICEProgramme: P1 General Administration, Planning and Support Services
Outcome: An enhanced institutional framework for efficient and effective service delivery
Sub Programme: SP1.1 General Administration, Planning and Support Services
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Office of the Governor
Delivery of quality, effective and efficient services
Ability to achieve on agreed deliverables
100% 100% 100%
F: SUMMARY OF EXPENDITURE BY PROGRAMMES 2014/2015- 2016/2017
OFFICE OF THE GOVERNOR
ProgrammesProjected Estimates
2014/15 2015/2016 2016/2017
SP1.1 General Administration Services 251,080,156.99
276,188,172.69
303,806,989.96
P1 General Administration, Planning and Support Services
251,080,156.99
276,188,172.69
303,806,989.96
SP2.1 Construction of Governor’s residence
218,528,877.00 20,000,000.00 10,000,000.0
0
P2 Governor’s Residence 218,528,877.00
20,000,000.00
10,000,000.00
SP3.1 Public-Private Partnership Initiatives (PPPs)
100,000,000.00 33,000,000.00 36,300,000.0
0
P3 Donor/ Investor engagement 100,000,000.00
33,000,000.00
36,300,000.00
SP4.1 CPMR Local Initiatives and Resettlement
100,000,000.00
110,000,000.00
121,000,000.00
SP4.2 CPMR Cross Border Initiatives 30,000,000.00 33,000,000.00 36,300,000.0
0P4 Security and Peace Building 130,000,000
.00143,000,000.00
157,300,000.00
SP5.1 Acquiring and development of communication systems/ equipment/materials
10,000,000.00 11,000,000.00 12,100,000.0
0
P5 Government Communication and Media relations
10,000,000.00
11,000,000.00
12,100,000.00
Total Expenditure Vote for the Office of the Governor
709,609,033.99
483,188,172.69
519,506,989.96
OFFICE OF THE DEPUTY GOVERNORSP1.1 General Administration, Planning 78,171,978.4 85,989,176.29 94,588,093.9
and Support Services 4 2P1 General Administration, Planning and Support Services
78,171,978.44
85,989,176.29
94,588,093.92
Total Expenditure Vote for the office of the Deputy Governor
78,171,978.44
85,989,176.29
94,588,093.92
NAIROBI LIAISON OFFICESP1.1 General Administration, Planning and Support Services
23,233,786.72 25,557,165.39 28,112,881.9
3P1 General Administration, Planning and Support Services
23,233,786.72
25,557,165.39
28,112,881.93
Total Expenditure Vote for the Nairobi Liaison Office
23,233,786.72
25,557,165.39
28,112,881.93
FINANCE AND ECONOMIC PLANNING
A. Vision:
To be accountable to the public in providing efficient planning and financial services with the aim of
promoting growth, development and prosperity to realize the full potential of Turkana County’s economy.
B. Mission:
To promote economic development, good governance, social progress and rising living
standards through accountable, economic, efficient, equitable and sustainable management of Turkana
County’s public finances in order to advance economic growth, broad-based empowerment, progressive
realization of human rights and the elimination of poverty.
C. Strategic Overview and Context for Budget Intervention:
The sector will implement the following strategic objectives:
i. Create enabling environment and enhance institutional efficiency and effectiveness.
ii. Strengthen the effectiveness and efficiency of revenue collection systems
iii. Enhance accountability and transparency.
iv. Strengthen social and financial security.
v. Create enabling environment and enhance institutional efficiency and effectiveness for
county planning and development.
vi. Strengthen coordination structures to ensure equitable development
vii. Promote efficiency and effectiveness of projects delivery
viii. Promote public participation and access to information
ix. Ensure collection, collation, storage and updating of data and information suitable for
planning process
x. Enhance service delivery and track performance.
xi. Institutionalize and enhance Grants and Investments
Major achievements for the period under review
The department of finance has operationalized other departments through construction,
refurbishment and equipping of county offices, purchased vehicles and other county assets,
promptly facilitated other offices as well as providing timely financial reports, collection of
revenue and increased capacity through hiring of more officers and setting up of departmental
sub units.
The department of Planning has prepared and reviewed the CIDP, Ensured public participation
in planning and budgeting, Provided technical advice to county departments, Developed Turkana
County Fiscal Strategy Paper 2014/2015, Prepared and issued budget circular FY 2014/2015, In
collaboration with the national government, disseminate MTP 2 and supporting community
groups
Challenges
Inadequate staffing, Weak institutional framework,
Major services and outputs to be provided in 2014/2015
Dissemination of the CIDP and the 2014/2015 budget, Building capacity of staff, Establishment
of Sub-County Resource Centres, Establishment of monitoring and evaluation framework,
Establishment ofcounty statistic and economic planning sub-units, create a modern and effective
realtime project management system, quest for ISO certification.
Increase revenue collections, setting up of units/systems, build capacity in current financial
management system, improved accountability and transparency in resource utilization, ensured
safe custody of County assets.
D. Programs and their objectives
STRATEGIC OBJECTIVES PROGRAMME SUB PROGRAMME
Create enabling environment
and enhance institutional
efficiency and effectiveness
P1 General Administration, Planning and Support Services
SP1.1 General Administration and Support ServicesSP1.2 Construction of office (County Executive)SP1.3 Refurbishment of Non-Residential BuildingsSP1.4 Purchase of Vehicles (Elongated Land Cruiser for Planning, 3 Trucks for relief)SP1.5 Vehicle Overhaul (Former Local Authority Vehicles)SP1.6 Purchase of Office Furniture and FittingsSP1.7 Purchase of Computers, Printers and other IT EquipmentSP1.8 BillsSP1.9 Policies
Strengthen the effectiveness and
efficiency of revenue collection
systems
P2 Revenue
Collection Systems
SP2.1 Automated Revenue CollectionSP2.2 Feasibility on Revenue BaseSP2.3 Awareness and Campaigns on Revenue at ward level.SP2.4 Motorbikes for Revenue Officers 30 No.SP2.5 Strengthening Revenue SystemsSP2.6 Renovation of Former WFP Compound as a revenue sourceSP2.7 Benchmarking and Learning experiences at Norway, Rwanda and Ghana with Budget and Appropriation CommitteeSP2.8 Lokiriama Border point revenue centre
Enhance accountability and transparency
P3 Accountability and Transparency
SP3.1 Internal AuditSP3.2 Procurement systemsSP3.3 Assets management and Valuation of County AssetsSP3.4 IFMIS Training Expenses
Strengthen social and financial
security
P4 Social and
Financial Security
SP4.1 Assurance and Insurance of
Govt. Assets
Enhance efficiency and effectiveness for county planning and development.
P5 Planning and Policy formulation
SP5.1 Economic Policy formulation and DisseminationSP5.2 CIDP review and DisseminationSP5.3 Budget preparation and DisseminationSP5.4 Preparation of Annual Plans and Reports (Quarterly)SP5.5 County Budget and Economic Forums (Participation)
Strengthen coordination structures to ensure equitable development
P6 Development coordination Programme
SP6.1 Donor scan/Mapping within the county for resource mobilizationSP6.2 Establishment of development committees (Sub County and Ward)SP6.3 Training of the development committees (Sub County and Ward)
Promote efficiency and
effectiveness of projects
delivery
P7 Monitoring and
Evaluation
SP7.1 Soft wares( E-ProMIS, GIS e.t.c)SP7.2 Field visits, data collection and ReportingSP7.3 Training and Knowledge managementSP7.4 Devolved Monitoring and Evaluation CommitteesSP7.5 Indicator Development
Promote public participation
and access to information
P8 Public
Participation and
Access to
Information
SP8.1 Construction of County Citizen Resource CentreSP8.2 Web site DevelopmentSP8.3 Social Budgeting and Generation of SIR Reports
Ensure collection, collation, storage and updating of data and information suitable for planning process
P9 County Statistical Unit
SP9.1 Soft wares, databases and toolsSP9.2 Capacity DevelopmentSP9.3 Data Collection, Surveys and Reports
Enhance service delivery and track performance.
P10 Service Delivery- ISO Certification
SP10.1 Service CharterSP10.2 Development of County Filing SystemsSP10.3 Procedure Manual and Training
P11 County Internship Programme
SP11.1 County Internship Programme
E. SUMMARY OF PROGRAMME OUTPUTS AND PERFORMANCE INDICATORS
FOR 2014/2015- 2016/2017
Programme: P1 General Administration, Planning and Support Services
Outcome: An enhanced institutional framework for efficient and effective service delivery
Sub Programme: SP1.1 General Administration and Support Services
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Treasury Delivery of quality, effective and efficient services
Ability to achieve on agreed deliverables
100% 100% 100%
Sub Programme: SP1.2 Construction of office (County Executive)
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Treasury Provide office space
County Executive Office
60% 80% 100%
Sub Programme: SP1.3 Refurbishment of Non-Residential Buildings
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Treasury Provide for conducive working space
Refurbished buildings
70% 80% 90%
Sub Programme: SP1.4 Purchase of Motor Vehicles (Elongated Land Cruiser for Planning, 3
Trucks for relief)
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Planning Enhanced mobility and service delivery
No. of Motor Vehicles
4 0 0
Sub Programme: SP1.5 Vehicle Overhaul (Former Local Authority vehicles)
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Treasury Enhanced mobility and service delivery
Proportion of vehicles restored and serviced
80% 90% 100%
Sub Programme: SP1.6 Purchase of Office Furniture and Fittings
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Treasury Conducive working
Proportion of offices
80% 90% 95%
environment equipped with furniture and fittings
Sub Programme: SP1.7 Purchase of Computers, Printers and other IT Equipment
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Treasury Delivery of quality, effective and efficient services
Proportion of offices equipped
80% 90% 95%
Sub Programme: SP1.8 Bills
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Treasury Bills Number of bills enacted
5 6 7
Sub Programme: SP1.9 Policies
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Treasury Policies Number of financial policies formulated
7 8 9
Programme: P2 Revenue Collection Systems
Outcome: Strengthened revenue collection systems
Sub Programme: SP2.1 Automated Revenue CollectionDelivery Unit
Key Output(KO)
Key Performance Indicators(KP
Targets
2014/2015 2015/2016 2016/2017
Is)Revenue Automated
transactionsAutomation systems in place
70% 80% 90%
Sub Programme: SP2.2 Feasibility on Revenue BaseDelivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Revenue Increased revenue base
Study reports 1 2 3
Sub Programme: SP2.3 Awareness and Campaigns on Revenue at ward levelDelivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Revenue Informed society
Level of awareness
70% 80% 90%
Sub Programme: SP2.4 Motorbikes for Revenue Officers 30 NoDelivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Revenue Increased mobility
Number of motorbikes bought
30 15 10
Sub Programme: SP2.5 Strengthening Revenue SystemsDelivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Revenue Efficient revenues systems
Percent increase in revenue collection
80% 90% 95%
Sub Programme: SP2.6 Renovation of Former WFP Offices as revenue source
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Treasury Enhanced revenue source
Renovated former WFP offices
100% 0 0
Sub Programme: SP2.7 Benchmarking and Learning experience at Norway, Rwanda and
Ghana with Budget and Appropriation Committee
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Planning Improved service delivery from learnt experience
Benchmarking reports
3 0 0
Sub Programme: SP2.8 Lokiriama Border point revenue centre
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Revenue Increased revenue
Functional Lokiriama Border point revenue centre
80% 90% 100%
Programme: P3 Accountability and Transparency
Outcome: Improved utilization of public funds
Sub Programme: SP3.1 Internal Audit
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Audit Internal control systems
Effectiveness of expenditure systems
80%% 90% 95%
Sub Programme: SP3.2 Procurement systemsDelivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Procurement Faster and transparent procuring of goods and services
Percentage of completed procurements
70% 80% 90%
Sub Programme: SP3.3 Assets Management and Valuation of County AssetsDelivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Treasury Good use of public properties/assets
Percentage of Asset registered
75% 80% 90%
Sub Programme: SP3.4 IFMIS Training ExpensesDelivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Treasury Improved financial transactions
Percentage of officers trained
70% 80% 95%
Programme: P4 Social and Financial Security
Outcome: Enhanced social and financial security
Sub Programme: SP4.1 Assurance and Insurance of Govt. AssetsDelivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Treasury Cushion County Government from losses
percentage of government assets insured
60% 75% 80%
Programme: P5 Planning and Policy formulation
Outcome: Enhanced planning and policy formulation
Sub Programme: SP5.1 Economic Policy formulation and DisseminationDelivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Planning Better planning through better policies
Number of policies formulated
3 4 6
Sub Programme: SP5.2 CIDP review and DisseminationDelivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Planning Proper planning and coordinated development
Number of CIDP reviews
1 1 1
Sub Programme: SP5.3 Budget preparation and DisseminationDelivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Planning Proper Budgeting
Budget documents
4 4 4
Sub Programme: SP5.4 Preparation of Annual Plans and Reports (Quarterly)Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Planning Proper planning and reporting
Number of reports, Plans
2 3 3
Sub Programme: SP5.5 County Budget and Economic Forums (Participation)Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Planning Increased investments
Number of economic forums
4 4 4
Programme: P6 Development coordination Programme
Outcome: Strengthened development coordination structures
Sub Programme: SP6.1 Donor scan/Mapping within the county for resource mobilizationDelivery Unit
Key Output(KO)
Key Performance Indicators(KP
Targets
2014/2015 2015/2016 2016/2017
Is)Planning Mapped
development partners
Donor scan report
1 1 1
Sub Programme: SP6.2 Establishment of development committees (Sub County and Ward)Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Planning Devolved development planning
Number of committees established
37 37 37
Sub Programme: SP6.3 Training of the development committees (Sub County and Ward)Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Planning Improved capacities of development committees
Number of committees trained
37 37 37
Programme: P7 Monitoring and Evaluation
Outcome: Enhanced efficient and effective projects implementation
Sub Programme: SP7.1 Soft wares( E-ProMIS, GIS e.t.c)Delivery Unit
Key Output(KO)
Key Performance Indicators(KP
Targets
2014/2015 2015/2016 2016/2017
Is)Planning Improved and
timely reporting Percentage of reporting
70% 80% 90%
Sub Programme: SP7.2 Field visits, data collection and ReportingDelivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Planning Improved and timely reporting
Quarterly reports
4 4 4
Sub Programme: SP7.3 Training and Knowledge ManagementDelivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Planning Improved reporting skills
Percentage of officers trained
70% 80% 90%
Sub Programme: SP7.4 Devolved Monitoring and Evaluation CommitteesDelivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Planning Improved monitoring and evaluation
Percentage of monitored/ completed projects
70% 80% 90%
Sub Programme: SP7.5 Indicator Development
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Planning Improved reporting
Existence of indicator manual
1 1 1
Programme: P8 Public Participation and Access to Information
Outcome: Enhanced citizen driven development
Sub Programme: SP8.1 Construction of County Citizen Resource CentreDelivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Planning Improved accessibility to information
Number of Resource centres constructed
1 1 1
Sub Programme: SP8.2 Web site DevelopmentDelivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Planning Improved accessibility to information
Web site Existence of a website
Existence of a website
Existence of a website
Sub Programme: SP8.3 Social Budgeting and Generation of SIR ReportsDelivery Key Key Targets
Unit Output(KO) Performance Indicators(KPIs)
2014/2015 2015/2016 2016/2017
Planning Improved use of public funds
Bi-annual SIR Reports
2 2 2
Programme: P9 County Statistical Unit
Outcome:Enhanced data for planning
Sub Programme: SP9.1 Soft wares, databases and toolsDelivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Planning Improved data capture and reporting
Percentage coverage of statistical data
60% 70% 80%
Sub Programme: SP9.2 Capacity DevelopmentDelivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Planning Increased capacity of statisticians
percentage of statisticians trained
60% 80% 90%
Sub Programme: SP9.3 Data Collection, Surveys and ReportsDelivery Key Key Targets
Unit Output(KO) Performance Indicators(KPIs)
2014/2015 2015/2016 2016/2017
Planning Real time data and reports
Number of surveys
3 4 6
Programme: P10 Service Delivery- ISO Certification
Outcome:Enhanced service delivery and tracking performance
Sub Programme: SP10.1 Service CharterDelivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Planning Improved services offered
Service charters
Existence of service charter
Existence of service charter
Existence of service charter
Sub Programme: SP10.2 Development of County Filing SystemsDelivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Planning Improved filing Filing system Existence of filling system
Existence of filling system
Existence of filling system
Sub Programme: SP10.3 Procedure Manual and TrainingDelivery Key Key Targets
Unit Output(KO) Performance Indicators(KPIs)
2014/2015 2015/2016 2016/2017
Planning Standardized procedures
Procedure manual
Existence of procedure manual
Existence of procedure manual
Existence of procedure manual
Programme: P11 County Internship Programme
Outcome:
Sub Programme: SP11.1 County Internship ProgrammeDelivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Planning Impart technical knowledge
Number of interns engaged
300 300 400
F: SUMMARY OF EXPENDITURE BY PROGRAMMES 2014/2015- 2016/22017
FINANCE AND ECONOMIC PLANNINGProgramme Projected Estimates
2014/2015 2015/2016 2016/2017SP1.1 General Administration and Support Services
405,209,070.34445,729,977 490,302,975
SP 1.2 Construction of office(County Executive)
290,000,000.00110,000,000
-
SP1.3 Refurbishment of Non-Residential Buildings
50,000,000.00 55,000,000 60,500,000
SP1.4 Purchase of Motor Vehicles(Elongated Land Cruiser for Planning, 3 Trucks for relief)
40,000,000.00 30,000,000 20,000,000
SP1.5 Vehicle Overhaul( Fomer Local Authority vehicles)
20,000,000.00 - -
SP1.6 Purchase of Office Furniture and Fittings 20,000,000.00 22,000,000 24,200,000SP1.7 Purchase of Computers, Printers and other IT Equipment
10,000,000.00 11,000,000 12,100,000
SP1.8 Bills 4,000,000.00 4,400,000 4,840,000SP1.9 Policies 4,000,000.00 4,400,000 4,840,000P1 General Administration, Planning and Support Services
843,209,070.34 454,529,977 499,982,975
SP 2.1 Automated Revenue Collection 40,000,000.00 44,000,000 48,400,000SP2.2 Feasibility on Revenue Base 3,000,000.00 3,300,000 -SP2.3 Awareness and campaigns on revenue at ward level
21,000,000.00 15,000,000 10,000,000
SP2.4 Motorbikes for revenue officers 30 No. 9,000,000.00 - -SP2.5 Strengthening Revenue Systems 90,000,000.00 50,000,000 20,000,000SP2.6 Renovation of Former WFP Compound as a revenue source
37,562,968.00
SP2.7 Benchmarking and Learning experience at Norway, Rwanda and Ghana with Budget and Appropriation Committee
35,361,199.00
SP2.8 Lokiriama Border point revenue centre 18,129,477.00
P2 Revenue Collection Systems 254,053,644.00 112,300,000 78,400,000SP3.1 Internal Audit 10,000,000.00 11,000,000 12,100,000SP3.2 Procurement systems 13,000,000.00 14,300,000 15,730,000SP3.3 Assets management and Valuation of County Assets
10,000,000.00 11,000,000 12,100,000
SP3.4 IFMIS Training Expenses 8,000,000.00 8,800,000 9,680,000P3 Accountability and Transparency 41,000,000.00 45,100,000 49,610,000SP4.1 Assurance and Insurance of Govt. Assets 10,000,000.00 11,000,000 12,100,000P4 Social and Financial Security 10,000,000.00 11,000,000 12,100,000SP5.1 Economic Policy formulation and Dissemination
7,000,000.00 7,700,000 8,470,000
SP5.2 CIDP review and Dissemination 10,000,000.00 11,000,000 12,100,000SP5.3 Budget preparation and Dissemination 25,000,000.00 27,500,000 30,250,000SP5.4 Preparation of Annual Plans and Reports(Quarterly)
10,000,000.00 11,000,000 12,100,000
SP5.5 County Budget and Economic Forums(Participation)
12,000,000.00 13,200,000 14,520,000
P5 Planning and Policy formulation 64,000,000.00 70,400,000 77,440,000SP6.1 Donor scan/Mapping within the county for resource mobilization
5,000,000.00 5,500,000 6,050,000
SP 6.2 Establishment of development committees(Sub County and Ward)
12,000,000.00 13,200,000 14,520,000
SP6.3 Training of the development committees( Sub County and Ward)
5,000,000.00 5,500,000 6,050,000
P6 Development coordination Programme 22,000,000.00 24,200,000 26,620,000SP7.1 Soft wares( E-ProMIS, GIS e.t.c) 4,500,000.00 4,950,000 5,445,000SP7.2 Field visits, data collection and Reporting 10,000,000.00 11,000,000 12,100,000SP7.3 Training and Knowledge management 3,000,000.00 3,300,000 3,630,000SP7.4 Devolved Monitoring and Evaluation Committees
5,000,000.00 5,500,000 6,050,000
SP7.5 Indicator Development 2,000,000.00 2,200,000 2,420,000P7 Monitoring and Evaluation 24,500,000.00 26,950,000 29,645,000SP 8.1 Construction of County Citizen Resource Centre
30,000,000.00 33,000,000 36,300,000
SP8.2 Web site Development 4,000,000.00 4,400,000 4,840,000SP8.3 Social Budgeting and Generation of SIR Reports
7,000,000.00 7,700,000 8,470,000
P8 Public Participation and Access to Information
41,000,000.00 45,100,000 49,610,000
SP9.1 Soft wares, databases and tools 5,000,000.00 5,500,000 6,050,000
SP9.2 Capacity Development 4,000,000.00 4,400,000 4,840,000SP9.3 Data Collection, Surveys and Reports 14,000,000.00 15,400,000 16,940,000P9 County Statistical Unit 23,000,000.00 25,300,000 27,830,000SP10.1 Service Charter 1,500,000.00 1,650,000 1,815,000SP10.2 Development of County Filing Systems 2,000,000.00 2,200,000 2,420,000SP10.3 Procedure Manual and Training 5,000,000.00 5,500,000 6,050,000P10 Service Delivery- ISO Certification 8,500,000.00 9,350,000 10,285,000SP11.1 County Internship Programme 20,000,000.00 22,000,000 24,200,000P11 County Internship Programme 20,000,000.00 22,000,000 24,200,000Total Expenditure Vote for Finance and Economic Planning
1,351,262,714.34 846,229,977 885,722,975
VOTE: MINISTRY OF WATER, IRRIGATION AND AGRICULTURE
A. Vision:
To be a lead agent in ensuring food security, adequate and quality water and income generation
for poverty reduction.
B. Mission:
To improve livelihoods of Turkana people through provision of adequate and quality water,
promotion of agribusiness, food diversification and nutrition security in an environment friendly.
C. Strategic Overview and Context for Budget Intervention:
The sector will implement the following seven strategic objectives:
i. Increase agricultural productivity and output
ii. Improve on market access and product development
iii. Enhance accessibility of affordable inputs and credit to farmers
iv. Promote sustainable land use practices and environmental conservation
v. Enhance institutional efficiency and effectiveness in implementation and service delivery
vi. Create a favorable environment for agricultural development
vii. Increase quantity and quality of safe water
Major achievements for the period under review 2013/14 in Agriculture department
i. Turkana CountyWorld Food day celebrations in Lokichoggio on 16th October 2013
ii. The establishment of trapezoidal bunds’ water micro catchments at Kalotum-Lodwar in
November-December 2013.The bunds created around 2 acres of cultivable land with the
potential to produce food of various kinds to feed around 60 households and harvesting of
rain water.
iii. Locust surveillance,reporting,survey,mapping and aerial spraying in some affected but
ameliorable sites in Turkana North, Turkana Central, Loima,and in Turkana South in
August, December 2013 and January 2014.
iv. Seed distribution in Turkana County that is ongoing as from 27th march 2014. Seeds
procured and are being distributed to farmers’ in riverine, irrigated and rain fed farming
sites all over the county. In this case the seeds received are: 8 tonnes of maize
seed(PHO4), 8 tonnes of Sorghum seed(Gadam), 288 kg of Cow peas(Kenkunde),
500kgs of Green grams and 15 Knap sack sprayers for crop protection. Around 5 tonnes
of sorghum, 3 tonnes of maize, 400 kg of green grams and 288kg of cowpeas have been
distributed. With the already distributed seeds around 700 acres are under maize
production, 700 acres again under production, 30 acres are under green gram crop and 25
acres are under cow pea crop across the county.
v. Three tractors and one back hoe along with their accessories have been procured and the
plant operators are being recruited.
vi. On farm trainings and demonstrations on field agronomic practices are also ongoing with
close proximity to seed distributions.
vii. Twelve shed nets have been procured and distributed to the Sub counties. The sites in
each sub county include the following: Turkana Central-Nayuu, Turkana north-Kachoda,
Turkana west-Naduat, Loima-Lochorekuyen, Turkana South-Katilu and Turkana East-
Morulem and Elelea. They shall be utilized in the production of high value horticultural
crop production to improve nutrition, health and income to the communities targeted.
viii. Some irrigation schemes’ infrastructure is being laid down in Nadoto, Naoros and
successful prefeasibility study for Kakwanyang irrigation.
ix. Field extension visits and follow-ups to irrigation /farming sites in support of crop
production in the whole County is ongoing.
x. Formation of Turkana County steering committee of Agricultural Support Development
Support Programme (ASDSP) in March 2013.
xi. Launch of ASDSP in Turkana County at the Lodwar show grounds in July 2013.
xii. One workshop held to train and induct the County steering Committee on the program
activities in September.
xiii. Four meetings on program activities’ coordination held.
xiv. One workshop to assess the capacity of sector institutions held.
xv. Formation of county sector technical working group that identified value chains.
xvi. One Turkana County stakeholder forum established.
xvii. Identification and mapping of stakeholders and partners involved in natural resource
management and climate change activities in the county.
xviii. Formation of one NRM (Natural Resource Management) thematic work group.
xix. Formation of NRM (Natural resource Management) stakeholder’s forum.
xx. Identification and prioritization of value chains in the county. Formation of value chain
stakeholder’s forum.
xxi. Formation of value chain platform (one per value chain).
xxii. The Show ground water availability and accessibility project for horticultural production
of the vulnerable populations therein is under tendering process.
xxiii. Facilitated the increase of quality water through implementation nineteen new water
projects in the County.
xxiv. The department helped in drought mitigation through tinkering and tendering for drilling
of 58 boreholes, 7 pans and development of Eliye Springs.
Challenges
Late disbursement of funds, slow procurement process, Low staff: farmer ratio, unfavorable
weather conditions, lack of office space, pest and diseases, high cost of inputs, low soil fertility,
poor road infrastructure, poor marketing outlets, insufficient budgetary allocation.
For Turkana rehabilitation project the planed programs didn’t take off as a result of funding.
Major Services and Outputs to be provided in 2014/2015
Water Programme: Joint planning with stakeholders, Technical planning and design, Hydro-
geological Surveys, Water Permits, Rehabilitation of water supplies, Construction of Water
pans/dams, Drilling of boreholes, Equipping of boreholes, Construction of piped water supplies,
Upgrading of motorized water system to solar, Drought water related stress mitigation,
Construction of sewerage systems, Purchase of stand-by gensets, Training of water users
association and water services providers, Construction of new offices.
Irrigation and Schemes Development Programme: Feasibility studies for irrigation systems
development, Construction of two new irrigation schemes, Expansion of three existing irrigation
schemes, Rehabilitation of two existing irrigation schemes, and Construction of a model drip
irrigation system at Napuu aquifer.
Turkana Agriculture Programme: Farmers training, Establishment of farm demonstrations and
trials, Organising field days show and exhibitions, Construction of strategic ware house and
stores, Seminars and workshops, Promotion of drought tolerant crops, Promotion of shade net,
greenhouse technology & drip kits, Purchase of seeds and planting materials, Purchase of farm
tools and equipment, Purchase of pesticides, spraying equipment and safety gears, County
farmers training and resource center, Purchase of motor cycles, Purchase of Agricultural heavy
machinery
D. PROGRAMS AND THEIR OBJECTIVES
STRATEGIC OBJECTIVES
PROGRAMME SUB-PROGRAMME
Creating enabling environment and enhance institutional efficiency and effectiveness for agricultural and water development
P1 General administration, Planning and Support Services
SP1.1 General Administration, Planning and Support Services
To provide safe, adequate water for domestic and livestock
P2 Turkana Water Programme
SP 2.1 Joint planning with stakeholdersSP 2.2 Technical planning and designSP 2.4 Water PermitsSP 2.5 Rehabilitation of water suppliesSP 2.6 Construction of Water
pan per wardSP 2.7 Drilling and Equipping three boreholes per wardSP 2.8 Construction of piped water suppliesSP 2.9 Upgrading of motorized water system to solar SP 2.10 Purchase of two water BrowsersSP 2.11Drought water related stress mitigationSP 2.12Construction of sewerage systemsSP 2.13Purchase of stand-by gensetSP2.14 Training of water users association & water services providers
To improve food security and nutrition status
P3 Irrigation and Schemes Development Programme
SP 3.1 Feasibility studies for irrigation systems developmentSP 3.2 Construction of 2 new dry land irrigation schemes (Nadung’a and Lotikippi)SP 3.3 Expansion of 5 existing irrigation schemes (Lokubae, Katilu, Turkwel, Naoros, Elelea)SP 3.4 Rehabilitation of 5 existing irrigation schemes (Nanyee, Kolioroo, Kakwenyang, Namoruu, Morulem)SP 3.5 Construction of a model drip irrigation system at Napuu aquifer&Turkwell
To increase agricultural P4 Turkana Agriculture SP 4.1 Farmers training
productivity and outputs Programme SP 4.2 Establishment of farm demonstrations and trialsSP 4.3 Organising field days show and exhibitionsSP 4.4 Construction of strategic ware house and storesSP 4.5 Seminars and workshopsSP 4.6 Promotion of drought tolerant cropsSP 4.7 Promotion of shade net, greenhouse technology & drip kitsSP 4.8 Purchase of seeds and planting materialsSP 4.9 Purchase of farm tools and equipmentSP 4.10 Purchase of pesticides, spraying equipment and safety gearsSP 4.11 Purchase of motor cycles
To conserve soil and water for crop and livestock feeds production
P5 Turkana Rehabilitation Programme
SP 5.1 Construction of trapezoidal bunds, contours & micro catchmentSP 5.2 Construction of rock catchments (Lapur, Lokiriama, Songot, Riokomor, Lomelo, Kibish)SP5.3 Construction of Sand DamsSP 5.4 Pasture reseedingSP 5.5 Farmers capacity building
E. SUMMARY OF PROGRAMME OUTPUTS AND PERFORMANCE INDICATOR FOR 2014/2015-2016/2017
Programme: P1 General Administration, Planning and Support Services
Outcome: An enhanced institutional framework for efficient and effective service delivery
Sub-Programme: SP1.1 General Administration, Planning and Support Services
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Water services, Irrigation and Agriculture
Delivery of quality, effective and efficient services
Ability to achieve on agreed deliverables
100% 100% 100%
Programme: P2 Turkana Water Programme
Outcome: Improved access to safe, adequate water for domestic and livestock use within one kilometre of their homesteads
Sub-Programme: SP 2.1 Joint planning with stakeholders
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017Water services
Water stakeholder’s meeting
No. of joint consultative meeting held
12 12 12
Sub-Programme: SP 2.2 Technical planning and design
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017Water services
Accurate designs and realistic work plans developed
No. of designs prepared and timely completion of works as per designs
100% 100% 100%
Sub-Programme: SP 2.4 Water Permits
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Water services
Timely acquisition of water permits for major water works
No. of water permits acquired for major water works
100 150 200
Sub-Programme: SP2.5 Rehabilitation of water supplies
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Water services
Rehabilitated and functional water points
Reduced % in the number of non-functional water supplies
20% 30% 40%
Sub-Programme: SP 2.6 Construction of one Water pan ward
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Water services
Newly constructed water pans
No. of newly constructed water pans
30 30 30
Sub-Programme: SP 2.7 Drilling and equipping three boreholes per ward
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Water services
Access to clean potable water
No. of new boreholes
90 90 90
Sub-Programme: SP2.8 Construction of piped water supplies
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Water services
Increased water supply
No. of new piped water supplies
10 20 20
Sub-Programme: SP 2.9 Upgrading of motorized water system to solar
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Water services
Powered water supply
No. of newly establishedand functional solar system
4 20 20
Sub-Programme: SP 2.10 Purchase of two water Bowsers
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Water services
Boost supply of water
No of purchased water Bowsers
2 2 2
Sub-Programme: SP 2.11 Drought water related stress mitigation
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Water services
Effective and rapid response to drought water stress
Effectiveness and efficiency of drought contingency plan
40% 60% 80%
Sub-Programme: SP 2.12 Construction of sewerage systems
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Water services
Provision of Lodwar town sewerage system
Completed Lodwar town sewerage design and plan
1 1 1
Sub-Programme: SP 2.13 Purchase of stand-by gensets
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Water services
Installation of stand-by gensets
No. of newly installed stand-by gensets
2 2 2
Sub-Programme: SP 2.14 Training of water users association & water services providers
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Water services department
Capacity building of water users’
Improved management of water
50% 60% 80%
association and water services providers
supplies/points
Programme: P3 Irrigation and Schemes Development Programme
Outcome: Improved food security and nutrition status
Sub-Programme: SP 3.1 Feasibility studies for irrigation systems development
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Irrigation department
Accurate feasibility studies for planned irrigation system
Construction of water efficient irrigation systems
3 10 15
Sub-Programme: SP 3.2 Construction of 2 new irrigation schemes
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Irrigation department
Two new irrigation schemes completed and functioning
% increase in land under irrigation
2% 10% 20%
Sub-Programme: SP 3.3 Expansion of 3 existing irrigation schemes
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Irrigation department
Expansion of 3 existing irrigation schemes
% increase in land under irrigation
2% 10% 20%
Sub-Programme: SP3.4 Rehabilitation of 2 existing irrigation schemes
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Irrigation department
Rehabilitation of 2 existing irrigation schemes
% increase in agricultural productivity of land under irrigation
2% 10% 20%
Sub-Programme: SP3.5 Construction of a model drip irrigation system at Napuu aquifer and Turkwel
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Irrigation department
Establishment of model drip irrigation system
% increase in agricultural productivity of land under irrigation
2% 10% 20%
Programme: P4 Turkana Agriculture Programme
Outcome: To increase agricultural productivity and outputs
Sub-Programme: SP 4.1 Farmers training
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Agriculture department
Trained and empowered farmers
No. of trained and practising farmers
6000 12000 30000
Sub-Programme: SP 4.2 Establishment of farm demonstrations and trials
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Agriculture department
Demonstrations farms planted with trail crops/plants
No. of demonstration farms and successful trial crops ready for scaling up
2 7 14
Sub-Programme: SP 4.3 Organizing field days show and exhibitions
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Agriculture department
Field days and exhibitions
No. of successful field days and exhibitions
28 56 126
Sub-Programme: SP 4.4 Construction of strategic ware house and stores
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Agriculture department
Strategic warehouse and stores
Amount of harvested food crop properly stored in the warehouse
200,000 bags 600,000 bags 1,200,000 bags
Sub-Programme: SP 4.5 Seminars and workshops
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Agriculture department
Seminars and Workshops
No. of farmers who are practising good agronomy.
56 560 1260
Sub-Programme: SP 4.6 Promotion of drought tolerant crops
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Agriculture department
Increase in the adoption of drought tolerant crops
% increase in farmers harvest as result of adoption of drought crops
20% 40% 60%
Sub-Programme: SP 4.7 Promotion of shade net, greenhouse technology & drip kits
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Agriculture department
Shade nets, greenhouse technology and drip kits
% increase in crop harvest as a result of use of shade nets, greenhouse and drip kits
10% 20% 40%
Sub-Programme: SP 4.8 Purchase of seeds and planting materials
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Agriculture department
Certified seeds and planting materials
% increase in crop harvest as a result of use of certified seeds and planting materials
10% 20% 40%
Sub-Programme: SP 4.9 Purchase of farm tools and equipment
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Agriculture department
Provision of farm tools and equipment
% increase in in farm produce as a result of use of appropriate farm tools and
10% 20% 40%
equipment
Sub-Programme: SP 4.10 Purchase of pesticides, spraying equipment and safety gears
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Agriculture department
Provision of pesticides, spraying equipment and safety gears
% reduction in loss of crop harvest as a result of use of pesticides
10% 20% 40%
Sub-Programme: SP 4.12 Purchase of motor cycles
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Agriculture department
Purchase of motorcycles
Improved efficiency of farmers’ extension support
20% 40% 60%
PROGRAMME: P5 Turkana Rehabilitation Programme
OUTCOME: Sustainable use of land and environmental conservation
Sub-Programme: SP 5.1 Construction of trapezoidal bunds, contours & micro catchment
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Turkana Rehabilitation Programme/ department
Community built trapezoidal bunds,
%increase in reclaimed land
10% 20% 40%
contours and micro catchment
Sub-Programme: SP 5.2 Construction of rock catchments and sand dams
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Turkana Rehabilitation Programme/ department
Constructed rock catchments and sand dams
No. of water conservation structures established
16 30 30
Sub-Programme: SP 5.3 Sinking of shallow wells
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Turkana Rehabilitation Programme/ department
Sunk shallow wells
No. of shallow wells developed in agriculture potential areas
16 20 20
Sub-Programme: SP 5.4 Pasture reseeding
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Turkana Rehabilitation Programme/
Arable land under pasture
%increase in pasture land
10% 20%
department
Sub-Programme: SP 5.5 Farmers capacity building
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Turkana Rehabilitation Programme/ department
Farmers trained and practising good agronomy
%increase in no. of farmers practising good crop husbandry
10% 20% 40%
F. SUMMARY OF EXPENDITURE BY PROGRAMMES 2014/2015-2016/2017
PROGRAMMES PROJECTED ESTIMATES
2014/15 2015/2016 2016/2017P1 General Administration Planning and Support Services 160,153,249.78 176,168,575 193,785,432
SP 2.1 Joint planning with stakeholders 5,000,000.00 5,500,000 6,050,000SP 2.2 Technical planning and design 6,000,000.00 6,600,000 7,260,000SP 2.4 Water Permits 1,000,000.00 1,100,000 1,210,000SP 2.5 Rehabilitation of water supplies 20,000,000.00 22,000,000 24,200,000SP 2.6 Construction of one Water pan per ward 250,000,000.00 165,000,000 181,500,000SP 2.7 Drilling and Equiping three boreholes per ward 280,000,000.00 198,000,000 217,800,000
SP 2.8 Construction of piped water supplies 60,000,000.00 33,000,000 36,300,000SP 2.9 Upgrading of motorised water system to solar 10,000,000.00 11,000,000 12,100,000
SP2.10 Purchase of two water Bowsers 16,000,000.00SP 2.11Drought water related stress mitigation 4,000,000.00 4,400,000 4,840,000SP 2.12 Construction of sewerage systems 5,000,000.00 5,500,000 6,050,000SP 2.13 Purchase of stand-by genset 1,500,000.00 1,650,000 1,815,000
SP 2.14Training of water users association & water services providers 5,000,000.00 5,500,000 6,050,000
P2 Turkana Water Programme 663,500,000.00 476,850,000 524,535,000SP 3.1 Feasibility studies for irrigation systems development 5,000,000.00 5,500,000 6,050,000
SP3.2 Construction of 2 new dry land irrigation schemes( Nadung'a and Lotikippi) 80,000,000.00
88,000,000 96,800,000
SP3.3 Expansion of 5 existing irrigation schemes(Lokubae, Katilu, Turkwel, Naoros, Elelea) 50,000,000.00
55,000,000 60,500,000
SP3.4 Rehabilitation of 5 existing irrigation schemes(Nanyee, Kolioroo,Kakwenyang, Namoruu, Morulem) 25,000,000.00
27,500,000 30,250,000
SP3.5 Construction of a model drip irrigation system at Napuu aquifer &Turkwell 20,000,000.00
22,000,000 24,200,000
SP3.6 Construction Food Reserve Stores 20,000,000.00 30,000,000 35,000,000P3 Irrigation and Schemes Development Programme 200,000,000.00 198,000,000 217,800,000
SP 4.1 Farmers training 1,200,000.00 1,320,000 1,452,000SP 4.2 Establishment of farm demonstrations and trials 900,000.00 990,000 1,089,000
SP 4.3 Organising field days show and exhibitions 1,500,000.00 1,650,000 1,815,000SP 4.4 Construction of strategic ware house and stores 7,000,000.00 7,700,000 8,470,000
SP 4.5 Seminars and workshops 1,200,000.00 1,320,000 1,452,000SP 4.6 Promotion of drought tolerant crops 3,000,000.00 3,300,000 3,630,000SP 4.7 Promotion of shade net, greenhouse technology & drip kits 19,070,000.00 20,977,000 23,074,700
SP 4.8 Purchase of seeds and planting materials 20,000,000.00 22,000,000 24,200,000SP 4.8 Purchase of farm tools and equipment 10,000,000.00 11,000,000 12,100,000SP 4.9 Purchase of pesticides, spraying equipment and safety gears 5,000,000.00 5,500,000 6,050,000
SP 4.10 Purchase of motor cycles 1,200,000.00 1,320,000 1,452,000P4 Turkana Agriculture Programme 70,070,000.00 77,077,000 84,784,700SP 5.1 Construction of trapezoidal bunds, contours & micro catchment 1,000,000.00 1,100,000 1,210,000
SP5.2 Construction of rock catchments(Lapur, Lokiriama, Songot, Riokomor, Lomelo,Kibish) 16,000,000.00
17,600,000 19,360,000
SP5.3 Construction of Sand Dams 6,000,000.00 6,600,000 7,260,000SP 5.4 Pasture reseeding 7,000,000.00 7,700,000 8,470,000SP 5.5 Farmers capacity building 5,000,000.00 5,500,000 6,050,000P5 Turkana Rehabilitation Programme 35,000,000.00 38,500,000 42,350,000Total Expenditure Vote for WIA 1,128,723,249.78 966,595,575 1,063,255,132
DEPARTMENT OF HEALTH AND SANITATION
A. VISION: A healthy and productive county
B. MISSION: To deliberately build progressive, responsive and sustainable technologically-driven, evidence-based and client-centered health system for accelerated attainment of highest standard of health to all turkana residents.
C. STRATEGIC OVERVIEW AND CONTEXT FOR BUDGET INTERVENTION
The sector will implement the following strategic objectives;
1. Eliminate communicable conditions: This it aims to achieve by forcing down the burden of communicable diseases, till they are not of major public health concern. this will be addressed through health education and health promotion on communicable diseases, immunization, improved child health, screening for communicable conditions, strengthened antenatal care, prevention of mother to child HIV transmission, integrated vector management, good sanitation and hygiene practices, HIV and STI prevention strengthened of e-MTCT programming, early
surveillance case detection and strengthening of laboratory early detection and sample referrals and treatments
2. Halt, and reverse the rising burden of non-communicable conditions. This it aims to achieve by ensuring clear strategies for implementation to address all the identified non-communicable conditions in the country. This will be achieved through health promotion & education for Ncd’s, promotion of healthy life styles and diets, institutional screening for Ncd’s rehabilitation, workplace health &safety , food quality & safety,
3. Reduce the burden of violence and injuries. This it aims to achieve by directly putting in place strategies that address each of the causes of injuries and violence at the time. This will be achieved through: health promotion and education on violence / injuries e.g., pre hospital care, opd/accident and emergency, management for injuries, and rehabilitation.
4. Provide essential health care.These shall be medical services that are affordable, equitable, accessible and responsive to client needs. to be achieved through implementation of high impact nutrition intervention, integrated mch / family planning services implementation of maternity and newborn services, reproductive health, emergency services and specialized care, improvement of the referral hospital,, upgrading and establishment of sub-county hospitals and health center, implementation of comprehensive youth friendly services
5. Minimize exposure to health risk factors. This it aims to achieve by strengthening the health promoting interventions, which address risk factors to health, plus facilitating use of products and services that lead to healthy behaviors in the population. This will be achieved through health promotion including health education, sexual education, substance abuse, micronutrient deficiency control, provision of water, sanitation and hygiene services, maternal and infant and young child feeding, active case finding and referral and physical activity
6. Strengthen collaboration with health related sectors.This it aims to achieve by adopting a ‘health in all policies’ approach, which ensures the health sector interacts with and influences design implementation and monitoring processes in all health related sector actions. Key strategies will be multi sectoral planning implementation, monitoring and evaluation, networking, capacity building for health related forums, and enacting of partner legal framework (Coc Paris declaration)
MAJOR ACHIEVEMENTS FOR THE PERIOD UNDER REVIEW.
I. Health infrastructure
i. On-going Upgrading of 35 Health facilities in the entire County
ii. Tendering for the Mortuary, Laundry, Oxygen plant and general repairs of the
Lodwar district hospital
iii. Tendering for the commodity warehouse
iv. Equipping the SCMOHs officer with furniture
v. Supply of 17 motorbikes with support from partners
vi. 2 utility vehicles from WHO to strengthen outreach services
vii. 3 ambulances from partners
viii. 4 ambulances already procured by the county for distribution to the sub-counties
ix. Expansion of a modern maternity unit at the Lodwar District Hospital
x. 1 Gene expert machine with partners’ support
xi. Assorted medical equipment support from the Islamic Centre Team
xii. Repair of three vehicles for, Lokitaung, Kibish and Lopiding
xiii. Servicing and maintenance of all the Ministry’s vehicles
II. Work force
i. Conferences attendance by the senior management
ii. Support for the quarterly health technical review meetings and regional review
meetings.
iii. Support on the World Malaria Day, Disability, TB and the World Aids Day
iv. National HTC New Algorithm trainings for two classes
v. Capacity building and refresher trainings for the Health workers in partnership with
of partners
vi. County Health workers party celebration
III. Health Commodities
i. Supply of drugs and Non-pharmaceuticals to all facilities in the County i.e. (GOK
and Faith based organization)
ii. Supply of solar Fridges to all facilities in the county in partnership with health
partners
iii. Laboratory reagents
IV. Health information
i. Supply of computers/Laptops/printers/photocopiers machines and stationery across
the county
ii. Electronic Medical records/ DHISTrainings for the facility in charges, DHMTs and
the CHMTS
V. Health financing
i. Support to the County and the Sub County Health mgt teams with fuel and support
supervision
ii. Officers attended an international training on performance based financing (PBF)
VI. Health management
i. Constitution of the CHMTs and the SCHMTs and formation of the Technical
Working Groups
ii. 4 Deputy Directors competitively recruited by the County Public Service Board
iii. Capacity building of the senior staff on the Senior Management Course and Strategic
Leadership Development Programme
VII. Inter-sectoral collaboration
i. Provision of sanitation facilities in schools, Health facilities and communities with
UNICEF
ii. Formation of a coordinating agency on WASH activities
iii. School deworming programmessectoral work
CHALLENGES
i. Limited supply of essential commodities like pharmaceuticals, non-pharmaceuticals,
laboratory reagents and related logistics/ consumables and equipment, x-ray , theatre
and other departments essential equipment’, vaccines, cold chain-fridges and storage
facilities.
ii. Inadequate human resources for health due to previous understaffing County gap, due
to a high staff turnover attributed to limited financial resources and non-availability
of staff retention schemes
iii. Inadequate health infrastructure comprising of only one referral hospitals which is not
in tandem with the approved standards and norms, few facilities that do not conform
with the required standards, limited mortuary, dilapidated health infrastructure, and
non-availability of essential utility services in most health facilities.
iv. Unsatisfactory service delivery of essential programmes like; Hiv/Aids And TB,
Laboratory, MCH/Family Planning, Eye/ENT, Nutrition, Reproductive Health,
Psychiatry, Immunization, Dental Care, Ambulatory Service and, Blood Transfusion
Services
v. Unsafe hygiene and sanitation practices compounded by low latrine coverage and use,
unsafe food hygiene practices, poor water quality practices, unsafe rural and urban
waste management and effluent control mechanisms.
vi. Poor health information management system exacerbated by poor reporting and
recording, poor archiving, unavailability of information, technology infrastructure
and services and monitoring and evaluation systems
vii. Inadequate disaster response preparedness and response planning, implementation,
monitoring and evaluation due to limited capacity building initiatives, limited
contingency planning and stocks, limited logistical support and lack of contingency
funds.
viii. Limited research and development operational research capacity
MAJOR SERVICES AND OUTPUTS TO BE PROVIDED IN 2014/2015
Amongst the services to be provided are
i. To improve the medical transport system.
ii. To Halt, Reverse and Eliminate communicable conditions
iii. To improve Health Infrastructure
iv. To improve in storage and supply of health supplies.
v. To enhance sub-counties public communication systems.
vi. To enhance service delivery
D. PROGRAMS AND THEIR OBJECTIVES
STRATEGIC
OBJECTIVES
PROGRAMME SUB PROGRAMME
Create an enabling
environment and enhance
institutional efficiency and
effectiveness
P1 General
Administration,
Planning and
Support Services
SP1.1 General Administration and
Support Services
To Improve Health Infrastructure
P2 Health
facilities
upgrading,
renovations and
maintenance
P2.1 Inpatient blocks, equipment,
fencing, gate, surveying, power
connectivity, water, toilets, staff
quarters, incinerator
P2.2 Lodwar County Hospital upgrading
P2.3 Lorugum, Elelea, Lokichar,
Lokitaung and Lopiding upgrading
P2.4 Construction and equipping 2
dispensaries per ward
To Improve the medical transport system.
P3 Health Utility
Vehicles
Improvement
Programme
SP3.1 Utility vehicles(2)
SP3.2 Motorcycles (15)
SP3.3 Bicycles (100) for CHWs
SP3.4 Communication gadgets for
ambulances
SP3.5 Lorry (For pharmaceutical and
non-pharms)
To enhance service delivery P4Provision of
office space
SP4.1 Construction of county health
administrative office block
To Improve in storage and supply of health supplies.
P5 County Health
Supply System
SP5.1 Construction of a central
commodity store/warehouse
To enhance sub-counties public communication systems.
P6 Sub-Counties
Public
Communication
Programme
SP6.1 Purchase of public address systems for 7 sub-counties
To Halt, Reverse and Eliminate communicable conditions
P2 Support to
Health Programs
SP7.1 HMIS support including printing
of tools
SP7.2 HIV & AIDS including
community based HIV interventions
SP7.3 TB & Leprosy
SP7.4 Malaria
SP7.5 NTDs(neglected tropical diseases)
SP7.6 Nutrition
SP7.7 Reproductive health
SP7.8 Disease surveillance
SP7.9 EPI/outreaches
SP7.10 Community strategy
SP7.11 Health promotion
SP7.12 Environmental health services
SP7.13 Emergency preparedness &
disaster response
SP7.14 Laboratory supplies and support
SP7.15 Rehabilitation and disability
mainstreaming
SP7.16 Mental health
SP7.17 Alcoholism and drug abuse
management
EP7.18 Dental Care
SP7.19ENT care
SP7.20 Quality Assurance
E. SUMMARY OF PROGRAMME OUTPUTS AND PERFORMANCE INDICATORS FOR 2014/2015- 2016/2017
Programme: P1 General Administration, Planning and Support Services
Outcome: An enhanced institutional framework for efficient and effective service delivery
Sub Programme: SP1.1 General Administration and Support Services
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health Delivery of quality, effective and efficient services
Ability to achieve on agreed deliverables
100% 100% 100%
Programme: P2 Health facilities
Outcome: To improve health Infrastructure
Sub Programme: SP2.1 Inpatient blocks, equipment, fencing, gate, surveying, power connectivity, water, toilets, staff quarters, incinerator
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health To improve health infrastructure
% of funds utilized in health infrastructure
100% 100% 100%
Sub Programme: SP2.2 Lodwar County Hospital Upgrading
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health To improve LDH health infrastructure
% of funds utilized in improving LDH health infrastructure
100% 100% 100%
Sub Programme: SP2.3 Lorugum, Elelea, Lokichar, Lokitaung and Lopiding Hospital Upgrading
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health To improve Lokitaung health infrastructure
% of funds utilized in improving Lokitaung health infrastructure
100% 100% 100%
Sub Programme:SP2.4 Construction and equipping 2 dispensaries per ward
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health To maintain health infrastructure
No. of dispensaries constructed per ward
2 2 2
Programme: P3 Health Utility Improvement Programme
Outcome: To Improve the medical transport system
Sub Programme: SP3.1 Utility Vehicles (2)
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health To Improve the medical transport system
No. of utility vehicles procured
2 - -
Sub Programme: SP3.2 Motorcycles (15)
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health To Improve the medical transport system
No. of motorcycles procured
15 - -
Sub Programme: SP3.3 Bicycles (100) for CHWs
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health To Improve the medical transport system
No. of Bicycles procured
100 - -
Sub Programme: SP3.4 Communication gadgets for ambulances
Delivery Unit
Key Output(KO)
Key Performance Indicators(KP
Targets
2014/2015 2015/2016 2016/2017
Is)Health To Improve the
medical transport system
No. of communication gadgets fitted
500 500 500
Sub Programme: SP3.5 Lorry (For pharmaceutical and non pharms)
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health To Improve the medical transport system
Lorry procured 1 - -
Programme: P4 Provision of office space
Outcome: Effective service delivery and administrative work
Sub Programme: SP5.1 Construction of a county health administrative office block
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health Effective service delivery and administrative work
County health administrative office block
1 - -
Programme: P5 County Health Supply System
Outcome: To improve storage and supply of health supplies
Sub Programme: SP5.1 Construction of a central commodity store/warehouse
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health Construction of a central commodity
Central warehouse in place
1 - -
store/warehouse
Programme: P6 Sub-Counties Public Communications Programme
Outcome: To enhance sub-counties public communication systems
Sub Programme: SP6.1 Purchase of public address systems
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health Effective and timely communication
Public address systems purchased
7 - -
Programme: P7 Support to Health Programs
Outcome: To Halt, Reverse and Eliminate communicable conditions
Sub Programme: SP7.1 HMIS support including printing of tools
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health Strengthen the health, nutrition and wash surveillance, monitoring and evaluation systems
% of facilities submitting timely, complete and accurate information
70% 80% 90%
Sub Programme: SP7.2 HIV & AIDS including community based HIV interventions
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health To prevent HIV and STI
% of population
20% 40% 70%
infectionsProvide quality services to improve quality of life
undergoing HIV test and cancelling; No of TB patient screened for HIVno of HIV+ clients enrolled in care
2841
2726
3400
3450
4200
3842% of HIV exposed infants tested at 6 weeks
60% 70% 80%
Sub Programme: SP7.3 TB & Leprosy
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health To reduce TB and Leprosy prevalence
TB cure rate 80 90 95
No. of TB and Leprosy patients screened and undergoing treatment
2842 3840 4850
Sub Programme: SP7.4 Malaria
Delivery Unit
Key Output( KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health To reduce malaria the spread of malaria, morbidity and mortality
% Decrease in morbidity and mortality rates
30% 20% 10%
Sub Programme: SP7.5 NTDs – Neglected Tropical Diseases
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health To reduce prevalence and mortality of NTDs
% Decrease in prevalence and mortality of NTDs and related illnesses
5% 3% 2%
Sub Programme: SP7.6 Nutrition
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health Proper High Impact Nutrition Interventions
GAM rates 20% 15% 10%
Sub Programme: SP7.7 Reproductive Health
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health To safeguard and improve the reproductive health of the populace
Percentage reduction in maternal mortalities and contraceptive uptake
10% 15% 20%
Sub Programme: SP7.8 Disease surveillance
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health To monitor threats and diseases and to
Disease surveillance Reports
4 4 4
plan and respond to outbreaks
Sub Programme: SP7.9 EPI/Outreaches
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health To reduce morbidity, diseases and increased hard immunity
% of population immunized
70% 80% 90%
Sub Programme: SP7.10 Community Strategy
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health To increase health involvement of community inordertp provide real time information
Monthly reports, No. of community dialogue days
12 12 12
Sub Programme: SP7.11 Health Promotion
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health Ensuring Proportion of 40% 60% 80%
population is reached with key health messages
proportion aware of key health messages
Sub Programme: SP7.12 Environmental Health Services
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health To ensure quality environmental health services
No. of Environmental Health Reports
4 4 4
Sub Programme: SP7.13 Emergency preparedness & disaster response
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health Improved Disaster Management
Amount of funds allocated for emergency fund
20M 22M 24M
Sub Programme: SP7.14 Laboratory supplies and support
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health To procure lab equipment and reagents
% of funds absorbed in purchasing lab supplies
100% 100% 100%
Sub Programme: SP7.15 Rehabilitation and Disability mainstreaming
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health To support with people living with disability
No. of people supported
1500 3000 5000
Sub Programme: SP7.16 Mental Health Care
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health To rehabilitate, manage and contain people with mental illness and early detection
No. of people enrolled in Programme
50 150 450
Sub Programme: SP7.17 Alcoholism and drug abuse management
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health Reduced effects of alcoholism and drug abuse
Amount of funds allocated for the programme
50M 55M 60M
Sub Programme: SP7.18 Dental Care
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health Improved dental health in the county
Proportion of people with dental problems accessing
60% 80% 95%
dental care.
Sub Programme: SP7.19 ENT care
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health Improved ENT health in Turkana County
Amount of funds allocated
5M 5.5M 6M
Sub Programme: SP7.20 Quality Assurance
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Health To ensure standards and norms are adhered to
Data Quality Audit Reports
28 28 28
F: SUMMARY OF EXPENDITURE BY PROGRAMMES 2014/2015-2016/2017
Programmes Projected Estimates2014/2015 2015/2016 2016/2017
SP1.1 General Administration and Support Services 915,751,246.62P1 General Administration, Planning and Support Services 915,751,246.62 1,007,326,371 1,108,059,008
SP2.1 Inpatient blocks, equipments, fencing,gate, surveying,power connectivity, water, toilets, staff quarters, incinerator for all the recently constructed dispensaries in all wards
210,000,000.00 231,000,000 254,100,000
SP2.2 Lodwar County Hospital upgrading 170,000,000.00 187,000,000 205,700,000SP2.3 Lorugum, Elelea, Lokichar, Lokitaung and Lopiding Upgrading 100,000,000.00 110,000,000 121,000,000
SP2.4 Construction and equipping 2 dispensaries per ward 484,177,434.00 532,595,177 585,854,695
P2 Health Facilities 964,177,434.00 1,060,595,177 1,166,654,695SP3.1 Utility vehicles(2) 12,000,000.00 13,200,000 14,520,000SP3.2 Motorcycles(15) 4,500,000.00 4,950,000 5,445,000SP3.3 Bicycles(100) for CHWs 1,500,000.00 1,650,000 1,815,000SP3.4 Communication gadgets for 2,000,000.00 2,200,000 2,420,000
ambulancesSP3.5 Lorry( For pharmaceutical and non pharms) 8,000,000.00 8,800,000 9,680,000
P3 Health Utility Improvement Programme 28,000,000.00 30,800,000 33,880,000
SP4.1 Construction of county health adminstrative office block 39,808,110.00 43,788,921 48,167,813
P4 Provision of office space 39,808,110.00 43,788,921 48,167,813SP5.1 Construction of a central commodity store/warehouse 15,000,000.00 16,500,000 18,150,000
P5 County Health Supply System 15,000,000.00 16,500,000 18,150,000SP6.1 Purchase of public address systems for 7 sub-counties 1,050,000.00 1,155,000 1,270,500
P6 Sub-Counties Public Communications Programme 1,050,000.00 1,155,000 1,270,500
SP7.1 HMIS support including printing of tools
5,000,000.00 5,500,000 6,050,000
SP7.2 HIV & AIDS including community based HIV interventions
15,443,600.00 16,987,960 18,686,756
SP7.3 TB & Leprosy 10,032,456.00 11,035,702 12,139,272SP7.4 Malaria 8,000,000.00 8,800,000 9,680,000SP7.5 NTDs(neglected tropical diseases) 5,000,000.00 5,500,000 6,050,000SP7.6 Nutrition 15,000,000.00 16,500,000 18,150,000SP7.7 Reproductive health 5,000,000.00 5,500,000 6,050,000SP7.8 Disease surveillance 5,000,000.00 5,500,000 6,050,000SP7.9 EPI/outreaches 10,000,000.00 11,000,000 12,100,000SP7.10 Community strategy 10,000,000.00 11,000,000 12,100,000SP7.11 Health promotion 5,000,000.00 5,500,000 6,050,000SP7.12 Environmental health services 5,000,000.00 5,500,000 6,050,000SP7.13 Emergency preparedness &diseaster response
20,000,000.00 22,000,000 24,200,000
SP7.14 Labaratory supplies and support 20,000,000.00 22,000,000 24,200,000SP7.15 Rehabilitation and disability mainstreaming
4,000,000.00 4,400,000 4,840,000
SP7.16 Mental Health Care 3,000,000.00 3,300,000 3,630,000SP7.17 Alcoholism and drug abuse management
5,000,000.00 5,500,000 6,050,000
SP7.18 Dental Care 5,000,000.00 5,500,000 6,050,000SP7.19 ENT care 5,000,000.00 5,500,000 6,050,000SP7.20 Quality Assuarance 2,000,000.00 2,200,000 2,420,000P7 Support to Health Programmes 162,476,056.00 178,723,662 196,596,028Total Expenditure Vote for Health 2,126,262,846.62 2,338,889,131 2,572,778,044
TOURISM, TRADE & INDUSTRIALIZATION
A. Vision:
To make Turkana County the most preferred global tourist & investment destination
with a socio-economically empowered populace arising from a robust mix of wealth
generating commercial and industrial enterprises operating in a free, fair and
responsible business environment.
B. Mission:
To promote, coordinate and facilitate tourism stakeholder engagement and
development, Support the identification, protection and preservation of all tourist and
cultural sites and strategically deploy a sustainable global marketing and promotion
campaign. To champion the growth, development and financing of sustainable Small
and Medium-size Enterprises (SMEs) and a vibrant, value-adding and profitable
Cooperative Societies network. Promoting fair trading practices by use of accurate
weighing and measuring equipment and provide high quality progressive business
development and training services.
C. Strategic Overview and Context for Budget Intervention:
The department will implement the following strategic objectives:
i. To improve socio-economic living standards of the people of Turkana County.
ii. To attract, retain and continuously increase the number of tourists visiting Turkana
County’s tourist and cultural attractions.
iii. To establish and empower Turkana County Tourism and Cultural Association to help
coordinate stakeholder engagements.
iv. To strengthen and facilitate the integration of culture and the arts into tourism.
v. To continuously increase multi-media marketing and promotion campaigns of Turkana
Tourism and Cultural products.
vi. To champion and increase public awareness on economic benefits of tourism and tourism
attraction sites across the county.
vii. To enhance the socio-economic growth, development and general emancipation of the
Turkana people.
viii. To develop and manage modern county markets to facilitate access and sale of fresh
produce and promotion of trade services.
ix. To facilitate the increase of investors into Turkana County by formulating supportive
legislative framework for their businesses.
x. To increase the number of performing Cooperative societies by offering financial and
technical support and widen the membership base.
xi. To increase access to management and leadership training for Cooperative movements’
leaders and members.
xii. To increase the number of businesses and traders accessing quality legal metrology
services (verification and inspection of weighing and measuring equipment).
xiii. To enhance capacity building of traders and businesses through provision of business
development and training services.
xiv. To increase the number of licensed businesses and promotion of free and fair trading
practices across the county to guarantee consumer protection by uniformly enforcing
relevant legislation.
xv. To increase the number of public private partnership in establishing industrial projects
and concerns to spur greater economic growth and development across the county.
xvi. To gather, collate and consolidate business opportunities and information intelligence
across the county and make this easily available to potential investors.
xvii. To facilitate trade and investment fairs, exhibitions and Expos locally, regionally and
internationally and coordinating stakeholders strategic linkages.
Major achievements for the period under review
i. Multi-media marketing and promotion campaigns: Participating in Miss Tourism
National finals at Mombasa and International Tourism Expo in Berlin, Germany.
ii. Formation of Turkana Tourism and Cultural Association (TTCA) after organizing
stakeholders’ forum.
iii. Public Education and Awareness Campaigns on Conservation and protection of Tourism
attractions across the county
iv. Documenting, research, website development, designing and printing of brochures for
Turkana Tourism department.
v. Construction of Eco-tourism hotels
vi. Generating the Turkana County Alcoholic Drinks Control Bill 2014 after wider public
participation across the county
vii. Business Development and Training Services
viii. Inspection and verification of Weighing and Measuring Equipment and acquisition of
basic standards and tools.
ix. Construction of Market Stalls
x. Community sensitization and mobilization on the value of the cooperative movement
xi. Capacity building of members: members’ education and registration.
xii. Revival meetings and election of new officials by cooperatives along River Turkwell in
Turkana South.
Challenges
Inadequate technical staff, slower procurement process, late disbursement of funds, inadequate
office space, Unavailability of vehicles to facilitate field operations, very low budget allocation
in the FY 2012/2013.
Major services and outputs to be provided in 2014/2015
Development of policy and master plans, Capacity building programmes, Multi-media
marketing, promotion and publicity campaigns, Business Development and training services,
Cooperative development funds and SME Credit financing, Construction of Turkana Business
and Conference Centre, Construction of modern physical market structures in Sub-counties.
Construction of weighbridges and completion of the construction of Eco-tourism hotels,
Initiatingflagship projects (Turkwood films projects, Home of mankind safaris) and supporting
value addition industries (Kakuma Milk Cooling/processing, Kalokol Fish Factory, Lomidat
Meat Processing Factory, Loima Aloe-Vera Processing plant, Katilu grain millers and Eliye
Springs Water bottling plant).
D. Programs and their objectives
STRATEGIC OBJECTIVES PROGRAMME SUB PROGRAMME
Create an enabling environment and
enhance institutional efficiency and
effectiveness
P1 General
Administration,
Planning and
Support Services
SP1.1 General Administration
and Support Services
To improve the socio-economic living standards of the people of Turkana County.
P2 SMEs and
Economic
Empowerment
Programme
SP2.1 SMEs Credit Scheme at
ward level
SP2.2 Capacity Building
Workshops
P3 Cooperative
Societies
Development &
Performance
Improvement
Programme
SP3.1 Cooperatives
Development Fund
SP3.2 Value Addition
Initiatives
SP3.3 Business Development
and Training Services
To develop and manage modern county markets to facilitate access and sale of fresh produce and promotion of trade services.
P4 Modern
Physical Markets
Infrastructure
SP4.1 Construction and
Development of Modern
Physical Market Infrastructure
in Sub-Counties
To gather, collate and consolidate business opportunities and information intelligence across the county and make this easily available to potential investors.
P5 Turkana
Business
Marketing
Programme
SP5.1 Construction and
Equipping of Turkana Business
and Conference Centre
SP5.2 Trade Fairs and
Exhibitions
SP5.3 Media and Publicity
Campaigns
SP5.4 Investment Forums
To attract, retain and continuously increase the number of tourists visiting Turkana County’s tourist and cultural attractions.
P6 Tourism and
Cultural Products
Development
Programme.
SP6.1 Turkwood Films ProjectSP6.2 Tourist Attractions Mapping & DevelopmentSP6.3 Home of Mankind Safaris SP6.4 Eco -Tourist Hotel
To increase the number of licensed businesses
P7 Advisory and
Licensing
SP7.1 Sectoral Advisory
Councils
SP7.2 Alcoholic Licensing
Directorate Funding
E. SUMMARY OF PROGRAMME OUTPUTS AND PERFORMANCE INDICATORS FOR 2014/2015- 2016/2017
Programme: P1 General Administration, Planning and Support Services
Outcome: An enhanced institutional framework for efficient and effective service delivery
Sub Programme: SP1.1 General Administration and Support Services
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Trade, Industrialization & Enterprise Development Department
Delivery of quality, effective and efficient services
Ability to achieve on agreed deliverables
Programme: P2 SMEs and Economic Empowerment Programme
Outcome: Increased number of successful Small and Medium Enterprises accessing affordable credit financing
Sub Programme:SP2.1 SMEs Credit Scheme
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Trade, Industrialization & Enterprise Development Department
Shorter Loan Processing cycle
Number and scale of loans accessed
Sub Programme:SP2.2 Capacity Building Workshops
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Trade, Industrialization & Enterprise Development Department
An informed business community
Number of business people trained;Number of trainings/workshops held
Programme: P3 Cooperative Societies Development & Performance Improvement Programme
Outcome: Increased number of economically viable/performing Cooperative Societies
Sub Programme:SP3.1 Cooperatives Development Fund
Delivery Key Key Targets
Unit Output(KO) Performance Indicators(KPIs)
2014/2015 2015/2016 2016/2017
Cooperatives Development Department
More cooperative societies accessing funds
Number of cooperative societies accessing funds
Sub Programme:SP3.2 Value Addition Initiatives
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Cooperatives Development Department
Improved quality of products/High value products
Types of high value products produced/ Number of high value products
Sub Programme:SP3.3 Business Development and Training Services
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Enterprise Development Department
Increased successful businesses
Number of successful businesses
Programme: P4 Modern Physical Markets Infrastructure
Outcome: Increased number of traders conducting business under modern market structures.
Sub Programme:SP4.1Construction and Development of Modern Physical Market
Infrastructure in Sub-Counties
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Trade Department
Modern market structures in all Sub-counties
Increased sales from businesses
Number of Sub Counties with Mordern MarketsVolumes of sales
Programme: P5 Turkana Business Marketing Programme
Outcome: Improved promotion and marketing of businesses in Turkana
Sub Programme:SP5.1 Construction and Equipping of Turkana Business and Conference
Centre
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Trade, Industrialization & Enterprise Development Dept
Turkana Business & Conference Centre
Construction completion reports, handover
Sub Programme:SP5.2 Trade Fairs and Exhibitions
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Trade, Industrialization & Enterprise Development Dept
Improved trade through Trade Fairs and Exhibitions
Number of Trade Fairs and Exhibitions held
Sub Programme:SP5.3 Media and Publicity Campaigns
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Trade, Industrializati
Improved marketing and
Number and types of
on & Enterprise Development Dept
awareness promotional messages sent out;Volumes of audience reached
Sub Programme:SP5.4 Investment Forums
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Trade, Industrialization & Enterprise Development Dept
Increased investment ventures
Informed investment community
Number of investment enterprises established
Number of investment forums held
Programme: P6 Tourism and Cultural Products Development Programme.
Outcome: Increased Turkana Tourism & Cultural Products and Tourist facilities in the County
Sub Programme:SP6.1 Turkwood Films Project
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Tourism department
Enhanced film industry
MOUs signed with partners in film industry;Number of films produced
Sub Programme:SP6.2 Tourist Attractions Mapping & DevelopmentDelivery Unit
Key Output(KO)
Key Performance Indicators(KP
Targets
2014/2015 2015/2016 2016/2017
Is)Tourism department
Increased earnings from tourism
Number of tourist arrivals
Sub Programme:SP6.3 Home of Mankind SafarisDelivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Tourism department
Increased earnings from tourism
Number of tourist arrivals
Sub Programme:SP6.4 Eco -Tourist HotelDelivery Unit
Key Output(KO) Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Tourism department
Increased earnings from tourism
Number of bed occupancy
Programme: P7 Advisory and Licensing
Outcome: Increased number of businesses licensed
Sub Programme:SP7.1 Sectoral Advisory Councils
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Weights and Measures Department
Stakeholder fora, public education initiatives
Protected consumer base
Sub Programme:SP7.2 Alcoholic Licensing Directorate Funding
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Weights and Enhanced Licenses
Measures Department
licensing of businesses
issued
F: SUMMARY OF EXPENDITURE BY PROGRAMMES 2014/2015-2016/2017
ProgrammesProjected Estimates
2014/2015 2015/2016 2016/2017SP1.1 General Administration and Support Services 123,747,350.00 128,697,085.00 141,566,793.5
0P1 General Administration, Planning and Support Services 123,747,350.00 136,122,085.00 149,734,293.5
0SP2.1 SMEs Credit Scheme at ward level 60,000,000.00 66,000,000.00 72,600,000.00SP2.2 Capacity Building Workshops 7,000,000.00 7,700,000.00 8,470,000.00P2 SMEs and Economic Empowerment Programme 67,000,000.00 73,700,000.00 81,070,000.00
SP3.1 Cooperatives Development Fund 30,000,000.00 33,000,000.00 36,300,000.00SP3.2 Value Addition Initiatives 5,000,000.00 5,500,000.00 6,050,000.00SP3.3 Business Development and Training Services 5,000,000.00 5,500,000.00 6,050,000.00
P3 Cooperative Societies Development & Performance Improvement Programme 40,000,000.00 44,000,000.00 48,400,000.00
SP4.1Construction and Development of Modern Physical Market Infrastructure in Sub-Counties 80,000,000.00 66,000,000.00 72,600,000.00
P4 Modern Physical Markets Infrastructure 80,000,000.00 66,000,000.00 72,600,000.00
SP5.1 Construction and Equipping of Turkana Business and Conference Centre 31,000,000.00 34,100,000.00 37,510,000.00
SP5.2 Trade Fairs and Exhibitions 9,000,000.00 9,900,000.00 10,890,000.00SP5.3 Media and Publicity Campaigns 5,000,000.00 5,500,000.00 6,050,000.00SP5.4 Investment Forums 10,000,000.00 11,000,000.00 12,100,000.00P5 Turkana Business Marketing Programme 55,000,000.00 60,500,000.00 66,550,000.00SP6.1 Turkwood Films Project 1,250,000.00 1,375,000.00 1,512,500.00SP6.2 Tourist Attractions Mapping & Development and Tourism Promotional (Water sports, Camel Derby, etc)
7,000,000.00 7,700,000.00 8,470,000.00
SP6.3 Home of Mankind Safaris 10,000,000.00 11,000,000.00 12,100,000.00SP6.4 Eco -Tourist Hotel 140,000,000.00 44,000,000.00 48,400,000.00P6 Tourism and Cultural Products Development Programme. 158,250,000.00 64,075,000.00 70,482,500.00
SP7.1 Sectoral Advisory Councils 750,000.00 825,000.00 907,500.00SP7.2 Alcoholic Licensing Directorate Funding 5,000,000.00 5,500,000.00 6,050,000.00P7 Advisory and Licensing 5,750,000.00 6,325,000.00 6,957,500.00Total Expenditure Vote for Trade, Tourism and Industry 529,747,350.00 450,722,085.00 495,794,293.5
0
EDUCATION, HUMAN RESOURCE, CULTURE AND SOCIAL DEVELOPMENT
A. Vision:
A county with a nationally competitive quality education and training with sustainable and
equitable socio-cultural and economic empowerment towards county’s sustainable development.
B. Mission:
To provide, promote and coordinate quality education, through responsive policies and strategies for sustained and balanced socio-cultural, economic development and empowerment of vulnerable and marginalised groups in the county.
C. Strategic Overview and Context for Budget Intervention:
The sector will implement the following strategic objectives:
i. Create enabling environment and enhance institutional efficiency and effectiveness for
education, human resource, culture and social development
ii. Increase access to education at all levels
iii. Enhance efficiency and effectiveness in service delivery
iv. Enhance social protection development
v. Promote cultural values and initiatives
Major achievements for the period under review
The sector has facilitated the assessment and construction of ECDE centers. ECDE teachers Interviews, recruitments and deployment have been conducted together with polytechnic instructors. Supported the renovations and equipping of youth polytechnics. Facilitatedthe establishment of PWDs using sub-county leadership structures.The sector facilitated the disbursement of educational bursary to college, universities, secondary and vocational trainings. It facilitated the establishment of the county executive offices
Challenges included;
Lack of office space, slow procurement processes, difficult terrains that delayed the construction
of some of the ECDE centers.
Some of the activities in the departments had not been factored during the last financial year
which led to constraints in the implementation of some of the crucial departmental programmes
and activities.
Major services and outputs to be provided in 2014/2015
During the period under review the following programmes/activities have been prioritized;
Equipping of the existing and construction of new ECDE centers, recruitment of more ECDE
teachers and youth polytechnic instructors, children’s rescue center, rehabilitation center for
persons with disabilities, establishments of a public university.
Establishment of modern library/archives and modern sports stadia.
Upgrading of the existing resource center to be an ECDE teachers training center.
D. Programs and their objectives
STRATEGIC OBJECTIVES PROGRAMME SUB PROGRAMME
Create enabling environment and
enhance institutional efficiency
and effectiveness for education,
human resource, culture and social
development
P1 General
Administration,
Planning and
Support Services
P1.1 General Administration, Planning and Support Services
Increase access to education at all P2 Access to SP2.1 Equipping and Furnishing
levels Education for All Existing ECDE centers
SP2.2 Constructing and equipping 2
ECD centresper ward
SP2.3 Renovation and Refurbishing
County DICECE College
SP2.4 Preliminary works for
establishment of a public university in
Turkana County
SP2.5 Provision of Educational,
Instructional and Learning materials
SP2.6 ECD Feeding Programme in all
wards
SP2.7 Refurbishing and Equipping
Village Polytechnics(Kaaleng, Lokori,
Kakuma, Kalokol and Loyopo)
SP2.8 Establishment of youth
polytechnics(Lorugum, Kataboi and
Lokichar)
SP2.9 Turkana Education and Skill
Development Fund
Enhance efficiency and
effectiveness in service delivery
P3 Human Resource
Development.
SP3.1 Training of Staff
Enhance social protection
development
P4 Social protection
programs/
Affirmative Action
SP4.1 Economic empowerment and
provision of assistive devices to
persons with disabilities(PWDS) in all
wards
SP4.2 Construction of PWDs multi-
purpose resource center
SP4.3 Youth and Women Development and Empowerment FundSP4.4 Campaign against Early child Marriages
SP4.5 Sexual and Gender Based
Violence Programme
Promote Sports, Arts and Cultural
values/ initiatives
P5 Sports and arts
programme
SP5.1 Sports(Athletics, Football,
Other disciplines)
SP5.2 Construction of sport Stadia
SP5.3 Support to Extra-Curriculum
Activities(Dramas and Music)
P6 Cultural values
/initiatives
SP6.1 Support to Annual Cultural
Festivals and initiatives
SP6.2 Construction of Library and
Archives
SP6.3 Establishment of Cultural
Centers(Lokiriama, Moruanayeche)
E. SUMMARY OF PROGRAMME OUTPUTS AND PERFORMANCE INDICATORS
FOR 2014/2015- 2016/2017
Programme: P1 General Administration, Planning and Support Services
Outcome: An enhanced institutional framework for efficient and effective service delivery
Sub Programme: SP1.1 General Administration, Planning and Support Services
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Department of Education
An enhanced institutional framework for efficient and effective service delivery
Ability to achieve on agreed deliverables
100% 100% 100%
Programme: P2 Access to Education for All
Outcome: Increased access to education at all levels
Sub Programme:SP2.1 Equipping and Furnishing Existing ECDE centers
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Department of Education
Child friendly learning environment
Number of ECDEs furnished and equipped
120 180 180
Sub Programme: SP2.2 Constructing and equipping 2 ECDcentersper ward
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Department of Education
Increased enrolments in ECDE
Number of ECDEs centers constructed, Number of pupils attending ECDE
60 60 60
Sub Programme:SP2.3 Renovation and Refurbishing County DICECE College
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Department of Education
Improved infrastructural developments
Number of structures/facilities improved
3 6 9
Sub Programme:SP2.4 Preliminary works for establishment of a public university in Turkana
County
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Department of Education
Infrastructural development
PDP, Structures built
1 2 3
Sub Programme:SP2.5 Provision of Educational Instructional and Learning materials
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Department of Education
Availability of educational materials
Number of educational and instructional materials provided
40% 70% 90%
Sub Programme:SP2.6 ECD Feeding Programme in all wards
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Department of Education
Availability of food in ECD
Percentage of ECD centers with food
70% 80% 90%
Sub Programme:SP2.7 Refurbishing and Equipping Village Polytechnics (Kaaleng, Lokori,
Kakuma, Kalokol and Loyopo)
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Department of Education
Improved infrastructures
Number of institutions rehabilitated and equipped
5 8 12
Sub Programme:SP2.8 Establishment of youth polytechnics (Lorugum, Kataboi and Lokichar)
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Department of Education
Increased enrolments in vocational training
Number of students attending vocational trainings;Modules/courses offered
350 1200 3000
Sub Programme:SP2.9 Turkana Education and Skill Development Fund
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Department of Education
Increased completion and transition rates
Number of pupils/students benefiting from the bursary scheme
10000 20000 30000
Programme: P3 Human Resource Development
Outcome: Enhance efficiency and effectiveness in service delivery
Sub Programme:SP3.1 Training of Staff
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Human Resource Development Department
Improved service delivery and human development
Number of staff trained
100 350 700
Programme: P4 Social protection programs/ Affirmative Action
Outcome: Enhance social protection development
Sub Programme:SP4.1 Economic empowerment and provision of assistive devices to persons
with disabilities (PWDs)
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Social Services Department
Empowered PWDs
Number of PWDs funded/trained;Number of PWDs with assistive devices
100 120 150
Sub Programme:SP4.2 Construction of PWDs multi-purpose resource center
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Social Services Department
Infrastructural development of the resource center
PDP, Site Plan, Structures
2 4 6
Sub Programme:SP4.4 Youth and Women Development and Empowerment Fund
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Social Services Department
Socio Economic empowerment of women and youths
Number of youths/women trained;Number of youths/women facilitated to access market for their products;Number of youths/women funded
300 800 1200
Sub Programme:SP4.5 Campaign against Early Child Marriages
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Social Services Department
Reduced number of Early Marriages
Number of children rescued/ rehabilitated;Number of sensitization programmes held
30 60 120
Sub Programme:SP4.6 Sexual and Gender Based Violence Programme
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Social Services Department
Reduced cases of Sexual and Gender Based Violence
Number of Sexual and Gender Based Violence reported;Number of sensitization programmes held
20 60 80
Programme: P5 Sports and Arts Programme
Outcome: Talent development
Sub Programme:SP5.1 Sports(Athletics, Football, Other disciplines)
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Sports Department
Talent development and sporting activities
Number of sporting activities
60 65 78
Sub Programme:SP5.2 Construction of sport Stadia
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Sports Department
Sports Stadia Percentage of stadia completed
20% 50% 80%
Programme: P6 Cultural values /initiatives
Outcome: Promote cultural values /initiatives
Sub Programme:SP6.1 Support to Annual Cultural Festivals and initiatives
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Culture Department
Museums and community cultural centres initiative
Number of Museums and community cultural centers initiated
4 8 12
Sub Programme:SP6.2 Construction of Library and Archives
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Culture Department
Library and archives
Number of libraries and archives
1 3 4
constructed and equipped
Sub Programme:SP6.3 Establishment of Cultural Centers (Lokiriama, Moruanayeche)
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Culture Department
Cultural sites and monuments
Number of cultural sites and monuments marked/identified
10 15 20
F: Summary of Expenditure by Programmes 2014/2015- 2016/2017
EDUCATION
ProgrammeProjected Estimates
2014/2015 2015/2016 2016/2017P1.1 General Administration, Planning and Support Services 203,952,922.52 224,348,214.77 246,783,036.25
P1 General Administration, Planning and Support Services 203,952,922.52 224,348,214.77 246,783,036.25
SP2.1 Equiping and Furnishing Existing ECD centers 28,160,440.00 13,200,000.00 14,520,000.00
SP2.2 Constructing and equiping two ECD Centres per ward 360,000,000.00 132,000,000.00 145,200,000.00
SP2.3 Renovation and Refurbishing County DICECE College 5,000,000.00 5,500,000.00 6,050,000.00
SP2.4 Preliminary Works forEstablishment of Public University in Turkana County 52,500,000.00 2,750,000.00 3,025,000.00
SP2.5 Provision of educational instructional and learning materials 5,000,000.00 5,500,000.00 6,050,000.00
SP2.6 ECD Feeding Programme in all wards 30,000,000.00 33,000,000.00 36,300,000.00
SP 2.7 Refurbishing and Equiping Village Polytechnics(Kaaleng, Lokori, Kakuma, Kalokol, Loyopo)
55,000,000.00 16,500,000.00 18,150,000.00
SP2.8 Establishment of youth polytechnics( Lorugum, Kataboi and Lokichar)
36,000,000.00 39,600,000.00 43,560,000.00
SP2.9 Turkana Education and Skill Development Fund 342,659,091.03 310,925,000.13 342,017,500.15
P2 Access to Education for All 914,319,531.03 558,975,000.13 614,872,500.15SP 3.1 Training of staff 2,500,000.00 2,750,000.00 3,025,000.00P3 Human Resource Development. 2,500,000.00 2,750,000.00 3,025,000.00SP 4.1 Economic empowerment and provision of assistive devices to persons with disabilities(PWDS) in all wards
41,000,000.00 23,100,000.00 25,410,000.00
SP4.2 Construction of persons with disabilities multi-purpose resource center 10,000,000.00 11,000,000.00 12,100,000.00
SP4.3 Youth and Women Development and Empowerment Fund 220,000,000.00 99,000,000.00 108,900,000.00
SP4.4 Campaign against Early child Marrieges 5,000,000.00 5,500,000.00 6,050,000.00
SP.4.5 Sexual and Gender Based Violence Programme 3,000,000.00 3,300,000.00 3,630,000.00
P4 Social protection programs/ Affirmative Action 279,000,000.00 141,900,000.00 156,090,000.00
SP 5.1 Sports (Athletics, Football, Other disciplines) at ward level 12,000,000.00 13,200,000.00 14,520,000.00
SP5.2 Construction of sports stadia 31,680,978.00 34,849,075.80 38,333,983.38SP5.3 Support to Extra- Curriculum Activities (Dramas and Music) 5,000,000.00 5,500,000.00 6,050,000.00
P5 Sports and arts programme 48,680,978.00 13,200,000.00 14,520,000.00SP 6.1 Support to Annual Cultural Festivals and initiatives 9,800,000.00 10,780,000.00 11,858,000.00
SP 6.2 Construction of Library and Archives 20,000,000.00 11,000,000.00 12,100,000.00
SP6.3 Establishment of Cultural Centers( Lokiriama, Moruanayeche) 10,000,000.00 11,000,000.00 12,100,000.00
P6 Cultural values /initiatives 39,800,000.00 38,280,000.00 42,108,000.00Total Expenditure Vote for Education 1,488,253,431.55 979,453,214.91 1,077,398,536.40
PUBLIC SERVICE, DECENTRALIZED ADMINISTRATION AND DISASTER
MANAGEMENT
A. VISION:
To be a sector of excellence in the promotion of enabling environment where people of Turkana
County enjoy quality services
B. MISSION:
Establish structures that provide conducive and inclusive environment for high productive
workforce, convenient workplaces as well as cross sector systems for preparedness, prevention
and response to disaster emergencies.
C. STRATEGIC OVERVIEW AND CONTEXT FOR BUDGET INTERVENTION:
The department will implement the following strategic objectives:
xii. Create enabling environment and enhance institutional efficiency and effectiveness for
Public Service and Disaster Management.
xiii. Ensure adequate and equal opportunities in appointment, training and advancement at all
levels of public service.
xiv. Ensure effective devolution and decentralization of powers, functions and resources.
xv. Promote active involvement of the people in the process of policy and decision making.
xvi. Promote disaster risk reduction.
xvii. Enhance service delivery and track performance.
Challenges
Inadequate public officers, Lack of offices and staff housing, Lack of office equipment for
effective execution of duties, Lack of incentives for officers, Inexistence of training institutions
for public officers, Lack of awareness of disaster management protocols, Inexistence of disaster
preparedness plans and Non disaster risk reduction oriented development policies.
D. PROGRAMMES AND THEIR OBJECTIVES
Objective Programme Sub Programme
Create enabling environment and
enhance institutional efficiency and
effectiveness for public service and
disaster management.
P1 General
Administration
Planning and Support
Services
P1.1 General Administration
Planning and Support Services
Ensure adequate and equal
opportunities in appointment, training
and advancement at all levels of
public service.
P2 Capacity
Development
SP2.1 Capacity Development
SP2.2 Construction of sub-county
and Ward Administration offices
SP2.3 Personnel need survey.
Ensure effective devolution and P3 Decentralized Units SP3.1 Decentralized County
decentralization of powers, functions
and resources.
Policy Policy
SP3.2 Policy sensitization and
dissemination
SP3.5 Public participation and
access to information
Promote accountability and service
delivery
P4 Mainstream Public
Sector Integrity
programme,
Accountability and anti-
corruption strategies
SP4.1 Mainstream Public Sector
Integrity programme,
Accountability and anti-
corruption strategies
Promote disaster risk reduction. P5 Disaster Risk
Reduction
SP5.1 Turkana County Drought
and
Disaster Contingency Fund
(CDDCF)
SP5.2 Turkana Multi hazard/Risk
Assessment and stake holder
capacity mapping
SP5.3 Regular Assessments of
Food , floods, and conflict
Security
SP5.4 Turkana County Relief
Programme
SP5.5 Turkana Cash Transfer
Programme at ward level
Enhance service delivery and track
performance
P6 Human resource SP6.1 Scheme of service
SP6.2 Performance Appraisal
E. SUMMARY OF PROGRAMME OUTPUTS AND PERFORMANCE INDICATORS
FOR 2014/2015-2016/2017
Programme: P1General Administration Planning and Support Services
Outcome: Create enabling environment and enhance institutional efficiency and effectiveness
for public service and disaster management.
Sub Programme: SP1.1 General Administration Planning and Support Services
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Public Service
Department
Office
operations
Ability to achieve
on agreed
deliverables
100% 100% 100%
Programme: P2 Capacity Development
Outcome: Ensure adequate and equal opportunities in appointment, training and advancement at
all levels of public service.
Sub Programme: SP2.2 Capacity development
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Public Service
Department
Efficient
personnel
Percentage of staff
trained
50% 60% 70%
Sub Programme: SP2.2 Construction of sub-county and Ward Administration offices
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Public Service Provision of No. offices 50% 100%
Department Office space constructed
Programme: P3 Decentralized Units Policy
Outcome: Ensure effective devolution and decentralization of powers, functions and resources.
Sub Programme: SP3.1 Decentralized County Policy
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Decentralized
Services
Department
Effective
devolved and
decentralized
unit
Policy document Policy
adopted
and
enacted
Sub Programme: SP3.2 Policy sensitization and dissemination
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Decentralized
Services
Department
An informed
public on the
policy
Level of
awareness
40% 60% 80%
Sub Programme: SP3.5 Public participation and access to information
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Decentralized
Services
Department
Public
engagement in
decision making
Level of public
engagement
40% 60% 80%
Programme: P4 Mainstream Public Sector Integrity programme, Accountability and anti-
corruption strategies
Outcome: Promote accountability and service delivery
Sub Programme: SP4.1 Mainstream Public Sector Integrity programme, Accountability and
anti-corruption strategies
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Decentralized
Services
Department
Accountable
and productive
public sector
Plans with
integrity
programme
incorporated
2 3 4
Programme: P5 Disaster Risk Reduction
Outcome: Promote disaster risk reduction
Sub Programme: SP5.1 Turkana County Drought and Disaster Contingency Fund (CDDCF)
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Disaster
Management
Department
Disaster
preparedness
Amount allocated
to CDDCF
2% 2% 2%
Sub Programme: SP5.2 Turkana Multi hazard/Risk Assessment and stake holder capacity
mapping
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Disaster
Management
Department
Multi hazard
reports
Reports 4 4 4
Sub Programme: SP5.3 Regular Assessments of food, floods, and conflict Security
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Disaster
Management
Department
Increased
preparedness
Assessment
reports
12 12 12
Sub Programme: SP5.4 Turkana County Relief Programme
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Disaster
Management
Department
Reduced
fatalities due to
drought
% of vulnerable
people assisted
30% 50% 70%
Sub Programme: SP5.5 Turkana Cash Transfer Programme at ward level
Delivery Unit Key Output
(KO)
Key
Performance
Indicators
(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Disaster
Management
Department
Increased
Household
Incomes
No. of
Households
assisted
6000
Households
Additional
1500
Households
Additional
3000
Households
Programme: P6 Human Resource
Outcome: Enhance service delivery and track performance
Sub Programme: SP6.1 Scheme of service
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Public Service
Department
Progressive
personnel
Existence of
personnel scheme
of service
3 5 7
Sub Programme: SP6.2 Performance Appraisal
Delivery Unit Key Output Key Performance Targets
(KO) Indicators (KPIs) 2014/2015 2015/2016 2016/2017
Public Service
Department
Tracked
performance
Filled PAS forms 100% 100% 100%
F: SUMMARY OF EXPENDITURE BY PROGRAMMES 2014/2015 – 2016/2017
PUBLIC SERVICE, DECENTRALIZED SERVICES AND DISASTER MAANGEMENT
ProgrammesProjected Estimates
2014/15 2015/2016 2016/2017P1.1 General Administration Planning and Support Services 501,094,611.76 551,204,072.94 606,324,480.23
P1. General Administration Planning and Support Services 501,094,611.76 551,204,072.94 606,324,480.23
SP2.1 Capacity Development 10,000,000.00 11,000,000.00 12,100,000.00SP2.2 Construction sub-county and Ward admin offices 100,000,000.00 100,000,000.0
050,000,000.00
SP2.2 Personnel need survey 4,000,001.00 4,400,001.10 4,840,001.21P2. Capacity Development 114,000,001.00 15,400,001.10 16,940,001.21
SP3.1 Decentralized County Policy 6,000,000.00 6,600,000.00 7,260,000.00SP3.2 Policy sensitization and dissemination(Civic Education) 10,000,000.00 11,000,000.00 12,100,000.00
SP3.5 Public participation and access to information 6,000,000.00 6,600,000.00 7,260,000.00
P3. Decentralised Policies 22,000,000.00 24,200,000.00 26,620,000.00SP4.1 Mainstream Public Sector Integrity programme, Accountability and anti-corruption strategies
5,000,000.00 5,500,000.00 6,050,000.00
P4 Mainstream Public Sector Integrity programme, Accountability and anti corruption strategies
5,000,000.00 5,500,000.00 6,050,000.00
SP5.1 Turkana County Drought and Disaster Contingency Fund (CDDCF) 188,000,000.00 206,800,000.00 227,480,000.00
SP5.2 Turkana Multi hazard/Risk Assessment and stake holder capacity mapping
5,000,000.00 5,500,000.00 6,050,000.00
SP5.3 Regular Assessments of Food , floods, and conflict Security 10,000,000.00 11,000,000.00 12,100,000.00
SP5.4 Turkana County Relief Programme 357,000,000.00 112,200,000.00 123,420,000.00SP5.5 Turkana Cash Transfer Programme at ward level 150,000,000.00 165,000,000.00 181,500,000.00
P5. Disaster Risk Reduction 710,000,000.00 500,500,000.00 550,550,000.00SP6.1 Scheme of service 5,000,000.00 5,500,000.00 6,050,000.00SP6.2 Performance Appraisal 20,000,000.00 22,000,000.00 24,200,000.00P6 Human resource 25,000,000.00 27,500,000.00 30,250,000.00Total Expenditure Vote for Public Service , Decentralized Services and Disaster Management
1,377,094,612.76 1,124,304,074.04 1,236,734,481.4
4
DEPARTMENT OF TRANSPORT AND INFRASTRUCTURE
A. Vision:
To realize adequate and accessible quality infrastructure, government housing and buildings and
other public works for the county
B.Mission:
To facilitate provision, construction and maintenance of quality infrastructure, government
buildings & housing and other public works for sustainable socio-economic development
C. Strategic Overview and Context for Budget Intervention:
The department will implement the following strategic objectives:
Create enabling environment and institutional efficiency and effectiveness
Facilitate adequate provision of cost effective infrastructure, government buildings &
housing and other public works
Develop and maintain infrastructural, building and housing facilities and other public
works for government operations and general public service
Develop and maintain technical and quality audit for infrastructure, housing, buildings
and other public works in the public sector
Major achievements for the period under review include;
Design, documentation and tendering for tarmacking 6km Lodwar town roads
Grading and gravelling of various county and rural roads
Purchase of 1 no. dozer, 1 no. grader and 2 no. tippers
Design, documentation and tendering for 38 no. Health facilities, County Mortuary,
County hospital renovations, County Drugstore, Governor’s residence, County Executive
offices, Eco-tourism hotels among others.
Challenges faced are;
Inadequate technical personnel, office space and equipment.
Inadequate plant and machinery for the county
Lack of town plans, road designs and appropriate legislation
Major services and outputs to be provided in 2014/2015 include;
Providing professional services in design, documentation, and contract administration for
infrastructural development programmes within the county.
Undertake feasibility studies, design and preliminary works for the proposed Lodwar
International airport and Lodwar storm water drainage works
Purchase of earth moving equipment and fire engine
Construction and equipping of mechanical garage
Tarmacking of Lodwar town roads and gravelling of rural roads
Construction of staff houses and Executive offices in Lodwar town
Capacity building of the public sector
D. PROGRAMS AND THEIR OBJECTIVES
STRATEGIC OBJECTIVES PROGRAMME SUB PROGRAMME
Create enabling environment and
institutional efficiency and
effectiveness
P1 General
Administration
Planning and Support
Services
SP1.1 General Administration
Planning and Support Services
Develop and maintain infrastructural,
building and housing facilities and
other public works for government
operations and general public service
P2 Develop and
maintain roads
SP2.1Tarmac Lodwar town roads
SP2.2 Gravel rural roads
SP2.3 Gravelling of two class D
roads(Makutano-
LokitaungandLokori-Kapedo)
SP2.4 Construction of
Nawoyaregae/ Kapelbok bridge
(Flagship)
P3 Develop and
maintain staff housing
and public offices
SP3.1 Constructand Renovation
County Departmental Offices
P4 Develop and
maintain other public
works
SP4.1 Preliminary works for
Lodwar International Airport
SP4.2 Phase 1 Works for Lodwar
Storm water drainage
SP4.3 Construct & Equip
mechanical garage
SP4.4 Purchase fire engine
SP4.5 Purchase graders and
rollers
Develop and maintain technical and
quality capacity and audit for
infrastructure, housing, buildings and
P5 Capacity building
for the public sector
SP5.1 Train BodaBoda
riders/Capacity Building and
formation of county transport
other public works in the public
sector
association
E. SUMMARY OF PROGRAMME OUTPUTS AND PERFORMANCE INDICATORS
FOR 2014/2015- 2016/2017
Programme: P1 General Administration, Planning and Support Services
Outcome: An enhanced institutional framework for efficient and effective service delivery
Sub Programme: SP1.1 General Administration, Planning and Support Services
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Transport and Infrastructure department
Delivery of quality, effective and efficient services by the Department of Infrastructure and Roads
Ability to achieve on agreed deliverables
100% 100% 100%
Programme: P2 Develop and Maintain Roads
Outcome: An efficient and effective road transport network for social economic development
Sub Programme: SP2.1Tarmac Lodwar Town Roads
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Transport and Infrastructure department
Easy accessibility within Lodwar town
Km road network tarmacked
6 Km
Sub Programme: SP2.2Gravel Rural Roads
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Transport and Infrastructure department
Easy accessibility within rural areas
Km road network gravelled
40% 60% 80%
Sub Programme:SP2.3 Gravelling of two class D roads (Makutano-Lokitaungand Lokori-
Kapedo)
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Transport and Infrastructure department
Easy accessibility
Km road network gravelled
100%
Sub Programme:SP2.3 Construction of Nawoyaregae/ Kapelbok bridge (Flagship)
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Transport and Infrastructure department
Connectivity between Nawoyaregae/ Kapelbok
Bridge 100%
Programme: P3 Development and Maintenance of Staff Houses and Public Offices
Outcome: A conducive and quality working / accommodation environment to enhance efficient
and effective service delivery
Sub Programme:SP3.1 Construct and Renovation County Departmental Offices
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Transport and Infrastructure department
Quality and spacious working place
No. offices renovated
10 15 20
Programme: P4 Development and Maintenance of Other Public Works
Outcome: Enhanced capacity and quality transport and infrastructural services
Sub Programme: SP4.1Preliminary Works for Lodwar International Airport
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Transport and Infrastructure department
Land allocated and approvals
Feasibility studies and design works
100%
Sub Programme: SP4.2Preliminary Works for Lodwar Storm Water Drainage
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Transport and Infrastructure department
Relevant approvals
Feasibility studies and design works
100%
Sub Programme: SP4.3Construct & Equip Mechanical Garage
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Transport and Infrastructure
Reduced cost of maintenance of
No. of plant/machiner
100%
department plant and machinery
y maintained in-house vs those referred externally
Sub Programme: SP4.4Purchase Fire Engine
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Transport and Infrastructure department
Reduced effect from fire outbreaks
No. of fire outbreaks managed
30% 40% 50%
Sub Programme: SP4.5Purchase of Graders and Rollers
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Transport and Infrastructure department
Enhanced access to affordable plant and equipment
Income generated and actual demand of plant and equipment
2 5 10
Programme: P5 Capacity Building of the Public Sector
Outcome: Enhanced efficiency and effective service provision in the public sector
Sub Programme:SP5.1 Train BodaBoda riders/Capacity Building and formation of county
transport association
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Transport and Infrastructure department
Reduced accidents involving riders
No. of riders trained
30% 40% 50%
F: SUMMARY OF EXPENDITURE BY PROGRAMMES 2014/2015- 2016/2017
TRANSPORT AND INFRASTRUCTURE
ProgrammeProjected Estimates
2014/15 2015/2016 2016/2017SP1.1 General Administration Planning and Support Services 97,556,767.20 107,312,443.92 118,043,688.31
P1 General Administration Planning and Support Services 97,556,767.20 107,312,443.92 118,043,688.31
SP2.1Tarmac Lodwar town roads 300,000,000.00 55,000,000.00 60,500,000.00SP2.2 Gravel rural roads at wards 373,398,193.00 231,000,000.00 254,100,000.00SP2.3 Gravelling of two Class D roads (Makutano-Lokitaung and Lokori-Kapedo) 100,000,000.00
SP2.4 Construction of Nawoyaregae/ Kapelbok bridge (Flagship) 100,000,000.00
P2 Develop and maintain roads 873,398,193.00 396,000,000.00 435,600,000.00
SP3.1 Construct & Renovation of County Departmental Offices 28,480,380.04 22,528,418.04 24,781,259.85
P3 Develop and maintain staff housing and public offices 28,480,380.04 22,528,418.04 24,781,259.85
SP4.1 Phase 1 works for Lodwar International Airport 50,000,000.00 55,000,000.00 60,500,000.00
SP4.2 Phase 1 Works for Lodwar Storm water drainage 20,000,000.00 22,000,000.00 24,200,000.00
SP4.3 Construct & Equip mechanical garage 30,000,000.00 33,000,000.00 36,300,000.00
SP4.4 Purchase fire engine 15,000,000.00 16,500,000.00 18,150,000.00SP4.5 Purchase 2 graders and 1 rollers 37,600,000.00 41,360,000.00 45,496,000.00P4 Develop and maintain other public works 152,600,000.00 167,860,000.00 184,646,000.00
SP5.1 Train BodaBoda riders/Capacity building and formation of county transport association
5,000,000.00 5,500,000.00 6,050,000.00
P5 Capacity building for the public sector 5,000,000.00 5,500,000.00 6,050,000.00
Total Expenditure for Vote Infrastructure 1,157,035,340.24 699,200,861.96 769,120,948.16
DEPARTMENT OF PASTORAL ECONOMY AND FISHERIES
A. VISION
To be a lead institution in Management and Development of Livestock and Fisheries
resources for socio- economic development of Turkana county
B. MISSIONTo improve livelihoods of the people through promotion of competitive , innovative and
sustainable livestock and fisheries development and management
C. PERFORMANCE OVERVIEW AND BACKGROUND FOR PROGRAMME(S) FUNDING
The Pastoral Economy and fisheries sector will i. Create enabling environment and enhance institutional efficiency and effectiveness for
livestock and fisheries development
ii. Facilitate access to marketsiii. Increase fish and livestock production and productivityiv. Safeguarding Human Health
D. PROGRAMMES AND THEIR OBJECTIVES
Objective Programme Sub Programme
Create enabling environment and
enhance institutional efficiency and
effectiveness for fisheries development
P1 General
administration and
planning services
SP1.1 General administration
and planning services
Facilitate access to markets P2 Fisheries
Production and
Development
SP2.1 Revival of Turkana
Fishermen Co-op. society
SP2.2 Frame survey
SP2.3 Demarcation of fish
breeding areas
SP2.4 Rescue units/BMUs
infrastructure and
Empowerment
SP2.5 Fisheries market
infrastructure/fish value
addition
SP2.6Fisheries livelihood
Development support
SP2.7Resource monitoring
facilities
SP2.8 Fish Stock Assessment
SP2.9Preminaries for Lake
Turkana Management
Authority
SP2.10 Establish fish hatcheries
P3 Livestock
production and
SP3.1 Construction and
stocking of three Strategic feed
Development SP3.2 Multiplication and
breeding centres
SP3.3 Market infrastructure
development
SP3.4 Promote poultry and
beekeeping
SP3.5Livestock extension
services support
SP3.6Establishment of holding
ground(FLAGSHIP)
SP3.7Rangeland rehabilitation
SP3.8Fodder and pastures
production,conservation and
development
SP3.9Livestock census
SP3.10Support Lomidat
abattoir
SP3.11Livestock Emergency
and restocking
SP3.12Construction hide and
skin tannery
P4Veternary
Services and
Development
SP4.1Annual Vaccination
oflivestock at ward level
SP4.2Mass deworming and
treatment of Livestock at ward
level
SP4.3Diseases surveillance and
assessments at ward level
SP4.4Livestock health
Extension(CBAHWs)services
SP4.5Veterinary Public Health
services(CBAHWs)
SP4.6Equip county laboratory
SP4.7Support livestock
emergencies health and
production at ward level
E. Summary of Programme Outputs and Performance Indicators for 2014/2015-2016/2017
Programme: P1General Administration and Planning Services
Outcome: An enhanced institutional framework for efficient and effective extension system
Sub Programme: SP1.1 General Administration and Planning Services
Delivery Unit Key Output
(KO)
Key
Performance
Indicators
(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Fisheries
Department
General
Administration
and Planning
Services
Ability to achieve
on agreed
deliverables
100% 100% 100%
Programme: P2 Fisheries production and development
Outcome: Developed Fisheries sector
Sub Programme: P2.1Revival of Turkana Fishermen Co-op. society
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Fisheries
Department
Amount of fish
sold
Tones of fish sold 9000
tonnes
12000
tonnes
15000
tonnes
Sub Programme: P2.2 Frame survey
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Fisheries
Department
An inventory of
fishing facilities
Frame survey
reports
4 4 4
Sub Programme: SP2.3 Demarcation of fish breeding zones
Delivery Unit Key Output
(KO)
Key
Performance
Indicators
(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Fisheries
Department
Demarcated breeding zones
Percentage of breeding zones demarcated
60% 70% 80%
Sub Programme: SP2.4 Rescue units
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Fisheries
Department
Rescue units Number of rescue units established
4 6 8
Sub Programme: SP2.5 Fish market infrastructure/ fish value addition
Delivery Unit Key Output
(KO)
Key
Performance
Indicators
(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Fisheries
Department
Market infrastructure
No. of market infrastructures established
2 3 4
Sub Programme: SP2.6 Fisheries livelihood development support
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Fisheries
Department
Fisheries livelihood development
Amount of funds allocated
150M 200M 350M
Sub Programme: SP 2.7 Resource monitoring facilities
Delivery Unit Key Output
(KO)
Key
Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Fisheries
Department
Resource monitoring facilities
Number of facilities established
1 1 2
Sub Programme: SP2.8 Fish Stock assessment
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Fisheries
Department
Establish fish stock status
Stock assessment reports
4 4 4
Sub Programme: SP2.9 Preliminaries for Lake Turkana Management Authority
Delivery Unit Key Output
(KO)
Key
Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Fisheries
Department
Established LakeTurkana Authority
Preliminary report 3 0 0
Sub Programme: SP2.10 Establish fish hatcheries
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Fisheries
Department
Increase fish production
No. of functional hatcheries
1 1 1
Programme: Livestock production and development
Outcome:Developed livestock sector
Sub Programme: SP3.1 Construction and stocking of three strategic feed reserves
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Livestock
Department
Strategic feed reserves
No of strategic feed reserves established
3 5 6
Sub Programme: SP 3.2 Establish livestock Multiplication and breeding Centre
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Livestock
Department
Better quality breeds
Percentage of livestock improved
50% 75% 85%
Sub Programme: SP3.3 Marketing infrastructure development
Delivery Unit Key Output
(KO)
Key
Performance
Indicators
(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Livestock
Department
Marketing infrastructure
Number of marketing infrastructure developed
2 3 4
Sub Programme: SP3.4 Promote poultry and bee keeping
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Livestock
Department
Poultry products Tonnage of poultry products produced
295.2 266.4 273.6
Sub Programme: SP3.5 Provision of Livestock Extension services
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Livestock
Department
Improved animal husbandry
Percentage of farmers adopting new farming techniques
50% 75% 90%
Sub Programme: SP3.6. Establishment of holding ground (FLAGSHIP)
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Livestock
Department
Holding grounds
Number of holding grounds established
1 2 4
Sub Programme: SP3.7 Rangeland rehabilitation
Delivery Unit Key Output
(KO)
Key
Performance
Indicators
(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Livestock
Department
Improve
rangeland
productivity
Acreage rehabilitated
875 900 1000
Sub Programme: SP3.8 Fodder and pasture production, conservation and development
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Livestock
Department
Adequate livestock feeds
Number of acreage under pasture and fodder
180 240 300
Sub Programme: SP3.9 Livestock Census
Delivery Unit Key Output
(KO)
Key
Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Livestock
Department
Population of livestock established
Census report 1 0 0
Sub Programme: SP3.10 Support of Lomidat slaughterhouse
Delivery Unit Key Output
(KO)
Key
Performance
Indicators
Targets
2014/2015 2015/2016 2016/2017
(KPIs)
Livestock
Department
Expanded Lomidat slaughterhouse
Amount of money allocated
20M 10M 10M
Sub Programme: SP3.11 Livestock emergency off-take and restocking
Delivery Unit Key Output
(KO)
Key
Performance
Indicators
(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Livestock
Department
Empowered farmers
Amount of money allocated
50M 50M 50M
Sub Programme: SP3.12 Construction of hide and Skin tannery
Delivery Unit Key Output
(KO)
Key
Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Livestock
Department
Established Hide and Skin tannery
Number of hide and skin tannery
1 2 3
Programme: Veterinary Services and development
Outcome: Effective and developed veterinary services
Sub Programme: SP4.1 Annual vaccination of livestock
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Veterinary
Department
Improved livestock health
Percentage of livestock vaccinated
50% 60% 70%
Sub Programme: SP4.2 Mass de-worming and treatment of livestock at ward level
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Veterinary Improved Percentage of 70% 80% 90%
Department livestock health livestock dewormed and treated
Sub Programme: SP4.3 Disease surveillance and assessments at ward level
Delivery Unit Key Output
(KO)
Key
Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Veterinary
Department
Disease status
established
Surveillance reports
12 12 12
Sub Programme: SP4.4 Livestock Health Extension (CBAHWs) services at ward level
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Veterinary
Department
Improved extension services
Percentage of livestock keepers reached
60% 75% 85%
Sub Programme: SP4.5 Veterinary Public Health (CBAHWs) services
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Veterinary
Department
Reduced livestock diseases
Livestock diseases incidence
5 4 2
Sub Programme: SP4.6 Equip County Laboratory
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Veterinary
Department
Equipped county laboratory
Functional laboratory
1 1 1
Sub Programme: SP4.7 Support livestock emergencies health and production at ward level
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
Veterinary
Department
Improved livestock health
Percentage of healthy livestock
70% 80% 90%
F: SUMMARY OF EXPENDITURE BY PROGRAMMES 2014/2015 – 2016/2017
PASTORAL ECONOMY AND FISHERIES
ProgrammesProjected Estimates
2014/15 2015/2016 2016/2017SP1.1 General Administration Planning and Support Services 87,992,004.96 96,791,205.46 106,470,326.00
P1. General Administration Planning and Support Services 87,992,004.96 96,791,205.46 106,470,326.00
SP2.1 Revival of Turkana Fishermen Cooperative society 26,000,000.00 1,100,000.00 1,210,000.00
SP2.2 Frame Survey 5,000,000.00 1,100,000.00 1,210,000.00SP2.3 Demarcation of fish breeding areas 5,000,000.00 11,000,000.00 12,100,000.00SP2.4 Rescue units/BMUs infrastructure and Empowerment 24,801,560.00 11,000,000.00 12,100,000.00
SP2.5 Fish market infrastructure/ fish value 20,000,000.00 56,430,000.00 62,073,000.00
additionSP2.6 Fisheries livelihood Development Support 51,300,000.00 56,430,000.00 62,073,000.00
SP2.7 Resource monitoring facilities 6,000,000.00 11,000,000.00 12,100,000.00SP2.8 Fish Stock Assessment 5,000,000.00 11,000,000.00 12,100,000.00SP2.9 Preliminaries for Lake Turkana Management Authority 15,440,000.00 5,500,000.00 6,050,000.00
SP2.10 Establish fish hatcheries 10,000,000.00 18,700,000.00 20,570,000.00P2 Fisheries Production and Development 168,541,560.00 24,200,000.00 26,620,000.00
SP3.1 Construction and stocking ot three Strategic feed reserves 30,000,000.00 5,500,000.00 6,050,000.00
SP3.2 Multiplication and breeding centre 30,000,000.00 5,500,000.00 6,050,000.00SP3.3 Market infrastructure development 10,000,000.00 6,600,000.00 7,260,000.00SP3.4 Promote poultry and beekeeping 10,000,000.00 11,000,000.00 12,100,000.00SP3.5 Livestock extension services support 21,000,000.00 23,584,000.00 25,942,400.00SP3.6 Establishment of holding ground(FLAGSHIP) 50,000,000.00 33,000,000.00 36,300,000.00
SP3.7 Rangeland rehabilitation 30,000,000.00 33,000,000.00 36,300,000.00SP3.8 Fodder and pasture production. conservation and Development 15,000,000.00 16,500,000.00 18,150,000.00
SP3.9 Livestock Census 30,000,000.00 - -SP3.10 Support Lomidat abattoir 22,000,000.00 33,000,000.00 36,300,000.00SP3.11 Livestock Emergency and restocking 60,000,000.00 66,000,000.00 72,600,000.00
SP3.12 Construct hide and skin tannery 19,500,000.00 33,000,000.00 36,300,000.00P3 Livestock Production and Development 327,500,000.00 360,250,000.00 396,275,000.00
SP4.1 Annual Vaccination of livestock at ward level 60,000,000.00 23,100,000.00 25,410,000.00
SP4.2 Mass deworming and treatment of livestock at ward level 21,000,000.00 23,100,000.00 25,410,000.00
SP4.3 Disease surveillance and assessments at ward level 10,000,000.00 11,000,000.00 12,100,000.00
SP4.4 Livestock health Extension(CBAHWs) services at ward level
9,000,000.00 11,000,000.00 12,100,000.00
SP4.5 Veterinary Public health services(CBAHWs) 15,000,000.00 55,000,000.00 60,500,000.00
SP4.6 Equip county laboratory 2,500,000.00 11,000,000.00 12,100,000.00SP4.7 Support livestock emergencies health and production at ward level 30,000,000.00 2,200,000.00 2,420,000.00
P4 Veterinary Services and development 147,500,000.00 68,200,000.00 75,020,000.00Total Expenditure Vote for Pastoral Economy and Fisheries 731,533,564.96 549,441,205.46 604,385,326.00
DEPARTMENT OF ENERGY ENVIRONMENT AND NATURAL RESOURCES
A. Vision:
Emerging the best in environmental conservation, technological development, weather
forecasting and sustainable utilization of energy and other natural resources.
B. Mission:
To facilitate accessible and reliable meteorological information and services, conservation of
environment and natural resources through sustainable management and utilization of forest,
wildlife and renewable energy with supervision and coordination of environmental matters,
conducting research and disseminating corresponding findings for stability and socio-economic
development.
C. Strategic Overview and Context for Budget Intervention:
The Ministry will implement the following strategic objectives:
i. Increasetree cover and species diversity
ii. Oversee sustainable development
iii. Upscale research technology
iv. Secure and protect flora and fauna
v. Protect and enforce environmental policy
vi. Integrate development with environmental integrity
vii. Enhance a clean and healthy environment for all
viii. Collect accurate and timely weather information for planning
ix. Produce up to standard weather forecasting
x. Promote and utilization of green energy
xi. Promote efficient use of energy
xii. Develop new energy technologies
Major achievements for the period under review:
The tree planting program across the county, the beatifications of urban center where 800 tree
seedling were planted. The formations of ministry secretariat tasked to carry out the survey to
establish the schools, hospital, and the water point that needs to be supplied and installed with
solar PV. The rural electrifications program that intends to supply power from Kainuk to
Lokichar and Lodwar town is also undertaken. The 1st phase of the transmission fromKainuk to
Lokichar has been done. The attainment of office and purchase of equipment’s and some
stationaries
Challenges
Inadequate staff, slow procurement process, slow implementation, unfavorable weather
conditions, lack of office space, shortage of vehicles, etc
Major services and outputs to be provided in 2014/2015
Establishment of two tree nurseries in each ward in the county, Research in agro forestry trees
and indigenous fruit trees, establishment of an arboretum, street lighting in round about in urban
centers, power connectivity in Kakuma, seedling production and tree planting in schools and
degraded areas and Gazzettement of Loima forest and Lotikipi Game reserve, environmental
policy formulation and management, micro mining policy development, the production of
environmental action plans, training of CFAs and other staff, purchase of vehicles to enhance
field operations and general office operations etc.
D. Programs and their objectives
STRATEGIC
OBJECTIVES
PROGRAMME SUB PROGRAMME
Create enabling
environment and
institutional efficiency and
effectiveness
P1 General
Administration
Planning and Support
Services
SP1.1 General Administration Planning
and Support Services
Increasetree cover and species diversity
P2 Turkana Greening Programme
SP2.1 Establishment of tree nurseries
SP2.2 Forest Gazettement-Loima
Enhanced environmental beauty P3Urban Beautification
SP3.1 Arboretum
Secure and protect wild species
P4Gazettement and
protection of Game
Reserve
SP4.1 Gazettement and protection of
Game
Reserves-Kibish/Lokitippi(Flagship)
Upscale research technology P5 Research and
Management of Tree
Species
SP5.1 Research in developing Agro
Forestry technologies
SP5.2 Research in developing indigenous
fruit trees
SP5.3 Management of Prosopis(Lake
Zone, Lokangae, Lokubae)
Enhance micro mining activities
P6Micro mining SP6.1 Micro mining(Small scale miners)
Protect and enforce environmental policyS
P7 Development of
policy and legal
frameworks
SP7.1 Engagement with Investors in
Energy Sector
SP7.2 Preparation of County
Environmental Action plan
SP7.3 Identification, formation, training
and supporting NR Committee
P8 Development of
CFAs and community
scout
SP8.1 Scout/Ranger Movement
Promote efficient use of renewable energy
P 9 Renewable Energy
Program
SP9.1 Rural Solar Lighting(Ward level)
Provide conducive working environment
P10 Construction of
office
SP10.1 Construction of office
E. SUMMARY OF PROGRAMME OUTPUTS AND PERFORMANCE INDICATORS
FOR 2014/2015- 2016/2017
Programme: P1 General Administration, Planning and Support Services
Outcome: An enhanced institutional framework for efficient and effective service delivery
Sub Programme: SP1.1 General Administration, Planning and Support Services
Delivery Unit
Key Output(KO)
Key Performance
Targets
2014/2015 2015/2016 2016/2017
Indicators(KPIs)
MEENR Delivery of quality, effective and efficient services
Ability to achieve on agreed deliverables
100% 100% 100%
Programme:P2 Turkana Greening Programme
Outcome: Enhanced tree cover and Improved micro-climate
Sub Programme: SP2.1 Establishment of tree nurseries
Delivery unit
Key output Key performance indicators
Targets
2014/2015 2015/2016 2016/2017
MEENR Tree nurseries established
Number of tree nurseries
60 90 110
Sub Programme: SP2.2 Forest Gazettement- Loima
Delivery unit Key output Key performance indicators
Targets
2014/2015 2015/2016 2016/2017
MEENR Protection of forests
Number gazette forests
1 1 1
Programme:P3Urban Beautification
Outcome: Enhanced environmental beauty
Sub Programme: SP3.1 Arboretum
Delivery unit Key output Key performance indicators
Targets
2014/2015 2015/2016 2016/2017
MEENR Arboretum Arboretum in place
1 2 2
Programme: P4Gazettement and protection of Game Reserve
Outcome: Protected wild species
Sub Programme: SP4.1 Establishment of Game Reserves- Kibish/Lokitippi(Flagship)
Delivery unit
Key output Key performance indicators
Targets
2014/2015 2015/2016 2016/2017
MEENR Protected/Gazetted Game Reserves
Number of Game Reserves
1 1 1
Programme: P5 Research and Management of Tree Species
Outcome: Enhanced research on tree species
Sub Programme: SP5.1 Research in developing Agro Forestry technologies
Delivery unit
Key output Key performance indicators
Targets
2014/2015 2015/2016 2016/2017
MEENR Adopted agroforestry tree species
No. of research conducted
1 1 1
Sub Programme: SP5.2 Research in developing indigenous fruit trees
Delivery unit
Key output Key performance indicators
Targets
2014/2015 2015/2016 2016/2017
MEENR Adopted indigenous fruit tree species
No. of research conducted
1 1 1
Sub Programme: SP5.3 Management of Prosopis(Lake zone, Lokangae, Lokubae)
Delivery unit
Key output Key performance indicators
Targets
2014/2015 2015/2016 2016/2017
MEENR Invasive nature of prosopis controlled
Management manual
1 1 1
Programme: P6Micro mining
Outcome: Increased earnings from minerals
Sub Programme: SP6.1 Micro mining(Small scale miners)
Delivery unit Key output Key performance indicators
Targets
2014/2015 2015/2016 2016/2017
MEENR Improved mining techniques
No. trained and exposed
1 1 1
Programme: P7 Development of policy and legal frameworks
Outcome: Enhanced protection and conservation of natural resources
Sub Programme: SP7.1 Engagement with Investors in Energy Sector
Delivery unit Key output Key performance indicators
Targets
2014/2015 2015/2016 2016/2017
MEENR Improved relationship between the community and investors
Number of meetings held
4 4 41
Sub Programme: SP7.2 Preparation of County Environmental Action plan
Delivery unit Key output Key performance indicators
Targets
2014/2015 2015/2016 2016/2017
MEENR Sustainable environmental management
Number of action plans
1 1 1
Sub Programme: SP7.3 Identification, formation, training and supporting NR Committee
Delivery unit Key output Key performance indicators
Targets
2014/2015 2015/2016 2016/2017
MEENR Committee No. of 6 4 4
formed sensitization sessions
Programme: P8 Development of CFAs and community scout
Outcome: Enhanced protection and conservation of natural resources
Sub Programme: SP8.1 Scout/Ranger Movement
Delivery unit Key output Key performance indicators
Targets
2014/2015 2015/2016 2016/2017
MEENR People trained on natural Resource management
Number of people trained
300 400 500
Programme: P 9 Renewable Energy Program
Outcome: Efficient utilization of renewable energy resources
Sub Programme: SP9.1 Rural Solar Lighting (Ward level)
Delivery unit Key output Key performance indicators
Targets
2014/2015 2015/2016 2016/2017
MEENR Increased solar power coverage
Percentage of HHs or facilities with solar power
30% 60% 90%
Programme: P10 Construction of office
Outcome: Improved working condition
Sub Programme: SP10.1Construction of office
Delivery unit Key output Key
performance
indicators
Targets
2014/2015 2015/2016 2016/2017
MEENR Office space Office
building
1 - -
F: SUMMARY OF EXPENDITURE BY PROGRAMMES 2014/2015- 2016/2017
ENVIRONMENT, ENERGY AND NATURAL RESOURCES
Programmes Projected Estimates2014/2015 2015/2016 2016/2017
SP1.1 General Administration Planning and Support Services
110,000,000.00
121,000,000.00
133,100,000.00
P1 General Administration Planning and Support Services
110,000,000.00
121,000,000.00
133,100,000.00
SP2.1 Establishment of tree nurseries at ward level
45,000,000.00
49,500,000.00 54,450,000.00
SP2.2 Forest Gazettement-Loima 5,000,000.00 5,500,000.00 6,050,000.00P2 Turkana Greening Programme
50,000,000.00
55,000,000.00
60,500,000.00
SP3.1 Arboretum 5,000,000.00 5,500,000.00 6,050,000.00
P3 Urban Beautification 5,000,000.00
5,500,000.00 6,050,000.00
SP4.1 Establishment of Game Reserves- Kibish/Lotikippi(FLAGSHIP)
100,000,000.00
110,000,000.00
121,000,000.00
P4 Gazettement and protection of Game Reserve
100,000,000.00
110,000,000.00
121,000,000.00
SP5.1 Research in developing Agro Forestry technologies 4,000,000.00 4,400,000.00 4,840,000.00
SP5.2 Research in developing 3,000,000.00 3,300,000.00 3,630,000.00
indigenous fruit treesSP5.3 Management of Prosopis(Lakezone, Lokangae, Lokubae)
15,000,000.00
16,500,000.00 18,150,000.00
P5 Research and Management of Tree Species
22,000,000.00
24,200,000.00
26,620,000.00
SP6.1 Micro mining(Small scale miners)
21,237,417.20 6,861,158.92 7,547,274.81
P6 Micro mining 21,237,417.20
6,861,158.92 7,547,274.81
SP7.1 Engagement with Investors in Energy Sector
10,000,000.00
11,000,000.00 12,100,000.00
SP7.2 Preparation of County Environmental Action plan 4,000,000.00 4,400,000.00 4,840,000.00SP7.3 Identification, formation, training and supporting NR Committee
9,000,000.00 9,900,000.00 10,890,000.00
P7 Development of policy and legal frameworks
23,000,000.00
25,300,000.00
27,830,000.00
SP8.1 Scout/Ranger Movement/ Wildlife Clubs 5,000,000.00 5,500,000.00 6,050,000.00P8 Development of CFAs and community scout
5,000,000.00
5,500,000.00 6,050,000.00
SP9.1 Rural Solar Lighting (Ward level)
110,000,000.00
33,000,000.00 36,300,000.00
P 9 Renewable Energy Program
110,000,000.00
33,000,000.00
36,300,000.00
SP10.1 Construction of Office 20,000,000.00
22,000,000.00 24,200,000.00
P10 Construction of Office 20,000,000.00
22,000,000.00
24,200,000.00
SP11.1 Mapping and Gazettment of Natural Resources 5,000,000.00 5,500,000.00 6,050,000.00P11 Mapping and Gazettment of Natural Resources
5,000,000.00
5,500,000.00 6,050,000.00
Total Expenditure Vote for Environment, Energy and Natural Resources
471,237,417.20
413,861,158.92
455,247,274.81
DEPARTMENT OF LANDS, PHYSICAL PLANNING & URBAN AREAS
MANAGEMENT
A. Vision
The Ministry’s vision is to have an efficient and effective land administration system that
promotes security of tenure equitable access and control of land for the sustainable socio-
economic development of the people of Turkana County.
B. Mission
To develop spatial plans for Turkana County that will identify the development needs and
priorities within the county, and recommend on the policies and strategies to help achieve the
prioritized needs/projects.
C. Strategic Objectives and Context for Budget Intervention:
The following are the ministry’s strategic objectives to realize its vision and mission:
i. Create enabling environment and institutional efficiency and effectiveness
ii. To promote public participation and inclusiveness on Land management & Governance
iii. To develop spatial plans that will provide spatial framework to guide, coordinate
development activities and management of all urban/ towns within the county
iv. To plan for ,provide and manage urban infrastructure & services such as streetlights,
sewerage system, drainage systems, waste management, CCTV technology installations,
public adverts, public recreational facilities
v. To Provide technical planning / survey equipment and software
vi. Provide for land ownership rights/titles for land owners within the county
vii. To establish Digital Land registry infrastructure and facilities
viii. Identify, map and demarcate intra and inter county boundaries in conjunction with
National government
ix. To Formulate the County’s Land Policies and Regulations for effective land governance.
Development achievements for the period under review 2013/2014 FY include;
i. Design, documentation and tendering for Consultancy services for 8 No. towns namely:
Lokori, Lokichar, Lorugum,Kalokol,Lowarengak, Lokitaung, Kakuma and Lokichoggio
ii. Design, documentation and tendering for Lodwar town street lighting
Challenges
During the 2013/2014 FY, the challenges faced were:
i. Inadequate technical personnel, office space and equipment.
ii. Inadequate funding especially for development activities
iii. Transition teething problems in terms of land laws, regulations and procedures
iv. Unclear system (operations and structures )
D. PROGRAMS AND THEIR OBJECTIVES
Strategic Objectives Programme Sub ProgrammeCreate enabling environment and institutional efficiency and effectiveness
P1 General Administration Planning and Support Services
SP1.1 General Administration Planning and Support Services
To promote public participation and inclusiveness on Land management & Governance
P2 LandsDevelopment Programme
SP2.1 Land Management and Governance (Public Participation sensitization and awareness)SP2.2 Land Registration, adjudication and settlement registration in 4 towns (Lokichoggio, Kakuma, Lodwar and Lokichar)SP2.3 Development of County Spatial Development PlanSP2.4 Development of Turkana County Land Policy and RegulationsSP2.5 Compulsory land acquisition for public utilities SP2.6 Establishment of land registry and land information databaseSP2.7 Technical equipment for survey and mapping (Total station, Geoditic GPS and Landcruiser)
To plan for ,provide and manage urban infrastructure & services
P3. Urban areas management and Improvement Programmes
SP3.1 Physical planning of potential towns in the county; Kibish, Katilia, Kalobeyei, Kainuk, Namoruputh, Kaikor and 3 others (Eliye, Kapedo and Nakurio)
SP3.2 Street lighting on major urban and trading centres: Lokori, Lokichar, Kakuma, Lokichoggio, Kalokol and Lokitaung
SP3.3 Town Management for 3 towns (Lokichar, Kakuma and Lokichoggio)
P4 Lodwar Town Management Committee
SP4.1 Improvement of Moi Garden StadiaSP4.2 Establishment of recreational park and street namingSP4.3 Fencing of the ministry’s offices(MoLPUA)
SP4.4 Setting up of dumping site in LodwarSP4.5 Establishment of a bus park and pavementsSP4.6 Lodwar Town Beautification ProgrammeSP4.7 Garbage TruckSP4.8 Construction of Drainage system of Lodwar townSP4.9 Street lighting in Lodwar town
E. SUMMARY OF PROGRAMME OUTPUTS AND PERFORMANCE INDICATORS
FOR 2014/2015- 2016/2017
Programme: P1 General Administration, Planning and Support ServicesOutcome: An enhanced institutional framework for efficient and effective service deliverySub Programme: SP1.1 General Administration, Planning and Support Services
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Lands, Physical Planning and Urban areas Management
Delivery of quality, effective and efficient services
Ability to achieve on agreed deliverables
100% 100% 100%
Programme: P2 Land Governance and Management
Outcome: Enhanced public participation and inclusiveness on Land management & Governance
Sub Programme: SP2.1 Land Management and Governance (Public Participation sensitization
and awareness)
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Lands, Physical Planning and Urban areas Management department
Public awareness meetings minutes reports
Level of Public awareness and participation on land
60% 70% 90%
Sub Programme:SP2.2 Land Registration, adjudication and settlement registration in 4 towns
(Lokichoggio, Kakuma, Lodwar and Lokichar)
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Lands, Physical Planning and Urban areas Management department
Base maps Adjudicated areas Plans and maps
2 plans1 map
Sub Programme: SP2.3 Development of County Spatial Development Plan
Delivery Unit
Key Output(KO)
Key Performance
Targets
2014/2015 2015/2016 2016/2017
Indicators(KPIs)
Lands, Physical Planning and Urban areas Management department
Base maps County Spatial plan draft
1 spatial plan
Sub Programme: SP2.4 Development of Turkana County Land Policy and Regulations
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Lands, physical planning and urban areas
Turkana Land policy paper
Efficiency in land governance and management
70% 90% 100%
Sub Programme:SP2.5 Compulsory land acquisition for public utilities
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Lands, Physical Planning and Urban areas Management department
Acquired land for public use
Increased Sites for public use
8 sites 3 1
Sub Programme:SP2.6 Establishment of land registry and land information database
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Lands, Physical Planning and Urban areas Management
Efficiency in community land management and registration
Land registry and database
100% 100% 100%
department
Sub Programme:SP2.7 Technical equipment for survey and mapping (Total station, Geodetic
GPS and Land cruiser
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Lands, Physical Planning and Urban areas Management department
Technical equipment procured
Items acquired and in use
100% 100% 100%
Programme: P3Urban Areas Management and Improvement Programmes
Outcome: Ordered, coordinated and development controlled urban areas
Sub Programme:SP3.1 Physical planning of potential towns in the county; Kibish, Katilia,
Kalobeyei, Kainuk, Namoruputh, Kaikor and 3 others (Eliye, Kapedo and Nakurio)
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Lands, Physical Planning and Urban areas Management department
Urban physical development plans
-Order and development control in towns-increased development applications for approvals
10No. 5 3
Sub Programme:SP3.2 Street lighting on major urban and trading centres: Lokori, Lokichar,
Kakuma, Lokichoggio, Kalokol and Lokitaung
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Lands, Physical Planning and Urban areas Management department
Street lights % of roads with street lights
30% 50% 70%
Sub Programme: SP3.3 Town Management for 3 towns Lokichar, Kakuma& Lokichoggio
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Lands, Physical Planning and Urban areas Management department
Improved town management
No. of Services provide
3 7 10
Programme: P4 Lodwar Town Management Committee
Outcome: Functional public utilities
Sub Programme: SP4.1 Improvement of Moi Garden Stadia
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Lodwar Town Management Committee
Improved stadia Functionality and frequency of use by public
60% 80% 100%
Sub Programme:SP4.2 Establishment of recreational park and street naming
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Lodwar Town Management Committee
Available recreational park
Functionality and frequency of use by public
80%
Sub Programme: SP4.3Fencing off the ministry of lands offices
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Lodwar Town Management Committee
Fenced office compound
Increased office security
100%
Sub Programme: SP4.4Setting up of dumping site in Lodwar
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Lodwar Town Management Committee
Dumping site Reduced solid waste in town
70% 80% 95%
Sub Programme: SP4.5 Establishment of a bus park and pavements
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Lodwar Town Management Committee
Bus park and paved sideways
Existence of bus park and sideways
80% 100%
Sub Programme: SP4.6 Lodwar Town Beautification Programme
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Lodwar Town Management Committee
Improved aesthetics of town
No. of installations to beautify town
10 50 70
Sub Programme: SP4.7 Garbage Truck
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Lodwar Town Management Committee
Improved aesthetics of town
No. of installations to beautify town
10 50 70
Sub Programme: SP4.8 Construction of Drainage System of Lodwar Town
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Lodwar Town Management Committee
Drainage System
Length of Drainage trench excavated
5Km 10Km 20Km
Sub Programme: SP4.9 Street Lighting in Lodwar Town
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Lodwar Town Management Committee
Street lighting for Improved Security
Length o roads under street lights
7Km 15Km 25Km
F: SUMMARY OF EXPENDITURE BY PROGRAMMES 2014/2015- 2016/22017
LANDS, PHYSICAL PLANNING AND URBAN AREAS MANAGEMENT
ProgrammesProjected Estimates
2014/15 2015/2016 2016/2017SP1.1 General Administration Planning and Support Services 99,529,734.89 109,482,708.38 120,430,979.21
P1 General Administration Planning and Support Services 99,529,734.89 109,482,708.38 120,430,979.21
SP2.1 Land Governance and Management (Public Participation, sensitization and awareness)
10,000,000.00 11,000,000.00 12,100,000.00
SP2.2 Land Registration, adjudication and settlement registration in 4 towns (Lokichoggio, Kakuma, Lodwar and Lokichar)
16,000,000.00 17,600,000.00 19,360,000.00
SP2.3 Development of County Spatial Development Plan (CSDP) 50,000,000.00 55,000,000.00 60,500,000.00
SP2.4 Development of Turkana County Land Policy and Regulations 5,150,000.00 5,665,000.00 6,231,500.00
SP2.5 Compulsory Land acquisition for establishment of necessary public utilities 30,000,000.00 33,000,000.00 36,300,000.00
SP2.6 Establishment of Land registry and Land Information System Database 7,000,000.00 7,700,000.00 8,470,000.00
SP2.7 Technical Equipment for Survey and mapping (Total Station, Geoditic GPS and Land Cruiser)
16,000,000.00 17,600,000.00 19,360,000.00
P2 Lands Development Programme 134,150,000.00 147,565,000.00 162,321,500.00SP3.1 Physical planning of potential towns in the county; Kibish, Katilia,Kalobeyei, Kainuk, Namoruputh, Kaikor and three others(Eliye, Kapedo and Nakurio)
130,897,320.77 143,987,052.85 158,385,758.13
SP3.2 Street lights in major trading centers; Lokori, Lokichar, Kakuma, Lokichoggio, Kalokol, and Lokitaung
63,954,000.00 70,349,400.00 77,384,340.00
SP3.3 Town Management for 3 Towns (Lokichar, Kakuma and Lokichoggio) 7,500,000.00 8,250,000.00 9,075,000.00
P3 Urban Areas Management and Improvement Programme 202,351,320.77 222,586,452.85 244,845,098.13
SP4.1 Improvement of Moi Garden 7,171,909.91 7,889,100.90 8,678,010.99SP4.2 Establishment of recreational parks and street naming 20,000,000.00 22,000,000.00 24,200,000.00
SP4.3 Fencing of the Ministry offices (Lands, Physical planning and Urban Areas Management
5,000,000.00 5,500,000.00 6,050,000.00
SP4.4 Setting up of a dumpsite in Lodwar 5,000,000.00 5,500,000.00 6,050,000.00SP4.5 Establishment of a Bus Park/Terminal and pavements 15,000,000.00 16,500,000.00 18,150,000.00
SP4.6 Lodwar Town Beautification Programme 5,000,000.00 5,500,000.00 6,050,000.00
SP4.7 Garbage Truck 10,000,000.00 11,000,000.00 12,100,000.00SP4.8 Construction of drainage system of Lodwar Town 33,961,568.00 37,357,724.80 41,093,497.28
SP4.9 Street Lighting in Lodwar Town 15,000,000.00 16,500,000.00 18,150,000.00P4 Lodwar Town Management Committee : 116,133,477.91 127,746,825.70 140,521,508.27
Total Expenditure Vote for Lands, Physical Planning and Urban Areas 552,164,533.57 607,380,986.92 668,119,085.62
Management
COUNTY ASSEMBLY
A. VISION
To be a county government arm of excellence in legislation, oversight and policy approvals for
the efficient and effective governance to the people of Turkana County.
B. MISSION
To spearhead democracy in Turkana County through effective dispensation of legislations by
facilitating Members of the County Assembly to fulfill their constitutional mandate in a
representative system of government by upholding and ensuring the autonomy of the county
assembly in its corporate relationship with the other arms of the government.
C. STRATEGIC OVERVIEW AND CONTEXT FOR BUDGET INTERVENTION:
The County Assembly will implement the following strategic objectives:
1 .To create a sustainable working environment for staff and members.
2. To improve service delivery and work methods of members and staff.
3. To set up an efficient, effective and transparent expenditure control system.
4. Digitize operations of the county assembly and automate library services
5. Public involvement in Budget making process.
D. PROGRAMS AND THEIR OBJECTIVES
Objective Programme Sub Programme
Create enabling environment
and enhance institutional
efficiency and effectiveness
for public service and disaster
management.
P1. General Administration
Planning and Support Services
P1.1 General Administration
Planning and Support Services
To improve service delivery
and work methods of members
and staff.
P2 County Assembly P2.1 Construction of New
Assembly Building
P2.2 Purchase of land for New Assembly
To Provide an official residence for the Speaker of the County Assembly
P3 Turkana County Speaker’s Residence
P 3.1 Construction of
Speaker's Residence
P 3.2 Purchase of land for
construction of speaker's
residence
E. SUMMARY OF PROGRAMME OUTPUTS AND PERFORMANCE INDICATORS
FOR 2014/2015-2016/2017
Programme: P.1General Administration Planning and Support Services
Outcome: Create enabling environment and enhance institutional efficiency and effectiveness in
executing the County Assembly’s mandate.
Sub Programme: SP1.1 General Administration Planning and Support Services
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
County Assembly
Delivery of quality, effective and efficient services
Ability to achieve on agreed deliverables
100% 100% 100%
Programme: P2 County Assembly
Outcome: To improve service delivery and work methods of members and staff.
Sub Programme: P2.1 Construction of New Assembly Building
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
County Assembly New County
Assembly
Chamber
County Assembly
chamber in place
100% 100% 100%
Programme: P3 Turkana County Speaker’s Residence
Outcome: To Provide an official residence for the Speaker of the County Assembly
Sub Programme: P3.1 Construction of County Speaker’s Residence
Delivery Unit Key Output
(KO)
Key Performance
Indicators (KPIs)
Targets
2014/2015 2015/2016 2016/2017
County Assembly County Speaker’s 100% 100% 100%
Speaker’s
Residence
residence
residence in place
F: SUMMARY OF EXPENDITURE BY PROGRAMMES 2014/2015- 2016/22017
COUNTY ASSEMBLY
Programme Projected Estimates2014/2015 2015/2016 2016/2017
SP1.1 General Administration and Support Services
967,300,234.00
809,037,452.30
889,941,197.53
P1 General Administration, Planning and Support Services
967,300,234.00
809,037,452.30
889,941,197.53
P2.1 Construction of New Assembly Building
175,000,000.00 - -
P2.2 Purchase of land for New Assembly - - -
P2 Construction of New Assembly Building
175,000,000.00 - -
P3.1 Purchase of Land for construction of speaker's residence
- - -
P3.2 Construction of Speaker's Residence
60,000,000.00 - -
P3 Construction of Speaker's Residence
60,000,000.00 - -
Total Expenditure Vote for County Assembly
1,202,300,234.00
809,037,452.30
889,941,197.53
COUNTY PUBLIC SERVICE BOARD
A. Vision:
To be an institution of excellence in the provision of a high performing, dynamic and ethical
public service within and beyond Turkana county.
B.Mission:
To establish and maintain a sufficient, professional and competent workforce through quality and
effective service delivery for the realization of county development goals and foster national
unity.
C. STRATEGIC OVERVIEW AND CONTEXT FOR BUDGET INTERVENTION
The board will implement the following strategic objectives:
i. To provide leadership and policy direction for effectiveservice delivery.
ii. Establish a county skill database that will provide a comprehensive audit of all present
and needed skills
Major achievements for the period under review include;
i. Recruitment and placement of officers to various positions
ii. Training and development of human resource.
Challenges faced are;
i. Personnel, office space and equipment.
ii. Lack of personnel need assessment
MAJOR SERVICES AND OUTPUTS TO BE PROVIDED IN 2014/2015
i. Recruitment and placement of officers.
D. PROGRAMS AND THEIR OBJECTIVES
STRATEGIC OBJECTIVES PROGRAMME SUB PROGRAMME
Create enabling environment and
institutional efficiency and effectiveness
P1 General
Administration
Planning and
Support Services
SP1.1 General Administration
Planning and Support Services
E. SUMMARY OF PROGRAMME OUTPUTS AND PERFORMANCE INDICATORS
FOR 2014/2015- 2016/2017
Programme: P1 General Administration, Planning and Support Services
Outcome: An enhanced institutional framework for efficient and effective service delivery
Sub Programme: SP1.1 General Administration, Planning and Support Services
Delivery Unit
Key Output(KO)
Key Performance Indicators(KPIs)
Targets
2014/2015 2015/2016 2016/2017
Public Service Board
Delivery of quality, effective and efficient service
Ability to achieve on agreed deliverables
100% 100% 100%
F: Summary of Expenditure by Programmes 2014/2015- 2016/2017
County Public Service Board
Programme Projected Estimates2014/2015 2015/2016 2016/2017
SP1.1 General Administration Planning and Support Services
68,176,051.44 74,993,656.58 82,493,022.2
4P1 General Administration Planning and Support Services
68,176,051.44
74,993,656.58
82,493,022.24
Total Expenditure Vote for Public Service Board
68,176,051.44
74,993,656.58
82,493,022.24