GHPZJZD1051H Fenquan River Yangqiao Ship Lock Extension Project (As part of Anhui Shaying River Channel Improvement Project) Environmental Management Plan E2520 V5 REV

documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

GHPZJZD1051H

Fenquan River Yangqiao Ship Lock Extension Project

(As part of Anhui Shaying River Channel Improvement Project)

Environmental Management Plan

Anhui Provincial Port and Shipping Construction Investment Co., Ltd.

Beijing Zhongzi-Huayu Environmental Technology Co., Ltd.

E2520 V5 REV

Page 2: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

September 2014

Page 3: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

Table of Content

Chapter 1 General......................................................................................................1

Chapter 2 Environmental Impact Control Measures and Implementation Plans..............................................................................................................................................8

Chapter 3 Environmental Management Responsibilities.....................................14

Chapter 4 Environmental Monitoring Plans.........................................................23

Chapter 5 Staff Training..........................................................................................28

Chapter 6 Investment Estimates for Environmental Protection..........................30

Chapter 7 Miscellaneous..........................................................................................32

Page 4: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

1

Chapter 1 General

1.1 Project Background

The Yangqiao Ship Lock is one of the major hydraulic structures which make up the

Fenquan River Hydraulic Engineering Project. The Lock directly concerns water

transportation of mass goods in Linquan County, since the water route finally joins with

the Yangtze River after taking the path of the Fenquan River, the Shaying River, the

Huaihe River and the Beijing-Hangzhou Great Canal. Linquan County is featured by

fertile land and abundant natural resources, which make it a national commercial grain

production base and one of the important energy industry bases in China. The direct

heartland of the Linquan spans across Linquan County, Fuyang County and Yingshang

County, and its indirect heartland can extend as far as Henan Province, cities along the

Huaihe River, Jiangsu, Zhejiang and Shanghai. Insomuch as the direct heartland is

concerned, Linquan is an important coal industry-pillared Chinese city as well as an

important transportation hub in East China. Apart from that, the city is a center of

commerce & trade and a regional hub of processing industries. With diverse

characteristics and advantages, Linquan promises an optimistic future outlook.

As national economy grows and resources development proceeds in the heartland, the

Ship Lock is witnessing increasing throughput handling accompanied especially by the

staggering production capacity of Linquan Chemical Engineering Co, Ltd. and the

constant growth of agricultural & sideline product processing. It is anticipated that the

annual throughput will rise to 4.80 million tons in 2020 and 6.1 million tons in 2030. Seen

from this perspective, the Yangqiao Ship Lock Extension Project (hereinafter referred to

as “the Ship Lock”, “the Project” or “the Work”) is a very important one.

1.2 Project Profile

Page 5: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

2

The Ship Lock is set to be extended against Grade IV ship lock criteria, with a 500t

design tonnage for barges. A 180m-long chamber will be constructed, totaling a specified

volume of 180×12×3.5m (Length*Width*Water Depth at Lock Sill). The Project involves

a capital investment of approximately RMB161 million, including RMB9.958 worth of

environmental protection facilities. The Project plans to involve a construction period of

two years; that is, it is set to be completed and commissioned at the end of 2015. As for

construction plans, the Project will comprise the chamber, upstream & downstream lock

heads, upstream & downstream navigation channels, upstream & downstream approach

channels, berthing structures, highway bridge & link road, sluice gate &

electromechanical equipment, and control panel room & management facility.

1.3 Laws, Legislations and Technical Standards

A. State Laws and Legislations:

1. Environmental Protection Act of the People’s Republic of China (proclaimed on 26 Dec. 1989)

2. Environmental Impact Assessment Act of the People’s Republic of China (proclaimed on 1 Sept. 2003);

3. Atmospheric Pollution Prevention and Control Act of the People’s Republic of China (proclaimed on 1 Sept. 2000);

4. Water Pollution Prevention and Control Act of the People’s Republic of China (proclaimed on 28 Feb. 2008);

5. Ambient Noise Pollution Prevention and Control Act of the People’s Republic of China (proclaimed on 1 Mar. 1997);

6. Solid Waste-generated Environmental Pollution Prevention and Control Act of the People’s Republic of China (proclaimed in April, 2005);

7. Soil & Water Conservation Law of the People’s Republic of China (proclaimed on 29 Jun. 1996);

Page 6: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

3

8. Port Act of the People’s Republic of China (proclaimed on 1 Jan. 2004);

9. Water Act of the People’s Republic of China (proclaimed on 29 Aug. 2002);

10. Land Management Act of the People’s Republic of China (proclaimed in Aug. 1998);

11. Flood Prevention & Control Act of the People’s Republic of China (proclaimed in Aug. 1997);

12. River Channel Management Act of the People’s Republic of China (No.: GWYLD3H; proclaimed in Jun. 1988);

13. Guideline on National Ecosystem Protection (proclaimed in Nov. 2000);

14. Regulation on Environmental Protection for Construction Projects (proclaimed on 29 Nov. 1998);

15. Regulation on Inland Waters Transportation Safety Management of the People’s Republic of China (proclaimed in 2002);

16. Regulation on Environmental Protection for Transport Infrastructure Projects (No.: JTB (2003) D5HL);

17. Administrative Regulations of People’s Republic of China on Prevention and Control of Environmental Pollution of Inland Waters Caused by Ships, Decree of Ministry of Communications (2005) No. 11;

B. Local Laws and Regulations

1. Directive on Quality Improvement for Environmental Impact Assessments (No.: HJ [2002]46HW; issued by the Anhui Provincial Environmental Protection Dept. on 10 Apr. 2002);

2. Provisional Directive on Preparation Procedure Standardization for Environmental Impact Assessments of Construction Projects (No.: AHSHJBHJHP [2006]113HW; issued by the Anhui Provincial Environmental Protection Dept. on 16 Jun. 2006);

3. Resolution of the Anhui Provincial People’s Government on More Pragmatic Environmental Protection Efforts (No.: SZFWZ (1997)28HW);

Page 7: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

4

4. Anhui Environmental Protection Management Procedure (issued by the Anhui Provincial Environmental Protection Dept.);

5. Regulations of Anhui Province on Agroecological Environment Protection (Revised), Jun. 29, 2006;

6 Regulations of Anhui Province on Protection and Control of Water Pollution of Huai River Basin, Jun. 2006;

C. Applicable WBG Safety Control Policies

1. Environmental Assessment (OP/BP4.01, 1999.1)

Major Assessment Standards Applicable to the Project:

Environmental Quality Standards

  Ambient air quality shall meet the Grade 2 requirements of the Ambient Atmosphere

Quality Standard (GB3095-1996). See Tab. 1-1 for details.

Tab. 1-1 Concentration Limits of Pollutants in the Ambient Atmosphere

Atmosphere Quality Standard Pollutant Type Sampling Frequency

Concentration Limits

(mg/Nm³)

Grade 2 requirements of the Ambient Atmosphere Quality Standard

(GB3095-1996)SO2

1h average

Daily average

Annual average

0.50

0.15

0.06

TSPDaily average

Annual average

0.30

0.20

PM10Daily average

Annual average

0.15

0.10

Page 8: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

5

NO2

1h average

Daily average

Annual average

0.24

0.12

0.08

Ambient Noise Level

Ambient noise level shall meet the Grade 2 and Grade 4a requirements of the

Ambient Noise Level Standard (GB3096-2008). Areas 30m of Building Line X017 shall

meet the Grade 4a requirements of the Ambient Noise Level Standard (GB3096-2008).

For the remaining areas, the Grade 2 requirements of the same standard shall apply. See

Tab. 1-2 for specific standard values. For noises in construction, refer to Emission

standard of environment noise for boundary of construction site (GB12523-2011), and see

Tab. 1-3 for specific values.

Tab. 1-2: Ambient Noise Level Requirements (unit: dB (A))

Applicable Standard RequirementsStandard Value (dB(A))

Day Night

Grade 2 requirements 60 50

Grade4a requirements 70 55

Tab. 1-3 – Noise Emissions Limits for Construction Sites (unit: dB (A))

Construction Site Noise Emissions Control Standard (GB12523-2011)Day Night

70 55

Surface Water Quality

  The Fenquan River shall meet the Grade IV water quality requirements of the Surface

Water Quality Standard (GB3838-2003). See Tab. 1-4 for specific values. The

impoundment in the Yangqiao Ship Lock is used primarily for field irrigation, water

Page 9: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

6

transportation and industrial/domestic water along the route of the Project. Tail water

discharge shall meet the Grade 2 requirements of the General Wastewater Discharge

Control Standard (GB8978-1996). See Tab. 1-5 for specific values. The assessment

defines vessel waste discharge shall comply with the requirements of the Vessel Pollutant

Discharge Control Standard (GB3552-83). See Tab. 1-6 for specifics.

Tab. 1-4 - Surface Water Quality Standard Values

Pollutant Type

Standard Value

(mg/L; exclusive of

pH)

Source of the Value

pH 6-9

For SS, the standard limits specified by the Field Irrigation

Water Quality Standard (GB5084-2005) for moderate

drought-tolerant crops shall apply. For the remaining

indicators, the Grade IV requirements in the Surface Water

Quality Standard (GB3838-2002) shall apply.

DO ≥3

Permanganate

index≤10

BOD5 ≤6

COD ≤30

NH3-N ≤1.5

As ≤0.1

Volatile

phenols≤0.01

Petroleum ≤0.5

SS ≤100

Tab. 1-5 - General Wastewater Discharge Control Standard (unit: mg/L; exclusive of pH)

Pollutant Type pH SS COD BOD5 NH3-N Petroleum

Standard Value 6-9 ≤150 ≤150 ≤30 ≤25 ≤10

Page 10: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

7

Tab. 1-6 - Vessel Pollutant Discharge Control Standard (unit: mg/L)

Pollutant Type Petroleum BOD5 SS Coliform GroupPlastic

s

Floating

object

Waste

food

Standard value

(≤)15 50 150

250

groups/100mL

Such pollutants must not appear in

water

Sediment Dumping Site Environmental Standard

Sediment for agricultural use shall meet the control values in the Agriculture-purpose

Mud Pollutant Control Standard (GB4284-84). See Tab. 1-7 for details. Sediment

dumping sites shall meet the Grade 2 requirements of the Soil Environment Quality

Standard (GB15618-1995). See Tab. 1-8 for details.

Tab. 1-7 - Agriculture-purpose Mud Pollutant Control Standard (GB4284-84)

(Unit: mg/kg; exclusive of pH)

Item pH As Hg Pb Cu Zn Cr Ni

GB4284-84pH<6.5 75 5 300 250 500 600 100

pH≥6.5 75 15 1000 500 1000 1000 200

Tab. 1-8 – Soil Environment Quality Standard (GB15618-1995; excerpt) (unit: mg/kg)

Grade pH As Hg Pb Cu Zn Cr Cd

Grade II 6.5-7.5 25 0.5 300 100 250 300 0.6

Page 11: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

8

Chapter 2 Environmental Impact Control Measures and

Implementation Plans

A series of environmental impact control measures are prepared on the basis of the

EIA results. They are listed as part of the environmental management plan. Refer to Tabs.

2-1, 2-2 and 2-3.

Page 12: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

9

Page 13: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

10

Tab. 2-1 – Implementation Plan for Environmental Protection for the Design Stage

Work Potential Impact/Challenge Control Measure Period of ImplementationBudget

(unit: RMB10,000)Implementer Supervision Monitoring Criteria Monitoring Frequency

Land expropriation

and resettlement

Select appropriate spoil areas and rubble dumping

sites;

Preparing “Resettlement action plan”.

Design and EIA/ Preparation

phase of Resettlement action

plan

Design unit, EIA

team, and consultant

of resettlement plan

APPSCI, Transport Department

of Anhui Province, WBG, Land

& Resources Dept., and Water

Authority

——

The regular meeting

among the design unit,

EIA team and agency of

resettlement action plan.

Soil & water loss

control

Navigation channel site,

embankment site, worksites, living

quarters and spoil areas will be

impacted

The Soil & Water Conservation Report for the

Fenquan River Yangqiao Ship Lock Project,

drafted according to the Soil & Water

Conservation Law, is a legally binding document

and part of a total environmental management

system. The report deals with soil & water loss

control measures for the preparation stage,

navigation channel site, embankment site, road

bridge site and link road site. Also, monitoring

plans are made and integrated with the bid

proposals and the Agreement. Execution,

supervision and budgets are included as well.

Preparation stage for design

and EIA663.8

Designer, soil &

water conservation

assessment

authority, and EIA

authority

APPSCI, Anhui Transport Dept.,

WBG, and Water Conservation

Bureau

The Soil & Water

Conservation Report for

the Fenquan River

Yangqiao Ship Lock

Project (integrated with

the design and bid

proposals

Regular meetings

among the designer, soil

& water conservation

authority and EIA

authority

Tab. 2-2 - Implementation Plan for Environmental Protection for the Construction Stage

  WorkPotential Impact &

ChallengeControl Measure

Period of

Implementation

Budget

(unit: RMB10,000)

Implementer Supervision Monitoring Criteria Monitoring Frequency

Ship lock, bridge; link

road

Impacts of channel

dredging and bridge

construction on water

quality;

Industrial & domestic

waste water drained

into surface water

bodies

1. Forbid workmen to drain domestic waste water directly into water bodies. It’s

advised that domestic waste water and feces be pretreated in septic tanks before

hauled away for crop irrigation. Educate workmen on environmental protection.

Forbid draining domestic wastewater at will. Don’t pour domestic wastewater or

drop garbage at will. Dump domestic waste at appointed places for regular

removal.

2、Build temporary facilities for wastewater and mud generated by sand/ grave

washing, concrete mixing and construction, including sump pits, sedimentation

basins, oil separators and drains. Collect construction wastewater separately

according to types and nature and let it drain into treatment units and

sedimentation basins for satisfactory treatment before discharge. Construction

vessels shall be fitted with oil/water separators or oil collectors to treat oily

During the Work 50 Contractor APPSCI; ESE

(Environmental

Supervision

Engineer)

Surface water shall meet the

requirements of the Surface

Water Quality Standard

(GB3838-2002)

 Daily monitoring by ESE;

regular monitoring by local

environmental monitoring

stations

Page 14: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

11

  WorkPotential Impact &

ChallengeControl Measure

Period of

Implementation

Budget

(unit: RMB10,000)

Implementer Supervision Monitoring Criteria Monitoring Frequency

wastewater satisfactorily before discharge. Educate workmen on HSE. Maintain

construction equipment regularly and overhaul it in time. Prevent construction

incidents from polluting the water environment.

3. Install oily water collection & storage units. Vessels must have oil/water

separators; an alternative is to charge the task to specialized external watercraft

pollution service providers for treatment and drainage.

4. Build cofferdams before construction. Don’t remove them until the water is let

to settle for days.

Construction site;

material transport

Noise impact on

neighborhoods

1. Rationalize the work schedule. Select daytime operation near residential

communities. Take every reasonable measure to minimize the noise of machinery

on neighborhoods.

2. Forbid the use of machinery not in compliance with state noise emissions

standards. Try the best to use low-noise machinery. Minimize the reach and

extent of the noise of major construction machinery.

3. Maintain construction machinery as appropriately as reasonable in order to

reduce noise resulting from improper upkeep.

4. Locate concrete batching plants as far from residential areas as possible. Erect

sound barrier walls. Abide strictly by the Construction Site Noise Emissions

Control Standard. Forbid the use of big-noise equipment during night operation.

5. Reinforce safeguards and protective measures during the blasting of the old

ship lock. Issue prior notice to local residents before blasting operation. For

avoidance of hearing impairment, workmen and local residents are forbidden to

remain in the restricted area.

6. Arrange for the routes and time schedule of construction vehicles rationally.

Implement driving speed limits. Strengthen transport regulation for trucks nearby

the Site. Try the best not to blow horns so that traffic noise resulting from

congestion can be avoided.

During the Work 40 Contractor APPSCI; ESE Implementing proper mitigation

measures.

 Daily monitoring by ESE;

regular monitoring by local

environmental monitoring

stations

(Tab. 3-4)

Page 15: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

12

  WorkPotential Impact &

ChallengeControl Measure

Period of

Implementation

Budget

(unit: RMB10,000)

Implementer Supervision Monitoring Criteria Monitoring Frequency

7. Select construction vehicles according to the Allowable Noise Standard for

Motor Vehicles (GB1495-79). Prohibit non-conforming vehicles and equipment

from entering the Site.

8. Implement work ethics and install simple mobile noise barriers near the source

of noise. Surround the Site with enclosures to cut down on the travel distance of

noise.

Construction site;

material transport

Fugitive dust impact

on neighborhoods

1. Locate the Site as far from residential areas as possible, i.e. at places with less

interference to residential areas.

2. For the sake of dust prevention, promptly haul spoil out of the Site and cover

sand and cement with coverings. Sprinkle water on the Site and roads regularly to

effectively reduce fugitive dust. Wash the truck tires in time. Haul roads for earth

and mortar transport must be inspected and cleared to ensure tidiness.

3. Load spoil to a height below the baffle plates to reduce transport loss. Control

the speed of construction vehicle below 40km/h to reduce secondary fugitive

dust. Forbid the entry of construction machinery and vehicles if they fail state

exhaust emissions standards.

4. Surround sand/gravel storage yards with wind barriers. Locate stowage at

proper places to reduce potential fugitive dust. Clear broken sacks and cement

dust away from the ground in time. Sprinkle water on hauling roads from time to

time to keep the pavement humid. Cover the pavement with braided bamboo

mats and straw bags to reduce fugitive dust generated by passing vehicles and

wind. Store cement materials and the like at separate places. Clean away cement

dust in time away from the ground.

5. Enclosure the Site while the Work is going on. Surround the Site with railings

or barriers to reduce the impact of fugitive dust on neighborhoods.

6. Cover or sprinkle water on the excavated earth and haul it away as soon as

possible.

During the Work 10 Contractor APPSCI; ESE Implementing proper mitigation

measures.

 Daily monitoring by ESE

Page 16: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

13

  WorkPotential Impact &

ChallengeControl Measure

Period of

Implementation

Budget

(unit: RMB10,000)

Implementer Supervision Monitoring Criteria Monitoring Frequency

7. Provide adequate PPE for workmen on site. Provide masks for workmen who

carry out dusty operation.

Ship lock demolition &

construction; workmen’s

living quarters

Spoil, domestic &

construction waste

1. Recycle solid waste generated during cut work and demolition. Useless silt at

the underwater part of cofferdams and similar projects must be hauled to and

dumped at designated places.

2. Spread ripe topsoil over dry silts or spoil so that the topsoil in the dumping

sites will have good cultivation performance. Take drainage & slope protection

measures against soil & water loss. Restore the dumping sites

3. Classify and collect domestic waste at separate places so that local urban

sanitation authorities can remove it.

During the Work 42 Contractor APPSCI; ESEImplementing proper mitigation

measures.

 Daily monitoring by ESE

Living quarters and

workmen

Communicable

diseases

1. Pay regard to worksite sanitation. Workmen must pass the health exam before

entry into the Site. Provide periodical health exams for workmen during

construction to ensure their healthiness.

2. Do a good job of sanitation education. Help workmen build up a high

consciousness of sanitation and provide good medical & vaccination services.

3. Provide hygienic drinking water and a clean environment. Help workmen

build up a high consciousness of personal hygiene and disease control &

prevention. Pay regard to food hygiene management to prevent contagious

diseases.

4. Make site hygiene management rules. Check public hygiene conditions. Pay

regard to food hygiene and site sanitation.

During the Work See the Agreement Contractor APPSCI; ESEImplementing proper mitigation

measures.

 Daily monitoring by ESE

  

Page 17: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

14

Tab. 2-3 – Implementation Plan for Environmental Protection Measures for the Operation Period

WorkPotential

Impact/ChallengeControl Measure

Period of

Implementation

Budget

(unit: RMB10,000)

Implementer SupervisionMonitoring

Criteria

Monitoring

Frequency

Vessels and the ship

lock management

facility

Slops and domestic

waste water from

vessels might cause

water pollution to the

Fenquan River

Forbid vessels to discharge foul water into the river. Rather, it should be

discharged at places designated by the port & navigation administration.

Build wastewater disposal facilities at designated sites where domestic

wastewater from the ship lock area is treated.

Conform strictly to the navigation rules and chamber management

regulations for hazardous substances and oils. Take risk prevention

measures.

Before operation

During operation

60 Yangqiao Ship Lock

Operation Company

APPSCI and local

environmental

protection authority

Permanganate index,

SS and petroleum

Once a month

Vessels and the ship

lock management

facility

Solid waste disposal Build domestic waste collection sites to collect domestic waste generated

at the Site. Transport it in time to the dumping sites.

During operation 20 Yangqiao Ship Lock

Operation Company

APPSCI; local

environmental

protection authority

Collection and

disposal of waste

Regularly

Vessels Noise impact on

neighborhoods along

the navigation

channel

1. Ensure the GAR in the Ship Lock Area and on both banks of the

approach channel meets the environmental requirements. Plant trees within

20m of both sides of the ship lock management facility and the approach

channel.

2. Make every endeavor to reduce the duration and frequency of whistles

when getting into or out of the ship lock and the approach channels. Close

the door of the engine room. High-pitched and low-pitched whistles must

be available. Only the low-pitched whistle is allowed in and near the ship

lock.

3. Place gradual limits on the intensity of the whistling sound of vessels in

inland rivers. Make every effort not to blow the whistle at night in or near

the ship lock.

4. The vessel shall travel at a low speed at the navigational part of the ship

During operation — Yangqiao Ship Lock

Operation Company

Fuyang Port &

Navigation

Administration;

local environmental

protection authority

Leq Twice a month

Page 18: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

15

lock.

5. Take measures to lower the noise. Upgrade the machines and equipment

used in vessel building. Obsolete non-environmental vessel types. Fit

appropriate mufflers to control noise.

Page 19: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

16

Chapter 3 Environmental Management Responsibilities

3.1 Environmental Management Organizations and Responsibilities

The following organizations are responsible for environmental management

during the construction period: APPSCI, Contractor, ESE and External Environmental

Consultant (EEC) (see Fig. 3-1). APPSCI takes environmental management

responsibilities during the operation period.

The following information describes the specific responsibilities of the above

stakeholders.

(1) Anhui Provincial Transport Dept. (Foreign Investment Administration Office)

Transport Department of Anhui Province is ultimately responsible for conducting,

administering and supervising environmental management for the Project through the

Transport Department of Anhui Province

TDA Foreign investment Administration office

EECEMS

Contractor

ESE

Anhui Provincial Port & Shipping Construction Investment Group

Fig. 3-1 Environmental Management System during Construction Period

Page 20: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

17

Foreign Investment Administration Office (“FIAO”). Also, the FIAO is responsible

for liaising and coordinating with the World Bank.

(2) Anhui Provincial Port & Shipping Construction Investment Group (APPSCI)

APPSCI is responsible for total environmental management at the construction

stage. An Environmental Protection Branch accountable to one or two Environmental

Management Commissioners (“Commissioner”) will be set up as a subordinate to the

APPSCI Project Office. The Commissioner takes the following responsibilities:

Under the supervision and instruction of the APPSCI Project Office as well as

provincial/local/municipal level-environmental protection authorities, forestry

administrations and water conservation authorities, the Commissioner is responsible

for total environmental management. During the construction period, the

Commissioner shall submit to the Transport Department of Anhui Province

environmental management & monitoring reports on an annual basis, or data required

for preparation of such reports on a semiannual basis.

The Commissioner shall employ environmental monitoring agencies to conduct

environmental monitoring during the construction period and provide support for

environmental monitoring work.

The Commissioner shall ensure that the environmental management plans are

included in the bid proposals and the Agreement apart from supervision of the

pollution prevention & control measures adopted by the Contractor. In case that any

construction team breaches the environmental protection regulations or fails to take

pollution control & prevention measures, the Commissioner shall immediately notify

the construction team and the APPSCI Project Office. In case of any pollution

incidents, the Commissioner shall assist in addressing the incident.

Page 21: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

18

The Commissioner shall ensure the environmental management plans are included

in bid proposals and the Project Supervision Agreement. The Commissioner will

supervise and participate in project supervision.

The Commissioner shall employ external environmental consultants (EEC) to

provide onsite technical support, supervision and instructions during the construction

period. Also, the EECs shall review the implementation of the environmental

protection measures. The Commissioner shall provide the Contractor with

environmental protection instructions and on-the-job training for project supervisors

and the Contractor. The Commissioner also assists the Owner to prepare semi-annual

reports.

(3) Contractor

The Contractor is responsible for implementing specific environmental pollution

control measures detailed in the environmental management plans and the Agreement,

making environmental working plans for the Agreement, reporting to the Project

Supervision Engineer on newly-emerging environmental problems or cultural relics

discovered by chance during construction, and coordinating & communicating with

local stakeholders on a continuous basis. The Contractor shall require the

Subcontractors to appoint one or two full-time environmental monitors to in charge of

environmental management and provide periodical training for workmen and

foremen.

(4) Environmental Supervision Engineer (ESE)

The Project Supervision Company shall, as specified by the Agreement, appoint

an Environmental Supervision Engineer (ESE) to be in charge of the following

responsibilities:

The ESE will, on behalf of the APPSCI Project Office, assess whether the Project

design complies with the requirements of the environmental impact assessment and

Page 22: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

19

the environmental management plans, especially the requirements for Site

environmental managements and environmental impact control measures.

The ESE will supervise the Contractor’s Site environmental management system

(including performance, experience and incident responses) and give directives on

remediation, if applicable.

The ESE will supervise the Contractor’s implementation of the environmental

management plans and inspect & confirm the procedure, parameters, places,

equipment and results relevant to the environmental supervision plans.

The ESE shall report to the APPSCI Project Office on the execution of the

environmental management plans.

(5) External Environmental Consultant (EEC)

The APPSCI Project Office will employ external environmental consultants (EEC)

to supervise the execution of environmental management plans. The EEC directly

enters into the Consultancy Agreement with the Owner and assumes responsibility

independent of the Contractor and the Project Supervision Engineer. The following is

the duties of an EEC.

An EEC assists the Owner to provide training and consultation services.

An EEC reviews the environmental protection measures taken by the Contractor on

the advice of the Project Supervision Engineer.

An EEC assists with the preparation and submission of semiannual reports to the

APPSCI Project Office and the World Bank.

(6) Environmental Monitoring Agency

Page 23: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

20

The APPSCI Project Office employs an environmental monitoring agency to

execute the environmental monitoring plans prescribed by the environmental

management plans.

(7) Anhui Provincial Environmental Protection Dept. and Municipal/County-level Environmental Protection Bureaus

The Anhui Provincial Environmental Protection Dept. is responsible for

supervising and managing the environmental protection work of the Project,

coordinating with relevant organizations and entities to provide environmental

protection services, reviewing environmental impact reports, supervising the

execution of environmental action plans, conducting acceptance test for

environmental protection facilities built for the Project, confirming the applicable

environmental laws, regulations and standards, and guiding municipal/county-level

environmental protection bureaus to supervise environmental management during the

construction and operation period.

Under the directions of the Anhui Provincial Environmental Protection Dept.,

Fuyang Municipal Environmental Protection Bureau and Liquan Environmental

Protection Bureau are responsible for overseeing environmental action plans executed

by the Owner, enforcing environmental management laws and standards, coordinating

with different sections to make concerted efforts in environmental protection, and

overseeing the construction, completion and operation of environmental protection

facilities in proper jurisdiction.

3.2 Environmental Monitoring Plans

Environmental protection efforts made during the preparation, construction and

operation stages will be monitored. See Tab. 3-1 for details on the governing

authorities, contents and objectives of the action plans:

Page 24: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

21

Tab. 3-1 – Environmental Monitoring Plans

StageGoverning

AuthorityContents Objectives

Design

Environmental

protection authority

and NDRC

1. Review and approve

environmental management

plans; 2. Review and approve

preliminary environmental

protection designs.

1. Ensure that the EIA is complete

in content, appropriate in subject

selection and distinctive in focus;

2. Ensure that the potential gross

environmental concerns will be

addressed; 3. Ensure that there are

specific, applicable plans to

implement environmental impact

control.

ConstructionEnvironmental

protection authority

1. Check the restoration of land,

vegetation and the environment;

2. Check fugitive dust and noise

emissions control measures.

Select the proper time for

construction work; 3. Check the

disposal and discharge of

domestic wastewater and oily

wastewater on the Site. 4. Check

the disposal of spoil; 5. Check the

disposal of sediment.

1. Make sure that environmental

protection facilities are designed,

constructed and commissioned in

close pace with the Work; 2.

Minimize the impact of the Work

on the environment and comply

with the applicable environmental

laws and regulations; 3. Ensure

there is no water pollution to the

river; 4. Ensure the landscape and

land resources are not seriously

spoiled. Avoid soil & water loss.

Operation Environmental

protection authority

1. Check the implementation of

the environmental protection

action plan for the operation

stage; 2. Check the

implementation of the monitoring

plans for the operation stage; 3.

Check if the environmental

quality at environmentally

sensitive areas meets applicable

1. Implement environmental

protection action plans; 2.

Implement monitoring plans; 3.

Conduct closer environmental

management and ensure public

health.

Page 25: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

22

environmental standards.

3.3 Environmental Supervision

Environmental supervision shall be conducted for the Work in an active way to

realize “clean production” in compliance with the Notice on the Performance of

Environmental Supervision for Public Transport Projects (issued by the Ministry of

Transport). The policy is intended to minimize ecosystem damage, maximize

ecosystem restoration during the construction work, conform to the environmental

protection requirements and make noise, waste gas and wastewater emissions meet

the relevant criteria. The relevant stakeholders shall ensure adequate investment in

environmental protection projects while securing that ecosystem protection/restoration

and aquatic environment protection efforts proceed in pace with the Work.

Environmental supervision is an important condition for the implementation of

environmental protection measures. As an important supplementary step for the

entirety of Project supervision focusing primarily on Work quality, environmental

supervision helps lay the groundwork for the environmental protection acceptance

procedure of the Work.

The ESE is an important role in the management and supervision hierarchy. For

this Project, it is very important to ensure the integration of the ESE into the ESE

system; in other words, the environmental supervision responsibility is specifically

defined and integrated into the Project Supervision Engineer Employment Agreement.

Meanwhile, the EEC is introduced into the Project supervision mechanism. The

EEC directly enters into an employment agreement with the Owner independent of

the Contractor and the ESE. The EEC assists the Owner in training, consultancy

services and review of the environmental protection measures taken by the Contractor

on the advice of the ESE. The EEC also assists with the preparation of semiannual

Page 26: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

23

environmental monitoring reports during the operation of the Project as requested by

the World Bank.

3.4 Contractor Management

The Contractor is responsible for environmental protection at the construction stage

of the Work. The FIDIC Civil Work Evaluation Standard Form Contract thus provides

in Chapter19.1: “In the entire process of construction, completion and rectification of

other defects, the Contractor shall take every reasonable measure to protection the Site

and surrounding environment so as to prevent the Work from generating pollution,

noise or other consequences that may cause personal or financial damage or hindrance

to the public.”

For this Project, the Contractor will play a key role in the construction work,

especially in regard of environmental management, pollution control & prevention,

etc. Therefore, the following requirements are made of the Contractor.

A powerful contractor shall be selected so that the environmental management

plans can be effectively executed;

The Contractor and the Engineer shall receive training on environmental

protection and management before commencement;

Environmental impact control measures for the construction period shall be

included in the Bidding Document of the Contractor as well as in the Agreement as a

contractual requirement for the Contractor.

The Contractor is required to monitor its own environmental activities and submit

environmental performance reports on a weekly basis, which are to be reviewed and

approved by the APPSCI Project Office and the work supervision team.

Page 27: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

24

The Contractor shall provide each subproject with one fulltime environmental

monitor, who is to receive further training programs in order to be fit for their job.

Throughout the construction stage, the Contractor shall communicate and consult

with the areas near the Site and post notices in each and every individual construction

site to provide the public with information on specific types and time schedules of

work. At the same time, contact information about the contact persons shall be

provided to facilitate communication of public complaints and proposals on the Work.

Page 28: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

25

Chapter 4 Environmental Monitoring Plans

Purpose

Environmental monitoring is a must for both the construction stage and the

operation stage. Its purpose is to provide a basis for grasping full and dynamic

information of the Project in a timely way, understanding the local environmental

quality changes brought by the Project, understanding the scope of such changes,

obtaining dynamic information on environmental quality during the operation period

and feeding back information in a timely way to the governing authorities for

environmental management.

Monitoring Agency

Environmental monitoring for the construction and operation period involves

many aspects (e.g. noise emissions, the aquatic environment and ecology) and

requires highly sophisticated monitoring personnel and apparatuses. Therefore, it is

suggested that the Owner entrust the job to accredited professional entities.

Monitoring program

The environmental monitoring covers noise, water quality and ecological environment. The detailed monitoring tiem, frequency and items are listed in Table 4-1 and Table 4-2.

In addition to routine monitoring conducted by professionals in professional agency according to relevant regulations, the contractor and construction supervision unit can also carry out other monitoring.

Noise monitoring near the construction machinery and sensitive point with portable noise meter;

Visual checking of dust caused by temporary detour, piling yard of powder material, disturbed surface soil and transport trucks;

Visual checking of water quality of Fenquan River at upstream and downstream of approach channel site , and water quality of the rivers,and fish ponds into

Page 29: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

26

which wastewater from the construction sites and camps is discharged.

Drawing on experiences from environmental management of other WB project, the contractor should be responsible for environmental supervision. Thus, the contractor and construction supervision unit shoud submit environmental monitoring report to the WB project office of Provincial Transport Department. Furthermore, they are required to report to the WB project office immediately when unexpected environmental pollution accident happens. The contractor can apply proper pollution control measures including professional agency to conduct monitoring. All of the monitoring facilities should be included in bidding documents so that bidding can meet the requirements and they can become parts of the contract. Meanwhile, the contractor and the construction supervisor should pay attention to these requirements. Anhui Provincial Transport Department and other environmental management and supervision agencies can aslo select good contractor according to these requirements.

Monitoring staff from the contractor and construction supervision unit should be trained before carrying out environmental monitoring. Transport Department will review monthly environmental rerport and check daily monitoring on site. The requirements about monitoring and reporting will be included in bidding documents and contracts with the contractor and construction supervision unit.

Environmental Monitoring Report

Construction Phase

During the construction phase, the Environmental Management Section should commission local environmental monitoring station to carry out monitoring according to construction periods of the channel improvement project.

During the construction phase, environmental monitoring report should be submitted monthly to the Construction Section and Municipal Environmental Protection Bureau.

Operation Phase

The monitoring results should be formally submitted twice a year to the WB project office of Transport Departmen or APPSCIG. The WB project office (APPSCIG) should collate and archive these reports. The envionmental monitoring reports are the basis for the WB and Provincial Environmental Protection Bureau to valuation the achievement of environmental protection, environmental impacts and the need of extra environmental protection measures for unexpcted impacts.

The main contents of the environmental monitoring plan include:

Monitoring time, frequency, position, item, method and quality control program;

Page 30: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

27

Monitoring data and statistic analyses;

Introduction of the operation of monitoring facilities;

Abnormal items.

Estimation of Monitoring Cost

The monitoring cost at the construction phase is estimated as: 50,000 RMB * 2 years=100,000 RMB. The monitoring cost at the operation phase is estimated as: 50,000 RMB * 3 years=150,000 RMB. The monitoring results at first three years of the operation phase will be checked with prediction of environmental impacts. The monitoring program after that will be revised according to the results in first three years.

In addition, 50,000RMB will be remained for monitoring of emergency accident.

The cost of other monitoring conducted by the contractor and supervisor is included in contract price.

Page 31: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

28

Table 4-1 The Environmental Monitoring Plan During the Construction Phase

Monitoring

contentMonitoring time and frequency Monitoring sites Monitoring project

The responsibilities

of implementation

River water

quality

Before the excavation, each sample site should①

be sampled once. This will be the background val

ue of water quality monitoring in construction pe

riod.

During construction period, it should be sampl②ed once per ten days if the sampling sites area w

as excavated. Other sampling sites should be

sampled per quarter.

The interchange between the upstream

and downstream approach channel and

Fenquan river

SS, TN, TP, COD, permanganate index, PH,

ammonia nitrogen and oil, synchronous mon

itoring water temperature and depth

Local environmental

monitoring station

which contract with

project office

The

wastewaterOnce per month

Discharge outlet of sand sedimentation

tankCOD, SS

Remained

water of

spoil area

Once per month, the continuous sampling time is

not less than five hours.The drain of spoil area SS, TN, TP, COD

NoiseOnce per half year during the construction peak

time (once each day and night)

Sensitive points near the east or west of

construction areaLeq

Ambient air

quality

Once per three month during the construction

peak timeThe construction area TSP

Page 32: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

29

Table 4-2 The Environmental Monitoring Plan During the Operation Phase

Monitoring

contentMonitoring time and frequency Monitoring sites Monitoring project

The responsibilities of

implementation

Water

quality of

Fenquan

river

Two times per year, continuous three days every

time, sampled once a day.

1.0 km above the upstream approach chan

nel and 1.0 km below the downstream

approach channel

PH, COD, BOD5, DO, NH3-N, per

manganate index, SS and oil

Local environmental monitoring

station which contract with

project office

Water

quality of the

ship lock

management

office

Four times per year, continuous three days every

time, sampled once a day.Yang Qiao ship lock management office permanganate index, SS and oil

NoiseFour times per year, one day every time(once

each day and night)

Sensitive points of the upstream and

downstream approach channelLeq

Ecological m

onitoring of

spoil area

Once per year, Continuous monitoring for three

yearsSpoil area

The soil of spoil area and the

heavy metal content of the

fruits, flowers and leaves of the

plants

Page 33: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

30

Chapter 5 Staff Training

Successful implementation of a Project environmental management plan depends

on the knowhow and working experience of environmental management and

environmental management staff. Meanwhile, with constant developments and

progress in science & technology, it is of vital importance to provide staff training and

improve the staff organization structure. Staff training programs may be provided

either at home or abroad. Overseas training shall be provided in countries with mature

experience in terms of roadwork construction and operation/management systems.

Domestic training programs may be provided in the form of lectures given by experts

from universities, environmental research institutes and professional consulting

agencies.

A retrospect of earlier experience indicates that the Contractor and the Project

Supervision Company must be strict with themselves in stepping up environmental

protection efforts. Even if such self-inspection is not the ultimate end, it can help them

develop a consciousness of environmental protection and help the Environmental

Management & Monitoring Authority better perform supervision responsibilities. The

Contractor, the Project Supervision Engineer s and their superiors must undergo

training programs in order to conduct self-inspection.

See Tab. 5-1 for specific details about the staff training plan.

Page 34: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

31

Tab. 5-1 – Staff Training Plan

Stage Training Program Staff Duration Period Cost

(unit:

RMB10,000)

Construction

stage

Environmental

management and

environmental

policies

One person from

FIAO, APPSCI and

the design institute,

respectively.

One month 2013-2015 15

Environmental

laws, regulations

and policies;

environmental

impact assessment

for highway

projects and

relevant

environmental

management plans;

routine

environmental

monitoring

methods;

environmental

protection

supervision work

One person from the

Contractor, the

Project Supervision

Company and the

Design institute,

respectively.

four days 2014 2

Emergency

environmental

management plans

and measures

Two people from

APPSCI, FIAO and

the Fuyang Port &

Navigation

Administration,

respectively

Three days 2014 5

Operation stage

Environmental

management and

relevant policies

One people from

FIAO, APPSCI and

the Yangqiao Ship

Lock Operation

Company

One month 2015-2018 15

Page 35: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

32

Chapter 6 Investment Estimates for Environmental Protection

See Tab. 6-1 for details about the investment estimates for the environmental

protection for the Project. The Project involves about RMB9.958 million of

environmental investment, accounting for 6.2% of the total capital investment of the

Project (RMB160.8194 million).

Tab. 6-1 – Investment Estimates for Environmental Protection

Period S/NEnvironmental Improvement

MeasuresEffects

Investment

Estimates

(unit:

RMB10,000)

Construction

stage 1

Domestic water treatment

facilities (including collection &

transport)

Domestic wastewater is treated

against acceptable standards

before drainage.

10

2

Oil separator, settling tank,

drainage systems and other

construction wastewater

treatment facilities

Construction wastewater is

treated against acceptable

standards before drainage.

45

3 Worksite enclosing structures

Sand and gravel are prevented

from being washed away by rain

and polluting the environment.

5

4Walls around sand/gravel

storage yardsFugitive dust is reduced. 5

5Water sprinklers and related

operationFugitive dust is reduced. 5

6Sound barriers (temporary

houses)

Prevention of the disturbance

Noises are prevented from

disturbing neighborhoods

4

7 Construction vessel-generated

waste transport

Such waste is forbidden to be

directly discharged into surface

16

Page 36: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

33

Period S/NEnvironmental Improvement

MeasuresEffects

Investment

Estimates

(unit:

RMB10,000)

water bodies.

8Waste collection, storage and

transport facilities

Solid waste pollution is

prevented.18

9Road greening & drainage

facilities

Noises are reduced and

soil/water loss is prevented.24

Operation

stage

10Ship lock area domestic waste

collection & transport system

Domestic waste in the ship gate

area is collected.10

11

Plant dense broadleaved green

belts with good noise reduction

effects within 20m of the

periphery of the approach

channels. Plant flowers, lawns

and trees in in the ship lock area

The impact of vessel-generated

noises on the targets for

protection is reduced. The air is

purified and the landscape is

improved.

40

12Domestic wastewater treatment

facilities

Wastewater is treated

appropriated before draining off.20

Monitoring

fees & costs

13 Environmental monitoring fees

Monitor the environmental

quality during the construction

and operation of the Work.

30

14 Soil & water conservation fees 663.8

Project

supervision15

Environmental supervision

during the construction period

The environmental facilities are

inspected and environmental

monitoring and management are

conducted.

50

16 Reserved fund 50

Total (unit: RMB10,000): 995.8

Page 37: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

34

Chapter 7 Miscellaneous

Information Exchange

Environmental management requires information exchange between different

sections or positions within the same organization as a necessary step. Meanwhile, the

organization shall release relevant information to external third parties (stakeholders

and the general public).

Internal information exchange may take the form of meetings and bulletins. There

shall be at least one formal meeting every month and all information shall be recorded

and put on file.

  There shall be external information exchange once every half year or once a year.

Minutes shall be kept of meetings with the cooperators and put on file.

Records

The organization shall establish a well-developed recording system in order for the

environmental management system to function effectively. Records shall be kept of

the following aspects:

Applicable laws and regulations;

Permits and licenses;

Environmental factors and relevant environmental impacts;

Training programs;

Inspection, verification and maintenance activities;

Monitoring data;

Page 38: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

35

Nonconformance;

Effectiveness of remedial and preventative measures;

Information about related parties;

Reviews;

Assessments;

  Besides, necessary control shall be exercised for the above records, including the

identification, collection, categorization, storage, management, maintenance, enquiry,

intended life period and destruction.

Reports

In the implementation of the Project, the Contractor, the Project Supervision

Company and the APPSCI Project Office shall report in time to the governing

authorities on such information as the progress of the Work, the implementation of the

environmental management plans (EMP) and the environmental monitoring results.

There are primarily the following three kinds of report:

Detailed EMP records maintained by the Environmental Monitoring Authority and

the Contractor. Reports shall be immediately submitted to the APPSCI Project Office;

Progress reports (e.g. monthly, quarterly and annual reports) prepared by the

APPSCI Project Office. These reports shall include such information about the

progress of EMP as the progress of implementation and effects;

EMP execution reports for the Project. Such reports shall be submitted to the World

Bank on a semiannual basis.

The EMP execution reports may include the following primary contents:

Page 39: documents.worldbank.orgdocuments.worldbank.org/.../E25200V50REVIS0Box38540…  · Web view1.1 Project Background. The Yangqiao Ship Lock is one of the major hydraulic structures

36

Implementation of the training programs;

Progress of the Project, e.g. the completed length of river channel improvement,

and construction process of the service area and the bridge;

Public complaints (if any). If any public complaint is lodged, the claims, solutions

and public satisfaction shall be recorded.

The next EMP execution plans.