Prepared By Web-based AASHTOWare Project Interaction Guide AASHTOWare Project Estimator 2.16b AASHTOWare Project Preconstruction (web Trns•port 2.02 and Later Releases) June 2018 Last Updated April 2019

Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

Prepared By

Web-based AASHTOWare Project

Interaction Guide

AASHTOWare Project Estimator 216b

AASHTOWare Project Preconstruction (web

Trnsbullport 202 and Later Releases)

June 2018

Last Updated

April 2019

FieldManager is a registered trademark and product of Info Tech Inc and the Michigan

Department of Transportation

FieldBook and FieldBuilder are trademarks and products of Info Tech Inc and the Michigan

Department of Transportation

FieldNet is a proprietary product of Info Tech Inc

AASHTO Trnsbullport the AASHTO Trnsbullport logo the AASHTOWare logo Trnsbullport

Estimator the Trnsbullport Estimator logo Trnsbullport Expedite the Trnsbullport Expedite logo

Trnsbullport FieldBook the Trnsbullport FieldBook logo Trnsbullport FieldBuilder the Trnsbullport

FieldBuilder logo Trnsbullport FieldManager and the Trnsbullport FieldManager logo are registered

trademarks of the American Association of State Highway and Transportation Officials

(AASHTO)

AASHTOWare Project AASHTOWare Project Bids the AASHTOWare Project Bids logo

AASHTOWare Project Estimator the AASHTOWare Project Estimator logo AASHTOWare

Project Expedite the AASHTOWare Project Expedite logo AASHTOWare Project

FieldManager the AASHTOWare Project FieldManager logo AASHTOWare Project

FieldBook the AASHTOWare Project FieldBook logo AASHTOWare Project FieldBuilder the

AASHTOWare Project FieldBuilder logo AASHTOWare Project FieldNet and the

AASHTOWare Project FieldNet logo are trademarks of AASHTO

Estimator Field Interviewer and SYNC are trademarks and proprietary products of Info Tech

Inc Mobile Inspector is a registered trademark and a proprietary product of Info Tech Inc

Other product names are trademarks or registered trademarks of their respective owners

Copyright copy 2019 Info Tech Inc All rights reserved Printed in the United States of America

This document or parts thereof may not be reproduced in any form without written permission of

Info Tech Inc

i

Contents

1 Introduction 1-1

11 Overview 1-1

2 Importing and Exporting in the AASHTOWare Project Estimator Software 2-1

21 Exporting Information to the AASHTOWare Project Preconstruction

Application 2-1

211 Export to AASHTOWare Project 2-2

22 Importing Information From the AASHTOWare Project Preconstruction

Application 2-2

23 Importing Checked-out Project or Proposals From the AASHTOWare

Project Preconstruction Application 2-3

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator 3-1

31 Contingency Percent vs Engineering and Construction Percent 3-2

32 Import from AASHTOWare Project 3-2

33 Checkout from AASHTOWare Project 3-4

34 Export to AASHTOWare Project 3-6

35 Checkin to AASHTOWare Project 3-8

4 Importing and Exporting in AASHTOWare Project Preconstruction (version

Trnsbullport Preconstruction 202 and later) 4-1

41 Contingency Percent vs Engineering and Construction Percent 4-2

42 Exporting a Project to the AASHTOWare Project Estimator Software 4-2

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software 4-3

43 Importing Project Data From the AASHTOWare Project Estimator Software 4-6

44 Checking-Out Projects to the AASHTOWare Project Estimator Software 4-9

441 Checking-out an AASHTOWare Project Preconstruction Project to

the AASHTOWare Project Estimator Software 4-9

45 Checkin Project Prices From the AASHTOWare Project Estimator Software4-12

46 Exporting a Proposal to the AASHTOWare Project Estimator Software 4-14

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software 4-14

462 Setting the Estimate Catalog 4-18

47 Checking-Out Proposals to the AASHTOWare Project Estimator Software 4-18

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software 4-19

472 Setting the Estimate Catalog 4-22

ii

48 Exporting Code Tables and Reference data to the AASHTOWare Project

Estimator Software 4-22

5 Interface Information 5-25

51 Importing Proposal or Project Data From the AASHTOWare Project

Estimator Software 5-25

511 Sample Import File From the AASHTOWare Project Estimator

Software 5-25

52 Importing Project Prices From the AASHTOWare Project Estimator

Software 5-27

521 Sample Import File From the AASHTOWare Project Estimator

Software 5-27

53 Importing Proposal Prices From The AASHTOWare Project Estimator

Software 5-28

531 Sample Import File From the AASHTOWare Project Estimator

Software 5-28

54 Exporting Projects to the AASHTOWare Project Estimator Software 5-28

541 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-29

55 Checking Out a Project to the AASHTOWare Project Estimator Software 5-30

551 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-30

56 Exporting a Proposal to the AASHTOWare Project Estimator Software 5-32

561 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-32

57 Checking Out a Proposal to the AASHTOWare Project Estimator Software 5-34

571 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-34

58 Reference Data 5-35

581 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-35

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 1-1

1 Introduction

The AASHTOWare Project Estimator software helps agencies estimate the cost of a

construction project using cost-based bid-based quote-based and ad hoc estimation

methods The software automates estimation data gathering and in doing so relieves the

tedium of the estimation process while providing consistent and flexible methods for the

estimation AASHTOWare Project Estimator software interacts with the web-based

AASHTOWare Project (formerly known as web Trnsbullport) application which is used

by highway agencies to prepare estimates and proposals before bid lettings

This guide documents the interfaces between the AASHTOWare Project Estimator

software and the AASHTOWare Project Preconstruction application It is intended as a

supplement to the documentation for those products and assumes that you already have a

working knowledge of AASHTOWare Project Estimator software and the AASHTOWare

Project Preconstruction application

Note For more information on AASHTOWare Project Estimator software basics and estimation techniques such as starting the software or logging on please see the Estimator Userrsquos Guide

Specific file transfer procedures are not covered in the guide For help with file transfer

software please see your agencyrsquos network specialist Support for your file transfer is not

provided through Info Tech Inc

11 Overview

Sharing information between the AASHTOWare Project Estimator software and the

AASHTOWare Project Preconstruction application helps you create estimates and update

project data and prices for projects and proposals much more quickly than working in

either application alone The following chapters contain instructions for importing and

exporting information from within the AASHTOWare Project Estimator software as well

as from within the AASHTOWare Project Preconstruction application

1-2 Introduction

AASHTOWare Project Preconstruction Projects consist of items used in construction

These items typically fall into different project categories for funding purposes for

segregating types of work items or for segregating work phases In order to create a

AASHTOWare Project Preconstruction-compatible project in the AASHTOWare Project

Estimator software all items and associated cost bases must be AASHTOWare Project-

compatible

Once the estimate has been created in the AASHTOWare Project Estimator software it

must be delivered to the AASHTOWare Project Preconstruction application to be

included in a project or proposal and eventually a bid letting The following steps are

required to successfully complete the estimate

1 Transfer data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator or

2 Export the AASHTOWare Project Estimator file as an XML file

3 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction application

4 Import the AASHTOWare Project Estimator XML file into the

AASHTOWare Project Preconstruction application

Each of these steps is described in detail in the following chapters

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 2-1

2 Importing and Exporting in the AASHTOWare

Project Estimator Software

The AASHTOWare Project Estimator software stores estimates in separate data files

You can use the AASHTOWare Project Estimator softwarersquos import and export

capabilities to export data into other applications or import information created in

external programs into the AASHTOWare Project Estimator software See the Estimator

System Managers Guide for more details

When importing the software checks the information being imported to determine if it is

a catalog or estimate and places it accordingly

The AASHTOWare Project Estimator softwarersquos data security measures are enforced

when you import catalogs and the software will import catalog data only for users that

have permission to edit a catalog You can export any catalog or estimate that you can

open

21 Exporting Information to the AASHTOWare Project

Preconstruction Application

The export command is content sensitive in the AASHTOWare Project Estimator

software That is the data you want to export must be currently active (displayed) For

example if you want to export an estimate you must have the estimate open

Follow these steps to export an estimate

1 Ensure that the estimate is active

2 Select Export Estimate File from the File menu

The software displays the dialog box shown in Figure 2-1

2-2 Importing and Exporting in Estimator

Figure 2-1 Export Project Dialog Box

3 Click SAVE

Upon successfully exporting the estimate you are ready to transfer the project into the

AASHTOWare Project Preconstruction application The software used to transfer the

data to the AASHTOWare Project Preconstruction system is supported by your computer

staff Info Tech assumes that software and resources are available to you for transferring

your project to the AASHTOWare Project Preconstruction system

211 Export to AASHTOWare Project

When exporting or checking in an estimate to AASHTOWare Project Preconstruction

software an additional ldquoExport Estimate Tohelliprdquo menu option has been added Selecting

this option displays a pop-up window where you can enter the information required by

AASHTOWare Project Preconstruction software including the URL the Domain Name

Username Password and the AASHTOWare Project Preconstruction Project ID which

will be populated from the Estimate ID If you do not know the above information

please contact your System Administrator

22 Importing Information From the AASHTOWare Project

Preconstruction Application

You can import AASHTOWare Project Preconstruction project or proposal information

into the AASHTOWare Project Estimator software Select Import File from the File

menu and choose the project or proposal from the Import window Click OPEN

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 2-3

Figure 2-2 Import Projects and Proposals From the AASHTOWare Project Preconstruction Application

You can treat these imported projects and proposals like a normal estimate but you must

use the Save As option when saving them for the first time

23 Importing Checked-out Project or Proposals From the

AASHTOWare Project Preconstruction Application

You can import AASHTOWare Project Preconstruction projects or proposals that have

been checked-out for pricing or repricing into the AASHTOWare Project Estimator

software Once the file has been checked-out of web-based AASHTOWare Project

select Import File from the File menu in the AASHTOWare Project Estimator software

and choose the project or proposal from the Import window (See Figure 2-2) Click

OPEN

The AASHTOWare Project Preconstruction projects or proposals that have been

checked-out will import into the AASHTOWare Project Estimator software and will only

allow the unit price of the items to be edited Items can not be added nor deleted on

checked-out projects or proposals After pricing has been completed export the estimate

as detailed in Section 2 Importing and Exporting in the AASHTOWare Project

Estimator Software

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-1

3 Transferring Data between AASHTOWare

Project Preconstruction and AASHTOWare Project

Estimator

Transferring estimate XML files with AASHTOWare Project Preconstruction software

uses a web service that is available to both agency and non-agency users that have the

proper access for the importexportcheckoutcheckin processes for AASHTOWare

Project Preconstruction software

You can

Transfer data to create a new AASHTOWare Project Preconstruction project

from an AASHTOWare Project Estimator estimate

Update project data already in the AASHTOWare Project Preconstruction

application with data from the AASHTOWare Project Estimator software

Import new pricing information for AASHTOWare Project Preconstruction

projects and proposals from the AASHTOWare Project Estimator software

The AASHTOWare Project Preconstruction application will accept only

estimate information that already exists in the AASHTOWare Project

Preconstruction system and has been checked-out Pricing data is the only

kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

Transfer an AASHTOWare Project Preconstruction project or proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a

new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked out the entire project or proposal is locked and cannot be changed

3-2 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

AASHTOWare Project Preconstructionrsquos Engineering and Construction Percent (EampC) is

an industry standard percentage added by some agencies to the cost of the work items on

a project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

32 Import from AASHTOWare Project

When you select the Import Estimate From hellip menu option a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in figure 3-2 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID When you click on the OK button the AASHTOWare Project

Preconstruction project will be imported into AASHTOWare Project Estimator software

without user interaction

To import from web-based AASHTOWare Project follow these steps

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-3

1 From the File menu select Import Estimate From

Figure 3-1 Import Estimate Fromhellip

2 At the Import estimate from an external system complete the following

information

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3-4 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-2 Import Estimate From External System hellip Window

33 Checkout from AASHTOWare Project

The checkout from AASHTOWare Project uses the Import Estimate From hellip menu

option This process displays a pop-up window where you can enter the information

required by AASHTOWare Project Preconstruction software as shown in Figure 3-4

including the URL Domain Name Username Password and AASHTOWare Project ID

The same AASHTOWare Project ID will be copied into the AASHTOWare Project

Estimator ID then checked against the Checkout selection When you click the OK

button the AASHTOWare Project Preconstruction project is checked out into

AASHTOWare Project Estimator software automatically

To check out from web-based AASHTOWare Project follow these steps

1 From the File menu select Import Estimate Fromhellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-5

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3 Select the Checkout selection

Figure 3-3 Import Estimate Fromhellip(Checkout)

3-6 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-4 Import Estimate from an External System Using the Checkout Option

34 Export to AASHTOWare Project

When the Export Estimate To hellip menu option is selected a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in Figure 3-6 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID if desired When you click the OK button the AASHTOWare Project

Preconstruction project is imported into AASHTOWare Project Estimator software

automatically

1 From the File menu select Export Estimate Tohellip

2 Enter the following

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-7

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

Certificate Name

3 The Import Type will be preselected if used in conjunction with a checkin

4 The Update Option that should occur when an existing project is available in

AASHTOWare Project Preconstruction will be preselected based on the users

rights in the Estimators Users Table Please see the Estimator System

Manager if the selection is incorrect

Figure 3-5 Export Estimate Tohellip(Checkin)

3-8 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-6 Export Estimate to an External system

35 Checkin to AASHTOWare Project

When you have an estimate open that has been checked out from AASHTOWare Project

Preconstruction and select Export Estimate Tohellip from the File menu a pop-up window

appears where you can enter the information required by AASHTOWare Project

Preconstruction software as shown in Figure 3-8 and the AASHTOWare Project

Preconstruction ProjectProposal ID which will be populated from the Estimate ID

Only a checked-out project or proposal can be checked in A Checkin option check box

appears on the dialog When you click the OK button with this check box select the file

is checked in to AASHTOWare Project Preconstruction software

To check in an estimate from AASHTOWare Project Estimator to AASHTOWare Project

Preconstruction

1 From the File menu select Export Estimate Tohellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-9

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

For a checkin the Import Type will be preselected with a checkin and the

Update options will not be selectable

Figure 3-7 Export Estimate To (Checkin)

3-10 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-8 Export Estimate to an External System (Checkin Process)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare

Project Preconstruction (version Trnsbullport

Preconstruction 202 and later)

You can perform several types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from an AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be changed

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

4-2 System Interface Information

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export an AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 2: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

FieldManager is a registered trademark and product of Info Tech Inc and the Michigan

Department of Transportation

FieldBook and FieldBuilder are trademarks and products of Info Tech Inc and the Michigan

Department of Transportation

FieldNet is a proprietary product of Info Tech Inc

AASHTO Trnsbullport the AASHTO Trnsbullport logo the AASHTOWare logo Trnsbullport

Estimator the Trnsbullport Estimator logo Trnsbullport Expedite the Trnsbullport Expedite logo

Trnsbullport FieldBook the Trnsbullport FieldBook logo Trnsbullport FieldBuilder the Trnsbullport

FieldBuilder logo Trnsbullport FieldManager and the Trnsbullport FieldManager logo are registered

trademarks of the American Association of State Highway and Transportation Officials

(AASHTO)

AASHTOWare Project AASHTOWare Project Bids the AASHTOWare Project Bids logo

AASHTOWare Project Estimator the AASHTOWare Project Estimator logo AASHTOWare

Project Expedite the AASHTOWare Project Expedite logo AASHTOWare Project

FieldManager the AASHTOWare Project FieldManager logo AASHTOWare Project

FieldBook the AASHTOWare Project FieldBook logo AASHTOWare Project FieldBuilder the

AASHTOWare Project FieldBuilder logo AASHTOWare Project FieldNet and the

AASHTOWare Project FieldNet logo are trademarks of AASHTO

Estimator Field Interviewer and SYNC are trademarks and proprietary products of Info Tech

Inc Mobile Inspector is a registered trademark and a proprietary product of Info Tech Inc

Other product names are trademarks or registered trademarks of their respective owners

Copyright copy 2019 Info Tech Inc All rights reserved Printed in the United States of America

This document or parts thereof may not be reproduced in any form without written permission of

Info Tech Inc

i

Contents

1 Introduction 1-1

11 Overview 1-1

2 Importing and Exporting in the AASHTOWare Project Estimator Software 2-1

21 Exporting Information to the AASHTOWare Project Preconstruction

Application 2-1

211 Export to AASHTOWare Project 2-2

22 Importing Information From the AASHTOWare Project Preconstruction

Application 2-2

23 Importing Checked-out Project or Proposals From the AASHTOWare

Project Preconstruction Application 2-3

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator 3-1

31 Contingency Percent vs Engineering and Construction Percent 3-2

32 Import from AASHTOWare Project 3-2

33 Checkout from AASHTOWare Project 3-4

34 Export to AASHTOWare Project 3-6

35 Checkin to AASHTOWare Project 3-8

4 Importing and Exporting in AASHTOWare Project Preconstruction (version

Trnsbullport Preconstruction 202 and later) 4-1

41 Contingency Percent vs Engineering and Construction Percent 4-2

42 Exporting a Project to the AASHTOWare Project Estimator Software 4-2

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software 4-3

43 Importing Project Data From the AASHTOWare Project Estimator Software 4-6

44 Checking-Out Projects to the AASHTOWare Project Estimator Software 4-9

441 Checking-out an AASHTOWare Project Preconstruction Project to

the AASHTOWare Project Estimator Software 4-9

45 Checkin Project Prices From the AASHTOWare Project Estimator Software4-12

46 Exporting a Proposal to the AASHTOWare Project Estimator Software 4-14

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software 4-14

462 Setting the Estimate Catalog 4-18

47 Checking-Out Proposals to the AASHTOWare Project Estimator Software 4-18

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software 4-19

472 Setting the Estimate Catalog 4-22

ii

48 Exporting Code Tables and Reference data to the AASHTOWare Project

Estimator Software 4-22

5 Interface Information 5-25

51 Importing Proposal or Project Data From the AASHTOWare Project

Estimator Software 5-25

511 Sample Import File From the AASHTOWare Project Estimator

Software 5-25

52 Importing Project Prices From the AASHTOWare Project Estimator

Software 5-27

521 Sample Import File From the AASHTOWare Project Estimator

Software 5-27

53 Importing Proposal Prices From The AASHTOWare Project Estimator

Software 5-28

531 Sample Import File From the AASHTOWare Project Estimator

Software 5-28

54 Exporting Projects to the AASHTOWare Project Estimator Software 5-28

541 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-29

55 Checking Out a Project to the AASHTOWare Project Estimator Software 5-30

551 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-30

56 Exporting a Proposal to the AASHTOWare Project Estimator Software 5-32

561 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-32

57 Checking Out a Proposal to the AASHTOWare Project Estimator Software 5-34

571 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-34

58 Reference Data 5-35

581 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-35

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 1-1

1 Introduction

The AASHTOWare Project Estimator software helps agencies estimate the cost of a

construction project using cost-based bid-based quote-based and ad hoc estimation

methods The software automates estimation data gathering and in doing so relieves the

tedium of the estimation process while providing consistent and flexible methods for the

estimation AASHTOWare Project Estimator software interacts with the web-based

AASHTOWare Project (formerly known as web Trnsbullport) application which is used

by highway agencies to prepare estimates and proposals before bid lettings

This guide documents the interfaces between the AASHTOWare Project Estimator

software and the AASHTOWare Project Preconstruction application It is intended as a

supplement to the documentation for those products and assumes that you already have a

working knowledge of AASHTOWare Project Estimator software and the AASHTOWare

Project Preconstruction application

Note For more information on AASHTOWare Project Estimator software basics and estimation techniques such as starting the software or logging on please see the Estimator Userrsquos Guide

Specific file transfer procedures are not covered in the guide For help with file transfer

software please see your agencyrsquos network specialist Support for your file transfer is not

provided through Info Tech Inc

11 Overview

Sharing information between the AASHTOWare Project Estimator software and the

AASHTOWare Project Preconstruction application helps you create estimates and update

project data and prices for projects and proposals much more quickly than working in

either application alone The following chapters contain instructions for importing and

exporting information from within the AASHTOWare Project Estimator software as well

as from within the AASHTOWare Project Preconstruction application

1-2 Introduction

AASHTOWare Project Preconstruction Projects consist of items used in construction

These items typically fall into different project categories for funding purposes for

segregating types of work items or for segregating work phases In order to create a

AASHTOWare Project Preconstruction-compatible project in the AASHTOWare Project

Estimator software all items and associated cost bases must be AASHTOWare Project-

compatible

Once the estimate has been created in the AASHTOWare Project Estimator software it

must be delivered to the AASHTOWare Project Preconstruction application to be

included in a project or proposal and eventually a bid letting The following steps are

required to successfully complete the estimate

1 Transfer data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator or

2 Export the AASHTOWare Project Estimator file as an XML file

3 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction application

4 Import the AASHTOWare Project Estimator XML file into the

AASHTOWare Project Preconstruction application

Each of these steps is described in detail in the following chapters

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 2-1

2 Importing and Exporting in the AASHTOWare

Project Estimator Software

The AASHTOWare Project Estimator software stores estimates in separate data files

You can use the AASHTOWare Project Estimator softwarersquos import and export

capabilities to export data into other applications or import information created in

external programs into the AASHTOWare Project Estimator software See the Estimator

System Managers Guide for more details

When importing the software checks the information being imported to determine if it is

a catalog or estimate and places it accordingly

The AASHTOWare Project Estimator softwarersquos data security measures are enforced

when you import catalogs and the software will import catalog data only for users that

have permission to edit a catalog You can export any catalog or estimate that you can

open

21 Exporting Information to the AASHTOWare Project

Preconstruction Application

The export command is content sensitive in the AASHTOWare Project Estimator

software That is the data you want to export must be currently active (displayed) For

example if you want to export an estimate you must have the estimate open

Follow these steps to export an estimate

1 Ensure that the estimate is active

2 Select Export Estimate File from the File menu

The software displays the dialog box shown in Figure 2-1

2-2 Importing and Exporting in Estimator

Figure 2-1 Export Project Dialog Box

3 Click SAVE

Upon successfully exporting the estimate you are ready to transfer the project into the

AASHTOWare Project Preconstruction application The software used to transfer the

data to the AASHTOWare Project Preconstruction system is supported by your computer

staff Info Tech assumes that software and resources are available to you for transferring

your project to the AASHTOWare Project Preconstruction system

211 Export to AASHTOWare Project

When exporting or checking in an estimate to AASHTOWare Project Preconstruction

software an additional ldquoExport Estimate Tohelliprdquo menu option has been added Selecting

this option displays a pop-up window where you can enter the information required by

AASHTOWare Project Preconstruction software including the URL the Domain Name

Username Password and the AASHTOWare Project Preconstruction Project ID which

will be populated from the Estimate ID If you do not know the above information

please contact your System Administrator

22 Importing Information From the AASHTOWare Project

Preconstruction Application

You can import AASHTOWare Project Preconstruction project or proposal information

into the AASHTOWare Project Estimator software Select Import File from the File

menu and choose the project or proposal from the Import window Click OPEN

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 2-3

Figure 2-2 Import Projects and Proposals From the AASHTOWare Project Preconstruction Application

You can treat these imported projects and proposals like a normal estimate but you must

use the Save As option when saving them for the first time

23 Importing Checked-out Project or Proposals From the

AASHTOWare Project Preconstruction Application

You can import AASHTOWare Project Preconstruction projects or proposals that have

been checked-out for pricing or repricing into the AASHTOWare Project Estimator

software Once the file has been checked-out of web-based AASHTOWare Project

select Import File from the File menu in the AASHTOWare Project Estimator software

and choose the project or proposal from the Import window (See Figure 2-2) Click

OPEN

The AASHTOWare Project Preconstruction projects or proposals that have been

checked-out will import into the AASHTOWare Project Estimator software and will only

allow the unit price of the items to be edited Items can not be added nor deleted on

checked-out projects or proposals After pricing has been completed export the estimate

as detailed in Section 2 Importing and Exporting in the AASHTOWare Project

Estimator Software

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-1

3 Transferring Data between AASHTOWare

Project Preconstruction and AASHTOWare Project

Estimator

Transferring estimate XML files with AASHTOWare Project Preconstruction software

uses a web service that is available to both agency and non-agency users that have the

proper access for the importexportcheckoutcheckin processes for AASHTOWare

Project Preconstruction software

You can

Transfer data to create a new AASHTOWare Project Preconstruction project

from an AASHTOWare Project Estimator estimate

Update project data already in the AASHTOWare Project Preconstruction

application with data from the AASHTOWare Project Estimator software

Import new pricing information for AASHTOWare Project Preconstruction

projects and proposals from the AASHTOWare Project Estimator software

The AASHTOWare Project Preconstruction application will accept only

estimate information that already exists in the AASHTOWare Project

Preconstruction system and has been checked-out Pricing data is the only

kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

Transfer an AASHTOWare Project Preconstruction project or proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a

new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked out the entire project or proposal is locked and cannot be changed

3-2 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

AASHTOWare Project Preconstructionrsquos Engineering and Construction Percent (EampC) is

an industry standard percentage added by some agencies to the cost of the work items on

a project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

32 Import from AASHTOWare Project

When you select the Import Estimate From hellip menu option a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in figure 3-2 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID When you click on the OK button the AASHTOWare Project

Preconstruction project will be imported into AASHTOWare Project Estimator software

without user interaction

To import from web-based AASHTOWare Project follow these steps

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-3

1 From the File menu select Import Estimate From

Figure 3-1 Import Estimate Fromhellip

2 At the Import estimate from an external system complete the following

information

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3-4 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-2 Import Estimate From External System hellip Window

33 Checkout from AASHTOWare Project

The checkout from AASHTOWare Project uses the Import Estimate From hellip menu

option This process displays a pop-up window where you can enter the information

required by AASHTOWare Project Preconstruction software as shown in Figure 3-4

including the URL Domain Name Username Password and AASHTOWare Project ID

The same AASHTOWare Project ID will be copied into the AASHTOWare Project

Estimator ID then checked against the Checkout selection When you click the OK

button the AASHTOWare Project Preconstruction project is checked out into

AASHTOWare Project Estimator software automatically

To check out from web-based AASHTOWare Project follow these steps

1 From the File menu select Import Estimate Fromhellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-5

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3 Select the Checkout selection

Figure 3-3 Import Estimate Fromhellip(Checkout)

3-6 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-4 Import Estimate from an External System Using the Checkout Option

34 Export to AASHTOWare Project

When the Export Estimate To hellip menu option is selected a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in Figure 3-6 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID if desired When you click the OK button the AASHTOWare Project

Preconstruction project is imported into AASHTOWare Project Estimator software

automatically

1 From the File menu select Export Estimate Tohellip

2 Enter the following

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-7

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

Certificate Name

3 The Import Type will be preselected if used in conjunction with a checkin

4 The Update Option that should occur when an existing project is available in

AASHTOWare Project Preconstruction will be preselected based on the users

rights in the Estimators Users Table Please see the Estimator System

Manager if the selection is incorrect

Figure 3-5 Export Estimate Tohellip(Checkin)

3-8 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-6 Export Estimate to an External system

35 Checkin to AASHTOWare Project

When you have an estimate open that has been checked out from AASHTOWare Project

Preconstruction and select Export Estimate Tohellip from the File menu a pop-up window

appears where you can enter the information required by AASHTOWare Project

Preconstruction software as shown in Figure 3-8 and the AASHTOWare Project

Preconstruction ProjectProposal ID which will be populated from the Estimate ID

Only a checked-out project or proposal can be checked in A Checkin option check box

appears on the dialog When you click the OK button with this check box select the file

is checked in to AASHTOWare Project Preconstruction software

To check in an estimate from AASHTOWare Project Estimator to AASHTOWare Project

Preconstruction

1 From the File menu select Export Estimate Tohellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-9

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

For a checkin the Import Type will be preselected with a checkin and the

Update options will not be selectable

Figure 3-7 Export Estimate To (Checkin)

3-10 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-8 Export Estimate to an External System (Checkin Process)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare

Project Preconstruction (version Trnsbullport

Preconstruction 202 and later)

You can perform several types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from an AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be changed

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

4-2 System Interface Information

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export an AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 3: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

i

Contents

1 Introduction 1-1

11 Overview 1-1

2 Importing and Exporting in the AASHTOWare Project Estimator Software 2-1

21 Exporting Information to the AASHTOWare Project Preconstruction

Application 2-1

211 Export to AASHTOWare Project 2-2

22 Importing Information From the AASHTOWare Project Preconstruction

Application 2-2

23 Importing Checked-out Project or Proposals From the AASHTOWare

Project Preconstruction Application 2-3

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator 3-1

31 Contingency Percent vs Engineering and Construction Percent 3-2

32 Import from AASHTOWare Project 3-2

33 Checkout from AASHTOWare Project 3-4

34 Export to AASHTOWare Project 3-6

35 Checkin to AASHTOWare Project 3-8

4 Importing and Exporting in AASHTOWare Project Preconstruction (version

Trnsbullport Preconstruction 202 and later) 4-1

41 Contingency Percent vs Engineering and Construction Percent 4-2

42 Exporting a Project to the AASHTOWare Project Estimator Software 4-2

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software 4-3

43 Importing Project Data From the AASHTOWare Project Estimator Software 4-6

44 Checking-Out Projects to the AASHTOWare Project Estimator Software 4-9

441 Checking-out an AASHTOWare Project Preconstruction Project to

the AASHTOWare Project Estimator Software 4-9

45 Checkin Project Prices From the AASHTOWare Project Estimator Software4-12

46 Exporting a Proposal to the AASHTOWare Project Estimator Software 4-14

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software 4-14

462 Setting the Estimate Catalog 4-18

47 Checking-Out Proposals to the AASHTOWare Project Estimator Software 4-18

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software 4-19

472 Setting the Estimate Catalog 4-22

ii

48 Exporting Code Tables and Reference data to the AASHTOWare Project

Estimator Software 4-22

5 Interface Information 5-25

51 Importing Proposal or Project Data From the AASHTOWare Project

Estimator Software 5-25

511 Sample Import File From the AASHTOWare Project Estimator

Software 5-25

52 Importing Project Prices From the AASHTOWare Project Estimator

Software 5-27

521 Sample Import File From the AASHTOWare Project Estimator

Software 5-27

53 Importing Proposal Prices From The AASHTOWare Project Estimator

Software 5-28

531 Sample Import File From the AASHTOWare Project Estimator

Software 5-28

54 Exporting Projects to the AASHTOWare Project Estimator Software 5-28

541 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-29

55 Checking Out a Project to the AASHTOWare Project Estimator Software 5-30

551 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-30

56 Exporting a Proposal to the AASHTOWare Project Estimator Software 5-32

561 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-32

57 Checking Out a Proposal to the AASHTOWare Project Estimator Software 5-34

571 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-34

58 Reference Data 5-35

581 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-35

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 1-1

1 Introduction

The AASHTOWare Project Estimator software helps agencies estimate the cost of a

construction project using cost-based bid-based quote-based and ad hoc estimation

methods The software automates estimation data gathering and in doing so relieves the

tedium of the estimation process while providing consistent and flexible methods for the

estimation AASHTOWare Project Estimator software interacts with the web-based

AASHTOWare Project (formerly known as web Trnsbullport) application which is used

by highway agencies to prepare estimates and proposals before bid lettings

This guide documents the interfaces between the AASHTOWare Project Estimator

software and the AASHTOWare Project Preconstruction application It is intended as a

supplement to the documentation for those products and assumes that you already have a

working knowledge of AASHTOWare Project Estimator software and the AASHTOWare

Project Preconstruction application

Note For more information on AASHTOWare Project Estimator software basics and estimation techniques such as starting the software or logging on please see the Estimator Userrsquos Guide

Specific file transfer procedures are not covered in the guide For help with file transfer

software please see your agencyrsquos network specialist Support for your file transfer is not

provided through Info Tech Inc

11 Overview

Sharing information between the AASHTOWare Project Estimator software and the

AASHTOWare Project Preconstruction application helps you create estimates and update

project data and prices for projects and proposals much more quickly than working in

either application alone The following chapters contain instructions for importing and

exporting information from within the AASHTOWare Project Estimator software as well

as from within the AASHTOWare Project Preconstruction application

1-2 Introduction

AASHTOWare Project Preconstruction Projects consist of items used in construction

These items typically fall into different project categories for funding purposes for

segregating types of work items or for segregating work phases In order to create a

AASHTOWare Project Preconstruction-compatible project in the AASHTOWare Project

Estimator software all items and associated cost bases must be AASHTOWare Project-

compatible

Once the estimate has been created in the AASHTOWare Project Estimator software it

must be delivered to the AASHTOWare Project Preconstruction application to be

included in a project or proposal and eventually a bid letting The following steps are

required to successfully complete the estimate

1 Transfer data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator or

2 Export the AASHTOWare Project Estimator file as an XML file

3 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction application

4 Import the AASHTOWare Project Estimator XML file into the

AASHTOWare Project Preconstruction application

Each of these steps is described in detail in the following chapters

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 2-1

2 Importing and Exporting in the AASHTOWare

Project Estimator Software

The AASHTOWare Project Estimator software stores estimates in separate data files

You can use the AASHTOWare Project Estimator softwarersquos import and export

capabilities to export data into other applications or import information created in

external programs into the AASHTOWare Project Estimator software See the Estimator

System Managers Guide for more details

When importing the software checks the information being imported to determine if it is

a catalog or estimate and places it accordingly

The AASHTOWare Project Estimator softwarersquos data security measures are enforced

when you import catalogs and the software will import catalog data only for users that

have permission to edit a catalog You can export any catalog or estimate that you can

open

21 Exporting Information to the AASHTOWare Project

Preconstruction Application

The export command is content sensitive in the AASHTOWare Project Estimator

software That is the data you want to export must be currently active (displayed) For

example if you want to export an estimate you must have the estimate open

Follow these steps to export an estimate

1 Ensure that the estimate is active

2 Select Export Estimate File from the File menu

The software displays the dialog box shown in Figure 2-1

2-2 Importing and Exporting in Estimator

Figure 2-1 Export Project Dialog Box

3 Click SAVE

Upon successfully exporting the estimate you are ready to transfer the project into the

AASHTOWare Project Preconstruction application The software used to transfer the

data to the AASHTOWare Project Preconstruction system is supported by your computer

staff Info Tech assumes that software and resources are available to you for transferring

your project to the AASHTOWare Project Preconstruction system

211 Export to AASHTOWare Project

When exporting or checking in an estimate to AASHTOWare Project Preconstruction

software an additional ldquoExport Estimate Tohelliprdquo menu option has been added Selecting

this option displays a pop-up window where you can enter the information required by

AASHTOWare Project Preconstruction software including the URL the Domain Name

Username Password and the AASHTOWare Project Preconstruction Project ID which

will be populated from the Estimate ID If you do not know the above information

please contact your System Administrator

22 Importing Information From the AASHTOWare Project

Preconstruction Application

You can import AASHTOWare Project Preconstruction project or proposal information

into the AASHTOWare Project Estimator software Select Import File from the File

menu and choose the project or proposal from the Import window Click OPEN

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 2-3

Figure 2-2 Import Projects and Proposals From the AASHTOWare Project Preconstruction Application

You can treat these imported projects and proposals like a normal estimate but you must

use the Save As option when saving them for the first time

23 Importing Checked-out Project or Proposals From the

AASHTOWare Project Preconstruction Application

You can import AASHTOWare Project Preconstruction projects or proposals that have

been checked-out for pricing or repricing into the AASHTOWare Project Estimator

software Once the file has been checked-out of web-based AASHTOWare Project

select Import File from the File menu in the AASHTOWare Project Estimator software

and choose the project or proposal from the Import window (See Figure 2-2) Click

OPEN

The AASHTOWare Project Preconstruction projects or proposals that have been

checked-out will import into the AASHTOWare Project Estimator software and will only

allow the unit price of the items to be edited Items can not be added nor deleted on

checked-out projects or proposals After pricing has been completed export the estimate

as detailed in Section 2 Importing and Exporting in the AASHTOWare Project

Estimator Software

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-1

3 Transferring Data between AASHTOWare

Project Preconstruction and AASHTOWare Project

Estimator

Transferring estimate XML files with AASHTOWare Project Preconstruction software

uses a web service that is available to both agency and non-agency users that have the

proper access for the importexportcheckoutcheckin processes for AASHTOWare

Project Preconstruction software

You can

Transfer data to create a new AASHTOWare Project Preconstruction project

from an AASHTOWare Project Estimator estimate

Update project data already in the AASHTOWare Project Preconstruction

application with data from the AASHTOWare Project Estimator software

Import new pricing information for AASHTOWare Project Preconstruction

projects and proposals from the AASHTOWare Project Estimator software

The AASHTOWare Project Preconstruction application will accept only

estimate information that already exists in the AASHTOWare Project

Preconstruction system and has been checked-out Pricing data is the only

kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

Transfer an AASHTOWare Project Preconstruction project or proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a

new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked out the entire project or proposal is locked and cannot be changed

3-2 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

AASHTOWare Project Preconstructionrsquos Engineering and Construction Percent (EampC) is

an industry standard percentage added by some agencies to the cost of the work items on

a project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

32 Import from AASHTOWare Project

When you select the Import Estimate From hellip menu option a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in figure 3-2 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID When you click on the OK button the AASHTOWare Project

Preconstruction project will be imported into AASHTOWare Project Estimator software

without user interaction

To import from web-based AASHTOWare Project follow these steps

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-3

1 From the File menu select Import Estimate From

Figure 3-1 Import Estimate Fromhellip

2 At the Import estimate from an external system complete the following

information

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3-4 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-2 Import Estimate From External System hellip Window

33 Checkout from AASHTOWare Project

The checkout from AASHTOWare Project uses the Import Estimate From hellip menu

option This process displays a pop-up window where you can enter the information

required by AASHTOWare Project Preconstruction software as shown in Figure 3-4

including the URL Domain Name Username Password and AASHTOWare Project ID

The same AASHTOWare Project ID will be copied into the AASHTOWare Project

Estimator ID then checked against the Checkout selection When you click the OK

button the AASHTOWare Project Preconstruction project is checked out into

AASHTOWare Project Estimator software automatically

To check out from web-based AASHTOWare Project follow these steps

1 From the File menu select Import Estimate Fromhellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-5

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3 Select the Checkout selection

Figure 3-3 Import Estimate Fromhellip(Checkout)

3-6 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-4 Import Estimate from an External System Using the Checkout Option

34 Export to AASHTOWare Project

When the Export Estimate To hellip menu option is selected a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in Figure 3-6 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID if desired When you click the OK button the AASHTOWare Project

Preconstruction project is imported into AASHTOWare Project Estimator software

automatically

1 From the File menu select Export Estimate Tohellip

2 Enter the following

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-7

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

Certificate Name

3 The Import Type will be preselected if used in conjunction with a checkin

4 The Update Option that should occur when an existing project is available in

AASHTOWare Project Preconstruction will be preselected based on the users

rights in the Estimators Users Table Please see the Estimator System

Manager if the selection is incorrect

Figure 3-5 Export Estimate Tohellip(Checkin)

3-8 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-6 Export Estimate to an External system

35 Checkin to AASHTOWare Project

When you have an estimate open that has been checked out from AASHTOWare Project

Preconstruction and select Export Estimate Tohellip from the File menu a pop-up window

appears where you can enter the information required by AASHTOWare Project

Preconstruction software as shown in Figure 3-8 and the AASHTOWare Project

Preconstruction ProjectProposal ID which will be populated from the Estimate ID

Only a checked-out project or proposal can be checked in A Checkin option check box

appears on the dialog When you click the OK button with this check box select the file

is checked in to AASHTOWare Project Preconstruction software

To check in an estimate from AASHTOWare Project Estimator to AASHTOWare Project

Preconstruction

1 From the File menu select Export Estimate Tohellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-9

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

For a checkin the Import Type will be preselected with a checkin and the

Update options will not be selectable

Figure 3-7 Export Estimate To (Checkin)

3-10 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-8 Export Estimate to an External System (Checkin Process)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare

Project Preconstruction (version Trnsbullport

Preconstruction 202 and later)

You can perform several types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from an AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be changed

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

4-2 System Interface Information

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export an AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 4: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

ii

48 Exporting Code Tables and Reference data to the AASHTOWare Project

Estimator Software 4-22

5 Interface Information 5-25

51 Importing Proposal or Project Data From the AASHTOWare Project

Estimator Software 5-25

511 Sample Import File From the AASHTOWare Project Estimator

Software 5-25

52 Importing Project Prices From the AASHTOWare Project Estimator

Software 5-27

521 Sample Import File From the AASHTOWare Project Estimator

Software 5-27

53 Importing Proposal Prices From The AASHTOWare Project Estimator

Software 5-28

531 Sample Import File From the AASHTOWare Project Estimator

Software 5-28

54 Exporting Projects to the AASHTOWare Project Estimator Software 5-28

541 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-29

55 Checking Out a Project to the AASHTOWare Project Estimator Software 5-30

551 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-30

56 Exporting a Proposal to the AASHTOWare Project Estimator Software 5-32

561 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-32

57 Checking Out a Proposal to the AASHTOWare Project Estimator Software 5-34

571 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-34

58 Reference Data 5-35

581 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-35

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 1-1

1 Introduction

The AASHTOWare Project Estimator software helps agencies estimate the cost of a

construction project using cost-based bid-based quote-based and ad hoc estimation

methods The software automates estimation data gathering and in doing so relieves the

tedium of the estimation process while providing consistent and flexible methods for the

estimation AASHTOWare Project Estimator software interacts with the web-based

AASHTOWare Project (formerly known as web Trnsbullport) application which is used

by highway agencies to prepare estimates and proposals before bid lettings

This guide documents the interfaces between the AASHTOWare Project Estimator

software and the AASHTOWare Project Preconstruction application It is intended as a

supplement to the documentation for those products and assumes that you already have a

working knowledge of AASHTOWare Project Estimator software and the AASHTOWare

Project Preconstruction application

Note For more information on AASHTOWare Project Estimator software basics and estimation techniques such as starting the software or logging on please see the Estimator Userrsquos Guide

Specific file transfer procedures are not covered in the guide For help with file transfer

software please see your agencyrsquos network specialist Support for your file transfer is not

provided through Info Tech Inc

11 Overview

Sharing information between the AASHTOWare Project Estimator software and the

AASHTOWare Project Preconstruction application helps you create estimates and update

project data and prices for projects and proposals much more quickly than working in

either application alone The following chapters contain instructions for importing and

exporting information from within the AASHTOWare Project Estimator software as well

as from within the AASHTOWare Project Preconstruction application

1-2 Introduction

AASHTOWare Project Preconstruction Projects consist of items used in construction

These items typically fall into different project categories for funding purposes for

segregating types of work items or for segregating work phases In order to create a

AASHTOWare Project Preconstruction-compatible project in the AASHTOWare Project

Estimator software all items and associated cost bases must be AASHTOWare Project-

compatible

Once the estimate has been created in the AASHTOWare Project Estimator software it

must be delivered to the AASHTOWare Project Preconstruction application to be

included in a project or proposal and eventually a bid letting The following steps are

required to successfully complete the estimate

1 Transfer data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator or

2 Export the AASHTOWare Project Estimator file as an XML file

3 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction application

4 Import the AASHTOWare Project Estimator XML file into the

AASHTOWare Project Preconstruction application

Each of these steps is described in detail in the following chapters

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 2-1

2 Importing and Exporting in the AASHTOWare

Project Estimator Software

The AASHTOWare Project Estimator software stores estimates in separate data files

You can use the AASHTOWare Project Estimator softwarersquos import and export

capabilities to export data into other applications or import information created in

external programs into the AASHTOWare Project Estimator software See the Estimator

System Managers Guide for more details

When importing the software checks the information being imported to determine if it is

a catalog or estimate and places it accordingly

The AASHTOWare Project Estimator softwarersquos data security measures are enforced

when you import catalogs and the software will import catalog data only for users that

have permission to edit a catalog You can export any catalog or estimate that you can

open

21 Exporting Information to the AASHTOWare Project

Preconstruction Application

The export command is content sensitive in the AASHTOWare Project Estimator

software That is the data you want to export must be currently active (displayed) For

example if you want to export an estimate you must have the estimate open

Follow these steps to export an estimate

1 Ensure that the estimate is active

2 Select Export Estimate File from the File menu

The software displays the dialog box shown in Figure 2-1

2-2 Importing and Exporting in Estimator

Figure 2-1 Export Project Dialog Box

3 Click SAVE

Upon successfully exporting the estimate you are ready to transfer the project into the

AASHTOWare Project Preconstruction application The software used to transfer the

data to the AASHTOWare Project Preconstruction system is supported by your computer

staff Info Tech assumes that software and resources are available to you for transferring

your project to the AASHTOWare Project Preconstruction system

211 Export to AASHTOWare Project

When exporting or checking in an estimate to AASHTOWare Project Preconstruction

software an additional ldquoExport Estimate Tohelliprdquo menu option has been added Selecting

this option displays a pop-up window where you can enter the information required by

AASHTOWare Project Preconstruction software including the URL the Domain Name

Username Password and the AASHTOWare Project Preconstruction Project ID which

will be populated from the Estimate ID If you do not know the above information

please contact your System Administrator

22 Importing Information From the AASHTOWare Project

Preconstruction Application

You can import AASHTOWare Project Preconstruction project or proposal information

into the AASHTOWare Project Estimator software Select Import File from the File

menu and choose the project or proposal from the Import window Click OPEN

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 2-3

Figure 2-2 Import Projects and Proposals From the AASHTOWare Project Preconstruction Application

You can treat these imported projects and proposals like a normal estimate but you must

use the Save As option when saving them for the first time

23 Importing Checked-out Project or Proposals From the

AASHTOWare Project Preconstruction Application

You can import AASHTOWare Project Preconstruction projects or proposals that have

been checked-out for pricing or repricing into the AASHTOWare Project Estimator

software Once the file has been checked-out of web-based AASHTOWare Project

select Import File from the File menu in the AASHTOWare Project Estimator software

and choose the project or proposal from the Import window (See Figure 2-2) Click

OPEN

The AASHTOWare Project Preconstruction projects or proposals that have been

checked-out will import into the AASHTOWare Project Estimator software and will only

allow the unit price of the items to be edited Items can not be added nor deleted on

checked-out projects or proposals After pricing has been completed export the estimate

as detailed in Section 2 Importing and Exporting in the AASHTOWare Project

Estimator Software

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-1

3 Transferring Data between AASHTOWare

Project Preconstruction and AASHTOWare Project

Estimator

Transferring estimate XML files with AASHTOWare Project Preconstruction software

uses a web service that is available to both agency and non-agency users that have the

proper access for the importexportcheckoutcheckin processes for AASHTOWare

Project Preconstruction software

You can

Transfer data to create a new AASHTOWare Project Preconstruction project

from an AASHTOWare Project Estimator estimate

Update project data already in the AASHTOWare Project Preconstruction

application with data from the AASHTOWare Project Estimator software

Import new pricing information for AASHTOWare Project Preconstruction

projects and proposals from the AASHTOWare Project Estimator software

The AASHTOWare Project Preconstruction application will accept only

estimate information that already exists in the AASHTOWare Project

Preconstruction system and has been checked-out Pricing data is the only

kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

Transfer an AASHTOWare Project Preconstruction project or proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a

new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked out the entire project or proposal is locked and cannot be changed

3-2 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

AASHTOWare Project Preconstructionrsquos Engineering and Construction Percent (EampC) is

an industry standard percentage added by some agencies to the cost of the work items on

a project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

32 Import from AASHTOWare Project

When you select the Import Estimate From hellip menu option a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in figure 3-2 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID When you click on the OK button the AASHTOWare Project

Preconstruction project will be imported into AASHTOWare Project Estimator software

without user interaction

To import from web-based AASHTOWare Project follow these steps

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-3

1 From the File menu select Import Estimate From

Figure 3-1 Import Estimate Fromhellip

2 At the Import estimate from an external system complete the following

information

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3-4 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-2 Import Estimate From External System hellip Window

33 Checkout from AASHTOWare Project

The checkout from AASHTOWare Project uses the Import Estimate From hellip menu

option This process displays a pop-up window where you can enter the information

required by AASHTOWare Project Preconstruction software as shown in Figure 3-4

including the URL Domain Name Username Password and AASHTOWare Project ID

The same AASHTOWare Project ID will be copied into the AASHTOWare Project

Estimator ID then checked against the Checkout selection When you click the OK

button the AASHTOWare Project Preconstruction project is checked out into

AASHTOWare Project Estimator software automatically

To check out from web-based AASHTOWare Project follow these steps

1 From the File menu select Import Estimate Fromhellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-5

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3 Select the Checkout selection

Figure 3-3 Import Estimate Fromhellip(Checkout)

3-6 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-4 Import Estimate from an External System Using the Checkout Option

34 Export to AASHTOWare Project

When the Export Estimate To hellip menu option is selected a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in Figure 3-6 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID if desired When you click the OK button the AASHTOWare Project

Preconstruction project is imported into AASHTOWare Project Estimator software

automatically

1 From the File menu select Export Estimate Tohellip

2 Enter the following

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-7

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

Certificate Name

3 The Import Type will be preselected if used in conjunction with a checkin

4 The Update Option that should occur when an existing project is available in

AASHTOWare Project Preconstruction will be preselected based on the users

rights in the Estimators Users Table Please see the Estimator System

Manager if the selection is incorrect

Figure 3-5 Export Estimate Tohellip(Checkin)

3-8 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-6 Export Estimate to an External system

35 Checkin to AASHTOWare Project

When you have an estimate open that has been checked out from AASHTOWare Project

Preconstruction and select Export Estimate Tohellip from the File menu a pop-up window

appears where you can enter the information required by AASHTOWare Project

Preconstruction software as shown in Figure 3-8 and the AASHTOWare Project

Preconstruction ProjectProposal ID which will be populated from the Estimate ID

Only a checked-out project or proposal can be checked in A Checkin option check box

appears on the dialog When you click the OK button with this check box select the file

is checked in to AASHTOWare Project Preconstruction software

To check in an estimate from AASHTOWare Project Estimator to AASHTOWare Project

Preconstruction

1 From the File menu select Export Estimate Tohellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-9

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

For a checkin the Import Type will be preselected with a checkin and the

Update options will not be selectable

Figure 3-7 Export Estimate To (Checkin)

3-10 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-8 Export Estimate to an External System (Checkin Process)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare

Project Preconstruction (version Trnsbullport

Preconstruction 202 and later)

You can perform several types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from an AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be changed

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

4-2 System Interface Information

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export an AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 5: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 1-1

1 Introduction

The AASHTOWare Project Estimator software helps agencies estimate the cost of a

construction project using cost-based bid-based quote-based and ad hoc estimation

methods The software automates estimation data gathering and in doing so relieves the

tedium of the estimation process while providing consistent and flexible methods for the

estimation AASHTOWare Project Estimator software interacts with the web-based

AASHTOWare Project (formerly known as web Trnsbullport) application which is used

by highway agencies to prepare estimates and proposals before bid lettings

This guide documents the interfaces between the AASHTOWare Project Estimator

software and the AASHTOWare Project Preconstruction application It is intended as a

supplement to the documentation for those products and assumes that you already have a

working knowledge of AASHTOWare Project Estimator software and the AASHTOWare

Project Preconstruction application

Note For more information on AASHTOWare Project Estimator software basics and estimation techniques such as starting the software or logging on please see the Estimator Userrsquos Guide

Specific file transfer procedures are not covered in the guide For help with file transfer

software please see your agencyrsquos network specialist Support for your file transfer is not

provided through Info Tech Inc

11 Overview

Sharing information between the AASHTOWare Project Estimator software and the

AASHTOWare Project Preconstruction application helps you create estimates and update

project data and prices for projects and proposals much more quickly than working in

either application alone The following chapters contain instructions for importing and

exporting information from within the AASHTOWare Project Estimator software as well

as from within the AASHTOWare Project Preconstruction application

1-2 Introduction

AASHTOWare Project Preconstruction Projects consist of items used in construction

These items typically fall into different project categories for funding purposes for

segregating types of work items or for segregating work phases In order to create a

AASHTOWare Project Preconstruction-compatible project in the AASHTOWare Project

Estimator software all items and associated cost bases must be AASHTOWare Project-

compatible

Once the estimate has been created in the AASHTOWare Project Estimator software it

must be delivered to the AASHTOWare Project Preconstruction application to be

included in a project or proposal and eventually a bid letting The following steps are

required to successfully complete the estimate

1 Transfer data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator or

2 Export the AASHTOWare Project Estimator file as an XML file

3 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction application

4 Import the AASHTOWare Project Estimator XML file into the

AASHTOWare Project Preconstruction application

Each of these steps is described in detail in the following chapters

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 2-1

2 Importing and Exporting in the AASHTOWare

Project Estimator Software

The AASHTOWare Project Estimator software stores estimates in separate data files

You can use the AASHTOWare Project Estimator softwarersquos import and export

capabilities to export data into other applications or import information created in

external programs into the AASHTOWare Project Estimator software See the Estimator

System Managers Guide for more details

When importing the software checks the information being imported to determine if it is

a catalog or estimate and places it accordingly

The AASHTOWare Project Estimator softwarersquos data security measures are enforced

when you import catalogs and the software will import catalog data only for users that

have permission to edit a catalog You can export any catalog or estimate that you can

open

21 Exporting Information to the AASHTOWare Project

Preconstruction Application

The export command is content sensitive in the AASHTOWare Project Estimator

software That is the data you want to export must be currently active (displayed) For

example if you want to export an estimate you must have the estimate open

Follow these steps to export an estimate

1 Ensure that the estimate is active

2 Select Export Estimate File from the File menu

The software displays the dialog box shown in Figure 2-1

2-2 Importing and Exporting in Estimator

Figure 2-1 Export Project Dialog Box

3 Click SAVE

Upon successfully exporting the estimate you are ready to transfer the project into the

AASHTOWare Project Preconstruction application The software used to transfer the

data to the AASHTOWare Project Preconstruction system is supported by your computer

staff Info Tech assumes that software and resources are available to you for transferring

your project to the AASHTOWare Project Preconstruction system

211 Export to AASHTOWare Project

When exporting or checking in an estimate to AASHTOWare Project Preconstruction

software an additional ldquoExport Estimate Tohelliprdquo menu option has been added Selecting

this option displays a pop-up window where you can enter the information required by

AASHTOWare Project Preconstruction software including the URL the Domain Name

Username Password and the AASHTOWare Project Preconstruction Project ID which

will be populated from the Estimate ID If you do not know the above information

please contact your System Administrator

22 Importing Information From the AASHTOWare Project

Preconstruction Application

You can import AASHTOWare Project Preconstruction project or proposal information

into the AASHTOWare Project Estimator software Select Import File from the File

menu and choose the project or proposal from the Import window Click OPEN

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 2-3

Figure 2-2 Import Projects and Proposals From the AASHTOWare Project Preconstruction Application

You can treat these imported projects and proposals like a normal estimate but you must

use the Save As option when saving them for the first time

23 Importing Checked-out Project or Proposals From the

AASHTOWare Project Preconstruction Application

You can import AASHTOWare Project Preconstruction projects or proposals that have

been checked-out for pricing or repricing into the AASHTOWare Project Estimator

software Once the file has been checked-out of web-based AASHTOWare Project

select Import File from the File menu in the AASHTOWare Project Estimator software

and choose the project or proposal from the Import window (See Figure 2-2) Click

OPEN

The AASHTOWare Project Preconstruction projects or proposals that have been

checked-out will import into the AASHTOWare Project Estimator software and will only

allow the unit price of the items to be edited Items can not be added nor deleted on

checked-out projects or proposals After pricing has been completed export the estimate

as detailed in Section 2 Importing and Exporting in the AASHTOWare Project

Estimator Software

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-1

3 Transferring Data between AASHTOWare

Project Preconstruction and AASHTOWare Project

Estimator

Transferring estimate XML files with AASHTOWare Project Preconstruction software

uses a web service that is available to both agency and non-agency users that have the

proper access for the importexportcheckoutcheckin processes for AASHTOWare

Project Preconstruction software

You can

Transfer data to create a new AASHTOWare Project Preconstruction project

from an AASHTOWare Project Estimator estimate

Update project data already in the AASHTOWare Project Preconstruction

application with data from the AASHTOWare Project Estimator software

Import new pricing information for AASHTOWare Project Preconstruction

projects and proposals from the AASHTOWare Project Estimator software

The AASHTOWare Project Preconstruction application will accept only

estimate information that already exists in the AASHTOWare Project

Preconstruction system and has been checked-out Pricing data is the only

kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

Transfer an AASHTOWare Project Preconstruction project or proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a

new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked out the entire project or proposal is locked and cannot be changed

3-2 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

AASHTOWare Project Preconstructionrsquos Engineering and Construction Percent (EampC) is

an industry standard percentage added by some agencies to the cost of the work items on

a project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

32 Import from AASHTOWare Project

When you select the Import Estimate From hellip menu option a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in figure 3-2 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID When you click on the OK button the AASHTOWare Project

Preconstruction project will be imported into AASHTOWare Project Estimator software

without user interaction

To import from web-based AASHTOWare Project follow these steps

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-3

1 From the File menu select Import Estimate From

Figure 3-1 Import Estimate Fromhellip

2 At the Import estimate from an external system complete the following

information

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3-4 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-2 Import Estimate From External System hellip Window

33 Checkout from AASHTOWare Project

The checkout from AASHTOWare Project uses the Import Estimate From hellip menu

option This process displays a pop-up window where you can enter the information

required by AASHTOWare Project Preconstruction software as shown in Figure 3-4

including the URL Domain Name Username Password and AASHTOWare Project ID

The same AASHTOWare Project ID will be copied into the AASHTOWare Project

Estimator ID then checked against the Checkout selection When you click the OK

button the AASHTOWare Project Preconstruction project is checked out into

AASHTOWare Project Estimator software automatically

To check out from web-based AASHTOWare Project follow these steps

1 From the File menu select Import Estimate Fromhellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-5

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3 Select the Checkout selection

Figure 3-3 Import Estimate Fromhellip(Checkout)

3-6 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-4 Import Estimate from an External System Using the Checkout Option

34 Export to AASHTOWare Project

When the Export Estimate To hellip menu option is selected a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in Figure 3-6 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID if desired When you click the OK button the AASHTOWare Project

Preconstruction project is imported into AASHTOWare Project Estimator software

automatically

1 From the File menu select Export Estimate Tohellip

2 Enter the following

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-7

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

Certificate Name

3 The Import Type will be preselected if used in conjunction with a checkin

4 The Update Option that should occur when an existing project is available in

AASHTOWare Project Preconstruction will be preselected based on the users

rights in the Estimators Users Table Please see the Estimator System

Manager if the selection is incorrect

Figure 3-5 Export Estimate Tohellip(Checkin)

3-8 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-6 Export Estimate to an External system

35 Checkin to AASHTOWare Project

When you have an estimate open that has been checked out from AASHTOWare Project

Preconstruction and select Export Estimate Tohellip from the File menu a pop-up window

appears where you can enter the information required by AASHTOWare Project

Preconstruction software as shown in Figure 3-8 and the AASHTOWare Project

Preconstruction ProjectProposal ID which will be populated from the Estimate ID

Only a checked-out project or proposal can be checked in A Checkin option check box

appears on the dialog When you click the OK button with this check box select the file

is checked in to AASHTOWare Project Preconstruction software

To check in an estimate from AASHTOWare Project Estimator to AASHTOWare Project

Preconstruction

1 From the File menu select Export Estimate Tohellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-9

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

For a checkin the Import Type will be preselected with a checkin and the

Update options will not be selectable

Figure 3-7 Export Estimate To (Checkin)

3-10 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-8 Export Estimate to an External System (Checkin Process)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare

Project Preconstruction (version Trnsbullport

Preconstruction 202 and later)

You can perform several types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from an AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be changed

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

4-2 System Interface Information

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export an AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 6: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

1-2 Introduction

AASHTOWare Project Preconstruction Projects consist of items used in construction

These items typically fall into different project categories for funding purposes for

segregating types of work items or for segregating work phases In order to create a

AASHTOWare Project Preconstruction-compatible project in the AASHTOWare Project

Estimator software all items and associated cost bases must be AASHTOWare Project-

compatible

Once the estimate has been created in the AASHTOWare Project Estimator software it

must be delivered to the AASHTOWare Project Preconstruction application to be

included in a project or proposal and eventually a bid letting The following steps are

required to successfully complete the estimate

1 Transfer data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator or

2 Export the AASHTOWare Project Estimator file as an XML file

3 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction application

4 Import the AASHTOWare Project Estimator XML file into the

AASHTOWare Project Preconstruction application

Each of these steps is described in detail in the following chapters

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 2-1

2 Importing and Exporting in the AASHTOWare

Project Estimator Software

The AASHTOWare Project Estimator software stores estimates in separate data files

You can use the AASHTOWare Project Estimator softwarersquos import and export

capabilities to export data into other applications or import information created in

external programs into the AASHTOWare Project Estimator software See the Estimator

System Managers Guide for more details

When importing the software checks the information being imported to determine if it is

a catalog or estimate and places it accordingly

The AASHTOWare Project Estimator softwarersquos data security measures are enforced

when you import catalogs and the software will import catalog data only for users that

have permission to edit a catalog You can export any catalog or estimate that you can

open

21 Exporting Information to the AASHTOWare Project

Preconstruction Application

The export command is content sensitive in the AASHTOWare Project Estimator

software That is the data you want to export must be currently active (displayed) For

example if you want to export an estimate you must have the estimate open

Follow these steps to export an estimate

1 Ensure that the estimate is active

2 Select Export Estimate File from the File menu

The software displays the dialog box shown in Figure 2-1

2-2 Importing and Exporting in Estimator

Figure 2-1 Export Project Dialog Box

3 Click SAVE

Upon successfully exporting the estimate you are ready to transfer the project into the

AASHTOWare Project Preconstruction application The software used to transfer the

data to the AASHTOWare Project Preconstruction system is supported by your computer

staff Info Tech assumes that software and resources are available to you for transferring

your project to the AASHTOWare Project Preconstruction system

211 Export to AASHTOWare Project

When exporting or checking in an estimate to AASHTOWare Project Preconstruction

software an additional ldquoExport Estimate Tohelliprdquo menu option has been added Selecting

this option displays a pop-up window where you can enter the information required by

AASHTOWare Project Preconstruction software including the URL the Domain Name

Username Password and the AASHTOWare Project Preconstruction Project ID which

will be populated from the Estimate ID If you do not know the above information

please contact your System Administrator

22 Importing Information From the AASHTOWare Project

Preconstruction Application

You can import AASHTOWare Project Preconstruction project or proposal information

into the AASHTOWare Project Estimator software Select Import File from the File

menu and choose the project or proposal from the Import window Click OPEN

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 2-3

Figure 2-2 Import Projects and Proposals From the AASHTOWare Project Preconstruction Application

You can treat these imported projects and proposals like a normal estimate but you must

use the Save As option when saving them for the first time

23 Importing Checked-out Project or Proposals From the

AASHTOWare Project Preconstruction Application

You can import AASHTOWare Project Preconstruction projects or proposals that have

been checked-out for pricing or repricing into the AASHTOWare Project Estimator

software Once the file has been checked-out of web-based AASHTOWare Project

select Import File from the File menu in the AASHTOWare Project Estimator software

and choose the project or proposal from the Import window (See Figure 2-2) Click

OPEN

The AASHTOWare Project Preconstruction projects or proposals that have been

checked-out will import into the AASHTOWare Project Estimator software and will only

allow the unit price of the items to be edited Items can not be added nor deleted on

checked-out projects or proposals After pricing has been completed export the estimate

as detailed in Section 2 Importing and Exporting in the AASHTOWare Project

Estimator Software

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-1

3 Transferring Data between AASHTOWare

Project Preconstruction and AASHTOWare Project

Estimator

Transferring estimate XML files with AASHTOWare Project Preconstruction software

uses a web service that is available to both agency and non-agency users that have the

proper access for the importexportcheckoutcheckin processes for AASHTOWare

Project Preconstruction software

You can

Transfer data to create a new AASHTOWare Project Preconstruction project

from an AASHTOWare Project Estimator estimate

Update project data already in the AASHTOWare Project Preconstruction

application with data from the AASHTOWare Project Estimator software

Import new pricing information for AASHTOWare Project Preconstruction

projects and proposals from the AASHTOWare Project Estimator software

The AASHTOWare Project Preconstruction application will accept only

estimate information that already exists in the AASHTOWare Project

Preconstruction system and has been checked-out Pricing data is the only

kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

Transfer an AASHTOWare Project Preconstruction project or proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a

new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked out the entire project or proposal is locked and cannot be changed

3-2 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

AASHTOWare Project Preconstructionrsquos Engineering and Construction Percent (EampC) is

an industry standard percentage added by some agencies to the cost of the work items on

a project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

32 Import from AASHTOWare Project

When you select the Import Estimate From hellip menu option a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in figure 3-2 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID When you click on the OK button the AASHTOWare Project

Preconstruction project will be imported into AASHTOWare Project Estimator software

without user interaction

To import from web-based AASHTOWare Project follow these steps

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-3

1 From the File menu select Import Estimate From

Figure 3-1 Import Estimate Fromhellip

2 At the Import estimate from an external system complete the following

information

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3-4 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-2 Import Estimate From External System hellip Window

33 Checkout from AASHTOWare Project

The checkout from AASHTOWare Project uses the Import Estimate From hellip menu

option This process displays a pop-up window where you can enter the information

required by AASHTOWare Project Preconstruction software as shown in Figure 3-4

including the URL Domain Name Username Password and AASHTOWare Project ID

The same AASHTOWare Project ID will be copied into the AASHTOWare Project

Estimator ID then checked against the Checkout selection When you click the OK

button the AASHTOWare Project Preconstruction project is checked out into

AASHTOWare Project Estimator software automatically

To check out from web-based AASHTOWare Project follow these steps

1 From the File menu select Import Estimate Fromhellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-5

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3 Select the Checkout selection

Figure 3-3 Import Estimate Fromhellip(Checkout)

3-6 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-4 Import Estimate from an External System Using the Checkout Option

34 Export to AASHTOWare Project

When the Export Estimate To hellip menu option is selected a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in Figure 3-6 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID if desired When you click the OK button the AASHTOWare Project

Preconstruction project is imported into AASHTOWare Project Estimator software

automatically

1 From the File menu select Export Estimate Tohellip

2 Enter the following

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-7

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

Certificate Name

3 The Import Type will be preselected if used in conjunction with a checkin

4 The Update Option that should occur when an existing project is available in

AASHTOWare Project Preconstruction will be preselected based on the users

rights in the Estimators Users Table Please see the Estimator System

Manager if the selection is incorrect

Figure 3-5 Export Estimate Tohellip(Checkin)

3-8 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-6 Export Estimate to an External system

35 Checkin to AASHTOWare Project

When you have an estimate open that has been checked out from AASHTOWare Project

Preconstruction and select Export Estimate Tohellip from the File menu a pop-up window

appears where you can enter the information required by AASHTOWare Project

Preconstruction software as shown in Figure 3-8 and the AASHTOWare Project

Preconstruction ProjectProposal ID which will be populated from the Estimate ID

Only a checked-out project or proposal can be checked in A Checkin option check box

appears on the dialog When you click the OK button with this check box select the file

is checked in to AASHTOWare Project Preconstruction software

To check in an estimate from AASHTOWare Project Estimator to AASHTOWare Project

Preconstruction

1 From the File menu select Export Estimate Tohellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-9

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

For a checkin the Import Type will be preselected with a checkin and the

Update options will not be selectable

Figure 3-7 Export Estimate To (Checkin)

3-10 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-8 Export Estimate to an External System (Checkin Process)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare

Project Preconstruction (version Trnsbullport

Preconstruction 202 and later)

You can perform several types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from an AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be changed

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

4-2 System Interface Information

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export an AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 7: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 2-1

2 Importing and Exporting in the AASHTOWare

Project Estimator Software

The AASHTOWare Project Estimator software stores estimates in separate data files

You can use the AASHTOWare Project Estimator softwarersquos import and export

capabilities to export data into other applications or import information created in

external programs into the AASHTOWare Project Estimator software See the Estimator

System Managers Guide for more details

When importing the software checks the information being imported to determine if it is

a catalog or estimate and places it accordingly

The AASHTOWare Project Estimator softwarersquos data security measures are enforced

when you import catalogs and the software will import catalog data only for users that

have permission to edit a catalog You can export any catalog or estimate that you can

open

21 Exporting Information to the AASHTOWare Project

Preconstruction Application

The export command is content sensitive in the AASHTOWare Project Estimator

software That is the data you want to export must be currently active (displayed) For

example if you want to export an estimate you must have the estimate open

Follow these steps to export an estimate

1 Ensure that the estimate is active

2 Select Export Estimate File from the File menu

The software displays the dialog box shown in Figure 2-1

2-2 Importing and Exporting in Estimator

Figure 2-1 Export Project Dialog Box

3 Click SAVE

Upon successfully exporting the estimate you are ready to transfer the project into the

AASHTOWare Project Preconstruction application The software used to transfer the

data to the AASHTOWare Project Preconstruction system is supported by your computer

staff Info Tech assumes that software and resources are available to you for transferring

your project to the AASHTOWare Project Preconstruction system

211 Export to AASHTOWare Project

When exporting or checking in an estimate to AASHTOWare Project Preconstruction

software an additional ldquoExport Estimate Tohelliprdquo menu option has been added Selecting

this option displays a pop-up window where you can enter the information required by

AASHTOWare Project Preconstruction software including the URL the Domain Name

Username Password and the AASHTOWare Project Preconstruction Project ID which

will be populated from the Estimate ID If you do not know the above information

please contact your System Administrator

22 Importing Information From the AASHTOWare Project

Preconstruction Application

You can import AASHTOWare Project Preconstruction project or proposal information

into the AASHTOWare Project Estimator software Select Import File from the File

menu and choose the project or proposal from the Import window Click OPEN

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 2-3

Figure 2-2 Import Projects and Proposals From the AASHTOWare Project Preconstruction Application

You can treat these imported projects and proposals like a normal estimate but you must

use the Save As option when saving them for the first time

23 Importing Checked-out Project or Proposals From the

AASHTOWare Project Preconstruction Application

You can import AASHTOWare Project Preconstruction projects or proposals that have

been checked-out for pricing or repricing into the AASHTOWare Project Estimator

software Once the file has been checked-out of web-based AASHTOWare Project

select Import File from the File menu in the AASHTOWare Project Estimator software

and choose the project or proposal from the Import window (See Figure 2-2) Click

OPEN

The AASHTOWare Project Preconstruction projects or proposals that have been

checked-out will import into the AASHTOWare Project Estimator software and will only

allow the unit price of the items to be edited Items can not be added nor deleted on

checked-out projects or proposals After pricing has been completed export the estimate

as detailed in Section 2 Importing and Exporting in the AASHTOWare Project

Estimator Software

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-1

3 Transferring Data between AASHTOWare

Project Preconstruction and AASHTOWare Project

Estimator

Transferring estimate XML files with AASHTOWare Project Preconstruction software

uses a web service that is available to both agency and non-agency users that have the

proper access for the importexportcheckoutcheckin processes for AASHTOWare

Project Preconstruction software

You can

Transfer data to create a new AASHTOWare Project Preconstruction project

from an AASHTOWare Project Estimator estimate

Update project data already in the AASHTOWare Project Preconstruction

application with data from the AASHTOWare Project Estimator software

Import new pricing information for AASHTOWare Project Preconstruction

projects and proposals from the AASHTOWare Project Estimator software

The AASHTOWare Project Preconstruction application will accept only

estimate information that already exists in the AASHTOWare Project

Preconstruction system and has been checked-out Pricing data is the only

kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

Transfer an AASHTOWare Project Preconstruction project or proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a

new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked out the entire project or proposal is locked and cannot be changed

3-2 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

AASHTOWare Project Preconstructionrsquos Engineering and Construction Percent (EampC) is

an industry standard percentage added by some agencies to the cost of the work items on

a project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

32 Import from AASHTOWare Project

When you select the Import Estimate From hellip menu option a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in figure 3-2 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID When you click on the OK button the AASHTOWare Project

Preconstruction project will be imported into AASHTOWare Project Estimator software

without user interaction

To import from web-based AASHTOWare Project follow these steps

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-3

1 From the File menu select Import Estimate From

Figure 3-1 Import Estimate Fromhellip

2 At the Import estimate from an external system complete the following

information

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3-4 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-2 Import Estimate From External System hellip Window

33 Checkout from AASHTOWare Project

The checkout from AASHTOWare Project uses the Import Estimate From hellip menu

option This process displays a pop-up window where you can enter the information

required by AASHTOWare Project Preconstruction software as shown in Figure 3-4

including the URL Domain Name Username Password and AASHTOWare Project ID

The same AASHTOWare Project ID will be copied into the AASHTOWare Project

Estimator ID then checked against the Checkout selection When you click the OK

button the AASHTOWare Project Preconstruction project is checked out into

AASHTOWare Project Estimator software automatically

To check out from web-based AASHTOWare Project follow these steps

1 From the File menu select Import Estimate Fromhellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-5

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3 Select the Checkout selection

Figure 3-3 Import Estimate Fromhellip(Checkout)

3-6 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-4 Import Estimate from an External System Using the Checkout Option

34 Export to AASHTOWare Project

When the Export Estimate To hellip menu option is selected a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in Figure 3-6 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID if desired When you click the OK button the AASHTOWare Project

Preconstruction project is imported into AASHTOWare Project Estimator software

automatically

1 From the File menu select Export Estimate Tohellip

2 Enter the following

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-7

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

Certificate Name

3 The Import Type will be preselected if used in conjunction with a checkin

4 The Update Option that should occur when an existing project is available in

AASHTOWare Project Preconstruction will be preselected based on the users

rights in the Estimators Users Table Please see the Estimator System

Manager if the selection is incorrect

Figure 3-5 Export Estimate Tohellip(Checkin)

3-8 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-6 Export Estimate to an External system

35 Checkin to AASHTOWare Project

When you have an estimate open that has been checked out from AASHTOWare Project

Preconstruction and select Export Estimate Tohellip from the File menu a pop-up window

appears where you can enter the information required by AASHTOWare Project

Preconstruction software as shown in Figure 3-8 and the AASHTOWare Project

Preconstruction ProjectProposal ID which will be populated from the Estimate ID

Only a checked-out project or proposal can be checked in A Checkin option check box

appears on the dialog When you click the OK button with this check box select the file

is checked in to AASHTOWare Project Preconstruction software

To check in an estimate from AASHTOWare Project Estimator to AASHTOWare Project

Preconstruction

1 From the File menu select Export Estimate Tohellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-9

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

For a checkin the Import Type will be preselected with a checkin and the

Update options will not be selectable

Figure 3-7 Export Estimate To (Checkin)

3-10 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-8 Export Estimate to an External System (Checkin Process)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare

Project Preconstruction (version Trnsbullport

Preconstruction 202 and later)

You can perform several types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from an AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be changed

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

4-2 System Interface Information

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export an AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 8: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

2-2 Importing and Exporting in Estimator

Figure 2-1 Export Project Dialog Box

3 Click SAVE

Upon successfully exporting the estimate you are ready to transfer the project into the

AASHTOWare Project Preconstruction application The software used to transfer the

data to the AASHTOWare Project Preconstruction system is supported by your computer

staff Info Tech assumes that software and resources are available to you for transferring

your project to the AASHTOWare Project Preconstruction system

211 Export to AASHTOWare Project

When exporting or checking in an estimate to AASHTOWare Project Preconstruction

software an additional ldquoExport Estimate Tohelliprdquo menu option has been added Selecting

this option displays a pop-up window where you can enter the information required by

AASHTOWare Project Preconstruction software including the URL the Domain Name

Username Password and the AASHTOWare Project Preconstruction Project ID which

will be populated from the Estimate ID If you do not know the above information

please contact your System Administrator

22 Importing Information From the AASHTOWare Project

Preconstruction Application

You can import AASHTOWare Project Preconstruction project or proposal information

into the AASHTOWare Project Estimator software Select Import File from the File

menu and choose the project or proposal from the Import window Click OPEN

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 2-3

Figure 2-2 Import Projects and Proposals From the AASHTOWare Project Preconstruction Application

You can treat these imported projects and proposals like a normal estimate but you must

use the Save As option when saving them for the first time

23 Importing Checked-out Project or Proposals From the

AASHTOWare Project Preconstruction Application

You can import AASHTOWare Project Preconstruction projects or proposals that have

been checked-out for pricing or repricing into the AASHTOWare Project Estimator

software Once the file has been checked-out of web-based AASHTOWare Project

select Import File from the File menu in the AASHTOWare Project Estimator software

and choose the project or proposal from the Import window (See Figure 2-2) Click

OPEN

The AASHTOWare Project Preconstruction projects or proposals that have been

checked-out will import into the AASHTOWare Project Estimator software and will only

allow the unit price of the items to be edited Items can not be added nor deleted on

checked-out projects or proposals After pricing has been completed export the estimate

as detailed in Section 2 Importing and Exporting in the AASHTOWare Project

Estimator Software

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-1

3 Transferring Data between AASHTOWare

Project Preconstruction and AASHTOWare Project

Estimator

Transferring estimate XML files with AASHTOWare Project Preconstruction software

uses a web service that is available to both agency and non-agency users that have the

proper access for the importexportcheckoutcheckin processes for AASHTOWare

Project Preconstruction software

You can

Transfer data to create a new AASHTOWare Project Preconstruction project

from an AASHTOWare Project Estimator estimate

Update project data already in the AASHTOWare Project Preconstruction

application with data from the AASHTOWare Project Estimator software

Import new pricing information for AASHTOWare Project Preconstruction

projects and proposals from the AASHTOWare Project Estimator software

The AASHTOWare Project Preconstruction application will accept only

estimate information that already exists in the AASHTOWare Project

Preconstruction system and has been checked-out Pricing data is the only

kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

Transfer an AASHTOWare Project Preconstruction project or proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a

new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked out the entire project or proposal is locked and cannot be changed

3-2 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

AASHTOWare Project Preconstructionrsquos Engineering and Construction Percent (EampC) is

an industry standard percentage added by some agencies to the cost of the work items on

a project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

32 Import from AASHTOWare Project

When you select the Import Estimate From hellip menu option a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in figure 3-2 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID When you click on the OK button the AASHTOWare Project

Preconstruction project will be imported into AASHTOWare Project Estimator software

without user interaction

To import from web-based AASHTOWare Project follow these steps

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-3

1 From the File menu select Import Estimate From

Figure 3-1 Import Estimate Fromhellip

2 At the Import estimate from an external system complete the following

information

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3-4 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-2 Import Estimate From External System hellip Window

33 Checkout from AASHTOWare Project

The checkout from AASHTOWare Project uses the Import Estimate From hellip menu

option This process displays a pop-up window where you can enter the information

required by AASHTOWare Project Preconstruction software as shown in Figure 3-4

including the URL Domain Name Username Password and AASHTOWare Project ID

The same AASHTOWare Project ID will be copied into the AASHTOWare Project

Estimator ID then checked against the Checkout selection When you click the OK

button the AASHTOWare Project Preconstruction project is checked out into

AASHTOWare Project Estimator software automatically

To check out from web-based AASHTOWare Project follow these steps

1 From the File menu select Import Estimate Fromhellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-5

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3 Select the Checkout selection

Figure 3-3 Import Estimate Fromhellip(Checkout)

3-6 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-4 Import Estimate from an External System Using the Checkout Option

34 Export to AASHTOWare Project

When the Export Estimate To hellip menu option is selected a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in Figure 3-6 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID if desired When you click the OK button the AASHTOWare Project

Preconstruction project is imported into AASHTOWare Project Estimator software

automatically

1 From the File menu select Export Estimate Tohellip

2 Enter the following

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-7

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

Certificate Name

3 The Import Type will be preselected if used in conjunction with a checkin

4 The Update Option that should occur when an existing project is available in

AASHTOWare Project Preconstruction will be preselected based on the users

rights in the Estimators Users Table Please see the Estimator System

Manager if the selection is incorrect

Figure 3-5 Export Estimate Tohellip(Checkin)

3-8 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-6 Export Estimate to an External system

35 Checkin to AASHTOWare Project

When you have an estimate open that has been checked out from AASHTOWare Project

Preconstruction and select Export Estimate Tohellip from the File menu a pop-up window

appears where you can enter the information required by AASHTOWare Project

Preconstruction software as shown in Figure 3-8 and the AASHTOWare Project

Preconstruction ProjectProposal ID which will be populated from the Estimate ID

Only a checked-out project or proposal can be checked in A Checkin option check box

appears on the dialog When you click the OK button with this check box select the file

is checked in to AASHTOWare Project Preconstruction software

To check in an estimate from AASHTOWare Project Estimator to AASHTOWare Project

Preconstruction

1 From the File menu select Export Estimate Tohellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-9

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

For a checkin the Import Type will be preselected with a checkin and the

Update options will not be selectable

Figure 3-7 Export Estimate To (Checkin)

3-10 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-8 Export Estimate to an External System (Checkin Process)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare

Project Preconstruction (version Trnsbullport

Preconstruction 202 and later)

You can perform several types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from an AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be changed

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

4-2 System Interface Information

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export an AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 9: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 2-3

Figure 2-2 Import Projects and Proposals From the AASHTOWare Project Preconstruction Application

You can treat these imported projects and proposals like a normal estimate but you must

use the Save As option when saving them for the first time

23 Importing Checked-out Project or Proposals From the

AASHTOWare Project Preconstruction Application

You can import AASHTOWare Project Preconstruction projects or proposals that have

been checked-out for pricing or repricing into the AASHTOWare Project Estimator

software Once the file has been checked-out of web-based AASHTOWare Project

select Import File from the File menu in the AASHTOWare Project Estimator software

and choose the project or proposal from the Import window (See Figure 2-2) Click

OPEN

The AASHTOWare Project Preconstruction projects or proposals that have been

checked-out will import into the AASHTOWare Project Estimator software and will only

allow the unit price of the items to be edited Items can not be added nor deleted on

checked-out projects or proposals After pricing has been completed export the estimate

as detailed in Section 2 Importing and Exporting in the AASHTOWare Project

Estimator Software

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-1

3 Transferring Data between AASHTOWare

Project Preconstruction and AASHTOWare Project

Estimator

Transferring estimate XML files with AASHTOWare Project Preconstruction software

uses a web service that is available to both agency and non-agency users that have the

proper access for the importexportcheckoutcheckin processes for AASHTOWare

Project Preconstruction software

You can

Transfer data to create a new AASHTOWare Project Preconstruction project

from an AASHTOWare Project Estimator estimate

Update project data already in the AASHTOWare Project Preconstruction

application with data from the AASHTOWare Project Estimator software

Import new pricing information for AASHTOWare Project Preconstruction

projects and proposals from the AASHTOWare Project Estimator software

The AASHTOWare Project Preconstruction application will accept only

estimate information that already exists in the AASHTOWare Project

Preconstruction system and has been checked-out Pricing data is the only

kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

Transfer an AASHTOWare Project Preconstruction project or proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a

new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked out the entire project or proposal is locked and cannot be changed

3-2 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

AASHTOWare Project Preconstructionrsquos Engineering and Construction Percent (EampC) is

an industry standard percentage added by some agencies to the cost of the work items on

a project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

32 Import from AASHTOWare Project

When you select the Import Estimate From hellip menu option a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in figure 3-2 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID When you click on the OK button the AASHTOWare Project

Preconstruction project will be imported into AASHTOWare Project Estimator software

without user interaction

To import from web-based AASHTOWare Project follow these steps

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-3

1 From the File menu select Import Estimate From

Figure 3-1 Import Estimate Fromhellip

2 At the Import estimate from an external system complete the following

information

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3-4 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-2 Import Estimate From External System hellip Window

33 Checkout from AASHTOWare Project

The checkout from AASHTOWare Project uses the Import Estimate From hellip menu

option This process displays a pop-up window where you can enter the information

required by AASHTOWare Project Preconstruction software as shown in Figure 3-4

including the URL Domain Name Username Password and AASHTOWare Project ID

The same AASHTOWare Project ID will be copied into the AASHTOWare Project

Estimator ID then checked against the Checkout selection When you click the OK

button the AASHTOWare Project Preconstruction project is checked out into

AASHTOWare Project Estimator software automatically

To check out from web-based AASHTOWare Project follow these steps

1 From the File menu select Import Estimate Fromhellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-5

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3 Select the Checkout selection

Figure 3-3 Import Estimate Fromhellip(Checkout)

3-6 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-4 Import Estimate from an External System Using the Checkout Option

34 Export to AASHTOWare Project

When the Export Estimate To hellip menu option is selected a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in Figure 3-6 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID if desired When you click the OK button the AASHTOWare Project

Preconstruction project is imported into AASHTOWare Project Estimator software

automatically

1 From the File menu select Export Estimate Tohellip

2 Enter the following

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-7

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

Certificate Name

3 The Import Type will be preselected if used in conjunction with a checkin

4 The Update Option that should occur when an existing project is available in

AASHTOWare Project Preconstruction will be preselected based on the users

rights in the Estimators Users Table Please see the Estimator System

Manager if the selection is incorrect

Figure 3-5 Export Estimate Tohellip(Checkin)

3-8 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-6 Export Estimate to an External system

35 Checkin to AASHTOWare Project

When you have an estimate open that has been checked out from AASHTOWare Project

Preconstruction and select Export Estimate Tohellip from the File menu a pop-up window

appears where you can enter the information required by AASHTOWare Project

Preconstruction software as shown in Figure 3-8 and the AASHTOWare Project

Preconstruction ProjectProposal ID which will be populated from the Estimate ID

Only a checked-out project or proposal can be checked in A Checkin option check box

appears on the dialog When you click the OK button with this check box select the file

is checked in to AASHTOWare Project Preconstruction software

To check in an estimate from AASHTOWare Project Estimator to AASHTOWare Project

Preconstruction

1 From the File menu select Export Estimate Tohellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-9

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

For a checkin the Import Type will be preselected with a checkin and the

Update options will not be selectable

Figure 3-7 Export Estimate To (Checkin)

3-10 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-8 Export Estimate to an External System (Checkin Process)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare

Project Preconstruction (version Trnsbullport

Preconstruction 202 and later)

You can perform several types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from an AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be changed

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

4-2 System Interface Information

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export an AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 10: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-1

3 Transferring Data between AASHTOWare

Project Preconstruction and AASHTOWare Project

Estimator

Transferring estimate XML files with AASHTOWare Project Preconstruction software

uses a web service that is available to both agency and non-agency users that have the

proper access for the importexportcheckoutcheckin processes for AASHTOWare

Project Preconstruction software

You can

Transfer data to create a new AASHTOWare Project Preconstruction project

from an AASHTOWare Project Estimator estimate

Update project data already in the AASHTOWare Project Preconstruction

application with data from the AASHTOWare Project Estimator software

Import new pricing information for AASHTOWare Project Preconstruction

projects and proposals from the AASHTOWare Project Estimator software

The AASHTOWare Project Preconstruction application will accept only

estimate information that already exists in the AASHTOWare Project

Preconstruction system and has been checked-out Pricing data is the only

kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

Transfer an AASHTOWare Project Preconstruction project or proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a

new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked out the entire project or proposal is locked and cannot be changed

3-2 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

AASHTOWare Project Preconstructionrsquos Engineering and Construction Percent (EampC) is

an industry standard percentage added by some agencies to the cost of the work items on

a project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

32 Import from AASHTOWare Project

When you select the Import Estimate From hellip menu option a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in figure 3-2 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID When you click on the OK button the AASHTOWare Project

Preconstruction project will be imported into AASHTOWare Project Estimator software

without user interaction

To import from web-based AASHTOWare Project follow these steps

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-3

1 From the File menu select Import Estimate From

Figure 3-1 Import Estimate Fromhellip

2 At the Import estimate from an external system complete the following

information

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3-4 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-2 Import Estimate From External System hellip Window

33 Checkout from AASHTOWare Project

The checkout from AASHTOWare Project uses the Import Estimate From hellip menu

option This process displays a pop-up window where you can enter the information

required by AASHTOWare Project Preconstruction software as shown in Figure 3-4

including the URL Domain Name Username Password and AASHTOWare Project ID

The same AASHTOWare Project ID will be copied into the AASHTOWare Project

Estimator ID then checked against the Checkout selection When you click the OK

button the AASHTOWare Project Preconstruction project is checked out into

AASHTOWare Project Estimator software automatically

To check out from web-based AASHTOWare Project follow these steps

1 From the File menu select Import Estimate Fromhellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-5

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3 Select the Checkout selection

Figure 3-3 Import Estimate Fromhellip(Checkout)

3-6 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-4 Import Estimate from an External System Using the Checkout Option

34 Export to AASHTOWare Project

When the Export Estimate To hellip menu option is selected a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in Figure 3-6 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID if desired When you click the OK button the AASHTOWare Project

Preconstruction project is imported into AASHTOWare Project Estimator software

automatically

1 From the File menu select Export Estimate Tohellip

2 Enter the following

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-7

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

Certificate Name

3 The Import Type will be preselected if used in conjunction with a checkin

4 The Update Option that should occur when an existing project is available in

AASHTOWare Project Preconstruction will be preselected based on the users

rights in the Estimators Users Table Please see the Estimator System

Manager if the selection is incorrect

Figure 3-5 Export Estimate Tohellip(Checkin)

3-8 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-6 Export Estimate to an External system

35 Checkin to AASHTOWare Project

When you have an estimate open that has been checked out from AASHTOWare Project

Preconstruction and select Export Estimate Tohellip from the File menu a pop-up window

appears where you can enter the information required by AASHTOWare Project

Preconstruction software as shown in Figure 3-8 and the AASHTOWare Project

Preconstruction ProjectProposal ID which will be populated from the Estimate ID

Only a checked-out project or proposal can be checked in A Checkin option check box

appears on the dialog When you click the OK button with this check box select the file

is checked in to AASHTOWare Project Preconstruction software

To check in an estimate from AASHTOWare Project Estimator to AASHTOWare Project

Preconstruction

1 From the File menu select Export Estimate Tohellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-9

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

For a checkin the Import Type will be preselected with a checkin and the

Update options will not be selectable

Figure 3-7 Export Estimate To (Checkin)

3-10 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-8 Export Estimate to an External System (Checkin Process)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare

Project Preconstruction (version Trnsbullport

Preconstruction 202 and later)

You can perform several types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from an AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be changed

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

4-2 System Interface Information

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export an AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 11: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

3-2 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

AASHTOWare Project Preconstructionrsquos Engineering and Construction Percent (EampC) is

an industry standard percentage added by some agencies to the cost of the work items on

a project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

32 Import from AASHTOWare Project

When you select the Import Estimate From hellip menu option a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in figure 3-2 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID When you click on the OK button the AASHTOWare Project

Preconstruction project will be imported into AASHTOWare Project Estimator software

without user interaction

To import from web-based AASHTOWare Project follow these steps

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-3

1 From the File menu select Import Estimate From

Figure 3-1 Import Estimate Fromhellip

2 At the Import estimate from an external system complete the following

information

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3-4 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-2 Import Estimate From External System hellip Window

33 Checkout from AASHTOWare Project

The checkout from AASHTOWare Project uses the Import Estimate From hellip menu

option This process displays a pop-up window where you can enter the information

required by AASHTOWare Project Preconstruction software as shown in Figure 3-4

including the URL Domain Name Username Password and AASHTOWare Project ID

The same AASHTOWare Project ID will be copied into the AASHTOWare Project

Estimator ID then checked against the Checkout selection When you click the OK

button the AASHTOWare Project Preconstruction project is checked out into

AASHTOWare Project Estimator software automatically

To check out from web-based AASHTOWare Project follow these steps

1 From the File menu select Import Estimate Fromhellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-5

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3 Select the Checkout selection

Figure 3-3 Import Estimate Fromhellip(Checkout)

3-6 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-4 Import Estimate from an External System Using the Checkout Option

34 Export to AASHTOWare Project

When the Export Estimate To hellip menu option is selected a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in Figure 3-6 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID if desired When you click the OK button the AASHTOWare Project

Preconstruction project is imported into AASHTOWare Project Estimator software

automatically

1 From the File menu select Export Estimate Tohellip

2 Enter the following

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-7

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

Certificate Name

3 The Import Type will be preselected if used in conjunction with a checkin

4 The Update Option that should occur when an existing project is available in

AASHTOWare Project Preconstruction will be preselected based on the users

rights in the Estimators Users Table Please see the Estimator System

Manager if the selection is incorrect

Figure 3-5 Export Estimate Tohellip(Checkin)

3-8 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-6 Export Estimate to an External system

35 Checkin to AASHTOWare Project

When you have an estimate open that has been checked out from AASHTOWare Project

Preconstruction and select Export Estimate Tohellip from the File menu a pop-up window

appears where you can enter the information required by AASHTOWare Project

Preconstruction software as shown in Figure 3-8 and the AASHTOWare Project

Preconstruction ProjectProposal ID which will be populated from the Estimate ID

Only a checked-out project or proposal can be checked in A Checkin option check box

appears on the dialog When you click the OK button with this check box select the file

is checked in to AASHTOWare Project Preconstruction software

To check in an estimate from AASHTOWare Project Estimator to AASHTOWare Project

Preconstruction

1 From the File menu select Export Estimate Tohellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-9

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

For a checkin the Import Type will be preselected with a checkin and the

Update options will not be selectable

Figure 3-7 Export Estimate To (Checkin)

3-10 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-8 Export Estimate to an External System (Checkin Process)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare

Project Preconstruction (version Trnsbullport

Preconstruction 202 and later)

You can perform several types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from an AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be changed

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

4-2 System Interface Information

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export an AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 12: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-3

1 From the File menu select Import Estimate From

Figure 3-1 Import Estimate Fromhellip

2 At the Import estimate from an external system complete the following

information

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3-4 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-2 Import Estimate From External System hellip Window

33 Checkout from AASHTOWare Project

The checkout from AASHTOWare Project uses the Import Estimate From hellip menu

option This process displays a pop-up window where you can enter the information

required by AASHTOWare Project Preconstruction software as shown in Figure 3-4

including the URL Domain Name Username Password and AASHTOWare Project ID

The same AASHTOWare Project ID will be copied into the AASHTOWare Project

Estimator ID then checked against the Checkout selection When you click the OK

button the AASHTOWare Project Preconstruction project is checked out into

AASHTOWare Project Estimator software automatically

To check out from web-based AASHTOWare Project follow these steps

1 From the File menu select Import Estimate Fromhellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-5

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3 Select the Checkout selection

Figure 3-3 Import Estimate Fromhellip(Checkout)

3-6 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-4 Import Estimate from an External System Using the Checkout Option

34 Export to AASHTOWare Project

When the Export Estimate To hellip menu option is selected a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in Figure 3-6 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID if desired When you click the OK button the AASHTOWare Project

Preconstruction project is imported into AASHTOWare Project Estimator software

automatically

1 From the File menu select Export Estimate Tohellip

2 Enter the following

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-7

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

Certificate Name

3 The Import Type will be preselected if used in conjunction with a checkin

4 The Update Option that should occur when an existing project is available in

AASHTOWare Project Preconstruction will be preselected based on the users

rights in the Estimators Users Table Please see the Estimator System

Manager if the selection is incorrect

Figure 3-5 Export Estimate Tohellip(Checkin)

3-8 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-6 Export Estimate to an External system

35 Checkin to AASHTOWare Project

When you have an estimate open that has been checked out from AASHTOWare Project

Preconstruction and select Export Estimate Tohellip from the File menu a pop-up window

appears where you can enter the information required by AASHTOWare Project

Preconstruction software as shown in Figure 3-8 and the AASHTOWare Project

Preconstruction ProjectProposal ID which will be populated from the Estimate ID

Only a checked-out project or proposal can be checked in A Checkin option check box

appears on the dialog When you click the OK button with this check box select the file

is checked in to AASHTOWare Project Preconstruction software

To check in an estimate from AASHTOWare Project Estimator to AASHTOWare Project

Preconstruction

1 From the File menu select Export Estimate Tohellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-9

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

For a checkin the Import Type will be preselected with a checkin and the

Update options will not be selectable

Figure 3-7 Export Estimate To (Checkin)

3-10 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-8 Export Estimate to an External System (Checkin Process)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare

Project Preconstruction (version Trnsbullport

Preconstruction 202 and later)

You can perform several types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from an AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be changed

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

4-2 System Interface Information

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export an AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 13: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

3-4 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-2 Import Estimate From External System hellip Window

33 Checkout from AASHTOWare Project

The checkout from AASHTOWare Project uses the Import Estimate From hellip menu

option This process displays a pop-up window where you can enter the information

required by AASHTOWare Project Preconstruction software as shown in Figure 3-4

including the URL Domain Name Username Password and AASHTOWare Project ID

The same AASHTOWare Project ID will be copied into the AASHTOWare Project

Estimator ID then checked against the Checkout selection When you click the OK

button the AASHTOWare Project Preconstruction project is checked out into

AASHTOWare Project Estimator software automatically

To check out from web-based AASHTOWare Project follow these steps

1 From the File menu select Import Estimate Fromhellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-5

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3 Select the Checkout selection

Figure 3-3 Import Estimate Fromhellip(Checkout)

3-6 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-4 Import Estimate from an External System Using the Checkout Option

34 Export to AASHTOWare Project

When the Export Estimate To hellip menu option is selected a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in Figure 3-6 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID if desired When you click the OK button the AASHTOWare Project

Preconstruction project is imported into AASHTOWare Project Estimator software

automatically

1 From the File menu select Export Estimate Tohellip

2 Enter the following

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-7

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

Certificate Name

3 The Import Type will be preselected if used in conjunction with a checkin

4 The Update Option that should occur when an existing project is available in

AASHTOWare Project Preconstruction will be preselected based on the users

rights in the Estimators Users Table Please see the Estimator System

Manager if the selection is incorrect

Figure 3-5 Export Estimate Tohellip(Checkin)

3-8 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-6 Export Estimate to an External system

35 Checkin to AASHTOWare Project

When you have an estimate open that has been checked out from AASHTOWare Project

Preconstruction and select Export Estimate Tohellip from the File menu a pop-up window

appears where you can enter the information required by AASHTOWare Project

Preconstruction software as shown in Figure 3-8 and the AASHTOWare Project

Preconstruction ProjectProposal ID which will be populated from the Estimate ID

Only a checked-out project or proposal can be checked in A Checkin option check box

appears on the dialog When you click the OK button with this check box select the file

is checked in to AASHTOWare Project Preconstruction software

To check in an estimate from AASHTOWare Project Estimator to AASHTOWare Project

Preconstruction

1 From the File menu select Export Estimate Tohellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-9

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

For a checkin the Import Type will be preselected with a checkin and the

Update options will not be selectable

Figure 3-7 Export Estimate To (Checkin)

3-10 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-8 Export Estimate to an External System (Checkin Process)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare

Project Preconstruction (version Trnsbullport

Preconstruction 202 and later)

You can perform several types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from an AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be changed

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

4-2 System Interface Information

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export an AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 14: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-5

The Import From selection will be preselected to include AASHTOWare

Project Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

AASHTOWare Project ID

The Import Type (either Project or Proposal)

Select http or https

Certificate Name

3 Select the Checkout selection

Figure 3-3 Import Estimate Fromhellip(Checkout)

3-6 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-4 Import Estimate from an External System Using the Checkout Option

34 Export to AASHTOWare Project

When the Export Estimate To hellip menu option is selected a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in Figure 3-6 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID if desired When you click the OK button the AASHTOWare Project

Preconstruction project is imported into AASHTOWare Project Estimator software

automatically

1 From the File menu select Export Estimate Tohellip

2 Enter the following

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-7

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

Certificate Name

3 The Import Type will be preselected if used in conjunction with a checkin

4 The Update Option that should occur when an existing project is available in

AASHTOWare Project Preconstruction will be preselected based on the users

rights in the Estimators Users Table Please see the Estimator System

Manager if the selection is incorrect

Figure 3-5 Export Estimate Tohellip(Checkin)

3-8 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-6 Export Estimate to an External system

35 Checkin to AASHTOWare Project

When you have an estimate open that has been checked out from AASHTOWare Project

Preconstruction and select Export Estimate Tohellip from the File menu a pop-up window

appears where you can enter the information required by AASHTOWare Project

Preconstruction software as shown in Figure 3-8 and the AASHTOWare Project

Preconstruction ProjectProposal ID which will be populated from the Estimate ID

Only a checked-out project or proposal can be checked in A Checkin option check box

appears on the dialog When you click the OK button with this check box select the file

is checked in to AASHTOWare Project Preconstruction software

To check in an estimate from AASHTOWare Project Estimator to AASHTOWare Project

Preconstruction

1 From the File menu select Export Estimate Tohellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-9

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

For a checkin the Import Type will be preselected with a checkin and the

Update options will not be selectable

Figure 3-7 Export Estimate To (Checkin)

3-10 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-8 Export Estimate to an External System (Checkin Process)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare

Project Preconstruction (version Trnsbullport

Preconstruction 202 and later)

You can perform several types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from an AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be changed

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

4-2 System Interface Information

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export an AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 15: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

3-6 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-4 Import Estimate from an External System Using the Checkout Option

34 Export to AASHTOWare Project

When the Export Estimate To hellip menu option is selected a pop-up window appears

where you can enter the information required by AASHTOWare Project Preconstruction

software as shown in Figure 3-6 The same AASHTOWare Project ID will be copied into

the AASHTOWare Project Estimator ID but you can change the AASHTOWare Project

Estimator ID if desired When you click the OK button the AASHTOWare Project

Preconstruction project is imported into AASHTOWare Project Estimator software

automatically

1 From the File menu select Export Estimate Tohellip

2 Enter the following

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-7

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

Certificate Name

3 The Import Type will be preselected if used in conjunction with a checkin

4 The Update Option that should occur when an existing project is available in

AASHTOWare Project Preconstruction will be preselected based on the users

rights in the Estimators Users Table Please see the Estimator System

Manager if the selection is incorrect

Figure 3-5 Export Estimate Tohellip(Checkin)

3-8 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-6 Export Estimate to an External system

35 Checkin to AASHTOWare Project

When you have an estimate open that has been checked out from AASHTOWare Project

Preconstruction and select Export Estimate Tohellip from the File menu a pop-up window

appears where you can enter the information required by AASHTOWare Project

Preconstruction software as shown in Figure 3-8 and the AASHTOWare Project

Preconstruction ProjectProposal ID which will be populated from the Estimate ID

Only a checked-out project or proposal can be checked in A Checkin option check box

appears on the dialog When you click the OK button with this check box select the file

is checked in to AASHTOWare Project Preconstruction software

To check in an estimate from AASHTOWare Project Estimator to AASHTOWare Project

Preconstruction

1 From the File menu select Export Estimate Tohellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-9

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

For a checkin the Import Type will be preselected with a checkin and the

Update options will not be selectable

Figure 3-7 Export Estimate To (Checkin)

3-10 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-8 Export Estimate to an External System (Checkin Process)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare

Project Preconstruction (version Trnsbullport

Preconstruction 202 and later)

You can perform several types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from an AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be changed

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

4-2 System Interface Information

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export an AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 16: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-7

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

Certificate Name

3 The Import Type will be preselected if used in conjunction with a checkin

4 The Update Option that should occur when an existing project is available in

AASHTOWare Project Preconstruction will be preselected based on the users

rights in the Estimators Users Table Please see the Estimator System

Manager if the selection is incorrect

Figure 3-5 Export Estimate Tohellip(Checkin)

3-8 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-6 Export Estimate to an External system

35 Checkin to AASHTOWare Project

When you have an estimate open that has been checked out from AASHTOWare Project

Preconstruction and select Export Estimate Tohellip from the File menu a pop-up window

appears where you can enter the information required by AASHTOWare Project

Preconstruction software as shown in Figure 3-8 and the AASHTOWare Project

Preconstruction ProjectProposal ID which will be populated from the Estimate ID

Only a checked-out project or proposal can be checked in A Checkin option check box

appears on the dialog When you click the OK button with this check box select the file

is checked in to AASHTOWare Project Preconstruction software

To check in an estimate from AASHTOWare Project Estimator to AASHTOWare Project

Preconstruction

1 From the File menu select Export Estimate Tohellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-9

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

For a checkin the Import Type will be preselected with a checkin and the

Update options will not be selectable

Figure 3-7 Export Estimate To (Checkin)

3-10 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-8 Export Estimate to an External System (Checkin Process)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare

Project Preconstruction (version Trnsbullport

Preconstruction 202 and later)

You can perform several types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from an AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be changed

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

4-2 System Interface Information

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export an AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 17: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

3-8 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-6 Export Estimate to an External system

35 Checkin to AASHTOWare Project

When you have an estimate open that has been checked out from AASHTOWare Project

Preconstruction and select Export Estimate Tohellip from the File menu a pop-up window

appears where you can enter the information required by AASHTOWare Project

Preconstruction software as shown in Figure 3-8 and the AASHTOWare Project

Preconstruction ProjectProposal ID which will be populated from the Estimate ID

Only a checked-out project or proposal can be checked in A Checkin option check box

appears on the dialog When you click the OK button with this check box select the file

is checked in to AASHTOWare Project Preconstruction software

To check in an estimate from AASHTOWare Project Estimator to AASHTOWare Project

Preconstruction

1 From the File menu select Export Estimate Tohellip

2 Enter the following

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-9

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

For a checkin the Import Type will be preselected with a checkin and the

Update options will not be selectable

Figure 3-7 Export Estimate To (Checkin)

3-10 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-8 Export Estimate to an External System (Checkin Process)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare

Project Preconstruction (version Trnsbullport

Preconstruction 202 and later)

You can perform several types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from an AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be changed

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

4-2 System Interface Information

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export an AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 18: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 3-9

The Export To will be preselected to include AASHTOWare Project

Preconstruction

URL (the URL of the AASHTOWare Project Preconstruction)

Domain Name (the domain name of the AASHTOWare Project

Preconstruction)

Username (the Username of the AASHTOWare Project Preconstruction)

Password (the password of the AASHTOWare Project Preconstruction)

Estimate ID

Select http or https

For a checkin the Import Type will be preselected with a checkin and the

Update options will not be selectable

Figure 3-7 Export Estimate To (Checkin)

3-10 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-8 Export Estimate to an External System (Checkin Process)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare

Project Preconstruction (version Trnsbullport

Preconstruction 202 and later)

You can perform several types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from an AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be changed

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

4-2 System Interface Information

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export an AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 19: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

3-10 Transferring Data Between AASHTOWare Project Preconstruction and Estimator

Figure 3-8 Export Estimate to an External System (Checkin Process)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare

Project Preconstruction (version Trnsbullport

Preconstruction 202 and later)

You can perform several types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from an AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be changed

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

4-2 System Interface Information

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export an AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 20: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare

Project Preconstruction (version Trnsbullport

Preconstruction 202 and later)

You can perform several types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from an AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare Project

Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be changed

in the AASHTOWare Project Preconstruction application When a project or proposal

has been checked out from the AASHTOWare Project Preconstruction system pricing

information is the only information that may be changed

4-2 System Interface Information

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export an AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 21: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

4-2 System Interface Information

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not considered that might affect the estimate As you approach a final

estimate the contingency should drop to as close to zero as possible The AASHTOWare

Project Preconstruction contingencies are used to obtain funding based on fixed percents

of the cost of the work Even if you use the Estimator contingency field for this other

purpose you need to re-enter it in the AASHTOWare Project Preconstruction application

once the project is imported into the AASHTOWare Project Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export an AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 22: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 23: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

4-4 System Interface Information

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 24: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 25: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

4-6 System Interface Information

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

3 Transferring Data between AASHTOWare Project Preconstruction and

AASHTOWare Project Estimator)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 26: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 27: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

4-8 System Interface Information

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will navigate

directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 28: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you will

be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 29: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

4-10 System Interface Information

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 30: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 31: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

4-12 System Interface Information

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 32: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-13

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked-out file such as the one that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked-out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

Figure 4-21 Estimator Import Page

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 33: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

4-14 System Interface Information

4 Click the Import button A Project checkin succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 34: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-15

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

EXECUTE button (See Figure 4-25)

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 35: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

4-16 System Interface Information

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import File from the File menu

as shown in Figure 4-27

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 36: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import File window highlight the file and click the OPEN button as

shown in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 37: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

4-18 System Interface Information

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it back

in Also you will only be allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 38: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select EXECUTE PROCESS (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

4-20 System Interface Information

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import File from the

File menu as shown in Figure 4-34

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-21

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

4-22 System Interface Information

Figure 4-36 Estimate Window with Checked-Out Proposal

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 4-23

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

4-24 System Interface Information

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-25

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project prices

proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

5-26 System Interface Information

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-27

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

5-28 System Interface Information

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-29

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

5-30 System Interface Information

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-31

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

5-32 System Interface Information

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-33

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

5-34 System Interface Information

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

AASHTOWare Project Estimator AASHTOWare Project Preconstruction Interaction Guide 5-35

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update an

Estimator catalog Code tables are exported in a fixed-field format The format of this

file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-36 System Interface Information

This page intentionally left blank

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
          • 211 Export to AASHTOWare Project
            • 22 Importing Information From the AASHTOWare Project Preconstruction Application
            • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
              • 3 Transferring Data between AASHTOWare Project Preconstruction and AASHTOWare Project Estimator
                • 31 Contingency Percent vs Engineering and Construction Percent
                • 32 Import from AASHTOWare Project
                • 33 Checkout from AASHTOWare Project
                • 34 Export to AASHTOWare Project
                • 35 Checkin to AASHTOWare Project
                  • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 202 and later)
                    • 41 Contingency Percent vs Engineering and Construction Percent
                    • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                      • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                        • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                        • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                          • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                            • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                            • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                              • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                              • 462 Setting the Estimate Catalog
                                • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                  • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                  • 472 Setting the Estimate Catalog
                                    • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                      • 5 Interface Information
                                        • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                          • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                            • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                              • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                  • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                    • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                      • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                        • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                          • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                            • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                              • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                  • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 58 Reference Data
                                                                      • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 39: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to
Page 40: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to
Page 41: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to
Page 42: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to
Page 43: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to
Page 44: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to
Page 45: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to
Page 46: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to
Page 47: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to
Page 48: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to
Page 49: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to
Page 50: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to
Page 51: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to
Page 52: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to
Page 53: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to
Page 54: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to
Page 55: Web-based AASHTOWare Project Interaction Guide · 2021. 1. 13. · Figure 2-1. Export Project Dialog Box 3. Click SAVE. Upon successfully exporting the estimate, you are ready to