UPDATESKey changes since publication launched (July 2009)
11th Edition
Full book
15th February 2013 WB09_WHITE_BOOK_21
Revised to include updates due to the withdrawal of 150 FC 90 Fixing Channel. Refer to individual sections below for details of changes.
21st December 2012 WB09_WHITE_BOOK_20
Plaster sections updated to include Thistle Uni-Finish update. Refer to individual sections below for details of changes.
17th December 2012 WB09_WHITE_BOOK_19
Complete update to CasoLine GRID section to become CasoLine QUICK-LOCK GRID with new components, installation and construction details as well as including new Gyptone ACTIVair tiles and boards and removal of Casoprano products. CasoLine MF has been updated to include Gyptone ACTIVair tiles and boards. Also general technical review of White Book 2009, including complete removal of FlameLyner, GypFloor SB
and SoffitLine sections, and removal of two pages from GypWall CLASSIC section. As a result subsequent pages have been renumbered and indexing revised throughout. Refer to individual sections below for details of changes.
1ST November 2012 WB09_WHITE_BOOK_18
Update to Ceilings product section to add additional products into Gyptone range, remove Casoprano products, rename CasoLine GRID as CasoLine QUICK-LOCK GRID and update the components. Addition of ACTIVair to some Gyptone tiles and boards, also resulting in a reduction in thickness. As a result subsequent pages have been renumbered and indexing revised throughout.
22nd October 2012 WB09_WHITE_BOOK_17
Plaster sections have been revised to include Thistle Uni-Finish. Also Thistle Projection plaster and Thistle Thin Coat Mini Mesh Bead have been removed.
29th June 2012 WB09_WHITE_BOOK_16
Revised to include amendments to Introduction and Sustainability sections. Refer to individual sections below for details of changes.
25th May 2012 WB09_WHITE_BOOK_15
General technical review of White Book 2009, including Isover technical changes and implementation of Folded Edge branding to metal products throughout book. Refer to individual sections below for details of changes.
28th October 2011 WB09_WHITE_BOOK_14
Revised to include amendments to Tiling section. Refer to individual sections below for details of changes.
5th September 2011 WB09_WHITE_BOOK_13
Revised to include Thistle Spray Finish product. Also specific amends relating to partition to structural steelwork junctions have been made to the following sections: Basic principles, GypWall CLASSIC, GypWall CURVE, GypWall ROBUST, GypWall EXTREME, GypWall RADID dB Plus, GypWall QUIET, GypWall QUIET IWL, GypWall QUIET SF, GypWall STAGGERED, GypWall AUDIO and ShaftWall. Products - Access Panels section has been updated with new copy and photos. Two extra pages added into Basic principles section. As a result, subsequent pages have been renumbered and indexing revised throughout. Also includes minor changes as part of the general technical review of WHITE BOK 2009. Refer to individual sections below for details of changes.
8th August 2011 WB09_WHITE_BOOK_12
Revised to include Glasroc H TILEBACKER product, with specific amends made to the following sections: Basic principles, GypWall CLASSIC, DriLyner, GypLyner UNIVERSAL (w), GypLyner IWL, Tiling and Board products. Eight extra pages added into GypWall CLASSIC section, and two extra pages added into Tiling section. As a result, subsequent pages have been renumbered and indexing revised throughout. Also includes minor changes as part of the general technical review of WHITE BOOK 2009. Refer to individual sections below for details of changes.
7th June 2011 WB09_WHITE_BOOK_11
Revised to update advice on the use of Thistle Durafinish, with specific amends made to the Plaster systems and Plaster skimming sections. Refer to individual sections below for details of changes.
1st April 2011 WB09_WHITE_BOOK_10
Clarification of Thistle plaster product temperature limitations.
21st January 2011 WB09_WHITE_BOOK_09
General technical review of White Book 2009, including implementation of Isover brand changes and product deletions throughout the book.
11th October 2010 WB09_WHITE_BOOK_08
General technical review of White Book 2009, including revised Building Regulations in Basic principles, changed order of data in CasoLine MF
and new NBs for ShaftWall. Text amends to Basic principles, GypWall AUDIO, DryLiner BASIC, CasoLine GRID and Plaster systems sections. Refer to individual sections below for details of changes.
5th July 2010 WB09_WHITE_BOOK_07
General technical review of White Book 2009, including revised service penetration details, and revised text relating to cross bracing in GypWall AUDIO. Refer to individual sections below for details of changes. ShaftWall section renumbered. As a result, subsequent pages have also been renumbered and indexing revised throughout.
1
2
1 Contents and navigation
17th December 2012 WB09_Navigation_08
Revised due to complete removal of three system sections and page renumbering in the book - refer to ‘Full book’ for details. Refer to individual sections below for details of changes.
1st November 2012 WB09_Navigation_07
Revised due to page renumbering in the book - refer to ‘Full book’ for details. Refer to individual sections below for details of changes.
5th September 2011 WB09_Navigation_06
Revised due to page renumbering in the book - refer to ‘Full book’ for details. Refer to individual sections below for details of changes.
8th August 2011 WB09_Navigation_05
Revised due to page renumbering in the book - refer to ‘Full book’ for details. Refer to individual sections below for details of changes.
5th July 2010 WB09_Navigation_04
Revised due to page renumbering in the book - refer to ‘Full book’ for details. Refer to individual sections below for details of changes.
1st December 2009 WB09_Navigation_03
Amendments to Thermal performance figures in the System selector. Refer to individual sections below for details of changes.
24th August 2009 WB09_Navigation_02
Revised due to the inclusion of 92mm Gypframe AcouStud (92 AS 50) – refer to ‘Full book’ for details.
Contents
17th December 2012 WB09_Navigation_08
Page 3 – Indexing revised due to page renumbering from GypWall CLASSIC section onwards. Caveat updated.
1st November 2012 WB09_Navigation_07
Page 3 – Indexing revised due to page renumbering from Ceilings section onwards.
5th September 2011 WB09_Navigation_06
Pages 2-3 – Indexing revised due to page renumbering from Basic principles section onwards.
8th August 2011 WB09_Navigation_05
Pages 2-3 – Indexing revised due to page renumbering from GypWall CLASSIC section onwards.
5th July 2010 WB09_Navigation_04
Pages 2-3 – Indexing revised due to page renumbering from ShaftWall section onwards.
14th June 2010 WB09_WHITE_BOOK_06
Revised to include amendments to ShaftWall section. Refer to individual sections below for details of changes.
1st April 2010 WB09_WHITE_BOOK_05
General technical review of White Book 2009, including removal of Gyproc Nails and Gyproc Panhead Screws, and revised text relating to plasterboard for ‘frequently wetted’ areas. Refer to individual sections below for details of changes.
1st December 2009 WB09_WHITE_BOOK_04
First general technical review of White Book 2009, including amendments to Product ranges (including Thermal laminates). Refer to individual sections below for details of changes.
7th September 2009 WB09_WHITE_BOOK_03
Revised to include minor amendments to GypWall ROBUST section. Refer to individual sections below for details of changes.
24th August 2009 WB09_WHITE_BOOK_02
Revised to include 92mm Gypframe AcouStud (92 AS 50), with specific amends made to the following sections: Basic principles, GypWall CLASSIC, GypWall ROBUST and Metal products. Refer to individual sections below for details of changes. Two extra pages added into GypWall CLASSIC section, and two extra pages added into GypWall ROBUST section. As a result, subsequent pages have been renumbered and indexing revised throughout.
1st December 2009 WB09_Navigation_03
Updated due to amend on page 6 of system selector.
24th August 2009 WB09_Navigation_02
Pages 2-3 – Indexing revised.
How to use this publication
17th December 2012 WB09_Navigation_05
Pages 4 – ‘Performance selector’ box - System selector screen grab updated due to page revision.
5th July 2010 WB09_Navigation_04
Page 5 – ‘Products’ box - page number cross-references removed due to page renumbering from ShaftWall section onwards.
System selector
17th December 2012 WB09_Navigation_07
Pages 6-7 – FlameLyner, GypFloor SB and SoffitLine system sections removed from System selector.
5th September 2011 WB09_Navigation_06
Page 7 – Indexing revised due to page renumbering from Basic principles section onwards.
8th August 2011 WB09_Navigation_05
Page 7 – Indexing revised due to page renumbering from GypWall CLASSIC section onwards.
5th July 2010 WB09_Navigation_04
Page 7 – Indexing revised due to page renumbering from ShaftWall section onwards.
1st December 2009 WB09_Navigation_03
Page 6 – Changes to Thermal performance figures for DriLyner, GypLyner UNIVERSAL, GypLyner IWL and Loadbearing Timber joist floors and ceilings.
2 Introduction
29th June 2012 WB09_Introduction_02
Page 12 – Text added to ‘Environmental consideration’ relating to BES 6001 certification for UK manufactured British Gypsum products.
3 Basic principles of system design
15th February 2013 WB09_Basic_principles_12
Amendments to Service installations section. Refer to individual sections below for details of changes.
17th December 2012 WB09_Basic_principles_11
Amendments to Building acoustics, Thermal insulation and condensation, Service installations and Standards sections. Refer to individual sections below for details of changes.
25th May 2012 WB09_Basic_principles_10
Amendments to Service installations section. Refer to individual sections below for details of changes.
5th September 2011 WB09_Basic_principles_09
Amendments to Building acoustics, Robustness, and Standards sections. Refer to individual sections below for details of changes.
8th August 2011 WB09_Basic_principles_08
Amendments to Robustness, and Service installations sections. Refer to individual sections below for details of changes.
21st January 2011 WB09_Basic_principles_07
Amendments to Fire performance, Building acoustics, Thermal insulation and condensation, and Service installations sections. Refer to individual sections below for details of changes.
11th October 2010 WB09_Basic_principles_06
Amendments to Fire performance, Building acoustics, Thermal insulation and condensation, Robustness and Service installation sections. Refer to individual sections below for details of changes. 3
4
5th July 2010 WB09_Basic_principles_05
Amendments to Robustness and Service installations sections. Refer to individual sections below for details of changes.
1st April 2010 WB09_Basic_principles_04
Amendments to Building acoustics, Robustness, Service installations and Standards sections. Refer to individual sections below for details of changes.
1st December 2009 WB09_Basic_principles_03 Amendments to Building acoustics, Thermal insulation and condensation, and Robustness sections. Refer to individual sections below for details of changes.
24th August 2009 WB09_Basic_principles_02
Revised due to the inclusion of 92mm Gypframe AcouStud (92 AS 50). Service installations section amended. Refer to individual sections below for details of changes.
Fire performance
21st January 2011 WB09_BP_Building_Fire performance_03
Page 21 – Text added underneath Table 2 to clarify Euroclass categories.
11th October 2010 WB09_BP_Building_Fire performance_02
Page 20 – Amendment to BS EN 13501-7:2002 should read BS EN 13501-1:2002.
Building acoustics
17th December 2012 WB09_BP_Building_acoustics_07
Page 32 & 35 – Remove all references to GypFloor SB including two performance tables in Detail 15 0n Page 35.
5th September 2011 WB09_BP_Building_acoustics_06
Page 24 – Cross references to figure numbers within text have changed. Page 25 – Figure 4 renumbered as 4a and figure 5 renumbered as figure 4b. Page 26 – Cross references to figure numbers within text have changed. Pages 27 & 28 – New drawings included on partition to structural steelwork junctions. Page 29 onwards – Subsequent pages have been renumbered and cross references to figure numbers within text on pages 26, 28-31 have been amended.
21st January 2011 WB09_BP_Building_acoustics_05
Page 26 – Spelling error corrected. Page 27 – Heading amended for detail 6. Page 29 – Dntw and Ctr changed to Dntw + Ctr.
11th October 2010 WB09_BP_Building_acoustics_04
Pages 23-35 – Amends have been made due to changes in Building Regulations AD L and Scottish Technical Handbooks 5 and 6. Specific amends have been made to pages 23, 24, 29, 30 and 35, causing some reflow of information to the other pages. Page 24 – Additional text has been added.
1st April 2010 WB09_BP_Building_acoustics_03
Page 26 – Replace 2nd paragraph under Composite construction with 4 new paragraphs.
1st December 2009 WB09_BP_Building_acoustics_02
Page 24 – Under ‘Indirect paths (flanking transmission)’ heading, amend Gyproc SoundCoat with Gyproc Soundcoat Plus.
Thermal insulation and condensation
17th December 2012 WB09_BP_Thermal_insulation_and_condensation_06
Page 42 – Remove all references to Glasroc F SOFFITLINE in Table 10.
5th September 2011 WB09_BP_Thermal_insulation_and_condensation_05
Pages renumbered - refer to ‘Full book’ for details.
21st January 2011 WB09_BP_Thermal_insulation_and_condensation_04
Pages 39, 42 – All references to Isover General Purpose Roll changed to Isover Spacesaver Ready-Cut throughout section.
11th October 2010 WB09_BP_Thermal_insulation_and_condensation_03
Page 35 - Table 8 and Table 9 have been replaced.
1st December 2009 WB09_BP_Thermal_insulation_and_condensation_02
Page 37 – Under ‘Airtightness’ heading, amend Gyproc SoundCoat with Gyproc Soundcoat Plus and remove ‘(with the current exception of aircrete blocks)’. Page 40 – Changes made to Table 10.
5
Robustness
5th September 2011 WB09_BP_Robustness_07
Page 43 – Deleted paragraph on HTM 60 - ceilings in Healthcare environments. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_BP_Robustness_06
Page 43 – Glasroc H TILEBACKER board added into Table 14. Page 44 – New text relating to Glasroc H TILEBACKER board inserted into ‘Special environments’ section.
11th October 2010 WB09_BP_Robustness_05
Pages 43-44 – Note 1 had crept over to the top of page 44, it’s now been moved over to page 43 under Table 14. Page 44 – New paragraph added.
5th July 2010 WB09_BP_Robustness_04
Pages 46-47 – Text under ‘Special environments - swimming pools and similar environments’ and text under ‘Wall lining’ has been edited.
1st April 2010 WB09_BP_Robustness_03
Pages 46-47 – Text under ‘Special environments - swimming pools and similar environments’ has been edited and additional text added for wall linings.
1st December 2009 WB09_BP_Robustness_02
Pages 44-45 – Removal of 60 S 60 and inclusion of 92 AS 50. Page 46 – Addition of ‘specialist coatings’ to text under heading of ‘Special environments - swimming pools and similar environments’.
Service installations
15th February 2013 WB09_BP_Service_installations_11
Page 51 – Cross reference to Figure 25 removed from paragraph relating to Services. Page 53 – All references to Gypframe 150 FC 90 Fixing Channel removed from Table 16. Pages 55-56 – Figure 25 removed and subsequent details rearranged and renumbered. Gypframe 150 FC 90 reference removed from key on Page 55.
17th December 2012 WB09_BP_Service_installations_10
Page 50 – Paragraph edited under ‘3.5.1 Services with partitions and lining cavities’ relating to encasement of gas service pipes.
25th May 2012 WB09_BP_Service_installations_09
Pages 50-51 – Page number cross referencing corrected. Page 53 – Medium weight fixtures data changed for ShaftWall in Table 16. Page 54 – Typical SWL (typical failure load) for Reference A, no.10 woodscrew changed from 30kg (120kg) to 15kg (60kg) in Table 16 (continued).
5th September 2011 WB09_BP_Service_installations_08
Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_BP_Service_installations_07
Page 52 – Rigidur H board changed to SoundBloc in Reference ‘M’ Fischer PD nylon plug 10kg spec.
21st January 2011 WB09_BP_Service_installations_06
Page 53 – NB added to key relating to Gypframe Service Support Plates. Detail 27 amended to include dimensions on 70mm AcouStud.
11th October 2010 WB09_BP_Service_installations_05
Page 51 – Reference ‘C’ delete text = ‘into timber noggings’.
5th July 2010 WB09_BP_Service_installations_04
Page 54 – Details 31 and 32 have revised drawings and edited text. Key point 4 has been amended and additional text added.
1st April 2010 WB09_BP_Service_installations_03
Page 51 – Move ‘(Typical failure load)’ to underneath ‘Typical SWL2’ heading within Table 16.
24th August 2009 WB09_BP_Service_installations_02
Page 53 – Revised drawing inserted into Construction detail 27 - ‘Gypframe studs service push-out details - AcouStuds’.
Standards
17th December 2012 WB09_BP_Standards_04
Page 59 – Removal of reference to Glasroc F SOFFITLINE under ‘BBA Certificates’.
5th September 2011 WB09_BP_Standards_03
Page 56 – Updated BS 7671 standard from 2008 to 2011. Page 57 – Renamed Health Technical Memoranda to Healthcare, and removed HTM 56 Partitions, HTM 60 Ceilings and HTM 08-01 Acoustic Requirements, and instead inserted Acoustics Technical Design Manual 4032:0:3:England. Also amended list beneath BREEAM and replaced all existing BREEAM publications with BREEAM New Construction. Pages renumbered - refer to ‘Full book’ for details.
6
1st April 2010 WB09_BP_Standards_02
Page 55 – Deleted BS 8290: 1991 Suspended Ceiling (all 3 parts) Page 56 – Updated BS 5385 from 1995 to 2009, and to include Parts 1 and 4.
4 Health and Safety
5th September 2011 WB09_Health_and_safety_02
Pages renumbered - refer to ‘Full book’ for details.
5 Sustainability
29th June 2012 WB09_Sustainability_03
Page 65 – ‘Certified responsible sourcing’ text added under ‘Environmental sustainability’ relating to BES 6001 certification.
5th September 2011 WB09_Sustainability_02
Pages renumbered - refer to ‘Full book’ for details.
6 Partition and wall systems
15th February 2013 WB09_Partition_and_wall_systems_14
Revised to include amendments to GypWall CLASSIC, GypWall CURVE, GypWall ROBUST, GypWall EXTREME, GypWall RADID dB Plus, GypWall QUIET, GypWall QUIET IWL, GypWall QUIET SF, GypWall STAGGERED, GypWall AUDIO, ShaftWall and FireWall sections. Refer to individual sections below for details of changes.
17th December 2012 WB09_Partition_and_wall_systems_13
Revised to include amendments to GypWall CLASSIC, GypWall ROBUST, GypWall STAGGERED and ShaftWall sections. Two pages removed from GypWall CLASSIC section. As a result, subsequent pages have been renumbered. Refer to individual sections below for details of changes.
25th May 2012 WB09_Partition_and_wall_systems_12
Revised to include amendments to GypWall CLASSIC, GypWall CURVE, GypWall ROBUST, GypWall EXTREME, GypWall RADID dB Plus, GypWall QUIET, GypWall QUIET IWL, GypWall QUIET SF, GypWall STAGGERED, GypWall AUDIO, ShaftWall, FireWall and Non-loadbearing timber stud sections. Isover technical changes and Folded Edge branding to metal products throughout section. Refer to individual sections below for details of changes.
5th September 2011 WB09_Partition_and_wall_systems_11
Specific amends relating to partition to structural steelwork junctions have been made to GypWall CLASSIC, GypWall CURVE, GypWall ROBUST, GypWall EXTREME, GypWall RADID dB Plus, GypWall QUIET, GypWall QUIET IWL, GypWall QUIET SF, GypWall STAGGERED, GypWall AUDIO and ShaftWall. Due to the revision of Basic principles to include an additional two pages, all subsequent pages have been renumbered. Thistle Spray Finish product added.
8th August 2011 WB09_Partition_and_wall_systems_10
Revised due to the inclusion of Glasroc H TILEBACKER. GypWall CLASSIC section amended and six extra pages added – refer to individual section for full details. As a result, subsequent pages have been renumbered.
21st January 2011 WB09_Partition_and_wall_systems_09
Revised to include amendments to GypWall CLASSIC, GypWall ROBUST, GypWall QUIET, GypWall QUIET SF, GypWall AUDIO, ShaftWall, GypWall SECURE and Non-loadbearing timber stud sections. Refer to individual sections below for details of changes.
11th October 2010 WB09_Partition_and_wall_systems_08
Revised to include amendments to GypWall AUDIO and ShaftWall. Refer to individual sections below for details of changes.
5th July 2010 WB09_Partition_and_wall_systems_07
Revised to include amendments to GypWall CLASSIC, GypWall ROBUST, GypWall EXTREME and GypWall AUDIO sections. Refer to individual sections below for details of changes. ShaftWall section renumbered. As a result, subsequent pages have also been renumbered and indexing revised throughout.
14th June 2010 WB09_Partition_and_wall_systems_06
Revised to include amendments to ShaftWall section. Refer to individual sections below for details of changes.
1st April 2010 WB09_Partition_and_wall_systems_05
Revised to include amendments to GypWall CLASSIC, GypWall EXTREME, GypWall RAPID dB Plus, GypWall QUIET IWL, GypWall STAGGERED, ShaftWall and Non-loadbearing timber stud sections. Refer to individual sections below for details of changes.
1st December 2009 WB09_Partition_and_wall_systems_04
Revised to include amendments to GypWall CLASSIC, GypWall CURVE, GypWall RAPID dB Plus, GypWall ROBUST and GypWall STAGGERED sections. Refer to individual sections below for details of changes.
7th September 2009 WB09_Partition_and_wall_systems_03
Revised to include minor amendments to GypWall ROBUST section. Refer to individual sections below for details of changes.
7
24th August 2009 WB09_Partition_and_wall_systems_02
Revised due to the inclusion of 92mm Gypframe AcouStud (92 AS 50). GypWall CLASSIC section amended and two extra pages added – refer to individual section for full details. GypWall ROBUST section amended and two extra pages added – refer to individual section for full details. As a result, subsequent pages have been renumbered.
GypWall CLASSIC
15th February 2013 WB09_GypWall_CLASSIC_11
Page 70 – Gypframe 150 FC 90 Fixing Channel product removed from System components. Page 94 – References to Gypframe 150 FC 90 Fixing Channel removed (replaced with Service Support Plate under ‘Fixtures’). Cross references updated. Page 97 – Detail 13 removed and remaining details rearranged. Gypframe 150 FC 90 reference removed from key. All subsequent details renumbered. Page 98 – All details renumbered. Text added to Key number 12.
17th December 2012 WB09_GypWall_CLASSIC_10
Page 70 – Removal of Ergo900 board product and related Footnote 1 from ‘System components’. Remaining footnotes renumbered. Page 81 – New Footnote 3 added to Table 5b. Pages 88-89 – Complete removal of Tables 9a and 9b. Section pagination reduced by 2 pages and subsequent pages renumbered.
25th May 2012 WB09_GypWall_CLASSIC_09
Page 70 – Folded Edge branding added to metal channel products. Page 71 – New packaging images added to Isover products. Page 78 – Sound insulation figures changed for A206A014 and A206A139 in Table 4a. Pages 102-104 – Modification to fixing method in door details 25, 26, 27. Standard in Detail 27 heading amended from BS 5324 to BS 5234.
5th September 2011 WB09_GypWall_CLASSIC_08
Page 69 – Thistle Spray Finish product added to System components. Page 94 – Inclusion of text on Partition to structural steelwork junctions. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_GypWall_CLASSIC_07
Page 68 – Glasroc H TILEBACKER board added into System components. Page 88 – Six new performance tables added (10a+10b, 11a+11b, 12a+12b) from this page onwards. Subsequent pages have been renumbered.
21st January 2011 WB09_GypWall_CLASSIC_06
Pages 76, 77 – Spec for A206A013 removed from Tables 4a and 4b. Page 89 – Detail 1a amended to include dimensions on 70mm Gypframe AcouStud. Page 91 – NB added to key relating to Gypframe Service Support Plates.
5th July 2010 WB09_GypWall_CLASSIC_05
Page 98 – Details 31 and 32 have revised drawings. Key point 4 has additional text added.
1st April 2010 WB09_GypWall_CLASSIC_04
Page 76 – Change of Sound insulation performance for system references A206A014 and A206A139. Pages 86-87 – Change to 3rd and 4th column heading in tables 9a and 9b. Page 87 – Change to footnote 1 to table 9b.
1st December 2009 WB09_GypWall_CLASSIC_03
Pages 70-71 – Change of Duty rating for system reference A206153. Page 79 – Change of Approx. weight for system reference A206270 from 56 to 52. Page 82 – Deleted system against A206123 under 60 minutes fire resistance. Page 85 – Addition of Rw + Ctr figures for system references A206A028 and A206A091. Page 87 – Change from EN to BS within the table.
24th August 2009 WB09_GypWall_CLASSIC_02
Page 68 – Gypframe 92 AS 50 AcouStud data and image added into System components. Pages 78-79 – Performance tables amended to show additional specifications using 92mm Gypframe AcouStud (92 AS 50). Two additional tables inserted on two new pages. Page 89 – Revised drawing inserted into 1a - ‘Service cut-outs - Gypframe AcouStuds’. Pages renumbered - refer to ‘Full book’ for details.
GypWall CURVE
15th February 2013 WB09_GypWall_CURVE_08
Page 110 – Text removed from ‘Electrical’ paragraph relating to switch boxes due to withdrawal of Gypframe 150 FC 90 Fixing Channel product.
17th December 2012 WB09_GypWall_CURVE_07
Pages renumbered - refer to ‘Full book’ for details.
8
25th May 2012 WB09_GypWall_CURVE_06
Page 110 – New packaging images added to Isover products. Page 112 – Text added to end of paragraph under Planning relating to distance off curve.
5th September 2011 WB09_GypWall_CURVE_05
Page 110 – Inclusion of text on Partition to structural steelwork junctions. Thistle Spray Finish product added to System components. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_GypWall_CURVE_04
Pages renumbered - refer to ‘Full book’ for details.
1st December 2009 WB09_GypWall_CURVE_03
Page 104 – Change to sentence under heading ‘Fixing floor and ceiling channels’.
24th August 2009 WB09_GypWall_CURVE_02 Pages renumbered - refer to ‘Full book’ for details.
GypWall ROBUST
15th February 2013 WB09_GypWall_ROBUST_11
Page 114 – Gypframe 150 FC 90 Fixing Channel product removed from System components. Page 126 – References to Gypframe 150 FC 90 Fixing Channel removed (replaced with Service Support Plate under ‘Fixtures’).
17th December 2012 WB09_GypWall_ROBUST_10
Pages 126-127 – Pages moved and inserted after Page 119. Table numbers changed. Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_GypWall_ROBUST_09
Page 116 – New packaging images added to Isover products. Pages 120-121 – 90 minute spec data changed and 60 minute specs changed to 120 minute specs in Tables 2a and 2b. Pages 130-131 – Modification to fixing method in door details 6, 7. Standard in Detail 7 heading amended from BS 5324 to BS 5234.
5th September 2011 WB09_GypWall_ROBUST_08
Page 114 – Thistle Spray Finish product added to System components. Page 126 – Inclusion of text on Partition to structural steelwork junctions. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_GypWall_ROBUST_07
Pages renumbered - refer to ‘Full book’ for details.
21st January 2011 WB09_GypWall_ROBUST_06
Pages 108, 110, 111 – All references to Isover High Performance Acoustic Slab changed to Isover Acoustic Slab throughout section.
5th July 2010 WB09_GypWall_ROBUST_05
Pages 110-119 – NB under all performance tables relating to the use of Floor & Ceiling Channels at head and at base has been amended. Page 119 – Max. partition heights in Table 5b changed from 4200mm to 4300mm.
1st December 2009 WB09_GypWall_ROBUST_04
Page 108 – Change under Extra Deep Flange Floor & Ceiling Channel from 92 EDC 70 to 94 EDC 70. Pages 112-113 – Text in the Table under the heading ‘Inner board type mm’ has been clarified. Pages 110-119 – Amend to bottom NB to delete ‘For heights 4200mm and 8000mm’.
7th September 2009 WB09_GypWall_ROBUST_03
Pages 116-117 – Fire resistance changed from 30 minutes to 60 minutes in Table 4a and Table 4b.
24th August 2009 WB09_GypWall_ROBUST_02
Page 108 – Gypframe 92 AS 50 AcouStud data and image added into System components. Pages 114-115 – Performance tables amended to show additional specifications using 92mm Gypframe AcouStud (92 AS 50). Two additional tables inserted on two new pages (pages 116 and 116). Pages renumbered - refer to ‘Full book’ for details.
GypWall EXTREME
15th February 2013 WB09_GypWall_EXTREME_09
Page 132 – Gypframe 150 FC 90 Fixing Channel removed from System components. Gypframe Service Support Plate and Thistle GypPrime added. Page 140 – References to Gypframe 150 FC 90 Fixing Channel removed (replaced with Service Support Plate under ‘Fixtures’).
17th December 2012 WB09_GypWall_EXTREME_08
Pages renumbered - refer to ‘Full book’ for details.
9
25th May 2012 WB09_GypWall_EXTREME_07
Page 134 – New packaging images added to Isover products. Pages 144-145 – Modification to fixing method in door details 6, 7. Standard in Detail 7 heading amended from BS 5324 to BS 5234.
5th September 2011 WB09_GypWall_EXTREME_06
Page 132 – Thistle Spray Finish product added to System components. Page 140 – Inclusion of text on Partition to structural steelwork junctions. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_GypWall_EXTREME_05
Pages renumbered - refer to ‘Full book’ for details.
5th July 2010 WB09_GypWall_EXTREME_04
Pages 128-133 – NB under all performance tables relating to the use of Floor & Ceiling Channels at head and at base has been amended.
1st April 2010 WB09_GypWall_EXTREME_03
Pages 128-133 – Change to the second NB.
24th August 2009 WB09_GypWall_EXTREME_02
Pages renumbered - refer to ‘Full book’ for details. GypWall RAPID dB Plus
15th February 2013 WB09_GypWall_RAPID_dB_Plus_09
Page 146 – Gypframe Service Support Plate product added to System components. Page 150 – References to Gypframe 150 FC 90 Fixing Channel removed (replaced with Service Support Plate under ‘Fixtures’).
17th December 2012 WB09_GypWall_RAPID_dB_Plus_08
Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_GypWall_RAPID_dB_Plus_07
Page 148 – New packaging images added to Isover products.
5th September 2011 WB09_GypWall_RAPID_dB_Plus_06
Page 146 – Thistle Spray Finish product added to System components. Page 150 – Inclusion of text on Partition to structural steelwork junctions. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_GypWall_RAPID_dB_Plus_05
Pages renumbered - refer to ‘Full book’ for details.
1st April 2010 WB09_GypWall_RAPID_dB_Plus_04
Pages 141, 145-146 – Clarification that Gypframe 43 AS 50 AcouStud is the only stud to be used when at 900mm stud centres.
1st December 2009 WB09_GypWall_RAPID_dB_Plus_03
Pages 142-143 – Change to maximum partition height for system reference A139A006 from 2400mm to 2700mm.
24th August 2009 WB09_GypWall_RAPID_dB_Plus_02
Pages renumbered - refer to ‘Full book’ for details. GypWall QUIET
15th February 2013 WB09_GypWall_QUIET_08
Page 158 – Gypframe 150 FC 90 Fixing Channel removed from System components. Page 162 – References to Gypframe 150 FC 90 Fixing Channel removed (replaced with Service Support Plate under ‘Fixtures’).
17th December 2012 WB09_GypWall_QUIET_07
Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_GypWall_QUIET_06
Page 160 – Folded Edge branding added to metal channel products. New packaging images added to Isover products.
5th September 2011 WB09_GypWall_QUIET_05
Page 158 – Thistle Spray Finish product added to System components. Page 162 – Inclusion of text on Partition to structural steelwork junctions. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_GypWall_QUIET_04
Pages renumbered - refer to ‘Full book’ for details.
10
21st January 2011 WB09_GypWall_QUIET_03
Pages 152, 154, 155 – All references to Isover High Performance Acoustic Slab changed to Isover Acoustic Slab throughout section.
24th August 2009 WB09_GypWall_QUIET_02
Pages renumbered - refer to ‘Full book’ for details.
GypWall QUIET IWL
15th February 2013 WB09_GypWall_QUIET_IWL_08
Page 168 – Gypframe 150 FC 90 Fixing Channel removed from System components. Gypframe Service Support Plate added. Page 172 – References to Gypframe 150 FC 90 Fixing Channel removed (replaced with Service Support Plate under ‘Fixtures’).
17th December 2012 WB09_GypWall_QUIET_IWL_07
Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_GypWall_QUIET_IWL_06
Page 170 – Folded Edge branding added to metal channel products. New packaging images added to Isover products.
5th September 2011 WB09_GypWall_QUIET_IWL_05
Page 168 – Thistle Spray Finish product added to System components. Page 172 – Inclusion of text on Partition to structural steelwork junctions. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_GypWall_QUIET_IWL_04
Pages renumbered - refer to ‘Full book’ for details.
1st April 2010 WB09_GypWall_QUIET_IWL_03
Pages 164-165 – Re-position system reference A216014 under 90 minutes fire resistance.
24th August 2009 WB09_GypWall_QUIET_IWL_02
Pages renumbered - refer to ‘Full book’ for details.
GypWall QUIET SF
15th February 2013 WB09_GypWall_QUIET_SF_08
Page 176 – Gypframe 150 FC 90 Fixing Channel removed from System components. Page 180 – References to Gypframe 150 FC 90 Fixing Channel removed (replaced with Service Support Plate under ‘Fixtures’).
17th December 2012 WB09_GypWall_QUIET_SF_07
Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_GypWall_QUIET_SF_06
Page 178 – Folded Edge branding added to metal channel products. New packaging images added to Isover products. Pages 185-186 – Modification to fixing method in door details 8, 9.
5th September 2011 WB09_GypWall_QUIET_SF_05
Page 176 – Thistle Spray Finish product added to System components. Page 180 – Inclusion of text on Partition to structural steelwork junctions. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_GypWall_QUIET_SF_04
Pages renumbered - refer to ‘Full book’ for details.
21st January 2011 WB09_GypWall_QUIET_SF_03
Pages 172, 173 – Partition thicknesses changed on all specs in Tables 1a and 1b.
24th August 2009 WB09_GypWall_QUIET_SF_02
Pages renumbered - refer to ‘Full book’ for details.
GypWall STAGGERED
15th February 2013 WB09_GypWall_STAGGERED_09
Page 188 – Gypframe 150 FC 90 Fixing Channel removed from System components. Page 192 – References to Gypframe 150 FC 90 Fixing Channel removed (replaced with Service Support Plate under ‘Fixtures’).
17th December 2012 WB09_GypWall_STAGGERED_08
Pages 192-193 – Folded Edge branding applied to 72C50 in detail descriptions for Tables 1a and 1b. Pages renumbered - refer to ‘Full book’ for details.
11
25th May 2012 WB09_GypWall_STAGGERED_07
Page 190 – Folded Edge branding added to metal channel products. New packaging images added to Isover products.
5th September 2011 WB09_GypWall_STAGGERED_06
Page 188 – Thistle Spray Finish product added to System components. Page 192 – Inclusion of text on Partition to structural steelwork junctions. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_GypWall_STAGGERED_05 Pages renumbered - refer to ‘Full book’ for details.
1st April 2010 WB09_GypWall_STAGGERED_04
Pages 188 – Amend to insulation in detail 9. 1st December 2009 WB09_GypWall_STAGGERED_03
Page 185 – Change from EN to BS within the table. 24th August 2009 WB09_GypWall_STAGGERED_02
Pages renumbered - refer to ‘Full book’ for details. GypWall AUDIO
15th February 2013 WB09_GypWall_AUDIO_10
Page 198 – Gypframe 150 FC 90 Fixing Channel removed from System components. Gypframe Service Support Plate added. Pages 203-204 – References to Gypframe 150 FC 90 Fixing Channel removed (replaced with Service Support Plate under ‘Fixtures’).
17th December 2012 WB09_GypWall_AUDIO_09
Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_GypWall_AUDIO_08
Page 200 – Folded Edge branding added to metal channel products. New packaging images added to Isover products.
5th September 2011 WB09_GypWall_AUDIO_07
Page 198 – Thistle Spray Finish product added to System components. Page 205 – Inclusion of text on Partition to structural steelwork junctions. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_GypWall_AUDIO_06
Pages renumbered - refer to ‘Full book’ for details.
21st January 2011 WB09_GypWall_AUDIO_05
Pages 192, 194, 195, 196 – All references to Isover General Purpose Roll changed to Isover Spacesaver Ready-Cut throughout section.
11th October 2010 WB09_GypWall_AUDIO_04
Page 197 – Amendment to word (exhibit) under Deflection criteria heading.
5th July 2010 WB09_GypWall_AUDIO_03
Page 197 – New text added under ‘Planning - key factors’ and ‘Cross bracing’. ‘Design’ section text run across to following page.
24th August 2009 WB09_GypWall_AUDIO_02
Pages renumbered - refer to ‘Full book’ for details.
ShaftWall
15th February 2013 WB09_ShaftWall_12
Page 210 – Gypframe 150 FC 90 Fixing Channel removed from System components.
17th December 2012 WB09_ShaftWall_11
Page 224 – Spelling errors corrected in paragraph under ‘Deflection criteria’. Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_ShaftWall_10
Page 212 – Folded Edge branding added to metal channel products. Page 213 – New packaging images added to Isover products. Page 217 – Maximum partition height changed for G306006/025 in Table 1d.
5th September 2011 WB09_ShaftWall_09
Page 211 – Thistle Spray Finish product added to System components. Page 222 – Inclusion of text on Partition to structural steelwork junctions. Pages renumbered - refer to ‘Full book’ for details.
12
8th August 2011 WB09_ShaftWall_08
Pages renumbered - refer to ‘Full book’ for details.
21st January 2011 WB09_ShaftWall_07
Pages 212, 213 – Maximum span figures changed on C106055 and C106057 in Table 3a, and C106056 and C106057 in Table 3b. Pages 215 – Incorrect reference to Table 4a corrected to 4b in footnotes to Table 4b. Pages 220, 221 – Annotation numbers changed in details 14 and 22.
11th October 2010 WB09_ShaftWall_06
Page 205 – Text added under ‘installation overview’. Pages 206-211 – new footnotes inserted. Pages 212-213 – new footnotes inserted. Pages 214-215 – replaced existing footnote. Page 220 – Reference 2 has been added to 9 and 10 on the Construction details key and reference three has been amended. 5th July 2010 WB09_ShaftWall_05
Pages 207i-207ii – New pages now renumbered into correct sequence and all subsequent pages in book renumbered.
14th June 2010 WB09_ShaftWall_04
Page 204 – Glasroc F FIRECASE board product added together with additional footnote. Pages 207i-207ii – New EN and BS tables added to show specifications using Glasroc F FIRECASE board.
1st April 2010 WB09_ShaftWall_03
Page 204 – Gyproc CoreBoard width amended from 600m to 598mm.
24th August 2009 WB09_ShaftWall_02
Pages renumbered - refer to ‘Full book’ for details. GypWall SECURE
17th December 2012 WB09_GypWall_SECURE_07
Pages renumbered - refer to ‘Full book’ for details.
5th September 2011 WB09_GypWall_SECURE_06
Page 234 – Thistle Spray Finish product added to System components. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_GypWall_SECURE_05
Pages renumbered - refer to ‘Full book’ for details.
21st January 2011 WB09_GypWall_SECURE_04
Pages 228 – Throughbolt Anchors R-SPT changed to M8.
5th July 2010 WB09_GypWall_SECURE_03
Pages renumbered - refer to ‘Full book’ for details.
24th August 2009 WB09_GypWall_SECURE_02
Pages renumbered - refer to ‘Full book’ for details.
FireWall
15th February 2013 WB09_FireWall_08
Page 240 – Gypframe 150 FC 90 Fixing Channel removed from System components. Gypframe Service Support Plate added. Page 244 – References to Gypframe 150 FC 90 Fixing Channel removed (replaced with Service Support Plate under ‘Fixtures’).
17th December 2012 WB09_FireWall_07
Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_FireWall_06
Page 242 – Folded Edge branding added to metal channel products.
5th September 2011 WB09_FireWall_05
Page 240 – Thistle Spray Finish product added to System components. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_FireWall_04
Pages renumbered - refer to ‘Full book’ for details.
5th July 2010 WB09_FireWall_03
Pages renumbered - refer to ‘Full book’ for details.
24th August 2009 WB09_FireWall_02
Pages renumbered - refer to ‘Full book’ for details.
Non-loadbearing timber stud
17th December 2012 WB09_Non-loadbearing_timber_stud_09
Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_Non-loadbearing_timber_stud_08
Page 250 – New packaging images added to Isover products.
5th September 2011 WB09_Non-loadbearing_timber_stud_07
Page 248 – Thistle Spray Finish product added to System components. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Non-loadbearing_timber_stud_06
Pages renumbered - refer to ‘Full book’ for details.
21st January 2011 WB09_Non-loadbearing_timber_stud_05
Pages 242, 247 – All references to Isover General Purpose Roll changed to Isover Spacesaver Ready-Cut throughout section.
5th July 2010 WB09_Non-loadbearing_timber_stud_04
Pages renumbered - refer to ‘Full book’ for details.
1st April 2010 WB09_Non-loadbearing_timber_stud_03
Pages 246 – Edit to text under the ‘Nail popping’ heading.
24th August 2009 WB09_Non-loadbearing_timber_stud_02
Pages renumbered - refer to ‘Full book’ for details.
7 Wall lining systems
15th February 2013 WB09_Wall_lining_systems_11
Revised to include amendments to GypLyner UNIVERSAL and GypLyner IWL sections. Refer to individual sections below for details of changes.
17th December 2012 WB09_Wall_lining_systems_10
Revised due to the complete removal of FlameLyner system section. Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_Wall_lining_systems_09
Revised to include amendments to DriLyner, GypLyner UNIVERSAL, GypLyner IWL and FlameLyner sections. Isover technical changes and Folded Edge branding to metal products throughout section. Refer to individual sections below for details of changes.
5th September 2011 WB09_Wall_lining_systems_08
Amends made to DriLyner section. Thistle Spray Finish product added throughout. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Wall_lining_systems_07
Revised due to the inclusion of Glasroc H TILEBACKER. DriLyner, GypLyner UNIVERSAL and GypLyner IWL sections amended. Also includes minor changes as part of the General technical review of White Book 2009 – refer to individual sections for full details. Pages renumbered - refer to ‘Full book’ for details.
11th October 2010 WB09_Wall_lining_systems_06
Amendments to DriLyner BASIC section. Refer to individual section below for details of changes.
5th July 2010 WB09_Wall_lining_systems_05
Revised to include amendments to DriLyner BASIC section. Refer to individual section below for details of changes. All pages have been renumbered - refer to ‘Full book’ for details.
1st April 2010 WB09_Wall_lining_systems_04
Revised to include amendments to GypLyner UNIVERSAL section. Refer to individual section below for details of changes.
1st December 2009 WB09_Wall_lining_systems_03
Revised to include amendments to DriLyner, GypLyner UNIVERSAL and GypLyner IWL sections. Refer to individual sections below for details of changes.
24th August 2009 WB09_Wall_lining_systems_02
Revised due to the inclusion of 92mm Gypframe AcouStud (92 AS 50) – refer to ‘Full book’ for details. All pages have been renumbered.
13
14
DriLyner BASIC, TL, SI, MF, RF
17th December 2012 WB09_DriLyner_09
Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_DriLyner_08
Page 260 – New packaging images added to Isover products.
5th September 2011 WB09_DriLyner_07
Page 258 – Thistle Spray Finish product added to System components. Page 266 – Last paragraph under Thermal performance has been removed. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_DriLyner_06
Glasroc H TILEBACKER board added into System components. Installation overview and Design sections also amended. Pages renumbered - refer to ‘Full book’ for details.
11th October 2010 WB09_DriLyner_05
Page 252 – Reference 2 added after ‘MF’ and reference 2 footnote added below reference 1.
5th July 2010 WB09_DriLyner_04
Page 256 – Text amended under Construction detail 4 and related ‘Overall wall thicknesses’ in Table 2 changed. Pages renumbered - refer to ‘Full book’ for details.
1st December 2009 WB09_DriLyner_03
Page 249 – Thermal performance figures amended in heading banner and Key facts. Page 250 – Gyproc TriLine and ThermaLine laminates thickness ranges changed. Gyproc SoundCoat changed to Gyproc Soundcoat Plus. Page 251 – Gyproc SoundCoat references changed to Gyproc Soundcoat Plus and reference to ‘external ‘ walls included. Page 253 – Gyproc ThermaLine Platinum removed from list of boards in text under heading ‘Condensation and water vapour resistance’. Pages 254-257 – Major changes to data in Tables 2, 3 and 4. New detail added to Table 4. New Table 5 inserted and following pages moved. Page 258 – Additional Robust Detail references added to text under ‘Sound insulation’ and Gyproc SoundCoat changed to Gyproc Soundcoat Plus.
24th August 2009 WB09_DriLyner_02
Pages renumbered - refer to ‘Full book’ for details. GypLyner UNIVERSAL (Walls)
15th February 2013 WB09_GypLyner_UNIVERSAL_Walls_10
Page 274 – Gypframe 150 FC 90 Fixing Channel removed from System components. Gypframe Service Support Plate added. Page 279 – Reference to Gypframe 150 FC 90 Fixing Channel removed and replaced with Service Support Plate under ‘Fixtures’.
17th December 2012 WB09_GypLyner_UNIVERSAL_Walls_09
Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_GypLyner_UNIVERSAL_Walls_08
Page 276 – New packaging images added to Isover products.
5th September 2011 WB09_GypLyner_UNIVERSAL_Walls_07
Page 274 – Thistle Spray Finish product added to System components. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_GypLyner_UNIVERSAL_Walls_06
Glasroc H TILEBACKER board added into System components. Installation overview and Design sections also amended. Pages renumbered - refer to ‘Full book’ for details. Page 274 – Gyproc Sealant added into Construction detail 5 and footnote.
5th July 2010 WB09_GypLyner_UNIVERSAL_Walls_05
Pages renumbered - refer to ‘Full book’ for details.
1st April 2010 WB09_GypLyner_UNIVERSAL_Walls_04
Pages 267 – Edit to text within first paragraph under ‘Openings’ heading..
1st December 2009 WB09_GypLyner_UNIVERSAL_Walls_03
Page 265 – Thermal performance figures amended in heading banner. Page 266 – Gyproc ThermaLine boards thickness range changed from 22-65 to 22-90. Page 268 – Major changes made to data within Table 1, including removal of 3 specs and the addition of 2 specs. Page 269 – Changes made to data within Table 2.
15
24th August 2009 WB09_GypLyner_UNIVERSAL_Walls_02
Pages renumbered - refer to ‘Full book’ for details. GypLyner IWL
15th February 2013 WB09_GypLyner_IWL_09
Page 284 – Gypframe 150 FC 90 Fixing Channel removed from System components. Gypframe Service Support Plate added. Page 289 – Reference to Gypframe 150 FC 90 Fixing Channel removed and replaced with Service Support Plate under ‘Fixtures’.
17th December 2012 WB09_GypLyner_IWL_08
Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_GypLyner_IWL_07
Page 286 – Folded Edge branding added to metal channel products. Page 287 – New packaging images added to Isover products.
5th September 2011 WB09_GypLyner_IWL_06
Page 285 – Thistle Spray Finish product added to System components. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_GypLyner_IWL_05
Glasroc H TILEBACKER board added into System components. Installation overview and Design sections also amended. Pages renumbered - refer to ‘Full book’ for details. Pages 282-283 – ‘SF2’ reference deleted from Isover Steel Frame Infill Batts. New note 2 added to Table 5 on page 282 against Sound insulation column.
5th July 2010 WB09_GypLyner_IWL_04
Pages renumbered - refer to ‘Full book’ for details.
1st December 2009 WB09_GypLyner_IWL_03
Page 275 – Changes to the Thermal performance figures. Page 276 – The range of Gyproc ThermaLine laminates changed from 22 - 65mm to 22 - 90mm. Page 278 – Additional text added to footnote 1, underneath Table 1. Change to lining thicknesses and U-values in Table 2. Page 280 – Change made to Table 4 heading to amend regulation and additional line added within Table 4.
24th August 2009 WB09_GypLyner_IWL_02
Pages renumbered - refer to ‘Full book’ for details. FlameLyner
17th December 2012
Section completely removed from book due to withdrawal of system.
25th May 2012 WB09_FlameLyner_06
Page 296 – New packaging images added to Isover products.
5th September 2011 WB09_FlameLyner_05
Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_FlameLyner_04
Pages renumbered - refer to ‘Full book’ for details.
5th July 2010 WB09_FlameLyner_03
Pages renumbered - refer to ‘Full book’ for details.
24th August 2009 WB09_FlameLyner_02
Pages renumbered - refer to ‘Full book’ for details.
8 Floor, ceiling and soffit systems
17th December 2012 WB09_Floor_ceiling_and_soffit_systems_11
Amendments to CasoLine MF, CasoLine CURVE and CasoLine QUICK-LOCK GRID Sections. GypFloor SB and SoffitLine sections completely removed due to withdrawal of systems. Refer to individual sections below for details of changes. Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_Floor_ceiling_and_soffit_systems_10
Amendments to CasoLine MF, GypLyner UNIVERSAL, CasoLine GRID, GypFloor SILENT and GypFloor SB sections. Refer to individual sections below for details of changes.
5th September 2011 WB09_Floor_ceiling_and_soffit_systems_09
Amends made to CasoLine MF and GypFloor SILENT sections. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Floor_ceiling_and_soffit_systems_08
Revised due to the inclusion of Glasroc H TILEBACKER. All pages have been renumbered - refer to ‘Full book’ for details.
21st January 2011 WB09_Floor_ceiling_and_soffit_systems_07
Amendments to CasoLine MF, GypLyner UNIVERSAL, CasoLine GRID, GypFloor SILENT and SoffitLine sections. Refer to individual sections below for details of changes.
11th October 2010 WB09_Floor_ceiling_and_soffit_systems_06
Amendments to CasoLine MF and CasoLine GRID sections. Refer to individual sections below for details of changes.
5th July 2010 WB09_Floor_ceiling_and_soffit_systems_05
All pages have been renumbered - refer to ‘Full book’ for details.
1st April 2010 WB09_Floor_ceiling_and_soffit_systems_04
Revised to include amendments to GypLyner UNIVERSAL, GypFloor SILENT, CasoLine CURVE and CasoLine GRID sections. Refer to individual section below for details of changes.
1st December 2009 WB09_Floor_ceiling_and_soffit_systems_03
Revised to include amendments to CasoLine CURVE section. Refer to individual section below for details of changes.
24th August 2009 WB09_Floor_ceiling_and_soffit_systems_02
Revised due to the inclusion of 92mm Gypframe AcouStud (92 AS 50) – refer to ‘Full book’ for details. All pages have been renumbered.
CasoLine MF
17th December 2012 WB09_CasoLine_MF_09
All references to Gypframe GA1 Steel Angle changed to Gypframe FEA1 Steel Angle throughout section. Page 305 - Additional Gyptone QUATTRO, LINE, SIXTO and Rigitone products have been added in system components. Pages 312 - 315 Additional sound absorption table added for Gyptone QUATTRO, LINE, SIXTO and Rigitone resulting in an additional 2 pages. Page 317 - Gyptone boards with ACTIVair section has been added to Design section. Page 323 - Construction Detail 15 has been replaced. All pages have been renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_CasoLine_MF_08
Page 304 – New packaging images added to Isover products. Page 308 – Change of branding under Detail 1 of Table 4. Page 311 – New footnote ‘3’ added to Ceiling lining thickness figures on 90 minute specs C106004 and C106024 in Table 7. Page 317 – New text referencing plaster added to end of first heading in Table 10.
5th September 2011 WB09_CasoLine_MF_07
Page 302 – Thistle Spray Finish product added to System components. Page 314 – Revised text in third paragraph under ‘Suspension - Gyproc, British Gypsum specialist and Gyptone board linings’. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_CasoLine_MF_06
All pages have been renumbered - refer to ‘Full book’ for details.
21st January 2011 WB09_CasoLine_MF_05
All references to Isover General Purpose Roll changed to Isover Spacesaver Ready-Cut throughout section - pages 296, 301, 302, 303, 304, 305, 308. Page 302 – Table 7 - Spec 1 (C106005) removed and subsequent specs reordered. Text removed from Note 1 in footnotes. Page 303 – Table 8 deleted, so Table 7 moved from p302 to this page. Therefore Table 6 moved from p301 to p302, and Tables 9-13 renumbered 8-12.
11th October 2010 WB09_CasoLine_MF_04
Pages 306 - 307 – Changed order of data relating to the tables.
5th July 2010 WB09_CasoLine_MF_03
Pages renumbered - refer to ‘Full book’ for details.
24th August 2009 WB09_CasoLine_MF_02
Pages renumbered - refer to ‘Full book’ for details.
16
17
CasoLine CURVE
17th December 2012 WB09_CasoLine_CURVE_08
Page 326 – Removal of text from Footnote 1 relating to reduced channel length for radii. All references to Gypframe GA1 Steel Angle changed to Gypframe FEA1 Steel Angle throughout section. Pages renumbered - refer to ‘Full book’ for details.
5th September 2011 WB09_CasoLine_CURVE_07
Page 324 – Thistle Spray Finish product added to System components. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_CasoLine_CURVE_06
Pages renumbered - refer to ‘Full book’ for details.
5th July 2010 WB09_CasoLine_CURVE_05
Pages renumbered - refer to ‘Full book’ for details.
1st April 2010 WB09_CasoLine_CURVE_04
Pages 319 – Change four references of Gypframe MF7 Primary Support Channel to Gypframe MF7C Curved Support Channel.
1st December 2009 WB09_CasoLine_CURVE_03
Page 319 – Changes made to Table 1 under the heading ‘Span (suspension points) of MF7 for Gyptone LINE 7 Curve and BASE Curve.
24th August 2009 WB09_CasoLine_CURVE_02
Pages renumbered - refer to ‘Full book’ for details. GypLyner UNIVERSAL
17th December 2012 WB09_GypLyner_UNIVERSAL_Ceilings_09
Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_GypLyner_UNIVERSAL_Ceilings_08
Page 334 – New packaging images added to Isover products.
5th September 2011 WB09_GypLyner_UNIVERSAL_Ceilings_07
Page 332 – Thistle Spray Finish product added to System components. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_GypLyner_UNIVERSAL_Ceilings_06
Pages renumbered - refer to ‘Full book’ for details.
21st January 2011 WB09_GypLyner_UNIVERSAL_Ceilings_05
All references to Isover General Purpose Roll changed to Isover Spacesaver Ready-Cut throughout section - pages 326, 328, 330, 331. Page 329 – Spec C154002 removed from Table 2.
5th July 2010 WB09_GypLyner_UNIVERSAL_Ceilings_04
Pages renumbered - refer to ‘Full book’ for details.
1st April 2010 WB09_GypLyner_UNIVERSAL_Ceilings_03
Page 324 – Amend text for Gypframe GL2, GL9 and GL12 Brackets. Move footnote within Gyproc FireLine to specifically relate to 12.5mm.
24th August 2009 WB09_GypLyner_UNIVERSAL_Ceilings_02
Pages renumbered - refer to ‘Full book’ for details. CasoLine GRID
17th December 2012 WB09_CasoLine_GRID_10
Section has been renamed as CasoLine QUICK-LOCK GRID throughout. All metal system components have been updated. Casoprano has been removed throughout the section. All construction details have been updated. All Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_CasoLine_GRID_09
Page 346 – New packaging images added to Isover products.
5th September 2011 WB09_CasoLine_GRID_08
Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_CasoLine_GRID_07
Pages renumbered - refer to ‘Full book’ for details.
21st January 2011 WB09_CasoLine_GRID_06
All references to Isover General Purpose Roll changed to Isover Spacesaver Ready-Cut, and Isover High Performance Acoustic Slab changed to Isover Acoustic Slab throughout section.
11th October 2010 WB09_CasoLine_GRID_05
Page 343 – Added ‘A’ to Table 4, under 15mm.
5th July 2010 WB09_CasoLine_GRID_04
Pages renumbered - refer to ‘Full book’ for details.
1st April 2010 WB09_CasoLine_GRID_03
Pages 336 – Remove Isover TS48 Slab from component list. Pages 338 – Remove 75mm Isover TS48 Slab from table 1.
24th August 2009 WB09_CasoLine_GRID_02
Pages renumbered - refer to ‘Full book’ for details.
GypFloor SILENT
17th December 2012 WB09_GypFloor_SILENT_09
Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_GypFloor_SILENT_08
Page 360 – New packaging images added to Isover products.
5th September 2011 WB09_GypFloor_SILENT_07
Page 358 – Thistle Spray Finish product added to System components. Page 362 – The ceiling depths for all specifications within Table 2 have been amended. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_GypFloor_SILENT_06
Pages renumbered - refer to ‘Full book’ for details.
21st January 2011 WB09_GypFloor_SILENT_05
All references to Isover General Purpose Roll changed to Isover Spacesaver Ready-Cut throughout section.
5th July 2010 WB09_GypFloor_SILENT_04
Pages renumbered - refer to ‘Full book’ for details.
1st April 2010 WB09_GypFloor_SILENT_03
Pages 350 – Remove footnote 1 from Gyproc FireLine.
24th August 2009 WB09_GypFloor_SILENT_02
Pages renumbered - refer to ‘Full book’ for details. GypFloor SB
17th December 2012
Section completely removed from book due to withdrawal of system.
25th May 2012 WB09_GypFloor_SB_06
Page 370 – New packaging images added to Isover products.
5th September 2011 WB09_GypFloor_SB_05
Page 368 – Thistle Spray Finish product added to System components. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_GypFloor_SB_04
Pages renumbered - refer to ‘Full book’ for details.
5th July 2010 WB09_GypFloor_SB_03
Pages renumbered - refer to ‘Full book’ for details.
18
24th August 2009 WB09_GypFloor_SB_02
Pages renumbered - refer to ‘Full book’ for details.
SoffitLine
17th December 2012
Section completely removed from book due to withdrawal of system.
5th September 2011 WB09_SoffitLine_06
Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_SoffitLine_05
Pages renumbered - refer to ‘Full book’ for details.
21st January 2011 WB09_SoffitLine_04
Page 375 – text added to the start of Installation overview relating to deflection.
5th July 2010 WB09_SoffitLine_03
Pages renumbered - refer to ‘Full book’ for details.
24th August 2009 WB09_SoffitLine_02
Pages renumbered - refer to ‘Full book’ for details.
9 Steelwork encasement systems
17th December 2012 WB09_Steelwork_encasement_systems_09
Amends made to FireCase section. Refer to individual sections below for details of changes. Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_Steelwork_encasement_systems_08
Amends made to GypLyner ENCASE section. Refer to individual sections below for details of changes.
5th September 2011 WB09_Steelwork_encasement_systems_07
Amend made to GypLyner ENCASE section. Thistle Spray Finish product added throughout. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Steelwork_encasement_systems_06
Revised due to the inclusion of Glasroc H TILEBACKER. All pages have been renumbered - refer to ‘Full book’ for details.
21st January 2011 WB09_Steelwork_encasement_systems_05
Amendments to FireCase and GypLyner ENCASE sections. Refer to individual sections below for details of changes.
5th July 2010 WB09_Steelwork_encasement_systems_04
All pages have been renumbered - refer to ‘Full book’ for details.
1st December 2009 WB09_Steelwork_encasement_systems_03
Revised to include amendments to FireCase section. Refer to individual section below for details of changes.
24th August 2009 WB09_Steelwork_encasement_systems_02
Revised due to the inclusion of 92mm Gypframe AcouStud (92 AS 50) – refer to ‘Full book’ for details. All pages have been renumbered.
FireCase
17th December 2012 WB09_FireCase_08
Page 388 – Gyproc No-Coat Ultraflex 325 product removed from System components. Page 390 – Reference to Gyproc No-Coat Ultraflex 325 product changed to Gyproc Drywall Metal Angle Bead under ‘Finishing’. All references to Gypframe GA1 Steel Angle changed to FEA1 Steel Angle throughout section. Pages renumbered - refer to ‘Full book’ for details.
5th September 2011 WB09_FireCase_07
Page 386 – Thistle Spray Finish product added to System components. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_FireCase_06
Pages renumbered - refer to ‘Full book’ for details.
19
21st January 2011 WB09_FireCase_05
Pages 384-385 – Fire resistance changed to Fire protection, BS 476: Part 20 changed to BS 476: Part 21 in Tables 6 and 8. 4-sided columns added to Table 7.
5th July 2010 WB09_FireCase_04
Pages renumbered - refer to ‘Full book’ for details.
1st December 2009 WB09_FireCase_03
Page 383 – Key to Table 8 has been amended with revised thicknesses.
24th August 2009 WB09_FireCase_02
Pages renumbered - refer to ‘Full book’ for details.
GypLyner ENCASE
17th December 2012 WB09_GypLyner_ENCASE_08
Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_GypLyner_ENCASE_07
Pages 404-405 – ‘S’ dropped from system references below Tables 5, 6 and 7 to match reference below Table 8.
5th September 2011 WB09_GypLyner_ENCASE_06
Page 398 – Thistle Spray Finish product added to System components. Page 403 – Changed the reference in the table heading from Part 28 to Part 8. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_GypLyner_ENCASE_05
Pages 396-397 – Fire resistance changed to Fire protection, BS 476: Part 20 changed to BS 476: Part 21 in Tables 6 and 8, and BS 476: Part 28 in Table 7.
21st January 2011 WB09_GypLyner_ENCASE_04
Pages 396-397 – Fire resistance changed to Fire protection, BS 476: Part 20 changed to BS 476: Part 21 in Tables 6 and 8, and BS 476: Part 28 in Table 7.
5th July 2010 WB09_GypLyner_ENCASE_03
Pages renumbered - refer to ‘Full book’ for details.
24th August 2009 WB09_GypLyner_ENCASE_02
Pages renumbered - refer to ‘Full book’ for details.
10 Cavity fire barriers
17th December 2012 WB09_Cavity_fire_barriers_07
All references to Gypframe GA1 Steel Angle changed to FEA1 Steel Angle throughout section. All pages have been renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_Cavity_fire_barriers_06
Page 410 – Folded Edge branding added to metal channel products. New packaging images added to Isover products.
5th September 2011 WB09_Cavity_fire_barriers_05
Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Cavity_fire_barriers_04
Revised due to the inclusion of Glasroc H TILEBACKER. All pages have been renumbered - refer to ‘Full book’ for details.
5th July 2010 WB09_Cavity_fire_barriers_03
All pages have been renumbered - refer to ‘Full book’ for details.
24th August 2009 WB09_Cavity_fire_barriers_02
Pages renumbered - refer to ‘Full book’ for details.
11 Plaster systems
21st December 2012 WB09_Plaster_systems_13
Pages 388-389 - Updated information on backgrounds for Thistle Uni-Finish. Page 393 - Updated information on backgrounds for Thistle Uni-Finish. Page 395 - Updated information on backgrounds for Thistle Uni-Finish.
20
17th December 2012 WB09_Plaster_systems_12
All pages have been renumbered - refer to ‘Full book’ for details.
22nd October 2012 WB09_Plaster_systems_11
Page 416 – Thistle Uni-Finish product added to System components. Thistle Projection plaster has been removed. Page 417 - Text amended to reflect changes to Thistle plaster range Page 420 - Thistle Projection plaster removed from table. Page 421 - Thistle Uni-Finish added to the table Page 422-423 - text amended to add comments about Thistle Uni-Finish
5th September 2011 WB09_Plaster_systems_10
Page 414 – Thistle Spray Finish product added to System components. Page 416 – The first specification in the table has been removed. Page 419 – Thistle Spray Finish product added to Skim Finish Plaster table. Water requirement for Thistle Durafinish amended from 11.5 to 12 litres. Add minimum temperature to be maintained until dry for Thistle Spray Finish. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Plaster_systems_09
Revised due to the inclusion of Glasroc H TILEBACKER. All pages have been renumbered - refer to ‘Full book’ for details.
7th June 2011 WB09_Plaster_systems_08
Pages 415 – Text amended in ‘Plastering onto solid background’ and ‘Plastering onto metal lath’ to refer to the use of Thistle GypPrime prior to the application of Thistle Durafinish. Pages 419 – Additional icons added in the Durafinish row of the table, to refer to the use of Thistle GypPrime prior to application of Thistle Durafinish. Pages 421 – Text amended under ‘Expanded metal lath / beads’ to refer to the use of Thistle GypPrime prior to the application of Thistle Durafinish.
1st April 2011 WB09_Plaster_systems_07
Pages 413 – Clarification of Thistle plaster product temperature limitation in footnote under the table (positive rather than negative temperatures).
21st January 2011 WB09_Plaster_systems_06
Pages 410-411 – last NB note text changed in Tables 1 and 2. Pages 412-413 – Plaster selector tables updated.
11th October 2010 WB09_Plaster_systems_05
Page 409 – Amendment to text under ‘Tiling’ heading.
5th July 2010 WB09_Plaster_systems_04
All pages have been renumbered - refer to ‘Full book’ for details.
1st April 2010 WB09_Plaster_systems_03
Pages 410-411 – All @ symbols replaced with the word ‘at’ throughout the table Page 411 – Include text about moisture resistant grade boards.
24th August 2009 WB09_Plaster_systems_02
Pages renumbered - refer to ‘Full book’ for details.
12 Loadbearing framed systems
17th December 2012 WB09_Loadbearing_framed_systems_10
Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_Loadbearing_framed_systems_09
Revised to include amendments to Loadbearing steel, Loadbearing timber stud, Loadbearing timber frame and Loadbearing timber joist sections. Refer to individual sections below for details of changes.
5th September 2011 WB09_Loadbearing_framed_systems_08
Amend made to Loadbearing - Timber Stud section. Thistle Spray Finish product added throughout. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Loadbearing_framed_systems_07
Revised due to the inclusion of Glasroc H TILEBACKER. All pages have been renumbered - refer to ‘Full book’ for details.
21st January 2011 WB09_Loadbearing_framed_systems_06
Revised to include amendments to Loadbearing steel, Loadbearing timber stud, Loadbearing timber frame and Loadbearing timber joist sections. Refer to individual sections below for details of changes.
21
5th July 2010 WB09_Loadbearing_framed_systems_05
Revised to include amendments to Loadbearing timber joist floor and ceilings section. Refer to individual sections below for details of changes. All pages have been renumbered - refer to ‘Full book’ for details.
1st April 2010 WB09_Loadbearing_framed_systems_04
Revised to include amendments to Loadbearing timber stud, Loadbearing timber frame and Loadbearing timber joist floor and ceilings sections. Refer to individual sections below for details of changes.
1st December 2009 WB09_Loadbearing_framed_systems_03
Revised to include amendments to Loadbearing timber stud, Loadbearing timber frame and Loadbearing timber joist floors and ceilings sections. Refer to individual section below for details of changes.
24th August 2009 WB09_Loadbearing_framed_systems_02
Revised due to the inclusion of 92mm Gypframe AcouStud (92 AS 50) – refer to ‘Full book’ for details. All pages have been renumbered.
Loadbearing - steel framing systems
17th December 2012 WB09_Loadbearing_steel_framing_systems_09
Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_Loadbearing_steel_framing_systems_08
Pages 428, 436 – New packaging images added to Isover products.
5th September 2011 WB09_Loadbearing_steel_framing_systems_07
Page 426 – Thistle Spray Finish product added to System components. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Loadbearing_steel_framing_systems_06
Pages renumbered - refer to ‘Full book’ for details.
21st January 2011 WB09_Loadbearing_steel_framing_systems_05
All references to Isover High Performance Acoustic Slab changed to Isover Acoustic Slab throughout section. Page 422 – Part of footnote 1 below Table 2 relating to non-axial loaded wall situations deleted.
5th July 2010 WB09_Loadbearing_steel_framing_systems_04
Pages renumbered - refer to ‘Full book’ for details.
1st December 2009 WB09_Loadbearing_steel_framing_systems_03
Page 415 – The Metsec logo has been replaced with a newer version.
24th August 2009 WB09_Loadbearing_steel_framing_systems_02
Pages renumbered - refer to ‘Full book’ for details. Loadbearing - Timber stud
17th December 2012 WB09_Loadbearing_timber_stud_10
Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_Loadbearing_timber_stud_09
Page 440 – New packaging images added to Isover products.
5th September 2011 WB09_Loadbearing_timber_stud_08
Page 438 – Reference to SpecSure® has been removed. Thistle Spray Finish product added to System components. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Loadbearing_timber_stud_07
Pages renumbered - refer to ‘Full book’ for details.
21st January 2011 WB09_Loadbearing_timber_stud_06
All references to Isover General Purpose Roll changed to Isover Spacesaver Ready-Cut throughout section. Page 432 – Isover Frame Batt 32 (SF1) - SF1 suffix now removed.
5th July 2010 WB09_Loadbearing_timber_stud_05
Pages renumbered - refer to ‘Full book’ for details.
22
1st April 2010 WB09_Loadbearing_timber_stud_04
Page 436 – Edit to text under the ‘Nail popping’ heading.
1st December 2009 WB09_Loadbearing_timber_stud_03
Page 435 – Detail 1 has been amended to show double layer each side in Table 2b.
24th August 2009 WB09_Loadbearing_timber_stud_02
Pages renumbered - refer to ‘Full book’ for details. Loadbearing - Timber frame
17th December 2012 WB09_Loadbearing_timber_frame_10
Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_Loadbearing_timber_frame_09
Page 450 – New packaging images added to Isover products.
5th September 2011 WB09_Loadbearing_timber_frame_08
Page 448 – Thistle Spray Finish product added to System components. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Loadbearing_timber_frame_07
Pages renumbered - refer to ‘Full book’ for details.
21st January 2011 WB09_Loadbearing_timber_frame_06
Pages 442, 444, 445 – Isover Frame Batt 32 - lengths changed from 50mm and 90mm to 90mm and 140mm respectively wherever occuring.
5th July 2010 WB09_Loadbearing_timber_frame_05
Pages renumbered - refer to ‘Full book’ for details.
1st April 2010 WB09_Loadbearing_timber_frame_04
Page 444 – Edit to text under the ‘Nail popping’ heading.
1st December 2009 WB09_Loadbearing_timber_frame_03
Page 439 – Change to last bullet in the list of Key facts. Page 440 – Change of Gyproc ThermaLine PLATINUM to Gyproc ThermaLine PLUS and change thickness from 28mm to 48mm. Page 443 – Change to text under drawing 4, and re-ordering of details within Table. Page 444 – Change of Gyproc ThermaLine PLATINUM to Gyproc ThermaLine PLUS and change thickness from 28mm to 48mm under ‘Vapour control’ heading.
24th August 2009 WB09_Loadbearing_timber_frame_02
Pages renumbered - refer to ‘Full book’ for details.
Loadbearing - Timber joist floors and ceilings
17th December 2012 WB09_Loadbearing_timber_joist_10
Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_Loadbearing_timber_joist_09
Page 458 – New packaging images added to Isover products.
5th September 2011 WB09_Loadbearing_timber_joist_08
Page 456 – Thistle Spray Finish product added to System components. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Loadbearing_timber_joist_07
Pages renumbered - refer to ‘Full book’ for details.
21st January 2011 WB09_Loadbearing_timber_joist_06
All references to Isover General Purpose Roll changed to Isover Spacesaver Ready-Cut throughout section. Isover Frame Batt 32 - lengths changed from 50mm and 90mm to 90mm and 140mm respectively wherever occuring.
5th July 2010 WB09_Loadbearing_timber_joist_05
Page 456 – Details 6 and 7 withdrawn and drawings deleted. Associated specifications also removed from Table 3. Pages renumbered - refer to ‘Full book’ for details.
23
24
1st April 2010 WB09_Loadbearing_timber_joist_04
Page 448 – Move footnote 1 for Gyproc FireLine to specifically reference 12.5mm Gyproc FireLine. Pages 450-457 - Amend the NB relating to fixing direct to timber joists. Page 451 – Change loadbearing ratio for C016008 from 60% to 100% Page 459 – Edit to text under the “Nail popping’ heading.
1st December 2009 WB09_Loadbearing_timber_joist_03
Page 448 – The thickness range for Gyproc ThermaLine SUPER changed from 50-65 to 30-90. Page 455 – Addition of Rw + Ctr figure for system reference number C106040 (detail 3). System reference number changed to C016040. Page 458 – Change to lining thicknesses and U-values in Table 6. Table also re-ordered.
24th August 2009 WB09_Loadbearing_timber_joist_02
Pages renumbered - refer to ‘Full book’ for details.
13 Finishing systems and decorative effects
15th February 2013 WB09_Finishing_systems_and_decorative_effects_14
Plaster skimming section has been amended. Refer to individual section below for details of changes.
21st December 2012 WB09_Finishing_systems_and_decorative_effects_13
Plaster skimming section amended with updated information on backgrounds for Thistle Uni-Finish. Refer to individual section below for details of changes.
17th December 2012 WB09_Finishing_systems_and_decorative_effects_12
Jointing section amended. Refer to individual section below for details of changes. Pages renumbered - refer to ‘Full book’ for details.
22nd October 2012 WB09_Finishing_systems_and_decorative_effects_11
Plaster skimming section has been amended. Refer to individual section below for details of changes.
25th May 2012 WB09_Finishing_systems_and_decorative_effects_10
Tiling section has been amended. Refer to individual section below for details of changes.
28th October 2011 WB09_Finishing_systems_and_decorative_effects_09
Tiling section has been amended. Refer to individual section below for details of changes.
5th September 2011 WB09_Finishing_systems_and_decorative_effects_08
Jointing section has been amended. Thistle Spray Finish product added to Plaster skimming. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Finishing_systems_and_decorative_effects_07
Revised due to the inclusion of Glasroc H TILEBACKER. Tiling section amended including addition of 2 pages. Refer to individual section below for details of changes. All subsequent pages have been renumbered - refer to ‘Full book’ for details.
7th June 2011 WB09_Finishing_systems_and_decorative_effects_06
Revised to update advice on the use of Thistle Durafinish. Refer to individual section below for details of changes.
5th July 2010 WB09_Finishing_systems_and_decorative_effects_05
All pages have been renumbered - refer to ‘Full book’ for details.
1st April 2010 WB09_Finishing_systems_and_decorative_effects_04
Revised to include amendments to Jointing and Tiling sections. Refer to individual section below for details of changes.
1st December 2009 WB09_Finishing_systems_and_decorative_effects_03
Revised to include amendments to Jointing section. Refer to individual section below for details of changes.
24th August 2009 WB09_Finishing_systems_and_decorative_effects_02
Revised due to the inclusion of 92mm Gypframe AcouStud (92 AS 50) – refer to ‘Full book’ for details. All pages have been renumbered.
Plaster skimming
15th February 2013 WB09_Plaster_skimming_10
Page 448 – Thistle GypPrime product added to System components under a new ‘Fixing and finishing products’ heading. Page 449 – New paragraph relating to treatment of Rigidur H inserted under ‘Plastering to board backgrounds’. Page 451 – Paragraph under ‘Glasroc F MULTIBOARD, Glasroc F FIRECASE and Rigidur H’ amended relating to treatment of Rigidur H.
21st December 2012 WB09_Plaster_skimming_09
Page 448- Updated information on backgrounds for Thistle Uni-Finish. Page 451 - Updated information on backgrounds for Thistle Uni-Finish.
17th December 2012 WB09_Plaster_skimming_08
Pages renumbered - refer to ‘Full book’ for details.
22nd October 2012 WB09_Plaster_skimming_07
Page 476 – Thistle Uni-Finish product has been added and Thistle Thin Coat Mini Mesh Bead has been removed from System components. Page 477 – Thistle Uni-Finish has been added to Table 1. Text relating to Thistle Thin Coat Mini Mesh Bead has been deleted. Page 479 – Thistle Uni-Finish text has been added to the Backgrounds section. Reference to Gyproc Ergo 900 has been removed from Backgrounds section.
5th September 2011 WB09_Plaster_skimming_06
Page 474 – Thistle Spray Finish product added to System components. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Plaster_skimming_05
Pages renumbered - refer to ‘Full book’ for details.
7th June 2011 WB09_Plaster_skimming_04
Page 477 - Text amended in 3rd paragraph in ‘Design - planning key factors’ section, to refer to the use of Thistle GypPrime prior to the application of Thistle Durafinish.
5th July 2010 WB09_Plaster_skimming_03
Pages renumbered - refer to ‘Full book’ for details.
24th August 2009 WB09_Plaster_skimming_02
Pages renumbered - refer to ‘Full book’ for details. Jointing
17th December 2012 WB09_Jointing_08
Page 482 – Gyproc No-Coat Ultraflex 325 and Gyproc No-Coat Ultratrim L products removed from ‘System components’. All references to products removed throughout section. Pages renumbered - refer to ‘Full book’ for details.
5th September 2011 WB09_Jointing_07
Page 480 – Amended to include new photo and length for Gyproc Corner Tape. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Jointing_06
Pages renumbered - refer to ‘Full book’ for details.
5th July 2010 WB09_Jointing_05
Pages renumbered - refer to ‘Full book’ for details.
1st April 2010 WB09_Jointing_04
Pages 473 – Removed reference to nails in the third paragraph under the heading ‘Hand jointing - Gyproc plasterboards’.
1st December 2009 WB09_Jointing_03
Page 476 – Information added under ‘Reinforcement’ heading in Table 3.
24th August 2009 WB09_Jointing_02
Pages renumbered - refer to ‘Full book’ for details. Tiling
17th December 2012 WB09_Tiling_09
Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_Tiling_08
Page 491 – Page cross references in ‘Gyproc moisture resistant grade plasterboards’ paragraph changed to Table cross references to avoid further amendment if section is repaginated.
28th October 2011 WB09_Tiling_07
General text amends throughout section. Thistle tapes removed from System components. Image 4 removed from Installation overview.
5th September 2011 WB09_Tiling_06
Pages renumbered - refer to ‘Full book’ for details.
25
8th August 2011 WB09_Tiling_05
Section revised to include Glasroc H TILEBACKER. Pages 480 – Main image replaced. Pages 481 – Text revised and isometric image replaced. Pages 482 – System components revised including addition of Glasroc H TILEBACKER product. Installation overview page inserted with new images. Pages 483 – Design section extended including ‘Board lining requirements’ table. Pages 484-487 – Tables 1 and 2 amended to include Glasroc H TILEBACKER.
5th July 2010 WB09_Tiling_04
Pages renumbered - refer to ‘Full book’ for details.
1st April 2010 WB09_Tiling_03
Pages 479 – Replace reference to ‘commercial showers’ with ‘domestic showers’ in both text and ‘Key facts’.
24th August 2009 WB09_Tiling_02
Pages renumbered - refer to ‘Full book’ for details.
Decorative effects
17th December 2012 WB09_Decorative_effects_06
Pages renumbered - refer to ‘Full book’ for details.
5th September 2011 WB09_Decorative_effects_05
Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Decorative_effects_04
Pages renumbered - refer to ‘Full book’ for details.
5th July 2010 WB09_Decorative_effects_03
Pages renumbered - refer to ‘Full book’ for details.
24th August 2009 WB09_Decorative_effects_02
Pages renumbered - refer to ‘Full book’ for details.
14 Products
15th February 2013 WB09_Products_14
Revised to include amendments made to Metal components and Boards sections. Refer to individual sections below for details of changes.
21st December 2012 WB09_Products_13
Plaster and plaster accessories sections has been amended with updated information on backgrounds for Thistle Uni-Finish. Refer to individual sections below for details of changes.
17th December 2012 WB09_Products_12
Revised to include amendments to Metal components, Boards, Fixings and Plasterboard accessories sections. Refer to individual sections below for details of changes. Pages renumbered - refer to ‘Full book’ for details.
1st November 2012 WB09_Products_11
Update to Ceilings product section to add additional products into Gyptone range, remove Casoprano products, rename CasoLine GRID as CasoLine QUICK-LOCK GRID and update the components. Addition of ACTIVair to some Gyptone tiles and boards, also resulting in a reduction in thickness. As a result subsequent pages have been renumbered and indexing revised throughout.
22nd October 2012 WB09_Products_10
Plaster products section revised to include new Thistle Uni-Finish and both Thistle Projection plaster and Thistle Thin Coat Mini Mesh have been re moved. Refer to individual sections below for details of changes.
25th May 2012 WB09_Products_09
Revised to include amendments to Metal components, Boards and Insulation sections. Refer to individual sections below for details of changes.
5th September 2011 WB09_Products_08
Plasterboard accessories, Plasters and plaster accessories and Gyproc Access Panels sections have been updated. Thistle Spray Finish product added to Plasters and plaster accessories section. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Products_07
Revised due to the inclusion of Glasroc H TILEBACKER – amendments made to Metal components and Boards sections, which also include minor changes as part of the General technical review of White Book 2009. Refer to individual sections below for details of changes. All pages renumbered.
26
21st January 2011 WB09_Products_06
Revised to include amendments to Plasterboard accessories and Insulation sections. Refer to individual sections below for details of changes.
5th July 2010 WB09_Products_05
Revised to include amendments to Boards section. Refer to individual section below for details of changes. All pages have been renumbered - refer to ‘Full book’ for details.
1st April 2010 WB09_Products_04
Revised to include amendments to Fixings section. Refer to individual section below for details of changes.
1st December 2009 WB09_Products_03
Revised to include amendments to Product Introduction, Boards, Plasterboard accessories and Ceilings sections. Refer to individual section below for details of changes.
24th August 2009 WB09_Products_02
Revised due to the inclusion of 92mm Gypframe AcouStud (92 AS 50) – refer to ‘Full book’ for details. Metal components section amended – refer to individual section for full details. All pages have been renumbered and indexing revised throughout.
Products - introduction
17th December 2012 WB09_Products_Introduction_08
Pages renumbered - refer to ‘Full book’ for details.
1st November 2012 WB09_Products_Introduction_07
Update to index to reflects pages renumbered from Ceilings product section onwards- refer to ‘Full book’ for details.
5th September 2011 WB09_Products_Introduction_06
Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Products_Introduction_05
Pages renumbered - refer to ‘Full book’ for details.
5th July 2010 WB09_Products_Introduction_04
Pages renumbered - refer to ‘Full book’ for details. 1st December 2009 WB09_Products_Introduction_03
Page 491 – Change of page range for Gyproc ThermaLine laminates from 515-517 to 515-516.
24th August 2009 WB09_Products_Introduction_02
Pages renumbered and indexing revised - refer to ‘Full book’ for details.
Products - Metal components
15th February 2013 WB09_Products_Metal_components_08
Page 484 – Gypframe 150 FC 90 Fixing Channel product removed from Gypframe fixing channels.
17th December 2012 WB09_Products_Metal_components_07
Page 505 – GypFloor SB steel battens & accessories and FlameLyner components removed from under Gypframe channels in index. Page 510 – GypFloor SB steel battens & accessories completely removed due to withdrawal of system. Page 513 – FlameLyner components completely removed due to withdrawal of system. Pages renumbered and indexing revised - refer to ‘Full book’ for details.
25th May 2012 WB09_Products_Metal_components_06
Folded Edge branding implemented on metal products throughout section.
5th September 2011 WB09_Products_Metal_components_05
Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Products_Metal_components_04
Page 497 – 2700 and 3000mm lengths added to Gypframe AcouStuds. Pages renumbered - refer to ‘Full book’ for details.
5th July 2010 WB09_Products_Metal_components_03
Pages renumbered - refer to ‘Full book’ for details.
27
24th August 2009 WB09_Products_Metal_components_02
Page 495 – 92mm Gypframe 92 AS 50 AcouStud data added to Gypframe AcouStuds section and product images updated. Pages renumbered and indexing revised - refer to ‘Full book’ for details.
Products - Boards
15th February 2013 WB09_Products_Boards_09
Page 502 – Rigidur H – new paragraph inserted underneath ‘Finishing’ section relating to treatment of Rigidur H with Thistle GypPrime.
17th December 2012 WB09_Products_Boards_08
Page 517 – Glasroc F FLAMELINE, Glasroc F SOFFITLINE and Gyproc Ergo900 removed from index. Page 526 – Gyproc Ergo900 completely removed due to withdrawal of product. Page 528 – R-values and Thermal conductivity figure (PLUS extruded polystyrene) changed for Gyproc ThermaLine PLUS. Page 530 – Glasroc F SOFFITLINE completely removed due to withdrawal of SoffitLine system. Page 531 – Glasroc F FLAMELINE completely removed due to withdrawal of FlameLyner system. Pages renumbered and indexing revised - refer to ‘Full book’ for details.
25th May 2012 WB09_Products_Boards_07
Page 528 – Removal of Gyproc ThermaLine SUPER 30mm and 40mm boards, and thermal conductivity figures amended accordingly.
5th September 2011 WB09_Products_Boards_06
Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Products_Boards_05
Pages renumbered - refer to ‘Full book’ for details. Page 518 – Additional phenolic foam values added to Thermal conductivity of Gyproc ThermaLine SUPER.
5th July 2010 WB09_Products_Boards_04
Page 518 – R values changed in Gyproc ThermaLine PLUS, R values and Thermal conductivity figures changed in Gyproc ThermaLine SUPER. Page 520 – Thermal conductivity figures changed in Glasroc F SOFFITLINE. Page 521 – Thermal conductivity figure changed in Rigidur H. Pages renumbered - refer to ‘Full book’ for details.
1st December 2009 WB09_Products_Boards_03
Page 505 – Removal of Gyproc ThermaLine PLATINUM from Board product index, and update page numbering for items listed after it. Page 509 – Removal of type ‘D’ from under ‘Standards and certification’ heading for Gyproc Moisture Resistant. Page 512 – Additional 1800mm length available for SoundBloc RAPID. Page 515 – Add reference to ODP (Ozone Depletion Potential) under characteristics for TriLine. Remove 42mm version of TriLine from Table and remove text refering to optional vapour check grade. Remove 50mm version of ThermaLine BASIC, and all text relating to ‘optional vapour checkgrade’. Page 516 – Gyproc ThermaLine PLATINUM has been completely removed. Under Gyproc ThermaLine PLUS, change 45mm board to 48mm and insert relating footnote and remove 55mm board from Table. Page 516 – Revise the range of thicknesses available for Gyproc ThermaLine SUPER in the Table, and update corresponding weights and R values. Also under Thermal conductivity heading, remove FireLine and alter W/mk figure for SUPER phenolic foam. Pages 516-519 – Due to deletion to Gyproc ThermaLine PLATINUM, Gyproc ThermaLine SUPER and some Specialist boards have been moved forward by 1 page.
24th August 2009 WB09_Products_Boards_02
Pages renumbered and indexing revised - refer to ‘Full book’ for details. Products - Fixings
17th December 2012 WB09_Products_Fixings_07
Page 533 – Rigitone Screw added under ‘Gypframe fixing products’ in index. Page 537 – Rigitone Screw product data added. Pages renumbered - refer to ‘Full book’ for details. 5th September 2011 WB09_Products_Fixings_06
Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Products_Fixings_05
Pages renumbered - refer to ‘Full book’ for details.
5th July 2010 WB09_Products_Fixings_04
Pages renumbered - refer to ‘Full book’ for details.
1st April 2010 WB09_Products_Fixings_03
Page 521 – Remove Gyproc Panhead Screws and Gyproc Nails from Fixings index. Amended page numbers for specialist board fixing products and Gypframe fixing products. Page 523 – Remove Gyproc Panhead Screws and Gyproc Nails. Due to this deletion, Specialist board fixing products have moved to page 523 and Gypframe fixing products have moved forward to page 524.
28
29
24th August 2009 WB09_Products_Fixings_02
Pages renumbered and indexing revised - refer to ‘Full book’ for details.
Products - Plasterboard accessories
17th December 2012 WB09_Products_plasterboard_accessories_08
Page 539 – Gyproc No-Coat Ultraflex 325 and Gyproc No-Coat Ultratrim L products removed from under ‘Gyproc beads’ in index. Page 543 – Gyproc No-Coat data removed due to product withdrawal. Pages renumbered - refer to ‘Full book’ for details.
5th September 2011 WB09_Products_plasterboard_accessories_07
Page 540 amended to include new photo and length for Gyproc Corner Tape. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Products_plasterboard_accessories_06
Pages renumbered - refer to ‘Full book’ for details.
21st January 2011 WB09_Products_plasterboard_accessories_05
Page 533 – Dimensions added to Gyproc No-Coat for Ultraflex 325 and Ultratrim L.
5th July 2010 WB09_Products_plasterboard_accessories_04
Pages renumbered - refer to ‘Full book’ for details.
1st December 2009 WB09_Products_plasterboard_accessories_03
Page 527 – Replace Gyproc SoundCoat with Gyproc Soundcoat Plus in the Gyproc plasterboard accessories index. Page 529 – Replace Gyproc SoundCoat with Gyproc Soundcoat Plus and update Application text.
24th August 2009 WB09_Products_Plasterboard_accessories_02
Pages renumbered and indexing revised - refer to ‘Full book’ for details.
Products - Plaster and plaster accessories
21ST December 2012 WB09_Products_Plasters_and_plaster_accessories_08
Page 522 - Updated information on backgrounds for Thistle Uni-Finish.
17th December 2012 WB09_Products_Plasters_and_plaster_accessories_07
Pages renumbered - refer to ‘Full book’ for details.
22nd October 2012 WB09_Products_Plasters_and_plaster_accessories_06
Pages 547 & 550 – Thistle Uni-Finish product added and Thistle Project plaster has been removed. Pages 547 & 548 – Thistle Thin Coat Mini Mesh product has been removed.
5th September 2011 WB09_Products_Plasters_and_plaster_accessories_05
Pages 545 & 548 – Thistle Spray Finish product added. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Products_Plasters_and_plaster_accessories_04
Pages renumbered - refer to ‘Full book’ for details.
5th July 2010 WB09_Products_Plasters_and_plaster_accessories_03
Pages renumbered - refer to ‘Full book’ for details.
24th August 2009 WB09_Products_Plasters_and_plaster_accessories_02
Pages renumbered and indexing revised - refer to ‘Full book’ for details.
Products - Decorative
17th December 2012 WB09_Products_Decorative_06
Pages renumbered - refer to ‘Full book’ for details.
5th September 2011 WB09_Products_Decorative_05
Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Products_Decorative_04
Pages renumbered - refer to ‘Full book’ for details.
5th July 2010 WB09_Products_Decorative_03
Pages renumbered - refer to ‘Full book’ for details.
24th August 2009 WB09_Products_Decorative_02
Pages renumbered and indexing revised - refer to ‘Full book’ for details.
Products - Access panels
17th December 2012 WB09_Products_Access_panels_06
Pages renumbered - refer to ‘Full book’ for details. 5th September 2011 WB09_Products_Access_Panels_05
Whole section has been updated with new copy and photos, and has been extended by two additional pages. Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Products_Access_panels_04
Pages renumbered - refer to ‘Full book’ for details. 5th July 2010 WB09_Products_Access_panels_03
Pages renumbered - refer to ‘Full book’ for details. 24th August 2009 WB09_Products_Access_panels_02
Pages renumbered and indexing revised - refer to ‘Full book’ for details.
Products - Ceilings
17th December 2012 WB09_Products_Ceilings_08
Pages renumbered - refer to ‘Full book’ for details.
1st November 2012 WB09_Products_Ceilings_07
Complete update to Ceilings product section to reflect latest range changes. Gyptone QUATTRO 42, LINE 5, SIXTO 63, SIXTO 65 and QUATTRO 50 have been added to the Gyptone range. All Casoprano products have been removed. CasoLine GRID has been renamed as CasoLine QUICK-LOCK GRID and product range has been updated to include QUICK-LOCK GRID hangers, replacement Wall Angle components and Island / Raft components. An additional 4 pages have been added to this section. Pages 569 - 572 – ACTIVair has been added to Gyptone tiles and boards, also resulting in a reduction in thickness from 12.5mm to 10mm on 600mm x 600mm products.
5th September 2011 WB09_Products_Ceilings_06
Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Products_Ceilings_05
Pages renumbered - refer to ‘Full book’ for details.
5th July 2010 WB09_Products_Ceilings_04
Pages renumbered - refer to ‘Full book’ for details.
1st December 2009 WB09_Products_Ceilings_03
Page 553 – Change of RAL reference number from 9011 to 9016. Page 556 – Addition of RAL reference number under ‘CasoLine grid - ceiling components’ heading.
24th August 2009 WB09_Products_Ceilings_02
Pages renumbered and indexing revised - refer to ‘Full book’ for details.
Products - Insulation
17th December 2012 WB09_Products_Insulation_09
Pages renumbered - refer to ‘Full book’ for details.
1st November 2012 WB09_Products_Insulation_08
Pages renumbered - refer to ‘Full book’ for details.
25th May 2012 WB09_Products_Insulation_07
Page 573 – New introduction text inserted including a section on the 3 Point Plan. Page 575 – Isover Round The House Roll product included and other pages shuffled to accommodate. Page 576 – Isover RD Party Wall Roll product included and other pages shuffled to accommodate. Branding and product images updated throughout section.
5th September 2011 WB09_Products_Insulation_06
Pages renumbered - refer to ‘Full book’ for details.
30
8th August 2011 WB09_Products_Insulation_05
Pages renumbered - refer to ‘Full book’ for details.
21st January 2011 WB09_Products_Insulation_04
All references to Isover General Purpose Roll changed to Isover Spacesaver Ready-Cut throughout section. Isover Steel Frame Batt - (SF1) dropped from title, and Isover Steel Frame Infill Batts - (SF2) dropped from title throughout section. Page 562 – Isover Acoustic Slabs - Multi-Purpose Slabs removed. High Performance Slabs name changed and new dimensions added. Page 563 – Isover Modular Roll and Isover General Purpose Roll (now Spacesaver Ready-Cut) - new dimensions added. Page 564 – Isover RD35 - Euroclass A1 changed to A2. Isover CWS and Isover Timber Frame Batts and Rolls - new dimensions added. Page 565 – Isover Cavity Barriers - SF3 dropped from reference to self-adhesive version.
5th July 2010 WB09_Products_Insulation_03
Pages renumbered - refer to ‘Full book’ for details.
24th August 2009 WB09_Products_Insulation_02
Pages renumbered and indexing revised - refer to ‘Full book’ for details.
15 Glossary
17th December 2012 WB09_Glossary_07
Pages renumbered - refer to ‘Full book’ for details.
1st November 2012 WB09_Glossary_06
Pages renumbered - refer to ‘Full book’ for details.
5th September 2011 WB09_Glossary_05
Pages renumbered - refer to ‘Full book’ for details.
8th August 2011 WB09_Glossary_04
All pages have been renumbered - refer to ‘Full book’ for details.
5th July 2010 WB09_Glossary_03
All pages have been renumbered - refer to ‘Full book’ for details.
24th August 2009 WB09_Glossary_02
All pages have been renumbered - refer to ‘Full book’ for details.
16 Index
17th December 2012 WB09_Index_10
Pages 586-588 – Index amended to reflect the withdrawal of GypFloor SB system, FlameLyner system and Glasroc F FLAMELINE, SoffitLine system and Glasroc F SOFFITLINE. Also the withdrawal of Gyproc Ergo900, Gyproc No-Coat and Thistle Projection plaster products. Pages renumbered - refer to ‘Full book’ for details.
1st November 2012 WB09_Index_09
Pages renumbered - refer to ‘Full book’ for details. CasoLine GRID components have been renamed as CasoLine QUICK-LOCK GRID components. Thistle Uni-Finish has been added. Thistle Thin Coat Mini-Mesh Bead and Thistle Projection plaster have been removed.
5th September 2011 WB09_Index_08
Thistle Spray Finish product added. All pages renumbered and indexing revised - refer to ‘Full book’ for details.
8th August 2011 WB09_Index_07
All pages renumbered and indexing revised - refer to ‘Full book’ for details.
21st January 2011 WB09_Index_06
Pages 571 – Isover name changes applied to ‘I’ section.
5th July 2010 WB09_Index_05
All pages renumbered and indexing revised - refer to ‘Full book’ for details.
1st April 2010 WB09_Index_04
Pages 568 - 569 – Remove Gyproc Panhead Screws and Gyproc Nails. Due to this deletion, Specialist board fixing products have moved to page 523 and Gypframe fixing products have moved to page 524.
31
1st December 2009 WB09_Index_03
Pages 568-570 – Index amended to include changes made within the product section - replacement of Gyproc SoundCoat with Gyproc Soundcoat Plus and removal of Gyproc ThermaLine PLATINUM. The removal of Gyproc ThermaLine PLATINUM has resulted in Gyproc ThermaLine SUPER and some specialist boards moving forward by 1 page.
24th August 2009 WB09_Index_02
All pages renumbered and indexing revised - refer to ‘Full book’ for details.
32
FM 52358
“Gyproc”, “Thistle”, “Gypframe” and “Glasroc” are all registered trademarks of BPB United Kingdom Limited. “Isover” is a registered trademark of Saint-Gobain Isover and “Artex” is a registered trademark of Artex Limited.
BPB United Kingdom Limited is a limited company registered in England under company number 734396, having its registered office at Saint-Gobain House, Binley Business Park, Coventry, CV3 2TT, UK. BPB United Kingdom Limited tradesas British Gypsum for part of its business activities.
British Gypsum reserves the right to revise product specification without notice. The information herein should not be read in isolation as it is meant only as guidance for the user, who should always ensure that they are fully conversantwith the products and systems being used and their subsequent installation prior to the commencement of work. For a comprehensive and up-to-date library of information visit the British Gypsum website at: www.british-gypsum.comFor information about products supplied by Artex Limited or Saint-Gobain Isover please see their respective websites.
“British Gypsum” is a registered trademark of BPB United Kingdom Limited.
www.british-gypsum.com
Telephone: 0844 800 1991Fax: 0844 561 8816Email: [email protected]
Training enquiries: 0844 561 8810
British Gypsum February 2013 BG-WB09-Updates-21
Technical enquiriesBritish Gypsum Technical Advice CentreEast LeakeLoughboroughLeicestershireLE12 6HX
EMS 543324