    Foreword

    The National Highway Planning & Design Circle published the 7

    th

      edition of Schedule ofNational Highway works for the year 2014-15 in West Bengal in July, 2014 that came into

    effect from 10th  July, 2014, Which was very first occasion in the history of the NH wing of

    P.W.(R)Department, Govt. of West Bengal to issue the SOR in public domain free of cost in

    the Web. Thereafter getting a number of good suggestions from various levels of field

    engineers, vis-à-vis the resolution emerged out during the course of different monthly review

    meetings of the NH works under the chairmanship of the Principal Secretary, P.W.D & PWRD,

    Govt. of West Bengal, annual revision of SOR was of absolute necessity.

    Based on the input received from various reputed manufacturing houses/organizations

    related authorities, the updating of SOR has been compiled by the officers of N.H. Planning &Design Circle. Standard Data Book for analysis of rates (1st revision, 2003 of MOST) has been

    followed in framing up of item of works and analysis of rates. Specifications for Road & Bridge

    Works (5th revision, August 2013) have been strictly followed.

    This Eighth publication will come into effect from 16.04.2015 onwards.

    For any item not covered by the schedule, if that item is absolutely necessary on a work the

    concerned Superintending Engineer has to approve the rate with intimation to Superintending

    Engineer, N.H. Planning & Design Circle for record & reference. It is expected that, field

    Engineers will continue to send feed-backs regarding their experiences in handling the PresenSchedule of Rates for NH works 2015-16 with suggestions and updated data for furthe

    revision in future.

    The NH wing of P.W. (Roads) Department is thankful to the officers of N.H. Planning & Design

    Circle, who have updated the Schedule of Rates, for their sincere efforts in collection of input

    and the Computation work in the shortest possible time.

    Khadya Bhaban1st floor, Block-A

    11A, Mirza Galib StreetKolkata-700 087Phone: (033) 2252-0516Fax: (033) 2252-0553mail Id: [email protected] Dated: The 31st March, 2015

    (Shakti Brata Basu)

    Chief Engineer

    National Highway Wing

    P.W.(Roads) Directorate

    Govt. of West Bengal 

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    6/325

     

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    7/325

     

    2014

    (1  , 2003)

    & (5 

      , 2013). 5   2013.

      ,

    ., 20152016

    .

    (1  , 2003) &

    (5  , 2013), ,

    . ,

    ,

     . , / ʼ .

      ,

    .

      .

    ,

    .

    ...,  

    , ,

      .

    ( )

    .. & . ()

    .

    6 ,

    ,

    ,

    00 02 & . (033)2441523

    2  , 2015

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    8/325

     

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    9/325

    .

      ()

      1 .5

     

      9 .68

    1   , ,  

      71

    2   75 82

    3 ,   85 100

    4

      , ( )

      103 112

    5 ()   115 130

    6     133 136

    7   139 142

    8   ,

      145 168

    9   171 172

    10   175 179

    11   183 188

    12   193 236

    13   239 249

    14   253 271

    15   275 279

    16   283 288

    17       291 292

      295

    ()   296

      297

      298

    ( )   299

       

      300 302

     

    , .   305

      306

        306

    307

    /   ()

    ( )

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    10/325

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    11/325

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    12/325

     

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    13/325

      () ;

    1.

    2.

    3.

    4.

    NH  

    ANDAD DAA BOOK FO ANALI OF AE 1994 BLIHED B

    HE MINI OF FACE ANO (OAD) ING, GOENMEN

    OF INDIA AND IN ANCE OF CHIEF ENGINEE, NAIONAL

    HIGHA, .. (OAD) DEAMEN. A,   199798.

    . A  

     

    M .

    NH 201516 16.04.2015 NH : 201415,

    10.07.2014  

    .

    ,

    N H

    B.

    N ,

    5.

    6.

    7.

    I)

    II)     . ) L , &

    M ; ) ; ) O ; ) C ; )

    B ' C .

    M A ANDAD DAA BOOKFO ANALI OF AE (1 2003) MO .

    ) L, & M ; ) ; )

    ; ) ; ) C.

    ECIFICAION FO OAD AND BIDGE OK (5H

    EIION)2013 M ( ), G 

    I. I ECIFICAION

    FO OAD AND BIDGE OK (5H EIION)2013  

    .

    A ANDAD DAA BOOK FO

    ANALI OF AE (1 2003) MO .

    .

    F , ,

    E

    .

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    14/325

      () ;

    C () @10 % ( + + )

    C () @ 1 () % ( + ++)

    = ( + + + + )/  

    III)

    1)

    2)

    3)

    4)

    5)

    6)

    7)

    8)

    L  

    .

    O () @% ( + )  9()

     

    O , .

    E ) C C, )

    , ) D .

    M/ .

    , , , ,

    .

    L .

    L

    .

    M &

    , , ,

     9)

    10)

    11)

    12)

    13)14)

    15)

    I)

    )

    I)

    II

    / .

    / .

    M/

    .

    .

    / .

    E .

    .

    N ,  

    , ,

    E C

    .

    F .

    D . (MOH)

    E.  

     

    NH C . A ,

    L D,

    G B.

    ) M ( ), ) , )

    & .

     L A.

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    15/325

      () ;

    I)

    II)

    III

    I)

    )

    C A

    MO

    . F , ,

    , ( ), .

    .

    (I N D B A , MO,

    , 2003)

    .

    D . I

    /

    .

    D .

    D C A C 2  

    / /  

    .

    C A .

    8.

    I)

    II

     9.

    I)

    .

    M  

    .

     

    D.

    A ,

    , E

    ,

    ,

    .

     

    MO&H ,

    , ,

    .

    , ,

    /

    EC.

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    16/325

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    17/325

      () ;

    N . A C .

    ,

    . I

    D

    .

    F , ,

    , ,

    , ,

    . ,

    .

    B

    .  

    M

    .

     

    ( K M) E

    NH & D C 27 D M, 2015   .. () D

    G. B

    2 2.5

    1.5 450.

    I .,

    .

    .

    A 6 12 D

    12 6. F ,

    .

    ,

    . .

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    18/325

     

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    19/325

     

    CHAPTERCHAPTERCHAPTERCHAPTER A AA A

    APPROXIMATE MATERIALAPPROXIMATE MATERIALAPPROXIMATE MATERIALAPPROXIMATE MATERIAL REQUIREMENTREQUIREMENTREQUIREMENTREQUIREMENT

    FOR FOR FOR FOR

    DIFFERENT ITEMS OF WORKSDIFFERENT ITEMS OF WORKSDIFFERENT ITEMS OF WORKSDIFFERENT ITEMS OF WORKS

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    20/325

     

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    21/325

      (A) ; B  A 

    9

    A A

     AA AA

    &

    3.5 ( )

    .  G 80% = 0.350 C.

    .  E = 1.40 . /C.

    3.9 ( )

    .  G 80% = 0.350 C..  E = 5.60 . /C.

    3.12

    .  G 80% = 0.350 C..  E = 5.60 . /C.

    3.13 ( )

    .  G 80% = 0.350 C.

    .  E = 1.40 . /C.

    3.23

    .  B E = 0.23 .

    3.27

    1)  . 100.=1

    2)  G C /G / 3003,5  &H , 2013:

    F GI

    (C...)

    . (3)

    5.6 0.010

    2.8 0.011

    1.4 0.034

    710 0.048

    . (3)

    355 0.073

    180 0.043

    90 0.022

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    22/325

      (A) ; B  A 

    10

    &

    F GII

    F GIII

    3.28 A

    1)  G C /G 3004 :

    F A

    F B

    3.29 .

    .  C . . 12.8 CC( 20 G) C

    . . 12.8.  HD = 0.039 C.

    3.34

    .  G 80% = 0.206 C.

    .  E = 0.82 . /C.

    C H & B (5 ) 2013

    . (3)

    22.4 0.006

    11.2 0.056

    5.6 0.079

    2.8 0.032

    710 0.037

    . (3)

    355 0.016

    90 0.013

    . (3)

    22.4 0.047

    11.2 0.094

    5.6 0.053

    . (3)

    2.8 0.031

    1.4 0.006

    90 0.006

    . (3)

    10.0 0.037

    5.6 0.027

    600 0.035

    . (3)

    150 0.029

    75 0.007

    . (3)37.5 0.010

    20.0 0.111

    10.0 0.014

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    23/325

      (A) ; B  A 

    11

    &

    4.1 / & :

    F GI

    F GII

    F G

    F G I

    : , I/II//I 4001 &H & B (5 )

    2013.

    4.2  / & :

    . (3)

    2.36 0.13

    0.425 0.22

    0.075 0.16

    . (3)53 0.13

    26.5 0.22

    10.0 0.29

    5.6 0.13

    . (3)

    26.5 0.19

    10.0 0.26

    5.6 0.16

    2.36 0.16

    . (3)

    0.425 0.35

    0.075 0.16

    . (3)

    53.0 0.13

    26.5 0.22

    10.0 0.29

    5.6 0.19

    . (3)

    2.36 0.26

    0.85 0.12

    0.425 0.08

    . (3)

    26.5 0.1610.0 0.29

    5.6 0.29

    . (3)

    2.36 0.320.425 0.17

    0.075 0.05

    F G III

    . (3)

    26.5 0.48

    5.6 0.54

    0.075 0.26

    F G I

    . (3)

    26.5 0.45

    5.6 0.51

    0.075 0.32

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    24/325

      (A) ; B  A 

    12

    : , III / I

    4001 &H & B (5 ) 2013.

    &

    4.3 

    . = 50 K 3.. = 0.240 K 3.

    4.4 B

    . = 50 K 3.

    . = 0.240 K 3.

    4.5 B / B

    . C = 70 K 3.

    . = 0.240 K 3.  

    4.6

    . C = 0.08

    . G /, .

    : ,

    4004 &H & B (5 ) 2013.

    4.8 .

    . B = 1.20

    . = 0.18 K .   

    . (3)

    600 0.33

    300 0.18

    75 0.29

    . (3)

    37.5 0.03

    20.0 0.32

    10.0 0.06

    5.6 0.06

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    25/325

      (A) ; B  A 

    13

    &

    4.9 . B ( . 4009, 40010 & 40011)

    A.  

    (75 ) 

    .

    (75 ) 

    .

    63 0.07

    53 0.59 0.03

    45 0.56 0.26

    22.4 0.10 0.96

    11.2 0.07

    B. ( ./3) 

     

    1 (75

    )  . 

    2(75 ) 

    .

    13.2

    11.2

    5.6 0.13

    180 0.05 B

    11.2

    10.0 0.03 0.03

    5.6 0.08 0.08

    180 0.17 0.16

    C

    0.31 0.31

    C. B ( ./3) 

    1 (75 ) 

    .

    2 (75 ) 

    .

    2.36 75 0.08 0.08

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    26/325

      (A) ; B  A 

    14

    : . F

    4009, 40010 & 40011 &H & B (5 ) 2013.

    &

    4.12

    = 0.08K 3  

    : , F

    40013 &H & B (5 ) 2013.

    4.16 &

     A. : 400 1 . .

    4.1 ( G GB )

    F GI

    F GII

    B. . 15: 0.025 /.. . . 12.8 

    . 1:3

    . = 0.013 /..

    . C = 6.1 /..: , F

    4001 &H & B (5 ) 2013.

    4.17 :

    53

    . (3)

    45 0.03

    22.4 0.36

    11.2 0.26

    5.6 0.23

    D 0.43

    . (3)

    53 0.13

    26.5 0.22

    10.0 0.29

    5.6 0.13

    . (3)

    2.36 0.13

    0.425 0.22

    0.075 0.16

    . (3)

    26.5 0.19

    10.0 0.26

    5.6 0.16

    2.36 0.16

    . (3)

    0.425 0.35

    0.075 0.16

    . (3)

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    27/325

      (A) ; B  A 

    15

    . (3)

    90   0.23

    (C...)

    &

    37.5

    : , F

    40014 &H & B (5 )

    2013.

    4.18 :

    480 C.. (720 , D 1.50 / C.)

    + F @ 20% 720 = 144 : F = 4 : 16, = 29

    F = 115

    = 576 .. = (576 / 1.6) C = 360 C.

    1 C. , = 0.06042 = 60.42 K 1 C. , F = 0.23958 = 239.6 K 1 C. , = 0.75 C.

    45 0.09

    22.4 0.34

    5.6 0.43

    710 0.23

    . (3)

    22.4 0.07

    5.6 0.66

    710 0.33

    90 0.26

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    28/325

      H (AD) D ; B GEEA

    I &

    5.1   C 

    B E

    ) MM/BM = 0.70 / .) /C M = 0.90 .

    = 1.17 L ..

    5.2   C 

    B E

    ) B = 0.20 / .) G = 0.25 .

    ) C C = 0.30 .

    5.3 B

    :

    B 73 K 75 K

    0.08 0.08

    0.08 0.08

    3.30% 3.40%

    0.56 0.33

    0.43 0.65

    0.09 0.21

    . F

    5007 M&H' & B (5 ) 2013.

    5.6

    B (%)

    0.07

    0.11

    0.07

    37.5

    26.5

    20

    2.36

    300

    75

    13.2

    G1 40

    80

    100 (L

    ) .

    G219

    50 75

    (L )

    .

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    29/325

      H (AD) D ; B GEEA

    I &

    5.6 D G B

    :

    5.8 B C

    :

    127 K (M)

    0.13

    150

    B (%)

      5.20 % (.) 5.40 % (.)

    75 0.13 0.23

    300

    F(2 %

    )(C / /

    )

    45 45

    B 123 K (M)

    1.18 0.13 0.13

    600 0.09

    0.09

    0.10 0.24

    5.6 0.25 0.25

    0.09 0.10

    2.36 0.13 0.18

    0.2075

    B (%)

    F(2 % )(C / /

    )

    0.13

    0.27

    0.16

    20 0.07

      G 1

    19 (

    50)

    C

     G 2

    13.2

    ( 30

    40) C

    45 K

    . F

    50010 M&H' & B (5 )

    2013

    B 92 K (M) 104 K (M)

    4.5% (.)

    300

    0.22

    0.32

    13.2 0.38 0.07

    10

    0.19

    45 K

    0.30

    G1

    37.5

    (L 75

    100 ) .

    0.04

    0.28

    G2

    26.5

    (L 50 75

    ) .

    0.30

    0.16

    0.07

    0.17

    0.20

    37.5

    26.5

    5.6

    13.2

    . F

    500 17 M&H' & B (5 )

    4% (.)

    2.36

    20

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    30/325

      H (AD) D ; B GEEA

    I &

    5.9 .

    :

    5.10 . G

    :

    5.11 . CG /

    :

    B 2.20 K 1.90 K

    . F 50019 M&H' & B (5

    ) 2013

    5.6 0.0081 0.0142

    2.8 0.0119 0.0072

    90 0.007 0.004

    13.2

    11.2 0.0016

    B 1.46 K 2.153 K

    A

    B

    20 .

    B

    B

    20 .

    . F

    50023 & 50024 M&H' & B

    (5 ) 2013

    13.2 0.018 0.018

    11.2 0.009 0.009

    0.00013

    B 1.20 K 1.00 K

    CI.

    B

    .

    CII.

    C B

    E

    .

    . F

    50021 M&H' & B (5

    ) 2013

    5.6 0.0017

    2.36 0.0004 0.00025

    20 0.0011 13.2 0.0109 0.0007

    75 0.00015

    CI. 19

    .

    CII. 13

    .

    10.0 0.0025 0.0073

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    31/325

      H (AD) D ; B GEEA

    I &

    5.12 . C

    :

    5.14 . 25 A

     

    () B @ 2% . = 0.014 K .

    :

    5.15 . C

    :

    1.21 K

    .

    . F

    50025 M&H' & B (5 )

     0.75 .

    .

    2) CI . A .

    0.72 K .

    CII.

    46

    M  

    1.39 K

    .

    () C E

    B

    () L 80 % @ 17.92 %

    . = 10.29 K ..

    () C 5.6 13.2 @ 40 % . = 0.0157 C.

    .

    () 13.2 = 0.00057 C.

    .

    1) Quantities are only for estimation. For execution grading shall conform to table 500-39,

    500-40, 500-41 & 500-42of MORT&H's specification for Road & Bridge Works (5th

    Revision) - 2013

     F

    5.6

    (20%) &

    2.36

    (80%)

    = 0.0091

    C 2

    0.31 K

    .

     0.85 lit.

    per Sqm.

    CIII.

    68

    CI.

    23

    . F . 511.2.2 &

    511.2.3 M&H' & B (5 ) 2013

    () F 2.36 0.075 = 0.011

    C./.

    L C

    A

    .

    () C A

    0.009

     F

    2.36 = 0.0031

    C. .

    F

    5.6 5%

    2.36 &

    95%=

    0.00638

    C. .

     0.60 lit. per Sqm.

     0.11 K. .   0.22 K.

    .

    2.36 90 0.006

    B 0.98 K

    () C

    F @ 2%

    ()

    0.68 K

    5.6

    C

    B

    .

    () B 85/25 G 40

    ( 100C) = 5.714 /

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    32/325

      H (AD) D ; B GEEA

    I &

    5.16   . B  

    C = 70 % = 1.0304 .

    ) 37.5 26.5 @ 23 % 1.0304 C.= 0.237 C.. / C.. C .

    ) 26.5 10 @ 15 % 1.0304 C.. = 0.155 C.. / C.. C .

    ) 10 5.6 @ 20 % 1.0304 C.. = 0.206 C.. / C.. C .

    ) B 5.6 @ 40 % 1.0304 . = 0.412 C.. / C.. C .) F : C @ 2 % 2.30 = 46.00 K. / C.. C .

    ) B = 81.00 K / C.. C .

    5.17 F

     A   C B E @ 0.75 K .

    B

    ) C 2.36 @ 3.75 K .

    ) C B E @ 2% = 0.075 .

    5.18 . B C ( )

    0.068

    0.068 0.367

    0.510 0.327

    0.238 0.163

    0.374 0.286

    0.17 0.15

    109.76 K   109.76 K

    43.9 K   43.9 K:

    5.19 A B

    ) 4.75 75 = 1.38

    ii) Cement or Rock dust as filler @ 2 % = 43.90 Kg per cum.

    ) B @ 5 % =109.76 K

    :

    0.356

    0.494

    13.2

    300

    : I E F

    A

    CI.

    C

    B

    26.5

    . F

    50044 M&H' & B

    (5 ) 2013

    20

    0.16575

    0.066

    0.145

    2.36

    0.316

    0.23 0.158

    0.494

    175.61 KB E

    C175.61 K

    43.9 K

    CII.

    E

    26.5

    /

    26.5

    0.362

    43.9 K

    0.277

    L

    CI.

    B &

    13.2

    /

    0.066

    . F

    50014 M&H' & B (5 ) 2013

    5.6

    CIII.

    C

    B

    13.2

    /

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    33/325

      H (AD) D ; B GEEA

    I &

    5.21 C C ( )

    :

    CAE I B I G

    ) G B 80/100 = 1.05 / ..

    ) G 10 % = 1.10 ./ ..

    5.22 C

    0.0724

    0.326

    0.3984

    0.4347

    0.1646 0.5927

    0.2173

    0.3293

    0.2305

    98.78 K  186.60

    K

    29.27 29.27  

    :

    NIL

    0.4210

    37.5

    CI. 75

    >9 &

    >50%

    . F 500

    43 M&H' & B (5 ) 2013

    13.2 0.07

    F

    ( )

    @0.9

    /

    &5.6

    @0.01

    /

    B /

    CIII.25

    29.27  

    CII. 40

    1.3  5.6 0.006 &

    11.2 0.006

    600

    . F

    50047 M&H' & B

    < 6

    2.36

    C

    0.28

    A

    (/)

    26.5

    75

    300

    B E C153.66 K

    150

    D

    1.1 5.6 0.01

    6 9

    20

    1.5 11.2 0.012

    0.635.6

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    34/325

      H (AD) D ; B GEEA

    I &

    6.1 D C C

    F A : C : @ 0.45 C.. / C.. C .

    C: @ 150 / C.. C .

    : @ 106.67 . / C.. C .

    :

    2) F 20% .

    C 30% 601.2.3 M&H'

    & B (5 ) 2013

    6.2 C C  

    C: 43 G @ 360 / C.. C .

    J = 0.833 K / C.. C .

    = 0.110 K / C.. C .

    C C :1.76 . / C.. C .

    :  1) A 1% .

    1.25 D =0.044 .. / C..

    C .

    A I M 9103 1999 @ 0.5 % . C = 1.97 / C .

    2) . F

    6003 M&H' & B

    (5 ) 2013

    3) F 20% .

    C, C 310 /..

    602.3.2 M&H & B (5 )2013

    C A : 26.5 & 11.2 (

    602.2.6.4 M&H' ) @ 0.9 / . C .

    F A : C ( 602.2.6.3 & 602.2.6.4

    M&H' ): @ 0.45 / C .

    :32 M D G 240 @ 9.0 /C..

    C .

    :16 D G 415 @ 1.11 /

    C.. C .

    I 125 =3.50 .. / C.. C .

    J F 25 E = 0.016 .. /

    C.. C .

    : @ 205.71 . / C.. C .

    C A : 26.5 & 11.2

    @ 0.9 C.. / C.. C .

    1) . F 600

    1 M&H' & B (5 ) 2013

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    35/325

      H (AD) D ; B GEEA

    I &

    6.3

    6.5

    F A : C : @ 0.25 C.. / C.. C .

    C: 43 G @ 150 / .

    : @ 106.67 . / .

    6.6 C F C  

    C: 43 G @ 340 / C.. C .

    J = 0.833 K / C .

    = 0.110 K / C .

    1.25 D =0.044 .. / C .

    C C :1.76 . / . C .

    : @ 205.71 . / . C .

    E:

    G C = 400 C.. C .

    15 % C F = 60 C.. C .

    I 125 =3.50

    .. / .

    C A : 40

    2 IC: 741979 @ 0.9 / .

    J F 25 E = 0.016 .. /

    .

    A I M 9103 1999 @ 0.5 % .

    C = 1.97 / C .

    IE DEEED

    : F A C I 3812 ( II) :@ 0.20 C/ .

    F A : C I 383 C 602.2.4

    : @ 0.4048 / .

    :32 M D G 240 @ 9.0 / C.. C

    .

    :16 D G 415 @ 1.11 /

    .

    C A : 26.5 & 13.2

    @ 0.9 / .

    B /

    C F

    : F A C I 3812 ( II) : @ 0.104 / . .

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    36/325

      H (AD) D ; B GEEA

    I &

    B C = 85 % = 340 C.. C .

    G C = 0.45 C.. C.. C . =

    10 % F = 0.045 C.. = 44.0 C.. C .

    B = 0.45 0.90 = 0.405 C.. C.. C .

    F = 60.00 + 44.00 = 104.00 = 0.104

    7.1

    M  

    () G = 1.00 . .

    () G = 1.00 . .

    () G = 2.00 . .

    7.2

    M  

    () G = 1.25 . .7.3 F

    M  

    () F = 1.05 . . C

    () 80 / 100 = 1.00

    7.5 E

    7.5() , ,

     A

    60 5 3102

    1. G 1 /

    2. C 1 /

    3. A 1 /

    4. 1 /

    5. G / F / 1 /

    B

    7.5()  CC

    () HD @ 5 / .. . N. 13.6

    () 150 . = 1.0. /M .

    G 3102.8

    I .. / ..

    () .C.C. M 35 F E 18

    = 0.18 C.. / .. .N.12.8.

    A 10

    , /

    , , .

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    37/325

      H (AD) D ; B GEEA

    I &

    8.1 C C 20

     AM

    ) C 20 = 0.061 C.. / .

    ) C = 0.030 C.. / .

    ) C = 15.83 / .

    ) = 83.33 . / .

    M

    ) C 20 = 0.061 C.. / .

    ) C = 0.030 C.. / .

    ) C = 15.83 / .

    ) = 83.33 . / .

    8.2

     M

    ) C 20 = 0.122 C.. / .

    ) C = 0.061 C.. / .

    ) C = 30.03 / .

    )

    M

    ) C 20 = 0.122 C.. / .

    ) C = 0.061 C.. / .) C = 30.03 / .

    ) = 0.12 KL / .

    8.3   1  

    ) H

    = 0.00044 . / 1.0 .

    ) E & :H .

      = 0.0003 . / 1.0 .

    8.4 M :

    ) E F = 0.216 C.. .

    ) C C M 15 G= 0.12 C.. L. N. 12.8.

    ) 2 () = 0.43 2 .

     

    ) M A I 75 75 5 = 19.00 .

    ) 90 E 0.35 .. (C.)

    ( M, C

    )

    )

    & .

    C C 20

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    38/325

      H (AD) D ; B GEEA

    I &

    ) 60 E 0.156 ..

    ) 60 C 0.283 ..

    ) 80 60 0.48 ..

    ) 60 45 0.27 ..

    ) 60 60 0.36 ..

    ) 90 0.672 ..

    8.5

    M :

    I : C I

    ) E F = 0.216 C.. 0.9 .. .

    M

    8.6

    M :

    ) E F = 0.43 C.. 1.5 .. .

    M

    )

    = 0.90 .. .

    : A 2 %

    : 2 % , , ,

    .

    D

    0.90 B

    ) 2 () = 0.86 . 1.5 .

    .

    ) M I 75 75 6 , 2.85 2 () . = 38.00

    1.5 .. .

    ) A

    = 1.50 .. 1.5 .. .

    : 2 % A I , , .

    D

    0.90 B

    ) 2 () = 0.43 .. 0.9 ..

    .

    ) M I 75 75 6 , 2.85 = 19.00 0.9 ..

    .

    ) C C M 15 G 0.12 C.. 0.9 ..

    ) C C M 15 G 0.24 C..

    1.5 . . N. 12.8.

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    39/325

      H (AD) D ; B GEEA

    I &

    8.7

     A   AND EICAL

    M :

    B   ALMINIM ALL LAE F E HEAD IGN

    8.8

    M :

    ) 803.3. = 0.15 L .

    8.9

    M :

    ) .= 0.125 L .

    8.10

    M :

    ) .= 0.15 L .

    8.11

    M :

    ) I: 164.= 0.148 L .

    M :

    ) I: 164.= 0.148 L .

    8.12

    ) 10 .

    M :

    ) I: 164.= 0.09 L .

    ) 10 .

    M :

    ) I: 164.= 0.09 L .

    8.13

    H = 2.5 L .

    0 25 K

    N: ) E F C

    .

    ) L A

    . C.

    , , , .

    , , , .

    ) A A / G 5% = 1.05

    : ) A 1 % , , ,

    . ) A 15 % F .

    ) A A 2 ,

    801.3 = 1.00 ..

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    40/325

      H (AD) D ; B GEEA

    I &

    8.14

    M :   ()

    ) M 15 = 0.39167 C   0.21

    ) = @ 3.68 K N.   0.10

    0.040.18

    ) L = 300 107.84K

    M :   ()

    ) M 15 = 0.2693 C 0.14

    ) = 1.9 K 0.07

    0.03

    0.12

    ) L = 120 74.15K

    M :   :   ()

    ) M 15 = 0.048 C   ) 40   0.02

    ) = 2 K N.   ) 20 0.01

    ) 10   0.01

    0.02

    ) L = 10 13.22K

    8.15  

    M :

    8.16

    M : ()

    ) M 15 = 0.022 C   0.01

    b) Steel Reinforcement = 1.4 Kg 0.005

    0.005) L = 40 0.01

    ) =0.21 C. .   6.06K

    8.17

    M :

    ) B = 11.17 @ 9.38 /100 = 1.05 .

    ) C

    ) C

    )

    ) E . = 0.042 3

    ) C

    ) C

    )

    ) E . = 0.20 C

    ) C =

    0.815

    :

    :

    ) 40

    ) 20

    ) 10

    ) 10

    ) C =0.19 ) C

    ) 40

    ) 20

    ) E . = 0.28 3

    ) C

    )

    ) 40

    ) C

    )

    ) 10

    ) C

    ) 20

    ) E . =0.19 3

    :

    ) C =

    1.642

    Per number of Boundary pillar

    C II

    IC: 79 =1 N.

    ) H ( )

    ) 5 . . ( )

    ) . . ( )

    GI 1.2

    ) M.. 40406, 23 @ 3.5 / = 2.68 : A 2% , .

    ) A = 0 07

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    41/325

      H (AD) D ; B GEEA

    I &

    8.18

    M :

    ) B = 14.267 @ 9.38 /100 = 1.34 .

    8.19

    M :

    ) 50 . G.I. @ 5.15 / = 0.79

    ) 505 = 0.867 / .

    ) = 0.248 ./.

    8.20

    M :

    ) E (6 ) = 0.1296 C. .

    ) = 0.471 . .

    ) = 0.216 . .

    ) 50 I 1239 =3.00 . .

    8.21

    M :

    ) E = 0.1296 C. .

    )F M15 G CC = 0.0648 C. . . 12.8

    ) CC M 20 1.8 =0.032 C L. N. 14.1

    ) = 0.471 . . N.8.9.

    ) 50 I 1239 =3.00 . .

    ) M.. 50506, 33.80 @ 4.5 / = 5.07

    : A 2% , .

    GI 1.8

    : A 2.5 %

    ,

    (IC ) 100 50

    F 75 50

    ) M (IMC ) = 1.08 . /. @ 9.2 . =

    9.936 .

    CC , 1.2

    ) M (IMC ) = 1.08 . /. @ 9.2 . =

    9.936 .

    )F M 15 G CC = 0.0648 C. . L. N. 12.8.

    ) 75 50 @ 4.0 . = 1.26 . =5.04 .

    75 25 @7.75 . = 1.26

    /. = 9.765 .

    ) A =

    0.13 .

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    42/325

      H (AD) D ; B GEEA

    I &

    8.22

    M :

    )CC M 25 = 0.30 . . 14.1

    ) HD =0.028 .

    iii) Pre-moulded asphalt filler board =0.032 Sqm per m.

    8.23

    M :

    ) N =4.44 .

    M :

    ) C , 3 , "" = 16.209 .

    ) C 150 75 5 2 . ,3 @ 16.4 = 21.89 .

    ) N =6.67 .

    8.24

    :

    8.25

    M :

    ) J 100 75 16.5 @ 11.5 . =12.65 .

    ) N 2. = 3.067 K .

      ) 40 , 7.50 % = 4.33 .

    ) 150 75 5 .33 . 3 @ 16.4 . =

    3.608 .

    E

    : 15 % .

    :  25 % & .

    ) 150 75 5 0.546 . , 3 @ 16.4 . =

    5.9696 .

    CC

     A) A ""

    ) C , 3 , "" ,4.5

    = 9.158 .

    ) C 150 75 5 1.8 . 3 @ 16.4 =

    19.68 .

      ) 8 1.5 . E = 12.56 / .

    ) A 1 1 /

      ,

    II

    .

    B) B ""

    F ,

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    43/325

      H (AD) D ; B GEEA

    I &

    8.26

    B. A

    ) 25 =16 . .

    A 5 % , , , , , .

    ) = 1.83 . .

    C. A  

    ) A 50 50 6 =1.567 . = 7.05 .

    ) M 3 @ 24 . = 6.00 .

    A 5 % , , , , , .

    )A =0.57 ./

    8.27

     A. F

    M :

    ) 250 = 1

    B. F

    M :

    ) 250 = 1

    8.28

    M :

    ) 70 = 1

    A 5% , , , ,

    .

    )

    9 . =1

    ( )

    ( )

    A 1% , , , ,

    .

    )

    5 . =1

    ) M 600 300 3 N @ 24 . =

    4.32 .) M 250 , 3 , 4 N. @ 24 .

    =4.80 .

    )

    = 4.63 . F

    )

    = 5.75 . F

    )

    9 . =1

    A 5% , , , ,

    .

    )

    =2 76 F

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    44/325

      H (AD) D ; B GEEA

    I &

    8.29

    CAE I

    M :

    ) CC 300 = 1 /.

    ) C 300 = 0.45 . .

    ) C 1 :2 = 0.001 C. . . N. 12.6.

    CAE II D M :

    ) CC 300 = 2

    ) C 300 = 0.90 . .

    ) C 1 :2 = 0.002 C. . . N. 12.6.

    CAE III

    M :

    ) CC 300 = 3 .

    ) C 300 =1.35 . .

    ) C 1 :2 = 0.003 C. . . N. 12.6.

    8.33

    ) G

    M :

    : 15 %

    1 %

    G

    ) / B 1 : 6 = 0.118 . . N. 12.7

    ) G I 6 = 0.36

    C. .

    ) / B 1 : 6

    = 0.1685 . . N. 12.7

    ) G I 6 = 0.72

    .

    ) / B 1 : 6

    = 0.219 . . N. 12.7

    ) G I 6 = 1.08

    C. .

    A / G 5 % = 1.05

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    45/325

      H (AD) D ; B GEEA

    I &

    8.34

     A.

    ) 900 20 = 4 N. .

    ) 20 = 7.5 .

    : 1 % .

    B. / ,

    ) B = 2.50 N .

    ) = 0.4 C .

    ) 20 =0.75 .

    : 1 % .

    C. ()

    M :

    ) 50 , 1.2 = 4 N. .

    ) = 1.20 KL .

    ) 20 =10.00 .

    : 1 %

    8.35

    M :) 100 100 F =1 N. N.

    : 10 % .

    8.36

    M :

    ) C 150 =1 N .

    8.39

    iii) Steel pipe 25 mm dia 10.00 m for each

    ) CGI = 8   : 25 % . ) )

    8.43

    M :

    ) 45 45 5 =25

    ) M 300 , 2.5 2.6 =15

    ) =0.5

    /

    ( )

    ( )

     N : 2 % , ,

    .

    ) E/, / / 3 & 13

    ) 100 3.50

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    46/325

      H (AD) D ; B GEEA

    I &

    8.44

     A.

    M :

    ) 50 50 5 , 2M ,2 =15.00

    ) M 12 G, 3 N 200 4 =50

    ) =1.00

    B.

    = 0.18 C. F

      : 1 % , , .

    C.  

    ) = 1800.00

    ) = 22

    ) = 0.09 C ) =1.25

    8.45

    M :

    ) 300 1.2 / = 1

    ) = 0.5

    8.46

    M :

    ) F 600 600 = 1N ) 25 1 = 1 N

      : 1 % , ,

    .

    ( )

    F ( )

    D ( )

     

     

     

    / &

    ( M&H' ,5

    50050 ).

       

     

     

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    47/325

      H (AD) D ;  B GEEA 

    35 

    I &

    9.1 CC 1:3:6

    ) 40 A = 0.92 C. C.

    ) = 0.46 C C.

    ) C = 220 C.

    ) = 1.2 K C.

    9.2 CC 4 /

     A. 1000 .

    ) = 0.0056 C. .

    ) C = 4 .

    ) G 5.6 = 0.36 .

    B. 1200 .

    ) = 0.0072 C. .

    ) C = 5.6 .

    ) G 5.6 = 0.4 C. .

    9.3 CC 4 /

    ..

     A. 1000 .

    ) = 0.0112 C. .

    ) C = 8 .

    ) G 5.6 = 1.00 C .

    B. 1200 .

    ) = 0.0144 C. .

    ) C = 11.2

    .

    ) G 5.6 = 1.10 C .

    10.4 , 20

    ) C 13.2 = 0.018 C. .

    ) C 11.2 = 0.009 C. .

    ) B G30 = 1.46 .

    ) B = 0.24

    .

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    48/325

      H (AD) D ;  B GEEA 

    36 

    I &

    10.5 B

    G I 

    19

    ( 50)

    G II 

    13

    ( 40)

    20 0.004 .

    13.2 0.021 0.006

    11.2 0.009 0.011

    5.6 0.005 0.016

    2.8 & 0.032 0.024

    75

    A 5% 0 0

    B

    0.24 K 0.24 K

    F 2.2 K 1.76 K

    B 5.5 K 4.6 K

    10.6 C

    ) =0.066 .

    ) C D = 0.00004 C. .

    C 2.36 10% 0.075

    10.7 D

    C 2.36 10 % 0.075

    D @2.5/

    10.8B C

    C B

    /

    A

    (/)

    3 0.9 5.6 0.01 I

    < 6 1.1 5.6 0.011 C

    6 9 1.3 5.6 0.006 &11.2 0.006

    F ( )

    @0.9 /&5.6 @0.01

    /

    >9 &

    >50%1.5 11.2 0.012 D

    (C..)

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    49/325

      H (AD) D ;  B GEEA 

    37 

    B I G

    B (G 30)@1.05/

    10.8C

    C I C II C III

    23 46 68

    ) C.B.E 0.72 / 1.21 / 1.39 /

    ) F.A.0031 /

    (2.36 & )

    .00638 /

    (5.6 5% ,2.36 &

    95%)

    .0091 /

    (5.6 20% ,2.36 &

    80%)

    )

    F 0.11 / 0.22/ 0.31 /

    10.9

    ) E = 0.25 .

    ) E = 1.00 .

    10.10

    ) = 0.025 .

    ) = 0.10 .

    10.13

    ) G = 0.175 C.

    ) E D @ 1 2 = 0.7 C.

    11.2 ""

    ) I 15

    "D" = 1.00 .

    ) 7.5

    "D" = 2.00 .

    11.3

    ""

    ) = 0.0018 C. .

    ) F = 1.00 .

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    50/325

      H (AD) D ;  B GEEA 

    38 

    I &

    11.4

    =0.90 K .

    11.5

    ) = 0.006 C. .

    ) F = 1.00 .

    11.6

    =0.60 K .

    11.7

     A. .

    ) H 2 30 = 6.80 . .

    ) = 0.0467 C. .

    ) = 0.03 K .

    B.

    ) = 0.02 C. .

    ) = 0.005 .

    ) = 0.3 K .

    )H ( ) @ 10% = 0.68 . .

    11.8

     A. .

    C 3.00 &

    :

    ) =0.2 .

    ) = 0.8 .

    ) = 0.0634 C .

    ) =0.5

    ) = 0.036K .

    (C)

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    51/325

      H (AD) D ;  B GEEA 

    39 

    I &

    B.

    ) / =.01/) =0.02 . ( )

    ) = 0.08 . ( )

    ) =1.5

    ) = 0.18 K .

    11.9 ( )

    ) 2 25 = 1

    ) F = 0.094 C. F

    ) = 50

    ) = 1.2 K

    11.11

    , , ,

    , ..

    11.12 /

    C, , , .

    11.13 C

    C , , ,

    11.14 H , 2 , . 1.25

    1.2 0.20 (F

    ) B 2 = 230.00

    ) C ( 1:6 ) = 0.025 C. F . . 12.6.

    11.15 2 ,

    ) B 2 = 5.00 .

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    52/325

      H (AD) D ;  B GEEA 

    40 

    I &

    11.16 53 . A 1.3

    ( )

    ) E = 1 ) 50 0.5 = 0.65 K

    ) 6 10 = 22

    11.17 53 . A 2

    ( )

    ) E = 1.50

    ) 50 0.5 = 0.65 K

    ) 6 10 = 50

    ) 303 = 1.3

    11.18

    ) A, , . = 1.05

    ) = 0.05

    : 5%  

    11.19 ( )

    ) 256 =19.20

    ) 253 =9.60

    =1.770 . . 8.9.

    11.20 ( )

    ) 30303 =13.50

    ) 253 =18.00

    ) 3 =6

    =1.50 . .8.9.

    11.21

    ) 1 1.5 2 =290

    10% = 29 = 290+29=319.

    ) D / ( = 60.90 . )

    ) D / ( = 4.00 . )

    ) =0.50 (C)

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    53/325

      H (AD) D ;  B GEEA 

    41 

    I &

    ) = 1.50

    ) =18 K

    12.1 E

    III. H

    ) B = 0.35 . /

    ) E = 1.4 . /

    12.2

    15 =1 /

    E: . . 12.8 A

    12.3 F

    =1.20 / .

    12.4 CC 1:3:6

    ) 40 =0.60 /

    ) 20 =0.30 /

    ) C =0.45 /

    ) C =230.00 ./

    12.5 1:3

    ) B 1 =500 C.

    ) C 1:3 = 0.24 C C. . .12.6.

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    54/325

      H (AD) D ;  B GEEA 

    42 

    I &

    12.6

    G

    C

    ()

    ()1:2 0.67 0.93

    1:3 0.51 1.05

    1:4 0.4 1.12

    1:6 0.29 1.34

    12.7 1:3

     A. C ( )

    ) =1.1 C. C.) B =7 C.

    ) 1:3 =0.30 C. C . . 12.6.

    B: ( / )

    ) =1.1 C. C.

    ) B =7 C.

    ) 1:3 =0.31 C. C . . 12.6.

    12.8 /

    :

     A B C D E

    CC

    15

    ()

    CC

    20

    ()

    CC

    20

    ()

    CC

    25

    ()

    CC

    25

    ()

    ) 40 0.54 0.36 0.36

    ) 20 0.27 0.36 0.54 0.36 0.54

    ) 10 0.09 0.18 0.36 0.18 0.36

    ) C 0.45 0.45 0.45 0.45 0.45

    ) C )

    275.33 K 344 K 347.33 K 399.33 K 403.33 K

    ) B 347.2 K 399.60 K 403.17 K

    )

    (C)

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    55/325

      H (AD) D ;  B GEEA 

    43 

    :

    F G H

    CC

    30()

    CC 30

    ()

    CC 35

    ()

    ) 40 0.36

    ) 20 0.36 0.54 0.54

    ) 10 0.18 0.36 0.36

    ) C 0.45 0.45 0.45

    ) C )

    405.33 K 406.67 K 422.00 K

    ) B 405 K 406.67 K 422.00 K

    )

    12.9 16 . F

    8.00 ( )

     A. A 1.0. A = 1.25 .

    ) C E = 251.20

    ) = 750.00 .

    B. A 4.0. A = 4.50 .

    ) C E = 904.32

    ) = 6000.00 .

    ) B 8" 9 . = 95 .

    ) B 2" = 190 .

    C.

    A 30 . 10 1.00 .

    ) C E = 15.00 .

    ) = 10.00 . .

    12.10 40

    ) , , . = 1.05 .

    ) B = 20

    .

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    56/325

      H (AD) D ;  B GEEA 

    44 

    I &

    12.11

     A. C

    I) CC G 20AEIA EIEE:

    ( 12.8 C)

    ) CC G 25

    AEIA EIEE:

    ( 12.8 E)

    ) CC G 35

    AEIA EIEE:

    ( 12.8 H)

    B.

    ) CC G 15AEIA EIEE:

    ( 12.8 A)

    ) CC G 20

    AEIA EIEE:

    ( 12.8 B)

    ) CC G 20

    ( 12.8 C)

    ) CC G 25

    ( 12.8 D)

    ) CC G 25

    ( 12.8 E)

    ) CC G 30

    ( 12.8 F)

    ) CC G 30

    ( 12.8 G)

    ) CC G 35

    ( 12.8 H)

    ) CC G 40

    B , C

    AEIA EIEE:) 20 = 0.54 / .

    ) 10 = 0.36 /

    ) C = 0.45 / .

    ) C = 430.00 . /

      ) =1.20 K/ 3

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    57/325

      H (AD) D ;  B GEEA 

    45 

    I &

    C. B ( 10 % .)

    :

    CI

    CC

    20

    ()

    CII

    CC

    20

    B

    ()

    CI

    CC

    25

    ()

    CII

    CC

    25

    B

    ()

    CI

    CC

    30

    ()

    ) 40

    0.36 0.36 0.36

    ) 20

    0.36 0.54 0.36 0.54 0.36

    ) 10

    0.18 0.36 0.18 0.36 0.18

    ) C 0.45 0.45 0.45 0.45 0.45

    ) C

    370.0 370 399.0 399.00 405.33

    )

    ) 1.24 1.24 1.44 1.44 1.44

    :

    CII

    CC

    30

    B

    ()

    CI

    CC

    35

    ()

    CII

    CC

    35

    B

    ()

    ) 40 0.36

    ) 20 0.54 0.36 0.54

    ) 10 0.36 0.18 0.36

    ) C 0.45 0.45 0.45

    ) C

    405.33 419.33 419.00

    )

    ) 1.44 1.44 1.44

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    58/325

      H (AD) D ;  B GEEA 

    46 

    I &

    D. IEEDIAE G

    ) CC G 20

    .

    ) CC G 25

    .

    ) CC G 30

    .

    E. G

    ) CC G 15

    . 12.8 (A)

    ) CC G 20

    . 12.8 (B)

    ) CC G 25

    . 12.8 (D)

    ) CC G 30

    . 12.8 (F)

    F. E CA

    :

    CI 

    CC

    20

    ()

    CII

    CC

    20

    B

    ()

    CI

    CC

    25

    ()

    CII 

    CC

    25

    B

    ()

    CI 

    CC

    30

    ()

    ) 40

    ) 20

    0.54 0.54 0.54 0.54 0.54

    ) 10

    0.36 0.36 0.36 0.36 0.36

    ) C 0.45 0.45 0.45 0.45 0.45

    ) C

    341.33 341 403.33 403.33 406.67

    )

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    59/325

      H (AD) D ;  B GEEA 

    47 

    I &

    :

    CII

    CC

    30

    B

    ()

    CI

    CC

    35

    ()

    CII

    CC

    35

    B

    ()

    CC

    40

    B

    ()

    ) 40

    ) 20

    0.54 0.54 0.54 0.54

    ) 10

    0.36 0.36 0.36 0.36

    ) C 0.45 0.45 0.45 0.45

    ) C

    406.58 422.00 422.00 435.00

    )

    ) A 1.72

    12.12 6 .

    .

    D. H (6 . )D 4.0

    ) G 80 % = 4.00 .

    ) E = 18.00 . / .

    12.13 7 .

    .

    D. H (7 . )

    D 3.0

    ) G 80 % = 7.00 .

    ) E = 30.00 . / .

    12.14 8 .

    .

    D. H (8 . )

    D 3.0 (C)

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    60/325

      H (AD) D ;  B GEEA 

    48 

    I &

    ) G 80 % = 8.00 .

    ) E = 32.00 . / .

    12.15 9 .

    .

    D. H (9 . )

    D 3.0

    ) G 80 % = 10.00 .

    ) E = 40.00 . / .

    12.16 10 .

    .

    D. H (10 . )

    D 3.0

    ) G 80 % = 11.00 .

    ) E = 44.00 . / .

    12.17 11 . .

    D. H (11 . )

    D 3.0

    ) G 80 % = 12.00 .

    ) E = 48.00 . / .

    12.18 12 .

    .

    D. H (12 . )

    D 3.0

    ) G 80 % = 14.00 .

    ) E = 56.00 . / .

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    61/325

      H (AD) D ;  B GEEA 

    49 

    I &

    12.19 D . I

    H ( D )

    D 3.0

    ) G 80 % = 10.00 .

    ) E = 40.00 . / .

    12.20 C 1207.6 &H

    ) CC G 35

    I. . 12.8(H) = 1.60 C C.

    HD = 0.096 /

    ) B

    ) G 80 % = 0.300 C.

    ) E = 1.20 . / C.

    12.21

    = 1.20 / .

    12.22 10 6

    5 % = 1.05 / .

    12.23 35 CC .

    1000

    IE DIA. = 1000 .

    C G 35 = 0.785 C .

    I. .12.11(C)

    12.24 35 CC .

    1000

    IE DIA. = 1000 .

    C G 35 = 1.13 C .

    I. .12.11(C)

    12.25 35 CC .

    1000

    IE DIA. = 1200 . (C)

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    62/325

      H (AD) D ;  B GEEA 

    50 

    I &

    C G 35 = 1.13 C .

    I. .12.11(C)

    12.26 35 CC

    IE DIA. = 750 .

    ) CC G 35 = 0.4415 C. .

    I. .12.11(C)

    )

    ) CI = 160 ) 15 = 35

    ) =50

    12.27 35 CC

    IE DIA. = 1000 .

    ) CC G 35 = 0.785 C. .

    I. .12.11(C)

    ) ) CI = 160

    ) 15 = 35

    ) =50

    12.28 35 CC

    IE DIA. = 1200 .

    ) CC G 35 = 1.1305 C. .

    I. .12.11(C)

    )

    ) CI = 160

    ) 15 = 35

    ) =50

    .

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    63/325

      H (AD) D ;  B GEEA 

    51 

    I &

    12.30 35 CC

    IE DIA. = 750 .

    ) CC G 35 = 0.4416 C. .

    I. .12.11(F)

    )

    ) CI = 160

    ) . = 70

    ) =40

    12.31 35 CC

    IE DIA. = 1000 .

    ) CC G 35 = 0.785 C. .

    I. .12.11(F)

    )

    ) CI = 160

    ) . = 70

    ) =40

    12.34 35 CC

    IE F IE = 750 750

    ) CC G 35 = 0.5625 C. .

    I. .12.11(F)

    )

    ) CI = 160

    ) . = 70

    ) =30

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    64/325

      H (AD) D ;  B GEEA 

    52 

    I &

    12.35

    ECI F IE = H ECI EE C 400 250 (IHB )

    ) 5 % = 86.286 .

    12.36

    ECI F IE = H ECI EE C 400 250 (IHB )

    ) 5 % = 97.167 .

    12.37 I: 2911 (I)

    : A B

    , .

    12.38

    :

    CI

    CC

    20

    ()

    CII 

    CC

    20

    B

    ()

    CI 

    CC

    25

    ()

    CII 

    CC

    25

    B

    ()

    CI

    CC

    30

    ()

    ) 40

    ) 20

    0.54 0.54 0.54 0.54 0.54

    ) 10

    0.36 0.36 0.36 0.36 0.36

    ) C 0.45 0.45 0.45 0.45 0.45

    ) C

    341.33 341.33 399.33 399.33 406.67

    )

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    65/325

      H (AD) D ;  B GEEA 

    53 

    I &

    :

    CII

    CC

    30

    B

    ()

    CI 

    CC

    35

    ()

    CII

    CC

    35 B

    ()

    ) 40

    ) 20

    0.54 0.54 0.54

    ) 10

    0.36 0.36 0.36

    ) C 0.45 0.45 0.45

    ) C

    406.67 422.00 422.00

    )

    12.39

    , .C.C (15)

    ) 40 = 0.54 C. C.

    ) 20 = 0.27 / .

    ) 10 = 0.09 / .

    ) C = 0.45 / .

    ) C = 275.333 ./ .

    ) =

    12.40 HD

    ) HD 5 % = 1.05 . .

    ) B = 6 .

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    66/325

      H (AD) D ;  B GEEA 

    54 

    I &

    12.41

    ) 5 % = 1.05 . .

    ) B = 6 .

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    67/325

    (A) ; B A

    13.1

    :

    ) B 1 = 500.00 C.) C 1:3 ( I. . 12.6) = 0.24 C. C.

    13.2

    :

    ) C 1:3 ( I. . 12.6) = 0.003 C. .13.3

    :) C 1:3 ( I. . 12.6) =0.0144 C. .

    13.4

    : A.

    (

    1.00 7

    0.33

    13.5

    ) CC G 15

    ) CC G 20

    ) CC G 25

    ) CC G 30

    ) CC G 20

    ) CC G 25

    &

    0.30 0.33

    7 7

    1:3

    ,  

     

    (1:3)

    (1:3)

    1:3

    ) )

    ( 0.24

    0.24 . 0.39 .)

    B. C

    ( ) .

    C. A

    ( )

    .

    1.10 1.11

    ) C 1:3

    ( I. .

    12.6)

    /

    12.8.

    12.8.

    12.8 .

    12.8.

    12.8 .

    12 8

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    68/325

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    69/325

    (A) ; B A

    &

    13.12

    C 250

    13.13

    C 80

    13.14

    C 500 400 96

    = 19200 .

    6 . 488 388 4 = 4545 C.

    H, = 14655 C.

    :

    13.15

    C 80

    13.16

    ,

    .

    ( )

    C F 250

    = 1

     , ...  

    : 5400, 9.1 & 9.2 ( )  

    2004 & ( )

    C FE 80

    ,

    ...

    ( )

    7  

    6 .

    ,

    .=1 .

     , . 

      ( )

    C 80

    = 1

     ,

    ....  

      ( )

    .. 2006

    = 1

    C 250

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    70/325

    (A) ; B A

    14.1

    : CI

    CC

    20

    ()

    CII

    CC

    20

    B

    CI

    CC

    25

    ()

    CII

    CC

    25

    B

    ()

    CI

    CC

    30

    ()

    ) 40

    )20 0.54 0.54 0.54 0.54 0.54

    )10 0.36 0.36 0.36 0.36 0.36

    0.45 0.45 0.45 0.45 0.45

    341.333

    341.00

    399.333

    399.583

    406.667

    1.20 1.20 1.20 1.20 1.20

    & : CII

    CC

    30

    B

    ()

    CI

    CC /

    C

    35

    ()

    CII

    CC / C

    35

    B

    ()

    CI

    C

    40

    ()

    CII

    C

    40

    B

    ()

    ) 40

    ) 20 0.54 0.54 0.54 0.54 0.54

    ) 10 0.36 0.36 0.36 0.36 0.36

    0.45 0.45 0.45 0.45 0.45

    406.58 422.00

    422.00 430.00 430.00

    1.20 1.20 1.20 1.20 1.20

    1.72 1.72

    /  

    ) C

    ) C

    )

    ) C

    ) C

    )

    )

    :

    CII C

    45

    B

    ()

    CII C

    50

    B

    ()

    CII C

    55 B

    ()

    ) 40

    ) 20 0.54 0.54 0.54

    ) 10 0.36 0.36 0.36

    ) C 0.45 0.45 0.45) C 465.00 490.00 529.167

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    71/325

    (A) ; B A

    &

    14.2

    :

    ) HD 5 % = 1.05 . .

    ) B = 8 .14.3

    :

    ) ID 66 5 % = 111.41 . .

    14.4

    :) C 30 = 1.00 C. C.

    ( I I . 14.1)

    ) HD B = 75 C.

    (A I . 14.2)14.5

    :

    ) B 85 /25 30 /40 = 2.815 .

    ) C = 0.00538 C. .

    ) 3.35 9.5 = 0.00759 C. .

    ) B = 0.0145 .

    14.6

     

       

     

    ) H @ 9.42 . 2 %

    = 1.02 . .

    ) , ,

    =5.31 ) C 3 % @ 3 . = 331.565

    .

    12

    . A 515.

    ) 80

    % = 4.968 .

    ) 13.2 = 0.000497

    C .

    30 ..  

    30

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    72/325

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    73/325

    (A) ; B A

    &

    iii) 20 mm Aggregate = 0.54 cum per cum

    iv) 10 mm Aggregate = 0.36 cum per cum

    ) A = 1.88

    ) HD 100

    H 5 % = 60 C.D = 37 C.

    14.14

    :

    i) Helical pipes 600 mm diameter = 1 RM per RM.

    ) 20 . = 1 .14.15

    I C 8.14.16

    :

    14.17

    :

    14.18

    ()

    :C 1 250

    A = 0.25 .

    = 0.25 .002 8900 = 4.45

    @ 2.5 % = 4.45 .025 = 0.11125

    =4.56 .

    ()

    :

    ()

    :

    () :

    20

    .

    C B

    20 1 25 .

    20

     

    10 20 ,

    .

    , 1 , 20 300

    =0.30

    G 200 , 12 @ 94.20 / . I 5 %

    = 19.79 .

     

    2

    B  

    = 0.5

    .

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    74/325

    (A) ; B A

    &

    14.19

    :

    ) 12.5 = 0.0625 C .

    ) B =6.458 .

    14.20

    :

    14.21

    :

    14.22

    :

    14.23

    :

    14.24

    :

     

    ) G 200 , 6 2 = 9.417 .

     

     

    ) G 100 100 12

    I: 2062, 2 1 @ 17.70

    5 % = 37.17 .

    Supply of elastomeric slab seal expansion joint assembly manufactured

    by using chloroprene, elastomeric for elastomeric slab unit conforming

    to clause 915.1 of IRC - 83 (part-II) complete as per approved drawings

    and standard specifications conforming to clause 2606 of MORT&H

    specifications = 1m per RM.

    / B (

    70 140 )

    Supply of a modular strip / box seal joint assembly comprising of edge

    beams, central beams, 2 modules chloroprene seal, anchorage

    elements, support and control system, all steel sections procted against

    corrosion and installed by the manufacturer or his authorized

    representative = 1 m per RM.

    / B (

    140 210 )

    C  

    , ,

    = 1

    / 3 /

    , , ,

    , ,

    )

    ,

    = 1

     

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    75/325

    (A) ; B A

    & 15.1

    &

     A. B

    :

    ) = 1 .) = 0.20 .

    15.2

    :

    ) = 1 .

    ) = 0.20 15.3

    :

    C G 15 = 1

    A I . 12.8.15.4

     A. B

    :

    ) 40 = 1

    ) 25 = 0.20 .

    B. C ( 0.3 0.3 0.3 )

    :

    C G 15 = 1

    A I . 12.8 .15.5

    :

    G = 1.20

    15.6

    :

    15.8

     A 1 : 3

    :

    ) C 1 : 3 = 0.33

    A I . 12.6

     

    ) 4 GI 100 100 = 3.91

     

    G 5 %

    = 1.05

    ( 0.5 0.5 0.5 )

     

    ) C 15 I . 12.8 = 1

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    76/325

    (A) ; B A

    &

    B C 15

    :

    ) C G 15 = 1

    A I . 12.8.

    ) C 15 = 1 15.9

    :

    ) = 1 .

    ) = 0.20 .15.10

     A 1 : 3

    :

    C (1 ) = 1

    A I . 12.7 (A).B C 15 :

    CC G 15 = 1

    A I 12.8.15.11

    :

    ) = 1 .

    ) = 0.20 .

    15.12

    :

    ) 200 = 1

    ) 25 = 0.20 15.13

    :

    ) 200 = 1

    ) 25 = 0.20

    1

      40  

    ) G 100 100

    4 GI = 4. 84

    ,

    ) G 100 100

    4 GI = 10.833

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    77/325

    (A) ; B A

    16.3

    :

    ) C = 16 .

    ) G = 0.04 .) 50 50 3 = 2 .) E = 0.67 .

    16.4

    :

    ) 1 . 16.5

     A C  

    :

    ) C 10 % = 1.10

    B C (1 : 1)

    :

    ) C 10 % = 0.55

    ) 10 % = 0.55 16.6

    16.6

    :

    16.7

    :

    E 10 % = 1.10 16.8

    :

    i) Epoxy Resin - Hardener Mix for Prime coat = 0.25 Kg. per Sqm.

    ) E = 0.22 . .

    ) E H = 0.20 . .

    16.9

     

    , 25

    ) A @ 4 % = 0.64

    .  

    .. / ( )

    25  

    ,     

    /

    /

     

    /

      2803.1

    ,  

     

     

    , . 2807.1 .. 2807.6

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    78/325

    (A) ; B A

    &

    ) = 0.015 C .

    ) C 4.75 = 0.015 C .

    ) = 0.25 . .

    ) = 0.01 .

    16.10

    : A 10

    ) A = 0.14 .

    16.11

    :

    16.12

    :

    = 25

    ) HDE 75 5 % = 112

    ) C = 400

    ) E = 6.00

    16.13

    :

    : 25 50

    ) HDE 90 5 % = 72.26

    ) C = 325.80

    ) E = 3.23

    ) 45 28

    = 1.2 . .

       45 28

    E 60 90 2803.9 = 0.80. .

      ,

    ) H 5 % = 1.05

    ) ( ) = 2.10

    ) ( )

    /  

    ,

       

    ) H 5 % = 1.05

    ) , ,

    . = 8 .

    ) , ,

    . = 2.58 .

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    79/325

    (A) ; B A

    & 16.14

    :

    = 50

    ) HDE 90 5 % = 72.41

    ) C = 327.59

    ) E =1.51

    16.15

    :

    = 1 16.16

    :

    C = 1 16.17

    :

    )C 30 = 0.3 . ..14.116.18

    :

    16.19

    :

    16.21

    :

    30 G = 0.03 C. ..14.1

    .

    16.22

    :

    30 G = 0.01 C. .

    A 14.1

    HD = 0.0013

    A 14.216.23

    :

    ) IC = 2.90 .

    ) E B . . @ 0.8 /. = 0.8 /.

    .

    . ( )

    ( )

    CC

      8

    ) H . 5% & = 1.05 /

      ,

       

     

    ) , , .

    =1.293 .

    ) ( ) = 2.16

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    80/325

      ()

    68 

    &

    . .

    () 

    :

    225 150 0.6

    40 0.24

    20 0.12

    0.18

    53 0.092 .

    ( 5% )

    10 : 10

    80/100 .

    .

    20 : 20 & .

    30 : 30

    . 60/70 .

    40 : 40 ,

    30/40 . ,

    .

    ()

    10 20 30 40

    , 60°, , 800 1600 2400 3200

    , 135°, , 250 300 350 400

    , °, 220 220 220 220

    , %, 99.0 99.0 99.0 99.0

    25° 80100 6080 5070 4060

    , °, 40 45 47 50

    / :

    . 60°, 4.0 4.0 4.0 4.0

    . 25°, , ,

    75 50 40 25

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    81/325

     

    CHAPTER -1

    LOADING, UNLOADING, STACKING ANDLOADING, UNLOADING, STACKING ANDLOADING, UNLOADING, STACKING ANDLOADING, UNLOADING, STACKING AND

    CARRIAGE OF DIFFERENT MATERIALSCARRIAGE OF DIFFERENT MATERIALSCARRIAGE OF DIFFERENT MATERIALSCARRIAGE OF DIFFERENT MATERIALS

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    82/325

     

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    83/325

    . .

    .

    &

    1

    2

    3

    4

    5

    6 10,

    /

    1()   , , , ,  

    1()   , , / ,

    , , ,

    115.50 127.90 140.40 152.80 165.30 10.70

    2   ( ), , .. 161.00 77.00 85.30 93.60 101.90 110.20 7.20

    1

    , , &

    102.00

    ,

    3   ( 460 150

    ) &

    7.50

    .. 225.27 77.00 85.30 93.60 101.90 110.20 7.20

    4     1000 .   194.50 277.10 307.00 336.90 366.80 396.70 25.80

    5     1000 .   291.80 415.70 460.50 505.40 550.20 595.10 38.70

         

    1. : 20% .

      2. : 30% .

      3. 460 : 70% .  4. , . & ' .

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    84/325

     

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    85/325

     

    CHAPTER -2

    SITE CLEARANCESITE CLEARANCESITE CLEARANCESITE CLEARANCE

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    86/325

     

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    87/325

    () ;

     (.)

    1 2 3 4 5

    1 ,

    ,

    ,  

    ,  

    , ,

    1000

    /. (

    &' 201)

    ) 300 600   218.60

    ) 600 900   396.70

    ) 900 1800   768.50

    ) 1800 1459.00

    2  

    :

    50

    . (

    &' 201)

      15312.00

    3  

                                        

       

                             

            

       

                

    ,

    , , ,

    300 ,

     

     

    , 1000

    150

    . ( &'

    201)

                                                                    

        .    1

       :            

    ,

    &,

    .

    2

                                 .

       

    75

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    88/325

    () ;

     (.)

    1 2   3 4   5

    3()

    3()()       46326.00

    3()()       62028.00

    3()  

    3()()       41915.00

    3()()     50782.40

    4

    , ,

     

    , ,

    , , &

    ,

    ,

    1000

    ( &'

    202)

    4()  

    4()

    4().  

    329.20

    4().  

    &

    390.50

    4().    

    &

    1020.60

    4()

    4().  

    &

    394.70

    ,

    &,

    .

    2

                                 .

       

                                           

           

                      

        .

        3   :            

                                     

          

           

                      

        .

        4   :

                

    76

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    89/325

    () ;

     (.)

    1 2   3 4   5

    4().  /  

    20 &

    675.50

    4()   /  4()       206.70

    4()       268.00

    4()       182.20

    4()     170.00

    4()  

    4()  

    .

    231.20

    4()    

    .

    268.00

    4()  

    .

    206.70

    4()     194.50

    4()   /

    .

    182.20

    4()  

    .

    206.70

    4()

    5 .

    486.90

    4()

    5

    .

    4()     1255.10

                                 .

    2

                                           

                             

        .    4   :            

        ,&,

    .

    77

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    90/325

    () ;

     (.)

    1 2   3 4   5

    4()   .   1023.00

    4()   () ()

    .

    9.10

    4()

    .

    4()   / 1000 .   1071.80

    4()     1000 .   382.80

    4()

    4()     432.90

    4()     89.80

    4()  

    /

    13.50

    4()

    1000

    .

    4()   600   158.40

    4()   600 900     216.40

    4()   900     369.60

     

     

     

     

     

     

     

    2

                                 .

          ,&,

    .

                                           

                                

     .    4   :            

    78

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    91/325

    () ;

     (.)

    1 2   3 4   5

    5

    1000 ,

    (

    &' 202)

    5()  

    5()     607.60

    5()     434.90

    5()  

    5()     245.00

    6

     

    1134.00

        .

    ,

    0.25 .. .

    80.50 .

        ,&,

    .

    2

                                

                                           

                             

           .

        5    &    6   :            

    ,

    0.02

    1000 ,

    (

    &' 202)

    79

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    92/325

    () ;

     (.)

    1 2   3 4   5

    7

    1000 ,

    &

    & (

    &' 202).

    65.40    

    8

    1000 (

    &' 202).

    12.81    

    9

     

    1000 (

    &'

    202).

    19.20    

    10

    ,

    1000

    &  ( &'

    202).

    10 5     391.30    

    10     192.10    

    10   38.40    

                                 .

          ,&,

    .

    2

    80

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    93/325

    () ;

     (.)

    1 2   3 4   5

    11

    /

    ,

    ,  

    &

     

    1000 ,

    ( &'

    202).

    42.40    

    12

    600

    1000

     

    ( &'

    202).

    107.70  

       

    .

    13

    143.50    

     

    1500

     

    1000  

    ,

    &

    ( &'

    202). (...)

    2

                                 .

          ,&,

    .

    81

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    94/325

    () ;

     (.)

    1 2   3 4   5

       

     

    14 /

    /

    ,

    1000

    ,

    &

    ( &'

    202).

    147.90    

                                

          ,&,

    .

    2

    82

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    95/325

     

    CHAPTER -3

    EARTH WORK, EROSION CONTROL ANDEARTH WORK, EROSION CONTROL ANDEARTH WORK, EROSION CONTROL ANDEARTH WORK, EROSION CONTROL AND

    DRAINAGESDRAINAGESDRAINAGESDRAINAGES

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    96/325

     

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    97/325

    (A) ; A

     (.)

    1   2   3 4   5

    1  

    1000 (

    &' 301).

    156.50    

     

    ,

    (.. .40.90) .

    2  

     

    A 3A, A AA

                                

       ,&,

    .

    1000 (

    &' 301)

    220.30    

     

    ,

    (.. . 40.90   ) .

    3  

    100

    137.70    

     

    100

    ( 50 ),

    ,

    ( &'

    301).

    85

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    98/325

    (A) ; A

     (.)

    1 2 3 4 5

    4

    100

    , 80

     

    100

    ( 50 ),

    ,

    (

    &' 301).

    5 (

    ) 1000

    284.90

    232.40

     

              6   :            

    A 3A, A AA

                                

          ,&,

    .

    ( ) ,

    ,  

    ,

    ,  

    1000 ( &'

    301).

      1.

    .

     2.  

    ,

    .

    6

    90

    1000 .

    52.20

                                              

                          

        .

                      4

     

    0.9  

    , ,

    , ,

    1000

    ( &'

    301).

    86

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    99/325

    (A) ; A

     (.)

    1   2   3 4   5

    7

    90

    1000

    .

      65.60

    0.9

    ,

    1000 ,

    ,

    ( &'

    301).

    8   (

    A 3

    A, A AA

                                

          ,&,

    .

    )

     

    ( )  

    ,

    1000

    ,

    ,

    (

    &' 301).

      1.  

    .

     2. 50  

    .

    3. ,  

      .

    4.  

    ,  

    .

    87

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    100/325

    (A) ; A

     (.)

    1   2   3 4   5

    8A     428.70  

    8         1033.00   9 (

    ) 1000

    ,

    ,

    ,

    ,

    1000 ( &'

    301).

    328.50  

      1. 50  

    ,  

    .

    A 3A, A AA

                                

          ,&,

    .

    .

    ,

    .

    10     57.80

    0.9

    1000 ,

    ,

    (

    &' 301).

    11  

    1000

    52.80  

       

    .

    ()

    ,

    1000

    305

    ( &'

    301).

    88

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    101/325

    (A) ; A

     (.)

    1   2   3 4   5

    , ,

     

    305.

    12  

    121.10

     

    ,

    80 ,

    1000 ,

    A 3

     

    A, A AA

                                

          ,&,

    .

    .

    &' 303).

    13  

    ,

    ,

    ,

    ,

    ,

    ( &'

    304).

    13()  

    13()A   ( 3 ) 245.00        

    10  

    .. . 24.50  

    .

    89

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    102/325

    (A) ; A

     (.)

    1   2   3 4   5

    13()

    ( 3 )   36.20    

      5  

    ..  

    4 ,

    .

    .

    13() (

    )

    13()A   ( 3 ) 306.20     10  

    ; .. . 30.60 ,

    .  

    A 3

    A, A AA

                                

          ,&,

    .

    .

    13()     47.40  

      1. 5  

    .. 4

    , .

     

    .

    13()  ( )

    13()

     A

      493.80

      10  

    ; .. . 38.50 ,

    .  

    .

    13()   ( )

    13()

     A

      494.10  

      1. 5  

    .. 4

    ,  

     

    .

    ()

    90

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    103/325

    (A) ; A

     (.)

    1   2   3 4   5

     2. ,  

    3  

    .

    13()  

    13()A  ( 3 )

    531.40   .

      1. 30  

    .. . 92.00 ,

    , .  

    .

     2. & 20  

    .. . 61.25,  

     

    A 3

    A, A AA

                                

          ,&,

    .

    .

    13()   233.50

      1. 20  

    & ...22.50  

    , .

     2. & 10   & .. .11.25,

    .

    3.

    3 .

    14  

    50

    21.80

    .

    50

    1000

    ( &'

    305.4.3).

    91

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    104/325

    (A) ; A

     (.)

    1   2   3 4   5

    15  

    50

    4.70

    50

    1000

    ( &'

    305.4.3).

    16    

    381.00

    ,

    , ,

    ( &

    :

    )

                                

          ,&,

    .

    A 3

    A, A AA

    3002

    ( &'

    305).

    17  

    87.70  

     

     

    . . , .. .

     238.00/3

    . 4.  

    .

    3002

    ( &'

    305). (...)

    92

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    105/325

    (A) ; A

     (.)

    1   2   3 4   5  

    ,

    .. . 19.80/3

    (. 4)

    . ,

    ,

    .

    18  

    413.50

    &

    ( &

    :

    )

    A 3A, A AA

                                

          ,&,

    .

    , , ,

    . 3002

    ( &'

    305).

    19  

     

    58.40  

     

    500 ,

    ,

    3002

    (

    &' 305.3.4).

     

     

    29.90  

    ,

    , 150

    ,

    3002

    .( &'

    305.3.4).

    93

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    106/325

    (A) ; A

     (.)

    1   2   3 4   5

    20     193.40   ,

    15

    ,

     

    (

    &' 305).

    21 ,

    A

     A .

    82.60  

    ,

    ,

    A 3

    A, A AA

                                

          ,&,

    .

    22       29.50

     

    ,

    ,

    ( &'

    307).

    23   121.20

    ,

    .

     A  

    .

    A, .

    3.23

    .

    ,  

    , , ,

    0.23

    ,

    3

    308 ( &'

    308).

    .

    .

    94

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    107/325

    (A) ; A

     (.)

    1   2   3 4   5

    24  

    0.40

    , ,

    301

    309.

    50

    ( 25 )

    ( &' 309).

    24A     . 53.90  

    24     . 61.20  

      ,

    A 3

    A, A AA

                                

          ,&,

    .

     

       

    /  

    .

    25    

    0.4

    , ,

    301 309.

    (

    &' 309).

    25A     . 109.10  

    25     . 91.90  

    26    

    . ()

    95

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    108/325

    (A) ; A

     (.)

    1   2   3 4   5

    ,

    (

    &' 309).

    27  

    100

    / /

    /, ,

    3 6

    , 150

    300

    ,  

    450 550 .

    . 171.10

    / /

    A,

    . .3.27 .

    A 3

    A, A AA

                                

          ,&,

    .

     

    ( &'

    309).

     

    .

    28   A

    300 450

    3004,

    ( &'

    309).

    . 41.80  

     

     

    29  

      306.00

    1 1 ( )

    ... (20) , 20

    (20) , 10

    (

    &' 309).

    96

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    109/325

    (A) ; A

     (.)

    1   2   3 4   5

    30  

    . 1.70  

     

    ,

    ,

    , ,

    810

    ,

    310 ( &'

    310).

    31

      52.90  

     

    A 3

    A, A AA

                                

          ,&,

    .

    500

    ,

    ,

    , 313

    ( &'

    313).

     

    .

    32   A A

    A

    153.40  

    1000

    ( &'

    301).

     

    ,

      ()

    97

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    110/325

    (A) ; A

     (.)

    1   2   3 4   5

    ; .. . 53.30

    .

    33   A

    .

    226.60    

    1000 (

    &' 301).

    A, A AA

                                

     

    A 3

    ,

    &,

    .

     

     

     

    ,  

    ; .. . 68.70

    .

    34   A

    277.60

    ,

     

    1000 (

    &' 301).

      1.  

     

    ,  

    (... 68.70)

    .

    98

  • 8/17/2019 WB Pwd Schedule-sor Nh 2015-16

    111/325

    (A) ; A

     (.)

    1   2   3 4   5

    35  

    :

    )

    , , ,

    /

    .

    10 15 .

                                

       

    A 3

    )  

    A, A AA

    ,

    &,

    .

    )

    .

    ,

    ,

    ,

     

    .

    )