Increased demand for renewable energy Wave Power – Renewable energy at a competitive price Energy from waves will be a part of the future!

Wave Power Renewable energy at a competitive price · EUR 1.5M Investors • EUR 400K Grants+ EUR 810K Patent, Legal, Adm Project 80 % direct project related Prototype Phase Deploy

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Wave Power Renewable energy at a competitive price · EUR 1.5M Investors • EUR 400K Grants+ EUR 810K Patent, Legal, Adm Project 80 % direct project related Prototype Phase Deploy

Increased demand for renewable energy

Wave Power – Renewable energy at a competitive price

Energy from waves will be a part of the future!

Page 2: Wave Power Renewable energy at a competitive price · EUR 1.5M Investors • EUR 400K Grants+ EUR 810K Patent, Legal, Adm Project 80 % direct project related Prototype Phase Deploy

Executive Summary

• Looking for EUR 400K from investors

In 2017 - 2019 • Partnership with industry • Possible exit for investor • Multiple of 20 – 100 times

payback

Value Proposition

Requirements and Exit

• Patented Technology • Reduction of costs on wave energy by a factor 20

Page 3: Wave Power Renewable energy at a competitive price · EUR 1.5M Investors • EUR 400K Grants+ EUR 810K Patent, Legal, Adm Project 80 % direct project related Prototype Phase Deploy

Existing technologies struggle with high costs

Potential: EUR 600 Bn per year / 2000 GW

Energy from waves has a large potential

We have the solution

Page 4: Wave Power Renewable energy at a competitive price · EUR 1.5M Investors • EUR 400K Grants+ EUR 810K Patent, Legal, Adm Project 80 % direct project related Prototype Phase Deploy

1,5 MW system

Very low weight! Very robust! Very cost efficient!

Weight = Costs

2400 Tons Wavestar

3600 Tons Pelamis

2700 Tons Oyster

510 Tons Seabased

158 Tons

Page 5: Wave Power Renewable energy at a competitive price · EUR 1.5M Investors • EUR 400K Grants+ EUR 810K Patent, Legal, Adm Project 80 % direct project related Prototype Phase Deploy

Fully Automatic Production

Standard Transportation

Inspired by the ”Flat Pack” principle

Custom production

Custom transportation

Page 6: Wave Power Renewable energy at a competitive price · EUR 1.5M Investors • EUR 400K Grants+ EUR 810K Patent, Legal, Adm Project 80 % direct project related Prototype Phase Deploy

One module (‘Energy Collector’)

In a system of strings and modules

Simple Deployment! High Redundancy!

Scalable!

Many modules – One system

Page 7: Wave Power Renewable energy at a competitive price · EUR 1.5M Investors • EUR 400K Grants+ EUR 810K Patent, Legal, Adm Project 80 % direct project related Prototype Phase Deploy

Nonintrusive – Almost Invisible

Looking at a 7MW system

Page 8: Wave Power Renewable energy at a competitive price · EUR 1.5M Investors • EUR 400K Grants+ EUR 810K Patent, Legal, Adm Project 80 % direct project related Prototype Phase Deploy

20

10

50

30

40

100

Cost of Energy (EUR / MWh)

The Result – A Very Competitive Price

Wavepiston Potential

EUR 27 / MWh

Page 9: Wave Power Renewable energy at a competitive price · EUR 1.5M Investors • EUR 400K Grants+ EUR 810K Patent, Legal, Adm Project 80 % direct project related Prototype Phase Deploy

Issued in 2009

+

Broad, Conceptual Patent

Ongoing

Page 10: Wave Power Renewable energy at a competitive price · EUR 1.5M Investors • EUR 400K Grants+ EUR 810K Patent, Legal, Adm Project 80 % direct project related Prototype Phase Deploy

Market, Customers and Turnover

Total Potential 2000 GW

Market Size 17 GW

Wavepiston 3 GW

Forecast 2028 Wavepiston Turnover (EUR ‘000)

A small part of the potential – Still a very interesting business

2019 - First year of turnover

2028 – Last year of patent

Customers – We start with small scale

Utilities and Energy Service Companies • Invest in large scale energy parks • Also potential future partners

Islands and Coastal Communities • Invest in small scale energy solutions • Less price sensitive • Good access to funding and subsidies

– And then large scale

Page 11: Wave Power Renewable energy at a competitive price · EUR 1.5M Investors • EUR 400K Grants+ EUR 810K Patent, Legal, Adm Project 80 % direct project related Prototype Phase Deploy

Technology validated

• Theoretical

• Proof of Concept

• Experimental

• External Evaluators

Grant EUR 650K

Calculations validated by leading engineering consultancy company (Niras)

Tested and validated in wave tank at Aalborg University

Proof of Concept in scale 1:9 at test centre DanWEC, Nissum Bredning

2010 - 2013 2014

Grant EUR 50K

Page 12: Wave Power Renewable energy at a competitive price · EUR 1.5M Investors • EUR 400K Grants+ EUR 810K Patent, Legal, Adm Project 80 % direct project related Prototype Phase Deploy

Construction & Hydrodynamics, Kristian Glejbøl. M.Sc. Mech. Eng., Ph.D. Material Science. > 20 years offshore and product development (NOV, NKT, Novo Nordisk) > 60 patents

CTO & Design, Martin von Bülow. B.Sc. Mech. Eng. > 16 years product development (Coloplast, Novo Nordisk)

CEO, Michael Henriksen. M.Sc. Econ. & Bus. Adm. > 15 years financial industry (Nordea, Nykredit, SDC) and 3 startups.

Composites & Production, Paul Harder Cohen. > 30 years marine industry

The Team

Chairman of the board, Asger Kej. M.Sc. Civ. Eng. > 40 years water environment, management and CEO (DHI Group)

We have the competences ready for the next phase

Numerical Modelling, Troels V. Lukassen. M.Sc. Mech Eng.

Page 13: Wave Power Renewable energy at a competitive price · EUR 1.5M Investors • EUR 400K Grants+ EUR 810K Patent, Legal, Adm Project 80 % direct project related Prototype Phase Deploy

Plan 2015 - 2017

2015 2016 2017 2018 2019 2020 2021

Use of Funds Funding One - Planned Sources

Founders EUR 240K

EUR 1.5M

Investors EUR 400K

Grants+ EUR 810K

Patent, Legal, Adm

Project

80 % direct project related Prototype Phase • Deploy a Wavepiston system

off the coast of Hanstholm to validate the full potential.

• Keep relevant industrial players up-to-date with progress to prepare for partnership.

Prototype Commercialisation Global

Current Partners: Experts in offshore hydraulics, mooring, hydrodynamics and testing wave power

• Construction and test of the Wavepiston system

• Produce power • Refine hydrodynamic model => Validate the full potential of

Wavepiston

Page 14: Wave Power Renewable energy at a competitive price · EUR 1.5M Investors • EUR 400K Grants+ EUR 810K Patent, Legal, Adm Project 80 % direct project related Prototype Phase Deploy

Plan 2017 - 2019

Prototype Commercialisation Global

2015 2016 2017 2018 2019 2020 2021

In dialogue

We are looking for more...

Keep updated

Value inflection points in 2017 and 2019

Possible exit for investor!

Commercialisation Phase • Partnership with large

industrial player • Deploy full scale Wavepiston

system • First commercial small scale

projects (Islands / Coastal Communities)

Page 15: Wave Power Renewable energy at a competitive price · EUR 1.5M Investors • EUR 400K Grants+ EUR 810K Patent, Legal, Adm Project 80 % direct project related Prototype Phase Deploy

Global

Plan 2020 - ...

Prototype Commercialisation

2015 2016 2017 2018 2019 2020 2021

Global Phase • Being partner in a large indu-

strial company - Go Global! • Large scale systems,

production, infrastructure, sales etc.

• Exploit synergies with offshore wind

• Continue with small scale projects

Worlwide Near-Shore Potential Min. 30.000 km relevant coast line By exploiting 10 % 20 – 30 GW EUR 25Bn – 40Bn

Our first step is to exploit the near-shore potential

Page 16: Wave Power Renewable energy at a competitive price · EUR 1.5M Investors • EUR 400K Grants+ EUR 810K Patent, Legal, Adm Project 80 % direct project related Prototype Phase Deploy

Financials - Valuation

Founders EUR 170K

Capital Increase EUR 0.6M

Investors EUR 400K

+

Post-Money EUR 1.6M

=

Equity EUR 70K

IPR+ EUR 130K

Grant+ EUR 810K

Founders EUR 170K

Investors EUR 400K

25 % 50 %

25 %

Equity EUR 70K

IPR+ EUR 130K

Grant+ EUR 810K

Pre-Money EUR 1M

• Patent • Knowledge • 12,000 hours • EUR 300K

• ForskEL: 650K • H2020: 50K • Tax Credit: 110K

Page 17: Wave Power Renewable energy at a competitive price · EUR 1.5M Investors • EUR 400K Grants+ EUR 810K Patent, Legal, Adm Project 80 % direct project related Prototype Phase Deploy

Financials - Valuation

2015 2016 2017 2018 2019 2020 2021

Budget I EUR 1.5M

Prototype Commercialisation Global

Budget II EUR 3M

A

Score Card (other companies)

B

Budget III EUR 5-10M

NPV EUR 40 – 200M

NPV EUR 80 – 400M

Market value of other wave power companies is EUR 8M – 80M.

Wavepiston is better! Exit A: EUR 40M – 200M Exit B: EUR 80M – 400M

Value EUR 1.6M

Page 18: Wave Power Renewable energy at a competitive price · EUR 1.5M Investors • EUR 400K Grants+ EUR 810K Patent, Legal, Adm Project 80 % direct project related Prototype Phase Deploy

Financials – Risks and Funding

2015 2016 2017 2018 2019 2020 2021

Budget I EUR 1.5M

Prototype Commercialisation Global

Budget II EUR 3M

Budget III EUR 5-10M

Grant+: EUR 1.5M Investors: EUR 1.5M

Grant+: EUR 810K Investors: EUR 400K Founders: EUR 240K

Tech Risk

Market Risk

Market Value

Step wise funding as risks decrease.

Page 19: Wave Power Renewable energy at a competitive price · EUR 1.5M Investors • EUR 400K Grants+ EUR 810K Patent, Legal, Adm Project 80 % direct project related Prototype Phase Deploy

“For WECs, the key to successful commercialization is the right combination of low cost, good conversion efficiency, and survivability. Wavepiston, because of its unique design is poised to offer a breakthrough in all three categories.” C.A. Goudey & Associates

“…Wavepiston have come up with what is in my opinion likely to be the first commercial viable wave energy harvesting device.” Julian Smith, CENG MRINA. Naval Architect and Structural Engineer Please contact us for further details.

Michael Henriksen, [email protected], +45 40 99 40 40

Simple, Robust,

Standard,

Invest EUR 400K,

ROI EUR 10M+

Broad, Conceptual

Patent

Competitive Renewable

Energy