Upload
mathias-makozh
View
214
Download
0
Embed Size (px)
DESCRIPTION
Template for creating waterfall graph
Citation preview
Status
Cost EngineeringShould Cost Waterfall
Part Number - - Should Cost 0.00GBPDescription0.00Country Of ManufactureUK
GBP
Should Cost Number- Rev Period1/1/12ClassificationShiftDoubleLife (yrs.)700ModelL405Annual Qty48,000CPSC II Code0Jaguar Landrover ConfidentialPrinted By: RGREER11 on 06/04/2012Page 1 of 1Should Cost Report
Base Data
Cost EngineeringShould Cost Waterfall - Base Details
Part Number Details
PrefixBaseSuffixSub CodePart Description
CountryUKClassificationCurrencyGBPPeriod1/1/12ShiftDoubleCPSC II Code
Estimator NameRichard GreerModelL405Creation Date23/10/2012Programme Life (yrs.)7Modification Date23/10/2012Annual Quantity48,000
RevShould Cost NumberSupplier NameMr ???Process Plan Number
Cost Element Details
Raw MaterialsBOPProcessSetupOtherHandlingSG&AProfitTotal Part CostGapSupplierTargetTargetStatusShould CostGapGapSupplierJLR Cost Engineering0.0000.000.00JLR Cost Engineering0.0000.0000.0000.0000.000.00Base value0.0000.0000.0000.0000.0000.0000.0000.00Base value0.0000.0000.0000.000.0000.000Estimator NameDABHI, PARESH0.0000.000Estimator Name0.0000.000Created Date09/02/20120.0000.000Created Date0.0000.000Modified Date09/02/20120.0000.000Modified Date0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000Mr ???0.00002.9003.5001.5000.500Base value0.000.000.000.000.000.000.000.00Base value0.000.000.000.000.000.002.902.900.000.006.406.400.000.007.907.900.000.008.400.000.000.000.000.000.000.000.00SP End value0.000.000.000.000.000.000.000.000.000.00SP End value0.000.000.000.00ERROR:#REF!CE End Value0.000.000.000.000.000.000.000.000.000.000.00CE End Value0.000.000.000.000.000.00
Raw MaterialsBOPProcessSetupOtherHandlingSG&AProfitTotal Part CostGapSupplierProfitSG&AHandlingOtherSetupProcessBOPRaw MaterialsRaw MaterialsBOPProcessSetupGapSupplierProfitSG&AHandlingOtherSetupProcessBOPRaw MaterialsCost estimation0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00Cost estimation0.000.000.000.000.000.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!0.501.503.502.90Base value0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00Base value0.000.000.000.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00ERROR:#REF!0.000.000.000.000.000.000.000.000.000.00ERROR:#REF!ERROR:#REF!0.000.00ERROR:#REF!ERROR:#REF!0.000.00ERROR:#REF!ERROR:#REF!0.000.00ERROR:#REF!ERROR:#REF!0.000.000.000.000.000.000.000.000.000.000.000.00
Total Part CostBOPRaw MaterialsProcessSetupOtherMarkupSupplierGapTotal Part CostTotal Part CostBOPRaw MaterialsProcessTotal Part CostCost gap0.0000.0000.0000.0000.0000.0000.0000.0000.0000.000Cost gapERROR:#REF!3.5002.9001.500ERROR:#REF!Base value0.0000.0000.0000.0000.0000.0000.0000.0000.0000.000Base valueERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!Total Part CostBOPRaw MaterialsProcessSetupOtherMarkupSupplierGapTotal Part CostTotal Part CostBOPRaw MaterialsProcessTotal Part Cost
Cost before uplift00ERROR:#REF!ERROR:#REF!Cost after upliftCost before uplift00ERROR:#REF!Uplifts:0.0000.0000.000ERROR:#REF!ERROR:#REF!ERROR:#REF!Uplifts:ERROR:#REF!0.0000.000ERROR:#REF!base value00.0000.0000.000ERROR:#REF!0.000base value0ERROR:#REF!ERROR:#REF!ERROR:#REF!
Page 1 of 1Jaguar Landrover ConfidentialShould Cost Waterfall - Base Details
Should Cost
Cost EngineeringShould Cost Waterfall
Part Number - - Should Cost 0.00GBPDescription0.00Country Of ManufactureUK
GBP
Should Cost Number- Rev Period1/1/12ClassificationShiftDoubleLife (yrs.)700ModelL405Annual Qty48,000CPSC II Code0Jaguar Landrover ConfidentialPrinted By: RGREER11 on 06/04/2012Page 1 of 1Should Cost Report
Cost Buildup
Cost EngineeringShould Cost Vs. Supplier Variance Analysis
Part Number - - Cost Engineering Should Cost 0 GBPDescription0.00Supplier: Mr ??? Cost0 GBPCountry Of ManufactureUKGap to Should Cost0.00ERROR:#DIV/0!
GBPGBP
Should Cost Number- Rev Period01/01/2012ClassificationShiftDoubleLife (yrs.)700ModelL405Annual Qty48,000CPSC II Code0Jaguar Landrover ConfidentialPrinted By: RGREER11 on 06/04/2012Page 1 of 1Should Cost Vs. Supplier Variance Analysis
Gap Analysis
- - - Main Gap Analysis
Part Number - - Should Cost Number12/31/99Period01/01/2012ClassificationCost Engineering Should Cost 0.0Description0.00ShiftDoubleProg. Life700Supplier: Cost0.0Country Of ManufactureUKCurrencyGBPModelL405Annual Qty48,000CPSC II Code0Gap to Should Cost0.0ERROR:#DIV/0!
CHALLENGES:Recommended Next Steps
11..2233.44..Jaguar Landrover ConfidentialShould Cost Vs. Supplier Variance Analysis
Should Cost Make-up Cost Comparision GAP Information
Item 1Item 2Item 3Cost Status Comments
Item 1Item 2Item 3