1
Abu Seif: Implemenng Agency: OXFAM and NRC Funconality: Not Funconal Timeline: The full rehablitaon is ongoing by OXFAM Old Leſt: Implemenng Agency: UNICEF and HRF Funconality: Funconal Rashidiya: Implemenng Agency: ICRC Funconality: Not Funconal Assessment: reported damage to pumps and transformers Timeline: 30 November New Leſt: Implemenng Agency: DRC and UNDP Funconality: Funconal Timeline: 15 November for UNDP full rehabilitaon Aden Al-Adel Al-Baladyat Al-Batool Al-Hadbah Al-Hashema Al-Jamiaa Al-Karama Al-Khathra Al-Kindy Al-Masarif Al-Mashraq Al-Moharebeen Al-Nahda Al-Qahira Al-Qayrawan Al-Qudus Al-Rahmaa Al-Sadeeq Al-Samah Al-Senaa Al-Suqar Al-Tahrir Al-Wahda Bab Shams Cemetery Falastin Jaber Bin Hayyan Jarf Almawsil Military Area Tarek Ben Zyad Younis Al-Sabaawe Al-Rasheed Al-Rasheed Ibn Khaldoun Kolan Kolan Al-Andalus Al-Araby Al-Athar Al-Dobat Al-Faysalya Al-Gazaer Al-Ghabat Al-Gofran Al-Malya Al-Markaz Al-Jamiy Al-Mohandiseen Al-Nabi Younis Al-Naser Al-Numaniya Al-Shortah Al-Swais Al-Thaqafah Al-Turath Al-Zeraee Bab Nergal Mohammed Alfatih Mosa Ben Nasear Al-Hureia Al-Mamun Al-Shaymaa Summer Al-Salam ۳۰Tammuz Al Mrur Al-Afraah Al-Akhaa Al-Baraka Al-Bareed Al-Ealaam Al-Farabe Al-Fathl Al-Mothana Al-Noor Al-Taameem Al-Zohoor Al-Fawqania Al-Istiqlal Al-Khlud Al-Qawsiat Al-Sada Al-Zaitoon Jawania Rashedeya Al-Ahmadiya Al-Khatunia Al-Maedan Al-Mansuriya Al-Mushahada Al-Nabi Jarjes Al-Najar Al-Refaee Al-Shifaa Bab Albaeth Badr Alkubra Hawi Alkanisa Khazraj Al-Abasia Qtheb Alban Shex Abu Al Allaa Suq Al Mousl Uhud Al-Rabee Ibn Khaldoun Myasa Al-Dawassa Al-Egedat Bab Al-Jadeed Mala Othman Al-Mosle Al-Jawsq Al-Khizlani Al-Kuwait Al-Mansoor Al-Tayaran Wadie Hagar Abi Tamam Agadeer Al-Bawasil Al-Ezdehar Al-Ezdihar Al-Iqtisadin Al-Islah Al Ziraee Al-Izdihar Al-Jadeed Al-Jihad Al-Maamoon Al-Magrbe Al-Mansoor Al-Mikanik Al-Mustaqbal Al-Nedaa Al-Rafidain Al-Rahman Al-Safaa Al-Snaa Al-Thawra Al-Uruba Al-Yarmook Bab Snjar Ibn Alather Mosul Al-Gadeeda Nablus Ragem Hadead Tal Al-Romman Tal Al-Romman and Hae Al Shuhada Al Adil PS Al Akha'a PS Al Dawasa PS Al Ma'amon apartments PS Al Ma'amon PS Al Mansour new PS Al Mansour old PS Al Mintaqah Al Qlea'at BS no.1, 2, & 3 PS Al Rafidain PS Al Yarmok apartments PS Al Zahra/Al Qadasiya secondary PS Al Zuhoor and Al Danadan low lift PS Al-Quds 1 PS Gogjali PS Judayda al-Mufti Ninawa Al Sharqiyah 1 Right bank WTP BS1 Right bank WTP BS2 Tal Al Ruman PS Wadi Akab BS Bab Shams Hadba'a Intisar Khadra'a Masarif Mulawatha WTPs Pumping Stations Water Treatment Plants Al-Guba (New Left bank) Al-Qosur (Old Left Bank) Al-Sahiroon Al-Zuhor Al-Rashidiya Old Right Bank Al-Danadan Al-Ghizlani New Right bank Water Treatment Plants and Pumping Stations Distribution in Mosul City New Right: Implemenng Agency: DRC and UNDP Funconality: Funconal. DRC emergency works complete 10th Sept. UNDP installed an electrical line from Qoba to New Right in June 2017. Al Zuhour: Implemenng Agency: UNDP Funconality: Funconal Danadan: Implemenng Agency: UNDP Funconality: Not Funconal Assessment: Revision of B.O.Q. Approximate Timeframe: 4-3 months inclding internaonal procurement Nasej Factory: Implemenng Agency: ? Funconality: ? Timeline: ? Al Ghizlani: Implemenng Agency: OXFAM Funconality: Funconal Al Sahroon: Implemenng Agency: UNICEF and UNDP Funconality: Funconal Hammam Al Alil: Implemenng Agency: SCI and ICRC Funconality: Funconal 08 November 2017 Updated on: 08 November 2017. Sources: UNICEF WASH Secon, Ninewa DoW, WASH Cluster, Water Trucking TWG. Info: Karam Hindi - [email protected] Old Right: Implemenng Agency: DoW, UNICEF Funconality: Funconal Assessment: Four chlorinaon units needed and pipeline network need repair.

Water Treatment Plants and Pumping Stations Distribution ... · Al-Adel Al-Baladyat Al-Batool A l-Hadbah Al-Hashema Al-Jamiaa A l-Karama Al-Khathra Al-Kindy Al-Masarif Al-Mashraq

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Water Treatment Plants and Pumping Stations Distribution ... · Al-Adel Al-Baladyat Al-Batool A l-Hadbah Al-Hashema Al-Jamiaa A l-Karama Al-Khathra Al-Kindy Al-Masarif Al-Mashraq

Abu Seif:Implementing Agency: OXFAM and NRCFunctionality: Not FunctionalTimeline: The full rehablitation is ongoing by OXFAM

Old Left:Implementing Agency: UNICEF and HRFFunctionality: Functional

Rashidiya:Implementing Agency: ICRCFunctionality: Not FunctionalAssessment: reported damageto pumps and transformersTimeline: 30 November

New Left:Implementing Agency:DRC and UNDPFunctionality: FunctionalTimeline: 15 November for UNDP full rehabilitation

Aden

Al-AdelAl-Baladyat

Al-Batool

Al-Hadbah

Al-Hashema

Al-Jamiaa

Al-Karama

Al-Khathra

Al-Kindy

Al-Masarif

Al-Mashraq

Al-Moharebeen

Al-Nahda

Al-QahiraAl-Qayrawan

Al-Qudus

Al-Rahmaa

Al-Sadeeq

Al-Samah

Al-Senaa

Al-Suqar Al-Tahrir

Al-Wahda

Bab Shams

Cemetery

Falastin

Jaber BinHayyanJarf Almawsil Military Area

TarekBen Zyad

YounisAl-Sabaawe

Al-Rasheed

Al-Rasheed

Ibn Khaldoun

Kolan

Kolan

Al-Andalus

Al-Araby

Al-Athar

Al-Dobat

Al-Faysalya

Al-Gazaer

Al-Ghabat

Al-Gofran

Al-Malya

Al-MarkazAl-Jamiy

Al-Mohandiseen

Al-NabiYounis

Al-NaserAl-Numaniya

Al-Shortah

Al-Swais

Al-ThaqafahAl-Turath

Al-Zeraee

BabNergal

MohammedAlfatih

MosaBen Nasear

Al-Hureia

Al-Mamun

Al-Shaymaa

Summer

Al-Salam

۳۰TammuzAl Mrur

Al-Afraah

Al-Akhaa

Al-Baraka

Al-Bareed

Al-Ealaam

Al-Farabe

Al-FathlAl-Mothana

Al-Noor

Al-Taameem

Al-Zohoor

Al-Fawqania

Al-IstiqlalAl-Khlud

Al-Qawsiat

Al-Sada

Al-ZaitoonJawania

Rashedeya

Al-AhmadiyaAl-Khatunia

Al-Maedan

Al-Mansuriya

Al-MushahadaAl-NabiJarjes

Al-Najar

Al-Refaee

Al-Shifaa

BabAlbaeth

Badr Alkubra

Hawi Alkanisa

Khazraj

Al-Abasia

QthebAlban Shex Abu

Al Allaa

Suq Al Mousl

Uhud

Al-Rabee

Ibn Khaldoun

Myasa

Al-DawassaAl-Egedat

Bab Al-Jadeed

MalaOthmanAl-Mosle

Al-Jawsq

Al-Khizlani

Al-Kuwait

Al-Mansoor

Al-Tayaran

Wadie Hagar

Abi Tamam

Agadeer

Al-Bawasil

Al-Ezdehar

Al-Ezdihar

Al-Iqtisadin

Al-IslahAl Ziraee

Al-IzdiharAl-Jadeed

Al-Jihad

Al-Maamoon

Al-Magrbe

Al-Mansoor

Al-Mikanik

Al-Mustaqbal

Al-Nedaa

Al-Rafidain

Al-Rahman

Al-Safaa

Al-Snaa

Al-Thawra

Al-UrubaAl-Yarmook

BabSnjarIbn Alather

MosulAl-Gadeeda

NablusRagem Hadead

Tal Al-RommanTal Al-Romman

and Hae AlShuhada

Al Adil PS

Al Akha'a PS

Al Dawasa PS

Al Ma'amonapartments PS

Al Ma'amon PS

Al Mansournew PS

Al Mansourold PS

Al Mintaqah

Al Qlea'atBS no.1,

2, & 3 PS

Al Rafidain PS

Al Yarmokapartments PS

Al Zahra/AlQadasiyasecondary PS

Al Zuhoor andAl Danadanlow lift PS Al-Quds 1 PS

Gogjali PS

Judaydaal-Mufti

Ninawa AlSharqiyah 1

Right bankWTP BS1

Right bankWTP BS2

Tal AlRuman PS

Wadi Akab BS Bab Shams

Hadba'a

Intisar

Khadra'a

Masarif

Mulawatha

WTPsPumping Stations

Water Treatment Plants

Al-Guba (New Left bank)

Al-Qosur (Old Left Bank)

Al-Sahiroon

Al-Zuhor

Al-Rashidiya

Old Right Bank

Al-Danadan

Al-Ghizlani

New Right bank

Water Treatment Plants and Pumping Stations Distribution in Mosul City

New Right:Implementing Agency: DRC and UNDPFunctionality: Functional.DRC emergency works complete 10th Sept. UNDP installed an electrical line from Qoba to New Right in June 2017.

Al Zuhour:Implementing Agency: UNDPFunctionality: Functional

Danadan:Implementing Agency: UNDPFunctionality: Not FunctionalAssessment: Revision of B.O.Q.Approximate Timeframe: 4-3 monthsinclding international procurement

Nasej Factory:Implementing Agency: ?Functionality: ?Timeline: ?

Al Ghizlani:Implementing Agency: OXFAMFunctionality: Functional

Al Sahroon:Implementing Agency: UNICEF and UNDPFunctionality: FunctionalHammam Al Alil:

Implementing Agency: SCI and ICRCFunctionality: Functional

08 November 2017

Updated on: 08 November 2017. Sources: UNICEF WASH Section, Ninewa DoW, WASH Cluster, Water Trucking TWG. Info: Karam Hindi - [email protected]

Old Right:Implementing Agency: DoW, UNICEFFunctionality: FunctionalAssessment: Four chlorination units needed and pipeline network need repair.