Water Supply Major project components. Intake channel ( 2000 MLD) Intake PS ( 2000 MLD) Intake pumps Ph-1: 525 MLD Raw water pipeline to WTP Ph-1: ( 525 MLD) Treated water pipes to Dhaka ( 500 MLD) 33kV power supplies (Phase 1) Stand-by power (Phase 1) Transformers (Phase 1) - PowerPoint PPT Presentation
Citation preview
Water SupplyMajor project components
Intake channel (2000 MLD) Intake PS (2000 MLD) Intake pumps Ph-1: 525 MLD Raw water pipeline to WTP
Ph-1: (525 MLD) Treated water pipes to Dhaka
(500 MLD) 33kV power supplies (Phase 1) Stand-by power (Phase 1) Transformers (Phase 1) 31m wide corridor Intake ~
Dhaka Sylhet Road (Both for Saidabad & GWTP)
Dhaka Environmentally Sustainable Water Supply ProjectSchematic Project Layout
N
Balu R.
Proposed new
New Injection Point 2000mm treated water pipelines* WTP at Gandharbpur
13 km
River bank protection
Intake structure
Saidabad WTPs Raw water PS
4.5 km 17 km
2x 2200 mm raw water pipelines*
Juice Factory on
Exist Twin box culvert 13 km Dhaka-Sylhet Hwy.
to Saidabad Intake
Meghna R.
This project
future project
(* sizes to be confirmed)