Water Supply Major project components Intake channel (2000 MLD) Intake PS (2000 MLD) Intake pumps Ph-1: 525 MLD Raw water pipeline to WTP Ph-1: (525 MLD) Treated water pipes to Dhaka (500 MLD) 33kV power supplies (Phase 1) Stand-by power (Phase 1) Transformers (Phase 1) 31m wide corridor Intake ~ Dhaka Sylhet Road (Both for Saidabad & GWTP) D haka Environm entally Sustainable W aterSupply Project SchematicProjectLayout N Balu R . Proposed new N ew Injection Point 2000m m treated w aterpipelines* W TP atG andharbpur 13 km R iver bank protection Intake structure Saidabad WTPs Raw w ater P S 4.5 km 17 km 2x 2200 m m raw waterpipelines* J uic e F ac tory on E xist Twin box culvert 13 km Dhaka-S ylhet Hwy. to S aidabad Intake Meghna R . This project future project (*sizes to be confirm ed) Sitalkhya R. 1 2 3 ExistingDN D Canal to Saidabad1& 2 (connectstoSitalkhya2km downstream )

Water Supply Major project components

  • Upload
    hei

  • View
    17

  • Download
    3

Embed Size (px)

DESCRIPTION

Water Supply Major project components. Intake channel ( 2000 MLD) Intake PS ( 2000 MLD) Intake pumps Ph-1: 525 MLD Raw water pipeline to WTP Ph-1: ( 525 MLD) Treated water pipes to Dhaka ( 500 MLD) 33kV power supplies (Phase 1) Stand-by power (Phase 1) Transformers (Phase 1) - PowerPoint PPT Presentation

Citation preview

Page 1: Water Supply Major project components

Water SupplyMajor project components

Intake channel (2000 MLD) Intake PS (2000 MLD) Intake pumps Ph-1: 525 MLD Raw water pipeline to WTP

Ph-1: (525 MLD) Treated water pipes to Dhaka

(500 MLD) 33kV power supplies (Phase 1) Stand-by power (Phase 1) Transformers (Phase 1) 31m wide corridor Intake ~

Dhaka Sylhet Road (Both for Saidabad & GWTP)

Dhaka Environmentally Sustainable Water Supply ProjectSchematic Project Layout

N

Balu R.

Proposed new

New Injection Point 2000mm treated water pipelines* WTP at Gandharbpur

13 km

River bank protection

Intake structure

Saidabad WTPs Raw water PS

4.5 km 17 km

2x 2200 mm raw water pipelines*

Juice Factory on

Exist Twin box culvert 13 km Dhaka-Sylhet Hwy.

to Saidabad Intake

Meghna R.

This project

future project

(* sizes to be confirmed)

Sita

lkhy

a R

.

1 2

3

Existing DND Canal to Saidabad 1 & 2 (connects to Sitalkhya 2km downstream)