2
 MONTHLY WATER SAMPLING SCHEDULE MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY  1 2 3 4 5 6 7 8 Imus Dasma Sta. Rosa Summit Ridge Forum Palawan Santiago CPGM RET RPR Lipa Los Banos Manila Otis Galleria 9 10 11 12 13 14 15 ISO/DIS 14001 TUV-SUD Malabon Cainta Metroeast Nova Market Pangasinan Luisita Malolos Starmills Angeles Magnolia Woodsville Cybergate Tower 1, 2, 3, Plaza, Alpha, Beta RS Pulilan Mall 16 17 18 19 20 21 22 Imus Dasma Sta. Rosa Forum Otis Palawan Santiago Lipa Los Banos Galleria Malabon Cainta Metroeast Nova Market Pangasinan 23 24 25 26 27 28 29 Malolos Starmills Angeles Magnolia Manila Quality Assurance in Chemical Analyses UP- NSRI RASL (MCE) Quality Assurance in Chemical Analyses UP- NSRI RASL (MCE) Quality Assurance in Chemical Analyses UP- NSRI RASL (MCE) 30 31 Internal Audit ISO/IEC 17025 Clauses 4.1 to 4.8 MARCH 2015 NOTES: Submit the following samples: Wastewater - Influent, Aeration & Effluent (for ALL MALLS) *************** Influent & Effluent (for AFFILIATES) Potable Water (for Bacteriological Test) - ALL MALLS submit only for 1st Cycle *****************sampling SAMPLE ACCEPTANCE CUT-OFF TIMES: AM: 0800 H - 1130H PM: 1330H - 1500H ************************* RLC LABORATORY Level 7 Mechanical Deck Engineering Depart, Robinsons Place Manila, Ermita, Manila PHONE: 02.310.1040 FAX: 02.302.0124

Water Sampling Schedule- MARCH 2015

  • Upload
    engrbvg

  • View
    217

  • Download
    0

Embed Size (px)

DESCRIPTION

Scheduling for water and wastewater monitoring

Citation preview

  • MONTHLY WATER SAMPLING SCHEDULE

    MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY

    1

    2 3 4 5 6 7 8Imus

    Dasma

    Sta. Rosa

    Summit Ridge

    Forum

    Palawan

    Santiago

    CPGM

    RET

    RPR

    Lipa

    Los Banos

    Manila

    Otis

    Galleria

    9 10 11 12 13 14 15ISO/DIS 14001

    TUV-SUDMalabon

    Cainta

    Metroeast

    Nova Market

    Pangasinan

    Luisita

    Malolos

    Starmills

    Angeles

    Magnolia

    Woodsville

    Cybergate Tower

    1, 2, 3, Plaza,

    Alpha, Beta

    RS Pulilan Mall

    16 17 18 19 20 21 22Imus

    Dasma

    Sta. Rosa

    Forum

    Otis

    Palawan

    Santiago

    Lipa

    Los Banos

    Galleria

    Malabon

    Cainta

    Metroeast

    Nova Market

    Pangasinan

    23 24 25 26 27 28 29Malolos

    Starmills

    Angeles

    Magnolia

    Manila

    Quality Assurance in Chemical

    Analyses UP-

    NSRI RASL (MCE)

    Quality Assurance in Chemical

    Analyses UP-

    NSRI RASL (MCE)

    Quality Assurance in Chemical

    Analyses UP-

    NSRI RASL (MCE)

    30 31Internal Audit ISO/IEC 17025

    Clauses 4.1 to 4.8

    MARCH 2015

    NOTES:

    Submit the following samples:

    Wastewater - Influent, Aeration & Effluent (for ALL MALLS)

    *************** Influent & Effluent (for AFFILIATES)

    Potable Water (for Bacteriological Test) - ALL MALLS submit only for 1st Cycle

    *****************sampling

    SAMPLE ACCEPTANCE CUT-OFF TIMES: AM: 0800H - 1130H PM: 1330H - 1500H *************************RLC LABORATORY Level 7 Mechanical Deck Engineering Depart, Robinsons Place Manila, Ermita, Manila

    PHONE: 02.310.1040FAX: 02.302.0124