3/6/2014 Water retaining concrete class C35A http://www.concrete.org.uk/fingertips_print.asp?docid=913 1/1 Water retaining concrete class C35A For design purposes, BS 8007, Code of practice for design of concrete structures for retaining aqueous liquids, 1987 generally referred to BS 8110, Structural use of concrete. However BS 8007 specified a 35N/mm 2 concrete with a minimum cement content of 325kg/m 3 (compared with 300kg/m 3 in BS 8110) and a maximum water/cement ratio of 0.50 (compared with 0.55 in BS 8110). This variation in constituent material limitations gave rise to the class grade C35A, where A stood for aqueous. The Code also specified maximum cement contents for reinforced concrete of 400kg/m 3 for ordinary Portland cement or cements containing ggbs, or 450kg/m 3 for cements containing fly ash. For prestressed concrete the quantities could be increased to 500kg/m 3 and 550kg/m 3 respectively. Acknowledgement: The Concrete Society The information contained in this nugget has been provided by The Concrete Society technical staff.

Water Retaining Concrete Class C35A

  • Upload
    rmfaceb

  • View
    767

  • Download
    22

Embed Size (px)

DESCRIPTION

concrete 35A

Citation preview

  • 3/6/2014 Water retaining concrete class C35A

    http://www.concrete.org.uk/fingertips_print.asp?docid=913 1/1

    Water retaining concrete class C35A

    For design purposes, BS 8007, Code of practice for design of concrete structures for retainingaqueous liquids, 1987 generally referred to BS 8110, Structural use of concrete. However BS 8007

    specified a 35N/mm2 concrete with a minimum cement content of 325kg/m3 (compared with

    300kg/m3 in BS 8110) and a maximum water/cement ratio of 0.50 (compared with 0.55 in BS 8110).This variation in constituent material limitations gave rise to the class grade C35A, where A stoodfor aqueous. The Code also specified maximum cement contents for reinforced concrete of

    400kg/m3 for ordinary Portland cement or cements containing ggbs, or 450kg/m3 for cements

    containing fly ash. For prestressed concrete the quantities could be increased to 500kg/m3 and

    550kg/m3 respectively.

    Acknowledgement: The Concrete Society

    The information contained in this nugget has been provided by The Concrete Society technical staff.