PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS DESCRIPTION OF JOB : PREPARED BY : JSA NO :DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID Water recticulation Mohd Firdaus Bin Kamaruddin
REV : 00TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520 SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN
LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2) APPROVED BY: Ching Soon Seng (PM)
PAGE : 01
LOCATION : (a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9
NO Job sequence /steps
HAZARD INDENTICATION
CURRENT RISK CONTROL
RISK ASSESSMENT
PROPOSED RISK CONTROL RESPONSIBILITYHazard/Effect
PR
OB
AB
ILIT
Y (
A)
CO
SEQ
UEN
CE (
B) RISK RANKING
SC
OR
E
LEV
EL
1 Site survey, planning
Trip & falls 2 2 4 M
PE & excavation Used approved type safety shoe. Standing supervision.
Housekeeping & material arrangement. Install rigid barrier to all excation area Site safety supervisorabove 1.5 meter.
Caught in between / hit by machinery 1 3 3 L
Site supervisor
Experianced/licensed operator. Provide Banksman to controll Stop all work near the excavation area machnery movement
Communication breakdown/ wrong methode apply 1 3 3 LBriefing Methode statement to all Standing supervisionworkers
Possible damage to underground utilities 2 3 6 M
Provide training & infromationconduct the mapping of undergroundutilities before starting the drilling work Standing Supervision.
Land slip / collapse 2 4 8 M
Apply PTW for excavation more than3 meter.
Standing Supervision.
Using sheetpile or do benching / sloping at excavation area
Place stockpile atlease 2 meter from excavation area
PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS DESCRIPTION OF JOB : PREPARED BY : JSA NO :DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID Water recticulation Mohd Firdaus Bin Kamaruddin
REV : 00TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520 SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN
LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2) APPROVED BY: Ching Soon Seng (PM)
PAGE : 02LOCATION : (a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9
NO Job sequence /steps
HAZARD INDENTICATION
CURRENT RISK CONTROL
RISK ASSESSMENT
PROPOSED RISK CONTROL RESPONSIBILITYHazard/Effect
PR
OB
AB
ILIT
Y (
A)
CO
SEQ
UEN
CE (
B) RISK RANKING
SC
OR
E
LEV
EL
2 Laying pipes and fitting
Crane topple 2 3 6 M
PEExperianced / licensed operator. Provide signalman.Attach steel plate at crane outrigger Standing supervision.
Ground condition inspection. Safety Supervisor
Hand / finger injuries 2 2 4 Mwear hand glooves for Used tag line to control loadprotection Signalman to control movement Site supervisor
caught in between 2 2 $ MExperianced / licensed operator. Used tag line to control load
Signalman to control movement
Heat stress 3 1 3 LProvide water dispenser & rest area Drink a lot of water
Used loose reflective clothing
Back injury 1 1 1 Luse proper body posture Buddy system
Used proper manual handling technique
PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS DESCRIPTION OF JOB : PREPARED BY : JSA NO :DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID Water recticulation Mohd Firdaus Bin Kamaruddin
REV : 00TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520 SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN
LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2) APPROVED BY: Ching Soon Seng (PM)
PAGE : 03
LOCATION : (a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9
NO Job sequence /steps
HAZARD INDENTICATION
CURRENT RISK CONTROL
RISK ASSESSMENT
PROPOSED RISK CONTROL RESPONSIBILITYHazard/Effect
PR
OB
AB
ILIT
Y (
A)
CO
SE
QU
EN
CE
(B
) RISK RANKING
SC
OR
E
LEV
EL
3 Cutting & grinding
Radiation / skin burn 2 2 4 M
Certified welder. PE Used coverall / jacket Utilise welding apronUsed welding hand glove Do not carry out this activity to long Site Engineer
Without stop.
Flying particle 2 2 4 M
Site supervisorUsed safety goggles & face sheild Inspection & make sure rotating cover
not removed. Site safety supervisor
Cut by rotating part 2 2 4 MUsed safety helmet, shoe and hand glove All sharp egde or rotating part must have
cover
PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS DESCRIPTION OF JOB : PREPARED BY : JSA NO :DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID Water recticulation Mohd Firdaus Bin Kamaruddin
REV : 00TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520 SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN
LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2) APPROVED BY: Ching Soon Seng (PM)
PAGE : 04LOCATION : (a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9
NO Job sequence /steps
HAZARD INDENTICATION
CURRENT RISK CONTROL
RISK ASSESSMENT
PROPOSED RISK CONTROL RESPONSIBILITYHazard/Effect
PR
OB
AB
ILIT
Y (
A)
CO
SE
QU
EN
CE
(B
) RISK RANKING
SC
OR
E
LEV
EL
4 General housekeeping
slip ,trip & fall
PEissues Keep Floor clean and debris free 1 2 2 L conduct daily tool box talk
Site Suoervisor
Cuts/ punctures
Safety SupervisorDo not put hand in trash cans - 2 1 2 L use hand gloves for the pick up plastics bags from the protectionedges
Back injury use proper body posture 1 1 1 L Buddy system
Used proper manual handling technique
5 Backfiling & Compaction
Caught in between / hit by machinery Experianced/licensed operator. 1 3 3 L Provide Banksman to controll Stop all work near the excavation area machnery movement
Hand arm / Whole body vibrationBriefing before start work 3 1 3 L Used buddy systemWear suitable PPE.
PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS DESCRIPTION OF JOB : PREPARED BY : JSA NO :DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID Water recticulation Mohd Firdaus Bin Kamaruddin
REV : 00TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520 SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN
LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2) APPROVED BY: Ching Soon Seng (PM)
PAGE : 05LOCATION : (a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9
NO Job sequence /steps
HAZARD INDENTICATION
CURRENT RISK CONTROL
RISK ASSESSMENT
PROPOSED RISK CONTROL RESPONSIBILITYHazard/Effect
PR
OB
AB
ILIT
Y (
A)
CO
SEQ
UEN
CE (
B) RISK RANKING
SC
OR
E
LEV
EL
6 Testing of pipe line
high prssure water contact eye 2 3 6 M
PECheck all fitting before start testing Used safety gogglesOnly authorized person at work area. Warning sign.
Safety Supervisor
Hand / finger injuries 2 2 4 Mall tool equipment must have wear hand glooves for proper guarding protection Site supervisor
Electrocution 2 3 6 Mall electrical cable have proper Used industrial socketinsulator Hang cable from ground.
Risk Rating
IMPA
CT C
ATEG
ORY
IMPACT SEVERITY
RISK AREA 1 2 3 4 5
Minimal Minor Moderate Major Severe
Financial Less than Rm 50 k RM 50 K to RM 250 K RM 250 K- RM 1.0m RM 1.0m to RM 10m Greater than Rm 10 m
Safety None First aid requiredMedical treatment
serious injury a fatality caserequired
Programme Less than one week 1-4 Weeks 1-3 months 3-6 months greater than 6 months
Third party impact Negligible damageMinor damage Moderate to high Significant/permanent widespread subtantialsome repairs damage requires damage /permanent damage
required specialist to repair
LIK
EH
OO
D
5 M H H H H
4 M M H H H
3 LM
M H H
2 L M M M H
1 L L L M M
Almost certain -happen frequenly (more than 10 times within the project
very likely -could happen frequenly (more than 3 times within the project
Likely-could happen occasionly (less than 3 times within the project
Unlikely- could happen rarely (1 times within the project
Very unlikely- probablilty will not happen (has never occurred)