Water
Policy
Programme
1
“WatSan and PRSPs”
ODI/WaterAid/WSP Regional Workshop,
Kampala, 2nd- 4th February, 2004
Peter Newborne, ODI Water Policy Programme
Water
Policy
Programme
2
WatSan and PRSPs project
• Phase I: 2002- preliminary assessment of extent of incorporation of
water (WSS and WRM) under PRSPs in five African countries: ie: review of PRSP preparation (both content & process)
- findings of Phase I on separate sheet.
• Phase II: 2003-2004 (until end March)- detailed study of how resources, allocated to WSS
priorities under PRSPs in three African countries, are converting into expenditure on WSS outputs, for poverty impacts.
Water
Policy
Programme
3
Strengthening Design, Finance and Delivery ofWater Supply and Sanitation Programmes
under PRSPs
• Phase II: 2003-2004 (until end March) project purpose
• To help strengthen the design, financing and delivery of water supply and sanitation programmes within PRSPs in selected countries in sub-Saharan Africa, as part of further development, implementation and monitoring of Poverty Reduction Strategies in the region
- investigation of PRSP implementation: (i) finance, and (ii)
design/delivery of WSS interventions under PRSPs in the region.
Water
Policy
Programme
4
Strengthening Design, Finance and Delivery ofWSS Programmes under PRSPs
Research scope and focus- through the water sector’s experience, to review progress of PRSP
implementation, in order to:-
- investigate how resources, allocated to WSS priorities in PRSPs in the region, are converting into expenditure on WSS-related outputs/outcomes;
- recommend how capacity for action by central & decentralised government may be strengthened to deliver on promises made in PRSPs - and those commitments may be developed - for achievement of water-related poverty reduction outcomes;
- make recommendations for how external donors may support this effort.
Water
Policy
Programme
5
WatSan and PRSPs project
• Phase I: 2002• - preliminary assessment of extent of incorporation of water (WSS
and WRM) under PRSPs in five African countries: ie: review of PRSP preparation (both content & process)
• Phase II: 2003-2004 (until end March)• - detailed study of how resources, allocated to WSS priorities under
PRSPs in three African countries, are converting into expenditure on WSS outputs, for poverty impacts
• - ie: investigation of PRSP implementation: (i) finance, and (ii) design/delivery of WSS interventions under PRSPs in the region.
Water
Policy
Programme
6
Countries for Water & PRSPs study
• ODI - WaterAid project Phase I: Zambia, Uganda, Malawi; Kenya, Madagascar
Phase II: Zambia, Uganda, Malawi
• WWF/ODI project
- Zambia, Uganda, Kenya, Madagascar; Tanzania, Niger - Pakistan, Vietnam- Nicaragua; Mexico (WB Strategy for Poorest Southern States).
Water
Policy
Programme
7
HDI Rankings of WWF-Selected CountriesSource: UNDP 2002, as per World Water Development Report -WWDR
Niger 172
Zambia 153
Tanzania 151
Uganda 150
Madagascar 147
Pakistan 138
Kenya 134
Nicaragua 118
Vietnam 109
Mexico - national 54
Water
Policy
Programme
8
Two HD Indicators for WWF-Selected CountriesSource: UNDP HDIs 2003 - www.undp.org
Child Mortality under five, per 1,000 births in 2001
Rural Water Coverage% of rural pop. with sustainable access to impr..water, 2002
Niger 265 56%
Zambia 202 48%
Tanzania 165 57%
Uganda 124 47%
Madagascar 136 31%
Pakistan 109 95%
Kenya 122 42%
Nicaragua 43 59%
Vietnam 38 72%
Mexico: national Mexico: South
29
41
69%
32-43% (piped connect)
Water
Policy
Programme
9
PRSPs Processes - I
Six core principles of PRSPsfor strengthening link between debt
relief & poverty reduction“comprehensive”: recognition that
poverty is multi-dimensional
PRSs should be:- country-driven; results-oriented; comprehensive; prioritised; partnership-oriented; based on long-term
perspective.
Water
Policy
Programme
10
PRSP and Related Processes - II
• PRSPs cover a three-year timeframe, with annual review and update
- PRSP role as “platform for financing”
- budget: key vehicle for PRSP implementation, annually
- both PRSP and Budget need to be “nested” within longer term development policy and planning process
- MTEF* is one planning tool, typically over 3 years: estimate of the resourses available for public expenditure, together with indicative plans for allocating those resources between competing priorities
- Role/aim of MTEF:a linking framework to ensure expenditure driven by policy priorities and disciplined by budget reality (World Bank 1998).
* Medium Term Expenditure Framework
Water
Policy
Programme
11
Key Parts of PRSPs
• PRSP Priorities- “pillars”; key “principles”/”concepts”; cross-cutting themes- analysis of multi-dimensional aspects of poverty- poverty reduction and economic growth responses
• PRSP Objectives- by sector/subject/theme- degree of prioritisation?
• PRSP “Action Plan” (or “implementation matrix” etc.)- with costings - degree of clear prioritisation?
NB: discontinuity of PRS process evident through discrepancies between above parts of PRSP in Zambia, Madagascar, Kenya & Vietnam.
Water
Policy
Programme
12
Progress in Production of PRSPsas at October 2003 (source IMF PRSPs website)
• Full PRSPs: 35 countries (see separate handout) • Interim PRSPs: 18 countries ( “ “ “ ) • Potentially 9 remaining HIPC countries not produced I-PRSP ( “ “ ) • What about the other low-income or “other” countries listed in the
WWDR, or as listed in World Bank Timelines website without explicit forecast as to PRSP production: Eritrea? Bhutan? Afganistan? Dominica? Haiti? Kazakstan? Yugoslavia?
• NB: above WB website last updated in April 2002: more recent information?
Water
Policy
Programme
13
PRSP Processes – Plenary discussion
• Possible focus/i of engagement:-- PRSP implementation;- PRSP preparation;
- in different countries/regions.
• Timing (as per WB Analysis of Implementation Progress, Sept 15th 2003):-
- average duration from I-PRSP to full PRSP: 20 months- annual PRSP progress reports (PRSP-PRs): 11 by 7 countries.
Water
Policy
Programme
15
WatSan and ATER, POVERTY & DEVELOPMENT
Status of Incorporation of Water Priorities under PRSPs
Water
Policy
Programme
16
• Lessons from ODI/Water DFID-funded WatSan & PRSPs project: Phase I (2002)
Water
Policy
Programme
17
Treatment of Water-related Issues in 10 WWF-Selected PRSPs - I
• Positioning of Water Objectives (see separate handout)
- in 6 countries, WSS is Social/human
- in 6 countries, WRM interventions are related to Economic and Growth, or Productive; but there is also some recognition of social functions of WRM, and in 2 countries of vulnerability aspects
- WSS in 1 country is labelled solely Economic
- Infrastructure in Kenya (& Zambia) clearly reflects different preoccupation, with physical installations
- for sector coherence: Zambia, Madagascar only?!
Water
Policy
Programme
18
Treatment of Water-related Issues in 10 WWF-Selected PRSPs - II
- Poverty noted as predominantly rural, although urban (peri-urban) poverty is a serious problem
- Gender: key role of women/girls in relation to WSS reflected in text of some PRSPs (Niger, Uganda, Kenya, Vietnam), but in PRSP water Objectives/Actions gender aspects are weak
- Agriculture referred to as a driver of growth or key economic sector, in 7 PRSPs
- Irrigation development clearly emerges as a key subject in 7 PRSPs
- Flood/drought noted in 9 PRSPs.
Water
Policy
Programme
19
Treatment of Water-related Issues in 10 WWF-Selected PRSPs - III
• IWRM: “integrated” WR management mentioned, as future need or incipient in 5 countries: Niger, Zambia (1 project), Tanzania, Nicaragua (compre-
-hensive solutions), Madagascar (1 project; also to be developed nationally)
• Freshwater ecosystems, environment or biodiversity: Zambia (important for tourism and fishing); Uganda (role of wetlands for c.5m); Kenya (conservation), Mexico-South (biod.= comparative advantage); Vietnam (pollution of rivers); Madagascar & Nicaragua (deterioration of watersheds); Tanzania (heavy dependence of poor on environmental resources)
• Water “efficiency”: Pakistan; cf: Vietnam: manage water resources strictly; Mexico: WSS low cost-recovery; Madagascar: irrigation efficiency presumably part of improving inputs to rice production
• Transboundary aspects: briefly mentioned in 2 PRSPs
• Hydro-power: 5 PRSPs refer to building of hydro facilities - Zambia, Uganda, Pakistan, Kenya, Mexico - several with major cost (how funded?).
Water
Policy
Programme
20
Treatment of Water-related Issues in 10 WWF-Selected PRSPs - IV
• Sanitation- relatively well integrated in 4 PRSPs; weak in 6 PRSPs- funding gap in Niger, Tanzania, Kenya; others?
• M&E - M&E processes described in text of all PRSPs, more development
of indicators & institutional system needed - Uganda: ahead of some countries, but Progress Report 2003 and
WaterAid study confirms need for improvement
• MDGs- mentioned in 4 PRSPs: Niger, Tanzania, Madagascar, Vietnam- water target referred to in Niger, Vietnam- reference to IDGs/DAC goals: Kenya, Nicaragua- Mexico-South: small probability of achieving MDG 1; WSS target
feasible, assuming funds and, as/more important, political will.
Water
Policy
Programme
21
Sectoral Links in Selected PRSPs
• Intra-sectoral: WSS-WRMImpression of some intra-sectoral (WSS-WRM) coherence portrayed in text of
5 PRSPs• Niger, Tanzania, Madagascar, Kenya, Vietnam• through linking of domestic and productive activities in rural lives/contexts
• Inter-sectoralWater links to health and education noted in 6 and 3 countries, also
environment (3 countries) articulated in PRSPs
WSS: time fetching/carrying water explicitly referred to in 5 PRSPs (gender)(but, in prioritisation of investment, is consequent substantial loss of productive
time taken into account?) NB: how are above links, as described, reflected in coordinated actions in
practice? example of good practice: “matrix” of types of intervention and contributing/delivering depts. in the Madagascar PRSP Action Plan.
Water
Policy
Programme
22
Incorporation of Water Priorities in PRSPs - Plenary Discussion
• How may the water "sector" support strengthening of PRSPs?
Water
Policy
Programme
23
WATER, POVERTY & DEVELOPMENT
Making Scarce “PRSP” Resources for Water Interventions Count
Water
Policy
Programme
24
Positioning of Water Objectives in WWF-Selected PRSPs
(recall of positioning of WSS and WRM)
• In 6 countries, WSS is Social/human;
• In 6 countries, WRM interventions are related to Economic and Growth, or Productive; but there is also some recognition of social functions of WRM, and in 2 countries of vulnerability aspects
• WSS in 1 country is labelled solely Economic
• - Infrastructure in Kenya (& Zambia) clearly reflects different preoccupation, with physical installations
• - for sector coherence: Zambia, Madagascar only?
Water
Policy
Programme
25
Targeting of Water Interventions in WWF-Selected PRSPs (see separate handout)
• Zambia, Madasgascar, Pakistan, Vietnam, Mexico: investment to follow regional policy, targeting locations with particular economic growth potential
• Madagascar and Nicaragua: both high development potential and poor/disadvantaged areas
• Tanzania and Uganda: targeting according to poverty
• Kenya: focus on “ASALs” (arid and semi-arid lands)
• Vietnam: “disaster prone areas” (eg. Mekong Delta)
• Pakistan: I-PRSP proposal for sub-national, as well as national, PRSPs
• “Trickle out” of benefits of growth from well-integrated areas to weakly-integrated areas (WIAs)? generally slow and patchy, and growth orientation insufficient on its own, without investment for social protection.
Water
Policy
Programme
26
Financial Allocations in WWF-Selected PRSPs
Percentage allocation
Niger WSS & WRM 3% of PRSP + Rural Dev?
Zambia “ “ 3.5%
Tanzania “ “ 11%
Uganda WS(S) Tripled in 3 years since 1999
Madagascar WSS (and WRM?) 4.2%
Pakistan WSS & WRM (Irrigation) 0.15% & o.35% of GDP
Kenya WSS
WRM (including major hydro?)
3.04% declining
Nicaragua WSS; WRM 2.84% of HIPC; little HIPC?
Vietnam Water not separately costed except Irrig. 13% of capital
Mexico-South Not costed: objective is to redress anti-South bias
Water
Policy
Programme
27
Targeting of Interventions under PRSPs
• Strategic Goals- economic growth and/or poverty reduction- information/analysis of poverty realities and growth opportunities
• Operational Objectives- need clarity what is being sought, when- eg. economic: improvement of economic performance/production- or poverty reduction: but who/where are the poor? “unserved/least
served”; “dispersed/isolated”; “vulnerable”- balance between financial-natural-physical-social-human, as per
livelihoods principles- clear/robust performance criteria: equity, sustainability, efficiency.
Water
Policy
Programme
28
From PRSP Priorities to resource targeting…
PRSP Priorities
GOVERNMENT REVENUES- Tax and non-tax
EXTERNAL FUNDS- Budget Support- “Project” support
RESOURCE “ENVELOPE”- resource projections- budget guidelines and expenditure limits (MoF)- line ministry expenditure proposals
Line Agencies
PRSPObjectives
PRSPAction Plan-with costings
BUDGET-prepared-appraised-approved
Local Govt.
Funds release
PRSP documentBudget formulation and execution
Fundstargeting T
MTEF- 3 years + indicative resource allocation plan
Water
Policy
Programme
29
PRSPs and Budgeting
• Budget- key public implementation mechanism of PRSP (and MTEF)- whole cycle from start to finish typically takes 3 years- start, ideally, 1 year before; execution = 1 year; further year to
prepare and audit accounts- budget cycle needs to be “nested” within longer-term policy and
planning process- time-lapse in practice for routine M&E data to inform budget
formulation; use of periodic in-depth Public Expenditure Reviews (PERs)
NB: policy processes are “outside the circle” in the following diagram: see second diagram below…
Water
Policy
Programme
30
3. Line Agency expenditure proposals prepared and submitted to MF
4. Proposals appraised by MF and negotiations
with line agencies
5. State budget prepared by MF
2. Budget Guidelines and Expenditure Limits
circulated by MF
1. Resource Projections prepared by MF and approved
by Cabinet
7. Budget appropriations voted
by Parlaiment
10. Preparation of audited accounts
6. Budget approved by Cabinet and submitted to
Parliament
8. Budget executed by line agencies
9. State accountsprepared by MF
11. Approval of audited accounts
by Parliament
IMF Negotations
Donor Budget Meetings for
SWAP
PER inputs & analysis
Government Donor
Meeting
Annual Review of
SWAP
Budget Cycle: the theory
Source: Norton and Elson, 2002, What’s Behind the Budget (p.8), ODI, adapted from Foster and Fozzard, 2000, Aid and Public Expenditure: A Guide ODI Working Paper 141.
Water
Policy
Programme
31
Linking Policy, Planning and Budgeting: the theory
(1)
REVIEW POLICYReview the previous planning and
implementation period (2)
SET POLICY AND UNDERTAKE PLANNING ACTIVITY
Establish resource framework, set out objectives, policies, strategies
and expenditure priorities
(3)
MOBILIZE AND ALLOCATE RESOURCES
Prepare budget
(4)
IMPLEMENT PLANNED ACTIVITIES
Collect revenues, release funds, deploy personnel,
undertake activities
(5)
MONITOR activities andACCOUNT for expenditures
(6)
EVALUATE AND AUDITPolicy activities’
effectiveness and feed the results into future plans
Source: World Bank (1998), Public Expenditure Management handbook (p.32)
Water
Policy
Programme
32
Channelling of Expenditure under PRSPs
• What can go wrong? (pessimistic scenario) - resource “envelope” does not match projections- external funds are delayed/blocked- public resources are applied “off-budget”- donors withhold budget support in preference for “off-budget” (project
support, bypassing national system)- actual allocations by MoF do not match budget (eg. expenditure cuts;
political capture, eg. for different sector or strategic goal)- funds releases to line agencies delayed by MoF- decentralisation does not function to enable funds release to local
government- line ministries/agencies or local govt. change operational objectives- line ministries/agencies or local govt. fail to analyse/plan poverty
realities/targets, or fail to distribute funds as per their targets - funds released to third parties are misapplied.
Water
Policy
Programme
33
• WaterAid “snapshot” tests for equity and (social/financial) sustainability
- recommendations from WatSan & PRSPs project: Phase II (2003-2004)
Water
Policy
Programme
34
Making Scarce PRSP Resources for Water Interventions Count - Plenary Discussion
• How may the water "sector" support better targeting of resources under PRSPs?
Water
Policy
Programme
35
Strengthening Incorporation of Water Priorities under PRSPs/CSPs
Recall of Workshop Questions
- How may the water sector (including WSS and WRM) support strengthening of PRSPs, to further water-related poverty reduction objectives?
- What opportunities are there for advocacy/policy work relating to ongoing PRSP/CSP processes?
- Actions, next steps…
Water
Policy
Programme
36
Why has Water not been better Represented in PRSPs to-date?
• Institutional dispersion: water sector often fragmented, with several institutions whose roles/responsibilities are unclear or overlapping;
• Weak sector stakeholders: in terms of capacity, individually or collectively,
to identify and advocate policy reforms;
• Donor dependence: in many low-income countries, historic high level of donor funding for water sector (50-90%); = less incentive to engage & actual engagement by water ministries and local government in budget/public expenditure processes;
• Weak inter-sectoral links: water sector inactive/ineffective in promoting “knock-on” benefits of water-related investments in other sectors (eg. health/education);
• Failure to link WSS & WRM to development and growth: as above
PRSP analysis suggests, water sector needs to better link water-related actions/activities to economic growth & development.
Water
Policy
Programme
37
Making the Case for Water• Integrated water strategies: one document for clear, well-presented water case in
each country, presenting unified proposals, supported with examples of best practice, and financially sound/sustainable mechanisms for implementing actions
• Water “Audit”: drive IWRM strategy based on water audit, identifying/recording where/when water resources are available, their allocation & distribution amongst different sectors/user-types, and “mapping” institutions’ roles/responsibilities
• Economic and development contribution: since growth-based strategies constitute
major PRSP element, alongside measures for social protection, water sector needs to further study and better articulate economic & development benefits of investment in WSS & WRM
• Value of Capacity-building: chronic lack of capacity at local level; the water sector (WSS & WRM) offers great opportunities for decentralised capacity-building with benefits both within and beyond water-related agencies
• Public participation in local and national planning processes: water is commonly
recognized as a priority issue at local level, so key to strengthen local participation in policy processes
• M&E: devise simple & clear performance indicators to guide targeting of water-related interventions and to track their links to, and impacts upon, other anti-poverty measures.
Water
Policy
Programme
38
What opportunities are there for advocacy/policy work relating to ongoing PRSP/CSP processes?
International
Products:- Scorecard; Water initiatives critique; NGO case studies; WWF/ODI
PRSP and CSPs study- Position summary (including a joint position, covering both WSS and
WRM issues) for input into policy “windows”:- (i) CSD 12 (April 2004 and 2005); (ii) Cotonou Mid-Term Review; (iii) WB-IMF PRSPs Review in 2005.
- Use indicators as drivers via UN JMP on MDGs (WaterAid on working group)
- Use Irish-Dutch-UK Presidencies of the EU.
Messages:- MDG-PRSP inconsistencies- Diminishing aid levels- Poor targeting of resources in-country.
Water
Policy
Programme
39
What opportunities are there for advocacy/policy work relating to ongoing PRSP/CSP processes?
National
- Use PRSP research to target countries eg. use IWG’s priority countries assessment: choose several countries of common interest to target for PRSP policy/advocacy work, where either the PRSP still to be prepared, or where PRSP review scheduled
- Explore joint NGO capacity-building in recipient nations (eg. WWF-UK and WaterAid)
- Work with key donor country agencies (eg. Nordics, UK): present the Water & PRSPs assessments to them
- Case Study of WRM resource flows to match WaterAid’s WSS resource flow studies (results of latter due by end March 2004)?
Water
Policy
Programme
40
Strengthening Incorporation of Water Priorities under PRSPs/CSPs
Other possible actions:-
- Development of an environmental sustainability “snapshot” (to complement WaterAid’s on social/financial sustainability.)
- Joint fieldwork to pilot and demonstrate, at local/district level,
multiplier effects of water investments on food security, production, health, education etc.
- Further study of productivity benefits and opportunity cost in poor rural communities of water investments (eg. time-management dilemmas around fetching/carrying water versus time in eg. fields )