Water Management in Turkey
Nermin ÇİÇEK Ministry for the Forest and Water
Affairs DG Water Management
Turkey’s water challenge
Estimated national water body status, 2009
0%
20%
40%
60%
80%
100%
High
Good
Moderate
Poor
Bad
3
During the precidency of Sweden beginning of negotiations for
Environment - Chapter 27 officially declared at the “Intergovernmental Accession Conference” which took place in Brussel, December 21st,
2009.
Turkey as EU candidate member
Closing benchmarks
Two closing benchmarks for water: • Transposition of WFD• River basin management plans
for 25 river basins
Revising the existing legislation
Environmental Law/By-Law on Water Pollution Control
New legislation*
Harmonization of WFD
• Water Law*• By-law on River Basin protection (Draft)*
ORGANIZATION
River basins in Turkey
Dicle -Dicle -
Waste Water Treatment Action Plan
River Basin Protection Action Plans
River Basin Management Plans
8
Akarçay RBPAP
Büyük Menderes RBMP
WWTAP
MINISTRY OF ENVİRONMENT AND FORESTRY
DG Environment Management
MINISTRY OF ENVİRONMENT AND FORESTRY
DG Environment Management
9
Basin Protection Action Plans are being prepared. 11 basins are completed, 5 basins are being updated, 9 basins are
started. They will set basis for the River Basin Management Plans which will be prepared in the context of Water Framework
Directive
BASIN PROTECTION ACTION PLANS
Started in the last quarter of 2011Will be revisedWill be finished
EXAMPLE ERGENE RIVER BASIN
Dicle -Dicle -
Determination of Special Provision studies are being conducted for the protection of drinking
water basins.
DETERMINATION OF SPECIAL PROVISION STUDIES IN TURKEY
COMPLETEDCONTINUEDUNDER CONTRACT PROCESSPLANNED
TRAINING WITH CERTIFICATE IS CARRIED OUT BY THE COORDINATION OF WWF AND GENERAL DIRECTORATE OF WATER
MANAGEMENT
We are struggling with water loss and leakage, developing standards, passing to certificate phase.
Important steps for the reuse of treated domestic wastewater.
The project (750.000 Euro) is being started with Afyonkarahisar Municipality under the scope of
Holland bilateral cooperation studies.
STUDIES FOR REUSE OF TREATED DOMESTIC WASTEWATER IN IRRIGATION
WATER FOOTPRINT STUDIES IN TURKEY
WATER EFFICIENCY
IPA-2011 Project on the Conversion of River Basin
Protection Action Plans into River Basin Management Plans
• Budget : 6.660.000 Euro• Duration : 3 years • Beneficiary : Ministry of Forestry and Water
Affairs • Purpose : Meriç Basin, Susurluk Basin, Akarçay
Basin, Büyük Menderes Basin and Konya Closed Basin
Project titled “Capacity Building on Water Quality Monitoring” was submitted to the Component I of
IPA for the Programming Year 2009.UNDER THE SCOPE OF
4.000.000 EURO EU TWINNING PROJECT
INBÜYÜKMENDERES
ERGENESUSURLUKSAKARYAAKARÇAYBASINS
DETERMINATION OF MEASURING STATIONS,
PARAMETERS WHICH WILL BE MEASURED
AND MEASUREMENT INTERVALS
15
WE ARE PROVIDING BASIN WIDE TRAININGS
39 persons are received certificate in Training of Trainers Project.
60 persons are received certificate in Water Footprint Training
Basin management training is given to municipalities.
NGO pool is formed. TAIEX application about
water economy is confirmed. Negotiation training is done.
TIME TABLE
Action Year Remarks
1 Designation of River Basin Districts
2012 25 basins have already been defined.
2 Start preparing the Article 5 Reports for River Basins
After 2013 River Basin Protection Action Plans (RBPAP) will set the basis for Article 5 reports
3 Start preparing the river basin management plans
After 2014
4 Start of implementation of river basin management plans
After 2015
5 Achievement of “good water status”
2027 Depends on the actual challenges in the basins.
2027(EU) 2033
4. RBMP TURKEY
2021(EU) 2027
3. RBMP
Many Member States will achieve good status at this date
2015(EU) 2021
2. RBMP
2009(EU)2015
1. RBMP
Implementation dates foreseen by the Directive
Exemptions
RBMP TIME TABLE
policy making and-implementation
integrated
policy making and-implementation
separated
concentration of tasks atnational level
concentration of tasks atregional level
T.C. ÇEVRE VE ORMAN BAKANLIĞI