Copyright of Shell International Exploration and Production BV March 2015 WATER INTAKE RISERS FOR PRELUDE FLNG Prelude FLNG Project Overview WIR Concept Selection WIR Concept Description WIR Installation on FLNG Response in Extreme Events Fatigue Design Flow Induced Vibratiions Mike Efthymiou Professor of Offshore Engineering, University of Western Australia (UWA)

WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

  • Upload
    domien

  • View
    224

  • Download
    4

Embed Size (px)

Citation preview

Page 1: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

March 2015

WATER INTAKE RISERS FOR PRELUDE FLNG

Prelude FLNG Project Overview

WIR Concept Selection

WIR Concept Description

WIR Installation on FLNG

Response in Extreme Events

Fatigue Design

Flow Induced Vibratiions

Mike Efthymiou

Professor of Offshore Engineering,

University of Western Australia (UWA)

Page 2: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

2 15 October 2013

DEFINITIONS AND CAUTIONARY NOTE Resources: Our use of the term “resources” in this announcement includes quantities of oil and gas not yet classified as Securities and Exchange Commission of the United Sta tes ("SEC") proved oil and gas reserves or SEC proven mining reserves. Resources a re consistent with the Society of Petroleum Engineers 2P and 2C definitions. The companies in which Roya l Dutch Shell plc directly and indirectly owns investments a re separa te entities. In this announcement "Shell", "Shell Group" and "Roya l Dutch Shell" a re sometimes used for convenience where references a re made to Roya l Dutch Shell plc and its subsidia ries in genera l. Likewise, the words "we", "us" and "our" a re a lso used to refer to subsidia ries in genera l or to those who work for them. These expressions a re a lso used where no useful purpose is served by identifying the pa rticula r company or companies. "Subsidia ries", "Shell subsidia ries" and "Shell companies" as used in this announcement refer to companies in which Shell either directly or indirectly has control, by having either a ma jority of the voting rights or the right to exercise a controlling influence. The companies in which Shell has significant influence but not control a re referred to as "associa ted companies" or "associa tes" and companies in which Shell has joint control a re referred to as "jointly controlled entities". In this announcement, a ssocia tes and jointly controlled entities a re a lso referred to as "equity-accounted investments". The term "Shell interest" is used for convenience to indica te the direct and/ or indirect (for example, through our 23 per cent sha reholding in Woodside Petroleum Ltd.) ownership interest held by Shell in a venture, pa rtnership or company, a fter exclusion of a ll third-party interest. This announcement conta ins forward looking sta tements concerning the financia l condition, results of opera tions and businesses of Shell and the Shell Group. All sta tements other than sta tements of historica l fact a re, or may be deemed to be, forward-looking sta tements. Forward-looking sta tements a re sta tements of future expecta tions tha t a re based on management' s current expecta tions and assumptions and involve known and unknown risks and uncerta inties tha t could cause actua l results, performance or events to differ ma teria lly from those expressed or implied in these sta tements. Forward-looking sta tements include, among other things, sta tements concerning the potentia l exposure of Shell and the Shell Group to market risks and sta tements expressing management’s expecta tions, beliefs, estima tes, forecasts, projections and assumptions. These forward looking sta tements a re identified by their use of terms and phrases such as "anticipa te", "believe", "could", "estima te", "expect", "goa ls", "intend", "may", "objectives", "outlook", "plan", "probably", "project", "risks", "seek", "should", "ta rget", "will" and simila r terms and phrases. There a re a number of factors tha t could a ffect the future opera tions of Shell and the Shell Group and could cause those results to differ ma teria lly from those expressed in the forward looking sta tements included in this announcement, including (without limita tion): (a ) price fluctua tions in crude oil and na tura l gas; (b) changes in demand for Shell' s products; (c) currency fluctua tions; (d) drilling and production results; (e) reserves estima tes; (f) loss of market sha re and industry competition; (g) environmenta l and physica l risks; (h) risks associa ted with the identifica tion of suitable potentia l acquisition properties and ta rgets, and successful negotia tion and completion of such transactions; (i) the risk of doing business in developing countries and countries subject to interna tiona l sanctions; (j) legisla tive, fisca l and regula tory developments including regula tory measures addressing clima te change; (k) economic and financia l market conditions in va rious countries and regions; (l) politica l risks, including the risks of expropria tion and renegotia tion of the terms of contracts with governmenta l entities, delays or advancements in the approva l of projects and delays in the reimbursement for sha red costs; and (m) changes in trading conditions. All forward looking sta tements conta ined in this announcement a re expressly qua lified in their entirety by the cautionary sta tements conta ined or referred to in this section. Readers should not place undue reliance on forward looking sta tements. Additiona l factors tha t may a ffect future results a re conta ined in Shell' s 20-F for the yea r ended 31 December 2011 (ava ilable a t www.shell.com/ investor and www.sec.gov ). These factors a lso should be considered by the reader. Each forward looking sta tement speaks only as of the da te of this presenta tion, March 2013. Neither Shell nor any of its subsidia ries nor the Shell Group undertake any obliga tion to publicly upda te or revise any forwa rd looking sta tement a s a result of new information, future events or other information. In light of these risks, results could differ ma teria lly from those sta ted, implied or inferred from the forward looking sta tements conta ined in this announcement. Shell may have used certa in terms, such as resources, in this announcement tha t the SEC strictly prohibits Shell from including in its filings with the SEC. U.S. investors a re urged to consider closely the disclosure in Shell' s Form 20-F, File No 1-32575, ava ilable on the SEC website www.sec.gov. You can a lso obta in these forms from the SEC by ca lling 1-800-SEC-0330.

March 2015

Page 3: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

3 15 October 2013 March 2015

PRELUDE FLOATING LNG

Facilities for gas production, liquefaction, storage of LNG, LPG and condensate & direct offloading to market – all on FLNG Designed to be permanently connected and permanently manned Hull, Topside structures, moorings, risers all designed to survive 10,000 year environmental conditions, including tropical cyclones FLNG Facility is 488m long, 74m wide – largest vessel ever

LNG Production: 3.6 mtpa LPG Production: 0.4 mtpa Condensate: 1.3 mtpa

Page 4: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

4 June 2012 March 2015

FLNG CONSTRUCTION – Hull floated out of dry dock Dec 2013

Page 5: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

5 June 2012

FLNG CONSTRUCTION: INSTALLATION OF MODULE 3P1 – Jan ’15 Module 3P1 being lifted from Quayside (left photo) onto FLNG (right photo) using floating crane. Lift weight 2900mT. .

Page 6: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

6 15 October 2013

LIQUEFACTION PROCESS

Liquefaction process requires la rge volumes of cooling wa ter

Cold wa ter boosts the process efficiency ~ more LNG production

Dual Mixed Refrigerant successfully applied in Sakha lin and chosen for Shell FLNG

Small footprint

March 2015

Page 7: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

7 June 2012

WATER INTAKE RISERS – FUNCTIONAL REQUIREMENTS Key Functional Requirements: Deliver 50,000 m3/ h of cooling wa ter

Water intake depth : 150m below sea level

Sparing philosophy: Allow for 1 spa re riser

Retreavable for ma inta inance & inspection

25 yea rs of service life

6-10 °C

Tem

pera

ture

(°C)

Typica l wa ter tempera ture profile in NW Austra lia

Water intake risers Avoid collision with moorings & risers

October 2014 March 2015

Page 8: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

8 June 2012 March 2015

WIR – CONCEPT SELECTION

Individual risers

+ Easy change-out

– Interferes with marine activity

– Requires protection ba lcony

– Large footprint on deck (piping)

Riser Bundle

+ Protected from boa t impact

+ Small footprint

– Dedica ted crane to retrieve riser

Rubber

+ Flexible – can accommoda te vessel motion

– Unknown fa ilure modes

– Difficult life time prediction

Steel

+ Extensive experience

+ Weight just right

- Rubber only a t hull interface

Page 9: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

9 June 2012 Copyright of Shell Projects & Technology

STEEL WATER INTAKE RISER BUNDLE

9 March 2013

Page 10: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

10 June 2012

Hull

Flexible Rubber Hoses

Riser hang-off system

10 March 2013

Page 11: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

11 June 2012

Dynamic Performance of the WIR

11 March 2013

Performance Criteria Von-Mises Stress below yield in 10,000 yrs cyclone conditions

No collision with flexible risers and mooring lines

No compression in rubber hose in 10,000 yrs cyclone conditions

Fa tigue life of 25 yea rs with a sa fety factor of 10

Unique challenges for a water intake riser bundle 1. Large interna l flow in the pipe

2. Vortex-induced vibra tion of a riser bundle in a current

Page 12: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

12 June 2012

Effect of internal flow in the pipe

12 March 2013

Before investigation Theory Unstable behaviour

for Uf > 0 m/ s

Experiments Stable behaviour

Free ha nging riser

uf

FLNG VESSEL

Page 13: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

13 June 2012

Experiments at Delft Hydraulics

13 March 2013

Page 14: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

14 June 2012

Experiments at Delft Hydraulics

14 March 2013

Page 15: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

15 June 2012 Copyright of Shell Projects & Technology

EFFECT OF INTERNAL FLOW IN THE PIPE

15 March 2013

Page 16: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

16 June 2012

Effect of internal flow in the pipe

16 March 2013

Before investigation Theory Unstable behaviour

for Uf > 0 m/ s

Experiments Stable behaviour

After investigation Theory Unstable behaviour

for Uf > critica l speed

Experiments Complex unstable behaviour for Uf > critica l speed

Free ha nging riser

uf

FLNG VESSEL

Page 17: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

17 June 2012

Vortex-induced vibrations of an individual riser

17 March 2013

VIV characteristics Natura l frequency = Shedding Frequency of Vortices

Amplitude ~ 1 x diameter

Page 18: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

18 June 2012

Vortex-induced vibrations of a riser bundle

18 March 2013

5D

OPTION 1

OPTION 2

Page 19: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

19 June 2012

Vortex-induced vibrations of a riser bundle

19 March 2013

Sca le 1:45 (Length of model is 3.3 m)

Risers slide through spacers

Page 20: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

20 June 2012

Vortex-induced vibrations of a riser bundle

20 March 2013

OPTION 3

SUPPRESSION OPTION

Page 21: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

21 June 2012

Vortex-induced vibrations of a riser bundle

21 March 2013

Page 22: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

22 June 2012

Vortex-induced vibrations of a riser bundle

22 March 2013

Page 23: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

23 June 2012

Build riser piece by piece until completion

Installation of water intake riser bundle

23 March 2013

Hang first piece of structura l riser in riser a ssembly tower

Structura l riser is stored on deck of the FLNG vessel

Structura l riser is a ssembled

Page 24: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

24 June 2012

Piece by piece built from Rat on flng vessel

24 March 2013

Connect structura l riser to rigging Lower riser and disconnect pedesta l crane using a ROV

Reconnect and retrieve riser with pedesta l crane, connect top pa rt

Water intake riser is insta lled from FLNG vessel

Copyright of Shell Projects & Technology

Page 25: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10

Copyright of Shell Interna tiona l Explora tion and Production BV

25 June 2012

PRELUDE WI RISERS: Innovations Taking Shape As far a possible PRELUDE uses proven and tested systems and components brought

together in innovative ways – However, some new concepts e.g. Offloading Arms, WIR

WI Risers: Largest ever in terms of throughput; new concept, new components, new

phenomena (in-flow induced vibrations, bundle riser VIV, Riser Hanger Assembly)

Design development went through a maturation process, including small-scale tests,

prototype experiments and CFD analyses

De-risking of New Technology through FEED, Detailed Design & Construction to ensure

full-size systems perform as intended – In a multi-billion $ project …get it right 1st time

October 2014 March 2015

Page 26: WATER INTAKE RISERS FOR PRELUDE FLNG · PDF file · 2017-12-22this presentation, ... large volumes of cooling water ... Riser hang-off system March 2013 10