WASTE WATER SAMPLING & ANALYSIS CONTRACT
Bid Packet
Prepared By: Brian Broussard, Utility Systems Manager
The Office of Facility Services Facility Utilities Department Louisiana State University Baton Rouge, LA 70803
Facility Services – Baton Rouge, LA 70803 – Office 225.578.5125 – Fax 225.578.0551
SECTION 01 – SUMMARY OF WORK AND GENERAL REQUIREMENTS
SUMMARY OF WORK
Contract to cover furnishing labor, materials, and equipment to sample and analyze sanitary waste water for LSU.
CONTRACT DURATION
The contract duration is twelve (12) calendar months from the date of the award. At the option of Louisiana State University and acceptance by the contractor, this contract may be extended for two additional twelve (12) month periods at the same price, terms and conditions. Contract not to exceed thirty six (36) months.
PRE-BID CONFERENCE
There will be non-mandatory pre-bid meetings. Please contact Brian Broussard at 225-578-5125 / [email protected] for requesting the site visit.
PROTECTION
The Contractor shall at all times be responsible for insuring the safety of all occupants, work, workers, equipment, and any other persons located within the immediate vicinity. He shall be further responsible for the erection of any barricades to reduce such injury or damage if they are needed.
INSURANCE, INDEMNIFICATION AND BONDS
Please refer to LSU Board of Supervisors Insurance and Indemnification Requirements attached.
Facility Services – Baton Rouge, LA 70803 – Office 225.578.5125 – Fax 225.578.0551
INSPECTION
Vendor must examine the areas and conditions under which the work is to be completed and notify the Owner in writing of conditions detrimental to be outside of the contractor’s responsibility before the work is performed.
CLEAN-UP AND PROTECTION
Clean-Up: During the progress of the work, remove from the site all discard materials, rubbish, cans and rags at the end of each workday. The use of University dumpsters is strictly forbidden.
Protection: Protect outside areas, vehicles or other buildings from damage during construction. It is Contractors responsibility to correct any damage caused by Contractor.
Facility Services – Baton Rouge, LA 70803 – Office 225.578.5125 – Fax 225.578.0551
SECTION 02 – SPECIFICATIONS
SCOPE OF WORK:
The successful bidder (for the purposes of this document denoted as the contractor) is to provide all labor, materials, and equipment to collect and analyze sanitary wastewater at LSU DPW permitted discharge points. Sample collection, analysis, and reporting shall comply with City of Baton Rouge/East Baton Rouge Parish Department of Public Works (DPW) Wastewater Discharge permit requirements for each location. See Appendix A for each sample discharge point permit and requirements is attached to these specifications for reference.
SCHEDULING OF WORK:
Contractor to follow the testing schedule set for by DPW for each permitted location. See attached schedule and map for reference. See Appendix A for testing schedule. There may be times that LSU request an additional test at any given location in addition to the DPW schedule. See Appendix B for discharge point location map.
DELIVERABLES:
Contractor to provide comprehensive report of analysis on each permitted location. See Appendix C for previous report to use as an example and reference.
PAYMENT:
Contractor will invoice LSU for locations tested in a given month per the DPW schedule. In the event that LSU request an extra additional test. That test will be at the rate for that location. The additional test would be included in the monthly invoice.
AWARDING OF BID:
Contractor is to quote a unit price to collect sample, analyze sample, and provide report as per the specifications set forth for each location as listed in the item sheet. The quantities listed in the item sheet are the number of test currently required by DPW. We will award the contract based on the lowest total of all items at the quantities given. This is an all or none awarded bid.
Facility Services – Baton Rouge, LA 70803 – Office 225.578.5125 – Fax 225.578.0551
Northwest Campus has two (2) test
L.S.U. TESTING SCHEDULE As of April 1, 2015
12
12
6
6
2
2
1
1
This new Testing Schedule is based on a more recent trend of discharge flows data.
All eight (8) permitted areas but one (Northwest Campus) have only one testing frequency per permitted area.
ing frequencies (montly & twice a year) that coincide in March & September.
Main Lift Station, that had previously two (2) testing frequencies (monthly & twice a year), will now test only monthly.
Fraternity Row, that was previously testing quarterly, will now test every two (2) months.
Lakeshore, that was previously testing quarterly, will now test twice a year.
MAIN LIFT STATION 02 - 02125 Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec.
NORTHWEST CAMPUS 02 - 02124 Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec.
FRATERNITY ROW 02 - 02120 Jan.
Mar.
May
Jul.
Sep.
Nov.
VET. MED. 02 - 02122 Jan.
Mar.
May
Jul.
Sep.
Nov.
VET. ANNEX 02 - 02256 Mar.
Sep.
LAKESHORE 02 - 02121 Mar.
Sep.
AG. AREA 02 - 02234 Sep.
SOUTH CAMPUS 02 - 02713 Sep.
L.S.U. MAIN LIFT STATION ( 02 – 02125 )
LIST OF PARAMETERS TO BE TESTED As of April 1, 2015
Until now the Main Lift Station had two (2) testing frequencies:
- monthly for nine (9) regular parameters, called “Production Limits” parameters,
- twice a year for (8) unusual parameters, called “Local Limits” parameters, and required
by EPA / DEQ for five (5) years.
During the last six (6) years, six (6) of the eight (8) “Local Limits” parameters have not been
detected: Arsenic, Cadmium, Chromium, Cyanide Total, Mercury, and Nickel. Therefore, as of
April 1, 2015, they will be deleted from the list of parameters to be tested twice a year. And the
two (2) “Local Limits” parameters that have been detected (Copper, and Zinc) will be transferred
to the list of Parameters to be tested monthly, as of April 1, 2015.
Therefore , as of April 1, 2015, there is only one testing frequency: monthly. And the 11
“Production Limits” parameters to be tested monthly are:
Parameters (Units) Limits
-
Biochemical Oxygen Demand (mg/L) 200
Chemical Oxygen Demand (mg/L) 1545
Copper (mg/L) 0.56
Lead (mg/L) 1.55
Oil & Grease (mg/L) 100
pH (unit) 5.5 - 9.5
Phenol Total (mg/L) 2.13
Silver (mg/L) 0.16
Total Organic Carbon (mg/L) 392
Total Suspended Solids (mg/L) 250
Zinc (mg/L) 0.57
L.S.U. NORTHWEST CAMPUS ( 02 - 02124 )
TWO SAMPLING FREQUENCIES As of April 1, 2015
Due to a high discharge flow (an average 180,336 gallons per day in 2014) the L.S.U. Northwest
Campus is becoming a Significant Industrial User (SIU) as of April 1, 2015. And as a new
SIU, the L.S.U. Northwest Campus has two (2) testing frequencies, as of April 1, 2015 :
- monthly for six (6) regular parameters, called “Production Limits” parameters,
- twice a year for eight (8) unusual parameters, called Local Limits” parameters, and
required by EPA / DEQ for five (5) years.
“Production Limits” Parameters (Units)
Biochemical Oxygen Demand (mg/L)
Limits
200
Chemical Oxygen Demand (mg/L) 1545
Oil & Grease 100
pH (units) 5.5 - 9.5
Silver (mg/L) 0.16
Total Suspended Solids (mg/L) 250
“Local Limits” Parameters
Arsenic (mg/L)
Limits
0.04
Cadmium (mg/L) 0.27
Chromium (mg/L) 1.7
Copper (mg/L) 0.56
Cyanide Total (mg/L) 0.57
Mercury (mg/L) 0.81
Nickel (mg/L) 0.37
Zinc (mg/L) 0.57
Department of Public Works City of Baton Rouge
Parish of East Baton Rouge
Post office Box 1471
Baton Rouge, La 70821
ENVIRONMENTAL DMSION Telephone: 225.389.5456
Fax: 225.389.5460
April 7, 2015
Renewal Date: April 1, 2015
Mr. Brian Broussard
Louisiana State University
Office of Facility Services
Baton Rouge, LA 70803
(Facility Address)
L.S.U. - Main Lift Station
Power House, Central Plant
Baton Rouge, LA 70803
Dear Mr. Broussard:
As required by Federal Regulations 40 CFR 403.8 (f) (1) (v) the City/Parish is required to
perform inspections, surveillances, and monitoring procedures. The implementation of
these activities necessitates the establishment of a permit fee based on an estimated cost of
performing these required tasks.
The charge for your permit, Standard Permit No: 02-02125, has been calculated to be
$199.00. Ifyou have any questions regarding the permit, please call John Busse at (225)
389-5456. The Service Fee Business Office will bill you for this fee.
Your next laboratory report Due Date is May 1, 2015. See the attached permit for details.
Failure to pay the pennit Fee will result in revocation of your permit.
Sincerely,
,cfcrunpf/::rw Environmental Coordinator
PERMIT NUMBER: 02-02125
CITY OF BATON ROUGE/EAST BATON ROUGE PARISH
DEPARTMENT OF PUBLIC WORKS
WASTEWATER DISCHARGE PERMIT
COMPANY NAME: L.S.U. - Main Lift Station
FACILITY ADDRESS: Power House, Central Plant
Baton Rouge, LA 70803
FACILITY CLASSIFICATION: Significant User
SIC Code: 8221, 8733
The above Regulated Commercial Facility is authorized to discharge industrial wastewater
into the City of Baton Rouge/East Baton Rouge Parish Sewer System in compliance with
the City/Parish Ordinance Number 9195, Title 2, Chapter 5, Sections 2:250-2:263. All
permitted discharge conditions are subject to the applicable provisions of Federal or State
Law regulations with respect to discharge point(s), effluent limitations, monitoring
requirements, and other conditions set forth herein.
This permit is granted in accordance with information, specification, and/or other data
submitted to the Department of Public Works, Environmental Division.
Renewal Date:
Expiration Date:
April 1, 2015
March 31, 2016
D u, P
Environmental Coordinator
PART I
A. WASTEWATER DISCHARGE LIMITATION AND
MONITORING REQUIREMENTS
Permit Number: 02-02125
The Regulated Commercial User shall comply with the effluent limitations by:
April 1, 2015
Outfall: 001
Samples are to be taken from the location described below: DEEP WELL on south west corner
of power house
Parameter (Units) 1,2
Biochemical Oxygen
Demand (mg/I)
Chemical Oxygen
Demand (mg/I)
200 -na- Monthly Comp
1545 -na- Monthly Comp
Copper (mg/I) 0.56 0.56 Monthly Comp
Flow** (gpd) -na- Monthly Meter
Lead (mg/I) 1.55 -na- Monthly Comp
Oil and Grease (mg/I) 100 -na- Monthly Grab
pH (unit) 5.5-9.5 -na- Monthly Meter
Phenol Total (mg/I) 2.13 -na- Monthly Grab
Silver (mg/I) 0.16 -na- Monthly Comp
Total Organic Carbon
(mg/I) 392
-na-
Monthly Comp
Total Suspended Solids
(mg/I)
250 -na- Monthly Comp
Zinc (mg/I) 0.57 0.57 Monthly Comp
IAll analytical tests must be performed in accordance with the techniques described
in 40 CFR part 136 (see LAC 33:IX.4901) and amendments thereto. Where 40
CFR part 136 does not contain sampling or analytical techniques for the pollutant
in question, or where the EPA detennines that the part 136 sampling and analytical
techniques are inappropriate for the pollutant in question, sampling and analysis
Daily Effluent Monthly Effluent Sample Sample
Limitation 3 Limitation 3 Frequency 4 Type
shall be performed by using validated analytical methods or other applicable
sampling and analytical procedures approved by the Environmental Division and the
LDEQ. 2To seek a waiver for a pollutant neither present nor expected to be present in the
wastewater discharge, please refer to LAC 33:IX.6123.E.2 or 40 CFR part
403.12(e)(2) [also see LAC 33:IX.6115.F.l.d.iv or 40 CFR part 403.8(f)(2)(v)(A)] 3Any exceedances of the effluent limitations listed in this permit must be reported to
the Environmental Division at (225) 389-5456 within 24 hours of becoming aware
of the violation. 4 Refer to APPENDIX A -TESTING SCHEDULE for a schedule of Sample
Frequencies.
**Flow - There are no specific minimum or maximum effluent limitations on flow, but
average and maximum daily flow in gallons per day for each month must be
reported to the Environmental Division as required in Part 1 B; Special
Provisions Required and Part II - Reporting Requirements, requirement #2.
This report of the monthly flows must be submitted along with the sampling
reports as required in Part II.2 unless an alternative flow-reporting schedule has
been approved by the Environmental Division.
The designated limitations and monitoring requirements may be revised as needed by the
Director of Public Works to comply with the DEQ and EPA regulations. Limitations shall
also be modified at the request of the Permittee when processes are altered.
Bypass or the intentional diversion of wastestreams from the treatment system is prohibited
unless all of the following conditions are met:
(1) The bypass was unavoidable to prevent loss oflife, personal injury, or severe
property damage.
(2) There was no feasible alternative to the bypass, including the use of auxiliary
treatment or retention of the wastewater.
(3) The industrial user properly notified the director as described in Ordinance 9195
section 2:257(f)
To comply with Ordinance 8095 section 8:206 all grease traps must be cleaned every three
(3) months.
Note: Ifthe reference levels for Biochemical Oxygen Demand (BODs) or Total Suspended
Solids (TSS) are exceeded, a surcharge will be implemented in accordance with the
City/Parish Ordinance 7853.
PART I
B. SPECIAL PROVISIONS REQUIRED
Permit Number: 02-02125 Outfall(s): All Outfalls
The Regulated Commercial Facility shall comply with the Special Provisions listed below
and shall be in compliance with the applicable requirements set forth in Part II.
SPECIAL PROVISIONS COMPLETION DATES
Report Requirements No. 1 of Part II See Provision
Report Requirements No. 2 of Part II See Appendix A -Testing Schedule
Report Requirements No. 3 of Part II See Provision
Report Requirements No. 4 of Part II See Provision
Report Requirements No. 5 of Part II See Provision
Special Condition No. 1 of Part III See Provision
Special Requirements for Part IV (Standard Conditions)
All sixteen (16) conditions apply
Part V Enforcement
Failure to comply with any of the previous permit requirements including failure to pay the
permit fee within the designated time frame may result in one or more of the following
legal remedies:
A. Injunctive Relief
B. Civil Enforcement Penalties
C. Criminal Penalties
D. Liability
E. Revocation of Permit
F. Termination of Utility Services (Sewer, Water, Electric)
APPENDIX A
TESTING SCHEDULE
Permit Number: 02-02125 Outfall(s): All Outfalls
Report Requirement No. 2 of Part II - The due date of these reports as described in this
requirement is based on the sample frequency identified in PART 1 A. WASTEWATER
DISCHARGE LIMITATION AND MONITORING REQUIREMENTS.
Reports are due on the following dates based on Sample Frequency:
ANNUAL October 1, 2015
TWICE A YEAR October 1, 2015
March 31, 2016
QUARTERLY
July 1, 2015
October 1, 2015
January 1, 2016
March 31, 2016
EVERY 2 MONTHS
June 1, 2015
August 1, 2015
October 1, 2015
December 1, 2015
February 1, 2016
March 31, 2016
MONTHLY
May 1, 2015
June 1, 2015
July 1, 2015
August 1, 2015
September 1, 2015
October 1, 2015
November 1, 2015
December 1, 2015
January 1, 2016
February 1, 2016
March 31, 2016
See PART I "A. WASTEWATER DISCHARGE LIMITATION AND MONITORING
REQUIREMENTS" for parameters and sampling frequencies required.
PART II
REPORTING REQUIREMENTS
1. All reports shall be submitted to the following address:
Department of Public Works - Environmental Division
P.O. Box 1471
Baton Rouge, La. 70821
Attention: Pretreatment Program
2. The permitted Regulated Commercial Facility (hereafter referred to as RCF) is required to submit to
the Environmental Division the required reports on the results of its sampling of the pollutants specified
in Part I ofthis permit. This report shall also contain monthly flows as required.
3. The director shall evaluate, at least every two (2) years, whether each significant industrial user needs
a plan to control slug discharges. For purposes of this subsection, a slug load shall constitute a discharge
that has a flow rate or contains concentrations of pollutants that exceed, for any time period longer
than fifteen (15) minutes, more than five (5) times the average twenty-four hour concentration,
quantities or flow rate during normal operations. Ifthe director determines that a slug control plan is
needed, the plan shall be prepared by the significant industrial user and submitted to the director for
review and approval. Such plan shall contain, at a minimum, the following elements:
a. Description of discharge practices, including non-routine batch discharges.
b. Description of all chemicals and hazardous substances stored at the facility site.
c. Procedures for immediately notifying the POTW of slug discharges, including any discharge
that would violate a prohibition under section 2:252 of the City/Parish Ordinance 9195, with
procedures for follow-up written notification to the director within five (5) days of any
reportable event.
d. Ifnecessary, procedures to prevent adverse impact from accidental spills, including inspection
and maintenance of storage areas, handling and transfer of materials, loading and unloading
operations, control of plant site runoff, working training, building of containment structures
or equipment, measures for containing toxic organic pollutants (including solvents), and/or
measures and equipment for emergency response.
4. Slug Loading Notification am/ Written Notice
RCF's shall immediately notify the director of any accidental slug pollutant load that has the potential
to cause interference or pass through at the POTW treatment plant. Within five (5) days following any
such accidental discharge, the RCF shall provide the director with a detailed written report describing
the cause of the discharge and the measures to be taken by the RCF to prevent similar future
occurrences. A slug load shall constitute a discharge that has a flow rate or contains concentrations of
pollutants that exceed, for any time period longer than fifteen (15) minutes, more than five (5) times
the average twenty-four hour concentration, quantities or flow rate during normal operations.
5. The permitted RCF shall notify the Director of Public Works prior to the introduction of new
wastewater or pollutants or any substantial change in the volume or characteristics of the wastewater
being introduced into the POTW from the RCF's industrial processes. Formal written notification shall
follow within thirty days of such introduction.
6. Any upset experienced by the RCF of its treatment that places it in a temporary state of non-compliance
with wastewater discharge limitations specified in the City/Parish Ordinance shall be reported to the
City/Parish within twenty-tour hours of first awareness of the commencement of the upset. A detailed
report shall be filed within five days.
7. Any malfunction of pretreatment related devices or equipment such as flow meters, treatment plants,
grease traps etc., shall be reported to the City/Parish within twenty-four hours of first awareness of the
commencing of the malfunction. A detailed report shall he filed within five days.
PART III
SPECIAL CONDITIONS COMPLIANCE SCHEDULES
1. Deviations from the schedules and limits established in Part I must be negotiated with the Department
of Public Works.
PART IV
STANDARD CONDITIONS
I. The permitted RCF shall comply with all the general prohibitive discharge standards in Section 2.252
and 2.253 of the City/Parish Ordinance.
2. Right of Entry
The permitted RCF shall allow the City/Parish or its representatives, exhibiting proper credentials and
identifications, to enter upon the premises of the RCF, at all reasonable hours, for the purposes of
inspection, sampling, or records inspection. Reasonable hours in the context of inspection and sampling
include any time the RCF is operating any process which results in a process wastewater discharge to
the city sewerage system.
3. Record Retention
a. The permitted RCF shall retain and preserve for no less than three years or as it seems
necessary by the Director of Public Works, any records, books, documents, memoranda,
reports, correspondence and any and all summaries thereof, relating to monitoring, sampling
and chemical analyses made by or on behalf of limitation with respect to any and all appeals
expired.
4. Confidential Information
Except for data determined to be confidential under Section 2:260 of the City/Parish Ordinance 9195,
Chapter 5, all reports required by this permit shall be available for public inspection at the office of the
Coordinator of Environmental Affairs.
5. Recording of Results
For each measurement or sample taken pursuant to the requirements of this permit, the RCF shall
record the following information:
a. The exact place, date and time of sampling;
b. the person(s) doing the sampling;
c. the dates the analyses were performed;
d. the person(s) who performed the analyses;
e. the analytical techniques or methods used; and
f. the results of all required analyses.
6. Dilution
No Permitted RCF shall increase the use of potable or process water or in any way attempt to dilute a
discharge as a partial or complete substitute for adequate treatment to achieve compliance with the
limitations contained in this permit.
7. Proper Disposal of Pretreatment Sludges and Spent Chemicals
The disposal of sludges and spent chemicals generated shall he done in accordance with Section 405
of the Clean Water Act and Subtitles C & D of the Resource Conservation and Recovery Act.
8. Signatory Requirements
All reports required by this permit shall be signed by a principal executive officer of the RCF, or his
designee.
9. Revocation of Permit
The permit issued to the RCF by the City may be revoked when, after inspection, monitoring or analysis
it is determined that the discharge of wastewater to the sanitary sewer is in violation of Federal, State,
or local laws, ordinances and regulations. Additionally, falsification or intentional misrepresentation of
data or statements pertaining to the permit application or any other required reporting forms shall be
cause for permit revocation.
10. Limitation on Permit Transfer
Wastewater discharge permits are issued to a specific RCF for a specific operation and are not
assignable to another RCF or transferable to any other location without proper written approval of the
Director. Sale of a permitted facility shall obligate the purchaser to seek prior written approval of the
City/Parish for continued discharge to the sewerage system.
11. Falsifying information or Tampering with Monitoring Equipment
Knowingly making any false statement on any report or other document required by this permit or
knowingly rendering any monitoring device or metl1od inaccurate, may result in punishment under
criminal laws of the City/Parish as well as being subjected to civil penalties and relief.
12. Modification or Revision of the Permit
a. The tem1s and conditions of this permit may be subject to modification by City/Parish at any
time as limitations or requirements as identified in the City/Parish Ordinance, are modified or
other just cause exists.
b. This permit may also be modified to incorporate special conditions resulting from the issuance
of a special order.
c The terms and conditions may be modified as a result of EPA promulgating a new federal
pretreatment standard.
d. Any permit modifications which result in new conditions in the permit shall include a
reasonable time schedule for compliance, it necessary.
13. Duty to Reapply
The City/Parish shall repermit a RCF on a yearly basis. Renewal will be automatic unless otherwise
notified by the RCF that he or she is no longer in business. Within thirty days of the notification, the
RCF shall reapply for reissuance of the permit on a form provided by the City/Parish.
14. Severability
If any provision, paragraph, word, section or article of this Ordinance is invalidated by any court of
competent jurisdiction, the remaining provision, paragraphs, words, sections, and chapters shall not be
affected and shall continue in full force and effect.
15. Property Rights
The issuance of this permit does not convey any property rights in either real or personal property; any
exclusive privileges; nor does it authorize any invasion of personal rights; nor any infringement of
Federal, State, or local regulations.
16. Legal Remedies
The legal remedies set forth in the City/Parish are as described in the Ordinance 9195, Section 2:259
(a), (b), (c), (d), and (e)
These subsections encompass:
a. Injunctive Relief
b. Civil Enforcement Penalties
c. Criminal Penalties
d. Liability
e. Revocation of Permit
f. Termination of Utility Services (Sewer, Water, and/or Electricity)
PART V
RULES OF ADMINISTRATIVE REVIEW
In accordance with the provisions of Ordinance 9195 of the Metropolitan Council of the City of Baton Rouge
and Parish of East Baton Rouge, and particularly in accordance with Section 2:255 thereof, the Director of the
Department of Public Works does hereby establish these rules for the administrative review of any appeal lodged
by a RCF of the City/Parish POTW system who is permitted for or whom the Department has notified must
obtain a permit for discharge of waste into the Publicly Owned Treatment Works system of the City of Baton
Rouge and the Parish of East Baton Rouge.
PARTIES
I . Any RCF who has received notice of the requirement to file an application for a pretreatment permit
for discharge into POTW's of the City/Parish, or a RCF who is presently permitted for discharge into
the POTW'S of the City/Parish may request an administrative review of the inclusion of said RCF
within the scope of the permit program, or may request administrative review of any fee, fine, penalty,
assessment, or order issued by the Director of the Department of Public Works in connection with
permitting of or discharges by said user into the City/Parish POTW system.
PAYMENT UNDER PROTEST
2. Ifthe request for administrative review is related to payment of pretreatment permit fees or the amount
of such fees, the RCF must indicate when paying the permit fee that, the fee is being paid under protest.
Said RCF must, simultaneously with the payment of the permit fee, file a request for an administrative
review setting forth the basis for the protest of the payment.
3. If the request for administrative review is related to assessment of fines, penalties, or the issuance of
an order by the Director of the Department of Public Works or his designee based on a violation of the
provisions and requirements or Ordinance 9195 said request must be filed with the Director within
thirty days of the receipt of such assessment.
CONTENTS OF REQUEST FOR ADMINISTRATIVE REVIEW
4. All requests for administrative review shall be in writing, shall be signed by the RCF or his authorized
representative, and shall, at a minimum, state:
a. The name, address and phone number of the individual filing the request;
b. the fee, fine, penalty or order from which relief is sought;
c. the name, address and telephone number of the regulated facility;
d. the name, address, business title or position, and telephone number of the authorized agent or
representative or other responsible person for operation of the facility's discharges into the
POTW system;
e. the basis upon which relief is sought;
f. extenuating circumstances or specific justification for granting the relief sought.
5. A request for administrative review shall be filed by hand delivery or by mail directed to: Coordinator
of Environmental Affairs, Department of Public Works, Post Office Box 1471, Baton Rouge,
Louisiana, 70821.
6. Filing a request for administrative review does not suspend the obligation of the requesting party to
comply with the discharge limitations and requirements of Ordinance 9195 prior to or during the
administrative review process.
7. All requests for administrative review shall be initially reviewed by the Department through the Office
of the Coordinator of Environmental Affairs and an administrative conference date will be established.
Any request not containing the information required by Rule 2 may be summarily rejected by the
Coordinator of Environmental Affairs and a notice sent to the requesting party stating the reason for
summary rejection. Summary rejection of a request does not preclude the requesting party from
submitting a new request in accordance with these rules.
8. Requests based on mistaken identification of a RCF, clerical error in the analysis of a waste stream, or
the lack of a physical connection between the discharge facilities of the requesting party and the POTW
system may be resolved in writing by the Director upon reconunendation of the Coordinator of
Environmental Affairs, in favor of the requesting party, without the need for an administrative
conference. All other requests must be the subject of at least one administrative conference between
the requesting party and one or more of the following department officials: the Coordinator of
Environmental Affairs, the Pretreatment Manager, or the Environmental Engineer.
9. The administrative conference will be informal in nature. At the administrative conference the
Department will compile an administrative record consisting of pertinent records of the Department
regarding the requesting party and discharges from the requesting party's facility, as well as, any
evidentiary filings the requesting party desires to introduce into the record.
10. Following the administrative conference, a staff determination on a request shall be rendered jointly
by the Coordinator of Environmental Affairs, the Pretreatment Manager, and the Environmental
Engineer. The decision shall be entered into the administrative record and a copy thereof shall be
forwarded to the RCF. Ifno appeal of the staff determination is filed with the Director within thirty
days of the date of the staff determination, the Director may approve the staff determination and render
a final decision based thereon.
11. Appeal of the staff determination on any request may be made in writing to the Director of the
Department of Public Works within thirty days of the date of the staff determination. Such appeal
request may provide any additional information the requesting party believes necessary for the
complete and thorough understanding of the request. If, in the opinion of the Director, an additional
administrative conferences is necessary to fully assess the issues raised by the requesting party, the
Director may give notice of such conference to the requesting party and the representatives of the
Department; additional written evidence or information for the administrative record may be provided
by the requesting party and representative of the Department of this time.
12. The Director may require that the requesting party provide any information maintained by it as a result
of the requirements of Ordinance 9195 relating to waste generation, disposal or discharge, or relating
to sampling, testing, and analysis of wastes discharged into the POTW system, which in the opinion
of the Director, would provide an evidentiary basis for rendering his decision. Where financial inability
to pay forms the basis for the request and the requested relief involves the payment offees in
installments or the mitigation of penalties or fines, the Director may require the requesting party to
provide financial statements or accounting data supporting it claim.
13. The Director may take such action following his administrative review as is appropriate for the safe
and environmentally sound operation and maintenance of the POTW's and the pretreatment permit
system; however, the Director shall not:
a. authorize violations of the requirements of Ordinance 9195 or
b. remove any facility from the pretreatment permit system if the facility is discharging any
pollutants into the POTW system in excess of the discharge limits established by Ordinance
9195.
14. The Director may compromise and/or mitigate the amount of penalties to be assessed for violation of
Ordinance 9195 based upon an affirmative good faith shown by the violator that one or more of the
following mitigating factors are applicable to the violating facility:
a. a lack of previous violations and historic compliance with discharge limits;
b. the cause of the violation was due to an act of God, war, or third parties not associated with
the facility;
c. the nature and gravity of the violation was not significant;
d. good faith efforts by the violator to prevent future violations;
e. payment of the full penalty amount creates a real and verifiable danger of making the facility
incapable of future operation;
f. other pertinent factors which, in the opinion of the Director, are probative of the fact that the
violation did not endanger the public safety, health or welfare and did not jeopardize the
integrity of the POTW's of the pretreatment permit system;
g. levying fines shall be in accordance with the United States Environmental Protection
Agency's approved enforcement procedures.
15. The Director may, for good cause shown, make permit fees payable through installments over a period
not to exceed 120 days from the date such fees are due, but the Director may not waive permit fees.
16. Decisions of the Director rendered in the administrative review process shall be final, shall be in
writing and shall be based on the full and complete written administrative record compiled by the
Department and the requesting party.
17. Information received by the Department in the course of the administrative review process may be
classified as confidential by the Department only if the Director makes a written determination that
confidentiality is necessary to protect trade secrets, proprietary secrets and information, and
commercial or financial information. However, such a finding regarding confidentiality shall not apply
to necessary use by authorized officers or employees of the department or the federal government in
carrying out their responsibilities under Ordinance 9195 or applicable federal law.
Department of Public Works City of Baton Rouge
Parish of East Baton Rouge
Post office Box 1471
Baton Rouge, La 70821
ENVIRONMENTAL DIVISION Telephone: 225.389.5456
Fax: 225.389.5460
April 7, 2015
Renewal Date: April 1, 2015
Mr. Brian Broussard
Louisiana State University
Office of Facility Services
Baton Rouge, LA 70803
(Facility Address)
L.S.U. - Vet. Annex
1700 Skip Bertman Drive
Baton Rouge, LA 70803
Dear Mr. Broussard:
As required by Federal Regulations 40 CFR 403.8 (t) (1) (v) the City/Parish is required to
perform inspections, surveillances, and monitoring procedures. The implementation of
these activities necessitates the establishment of a permit fee based on an estimated cost of
performing these required tasks.
The charge for your permit, Standard Permit No: 02-02256, has been calculated to be
$224.00. Ifyou have any questions regarding the permit, please call John Busse at (225)
389-5456. The Service Fee Business Office will bill you for this fee.
Your next laboratory report Due Date is October 1, 2015. See the attached permit for
details.
Failure to pay the pennit Fee will result in revocation of your pennit.
Sincerely,
f2. ,°:A=p W Environmental Coordinator
PERMIT NUMBER: 02-02256
CITY OF BATON ROUGE/EAST BATON ROUGE PARISH
DEPARTMENT OF PUBLIC WORKS
WASTEWATER DISCHARGE PERMIT
COMPANY NAME: L.S.U. - Vet. Annex
FACILITY ADDRESS: 1700 Skip Bertman Drive
Baton Rouge, LA 70803
FACILITY CLASSIFICATION: Non-Significant User
SIC Code: 0741, 0742, 8733
The above Regulated Commercial Facility is authorized to discharge industrial wastewater
into the City of Baton Rouge/East Baton Rouge Parish Sewer System in compliance with
the City/Parish Ordinance Number 9195, Title 2, Chapter 5, Sections 2:250-2:263. All
permitted discharge conditions are subject to the applicable provisions of Federal or State
Law regulations with respect to discharge point(s), effluent limitations, monitoring
requirements, and other conditions set forth herein.
This permit is granted in accordance with information, specification, and/or other data
submitted to the Department of Public Works, Environmental Division.
Renewal Date:
Expiration Date:
April 1, 2015
March 31, 2016
D u, P
Environmental Coordinator
PART I
A. WASTEWATER DISCHARGE LIMITATION
AND
MONITORING REQUIREMENTS
Permit Number: 02-02256
The Regulated Commercial User shall comply with the effluent limitations by:
April 1, 2015
Outfall: 001
Samples are to be taken from the location described below:
LIFf STATION on west side of second annex building from the south
Parameter (Units) 1,2
Biochemical Oxygen
Demand (mg/I)
Chemical Oxygen Demand
(mg/I)
Flow** (gpd)
Formaldehyde (mg/I)
Phenol Total (mg/I)
Total Organic Carbon
(mg/I)
Total Suspended Solids
(mg/I)
Volatiles (mg/I)
IAll analytical tests must be performed in accordance with the techniques described
in 40 CFR part 136 (see LAC 33:IX.4901) and amendments thereto. Where 40
CFR part 136 does not contain sampling or analytical techniques for the pollutant in
question, or where the EPA determines that the part 136 sampling and analytical
techniques are inappropriate for the pollutant in question, sampling and analysis
shall be performed by using validated analytical methods or other applicable
sampling and analytical procedures approved by the Environmental Division and the
LDEQ. 2To seek a waiver for a pollutant neither present nor expected to be present in the
wastewater discharge, please refer to LAC 33:IX.6123.E.2 or 40 CFR part
403.12(e)(2) [also see LAC 33:IX.6115.F. l.d.iv or 40 CFR part 403.8(t)(2)(v)(A)]
Daily Effluent
Limitation 3
Monthly Effluent
Limitation 3
Sample
Frequency 4
Sample
Type
200
-na-
Twice A Year
Grab
1545
-na-
Twice A Year
Grab
-na-
Twice A Year
Meter
2.13 -na- Twice A Year Grab
2.13 -na- Twice A Year Grab
392
-na-
Twice A Year
Grab
250
-na-
Twice A Year
Grab
2.13
-na-
Annual
Grab
3Any exceedances of the effluent limitations listed in this permit must be reported to
the Environmental Division at (225) 389-5456 within 24 hours of becoming aware
of the violation. 4 Refer to APPENDIX A -TESTING SCHEDULE for a schedule of Sample
Frequencies.
**Flow - There are no specific minimum or maximum effluent limitations on flow, but
average and maximum daily flow in gallons per day for each month must be
reported to the Environmental Division as required in Part 1 B; Special
Provisions Required and Part II - Reporting Requirements, requirement #2.
This report of the monthly flows must be submitted along with the sampling
reports as required in Part II.2 unless an alternative flow-reporting schedule has
been approved by the Environmental Division.
The designated limitations and monitoring requirements may be revised as needed by the
Director of Public Works to comply with the DEQ and EPA regulations. Limitations shall
also be modified at the request of the Permittee when processes are altered.
Bypass or the intentional diversion of wastestreams from the treatment system is prohibited
unless all of the following conditions are met:
(1) The bypass was unavoidable to prevent loss of life, personal injury, or severe
property damage.
(2) There was no feasible alternative to the bypass, including the use of auxiliary
treatment or retention of the wastewater.
(3) The industrial user properly notified the director as described in Ordinance 9195
section 2:257(t)
To comply with Ordinance 8095 section 8:206 all grease traps must be cleaned every three
(3) months.
Note: Ifthe reference levels for Biochemical Oxygen Demand (BODs) or Total Suspended
Solids (TSS) are exceeded, a surcharge will be implemented in accordance with the
City/Parish Ordinance 7853.
PART I
B. SPECIAL PROVISIONS REQUIRED
Permit Number: 02-02256 Outfall(s): All Outfalls
The Regulated Commercial Facility shall comply with the Special Provisions listed below
and shall be in compliance with the applicable requirements set forth in Part II.
SPECIAL PROVISIONS COMPLETION DATES
Report Requirements No. I of Part II See Provision
Report Requirements No. 2 of Part II See Appendix A - Testing Schedule
Report Requirements No. 3 of Part II See Provision
Report Requirements No. 4 of Part II See Provision
Report Requirements No. 5 of Part II See Provision
Special Condition No. I of Part III See Provision
Special Requirements for Part IV (Standard Conditions)
All sixteen (16) conditions apply
Part V Enforcement
Failure to comply with any of the previous permit requirements including failure to pay the
permit fee within the designated time frame may result in one or more of the following
legal remedies:
A. Injunctive Relief
B. Civil Enforcement Penalties
C. Criminal Penalties
D. Liability
E. Revocation of Pennit
F. Termination of Utility Services (Sewer, Water, Electric)
APPENDIX A
TESTING SCHEDULE
Permit Number: 02-02256 Outfall(s): All Outfalls
Report Requirement No. 2 of Part II - The due date of these reports as described in this
requirement is based on the sample frequency identified in PART 1 A. WASTEWATER
DISCHARGE LIMITATION AND MONITORING REQUIREMENTS.
Reports are due on the following dates based on Sample Frequency:
ANNUAL October 1, 2015
TWICE A YEAR October 1, 2015
March 31, 2016
QUARTERLY
July 1, 2015
October 1, 2015
January 1, 2016
March 31, 2016
EVERY 2 MONTHS
June 1, 2015
August 1, 2015
October 1, 2015
December 1, 2015
February 1, 2016
March 31, 2016
MONTHLY
May 1, 2015
June 1, 2015
July 1, 2015
August 1, 2015
September 1, 2015
October 1, 2015
November 1, 2015
December 1, 2015
January 1, 2016
February 1, 2016
March 31, 2016
See PART I "A. WASTEWATER DISCHARGE LIMITATION AND MONITORING
REQUIREMENTS" for parameters and sampling frequencies required.
PART II
REPORTING REQUIREMENTS
l. All reports shall be submitted to the following address:
Department of Public Works - Environmental Division
P.O. Box 1471
Baton Rouge, La. 70821
Attention: Pretreatment Program
2. The permitted Regulated Commercial Facility ( hereafter referred to as RCF) is required to submit to
the Environmental Division the required reports on the results ofits sampling of the pollutants specified
in Part I of this permit. This report shall also contain monthly flows as required.
3. The director shall evaluate, at least every two (2) years, whether each significant industrial user needs
a plan to control slug discharges. For purposes of this subsection, a slug load shall constitute a discharge
that has a flow rate or contains concentrations of pollutants that exceed, for any time period longer
than fifteen (15) minutes, more than five (5) times the average twenty-four hour concentration,
quantities or flow rate during normal operations. Ifthe director determines that a slug control plan is
needed, the plan shall be prepared by the significant industrial user and submitted to the director for
review and approval. Such plan shall contain, at a minimum, the following elements:
a. Description of discharge practices, including non-routine batch discharges.
b. Description of all chemicals and hazardous substances stored at the facility site.
c. Procedures for immediately notifying the POTW of slug discharges, including any discharge
that would violate a prohibition under section 2:252 of the City/Parish Ordinance 9195, with
procedures for follow-up written notification to the director within five (5) days of any
reportable event.
d. Ifnecessary, procedures to prevent adverse impact from accidental spills, including inspection
and maintenance of storage areas, handling and transfer of materials, loading and unloading
operations, control of plant site runoff, working training, building of containment structures
or equipment, measures for containing toxic organic pollutants (including solvents), and/or
measures and equipment for emergency response.
4. Slug Loading Notification and Written Notice
RCF's shall immediately notify the director of any accidental slug pollutant load that has the potential
to cause interference or pass through at the POTW treatment plant. Within five (5) days following any
such accidental discharge, the RCF shall provide the director with a detailed written report describing
the cause of the discharge and the measures to be taken by the RCF to prevent similar future
occurrences. A slug load shall constitute a discharge that has a flow rate or contains concentrations of
pollutants that exceed, for any time period longer than fifteen (15) minutes, more than five (5) times
the average twenty-four hour concentration, quantities or flow rate during normal operations.
5. The permitted RCF shall notify the Director of Public Works prior to the introduction of new
wastewater or pollutants or any substantial change in the volume or characteristics of the wastewater
being introduced into the POTW from the RCF's industrial processes. Formal written notification shall
follow within thirty days of such introduction.
6. Any upset experienced by the RCF of its treatment that places it in a temporary state of non-compliance
with wastewater discharge limitations specified in the City/Parish Ordinance shall be reported to the
City/Parish within twenty-tour hours of first awareness of the commencement of the upset. A detailed
report shall be filed within five days.
7. Any malfunction of pretreatment related devices or equipment such as flow meters, treatment plants,
grease traps etc., shall be reported to the City/Parish within twenty-four hours of first awareness of the
commencing of the malfunction. A detailed report shall he filed within five days.
PART III
SPECIAL CONDITIONS COMPLIANCE SCHEDULES
1. Deviations from the schedules and limits established in Part I must be negotiated with the Department
of Public Works.
PART IV
STANDARD CONDITIONS
I. The pennitted RCF shall comply with all the general prohibitive discharge standards in Section 2.252
and 2.253 of the City/Parish Ordinance.
2. Right of Entry
The permitted RCF shall allow the City/Parish or its representatives, exhibiting proper credentials and
identifications, to enter upon the premises of the RCF, at all reasonable hours, for the purposes of
inspection, sampling, or records inspection. Reasonable hours in the context of inspection and sampling
include any time the RCF is operating any process which results in a process wastewater discharge to
the city sewerage system.
3. Record Retention
a. The permitted RCF shall retain and preserve for no less than three years or as it seems
necessary by the Director of Public Works, any records, books, documents, memoranda,
reports, correspondence and any and all summaries thereof, relating to monitoring, sampling
and chemical analyses made by or on behalf of limitation with respect to any and all appeals
expired.
4. Confidential Information
Except for data determined to be confidential under Section 2:260 of the City/Parish Ordinance 9195,
Chapter 5, all reports required by this permit shall be available for public inspection at the office of the
Coordinator of Environmental Affairs.
5. Recording of Results
For each measurement or sample taken pursuant to the requirements of this permit, the RCF shall
record the following information:
a. The exact place, date and time of sampling;
b. the person(s) doing the sampling;
c. the dates the analyses were performed;
d. the person(s) who performed the analyses;
e. the analytical techniques or methods used; and
f. the results of all required analyses.
6. Dilution
No Pennitted RCF shall increase the use of potable or process water or in any way attempt to dilute a
discharge as a partial or complete substitute for adequate treatment to achieve compliance with the
limitations contained in this permit.
7. Proper Disposal of Pretreatment Sludges and Spent Chemicals
The disposal of sludges and spent chemicals generated shall he done in accordance with Section 405
of the Clean Water Act and Subtitles C & D of the Resource Conservation and Recovery Act.
8. Signatory Requirements
All reports required by this pennit shall be signed by a principal executive officer of the RCF, or his
designee.
9. Revocation of Permit
The pennit issued to the RCF by the City may be revoked when, after inspection, monitoring or analysis
it is detennined that the discharge of wastewater to the sanitary sewer is in violation of Federal, State,
or local laws, ordinances and regulations. Additionally, falsification or intentional misrepresentation of
data or statements pertaining to the pennit application or any other required reporting fonns shall be
cause for pennit revocation.
IO. Limitation on Permit Transfer
Wastewater discharge pennits are issued to a specific RCF for a specific operation and are not
assignable to another RCF or transferable to any other location without proper written approval of the
Director. Sale of a pennitted facility shall obligate the purchaser to seek prior written approval of the
City/Parish for continued discharge to the sewerage system.
11. Falsifying information or Tampering with Monitoring Equipment
Knowingly making any false statement on any report or other document required by this pennit or
knowingly rendering any monitoring device or method inaccurate, may result in punishment under
criminal laws of the City/Parish as well as being subjected to civil penalties and relief.
12. Modification or Revision of the Permit
a. The tenns and conditions of this pennit may be subject to modification by City/Parish at any
time as limitations or requirements as identified in the City/Parish Ordinance, are modified or
other just cause exists.
b. This permit may also be modified to incorporate special conditions resulting from the issuance
of a special order.
c The terms and conditions may be modified as a result of EPA promulgating a new federal
pretreatment standard.
d. Any permit modifications which result in new conditions in the permit shall include a
reasonable time schedule for compliance, it necessary.
13. Duty to Reapply
The City/Parish shall repermit a RCF on a yearly basis. Renewal will be automatic unless otherwise
notified by the RCF that he or she is no longer in business. Within thirty days of the notification, the
RCF shall reapply for reissuance of the permit on a form provided by the City/Parish.
14. Severability
If any provision, paragraph, word, section or article of this Ordinance is invalidated by any court of
competent jurisdiction, the remaining provision, paragraphs, words, sections, and chapters shall not be
affected and shall continue in full force and effect.
15. . Property Rights
The issuance of this permit does not convey any property rights in either real or personal property; any
exclusive privileges; nor does it authorize any invasion of personal rights; nor any infringement of
Federal, State, or local regulations.
16. Legal Remedies
The legal remedies set forth in the City/Parish are as described in the Ordinance 9195, Section 2:259
(a), (b), (c), (d), and (e)
These subsections encompass:
a. Injunctive Relief
b. Civil Enforcement Penalties
c. Criminal Penalties
d. Liability
e. Revocation of Permit
f. Termination of Utility Services (Sewer, Water, and/or Electricity)
PART Y
RULES OF ADMINISTRATIVE REVIEW
In accordance with the provisions of Ordinance 9195 of the Metropolitan Council of the City of Baton Rouge
and Parish of East Baton Rouge, and particularly in accordance with Section 2:255 thereof, the Director of the
Department of Public Works does hereby establish these rules for the administrative review of any appeal lodged
by a RCF of the City/Parish POTW system who is permitted for or whom the Department has notified must
obtain a permit for discharge of waste into the Publicly Owned Treatment Works system of the City of Baton
Rouge and the Parish of East Baton Rouge.
PARTIES
1. Any RCF who has received notice of the requirement to file an application for a pretreatment permit
for discharge into POTW's of the City/Parish, or a RCF who is presently permitted for discharge into
the POTW'S of the City/Parish may request an administrative review of the inclusion of said RCF
within the scope of the permit program, or may request administrative review of any fee, fine, penalty,
assessment, or order issued by the Director of the Department of Public Works in connection with
permitting of or discharges by said user into the City/Parish POTW system.
PAYMENT UNDER PROTEST
2. Ifthe request for administrative review is related to payment of pretreatment pem1it fees or the amount
of such fees, the RCF must indicate when paying the permit fee that, the fee is being paid under protest.
Said RCF must, simultaneously with the payment of the permit fee, file a request for an administrative
review setting forth the basis for the protest of the payment.
3. If the request for administrative review is related to assessment of fines, penalties, or the issuance of
an order by the Director of the Department of Public Works or his designee based on a violation of the
provisions and requirements or Ordinance 9195 said request must be filed with the Director within
thirty days of the receipt of such assessment.
CONTENTS OF REQUEST FOR ADMINISTRATIVE REVIEW
4. All requests for administrative review shall be in writing, shall be signed by the RCF or his authorized
representative, and shall, at a minimum, state:
a. The name, address and phone number of the individual filing the request;
b. the fee, fine, penalty or order from which relief is sought;
c. the name, address and telephone number of the regulated facility;
d. the name, address, business title or position, and telephone number of the authorized agent or
representative or other responsible person for operation of the facility's discharges into the
POTW system;
e. the basis upon which relief is sought;
f. extenuating circumstances or specific justification for granting the relief sought.
5. A request for administrative review shall be filed by hand delivery or by mail directed to: Coordinator
of Environmental Affairs, Department of Public Works, Post Office Box 1471, Baton Rouge,
Louisiana, 70821.
6. Filing a request for administrative review does not suspend the obligation of the requesting party to
comply with the discharge limitations and requirements of Ordinance 9195 prior to or during the
administrative review process.
7. All requests for administrative review shall be initially reviewed by the Department through the Office
of the Coordinator of Environmental Affairs and an administrative conference date will be established.
Any request not containing the information required by Rule 2 may be summarily rejected by the
Coordinator of Environmental Affairs and a notice sent to the requesting party stating the reason for
summary rejection. Summary rejection of a request does not preclude the requesting party from
submitting a new request in accordance with these rules.
8. Requests based on mistaken identification of a RCF, clerical error in the analysis of a waste stream, or
the lack of a physical connection between the discharge facilities of the requesting party and the POTW
system may be resolved in writing by the Director upon recommendation of the Coordinator of
Environmental Affairs, in favor of the requesting party, without the need for an administrative
conference. All other requests must be the subject of at least one administrative conference between
the requesting party and one or more of the following department officials: the Coordinator of
Environmental Affairs, the Pretreatment Manager, or the Environmental Engineer.
9. The administrative conference will be informal in nature. At the administrative conference the
Department will compile an administrative record consisting of pertinent records of the Department
regarding the requesting party and discharges from the requesting party's facility, as well as, any
evidentiary filings the requesting party desires to introduce into the record.
10. Following the administrative conference, a staff determination on a request shall be rendered jointly
by the Coordinator of Environmental Affairs, the Pretreatment Manager, and the Environmental
Engineer. The decision shall be entered into the administrative record and a copy thereof shall be
forwarded to the RCF. Ifno appeal of the staff determination is filed with the Director within thirty
days of the date of the staff determination, the Director may approve the staff determination and render
a final decision based thereon.
I I . Appeal of the staff determination on any request may be made in writing to the Director of the Department
of Public Works within thirty days of the date of the staff determination. Such appeal request may
provide any additional information the requesting party believes necessary for the complete and
thorough understanding of the request. If, in the opinion of the Director, an additional administrative
conferences is necessary to fully assess the issues raised by the requesting party, the Director may
give notice of such conference to the requesting party and the representatives of the Department;
additional written evidence or information for the administrative record may be provided by the
requesting party and representative of the Department of this time.
12. The Director may require that the requesting party provide any information maintained by it as a result
of the requirements of Ordinance 9195 relating to waste generation, disposal or discharge, or relating
to sampling, testing, and analysis of wastes discharged into the POTW system, which in the opinion
of the Director, would provide an evidentiary basis for rendering his decision. Where financial inability
to pay forms the basis for the request and the requested relief involves the payment of fees in
installments or the mitigation of penalties or fines, the Director may require the requesting party to
provide financial statements or accounting data supporting it claim.
13. The Director may take such action following his administrative review as is appropriate for the safe
and environmentally sound operation and maintenance of the POTW's and the pretreatment permit
system; however, the Director shall not:
a. authorize violations of the requirements of Ordinance 9195 or
b. remove any facility from the pretreatment permit system if the facility is discharging any
pollutants into the POTW system in excess of the discharge limits established by Ordinance
9195.
14. The Director may compromise and/or mitigate the amount of penalties to be assessed for violation of
Ordinance 9195 based upon an affirmative good faith shown by the violator that one or more of the
following mitigating factors are applicable to the violating facility:
a. a lack of previous violations and historic compliance with discharge limits;
b. the cause of the violation was due to an act of God, war, or third parties not associated with
the facility;
c. the nature and gravity of the violation was not significant;
d. good faith efforts by the violator to prevent future violations;
e. payment of the full penalty amount creates a real and verifiable danger of making the facility
incapable of future operation;
f. other pertinent factors which, in the opinion of the Director, are probative of the fact that the
violation did not endanger the public safety, health or welfare and did not jeopardize the
integrity of the POTW's of the pretreatment permit system;
g. levying fines shall be in accordance with the United States Environmental Protection
Agency's approved enforcement procedures.
15. The Director may, for good cause shown, make permit fees payable through installments over a period
not to exceed 120 days from the date such fees are due, but the Director may not waive permit fees.
16. Decisions of the Director rendered in the administrative review process shall be final, shall be in
writing and shall be based on the full and complete written administrative record compiled by the
Department and the requesting party.
l 7. Information received by the Department in the course of the administrative review process may be
classified as confidential by the Department only if the Director makes a written determination that
confidentiality is necessary to protect trade secrets, proprietary secrets and information, and
commercial or financial information. However, such a finding regarding confidentiality shall not apply
to necessary use by authorized officers or employees of the department or the federal government in
carrying out their responsibilities under Ordinance 9195 or applicable federal law.
Department of Public Works City of Baton Rouge
Parish of East Baton Rouge
Post office Box 1471
Baton Rouge, La 70821
ENVIRONMENTAL DIVISION Telephone: 225.389.5456
Fax: 225.389.5460
April 7, 2015
Renewal Date: April 1, 2015
Mr. Brian Broussard
Louisiana State University
Office of Facility Services
Rd.
Baton Rouge, LA 70803
(Facility Address)
L.S.U. - Vet. Med.
Intersection of Skip Bertman Dr. & River
Baton Rouge, LA 70803
Dear Mr. Broussard:
As required by Federal Regulations 40 CPR 403.8 (f) (1) (v) the City/Parish is required to
perform inspections, surveillances, and monitoring procedures. The implementation of
these activities necessitates the establishment of a pennit fee based on an estimated cost of
performing these required tasks.
The charge for your permit, Standard Permit No: 02-02122, has been calculated to be
$292.00. Ifyou have any questions regarding the permit, please call John Busse at (225)
389-5456. The Service Fee Business Office will bill you for this fee.
Your next laboratory report Due Date is June 1, 2015. See the attached permit for details.
Failure to pay the permit Fee will result in revocation of your permit.
Sincerely,
:Arunp Environmental Coordinator
PERMIT NUMBER: 02-02122
CITY OF BATON ROUGE/EAST BATON ROUGE PARISH
DEPARTMENT OF PUBLIC WORKS
WASTEWATER DISCHARGE PERMIT
COMPANY NAME: L.S.U. - Vet. Med.
FACILITY ADDRESS: Intersection of Skip Bertman Dr. & River Rd.
Baton Rouge, LA 70803
FACILITY CLASSIFICATION: Non-Significant User
SIC Code: 0741, 0742, 8733
The above Regulated Commercial Facility is authorized to discharge industrial wastewater
into the City of Baton Rouge/East Baton Rouge Parish Sewer System in compliance with
the City/Parish Ordinance Number 9195, Title 2, Chapter 5, Sections 2:250-2:263. All
permitted discharge conditions are subject to the applicable provisions of Federal or State
Law regulations with respect to discharge point(s), effluent limitations, monitoring
requirements, and other conditions set forth herein.
This permit is granted in accordance with information, specification, and/or other data
submitted to the Department of Public Works, Environmental Division.
Renewal Date:
Expiration Date:
April 1, 2015
March 31, 2016
Environmental Coordinator
PART I
A. WASTEWATER DISCHARGE LIMITATION
AND
MONITORING REQUIREMENTS
Permit Number: 02-02122
The Regulated Commercial User shall comply with the effluent limitations by:
April 1, 2015
Outfall: 001
Samples are to be taken from the location described below:
LIFT STATION on west side of building, in pen next to River Road
Parameter (Units) 1,2
Biochemical Oxygen
Demand (mg/I)
Chemical Oxygen Demand
(mg/I)
Flow** (gpd)
200 -na- Every 2 Months Comp
1545 -na- Every 2 Months Comp
Formaldehyde (mg/I)
Phenol Total (mg/I)
Silver (mg/I)
Total Organic Carbon
(mg/I)
Total Suspended Solids
(mg/I)
Volatiles (mg/I)
IAll analytical tests must be performed in accordance with the techniques described
in 40 CFR part 136 (see LAC 33:IX.4901) and amendments thereto. Where 40
CFR part 136 does not contain sampling or analytical techniques for the pollutant in
question, or where the EPA detennines that the part 136 sampling and analytical
techniques are inappropriate for the pollutant in question, sampling and analysis
shall be perfonned by using validated analytical methods or other applicable
sampling and analytical procedures approved by the Environmental Division and the
LDEQ.
2.13
-na-
-na-
Every 2 Months
Every 2 Months
Meter
Comp
2.13 -na- Every 2 Months Grab
0.16 -na- Every 2 Months Comp
392
-na-
Every 2 Months
Comp
250
-na-
Every 2 Months
Comp
2.13
-na-
Annual
Grab
Daily Effluent Monthly Effluent Sample Sample
Limitation 3 Limitation 3 Frequency 4 Type
2To seek a waiver for a pollutant neither present nor expected to be present in the
wastewater discharge, please refer to LAC 33:IX.6123.E.2 or 40 CFR part
403.12(e)(2) [also see LAC 33:IX.6115.F.l.d.iv or 40 CFR part 403.8(f)(2)(v)(A)] 3Any exceedances of the effluent limitations listed in this permit must be reported to
the Environmental Division at (225) 389-5456 within 24 hours of becoming aware
of the violation. 4 Refer to APPENDIX A -TESTING SCHEDULE for a schedule of Sample
Frequencies.
**Flow - There are no specific minimum or maximum effluent limitations on flow, but
average and maximum daily flow in gallons per day for each month must be
reported to the Environmental Division as required in Part 1 B; Special
Provisions Required and Part II -Reporting Requirements, requirement #2.
This report of the monthly flows must be submitted along with the sampling
reports as required in Part II.2 unless an alternative flow-reporting schedule has
been approved by the Environmental Division.
The designated limitations and monitoring requirements may be revised as needed by the
Director of Public Works to comply with the DEQ and EPA regulations. Limitations shall
also be modified at the request of the Permittee when processes are altered.
Bypass or the intentional diversion of wastestreams from the treatment system is prohibited
unless all of the following conditions are met:
(1) The bypass was unavoidable to prevent loss oflife, personal injury, or severe
property damage.
(2) There was no feasible alternative to the bypass, including the use of auxiliary
treatment or retention of the wastewater.
(3) The industrial user properly notified the director as described in Ordinance 9195
section 2:257(f)
To comply with Ordinance 8095 section 8:206 all grease traps must be cleaned every three
(3) months.
Note: Ifthe reference levels for Biochemical Oxygen Demand (BODs) or Total Suspended
Solids (TSS) are exceeded, a surcharge will be implemented in accordance with the
City/Parish Ordinance 7853.
PART I
B. SPECIAL PROVISIONS REQUIRED
Permit Number: 02-02122 Outfall(s): All Outfalls
The Regulated Commercial Facility shall comply with the Special Provisions listed below
and shall be in compliance with the applicable requirements set forth in Part IL
SPECIAL PROVISIONS COMPLETION DATES
Report Requirements No. 1 of Part II See Provision
Report Requirements No. 2 of Part II See Appendix A -Testing Schedule
Report Requirements No. 3 of Part II See Provision
Report Requirements No. 4 of Part II See Provision
Report Requirements No. 5 of Part II See Provision
Special Condition No. 1 of Part III See Provision
Special Requirements for Part IV (Standard Conditions)
All sixteen (16) conditions apply
Part V Enforcement
Failure to comply with any of the previous permit requirements including failure to pay the
permit fee within the designated time frame may result in one or more of the following
legal remedies:
A. Injunctive Relief
B. Civil Enforcement Penalties
C. Criminal Penalties
D. Liability
E. Revocation of Permit
F. Termination of Utility Services (Sewer, Water, Electric)
APPENDIX A
TESTING SCHEDULE
Permit Number: 02-02122 Outfall(s): All Outfalls
Report Requirement No. 2 of Part II - The due date of these reports as described in this
requirement is based on the sample frequency identified in PART 1 A. WASTEWATER
DISCHARGE LIMITATION AND MONITORING REQUIREMENTS.
Reports are due on the following dates based on Sample Frequency:
ANNUAL October 1, 2015
TWICE A YEAR October 1, 2015
March 31, 2016
QUARTERLY
July 1, 2015
October 1, 2015
January 1, 2016
March 31, 2016
EVERY 2 MONTHS
June 1, 2015
August 1, 2015
October 1, 2015
December 1, 2015
February 1, 2016
March 31, 2016
MONTHLY
May 1, 2015
June 1, 2015
July 1, 2015
August 1, 2015
September 1, 2015
October 1, 2015
November 1, 2015
December 1, 2015
January 1, 2016
February 1, 2016
March 31, 2016
See PART I "A. WASTEWATER DISCHARGE LIMITATION AND MONITORING
REQUIREMENTS" for parameters and sampling frequencies required.
PART II
REPORTING REQUIREMENTS
1. All reports shall be submitted to the following address:
Department of Public Works - Environmental Division
P.O. Box 1471
Baton Rouge, La. 70821
Attention: Pretreatment Program
2. The permitted Regulated Commercial Facility (hereafter referred to as RCF) is required to submit to
the Environmental Division the required reports on the results of its sampling of the pollutants specified
in Part I of this permit. This report shall also contain monthly flows as required.
3. The director shall evaluate, at least every two (2) years, whether each significant industrial user needs
a plan to control slug discharges. For purposes of this subsection, a slug load shall constitute a discharge
that has a flow rate or contains concentrations of pollutants that exceed, for any time period longer
than fifteen (15) minutes, more than five (5) times the average twenty-four hour concentration,
quantities or flow rate during normal operations. Ifthe director determines that a slug control plan is
needed, the plan shall be prepared by the significant industrial user and submitted to the director for
review and approval. Such plan shall contain, at a minimum, the following elements:
a. . Description of discharge practices, including non-routine batch discharges.
b. Description of all chemicals and hazardous substances stored at the facility site.
c. Procedures for immediately notifying the POTW of slug discharges, including any discharge
that would violate a prohibition under section 2:252 of the City/Parish Ordinance 9195, with
procedures for follow-up written notification to the director within five (5) days of any
reportable event.
d. Ifnecessary, procedures to prevent adverse impact from accidental spills, including inspection
and maintenance of storage areas, handling and transfer of materials, loading and unloading
operations, control of plant site runoff, working training, building of containment structures
or equipment, measures for containing toxic organic pollutants (including solvents), and/or
measures and equipment for emergency response.
4. Slug Loading Notificatio11 am/ Written Notice
RCF's shall immediately notify the director of any accidental slug pollutant load that has the potential
to cause interference or pass through at the POTW treatment plant. Within five (5) days following any
such accidental discharge, the RCF shall provide the director with a detailed written report describing
the cause of the discharge and the measures to be taken by the RCF to prevent similar future
occurrences. A slug load shall constitute a discharge that has a flow rate or contains concentrations of
pollutants that exceed, for any time period longer than fifteen (15) minutes, more than five (5) times
the average twenty-four hour concentration, quantities or flow rate during normal operations.
5 . The permitted RCF shall notify the Director of Public Works prior to the introduction of new
wastewater or pollutants or any substantial change in the volume or characteristics of the wastewater
being introduced into the POTW from the RCF's industrial processes. Formal written notification shall
follow within thirty days of such introduction.
6. Any upset experienced by the RCF of its treatment that places it in a temporary state of non-compliance
with wastewater discharge limitations specified in the City/Parish Ordinance shall be reported to the
City/Parish within twenty-tour hours of first awareness of the commencement of the upset. A detailed
report shall be filed within five days.
7. Any malfunction of pretreatment related devices or equipment such as flow meters, treatment plants,
grease traps etc., shall be reported to the City/Parish within twenty-four hours of first awareness of the
commencing of the malfunction. A detailed report shall he filed within five days.
PART III
SPECIAL CONDITIONS COMPLIANCE SCHEDULES
l. Deviations from the schedules and limits established in Part I must be negotiated with the Department
of Public Works.
PART IV
STANDARD CONDITIONS
l. The permitted RCF shall comply with all the general prohibitive discharge standards in Section 2.252
and 2.253 of the City/Parish Ordinance.
2. Right of Entry
The permitted RCF shall allow the City/Parish or its representatives, exhibiting proper credentials and
identifications, to enter upon the premises of the RCF, at all reasonable hours, for the purposes of
inspection, sampling, or records inspection. Reasonable hours in the context of inspection and sampling
include any time the RCF is operating any process which results in a process wastewater discharge to
the city sewerage system.
3. Record Retention
a. The permitted RCF shall retain and preserve for no less than three years or as it seems
necessary by the Director of Public Works, any records, books, documents, memoranda,
reports, correspondence and any and all summaries thereof, relating to monitoring, sampling
and chemical analyses made by or on behalf of limitation with respect to any and all appeals
expired.
4. Confidential Information
Except for data determined to be confidential under Section 2:260 of the City/Parish Ordinance 9195,
Chapter 5, all reports required by this permit shall be available for public inspection at the office of the
Coordinator of Environmental Affairs.
5. Recording of Results
For each measurement or sample taken pursuant to the requirements of this permit, the RCF shall
record the following information:
a. The exact place, date and time of sampling;
b. the person(s) doing the sampling;
c. the dates the analyses were performed;
d. the person(s) who performed the analyses;
e. the analytical techniques or methods used; and
f. the results of all required analyses.
6. Dilution
No Permitted RCF shall increase the use of potable or process water or in any way attempt to dilute a
discharge as a partial or complete substitute for adequate treatment to achieve compliance with the
limitations contained in this permit.
7. Proper Disposal of Pretreatment Sludges and Spent Chemicals
The disposal of sludges and spent chemicals generated shall he done in accordance with Section 405
of the Clean Water Act and Subtitles C & D of the Resource Conservation and Recovery Act.
8. Signatory Requirements
All reports required by this permit shall be signed by a principal executive officer of the RCF, or his
designee.
9. Revocation of Permit
The permit issued to the RCF by the City may be revoked when, after inspection, monitoring or analysis
it is determined that the discharge of wastewater to the sanitary sewer is in violation of Federal, State,
or local laws, ordinances and regulations. Additionally, falsification or intentional misrepresentation of
data or statements pertaining to the permit application or any other required reporting forms shall be
cause for permit revocation.
10. Limitation on Permit Transfer
Wastewater discharge permits are issued to a specific RCF for a specific operation and are not
assignable to another RCF or transferable to any other location without proper written approval of the
Director. Sale of a permitted facility shall obligate the purchaser to seek prior written approval of the
City/Parish for continued discharge to the sewerage system.
1 1 . Falsifying information or Tampering with Monitoring Equipment
Knowingly making any false statement on any report or other document required by this permit or
knowingly rendering any monitoring device or method inaccurate, may result in punishment under
criminal laws of the City!Parish as well as being subjected to civil penalties and relief.
12. Modification or Revision of the Permit
a. The terms and conditions of this permit may be subject to modification by City!Parish at any
time as limitations or requirements as identified in the City!Parish Ordinance, are modified or
other just cause exists.
b. This permit may also be modified to incorporate special conditions resulting from the issuance
of a special order.
c The terms and conditions may be modified as a result of EPA promulgating a new federal
pretreatment standard.
d. Any permit modifications which result in new conditions in the permit shall include a
reasonable time schedule for compliance, it necessary.
13. Duty to Reapply
The City/Parish shall repermit a RCF on a yearly basis. Renewal will be automatic unless otherwise
notified by the RCF that he or she is no longer in business. Within thirty days of the notification, the
RCF shall reapply for reissuance of the permit on a form provided by the City/Parish.
14. Severability
If any provision, paragraph, word, section or article of this Ordinance is invalidated by any court of
competent jurisdiction, the remaining provision, paragraphs, words, sections, and chapters shall not be
affected and shall continue in full force and effect.
15. Property Rights
The issuance of this permit does not convey any property rights in either real or personal property; any
exclusive privileges; nor does it authorize any invasion of personal rights; nor any infringement of
Federal, State, or local regulations .
16. Legal Remedies
The legal remedies set forth in the City/Parish are as described in the Ordinance 9195, Section 2:259
(a), (b), (c), (d), and (e)
These subsections encompass:
a. Injunctive Relief
b. Civil Enforcement Penalties
c. Criminal Penalties
d. Liability
e. Revocation of Permit
f. Termination of Utility Services (Sewer, Water, and/or Electricity)
PART Y
RULES OF ADMINISTRATIVE REVIEW
In accordance with the provisions of Ordinance 9195 of the Metropolitan Council of the City of Baton Rouge
and Parish of East Baton Rouge, and particularly in accordance with Section 2:255 thereof, the Director of the
Department of Public Works does hereby establish these rules for the administrative review of any appeal lodged
by a RCF of the City/Parish POTW system who is permitted for or whom the Department has notified must
obtain a permit for discharge of waste into the Publicly Owned Treatment Works system of the City of Baton
Rouge and the Parish of East Baton Rouge.
PARTIES
I. Any RCF who has received notice of the requirement to file an application for a pretreatment permit
for discharge into POTW's of the City/Parish, or a RCF who is presently permitted for discharge into
the POTW'S of the City/Parish may request an administrative review of the inclusion of said RCF
within the scope of the permit program, or may request administrative review of any fee, fine, penalty,
assessment, or order issued by the Director of the Department of Public Works in connection with
permitting of or discharges by said user into tl1e City/Parish POTW system.
PAYMENT UNDER PROTEST
2. Ifthe request for administrative review is related to payment of pretreatment permit fees or the amount
of such fees, the RCF must indicate when paying the permit fee that, the fee is being paid under protest.
Said RCF must, simultaneously with the payment of the permit fee, file a request for an administrative
review setting forth the basis for the protest of the payment.
3. If the request for administrative review is related to assessment of fines, penalties, or the issuance of
an order by the Director of the Department of Public Works or his designee based on a violation of the
provisions and requirements or Ordinance 9195 said request must be filed with the Director within
thirty days of the receipt of such assessment.
CONTENTS OF REQUEST FOR ADMINISTRATIVE REVIEW
4. All requests for administrative review shall be in writing, shall be signed by the RCF or his authorized
representative, and shall, at a minimum, state:
a. The name, address and phone number of the individual filing the request;
b. the fee, fine, penalty or order from which relief is sought;
c. the name, address and telephone number of the regulated facility;
d. the name, address, business title or position, and telephone number of the authorized agent or
representative or other responsible person for operation of the facility's discharges into the
POTW system;
e. the basis upon which relief is sought;
f. extenuating circumstances or specific justification for granting the relief sought.
5. A request for administrative review shall be filed by hand delivery or by mail directed to: Coordinator
of Environmental Affairs, Department of Public Works, Post Office Box 1471, Baton Rouge,
Louisiana, 70821.
6. Filing a request for administrative review does not suspend the obligation of the requesting party to
comply with the discharge limitations and requirements of Ordinance 9195 prior to or during the
administrative review process.
7. All requests for administrative review shall be initially reviewed by the Department through the Office
of the Coordinator of Environmental Affairs and an administrative conference date will be established.
Any request not containing the information required by Rule 2 may be summarily rejected by the
Coordinator of Environmental Affairs and a notice sent to the requesting party stating the reason for
summary rejection. Summary rejection of a request does not preclude the requesting party from
submitting a new request in accordance with these rules.
8. Requests based on mistaken identification of a RCF, clerical error in the analysis of a waste stream, or
the lack of a physical connection between the discharge facilities of the requesting party and the POTW
system may be resolved in writing by the Director upon recommendation of the Coordinator of
Environmental Affairs, in favor of the requesting party, without the need for an administrative
conference. All other requests must be the subject of at least one administrative conference between
the requesting party and one or more of the following department officials: the Coordinator of
Environmental Affairs, the Pretreatment Manager, or the Environmental Engineer.
9. The administrative conference will be informal in nature. At the administrative conference the
Department will compile an administrative record consisting of pertinent records of the Department
regarding the requesting party and discharges from the requesting party's facility, as well as, any
evidentiary filings the requesting party desires to introduce into the record.
10. Following the administrative conference, a staff determination on a request shall be rendered jointly
by the Coordinator of Environmental Affairs, the Pretreatment Manager, and the Environmental
Engineer. The decision shall be entered into the administrative record and a copy thereof shall be
forwarded to the RCF. If no appeal of the staff determination is filed with the Director within thirty
days of the date of the staff determination, the Director may approve the staff determination and render
a final decision based thereon.
11. Appeal of the staff determination on any request may be made in writing to the Director of the
Department of Public Works within thirty days of the date of the staff determination. Such appeal
request may provide any additional information the requesting party believes necessary for the
complete and thorough understanding of the request. If, in the opinion of the Director, an additional
administrative conferences is necessary to fully assess the issues raised by the requesting party, the
Director may give notice of such conference to the requesting party and the representatives of the
Department; additional written evidence or information for the administrative record may be provided
by the requesting party and representative of the Department of this time.
12. The Director may require that the requesting party provide any information maintained by it as a result
of the requirements of Ordinance 9195 relating to waste generation, disposal or discharge, or relating
to sampling, testing, and analysis of wastes discharged into the POTW system, which in the opinion
of the Director, would provide an evidentiary basis for rendering his decision. Where financial
inability to pay forms the basis for the request and the requested relief involves the payment of fees in
installments or the mitigation of penalties or fines, the Director may require the requesting party to
provide financial statements or accounting data supporting it claim.
13. The Director may take such action following his administrative review as is appropriate for the safe
and environmentally sound operation and maintenance of the POTW's and the pretreatment permit
system; however, the Director shall not:
a. authorize violations of the requirements of Ordinance 9195 or
b. remove any facility from the pretreatment permit system if the facility is discharging any
pollutants into the POTW system in excess of the discharge limits established by Ordinance
9195.
14. The Director may compromise and/or mitigate the amount of penalties to be assessed for violation of
Ordinance 9195 based upon an affirmative good faith shown by the violator that one or more of the
following mitigating factors are applicable to the violating facility:
a. a lack of previous violations and historic compliance with discharge limits;
b. the cause of the violation was due to an act of God, war, or third parties not associated with
the facility;
c. the nature and gravity of the violation was not significant;
d. good faith efforts by the violator to prevent future violations;
e. payment of the full penalty amount creates a real and verifiable danger of making the facility
incapable of future operation;
f. other pertinent factors which, in the opinion of the Director, are probative of the fact that the
violation did not endanger the public safety, health or welfare and did not jeopardize the
integrity of the POTW's of the pretreatment permit system;
g. levying fines shall be in accordance with the United States Environmental Protection
Agency's approved enforcement procedures.
15. The Director may, for good cause shown, make permit fees payable through installments over a period
not to exceed 120 days from the date such fees are due, but the Director may not waive permit fees.
16. Decisions of the Director rendered in the administrative review process shall be final, shall be in
writing and shall be based on the full and complete written administrative record compiled by the
Department and the requesting party.
17. Information received by the Department in the course of the administrative review process may be
classified as confidential by the Department only if the Director makes a written determination that
confidentiality is necessary to protect trade secrets, proprietary secrets and information, and
commercial or financial information. However, such a finding regarding confidentiality shall not apply
to necessary use by authorized officers or employees of the department or the federal government in
carrying out their responsibilities under Ordinance 9195 or applicable federal law.
Department of Public Works City of Baton Rouge
Parish of East Baton Rouge
Post office Box 1471
Baton Rouge, La 70821
ENVIRONMENTAL DIVISION Telephone: 225.389.5456
Fax: 225.389.5460
April 7, 2015
Renewal Date: April 1, 2015
Mr. Brian Broussard
Louisiana State University
Office of Facility Services
Baton Rouge, LA 70803
(Facility Address)
L.S.U. - Ag Area
Northwest of East Parker
Baton Rouge, LA 70803
Dear Mr. Broussard:
As required by Federal Regulations 40 CFR 403.8 (t) (1) (v) the City/Parish is required to
perform inspections, surveillances, and monitoring procedures. The implementation of
these activities necessitates the establishment of a permit fee based on an estimated cost of
performing these required tasks.
The charge for your permit, Standard Permit No: 02-02234, has been calculated to be
$189.00. Ifyou have any questions regarding the permit, please call John Busse at (225)
389-5456. The Service Fee Business Office will bill you for this fee.
Your next laboratory report Due Date is October 1, 2015. See the attached permit for
details.
Failure to pay the permit Fee will result in revocation of your permit.
Sincerely,
amp
Environmental Coordinator
PERMIT NUMBER: 02-02234
CITY OF BATON ROUGE/EAST BATON ROUGE PARISH
DEPARTMENT OF PUBLIC WORKS
WASTEWATER DISCHARGE PERMIT
COMPANY NAME: L.S.U. - Ag Area
FACILITY ADDRESS: Northwest of East Parker
Baton Rouge, LA 70803
FACILITY CLASSIFICATION: Non-Significant User
SIC Code: 8734
The above Regulated Commercial Facility is authorized to discharge industrial wastewater
into the City of Baton Rouge/East Baton Rouge Parish Sewer System in compliance with
the City/Parish Ordinance Number 9195, Title 2, Chapter 5, Sections 2:250-2:263. All
permitted discharge conditions are subject to the applicable provisions of Federal or State
Law regulations with respect to discharge point(s), effluent limitations, monitoring
requirements, and other conditions set forth herein.
This permit is granted in accordance with information, specification, and/or other data
submitted to the Department of Public Works, Environmental Division.
Renewal Date:
Expiration Date:
April 1, 2015
March 31, 2016
Dff] d:,u, P Environmental Coordinator
PART I
A. WASTEWATER DISCHARGE LIMITATION
AND
MONITORING REQUIREMENTS
Permit Number: 02-02234
The Regulated Commercial User shall comply with the effluent limitations by:
April 1, 2015
Outfall: 001
Samples are to be taken from the location described below:
MANHOLE on Southeast corner of Sheep & Swine Exhibit Building
Parameter (Units) 1,2
Biochemical Oxygen
Demand (mg/I)
Chemical Oxygen
Demand (mg/I)
200 -na- Annual Grab
1545 -na- Annual Grab
Flow** (gpd) -na- Annual Meter
Total Suspended Solids
(mg/I)
250 -na- Annual Grab
Volatiles (mg/I) 2.13 -na- Annual Grab
IAll analytical tests must be perfonned in accordance with the techniques described
in 40 CFR part 136 (see LAC 33:IX.4901) and amendments thereto. Where 40
CFR part 136 does not contain sampling or analytical techniques for the pollutant in
question, or where the EPA determines that the part 136 sampling and analytical
techniques are inappropriate for the pollutant in question, sampling and analysis
shall be performed by using validated analytical methods or other applicable
sampling and analytical procedures approved by the Environmental Division and the
LDEQ. 2To seek a waiver for a pollutant neither present nor expected to be present in the
wastewater discharge, please refer to LAC 33:IX.6123.E.2 or 40 CFR part
403.12(e)(2) [also see LAC 33:IX.6115.F.l.d.iv or 40 CFR part 403.8(f)(2)(v)(A)] 3Any exceedances of the effluent limitations listed in this permit must be reported to
the Enviromnental Division at (225) 389-5456 within 24 hours of becoming aware
of the violation. 4 Refer to APPENDIX A - TESTING SCHEDULE for a schedule of Sample
Frequencies.
**Flow - There are no specific minimum or maximum effluent limitations on flow, but
Daily Effluent Monthly Effluent Sample Sample
Limitation 3 Limitation 3 Frequency 4 Type
average and maximum daily flow in gallons per day for each month must be
reported to the Environmental Division as required in Part 1 B; Special
Provisions Required and Part II - Reporting Requirements, requirement #2.
This report of the monthly flows must be submitted along with the sampling
reports as required in Part Il.2 unless an alternative flow-reporting schedule has
been approved by the Environmental Division.
The designated limitations and monitoring requirements may be revised as needed by the
Director of Public Works to comply with the DEQ and EPA regulations. Limitations shall
also be modified at the request of the Permittee when processes are altered.
Bypass or the intentional diversion of wastestreams from the treatment system is prohibited
unless all of the following conditions are met:
(1) The bypass was unavoidable to prevent loss oflife, personal injury, or severe
property damage.
(2) There was no feasible alternative to the bypass, including the use of auxiliary
treatment or retention of the wastewater.
(3) The industrial user properly notified the director as described in Ordinance 9195
section 2:257(f)
To comply with Ordinance 8095 section 8:206 all grease traps must be cleaned every three
(3) months.
Note: Ifthe reference levels for Biochemical Oxygen Demand (BODs) or Total Suspended
Solids (TSS) are exceeded, a surcharge will be implemented in accordance with the
City/Parish Ordinance 7853.
PART I
B. SPECIAL PROVISIONS REQUIRED
Permit Number: 02-02234 Outfall(s): All Outfalls
The Regulated Commercial Facility shall comply with the Special Provisions listed below
and shall be in compliance with the applicable requirements set forth in Part II.
SPECIAL PROVISIONS COMPLETION DATES
Report Requirements No. 1 of Part II See Provision
Report Requirements No. 2 of Part II See Appendix A -Testing Schedule
Report Requirements No. 3 of Part II See Provision
Report Requirements No. 4 of Part II See Provision
Report Requirements No. 5 of Part II See Provision
Special Condition No. 1 of Part III See Provision
Special Requirements for Part IV (Standard Conditions)
All sixteen (16) conditions apply
Part V Enforcement
Failure to comply with any of the previous permit requirements including failure to pay the
permit fee within the designated time frame may result in one or more of the following
legal remedies:
A. Injunctive Relief
B. Civil Enforcement Penalties
C. Criminal Penalties
D. Liability
E. Revocation of Permit
F. Tennination of Utility Services (Sewer, Water, Electric)
APPENDIX A
TESTING SCHEDULE
Permit Number: 02-02234 Outfall(s): All Outfalls
Report Requirement No. 2 of Part II - The due date of these reports as described in this
requirement is based on the sample frequency identified in PART 1 A. WASTEWATER
DISCHARGE LIMITATION AND MONITORING REQUIREMENTS.
Reports are due on the following dates based on Sample Frequency:
ANNUAL October 1, 2015
TWICE A YEAR October 1, 2015
March 31, 2016
QUARTERLY
July 1, 2015
October 1, 2015
January 1, 2016
March 31, 2016
EVERY 2 MONTHS
June 1, 2015
August 1, 2015
October 1, 2015
December 1, 2015
February 1, 2016
March 31, 2016
MONTHLY
May 1, 2015
June 1, 2015
July 1, 2015
August 1, 2015
September 1, 2015
October 1, 2015
November 1, 2015
December 1, 2015
January 1, 2016
February 1, 2016
March 31, 2016
See PART I "A. WASTEWATER DISCHARGE LIMITATION AND MONITORING
REQUIREMENTS" for parameters and sampling frequencies required.
PART II
REPORTING REQUIREMENTS
l. All reports shall be submitted to the following address:
Department of Public Works - Environmental Division
P.O. Box 1471
Baton Rouge, La. 70821
Attention: Pretreatment Program
2. The permitted Regulated Commercial Facility ( hereafter referred to as RCF) is required to submit to
the Environmental Division the required reports on the results of its sampling of the pollutants specified
in Part I of this permit. This report shall also contain monthly flows as required.
3. The director shall evaluate, at least every two (2) years, whether each significant industrial user needs
a plan to control slug discharges. For purposes of this subsection, a slug load shall constitute a discharge
that has a flow rate or contains concentrations of pollutants that exceed, for any time period longer
than fifteen (15) minutes, more than five (5) times the average twenty-four hour concentration,
quantities or flow rate during normal operations. Ifthe director determines that a slug control plan is
needed, the plan shall be prepared by the significant industrial user and submitted to the director for
review and approval. Such plan shall contain, at a minimum, the following elements:
a. Description of discharge practices, including non-routine batch discharges.
b. Description of all chemicals and hazardous substances stored at the facility site.
c. Procedures for immediately notifying the POTW of slug discharges, including any discharge
that would violate a prohibition under section 2:252 of the City/Parish Ordinance 9195, with
procedures for follow-up written notification to the director within five (5) days of any
reportable event.
d. Ifnecessary, procedures to prevent adverse impact from accidental spills, including inspection
and maintenance of storage areas, handling and transfer of materials, loading and unloading
operations, control of plant site runoff, working training, building of containment structures
or equipment, measures for containing toxic organic pollutants (including solvents), and/or
measures and equipment for emergency response.
4. Slug Loading Notification and Written Notice
RCF's shall immediately notify the director of any accidental slug pollutant load that has the potential
to cause interference or pass through at the POTW treatment plant. Within five (5) days following any
such accidental discharge, the RCF shall provide the director with a detailed written report describing
the cause of the discharge and the measures to be taken by the RCF to prevent similar future
occurrences. A slug load shall constitute a discharge that has a flow rate or contains concentrations of
pollutants that exceed, for any time period longer than fifteen (15) minutes, more than five (5) times
the average twenty-four hour concentration, quantities or flow rate during normal operations.
5. The permitted RCF shall notify the Director of Public Works prior to the introduction of new
wastewater or pollutants or any substantial change in the volume or characteristics of the wastewater
being introduced into the POTW from the RCF's industrial processes. Formal written notification shall
follow within thirty days of such introduction.
6. Any upset experienced by the RCF of its treatment that places it in a temporary state of non-compliance
with wastewater discharge limitations specified in the City/Parish Ordinance shall be reported to the
City/Parish within twenty-tour hours of first awareness of the commencement of the upset. A detailed
report shall be filed within five days.
7. Any malfunction of pretreatment related devices or equipment such as flow meters, treatment plants,
grease traps etc., shall be reported to the City/Parish within twenty-four hours of first awareness of the
commencing of the malfunction. A detailed report shall he filed within five days.
PART III
SPECIAL CONDITIONS COMPLIANCE SCHEDULES
1. Deviations from the schedules and limits established in Part I must be negotiated with the Department
of Public Works.
PART IV
STANDARD CONDITIONS
I . The permitted RCF shall comply with all the general prohibitive discharge standards in Section 2.252
and 2.253 of the City/Parish Ordinance.
2. Right of Entry
The permitted RCF shall allow the City/Parish or its representatives, exhibiting proper credentials and
identifications, to enter upon the premises of the RCF, at all reasonable hours, for the purposes of
inspection, sampling, or records inspection. Reasonable hours in the context of inspection and sampling
include any time the RCF is operating any process which results in a process wastewater discharge to
the city sewerage system.
3. Record Retention
a. The permitted RCF shall retain and preserve for no less than three years or as it seems
necessary by the Director of Public Warks, any records, books, documents, memoranda,
reports, correspondence and any and all summaries thereof, relating to monitoring, sampling
and chemical analyses made by or on behalf of limitation with respect to any and all appeals
expired.
4. Confidential Information
Except for data determined to be confidential under Section 2:260 of the City/Parish Ordinance 9195,
Chapter 5, all reports required by this permit shall be available for public inspection at the office of the
Coordinator of Environmental Affairs.
5. Recording of Results
For each measurement or sample taken pursuant to the requirements of this permit, the RCF shall
record the following information:
a. The exact place, date and time of sampling;
b. the person(s) doing the sampling;
c. the dates the analyses were performed;
d. the person(s) who performed the analyses;
e. the analytical techniques or methods used; and
f. the results of all required analyses.
6. Dilution
No Permitted RCF shall increase the use of potable or process water or in any way attempt to dilute a
discharge as a partial or complete substitute for adequate treatment to achieve compliance with the
limitations contained in this permit.
7. Proper Disposal of Pretreatment Sludges and Spent Chemicals
The disposal of sludges and spent chemicals generated shall he done in accordance with Section 405
of the Clean Water Act and Subtitles C & D of the Resource Conservation and Recovery Act.
8. Signatory Requirements
All reports required by this permit shall be signed by a principal executive officer of the RCF, or his
designee.
9. Revocation of Permit
The permit issued to the RCF by the City may be revoked when, after inspection, monitoring or analysis
it is determined that the discharge of wastewater to the sanitary sewer is in violation of Federal, State,
or local laws, ordinances and regulations. Additionally, falsification or intentional misrepresentation of
data or statements pertaining to the permit application or any other required reporting forms shall be
cause for permit revocation.
10. Limitation on Permit Transfer
Wastewater discharge permits are issued to a specific RCF for a specific operation and are not
assignable to another RCF or transferable to any other location without proper written approval of the
Director. Sale of a permitted facility shall obligate the purchaser to seek prior written approval of the
City/Parish for continued discharge to the sewerage system.
11. Falsifying information or Tampering with Monitoring Equipment
Knowingly making any false statement on any report or other document required by this permit or
knowingly rendering any monitoring device or method inaccurate, may result in punishment under
criminal laws of the City/Parish as well as being subjected to civil penalties and relief.
12. Modification or Revision of the Permit
a. The tem1s and conditions of this permit may be subject to modification by City/Parish at any
time as limitations or requirements as identified in the City/Parish Ordinance, are modified or
other just cause exists.
b. This permit may also be modified to incorporate special conditions resulting from the issuance
of a special order.
c The terms and conditions may be modified as a result of EPA promulgating a new federal
pretreatment standard.
d. Any permit modifications which result in new conditions in the permit shall include a
reasonable time schedule for compliance, it necessary.
13. Duty to Reapply
The City/Parish shall repermit a RCF on a yearly basis. Renewal will be automatic unless otherwise
notified by the RCF that he or she is no longer in business. Within thirty days of the notification, the
RCF shall reapply for reissuance of the permit on a form provided by the City/Parish.
14. Severability
If any provision, paragraph, word, section or article of this Ordinance is invalidated by any court of
competent jurisdiction, the remaining provision, paragraphs, words, sections, and chapters shall not be
affected and shall continue in full force and effect.
15. Property Rights
The issuance of this permit does not convey any property rights in either real or personal property; any
exclusive privileges; nor does it authorize any invasion of personal rights; nor any infringement of
Federal, State, or local regulations.
16. Legal Remedies
The legal remedies set forth in the City/Parish are as described in the Ordinance 9195, Section 2:259
(a), (b), (c), (d), and (e)
These subsections encompass:
a. Injunctive Relief
b. Civil Enforcement Penalties
c. Criminal Penalties
d. Liability
e. Revocation of Permit
f. Termination of Utility Services (Sewer, Water, and/or Electricity)
PART V
RULES OF ADMINISTRATIVE REVIEW
In accordance with the provisions of Ordinance 9195 of the Metropolitan Council of the City of Baton Rouge
and Parish of East Baton Rouge, and particularly in accordance with Section 2:255 thereof, the Director of the
Department of Public Works does hereby establish these rules for the administrative review of any appeal lodged
by a RCF of the City/Parish POTW system who is permitted for or whom the Department has notified must
obtain a permit for discharge of waste into the Publicly Owned Treatment Works system of the City of Baton
Rouge and the Parish of East Baton Rouge.
PARTIES
1. Any RCF who has received notice of the requirement to file an application for a pretreatment permit
for discharge into POTW's of the City/Parish, or a RCF who is presently permitted for discharge into
the POTW'S of the City/Parish may request an administrative review of the inclusion of said RCF
within the scope of the permit program, or may request administrative review of any fee, fine, penalty,
assessment, or order issued by the Director of the Department of Public Warks in connection with
permitting of or discharges by said user into the City/Parish POTW system.
PAYMENT UNDER PROTEST
2. Ifthe request for administrative review is related to payment of pretreatment permit fees or the amount
of such fees, the RCF must indicate when paying the permit fee that, the fee is being paid under protest.
Said RCF must, simultaneously with the payment of the permit fee, file a request for an administrative
review setting forth the basis for the protest of the payment.
3. If the request for administrative review is related to assessment of fines, penalties, or the issuance of
an order by the Director of the Department of Public Works or his designee based on a violation of the
provisions and requirements or Ordinance 9195 said request must be filed with the Director within
thirty days of the receipt of such assessment.
CONTENTS OF REQUEST FOR ADMINISTRATIVE REVIEW
4. All requests for administrative review shall be in writing, shall be signed by the RCF or his authorized
representative, and shall, at a minimum, state:
a. The name, address and phone number of the individual filing the request;
b. the fee, fine, penalty or order from which relief is sought;
c. the name, address and telephone number of the regulated facility;
d. the name, address, business title or position, and telephone number of the authorized agent or
representative or other responsible person for operation of the facility's discharges into the
POTW system;
e. the basis upon which relief is sought;
f. extenuating circumstances or specific justification for granting the relief sought.
5. A request for administrative review shall be filed by hand delivery or by mail directed to: Coordinator
of Environmental Affairs, Department of Public Works, Post Office Box 1471, Baton Rouge,
Louisiana, 70821.
6. Filing a request for administrative review does not suspend the obligation of the requesting party to
comply with the discharge limitations and requirements of Ordinance 9195 prior to or during the
administrative review process.
7. All requests for administrative review shall be initially reviewed by the Department through the Office
of the Coordinator of Environmental Affairs and an administrative conference date will be established.
Any request not containing the information required by Rule 2 may be summarily rejected by the
Coordinator of Environmental Affairs and a notice sent to the requesting party stating the reason for
summary rejection. Summary rejection of a request does not preclude the requesting party from
submitting a new request in accordance with these rules.
8. Requests based on mistaken identification of a RCF, clerical error in the analysis of a waste stream, or
the Jack of a physical connection between the discharge facilities of the requesting party and the POTW
system may be resolved in writing by the Director upon recommendation of the Coordinator of
Environmental Affairs, in favor of the requesting party, without the need for an administrative
conference. All other requests must be the subject of at least one administrative conference between
the requesting party and one or more of the following department officials: the Coordinator of
Environmental Affairs, the Pretreatment Manager, or the Environmental Engineer.
9. The administrative conference will be informal in nature. At the administrative conference the
Department will compile an administrative record consisting of pertinent records of the Department
regarding the requesting party and discharges from the requesting party's facility, as well as, any
evidentiary filings the requesting party desires to introduce into the record.
I 0. Following the administrative conference, a staff determination on a request shall be rendered jointly by
the Coordinator of Environmental Affairs, the Pretreatment Manager, and the Environmental Engineer.
The decision shall be entered into the administrative record and a copy thereof shall be forwarded
to the RCF. If no appeal of the staff determination is filed with the Director within thirty days of the
date of the staff determination, the Director may approve the staff determination and render a final
decision based thereon.
11. Appeal of the staff determination on any request may be made in writing to the Director of the
Department of Public Works within thirty days of the date of the staff determination. Such appeal
request may provide any additional information the requesting party believes necessary for the
complete and thorough understanding of the request. If, in the opinion of the Director, an additional
administrative conferences is necessary to fully assess the issues raised by the requesting party, the
Director may give notice of such conference to the requesting party and the representatives of the
Department; additional written evidence or information for the administrative record may be provided
by the requesting party and representative of the Department of this time.
12. The Director may require that the requesting party provide any information maintained by it as a result
of the requirements of Ordinance 9195 relating to waste generation, disposal or discharge, or relating
to sampling, testing, and analysis of wastes discharged into the POTW system, which in the opinion
of the Director, would provide an evidentiary basis for rendering his decision. Where financial inability
to pay forms the basis for the request and the requested relief involves the payment of fees in
installments or the mitigation of penalties or fines, the Director may require the requesting party to
provide financial statements or accounting data supporting it claim.
13. The Director may take such action following his administrative review as is appropriate for the safe
and environmentally sound operation and maintenance of the POTW's and the pretreatment permit
system; however, the Director shall not:
a . authorize violations of the requirements of Ordinance 9195 or
b. remove any facility from the pretreatment permit system if the facility is discharging any pollutants
into the POTW system in excess of the discharge limits established by Ordinance 9195.
14. The Director may compromise and/or mitigate the amount of penalties to be assessed for violation of
Ordinance 9195 based upon an affirmative good faith shown by the violator that one or more of the
following mitigating factors are applicable to the violating facility:
a . a lack of previous violations and historic compliance with discharge limits;
b. the cause of the violation was due to an act of God, war, or third parties not associated with
the facility;
c . the nature and gravity of the violation was not significant;
d. good faith efforts by the violator to prevent future violations;
e . payment of the full penalty amount creates a real and verifiable danger of making the facility
incapable of future operation;
f. other pertinent factors which, in the opinion of the Director, are probative of the fact that the
violation did not endanger the public safety, health or welfare and did not jeopardize the
integrity of the POTW's of the pretreatment permit system;
g. levying fines shall be in accordance with the United States Environmental Protection
Agency's approved enforcement procedures.
15. The Director may, for good cause shown, make permit fees payable through installments over a period
not to exceed 120 days from the date such fees are due, but the Director may not waive permit fees.
16. Decisions of the Director rendered in the administrative review process shall be final, shall be in
writing and shall be based on the full and complete written administrative record compiled by the
Department and the requesting party.
17. Information received by the Department in the course of the administrative review process may be
classified as confidential by the Department only if the Director makes a written determination that
confidentiality is necessary to protect trade secrets, proprietary secrets and information, and
commercial or financial information. However, such a finding regarding confidentiality shall not apply
to necessary use by authorized officers or employees of the department or the federal government in
carrying out their responsibilities under Ordinance 9195 or applicable federal law.
Department of Public Works City of Baton Rouge
Parish of East Baton Rouge
Post office Box 1471
Baton Rouge, La 70821
ENVIRONMENT AL DIVISION Telephone: 225 .389.5456
Fax: 225.389.5460
April 7, 2015
Renewal Date: April 1, 2015
Mr. Brian Broussard
Louisiana State University
Office of Facility Services
Baton Rouge, LA 70803
(Facility Address)
L.S.U. - Northwest Campus
Between W Roosevelt St. & N Stadium Rd.
Baton Rouge, LA 70803
Dear Mr. Broussard:
As required by Federal Regulations 40 CFR 403.8 (f) (1) (v) the City/Parish is required to
perform inspections, surveillances, and monitoring procedures. The implementation of
these activities necessitates the establishment of a permit fee based on an estimated cost of
performing these required tasks.
The charge for your permit, Standard Permit No: 02-02124, has been calculated to be
$161.00. Ifyou have any questions regarding the permit, please call John Busse at (225)
389-5456. The Service Fee Business Office will bill you for this fee.
Your next laboratory report Due Date is May 1, 2015. See the attached permit for details.
Failure to pay the pennit Fee will result in revocation of your permit.
Sincerely,
lofcampr::r Environmental Coordinator
PERMIT NUMBER: 02-02124
CITY OF BATON ROUGE/EAST BATON ROUGE PARISH
DEPARTMENT OF PUBLIC WORKS
WASTEWATER DISCHARGE PERMIT
COMPANY NAME: L.S.U. - Northwest Campus
FACILITY ADDRESS: Between W Roosevelt St. & N Stadium Rd.
Baton Rouge, LA 70803
FACILITY CLASSIFICATION: Non-Significant User
SIC Code: 5812, 7395, 8221
The above Regulated Commercial Facility is authorized to discharge industrial wastewater
into the City of Baton Rouge/East Baton Rouge Parish Sewer System in compliance with
the City/Parish Ordinance Number 9195, Title 2, Chapter 5, Sections 2:250-2:263. All
permitted discharge conditions are subject to the applicable provisions of Federal or State
Law regulations with respect to discharge point(s), effluent limitations, monitoring
requirements, and other conditions set forth herein.
This permit is granted in accordance with information, specification, and/or other data
submitted to the Department of Public Works, Environmental Division.
Renewal Date:
Expiration Date:
April 1, 2015
March 31, 2016
D u, P
Environmental Coordinator
PART I A. WASTEWATER DISCHARGE LIMITATION
AND
MONITORING REQUIREMENTS
Permit Number: 02-02124
The Regulated Commercial User shall comply with the effluent limitations by:
April 1, 2015
Outfall: 001
Samples are to be taken from the location described below:
MANHOLE in a street wihtout name, located between practice field and fence, west of Kirby-Smith Hall.
Parameter (Units) 1,2 Daily Effluent
Limitation 3
Monthly Effluent Sample Sample
Limitation 3 Frequency 4 Type
Arsenic (mg/I) 0.04 -na- Twice A Year Grab
Biochemical Oxygen
Demand (mg/I) 200 -na- Monthly Comp
Cadmium (mg/I) 0.27 -na- Twice A Year Grab
Chemical Oxygen
Demand (mg/I) 1545 -na- Monthly Comp
Chromium (mg/I) 1.7
Copper (mg/I) 0.56
Cyanide Total (mg/I) 0.57
Flow** (gpd)
Mercury (mg/I) 0.81
Nickel (mg/I) 0.37
Oil and Grease (mg/I) 100
pH (unit) 5.5-9.5
Silver (mg/I) 0.16
-na- Twice A Year Grab
-na- Twice A Year Grab
-na- Twice A Year Grab
-na- Every 2 Months Meter
-na- Twice A Year Grab
-na- Twice A Year Grab
-na- Monthly Grab
-na- Monthly Meter
-na- Monthly Comp
Total Suspended Solids
(mg/I)
250
-na- Monthly Comp
Zinc (mg/I) 0.57 -na- Twice A Year Grab
IAll analytical tests must be performed in accordance with the techniques described
in 40 CFR part 136 (see LAC 33:IX.4901) and amendments thereto. Where 40
CFR part 136 does not contain sampling or analytical techniques for the pollutant in
question, or where the EPA determines that the part 136 sampling and analytical
techniques are inappropriate for the pollutant in question, sampling and analysis
shall be performed by using validated analytical methods or other applicable
sampling and analytical procedures approved by the Environmental Division and the
LDEQ. 2To seek a waiver for a pollutant neither present nor expected to be present in the
wastewater discharge, please refer to LAC 33:IX.6123.E.2 or 40 CFR part
403.12(e)(2) [also see LAC 33:IX.6115.F.l.d.iv or 40 CFR part 403.8(f)(2)(v)(A)] 3Any exceedances of the effluent limitations listed in this permit must be reported to
the Environmental Division at (225) 389-5456 within 24 hours of becoming aware
of the violation. 4 Refer to APPENDIX A -TESTING SCHEDULE for a schedule of Sample
Frequencies.
**Flow - There are no specific minimum or maximum effluent limitations on flow, but
average and maximum daily flow in gallons per day for each month must be
reported to the Environmental Division as required in Part 1 B; Special
Provisions Required and Part II -Reporting Requirements, requirement #2.
This report of the monthly flows must be submitted along with the sampling
reports as required in Part 11.2 unless an alternative flow-reporting schedule has
been approved by the Environmental Division.
The designated limitations and monitoring requirements may be revised as needed by the
Director of Public Works to comply with the DEQ and EPA regulations. Limitations shall
also be modified at the request of the Permittee when processes are altered.
Bypass or the intentional diversion of wastestreams from the treatment system is prohibited
unless all of the following conditions are met:
(1) The bypass was unavoidable to prevent loss oflife, personal injury, or severe
property damage.
(2) There was no feasible alternative to the bypass, including the use of auxiliary
treatment or retention of the wastewater.
(3) The industrial user properly notified the director as described in Ordinance 9195
section 2:257(f)
To comply with Ordinance 8095 section 8:206 all grease traps must be cleaned every three
(3) months.
Note: Ifthe reference levels for Biochemical Oxygen Demand (BODs) or Total Suspended
Solids (TSS) are exceeded, a surcharge will be implemented in accordance with the
City/Parish Ordinance 7853.
PART I
B. SPECIAL PROVISIONS REQUIRED
Permit Number: 02-02124 Outfall(s): All Outfalls
The Regulated Commercial Facility shall comply with the Special Provisions listed below
and shall be in compliance with the applicable requirements set forth in Part II.
SPECIAL PROVISIONS COMPLETION DATES
Report Requirements No. 1 of Part II See Provision
Report Requirements No. 2 of Part II See Appendix A -Testing Schedule
Report Requirements No. 3 of Part II See Provision
Report Requirements No. 4 of Part II See Provision
Report Requirements No. 5 of Part II See Provision
Special Condition No. 1 of Part III See Provision
Special Requirements for Part IV (Standard Conditions)
All sixteen (16) conditions apply
Part V Enforcement
Failure to comply with any of the previous permit requirements including failure to pay the
permit fee within the designated time frame may result in one or more of the following
legal remedies:
A. Injunctive Relief
B. Civil Enforcement Penalties
C. Criminal Penalties
D. Liability
E. Revocation of Permit
F. Termination of Utility Services (Sewer, Water, Electric)
APPENDIX A
TESTING SCHEDULE
Permit Number: 02-02124 Outfall(s): All Outfalls
Report Requirement No. 2 of Part II - The due date of these reports as described in this
requirement is based on the sample frequency identified in PART 1 A. WASTEWATER
DISCHARGE LIMITATION AND MONITORING REQUIREMENTS.
Reports are due on the following dates based on Sample Frequency:
ANNUAL October 1, 2015
TWICE A YEAR October 1, 2015
March 31, 2016
QUARTERLY
July 1, 2015
October 1, 2015
January 1, 2016
March 31, 2016
EVERY 2 MONTHS
June 1, 2015
August 1, 2015
October 1, 2015
December 1, 2015
February 1, 2016
March 31, 2016
MONTHLY
May 1, 2015
June 1, 2015
July 1, 2015
August 1, 2015
September 1, 2015
October 1, 2015
November 1, 2015
December 1, 2015
January 1, 2016
February 1, 2016
March 31, 2016
See PART I "A. WASTEWATER DISCHARGE LIMITATION AND MONITORING
REQUIREMENTS" for parameters and sampling frequencies required.
PART II
REPORTING REQUIREMENTS
I. All reports shall be submitted to the following address:
Department of Public Works - Environmental Division
P.O. Box 1471
Baton Rouge, La. 70821
Attention: Pretreatment Program
2. The permitted Regulated Commercial Facility (hereafter referred to as RCF) is required to submit to
the Environmental Division the required reports on the results of its sampling of the pollutants specified
in Part I of this permit. This report shall also contain monthly flows as required.
3. The director shall evaluate, at least every two (2) years, whether each significant industrial user needs
a plan to control slug discharges. For purposes of this subsection, a slug load shall constitute a discharge
that has a flow rate or contains concentrations of pollutants that exceed, for any time period longer
than fifteen (15) minutes, more than five (5) times the average twenty-four hour concentration,
quantities or flow rate during normal operations. Ifthe director determines that a slug control plan is
needed, the plan shall be prepared by the significant industrial user and submitted to the director for
review and approval. Such plan shall contain, at a minimum, the following elements:
a. Description of discharge practices, including non-routine batch discharges.
b. Description of all chemicals and hazardous substances stored at the facility site.
c. Procedures for immediately notifying the POTW of slug discharges, including any discharge
that would violate a prohibition under section 2:252 of the City/Parish Ordinance 9195, with
procedures for follow-up written notification to the director within five (5) days of any
reportable event.
d. Ifnecessary, procedures to prevent adverse impact from accidental spills, including inspection
and maintenance of storage areas, handling and transfer of materials, loading and unloading
operations, control of plant site runoff, working training, building of containment structures
or equipment, measures for containing toxic organic pollutants (including solvents), and/or
measures and equipment for emergency response.
4. Slug Loading Notification and Written Notice
RCF's shall immediately notify the director of any accidental slug pollutant load that has the potential
to cause interference or pass through at the POTW treatment plant. Within five (5) days following any
such accidental discharge, the RCF shall provide the director with a detailed written report describing
the cause of the discharge and the measures to be taken by the RCF to prevent similar future
occurrences. A slug load shall constitute a discharge that has a flow rate or contains concentrations of
pollutants that exceed, for any time period longer than fifteen (15) minutes, more than five (5) times
the average twenty-four hour concentration, quantities or flow rate during normal operations.
5. The permitted RCF shall notify the Director of Public Works prior to the introduction of new
wastewater or pollutants or any substantial change in the volume or characteristics of the wastewater
being introduced into the POTW from the RCF's industrial processes. Formal written notification shall
follow within thirty days of such introduction.
6. Any upset experienced by the RCF of its treatment that places it in a temporary state of non-compliance
with wastewater discharge limitations specified in the City/Parish Ordinance shall be reported to the
City/Parish within twenty-tour hours of first awareness of the commencement of the upset. A detailed
report shall be filed within five days.
7. Any malfunction of pretreatment related devices or equipment such as flow meters, treatment plants,
grease traps etc., shall be reported to the City/Parish within twenty-four hours of first awareness of the
commencing of the malfunction. A detailed report shall he filed within five days.
PART III
SPECIAL CONDITIONS COMPLIANCE SCHEDULES
I. Deviations from the schedules and limits established in Part I must be negotiated with the Department
of Public Works.
PART IV
STANDARD CONDITIONS
1. The permitted RCF shall comply with all the general prohibitive discharge standards in Section 2.252
and 2.253 of the City/Parish Ordinance.
2. Right of Entry
The permitted RCF shall allow the City/Parish or its representatives, exhibiting proper credentials and
identifications, to enter upon the premises of the RCF, at all reasonable hours, for the purposes of
inspection, sampling, or records inspection. Reasonable hours in the context of inspection and sampling
include any time the RCF is operating any process which results in a process wastewater discharge to
the city sewerage system.
3. Record Retention
a. The permitted RCF shall retain and preserve for no less than three years or as it seems
necessary by the Director of Public Works, any records, books, documents, memoranda,
reports, correspondence and any and all summaries thereof, relating to monitoring, sampling
and chemical analyses made by or on behalf of limitation with respect to any and all appeals
expired.
4. Confidential Information
Except for data determined to be confidential under Section 2:260 of the City/Parish Ordinance 9195,
Chapter 5, all reports required by this permit shall be available for public inspection at the office of the
Coordinator of Environmental Affairs.
5. Recording of Results
For each measurement or sample taken pursuant to the requirements of this permit, the RCF shall
record the following information:
a. The exact place, date and time of sampling;
b. the person(s) doing the sampling;
c. the dates the analyses were performed;
d. the person(s) who performed the analyses;
e. the analytical techniques or methods used; and
f. the results of all required analyses.
6. Dilution
No Permitted RCF shall increase the use of potable or process water or in any way attempt to dilute a
discharge as a partial or complete substitute for adequate treatment to achieve compliance with the
limitations contained in this permit.
7. Proper Disposal of Pretreatment Sludges and Spent Chemicals
The disposal of sludges and spent chemicals generated shall he done in accordance with Section 405
of the Clean Water Act and Subtitles C & D of the Resource Conservation and Recovery Act.
8. Signatory Requirements
All reports required by this permit shall be signed by a principal executive officer of the RCF, or his
designee.
9. Revocation of Permit
The permit issued to the RCF by the City may be revoked when, after inspection, monitoring or analysis
it is determined that the discharge of wastewater to the sanitary sewer is in violation of Federal, State,
or local laws, ordinances and regulations. Additionally, falsification or intentional misrepresentation of
data or statements pertaining to the permit application or any other required reporting forms shall be
cause for permit revocation.
10. Limitation on Permit Transfer
Wastewater discharge permits are issued to a specific RCF for a specific operation and are not
assignable to another RCF or transferable to any other location without proper written approval of the
Director. Sale of a permitted facility shall obligate the purchaser to seek prior written approval of the
City/Parish for continued discharge to the sewerage system.
11. Falsifying information or Tampering with Monitoring Equipment
Knowingly making any false statement on any report or other document required by this permit or
knowingly rendering any monitoring device or method inaccurate, may result in punishment under
criminal laws of the City/Parish as well as being subjected to civil penalties and relief.
l 2. Modification or Revision of the Permit
a. The tem1s and conditions of this permit may be subject to modification by City/Parish at any
time as limitations or requirements as identified in the City/Parish Ordinance, are modified or
other just cause exists.
b. This permit may also be modified to incorporate special conditions resulting from the issuance
of a special order.
c The terms and conditions may be modified as a result of EPA promulgating a new federal
pretreatment standard.
d. Any permit modifications which result in new conditions in the permit shall include a
reasonable time schedule for compliance, it necessary.
13. Duty to Reapply
The City/Parish shall repermit a RCF on a yearly basis. Renewal will be automatic unless otherwise
notified by the RCF that he or she is no longer in business. Within thirty days of the notification, the
RCF shall reapply for reissuance of the permit on a form provided by the City/Parish.
14. Severability
If any provision, paragraph, word, section or article of this Ordinance is invalidated by any court of
competent jurisdiction, the remaining provision, paragraphs, words, sections, and chapters shall not be
affected and shall continue in full force and effect.
15. Property Rights
The issuance of this permit does not convey any property rights in either real or personal property; any
exclusive privileges; nor does it authorize any invasion of personal rights; nor any infringement of
Federal, State, or local regulations.
16. Legal Remedies
The legal remedies set forth in the City/Parish are as described in the Ordinance 9195, Section 2:259
(a), (b), (c), (d), and (e)
These subsections encompass:
a. Injunctive Relief
b. Civil Enforcement Penalties
c. Criminal Penalties
d. Liability
e. Revocation of Permit
f. Termination of Utility Services (Sewer, Water, and/or Electricity)
PART V
RULES OF ADMINISTRATIVE REVIEW
In accordance with the provisions of Ordinance 9195 of the Metropolitan Council of the City of Baton Rouge
and Parish of East Baton Rouge, and particularly in accordance with Section 2:255 thereof, the Director of the
Department of Public Works does hereby establish these rules for the administrative review of any appeal lodged
by a RCF of the City/Parish POTW system who is permitted for or whom the Department has notified must
obtain a permit for discharge of waste into the Publicly Owned Treatment Works system of the City of Baton
Rouge and the Parish of East Baton Rouge.
PARTIES
1. Any RCF who has received notice of the requirement to file an application for a pretreatment permit
for discharge into POTW's of the City/Parish, or a RCF who is presently permitted for discharge into
the POTW'S of the City/Parish may request an administrative review of the inclusion of said RCF
within the scope of the permit program, or may request administrative review of any fee, fine, penalty,
assessment, or order issued by the Director of the Department of Public Works in connection with
permitting of or discharges by said user into the City/Parish POTW system.
PAYMENT UNDER PROTEST
2. Ifthe request for administrative review is related to payment of pretreatment permit fees or the amount
of such fees, the RCF must indicate when paying the permit fee that, the fee is being paid under protest.
Said RCF must, simultaneously with the payment of the permit fee, file a request for an administrative
review setting forth the basis for the protest of the payment.
3. If the request for administrative review is related to assessment of fines, penalties, or the issuance of
an order by the Director of the Department of Public Works or his designee based on a violation of the
provisions and requirements or Ordinance 9195 said request must be filed with the Director within
thirty days of the receipt of such assessment.
CONTENTS OF REQUEST FOR ADMINISTRATIVE REVIEW
4. All requests for administrative review shall be in writing, shall be signed by the RCF or his authorized
representative, and shall, at a minimum, state:
a. The name, address and phone number of the individual filing the request;
b. the fee, fine, penalty or order from which relief is sought;
c. the name, address and telephone number of the regulated facility;
d. the name, address, business title or position, and telephone number of the authorized agent or
representative or other responsible person for operation of the facility's discharges into the
POTW system;
e. the basis upon which relief is sought;
f. extenuating circumstances or specific justification for granting the relief sought.
5. A request for administrative review shall be filed by hand delivery or by mail directed to: Coordinator
of Environmental Affairs, Department of Public Works, Post Office Box 1471, Baton Rouge,
Louisiana, 70821.
6. Filing a request for administrative review does not suspend the obligation of the requesting party to
comply with the discharge limitations and requirements of Ordinance 9195 prior to or during the
administrative review process.
7. All requests for administrative review shall be initially reviewed by the Department through the Office
of the Coordinator of Environmental Affairs and an administrative conference date will be established.
Any request not containing the information required by Rule 2 may be summarily rejected by the
Coordinator of Environmental Affairs and a notice sent to the requesting party stating the reason for
summary rejection. Summary rejection of a request does not preclude the requesting party from
submitting a new request in accordance with these rules.
8. Requests based on mistaken identification of a RCF, clerical error in the analysis of a waste stream, or
the lack of a physical connection between the discharge facilities of the requesting party and the POTW
system may be resolved in writing by the Director upon recommendation of the Coordinator of
Environmental Affairs, in favor of the requesting party, without the need for an administrative
conference. All other requests must be the subject of at least one administrative conference between
the requesting party and one or more of the following department officials: the Coordinator of
Environmental Affairs, the Pretreatment Manager, or the Environmental Engineer.
9. The administrative conference will be informal in nature. At the administrative conference the
Department will compile an administrative record consisting of pertinent records of the Department
regarding the requesting party and discharges from the requesting party's facility, as well as, any
evidentiary filings the requesting party desires to introduce into the record.
10. Following the administrative conference, a staff determination on a request shall be rendered jointly
by the Coordinator of Environmental Affairs, the Pretreatment Manager, and the Environmental
Engineer. The decision shall be entered into the administrative record and a copy thereof shall be
forwarded to the RCF. If no appeal of the staff determination is filed with the Director within thirty
days of the date of the staff determination, the Director may approve the staff determination and render
a final decision based thereon.
1J . Appeal of the staff determination on any request may be made in writing to the Director of the Department
of Public Works within thirty days of the date of the staff determination. Such appeal request may
provide any additional information the requesting party believes necessary for the complete and
thorough understanding of the request. If, in the opinion of the Director, an additional administrative
conferences is necessary to fully assess the issues raised by the requesting party, the Director may
give notice of such conference to the requesting party and the representatives of the Department;
additional written evidence or information for the administrative record may be provided by the
requesting party and representative of the Department of this time.
12. The Director may require that the requesting party provide any information maintained by it as a result
of the requirements of Ordinance 9195 relating to waste generation, disposal or discharge, or relating
to sampling, testing, and analysis of wastes discharged into the POTW system, which in the opinion
of the Director, would provide an evidentiary basis for rendering his decision. Where financial
inability to pay forms the basis for the request and the requested relief involves the payment of fees in
installments or the mitigation of penalties or fines, the Director may require the requesting party to
provide financial statements or accounting data supporting it claim.
13. The Director may take such action following his administrative review as is appropriate for the safe
and environmentally sound operation and maintenance of the POTW's and the pretreatment permit
system; however, the Director shall not:
a. authorize violations of the requirements of Ordinance 9195 or
b. remove any facility from the pretreatment permit system if the facility is discharging any
pollutants into the POTW system in excess of the discharge limits established by Ordinance
9195.
14. The Director may compromise and/or mitigate the amount of penalties to be assessed for violation of
Ordinance 9195 based upon an affirmative good faith shown by the violator that one or more of the
following mitigating factors are applicable to the violating facility:
a. a lack of previous violations and historic compliance with discharge limits;
b. the cause of the violation was due to an act of God, war, or third parties not associated with
the facility;
c. the nature and gravity of the violation was not significant;
d. good faith efforts by the violator to prevent future violations;
e. payment of the full penalty amount creates a real and verifiable danger of making the facility
incapable of future operation;
f. other pertinent factors which, in the opinion of the Director, are probative of the fact that the
violation did not endanger the public safety, health or welfare and did not jeopardize the
integrity of the POTW's of the pretreatment permit system;
g. levying fines shall be in accordance with the United States Environmental Protection
Agency's approved enforcement procedures.
15. The Director may, for good cause shown, make permit fees payable through installments over a period
not to exceed 120 days from the date such fees are due, but the Director may not waive permit fees.
16. Decisions of the Director rendered in the administrative review process shall be final, shall be in
writing and shall be based on the full and complete written administrative record compiled by the
Department and the requesting party.
17. Information received by the Department in the course of the administrative review process may be
classified as confidential by the Department only if the Director makes a written determination that
confidentiality is necessary to protect trade secrets, proprietary secrets and information, and
commercial or financial information. However, such a finding regarding confidentiality shall not apply
to necessary use by authorized officers or employees of the department or the federal government in
carrying out their responsibilities under Ordinance 9195 or applicable federal law.
Pr
Department of Public Works City of Baton Rouge
Parish of East Baton Rouge
Post office Box 1471
Baton Rouge, La 70821
ENVIRONMENTAL DIVISION Telephone: 225.389.5456
Fax: 225.389.5460
April 14, 2015
Renewal Date: April 1, 2015
Mr. Brian Broussard
Louisiana State University
Office of Facility Services
Baton Rouge, LA 70803
(Facility Address)
L.S.U. - Fraternity Row
Between East Chimes St. & Dalrymple Dr.
Baton Rouge, LA 70802
Dear Mr. Broussard:
As required by Federal Regulations 40 CFR 403.8 (f) (1) (v) the City/Parish is required to
perform inspections, surveillances, and monitoring procedures. The implementation of
these activities necessitates the establishment of a permit fee based on an estimated cost of
performing these required tasks.
The charge for your permit, Standard Permit No: 02-02120, has been calculated to be
$153.00. Ifyou have any questions regarding the permit, please call John Busse at (225)
389-5456. The Service Fee Business Office will bill you for this fee.
Your next laboratory report Due Date is June 1, 2015. See the attached permit for details.
Failure to pay the permit Fee will result in revocation of your permit.
Sincerely,
fJ cJt ea Dale E. Campau,
Environmental Coordinator
PERMIT NUMBER: 02-02120
CITY OF BATON ROUGE/EAST BATON ROUGE PARISH
DEPARTMENT OF PUBLIC WORKS
WASTEWATER DISCHARGE PERMIT
COMPANY NAME: L.S.U. - Fraternity Row
FACILITY ADDRESS: Between East Chimes St. & Dalrymple Dr.
Baton Rouge, LA 70802
FACILITY CLASSIFICATION: Non-Significant User
SIC Code: 7013
The above Regulated Commercial Facility is authorized to discharge industrial wastewater
into the City of Baton Rouge/East Baton Rouge Parish Sewer System in compliance with
the City/Parish Ordinance Number 9195, Title 2, Chapter 5, Sections 2:250-2:263. All
permitted discharge conditions are subject to the applicable provisions of Federal or State
Law regulations with respect to discharge point(s), effluent limitations, monitoring
requirements, and other conditions set forth herein.
This permit is granted in accordance with information, specification, and/or other data
submitted to the Department of Public Works, Environmental Division.
Renewal Date:
Expiration Date:
April 1, 2015
March 31, 2016
D u, P
Environmental Coordinator
PART I
A. WASTEWATER DISCHARGE LIMITATION
AND
MONITORING REQUIREMENTS
Permit Number: 02-02120
The Regulated Commercial User shall comply with the effluent limitations by:
April 1, 2015
Outfall: 001
Samples are to be taken from the location described below:
MANHOLE next to lift station (upstream nd east from the lift station), located
northeast of Phi Delta Theta Fraternity
Parameter (Units) 1,2
Biochemical Oxygen
Demand (mg/I)
Chemical Oxygen
Demand (mg/I)
Flow** (gpd)
200 -na- Every 2 Months Comp
1545 -na- Every 2 Months Comp
Oil and Grease (mg/I)
Total Suspended Solids
(mg/I)
IAll analytical tests must be performed in accordance with the techniques described
in 40 CFR part 136 (see LAC 33:IX.4901) and amendments thereto. Where 40 CFR
part 136 does not contain sampling or analytical techniques for the pollutant in
question, or where the EPA determines that the part 136 sampling and analytical
techniques are inappropriate for the pollutant in question, sampling and analysis
shall be perfonned by using validated analytical methods or other applicable
sampling and analytical procedures approved by the Environmental Division and the
LDEQ. 2To seek a waiver for a pollutant neither present nor expected to be present in the
wastewater discharge, please refer to LAC 33:IX.6123.E.2 or 40 CFR part
403.12(e)(2) [also see LAC 33:IX.6115.F.1.d.iv or 40 CFR part 403.8(f)(2)(v)(A)] 3Any exceedances of the effluent limitations listed in this pennit must be reported to
the Enviromnental Division at (225) 389-5456 within 24 hours of becoming aware
of the violation. 4 Refer to APPENDIX A - TESTING SCHEDULE for a schedule of Sample
Frequencies.
100
-na-
-na-
Every 2 Months
Every 2 Months
Meter
Grab
250
-na-
Every 2 Months
Comp
Daily Effluent Monthly Effluent Sample Sample
Limitation 3 Limitation 3 Frequency 4 Type
**Flow - There are no specific minimum or maximum effluent limitations on flow, but
average and maximum daily flow in gallons per day for each month must be
reported to the Environmental Division as required in Part 1 B; Special
Provisions Required and Part II -Reporting Requirements, requirement #2.
This report of the monthly flows must be submitted along with the sampling
reports as required in Part 11.2 unless an alternative flow-reporting schedule has
been approved by the Environmental Division.
The designated limitations and monitoring requirements may be revised as needed by the
Director of Public Works to comply with the DEQ and EPA regulations. Limitations shall
also be modified at the request of the Permittee when processes are altered.
Bypass or the intentional diversion of wastestreams from the treatment system is prohibited
unless all of the following conditions are met:
(1) The bypass was unavoidable to prevent loss of life, personal injury, or severe
property damage.
(2) There was no feasible alternative to the bypass, including the use of auxiliary
treatment or retention of the wastewater.
(3) The industrial user properly notified the director as described in Ordinance 9195
section 2:257(±)
To comply with Ordinance 8095 section 8:206 all grease traps must be cleaned every three
(3) months.
Note: Ifthe reference levels for Biochemical Oxygen Demand (BODs) or Total Suspended
Solids {TSS) are exceeded, a surcharge will be implemented in accordance with the
City/Parish Ordinance 7853.
PART I
B. SPECIAL PROVISIONS REQUIRED
Permit Number: 02-02120 Outfall(s): All Outfalls
The Regulated Commercial Facility shall comply with the Special Provisions listed below
and shall be in compliance with the applicable requirements set forth in Part II.
SPECIAL PROVISIONS COMPLETION DATES
Report Requirements No. 1 of Part II See Provision
Report Requirements No. 2 of Part II See Appendix A - Testing Schedule
Report Requirements No. 3 of Part II See Provision
Report Requirements No. 4 of Part II See Provision
Report Requirements No. 5 of Part II See Provision
Special Condition No. 1 of Part III See Provision
Special Requirements for Part IV (Standard Conditions)
All sixteen (16) conditions apply
Part V Enforcement
Failure to comply with any of the previous permit requirements including failure to pay the
permit fee within the designated time frame may result in one or more of the following
legal remedies:
A. Injunctive Relief
B. Civil Enforcement Penalties
C. Criminal Penalties
D. Liability
E. Revocation of Permit
F. Tennination of Utility Services (Sewer, Water, Electric)
APPENDIX A
TESTING SCHEDULE
Permit Number: 02-02120 Outfall(s): All Outfalls
Report Requirement No. 2 of Part II - The due date of these reports as described in this
requirement is based on the sample frequency identified in PART 1 A. WASTEWATER
DISCHARGE LIMITATION AND MONITORING REQUIREMENTS.
Reports are due on the following dates based on Sample Frequency:
ANNUAL October 1, 2015
TWICE A YEAR October 1, 2015
March 31, 2016
QUARTERLY
July 1, 2015
October 1, 2015
January 1, 2016
March 31, 2016
EVERY 2 MONTHS
June 1, 2015
August 1, 2015
October 1, 2015
December 1, 2015
February 1, 2016
March 31, 2016
MONTHLY
May 1, 2015
June 1, 2015
July 1, 2015
August 1, 2015
September 1, 2015
October 1, 2015
November 1, 2015
December 1, 2015
January 1, 2016
February 1, 2016
March 31, 2016
See PART I "A. WASTEWATER DISCHARGE LIMITATION AND MONITORING
REQUIREMENTS" for parameters and sampling frequencies required.
PART II
REPORTING REQUIREMENTS
I . All reports shall be submitted to the following address:
Department of Public Works - Environmental Division
P.O. Box 1471
Baton Rouge, La. 70821
Attention: Pretreatment Program
2. The permitted Regulated Commercial Facility (hereafter referred to as RCF) is required to submit to
the Environmental Division the required reports on the results ofits sampling of the pollutants specified
in Part I of this permit. This report shall also contain monthly flows as required.
3. The director shall evaluate, at least every two (2) years, whether each significant industrial user needs
a plan to control slug discharges. For purposes of this subsection, a slug load shall constitute a discharge
that has a flow rate or contains concentrations of pollutants that exceed, for any time period longer
than fifteen (15) minutes, more than five (5) times the average twenty-four hour concentration,
quantities or flow rate during normal operations. Ifthe director determines that a slug control plan is
needed, the plan shall be prepared by the significant industrial user and submitted to the director for
review and approval. Such plan shall contain, at a minimum, the following elements:
a. Description of discharge practices, including non-routine batch discharges.
b. Description of all chemicals and hazardous substances stored at the facility site.
c. Procedures for immediately notifying the POTW of slug discharges, including any discharge
that would violate a prohibition under section 2:252 of the City/Parish Ordinance 9195, with
procedures for follow-up written notification to the director within five (5) days of any
reportable event.
d. Ifnecessary, procedures to prevent adverse impact from accidental spills, including inspection
and maintenance of storage areas, handling and transfer of materials, loading and unloading
operations, control of plant site runoff, working training, building of containment structures
or equipment, measures for containing toxic organic pollutants (including solvents), and/or
measures and equipment for emergency response.
4. Slug Loading Notification am/ Written Notice
RCF's shall immediately notify the director of any accidental slug pollutant load that has the potential
to cause interference or pass through at the POTW treatment plant. Within five (5) days following any
such accidental discharge, the RCF shall provide the director with a detailed written report describing
the cause of the discharge and the measures to be taken by the RCF to prevent similar future
occurrences. A slug load shall constitute a discharge that has a flow rate or contains concentrations of
pollutants that exceed, for any time period longer than fifteen (15) minutes, more than five (5) times
the average twenty-four hour concentration, quantities or flow rate during normal operations.
5. The permitted RCF shall notify the Director of Public Works prior to the introduction of new
wastewater or pollutants or any substantial change in the volume or characteristics of the wastewater
being introduced into the POTW from the RCF's industrial processes. Formal written notification shall
follow within thirty days of such introduction.
6. Any upset experienced by the RCF of its treatment that places it in a temporary state of non-compliance
with wastewater discharge limitations specified in the City/Parish Ordinance shall be reported to the
City/Parish within twenty-tour hours of first awareness of the commencement of the upset. A detailed
report shall be filed within five days.
7. Any malfunction of pretreatment related devices or equipment such as flow meters, treatment plants,
grease traps etc., shall be reported to the City/Parish within twenty-four hours of first awareness of the
commencing of the malfunction. A detailed report shall he filed within five days.
PART III
SPECIAL CONDITIONS COMPLIANCE SCHEDULES
I . Deviations from the schedules and limits established in Part I must be negotiated with the Department
of Public Works.
PART IV
STANDARD CONDITIONS
l . The permitted RCF shall comply with all the general prohibitive discharge standards in Section 2.252
and 2.253 of the City/Parish Ordinance.
2. Right of Entry
The pennitted RCF shall allow the City/Parish or its representatives, exhibiting proper credentials and
identifications, to enter upon the premises of the RCF, at all reasonable hours, for the purposes of
inspection, sampling, or records inspection. Reasonable hours in the context of inspection and sampling
include any time the RCF is operating any process which results in a process wastewater discharge to
the city sewerage system.
3. Record Retention
a. The permitted RCF shall retain and preserve for no less than three years or as it seems
necessary by the Director of Public Works, any records, books, documents, memoranda,
reports, correspondence and any and all summaries thereof, relating to monitoring, sampling
and chemical analyses made by or on behalf of limitation with respect to any and all appeals
expired.
4. Confidential Information
Except for data determined to be confidential under Section 2:260 of the City/Parish Ordinance 9195,
Chapter 5, all reports required by this permit shall be available for public inspection at the office of the
Coordinator of Environmental Affairs.
5. Recording of Results
For each measurement or sample taken pursuant to the requirements of this permit, the RCF shall
record the following information:
a. The exact place, date and time of sampling;
b. the person(s) doing the sampling;
c. the dates the analyses were performed;
d. the person(s) who performed the analyses;
e. the analytical techniques or methods used; and
f. the results of all required analyses.
6. Dilution
No Permitted RCF shall increase the use of potable or process water or in any way attempt to dilute a
discharge as a partial or complete substitute for adequate treatment to achieve compliance with the
limitations contained in this permit.
7. Proper Disposal of Pretreatment Sludges and Spent Chemicals
The disposal of sludges and spent chemicals generated shall he done in accordance with Section 405
of the Clean Water Act and Subtitles C & D of the Resource Conservation and Recovery Act.
8. Signatory Requirements
All reports required by this permit shall be signed by a principal executive officer of the RCF, or his
designee.
9. Revocation of Permit
The permit issued to the RCF by the City may be revoked when, after inspection, monitoring or analysis
it is determined that the discharge of wastewater to the sanitary sewer is in violation of Federal, State,
or local laws, ordinances and regulations. Additionally, falsification or intentional misrepresentation
of data or statements pertaining to the permit application or any other required reporting forms shall
be cause for permit revocation.
10. Limitation on Permit Transfer
Wastewater discharge permits are issued to a specific RCF for a specific operation and are not
assignable to another RCF or transferable to any other location without proper written approval of the
Director. Sale of a permitted facility shall obligate the purchaser to seek prior written approval of the
City/Parish for continued discharge to the sewerage system.
11. Falsifying information or Tampering with Monitoring Equipment
Knowingly making any false statement on any report or other document required by this permit or
knowingly rendering any monitoring device or method inaccurate, may result in punishment under
criminal laws of the City/Parish as well as being subjected to civil penalties and relief.
12. Modification or Revision of the Permit
a. The terms and conditions of this permit may be subject to modification by City/Parish at any
time as limitations or requirements as identified in the City/Parish Ordinance, are modified or
other just cause exists.
b. This permit may also be modified to incorporate special conditions resulting from the issuance
of a special order.
c The terms and conditions may be modified as a result of EPA promulgating a new federal
pretreatment standard.
d. Any permit modifications which result in new conditions in the permit shall include a
reasonable time schedule for compliance, it necessary.
13. Duty to Reapply
The City/Parish shall repermit a RCF on a yearly basis. Renewal will be automatic unless otherwise
notified by the RCF that he or she is no longer in business. Within thirty days of the notification, the
RCF shall reapply for reissuance of the permit on a form provided by the City/Parish.
14. Severability
If any provision, paragraph, word, section or article of this Ordinance is invalidated by any court of
competent jurisdiction, the remaining provision, paragraphs, words, sections, and chapters shall not be
affected and shall continue in full force and effect.
15. Property Rights
The issuance of this permit does not convey any property rights in either real or personal property; any
exclusive privileges; nor does it authorize any invasion of personal rights; nor any infringement of
Federal, State, or local regulations.
I 6. Legal Remedies
The legal remedies set forth in the City/Parish are as described in the Ordinance 9195, Section 2:259
(a), (b), (c), (d), and (e)
These subsections encompass:
a. Injunctive Relief
b. Civil Enforcement Penalties
c. Criminal Penalties
d. Liability
e. Revocation of Permit
f. Termination of Utility Services (Sewer, Water, and/or Electricity)
PART Y
RULES OF ADMINISTRATIVE REVIEW
In accordance with the provisions of Ordinance 9195 of the Metropolitan Council of the City of Baton Rouge
and Parish of East Baton Rouge, and particularly in accordance with Section 2:255 thereof, the Director of the
Department of Public Works does hereby establish these rules for the administrative review of any appeal lodged
by a RCF of the City/Parish POTW system who is permitted for or whom the Department has notified must
obtain a permit for discharge of waste into the Publicly Owned Treatment Works system of the City of Baton
Rouge and the Parish of East Baton Rouge.
PARTIES
1. Any RCF who has received notice of the requirement to file an application for a pretreatment permit
for discharge into POTW's of the City/Parish, or a RCF who is presently permitted for discharge into
the POTW'S of the City/Parish may request an administrative review of the inclusion of said RCF
within the scope of the permit program, or may request administrative review of any fee, fine, penalty,
assessment, or order issued by the Director of the Department of Public Works in connection with
permitting of or discharges by said user into the City/Parish POTW system.
PAYMENT UNDER PROTEST
2. Ifthe request for administrative review is related to payment of pretreatment permit fees or the amount
of such fees, the RCF must indicate when paying the permit fee that, the fee is being paid under protest.
Said RCF must, simultaneously with the payment of the permit fee, file a request for an administrative
review setting forth the basis for the protest of the payment.
3. If the request for administrative review is related to assessment of fines, penalties, or the issuance of
an order by the Director of the Department of Public Works or his designee based on a violation of the
provisions and requirements or Ordinance 9195 said request must be filed with the Director within
thirty days of the receipt of such assessment.
CONTENTS OF REQUEST FOR ADMINISTRATIVE REVIEW
4. All requests for administrative review shall be in writing, shall be signed by the RCF or his authorized
representative, and shall, at a minimum, state:
a. The name, address and phone number of the individual filing the request;
b. the fee, fine, penalty or order from which relief is sought;
c. the name, address and telephone number of the regulated facility;
d. the name, address, business title or position, and telephone number of the authorized agent or
representative or other responsible person for operation of the facility's discharges into the
POTW system;
e. the basis upon which relief is sought;
f. extenuating circumstances or specific justification for granting the relief sought.
5. A request for administrative review shall be filed by hand delivery or by mail directed to: Coordinator
of Environmental Affairs, Department of Public Works, Post Office Box 1471, Baton Rouge,
Louisiana, 70821.
6. Filing a request for administrative review does not suspend the obligation of the requesting party to
comply with the discharge limitations and requirements of Ordinance 9195 prior to or during the
administrative review process.
7. All requests for administrative review shall be initially reviewed by the Department through the Office
of the Coordinator of Environmental Affairs and an administrative conference date will be established.
Any request not containing the information required by Rule 2 may be summarily rejected by the
Coordinator of Environmental Affairs and a notice sent to the requesting party stating the reason for
summary rejection. Summary rejection of a request does not preclude the requesting party from
submitting a new request in accordance with these rules.
8. Requests based on mistaken identification of a RCF, clerical error in the analysis of a waste stream, or
the lack of a physical connection between the discharge facilities of the requesting party and the POTW
system may be resolved in writing by the Director upon recommendation of the Coordinator of
Environmental Affairs, in favor of the requesting party, without the need for an administrative
conference. All other requests must be the subject of at least one administrative conference between
the requesting party and one or more of the following department officials: the Coordinator of
Environmental Affairs, the Pretreatment Manager, or the Environmental Engineer.
9. The administrative conference will be informal in nature. At the administrative conference the
Department will compile an administrative record consisting of pertinent records of the Department
regarding the requesting party and discharges from the requesting party's facility, as well as, any
evidentiary filings the requesting party desires to introduce into the record.
10. Following the administrative conference, a staff determination on a request shall be rendered jointly
by the Coordinator of Environmental Affairs, the Pretreatment Manager, and the Environmental
Engineer. The decision shall be entered into the administrative record and a copy thereof shall be
forwarded to the RCF. If no appeal of the staff determination is filed with the Director within thirty
days of the date of the staff determination, the Director may approve the staff determination and render
a final decision based thereon.
11. Appeal of the staff determination on any request may be made in writing to the Director of the
Department of Public Works within thirty days of the date of the staff determination. Such appeal
request may provide any additional information the requesting party believes necessary for the
complete and thorough understanding of the request. If, in the opinion of the Director, an additional
administrative conferences is necessary to fully assess the issues raised by the requesting party, the
Director may give notice of such conference to the requesting party and the representatives of the
Department; additional written evidence or information for the administrative record may be provided
by the requesting party and representative of the Department of this time.
12. The Director may require that the requesting party provide any information maintained by it as a result
of the requirements of Ordinance 9195 relating to waste generation, disposal or discharge, or relating
to sampling, testing, and analysis of wastes discharged into the POTW system, which in the opinion
of the Director, would provide an evidentiary basis for rendering his decision. Where financial
inability to pay forms the basis for the request and the requested relief involves the payment offees in
installments or the mitigation of penalties or fines, the Director may require the requesting party to
provide financial statements or accounting data supporting it claim.
13. The Director may take such action following his administrative review as is appropriate for the safe
and environmentally sound operation and maintenance of the POTW's and the pretreatment permit
system; however, the Director shall not:
a. authorize violations of the requirements of Ordinance 9195 or
b. remove any facility from the pretreatment permit system if the facility is discharging any
pollutants into the POTW system in excess of the discharge limits established by Ordinance
9195.
14. The Director may compromise and/or mitigate the amount of penalties to be assessed for violation of
Ordinance 9195 based upon an affirmative good faith shown by the violator that one or more of the
following mitigating factors are applicable to the violating facility:
a. a lack of previous violations and historic compliance with discharge limits;
b. the cause of the violation was due to an act of God, war, or third parties not associated with
the facility;
c. the nature and gravity of the violation was not significant;
d. good faith efforts by the violator to prevent future violations;
e. payment of the full penalty amount creates a real and verifiable danger of making the facility
incapable of future operation;
f. other pertinent factors which, in the opinion of the Director, are probative of the fact that the
violation did not endanger the public safety, health or welfare and did not jeopardize the
integrity of the POTW's of the pretreatment permit system;
g. levying fines shall be in accordance with the United States Environmental Protection
Agency's approved enforcement procedures.
15. The Director may, for good cause shown, make permit fees payable through installments over a period
not to exceed 120 days from the date such fees are due, but the Director may not waive permit fees.
16. Decisions of the Director rendered in the administrative review process shall be final, shall be in
writing and shall be based on the full and complete written administrative record compiled by the
Department and the requesting party.
17. Information received by the Department in the course of the administrative review process may be
classified as confidential by the Department only if the Director makes a written determination that
confidentiality is necessary to protect trade secrets, proprietary secrets and information, and
commercial or financial information. However, such a finding regarding confidentiality shall not apply
to necessary use by authorized officers or employees of the department or the federal government in
carrying out their responsibilities under Ordinance 9195 or applicable federal law.
Department of Public Works City of Baton Rouge
Parish of East Baton Rouge
Post office Box 1471
Baton Rouge, La 70821
ENVIRONMENTAL DIVISION Telephone: 225.389.5456
Fax: 225.389.5460
April 14, 2015
Renewal Date: April 1, 2015
Mr. Brian Broussard
Louisiana State University
Office of Facility Services
Baton Rouge, LA 70803
(Facility Address)
L.S.U. - Lakeshore
East of Dalrymple Dr. & Isaac Cline Dr.
Baton Rouge, LA 70803
Dear Mr. Broussard:
As required by Federal Regulations 40 CFR 403.8 (f) (1) (v) the City/Parish is required to
perform inspections, surveillances, and monitoring procedures. The implementation of
these activities necessitates the establishment of a permit fee based on an estimated cost of
performing these required tasks.
The charge for your permit, Standard Permit No: 02-02121, has been calculated to be
$153.00. Ifyou have any questions regarding the permit, please call John Busse at (225)
389-5456. The Service Fee Business Office will bill you for this fee.
Your next laboratory report Due Date is October 1, 2015. See the attached permit for
details.
Failure to pay the permit Fee will result in revocation of your permit.
Sincerely,
Iolcamp(:; w Envirorunental Coordinator
PERMIT NUMBER: 02-02121
CITY OF BATON ROUGE/EAST BATON ROUGE PARISH
DEPARTMENT OF PUBLIC WORKS
WASTEWATER DISCHARGE PERMIT
COMPANY NAME: L.S.U. - Lakeshore
FACILITY ADDRESS: East of Dalrymple Dr. & Isaac Cline Dr.
Baton Rouge, LA 70803
FACILITY CLASSIFICATION: Non-Significant User
SIC Code: 7013
The above Regulated Commercial Facility is authorized to discharge industrial wastewater
into the City of Baton Rouge/East Baton Rouge Parish Sewer System in compliance with
the City/Parish Ordinance Number 9195, Title 2, Chapter 5, Sections 2:250-2:263. All
permitted discharge conditions are subject to the applicable provisions of Federal or State
Law regulations with respect to discharge point(s), effluent limitations, monitoring
requirements, and other conditions set forth herein.
This permit is granted in accordance with information, specification, and/or other data
submitted to the Department of Public Works, Environmental Division.
Renewal Date:
Expiration Date:
April 1, 2015
March 31, 2016
DJf::.u,P Environmental Coordinator
PART I
A. WASTEWATER DISCHARGE LIMITATION
AND
MONITORING REQUIREMENTS
Permit Number: 02-02121
The Regulated Commercial User shall comply with the effluent limitations by:
April 1, 2015
' Outfall: 001
Samples are to be taken from the location described below:
LIFT STATION on Lakeshore, next to International Learning Center
Parameter {Units) 1,2
Biochemical Oxygen
Demand (mg/I)
200 -na- Twice A Year Comp
Chemical Oxygen
Demand (mg/I)
1545 -na- Twice A Year Comp
Flow** (gpd)
Oil and Grease (mg/I)
Total Suspended Solids
(mg/I)
1All analytical tests must be performed in accordance with the techniques described
in 40 CFR part 136 (see LAC 33:IX.4901) and amendments thereto. Where 40
CFR part 136 does not contain sampling or analytical techniques for the pollutant in
question, or where the EPA detennines that the part 136 sampling and analytical
techniques are inappropriate for the pollutant in question, sampling and analysis
shall be performed by using validated analytical methods or other applicable
sampling and analytical procedures approved by the Enviromnental Division and the
LDEQ. 2To seek a waiver for a pollutant neither present nor expected to be present in the
wastewater discharge, please refer to LAC 33:IX.6123.E.2 or 40 CFR part
403.12(e)(2) [also see LAC 33:IX.6115.F.l.d.iv or 40 CFR part 403.8(f)(2)(v)(A)] 3Any exceedances of the effluent limitations listed in this pennit must be reported to
the Environmental Division at (225) 389-5456 within 24 hours of becoming aware
of the violation. 4 Refer to APPENDIX A -TESTING SCHEDULE for a schedule of Sample
Frequencies.
**Flow - There are no specific minimum or maximum effluent limitations on flow, but
100
-na-
-na-
Twice A Year
Twice A Year
Meter
Grab
250
-na-
Twice A Year
Comp
Daily Effluent Monthly Effluent Sample Sample
Limitation 3 Limitation 3 Frequency 4 Type
average and maximum daily flow in gallons per day for each month must be
reported to the Environmental Division as required in Part 1 B; Special
Provisions Required and Part II -Reporting Requirements, requirement #2.
This report of the monthly flows must be submitted along with the sampling
reports as required in Part 11.2 unless an alternative flow-reporting schedule has
been approved by the Environmental Division.
The designated limitations and monitoring requirements may be revised as needed by the
Director of Public Works to comply with the DEQ and EPA regulations. Limitations shall
also be modified at the request of the Permittee when processes are altered.
Bypass or the intentional diversion of wastestreams from the treatment system is prohibited
unless all of the following conditions are met:
(1) The bypass was unavoidable to prevent loss of life, personal injury, or severe
property damage.
(2) There was no feasible alternative to the bypass, including the use of auxiliary
treatment or retention of the wastewater.
(3) The industrial user properly notified the director as described in Ordinance 9195
section 2:257(f)
To comply with Ordinance 8095 section 8:206 all grease traps must be cleaned every three
(3) months.
Note: Ifthe reference levels for Biochemical Oxygen Demand (BODs) or Total Suspended
Solids (TSS) are exceeded, a surcharge will be implemented in accordance with the
City/Parish Ordinance 7853.
PART I
B. SPECIAL PROVISIONS REQUIRED
Permit Number: 02-02121 Outfall(s): All Outfalls
The Regulated Commercial Facility shall comply with the Special Provisions listed below
and shall be in compliance with the applicable requirements set forth in Part II.
SPECIAL PROVISIONS COMPLETION DATES
Report Requirements No. 1 of Part II See Provision
Report Requirements No. 2 of Part II See Appendix A - Testing Schedule
Report Requirements No. 3 of Part II See Provision
Report Requirements No. 4 of Part II See Provision
Report Requirements No. 5 of Part II See Provision
Special Condition No. 1 of Part III See Provision
Special Requirements for Part IV (Standard Conditions)
All sixteen (16) conditions apply
Part V Enforcement
Failure to comply with any of the previous permit requirements including failure to pay the
permit fee within the designated time frame may result in one or more of the following
legal remedies:
A. Injunctive Relief
B. Civil Enforcement Penalties
C. Criminal Penalties
D. Liability
E. Revocation of Pennit
F. Tennination of Utility Services (Sewer, Water, Electric)
APPENDIX A
TESTING SCHEDULE
Permit Number: 02-02121 Outfall(s): All Outfalls
Report Requirement No. 2 of Part II - The due date of these reports as described in this
requirement is based on the sample frequency identified in PART 1 A. WASTEWATER
DISCHARGE LIMITATION AND MONITORING REQUIREMENTS.
Reports are due on the following dates based on Sample Frequency:
ANNUAL October 1, 2015
TWICE A YEAR October 1, 2015
March 31, 2016
QUARTERLY
July 1, 2015
October 1, 2015
January 1, 2016
March 31, 2016
EVERY 2 MONTHS
June 1, 2015
August 1, 2015
October 1, 2015
December 1, 2015
February 1, 2016
March 31, 2016
MONTHLY
May 1, 2015
June 1, 2015
July 1, 2015
August 1, 2015
September 1, 2015
October 1, 2015
November 1, 2015
December 1, 2015
January 1, 2016
February 1, 2016
March 31, 2016
See PART I "A. WASTEWATER DISCHARGE LIMITATION AND MONITORING
REQUIREMENTS" for parameters and sampling frequencies required.
PART II
REPORTING REQUIREMENTS
l . All reports shall be submitted to the following address:
Department of Public Works - Environmental Division
P.O. Box 1471
Baton Rouge, La. 70821
Attention: Pretreatment Program
2. The permitted Regulated Commercial Facility (hereafter referred to as RCF) is required to submit to
the Environmental Division the required reports on the results of its sampling of the pollutants specified
in Part I of this permit. This report shall also contain monthly flows as required.
3. The director shall evaluate, at least every two (2) years, whether each significant industrial user needs
a plan to control slug discharges. For purposes of this subsection, a slug load shall constitute a discharge
that has a flow rate or contains concentrations of pollutants that exceed, for any time period longer
than fifteen (15) minutes, more than five (5) times the average twenty-four hour concentration,
quantities or flow rate during normal operations. Ifthe director determines that a slug control plan is
needed, the plan shall be prepared by the significant industrial user and submitted to the director for
review and approval. Such plan shall contain, at a minimum, the following elements:
a. Description of discharge practices, including non-routine batch discharges.
b. Description of all chemicals and hazardous substances stored at the facility site.
c. Procedures for immediately notifying the POTW of slug discharges, including any discharge
that would violate a prohibition under section 2:252 of the City/Parish Ordinance 9195, with
procedures for follow-up written notification to the director within five (5) days of any
reportable event.
d. Ifnecessary, procedures to prevent adverse impact from accidental spills, including inspection
and maintenance of storage areas, handling and transfer of materials, loading and unloading
operations, control of plant site runoff, working training, building of containment structures
or equipment, measures for containing toxic organic pollutants (including solvents), and/or
measures and equipment for emergency response.
4. Slug Loading Notification and Written Notice
RCF's shall immediately notify the director of any accidental slug pollutant load that has the potential
to cause interference or pass through at the POTW treatment plant. Within five (5) days following any
such accidental discharge, the RCF shall provide the director with a detailed written report describing
the cause of the discharge and the measures to be taken by the RCF to prevent similar future
occurrences. A slug load shall constitute a discharge that has a flow rate or contains concentrations of
pollutants that exceed, for any time period longer than fifteen (15) minutes, more than five (5) times
the average twenty-four hour concentration, quantities or flow rate during normal operations.
5. The permitted RCF shall notify the Director of Public Works prior to the introduction of new
wastewater or pollutants or any substantial change in the volume or characteristics of the wastewater
being introduced into the POTW from the RCF's industrial processes. Formal written notification shall
follow within thirty days of such introduction.
6. Any upset experienced by the RCF of its treatment that places it in a temporary state of non-compliance
with wastewater discharge limitations specified in the City/Parish Ordinance shall be reported to the
City/Parish within twenty-tour hours of first awareness of the commencement of the upset. A detailed
report shall be filed within five days.
7. Any malfunction of pretreatment related devices or equipment such as flow meters, treatment plants,
grease traps etc., shall be reported to the City/Parish within twenty-four hours of first awareness of the
commencing of the malfunction. A detailed report shall he filed within five days.
PART III
SPECIAL CONDITIONS COMPLIANCE SCHEDULES
I . Deviations from the schedules and limits established in Part Imust be negotiated with the Department
of Public Warks.
PART IV
STANDARD CONDITIONS
I . The permitted RCF shall comply with all the general prohibitive discharge standards in Section 2.252
and 2.253 of the City/Parish Ordinance.
2. Right of Entry
The permitted RCF shall allow the City/Parish or its representatives, exhibiting proper credentials and
identifications, to enter upon the premises of the RCF, at all reasonable hours, for the purposes of
inspection, sampling, or records inspection. Reasonable hours in the context of inspection and sampling
include any time the RCF is operating any process which results in a process wastewater discharge to
the city sewerage system.
3. Record Retention
a. The permitted RCF shall retain and preserve for no less than three years or as it seems
necessary by the Director of Public Works, any records, books, documents, memoranda,
reports, correspondence and any and all summaries thereof, relating to monitoring, sampling
and chemical analyses made by or on behalf of limitation with respect to any and all appeals
expired.
4. Confidential Information
Except for data determined to be confidential under Section 2:260 of the City/Parish Ordinance 9195,
Chapter 5, all reports required by this permit shall be available for public inspection at the office of the
Coordinator of Environmental Affairs.
5. Recording of Results
For each measurement or sample taken pursuant to the requirements of this permit, the RCF shall
record the following information:
a. The exact place, date and time of sampling;
b. the person(s) doing the sampling;
c. the dates the analyses were performed;
d. the person(s) who performed the analyses;
e. the analytical techniques or methods used; and
f. the results of all required analyses.
6. Dilution
No Permitted RCF shall increase the use of potable or process water or in ary way attempt to dilute a
discharge as a partial or complete substitute for adequate treatment to achieve compliance with the
limitations contained in this permit.
7. Proper Disposal of Pretreatment Sludges and Spent Chemicals
The disposal of sludges and spent chemicals generated shall he done in accordance with Section 405
of the Clean Water Act and Subtitles C & D of the Resource Conservation and Recovery Act.
8. Signatory Requirements
All reports required by this permit shall be signed by a principal executive officer of the RCF, or his
designee.
9. Revocation of Permit
The permit issued to the RCF by the City may be revoked when, after inspection, monitoring or analysis
it is determined that the discharge of wastewater to the sanitary sewer is in violation of Federal, State,
or local laws, ordinances and regulations. Additionally, falsification or intentional misrepresentation of
data or statements pertaining to the permit application or any other required reporting forms shall be
cause for permit revocation.
IO. Limitation on Permit Transfer
Wastewater discharge permits are issued to a specific RCF for a specific operation and are not
assignable to another RCF or transferable to any other location without proper written approval of the
Director. Sale of a permitted facility shall obligate the purchaser to seek prior written approval of the
City/Parish for continued discharge to the sewerage system.
11. Falsifying information or Tampering with Monitoring Equipment
Knowingly making any false statement on any report or other document required by this permit or
knowingly rendering any monitoring device or method inaccurate, may result in punishment under
criminal laws of the City/Parish as well as being subjected to civil penalties and relief.
12. Modification or Revision of the Permit
a. The terms and conditions of this permit may be subject to modification by City/Parish at any
time as limitations or requirements as identified in the City/Parish Ordinance, are modified or
other just cause exists.
b. This permit may also be modified to incorporate special conditions resulting from the issuance
of a special order.
c The terms and conditions may be modified as a result of EPA promulgating a new federal
pretreatment standard.
d. Any permit modifications which result in new conditions in the permit shall include a
reasonable time schedule for compliance, it necessary.
l3. Duty to Reapply
The City/Parish shall repermit a RCF on a yearly basis. Renewal will be automatic unless otherwise
notified by the RCF that he or she is no longer in business. Within thirty days of the notification, the
RCF shall reapply for reissuance of the permit on a form provided by the City/Parish.
14. Severability
If any provision, paragraph, word, section or article of this Ordinance is invalidated by any court of
competent jurisdiction, the remaining provision, paragraphs, words, sections, and chapters shall not be
affected and shall continue in full force and effect.
15. Property Rights
The issuance of this permit does not convey any property rights in either real or personal property; any
exclusive privileges; nor does it authorize any invasion of personal rights; nor any infringement of
Federal, State, or local regulations.
16. Legal Remedies
The legal remedies set forth in the City/Parish are as described in the Ordinance 9195, Section 2:259
(a), (b), (c), (d), and (e)
These subsections encompass:
a. Injunctive Relief
b. Civil Enforcement Penalties
c. Criminal Penalties
d. Liability
e. Revocation of Permit
f. Termination of Utility Services (Sewer, Water, and/or Electricity)
PART Y
RULES OF ADMINISTRATIVE REVIEW
In accordance with the provisions of Ordinance 9195 of the Metropolitan Council of the City of Baton Rouge
and Parish of East Baton Rouge, and particularly in accordance with Section 2:255 thereof, the Director of the
Department of Public Works does hereby establish these rules for the administrative review of any appeal lodged
by a RCF of the City/Parish POTW system who is permitted for or whom the Department has notified must
obtain a permit for discharge of waste into the Publicly Owned Treatment Works system of the City of Baton
Rouge and the Parish of East Baton Rouge.
PARTIES
I. Any RCF who has received notice of the requirement to file an application for a pretreatment permit for
discharge into POTW's of the City/Parish, or a RCF who is presently permitted for discharge into the
POTW'S of the City/Parish may request an administrative review of the inclusion of said RCF within
the scope of the permit program, or may request administrative review of any fee, fine, penalty,
assessment, or order issued by the Director of the Department of Public Works in connection with
permitting of or discharges by said user into the City!Parish POTW system.
PAYMENT UNDER PROTEST
2. Ifthe request for administrative review is related to payment of pretreatment permit fees or the amount
of such fees, the RCF must indicate when paying the permit fee that, the fee is being paid under protest.
Said RCF must, simultaneously with the payment of the permit fee, file a request for an administrative
review setting forth the basis for the protest of the payment.
3. If the request for administrative review is related to assessment of fines, penalties, or the issuance of
an order by the Director of the Department of Public Works or his designee based on a violation of the
provisions and requirements or Ordinance 9195 said request must be filed with the Director within
thirty days of the receipt of such assessment.
CONTENTS OF REQUEST FOR ADMINISTRATIVE REVIEW
4. . All requests for administrative review shall be in writing, shall be signed by the RCF or his
authorized representative, and shall, at a minimum, state:
a. The name, address and phone number of the individual filing the request;
b. the fee, fine, penalty or order from which relief is sought;
c. the name, address and telephone number of the regulated facility;
d. the name, address, business title or position, and telephone number of the authorized agent or
representative or other responsible person for operation of the facility's discharges into the
POTW system;
e. the basis upon which relief is sought;
f. extenuating circumstances or specific justification for granting the relief sought.
5. A request for administrative review shall be filed by hand delivery or by mail directed to: Coordinator
of Environmental Affairs, Department of Public Works, Post Office Box 1471, Baton Rouge,
Louisiana, 70821.
6. Filing a request for administrative review does not suspend the obligation of the requesting party to
comply with the discharge limitations and requirements of Ordinance 9195 prior to or during the
administrative review process.
7. All requests for administrative review shall be initially reviewed by the Department through the Office
of the Coordinator of Environmental Affairs and an administrative conference date will be established.
Any request not containing the information required by Rule 2 may be summarily rejected by the
Coordinator of Environmental Affairs and a notice sent to the requesting party stating the reason for
summary rejection. Summary rejection of a request does not preclude the requesting party from
submitting a new request in accordance with these rules.
8. Requests based on mistaken identification of a RCF, clerical error in the analysis of a waste stream, or
the lack of a physical connection between the discharge facilities of the requesting party and tl1e POTW
system may be resolved in writing by the Director upon recommendation of the Coordinator of
Environmental Affairs, in favor of the requesting party, without the need for an administrative
conference. All other requests must be the subject of at least one administrative conference between
the requesting party and one or more of the following department officials: the Coordinator of
Environmental Affairs, the Pretreatment Manager, or the Environmental Engineer.
9. The administrative conference will be informal in nature. At the administrative conference the
Department will compile an administrative record consisting of pertinent records of the Department
regarding the requesting party and discharges from the requesting party's facility, as well as, any
evidentiary filings the requesting party desires to introduce into the record.
10. Following the administrative conference, a staff determination on a request shall be rendered jointly
by the Coordinator of Environmental Affairs, the Pretreatment Manager, and the Environmental
Engineer. The decision shall be entered into the administrative record and a copy thereof shall be
forwarded to the RCF. Ifno appeal of the staff determination is filed with the Director within thirty
days of the date of the staff determination, the Director may approve the staff determination and render
a final decision based thereon.
11. Appeal of the staff determination on any request may be made in writing to the Director of the
Department of Public Works within thirty days of the date of the staff determination. Such appeal
request may provide any additional information the requesting party believes necessary for the
complete and thorough understanding of the request. If, in the opinion of the Director, an additional
administrative conferences is necessary to fully assess the issues raised by the requesting party, the
Director may give notice of such conference to the requesting party and the representatives of the
Department; additional written evidence or information for the administrative record may be provided
by the requesting party and representative of the Department of this time.
12. The Director may require that the requesting party provide any information maintained by it as a result
of the requirements of Ordinance 9195 relating to waste generation, disposal or discharge, or relating
to sampling, testing, and analysis of wastes discharged into the POTW system, which in the opinion
of the Director, would provide an evidentiary basis for rendering his decision. Where financial
inability to pay forms the basis for the request and the requested relief involves the payment offees in
installments or the mitigation of penalties or fines, the Director may require the requesting party to
provide financial statements or accounting data supporting it claim.
13. The Director may take such action following his administrative review as is appropriate for the safe
and environmentally sound operation and maintenance of the POTW's and the pretreatment permit
system; however, the Director shall not:
a. authorize violations of the requirements of Ordinance 9195 or
b. remove any facility from the pretreatment permit system if the facility is discharging any
pollutants into the POTW system in excess of the discharge limits established by Ordinance
9195.
14. The Director may compromise and/or mitigate the amount of penalties to be assessed for violation of
Ordinance 9195 based upon an affinnative good faith shown by the violator that one or more of the
following mitigating factors are applicable to the violating facility:
a. a lack of previous violations and historic compliance with discharge limits;
b. the cause of the violation was due to an act of God, war, or third parties not associated with
the facility;
c. the nature and gravity of the violation was not significant;
d. good faith efforts by the violator to prevent future violations;
e. payment of the full penalty amount creates a real and verifiable danger of making the facility
incapable of future operation;
f. other pertinent factors which, in the opinion of the Director, are probative of the fact that the
violation did not endanger the public safety, health or welfare and did not jeopardize the
integrity of the POTW's of the pretreatment permit system;
g. levying fines shall be in accordance with the United States Environmental Protection
Agency's approved enforcement procedures.
15. The Director may, for good cause shown, make permit fees payable through installments over a period
not to exceed 120 days from the date such fees are due, but the Director may not waive permit fees.
16. Decisions of the Director rendered in the administrative review process shall be final, shall be in
writing and shall be based on the full and complete written administrative record compiled by the
Department and the requesting party.
17. Information received by the Department in the course of the administrative review process may be
classified as confidential by the Department only if the Director makes a written determination that
confidentiality is necessary to protect trade secrets, proprietary secrets and information, and
commercial or financial information. However, such a finding regarding confidentiality shall not apply
to necessary use by authorized officers or employees of the department or the federal government in
carrying out their responsibilities under Ordinance 9195 or applicable federal law.
Department of Public Works City of Baton Rouge
Parish of East Baton Rouge
Post office Box 1471
Baton Rouge, La 70821
ENVIRONMENTAL DIVISION Telephone: 225.389.5456
Fax: 225.389.5460
April 7, 2015
Renewal Date: April 1, 2015
Mr. Brian Broussard
Louisiana State University
Office of Facility Services
Baton Rouge, LA 70803
(Facility Address)
L.S.U. - South Campus
Alongside Gourrier Lane
Baton Rouge, LA 70820
Dear Mr. Broussard:
As required by Federal Regulations 40 CFR 403.8 (f) (1) (v) the City/Parish is required to
perform inspections, surveillances, and monitoring procedures. The implementation of
these activities necessitates the establishment of a permit fee based on an estimated cost of
performing these required tasks.
The charge for your permit, Standard Permit No: 02-02713, has been calculated to be
$319.00. Ifyou have any questions regarding the permit, please call John Busse at (225)
389-5456. The Service Fee Business Office will bill you for this fee.
Your next laboratory report Due Date is October 1, 2015. See the attached pennit for
details.
Failure to pay the pennit Fee will result in revocation of your permit.
Sincerely,
ofcampr:::::r Environmental Coordinator
PERMIT NUMBER: 02-02713
CITY OF BATON ROUGE/EAST BATON ROUGE PARISH
DEPARTMENT OF PUBLIC WORKS
WASTEWATER DISCHARGE PERMIT
COMPANY NAME: L.S.U. - South Campus
FACILITY ADDRESS: Alongside Gourrier Lane
Baton Rouge, LA 70820
FACILITY CLASSIFICATION: Non-Significant User
SIC Code: 8221
The above Regulated Commercial Facility is authorized to discharge industrial wastewater
into the City of Baton Rouge/East Baton Rouge Parish Sewer System in compliance with
the City/Parish Ordinance Number 9195, Title 2, Chapter 5, Sections 2:250-2:263. All
permitted discharge conditions are subject to the applicable provisions of Federal or State
Law regulations with respect to discharge point(s), effluent limitations, monitoring
requirements, and other conditions set forth herein.
This permit is granted in accordance with information, specification, and/or other data
submitted to the Department of Public Works, Environmental Division.
Renewal Date:
Expiration Date:
April 1, 2015
March 31, 2016
Dd:u,P Environmental Coordinator
PART I
A. WASTEWATER DISCHARGE LIMITATION
AND
MONITORING REQUIREMENTS
Permit Number: 02-02713
The Regulated Commercial User shall comply with the effluent limitations by:
April 1, 2015
Outfall: 001
Samples are to be taken from the location described below:
MANHOLE outfall by GSRI Road
Parameter (Units) 1,2
Biochemical Oxygen
Demand (mg/I)
Chemical Oxygen
Demand (mg/I)
200 -na- Annual Grab
1545 -na- Annual Grab
Flow** (gpd) -na- Annual Meter
Total Suspended Solids
(mg/I)
250 -na- Annual Grab
IAll analytical tests must be performed in accordance with the techniques described
in 40 CFR part 136 (see LAC 33:IX.4901) and amendments thereto. Where 40
CFR part 136 does not contain sampling or analytical teclmiques for the pollutant in
question, or where the EPA detennines that the part 136 sampling and analytical
techniques are inappropriate for the pollutant in question, sampling and analysis
shall be performed by using validated analytical methods or other applicable
sampling and analytical procedures approved by the Environmental Division and the
LDEQ. 2To seek a waiver for a pollutant neither present nor expected to be present in the
wastewater discharge, please refer to LAC 33:IX.6123.E.2 or 40 CFR part
403.12(e)(2) [also see LAC 33:IX.6115.F. l.d.iv or 40 CFR part 403.8(f)(2)(v)(A)] 3Any exceedances of the effluent limitations listed in this pennit must be reported to
the Environmental Division at (225) 389-5456 within 24 hours of becoming aware
of the violation. 4 Refer to APPENDIX A -TESTING SCHEDULE for a schedule of Sample
Frequencies.
**Flow - There are no specific minimum or maximum effluent limitations on flow, but
average and maximum daily flow in gallons per day for each month must be
Daily Effluent Monthly Effluent Sample Sample
Limitation 3 Limitation 3 Frequency 4 Type
reported to the Environmental Division as required in Part 1 B; Special
Provisions Required and Part II-Reporting Requirements, requirement #2.
This report of the monthly flows must be submitted along with the sampling
reports as required in Part 11.2 unless an alternative flow-reporting schedule has
been approved by the Environmental Division.
The designated limitations and monitoring requirements may be revised as needed by the
Director of Public Works to comply with the DEQ and EPA regulations. Limitations shall
also be modified at the request of the Permittee when processes are altered.
Bypass or the intentional diversion of wastestreams from the treatment system is prohibited
unless all of the following conditions are met:
(1) The bypass was unavoidable to prevent loss oflife, personal injury, or severe
property damage.
(2) There was no feasible alternative to the bypass, including the use of auxiliary
treatment or retention of the wastewater.
(3) The industrial user properly notified the director as described in Ordinance 9195
section 2:257(t)
To comply with Ordinance 8095 section 8:206 all grease traps must be cleaned every three
(3) months.
Note: Ifthe reference levels for Biochemical Oxygen Demand (BODs) or Total Suspended
Solids (TSS) are exceeded, a surcharge will be implemented in accordance with the
City/Parish Ordinance 7853.
PART I
B. SPECIAL PROVISIONS REQUIRED
Permit Number: 02-02713 Outfall(s): All Outfalls
The Regulated Commercial Facility shall comply with the Special Provisions listed below
and shall be in compliance with the applicable requirements set forth in Part II.
SPECIAL PROVISIONS COMPLETION DATES
Report Requirements No. 1 of Part II See Provision
Report Requirements No. 2 of Part II See Appendix A -Testing Schedule
Report Requirements No. 3 of Part II See Provision
Report Requirements No. 4 of Part II See Provision
Report Requirements No. 5 of Part II See Provision
Special Condition No. 1 of Part III See Provision
Special Requirements for Part IV (Standard Conditions)
All sixteen (16) conditions apply
Part V Enforcement
Failure to comply with any of the previous pennit requirements including failure to pay the
permit fee within the designated time frame may result in one or more of the following
legal remedies:
A. Injunctive Relief
B. Civil Enforcement Penalties
C. Criminal Penalties
D. Liability
E. Revocation of Permit
F. Tennination of Utility Services (Sewer, Water, Electric)
APPENDIX A
TESTING SCHEDULE
Permit Number: 02-02713 Outfall: All Outfalls
Report Requirement No. 2 of Part II - The due date of these reports as described in this
requirement is based on the sample frequency identified in PART 1 A. WASTEWATER
DISCHARGE LIMITATION AND MONITORING REQUIREMENTS.
Reports are due on the following dates based on Sample Frequency:
ANNUAL October 1, 2015
TWICE A YEAR October 1, 2015
April 30, 2016
QUARTERLY
August 1, 2015
November 1, 2015
February 1, 2016
April 30, 2016
EVERY 2 MONTHS
July 1, 2015
September 1, 2015
November 1, 2015
January 1, 2015
March 1, 2016
April 30, 2016
MONTHLY
June 1, 2015
July 1, 2015
August 1, 2015
September 1, 2015
October 1, 2015
November 1, 2015
December 1, 2015
January 1, 2015
February 1, 2016
March 1, 2016
April 30, 2016
See PART I "A. WASTEWATER DISCHARGE LIMITATION AND MONITORING
REQUIREMENTS" for parameters and sampling frequencies required.
PART II
REPORTING REQUIREMENTS
l. All reports shall be submitted to the following address:
Department of Public Works - Environmental Division
P.O. Box 1471
Baton Rouge, La. 70821
Attention: Pretreatment Program
2. The permitted Regulated Commercial Facility (hereafter referred to as RCF) is required to submit to
the Environmental Division the required reports on the results of its sampling of the pollutants specified
in Part I of this permit. This report shall also contain monthly flows as required.
3. The director shall evaluate, at least every two (2) years, whether each significant industrial user needs
a plan to control slug discharges. For purposes of this subsection, a slug load shall constitute a discharge
that has a flow rate or contains concentrations of pollutants that exceed, for any time period longer
than fifteen (15) minutes, more than five (5) times the average twenty-four hour concentration,
quantities or flow rate during normal operations. Ifthe director determines that a slug control plan is
needed, the plan shall be prepared by the significant industrial user and submitted to the director for
review and approval. Such plan shall contain, at a minimum, the following elements:
a. Description of discharge practices, including non-routine batch discharges.
b. Description of all chemicals and hazardous substances stored at the facility site.
c. Procedures for immediately notifying the POTW of slug discharges, including any discharge
that would violate a prohibition under section 2:252 of the City/Parish Ordinance 9195, with
procedures for follow-up written notification to the director within five (5) days of any
reportable event.
d. Ifnecessary, procedures to prevent adverse impact from accidental spills, including inspection
and maintenance of storage areas, handling and transfer of materials, loading and unloading
operations, control of plant site runoff, working training, building of containment structures
or equipment, measures for containing toxic organic pollutants (including solvents), and/or
measures and equipment for emergency response.
4. Slug Loading Notification am/ Written Notice
RCF's shall immediately notify the director of any accidental slug pollutant load that has the potential
to cause interference or pass through at the POTW treatment plant. Within five (5) days following any
such accidental discharge, the RCF shall provide the director with a detailed written report describing
the cause of the discharge and the measures to be taken by the RCF to prevent similar future
occurrences. A slug load shall constitute a discharge that has a flow rate or contains concentrations of
pollutants that exceed, for any time period longer than fifteen (15) minutes, more than five (5) times
the average twenty-four hour concentration, quantities or flow rate during normal operations.
5. The permitted RCF shall notify the Director of Public Works prior to the introduction of new
wastewater or pollutants or any substantial change in the volume or characteristics of the wastewater
being introduced into the POTW from the RCF's industrial processes. Formal written notification shall
follow within thirty days of such introduction.
6. Any upset experienced by the RCF of its treatment that places it in a temporary state of non-compliance
with wastewater discharge limitations specified in the City/Parish Ordinance shall be reported to the
City/Parish within twenty-tour hours of first awareness of the commencement of the upset. A detailed
report shall be filed within five days.
7. Any malfunction of pretreatment related devices or equipment such as flow meters, treatment plants,
grease traps etc., shall be reported to the City/Parish within twenty-four hours of first awareness of the
commencing of the malfunction. A detailed report shall he filed within five days.
PART III
SPECIAL CONDITIONS COMPLIANCE SCHEDULES
1. Deviations from the schedules and limits established in Part I must be negotiated with the Department
of Public Works.
PART IV
STANDARD CONDITIONS
I . The pennitted RCF shall comply with all the general prohibitive discharge standards in Section 2.252
and 2.253 of the City/Parish Ordinance.
2. . Right of Entry
The permitted RCF shall allow the City/Parish or its representatives, exhibiting proper credentials and
identifications, to enter upon the premises of the RCF, at all reasonable hours, for the purposes of
inspection, sampling, or records inspection. Reasonable hours in the context of inspection and sampling
include any time the RCF is operating any process which results in a process wastewater discharge to
the city sewerage system.
3. Record Retention
a. The permitted RCF shall retain and preserve for no less than three years or as it seems
necessary by the Director of Public Works, any records, books, documents, memoranda,
reports, correspondence and any and all summaries thereof, relating to monitoring, sampling
and chemical analyses made by or on behalfoflimitation with respect to any and all appeals
expired.
4. Confidential Information
Except for data determined to be confidential under Section 2:260 of the City/Parish Ordinance 9195,
Chapter 5, all reports required by this permit shall be available for public inspection at the office of the
Coordinator of Environmental Affairs.
5. Recording of Results
For each measurement or sample taken pursuant to the requirements of this permit, the RCF shall
record the following information:
a. The exact place, date and time of sampling;
b. the person(s) doing the sampling;
c. the dates the analyses were performed;
d. the person(s) who performed the analyses;
e. the analytical techniques or methods used; and
f. the results of all required analyses.
6. Dilution
No Permitted RCF shall increase the use of potable or process water or in any way attempt to dilute a
discharge as a partial or complete substitute for adequate treatment to achieve compliance with the
limitations contained in this permit.
7. Proper Disposal of Pretreatment Sludges and Spent Chemicals
The disposal of sludges and spent chemicals generated shall he done in accordance with Section 405
of the Clean Water Act and Subtitles C & D of the Resource Conservation and Recovery Act.
8. Signatory Requirements
All reports required by this permit shall be signed by a principal executive officer of the RCF, or his
designee.
9. Revocation of Permit
The permit issued to the RCF by the City may be revoked when, after inspection, monitoring or analysis
it is determined that the discharge of wastewater to the sanitary sewer is in violation of Federal, State,
or local Jaws, ordinances and regulations. Additionally, falsification or intentional misrepresentation
of data or statements pertaining to the permit application or any other required reporting forms shall
be cause for permit revocation.
10. Limitation on Permit Transfer
Wastewater discharge permits are issued to a specific RCF for a specific operation and are not
assignable to another RCF or transferable to any other location without proper written approval of the
Director. Sale of a permitted facility shall obligate the purchaser to seek prior written approval of the
City/Parish for continued discharge to the sewerage system.
1 1. Falsifying information or Tampering with Monitoring Equipment
Knowingly making any false statement on any report or other document required by this permit or
knowingly rendering any monitoring device or method inaccurate, may result in punishment under
criminal laws of the City/Parish as well as being subjected to civil penalties and relief.
12. Modification or Revision of the Permit
a. The terms and conditions of this permit may be subject to modification by City/Parish at any
time as limitations or requirements as identified in the City/Parish Ordinance, are modified or
other just cause exists.
b. This permit may also be modified to incorporate special conditions resulting from the issuance
of a special order.
c The terms and conditions may be modified as a result of EPA promulgating a new federal
pretreatment standard.
d. Any permit modifications which result in new conditions in the permit shall include a
reasonable time schedule for compliance, it necessary.
13. Duty to Reapply
The City/Parish shall repermit a RCF on a yearly basis. Renewal will be automatic unless otherwise
notified by the RCF that he or she is no longer in business. Within thirty days of the notification, the
RCF shall reapply for reissuance of the permit on a form provided by the City/Parish.
14. Severability
If any provision, paragraph, word, section or article of this Ordinance is invalidated by any court of
competent jurisdiction, the remaining provision, paragraphs, words, sections, and chapters shall not be
affected and shall continue in full force and effect.
15. Property Rights
The issuance of this permit does not convey any property rights in either real or personal property; any
exclusive privileges; nor does it authorize any invasion of personal rights; nor any infringement of
Federal, State, or local regulations.
1 6 . Legal Remedies
The legal remedies set forth in the City!Parish are as described in the Ordinance 9195, Section 2:259
(a), (b), (c), (d), and (e)
These subsections encompass:
a. Injunctive Relief
b. Civil Enforcement Penalties
c. Criminal Penalties
d. Liability
e. Revocation of Permit
f. Termination of Utility Services (Sewer, Water, and/or Electricity)
PART Y
RULES OF ADMINISTRATIVE REVIEW
In accordance with the provisions of Ordinance 9195 of the Metropolitan Council of the City of Baton Rouge
and Parish of East Baton Rouge, and particularly in accordance with Section 2:255 thereof, the Director of the
Department of Public Works does hereby establish these rules for the administrative review of any appeal lodged
by a RCF of the City/Parish POTW system who is permitted for or whom the Department has notified must
obtain a permit for discharge of waste into the Publicly Owned Treatment Works system of the City of Baton
Rouge and the Parish of East Baton Rouge.
PARTIES
l. Any RCF who has received notice of the requirement to file an application for a pretreatment permit for
discharge into POTW's of the City/Parish, or a RCF who is presently permitted for discharge into the
POTW'S of the City/Parish may request an administrative review of the inclusion of said RCF
within the scope of the permit program, or may request administrative review of any fee, fine, penalty,
assessment, or order issued by the Director of the Department of Public Works in connection with
permitting of or discharges by said user into the City/Parish POTW system.
PAYMENT UNDER PROTEST
2. Ifthe request for administrative review is related to payment of pretreatment permit fees or the amount
of such fees, the RCF must indicate when paying the permit fee that, the fee is being paid under protest.
Said RCF must, simultaneously with the payment of the permit fee, file a request for an administrative
review setting forth the basis for the protest of the payment.
3. If the request for administrative review is related to assessment of fines, penalties, or the issuance of
an order by the Director of the Department of Public Works or his designee based on a violation of the
provisions and requirements or Ordinance 9195 said request must be filed with the Director within
thirty days of the receipt of such assessment.
CONTENTS OF REQUEST FOR ADMINISTRATIVE REVIEW
4. All requests for administrative review shall be in writing, shall be signed by the RCF or his authorized
representative, and shall, at a minimum, state:
a. The name, address and phone number of the individual filing the request;
b. the fee, fine, penalty or order from which relief is sought;
c. the name, address and telephone number of the regulated facility;
d. the name, address, business title or position, and telephone number of the authorized agent or
representative or other responsible person for operation of the facility's discharges into the
POTW system;
e. the basis upon which relief is sought;
f. extenuating circumstances or specific justification for granting the relief sought.
5. A request for administrative review shall be filed by hand delivery or by mail directed to: Coordinator
of Environmental Affairs, Department of Public Works, Post Office Box 1471, Baton Rouge,
Louisiana, 70821.
6. Filing a request for administrative review does not suspend the obligation of the requesting party to
comply with the discharge limitations and requirements of Ordinance 9195 prior to or during the
administrative review process.
7. All requests for administrative review shall be initially reviewed by the Department through the Office
of the Coordinator of Environmental Affairs and an administrative conference date will be established.
Any request not containing the information required by Rule 2 may be summarily rejected by the
Coordinator of Environmental Affairs and a notice sent to the requesting party stating the reason for
summary rejection. Summary rejection of a request does not preclude the requesting party from
submitting a new request in accordance with these rules.
8. Requests based on mistaken identification of a RCF, clerical error in the analysis of a waste stream, or
the lack of a physical connection between the discharge facilities of the requesting party and the POTW
system may be resolved in writing by the Director upon recommendation of the Coordinator of
Environmental Affairs, in favor of the requesting party, without the need for an administrative
conference. All other requests must be the subject of at least one administrative conference between
the requesting party and one or more of the following department officials: the Coordinator of
Environmental Affairs, the Pretreatment Manager, or the Environmental Engineer.
9. The administrative conference will be informal in nature. At the administrative conference the
Department will compile an administrative record consisting of pertinent records of the Department
regarding the requesting party and discharges from the requesting party's facility, as well as, any
evidentiary filings the requesting party desires to introduce into the record.
I 0. Following the administrative conference, a staff determination on a request shall be rendered jointly by
the Coordinator of Environmental Affairs, the Pretreatment Manager, and the Environmental
Engineer. The decision shall be entered into the administrative record and a copy thereof shall be
forwarded to the RCF. Ifno appeal of the staff determination is filed with the Director within thirty
days of the date of the staff determination, the Director may approve the staff determination and render
a final decision based thereon.
11. Appeal of the staff determination on any request may be made in writing to the Director of the
Department of Public Works within thirty days of the date of the staff determination. Such appeal
request may provide any additional information the requesting party believes necessary for the
complete and thorough understanding of the request. If, in the opinion of the Director, an additional
administrative conferences is necessary to fully assess the issues raised by the requesting party, the
Director may give notice of such conference to the requesting party and the representatives of the
Department; additional written evidence or information for the administrative record may be provided
by the requesting party and representative of the Department of this time.
12. The Director may require that the requesting party provide any information maintained by it as a result
of the requirements of Ordinance 9195 relating to waste generation, disposal or discharge, or relating
to sampling, testing, and analysis of wastes discharged into the POTW system, which in the opinion
of the Director, would provide an evidentiary basis for rendering his decision. Where financial
inability to pay forms the basis for the request and the requested relief involves the payment of fees in
installments or the mitigation of penalties or fines, the Director may require the requesting party to
provide financial statements or accounting data supporting it claim.
13. The Director may take such action following his administrative review as is appropriate for the safe
and environmentally sound operation and maintenance of the POTW's and the pretreatment permit
system; however, the Director shall not:
a. authorize violations of the requirements of Ordinance 9195 or
b. remove any facility from the pretreatment permit system if the facility is discharging any
pollutants into the POTW system in excess of the discharge limits established by Ordinance
9195.
14. The Director may compromise and/or mitigate the amount of penalties to be assessed for violation of
Ordinance 9195 based upon an affirmative good faith shown by the violator that one or more of the
following mitigating factors are applicable to the violating facility:
a. a lack of previous violations and historic compliance with discharge limits;
b. the cause of the violation was due to an act of God, war, or third parties not associated with
the facility;
c. the nature and gravity of the violation was not significant;
d. good faith efforts by the violator to prevent future violations;
e. payment of the full penalty amount creates a real and verifiable danger of making the facility
incapable of future operation;
f. other pertinent factors which, in the opinion of the Director, are probative of the fact that the
violation did not endanger the public safety, health or welfare and did not jeopardize the
integrity of the POTW's of the pretreatment permit system;
g. levying fines shall be in accordance with the United States Environmental Protection
Agency's approved enforcement procedures.
15. The Director may, for good cause shown, make permit fees payable through installments over a period
not to exceed 120 days from the date such fees are due, but the Director may not waive permit fees.
16. Decisions of the Director rendered in the administrative review process shall be final, shall be in
writing and shall be based on the full and complete written administrative record compiled by the
Department and the requesting party.
17. Information received by the Department in the course of the administrative review process may be
classified as confidential by the Department only if the Director makes a written determination that
confidentiality is necessary to protect trade secrets, proprietary secrets and information, and
commercial or financial information. However, such a finding regarding confidentiality shall not apply
to necessary use by authorized officers or employees of the department or the federal government in
carrying out their responsibilities under Ordinance 9195 or applicable federal law.
CAMPUS UTILITY MAP 71
City Park
SANITARY SEWER SYSTEM
Map Prepared by the Drafting Dept. of Facility Services at
Louisiana State University SCALE : 1" = 300'
NW CAMPUS
90
60j
60h
60g
60k
60p
60l
60m
70
????
71
72
72a
Crest Lake
619
Lake
LS U
60f
60n
60q
650
60e 60a 96
628
197
243 245
241
153
154
677
117
?
115
115c
60d
60r
60c
60b
95
630
627
629
LAKESHORE
University
Lake
?
151
152
156a
150
115b
115a
108
97 99
98
93 92
59
58
56 55a 54
?55?3?
?55?0?
613 616
51
611
609
606
603
600
624
626
156b 156a 89 89a
617
604
625
623
157
159b
156d 156c
157
121
91
94 88
57 55
49 615
612
?6?1?0
6??0?8
605
602
FRAT
529
621
159b 159a
618
ROW
?????
159d
159c
676
6
114
VET MED
186
192
185
190
193c
193b
????
196
171
170a
170
176
161b
161d
162
164b
165b
163
161a
161c
164a
165a
106
118
114
116
113
119
4
2 3
7
5
1
10
45 46 47
11
?5?1?7
516
5??1?9
?5?2?4
5??2?3
526
5??2?5
5??2?8
527
???
597
598
599b
599a
1A
649
177
191
173
193b
175
172
16?9
168a
168b
167 166
168c
199d
L eft L eft 44
107
112
124
130 135
13
137
12
14 42 43
15
17 40
38w
38
511
502
620
513
508
515
552
556
553
554
557
555
560
599 ???
651
647
646
VET MED
ANNEX
? 183
193a
199e
136
39
138 19
?
509
507
551
561
558 559
562
645
188
199c
L eft L eft 11
199
199a
199b
132
139
23 21
28 24
30
20
27
32 34
37 37n
37e
504
457
505
506
455
563
564
437
565
423
436 435
522
670
644
643
642
141 140 142
147
24 29
26
31 33 35 471 472
465
456
439
441
438
440
426
424
425
434
641
640
211
187
206
145
143
254
MAIN
LIFT
269
266
265
270 277
275
278
279
281
483
484
484a
482
464
458
463
459
460
449
450
447
444
427
431
428
421
665
639
638
200
207
203
200a
202
204
248
260
284
280
488
467 461
462
466
664
631
632
633
634
635
636
637
703
194a
19
4a
194
210
225
209
208
?
224
228
229
201
230 242
240
244
239
246
?
285
232b
288
287
289
287b
325
327
328
684
Campus Lake
University Lake
234 321
320
231a
232
329
330
339
707
70?6
231
283
335
331
337a 337
264
336
AG AREA College Lake
332 701
749
744
743
745
742
741
740
737
738
735
737
707
726
722
724
721
723
720
702
313
333
LEGEND
?
307
308 300
310
Appendix B -
Discharge
Points
?????
306
301
302
303
304
305
309
683 712
?
2609 North River Road, Port Allen, Louisiana 70767
(800) 401-4277 -- FAX (225) 381-2996
ARS International, LLC
Laboratory Analysis Report
MAIN LIFT STATION
November 2015
Prepared for:
Louisiana State University
Brian Broussard
Office of Facility Services
Baton Rouge, LA 70803
Phone: 225.806.1011
Management Review
Notes: ARS International, LLC assumes no liability for the use or interpretation of any analytical results provided other than the cost of the analysis itself.
Reproduction of this report in less than full requires the written consent of the client.
Contact Person: Questions regarding this analytical report should be addressed to:
Project Manager
Phone: 225.381.2991
Fax: 225.381.2996
LELAP Cert# 01949
Appendix C - Example Report
NELAP CERTIFICATE NUMBER: 01955
DOD ELAP CERTIFICATE NUMBER: L14-243
ANALYTICAL RESULTS
PERFORMED BY
GCAL, LLC 7979 Innovation Park Dr. Baton Rouge, LA 70820
Report Date 11/13/2015
GCAL Report 215110556
9999999999
Project LSU Permit
GCAL Report#: 215110556
ver To V Mulligan ARS
Riv Road Allen LA - -
on R en
Page 1 of 15
Report#: 215110556
Project ID: LSU Permit Report Date: 11/13/2015
Laboratory Endorsement
Sample analysis was performed in accordance with approved methodologies provided by the Environmental Protection Agency or other recognized agencies. The samples and their corresponding extracts will be maintained for a period of 30 days unless otherwise arranged. Following this retention period the samples will be disposed in accordance with GCAL's Standard Operating Procedures.
Common Abbreviations that may be Utilized in this Report
ND Indicates the result was Not Detected at the specified reporting limit DO Indicates the result was Diluted Out MI Indicates the result was subject to Matrix Interference TNTC Indicates the result was Too Numerous To Count SUBC Indicates the analysis was Sub-Contracted FLD Indicates the analysis was performed in the Field DL Detection Limit DL Diluted analysis – when appended to Client Sample ID LOD Limit of Detection LOQ Limit of Quantitation RE Re-analysis 00:01 Reported as a time equivalent to 12:00 AM
Reporting Flags that may be Utilized in this Report
J or I Indicates the result is between the MDL and LOQ J DOD flag on analyte in the parent sample for MS/MSD outside acceptance criteria U Indicates the compound was analyzed for but not detected B or V Indicates the analyte was detected in the associated Method Blank Q Indicates a non-compliant QC Result (See Q Flag Application Report) * Indicates a non-compliant or not applicable QC recovery or RPD – see narrative E The result is estimated because it exceeded the instrument calibration range E Metals - % diference for the serial dilution is > 10%
Sample receipt at GCAL is documented through the attached chain of custody. In accordance with NELAC, this report shall be reproduced only in full and with the written permission of GCAL. The results contained within this report relate only to the samples reported. The documented results are presented within this report.
This report pertains only to the samples listed in the Report Sample Summary and should be retained as a permanent record thereof. The results contained within this report are intended for the use of the client. Any unauthorized use of the information contained in this report is prohibited.
I certify that this data package is in compliance with the NELAC Institute standard and terms and conditions of the contract and Statement of Work both technically and for completeness, for other than the conditions in the case narrative. Release of the data contained in this hardcopy data package and in the computer readable data submitted has been authorized by the Quality Assurance Manager or his/her designee, as verified by the following signature.
Estimated uncertainty of measurement is available upon request. This report is in compliance with the DOD QSM as specified in the contract if applicable.
Authorized Signature GCAL Report 215110556
GCAL Report#: 215110556
Page 2 of 15
Report#: 215110556
Project ID: LSU Permit Report Date: 11/13/2015
Certifications
10/02/2015
Certification Certification Number
DOD ELAP L14-243
Alabama 01955
Arizona AZ0718
Arkansas 12-060-0
Colorado 01955
Delaware 01955
Florida E87854
Georgia 01955
Hawaii 01955
Idaho 01955
Illinois 200048
Indiana 01955
Kansas E-10354
Kentucky 95
Louisiana 01955
Maryland 01955
Massachusetts 01955
Michigan 01955
Mississippi 01955
Missouri 01955
Montana N/A
Nebraska 01955
New Mexico 01955
North Carolina 618
North Dakota R-195
Oklahoma 9403
South Carolina 73006001
South Dakota 01955
Tennessee 01955
Texas T104704178
Vermont 01955
Virginia 460215
USDA Soil Permit P330-10-00117
GCAL Report#: 215110556
Page 3 of 15
Report#: 215110556
Project ID: LSU Permit Report Date: 11/13/2015
Case Narrative
Client: ARS International Report: 215110556
Gulf Coast Analytical Laboratories received and analyzed the sample(s) listed on the Report Sample Summary page of this report. Receipt of the sample(s) is documented by the attached chain of custody. This applies only to the sample(s) listed in this report. No sample integrity or quality control exceptions were identified unless noted below.
METALS
In the EPA 200.8 analysis for prep batch 571819, the MS/MSD recoveries and RPD are not applicable for Copper because the sample concentration is greater than four times the spike concentration.
CONVENTIONALS
In the HACH 8000 analysis, sample 21511055602 (11052015-02125 (COMP)) had to be diluted in order to bracket the concentration within the calibration range of the instrument.
In the EPA 420.4 Rev. 1 analysis, sample 21511055601 (11052015-02125) had to be diluted in order to bracket the concentration within the calibration range of the instrument.
In the SM 5310 B-2011 analysis, sample 21511055602 (11052015-02125 (COMP)) had to be diluted in order to bracket the Total Carbon and/or Total Inorganic Carbon concentrations within the calibration range of the instrument. The Total Organic Carbon is based on the difference between the Total Carbon and the Inorganic Carbon. The dilution is reflected in the elevated reporting limit.
In the Total Phenolics analysis for prep batch 572040, the batch MS recovery is outside the control limits. The LCS recovery is acceptable. This indicates the analysis is in control and the sample is affected by matrix interference.
GCAL Report#: 215110556
Page 4 of 15
Report#: 215110556
Project ID: LSU Permit Report Date: 11/13/2015
Sample Summary
GCAL ID Client ID Matrix Collect Date/Time Receive Date/Time
21511055601 11052015-02125 Water 11/05/2015 11:48 11/05/2015 15:57
21511055602 11052015-02125 (COMP) Water 11/05/2015 11:48 11/05/2015 15:57
GCAL Report#: 215110556
Page 5 of 15
Report#: 215110556
Project ID: LSU Permit Report Date: 11/13/2015
Summary of Compounds Detected
EPA 1664A
CAS# Parameter Result LOQ Units
C-007 Oil and Grease 32.3 5.0 mg/L
EPA 420.4 Rev. 1
CAS# Parameter Result LOQ Units
WET-040 Total Phenolics 1.7 0.13 mg/L
SM 4500-H+ B/EPA 9040C
CAS# Parameter Result LOQ Units
pH pH 8.68 1.00 pH unit
EPA 200.8
CAS# Parameter Result LOQ Units
7440-50-8 Copper 0.049 0.0010 mg/L 7439-92-1 Lead 0.011 0.0010 mg/L 7440-22-4 Silver 0.0034 0.00050 mg/L 7440-66-6 Zinc 0.27 0.020 mg/L
HACH 8000 CAS# Parameter Result LOQ Units
C-004 COD 364 25.0 mg/L
SM 2540 D-2011 CAS# Parameter Result LOQ Units
C-009 Total Suspended Solids 560 5 mg/L
GCAL Report#: 215110556
11052015-02125 Collect Date 11/05/2015 11:48
Receive Date 11/05/2015 15:57
GCAL ID
Matrix
21511055601
Water
11052015-02125 (COMP) Collect Date 11/05/2015 11:48
Receive Date 11/05/2015 15:57
GCAL ID
Matrix
21511055602
Water
Page 6 of 15
Report#: 215110556
Project ID: LSU Permit Report Date: 11/13/2015
Summary of Compounds Detected
SM 5210 B-2011
CAS# Parameter Result LOQ Units
C-002 BOD 1314 1 mg/L
SM 5310 B-2011 CAS# Parameter Result LOQ Units
C-012 Total Organic Carbon 63.7 10.0 mg/L
GCAL Report#: 215110556
11052015-02125 (COMP) Collect Date 11/05/2015 11:48
Receive Date 11/05/2015 15:57
GCAL ID
Matrix
21511055602
Water
Page 7 of 15
11052015-02125 (COMP) Collect Date 11/05/2015 11:48 GCAL ID 21511055602
Receive Date 11/05/2015 15:57 Matrix Water
Report#: 215110556
Project ID: LSU Permit Report Date: 11/13/2015
Sample Results
EPA 1664A
Prep Date
11/06/2015 09:00
Prep Batch
571838
Prep Method
EPA 1664A
Dilution
1
Analysis Date
11/06/2015 12:25
By
WRW
Analytical Batch
571874
CAS#
C-007
Parameter
Oil and Grease
Result
32.3
LOQ
5.0
Units
mg/L
EPA 420.4 Rev. 1
Prep Date
11/09/2015 15:20
Prep Batch
572040
Prep Method
EPA 420.1
Dilution
25
Analysis Date
11/12/2015 17:03
By
DMT
Analytical Batch
572373
CAS#
WET-040
Parameter
Total Phenolics
Result
1.7
LOQ
0.13
Units
mg/L
SM 4500-H+ B/EPA 9040C
Prep Date
NA
Prep Batch
NA
Prep Method
NA
Dilution
1
Analysis Date
11/05/2015 16:30
By
RLA
Analytical Batch
571824
CAS#
pH
Parameter
pH
Result
8.68
LOQ
1.00
Units
pH unit
EPA 200.8
Prep Date
11/06/2015 10:00
Prep Batch
571819
Prep Method
EPA 200.8
Dilution
1
Analysis Date
11/11/2015 16:09
By
LWZ
Analytical Batch
572244
CAS# Parameter Result LOQ Units
7440-50-8 Copper 0.049 0.0010 mg/L 7439-92-1 Lead 0.011 0.0010 mg/L 7440-22-4 Silver 0.0034 0.00050 mg/L 7440-66-6 Zinc 0.27 0.020 mg/L
GCAL Report#: 215110556
11052015-02125 Collect Date 11/05/2015 11:48
Receive Date 11/05/2015 15:57
GCAL ID
Matrix
21511055601
Water
Page 8 of 15
Report#: 215110556
Project ID: LSU Permit Report Date: 11/13/2015
Sample Results
HACH 8000
Prep Date
NA
Prep Batch
NA
Prep Method
NA
Dilution
5
Analysis Date
11/09/2015 08:47
By
WRR
Analytical Batch
572016
CAS#
C-004
Parameter
COD
Result
364
LOQ
25.0
Units
mg/L
SM 2540 D-2011
Prep Date
NA
Prep Batch
NA
Prep Method
NA
Dilution
1
Analysis Date
11/06/2015 11:34
By
WRW
Analytical Batch
571863
CAS#
C-009
Parameter
Total Suspended Solids
Result
560
LOQ
5
Units
mg/L
SM 5210 B-2011
Prep Date
11/06/2015 15:15
Prep Batch
571858
Prep Method
BOD PREP
Dilution
1
Analysis Date
11/06/2015 15:15
By
AWL
Analytical Batch
572254
CAS#
C-002
Parameter
BOD
Result
1314
LOQ
1
Units
mg/L
SM 5310 B-2011
Prep Date
NA
Prep Batch
NA
Prep Method
NA
Dilution
5
Analysis Date
11/06/2015 19:28
By
JEM
Analytical Batch
571845
CAS#
C-012
Parameter
Total Organic Carbon
Result
63.7
LOQ
10.0
Units
mg/L
GCAL Report#: 215110556
11052015-02125 (COMP) Collect Date 11/05/2015 11:48
Receive Date 11/05/2015 15:57
GCAL ID
Matrix
21511055602
Water
Page 9 of 15
Report#: 215110556
Project ID: LSU Permit Report Date: 11/13/2015
Inorganics QC Summary
Analytical Batch Client ID 572244 GCAL ID Prep Batch Sample Type 571819 Prep Date Prep Method Analysis Date EPA 200.8 Matrix
MB571819 1506530 MB 11/06/2015 10:00 11/11/2015 14:44 Water
EPA 200.8 Units
Result mg/L LOQ
Lead Silver Zinc
7439-92-1 7440-22-4 7440-66-6
ND ND ND
0.0010 0.00050
0.020
Analytical Batch Client ID 572244 GCAL ID Prep Batch Sample Type 571819 Prep Date Prep Method Analysis Date EPA 200.8 Matrix
LCS571819 1506531 LCS 11/06/2015 10:00 11/11/2015 14:49 Water
EPA 200.8 Spike
Added Result %R
Control Limits%R
Lead Silver Zinc
7439-92-1 7440-22-4 7440-66-6
0.050 0.050 1.00
0.053 0.053 1.08
106 105 108
85 - 115 85 - 115 85 - 115
Analytical Batch Client ID 572337 GCAL ID Prep Batch Sample Type 571819 Prep Date Prep Method Analysis Date EPA 200.8 Matrix
MB571819 1506530 MB 11/06/2015 10:00 11/12/2015 18:51 Water
EPA 200.8 Units
Result mg/L LOQ
Copper 7440-50-8 ND 0.0010
Analytical Batch Client ID
572337 GCAL ID Prep Batch Sample Type 571819 Prep Date Prep Method Analysis Date EPA 200.8 Matrix
LCS571819 1506531 LCS 11/06/2015 10:00 11/12/2015 18:57 Water
EPA 200.8 Spike
Added Result %R
Control Limits%R
Copper 7440-50-8 0.050 0.056 111 85 - 115
Analytical Batch Client ID 572244 GCAL ID Prep Batch Sample Type 571819 Prep Date Prep Method Analysis Date EPA 200.8 Matrix
O/F 001 2015-221 21511052403 SAMPLE 11/06/2015 10:00 11/11/2015 14:54 Water
1506366MS 1506532 MS 11/06/2015 10:00 11/11/2015 15:00 Water
1506366MSD 1506533 MSD 11/06/2015 10:00 11/11/2015 15:05 Water
EPA 200.8 Units
Result mg/L LOQ
Spike Added
Result %R Control
Limits%R Spike
Added Result %R RPD
RPD Limit
Copper Lead Silver Zinc
7440-50-8 7439-92-1 7440-22-4 7440-66-6
0.38 0.00075
0.0 0.164
0.0010 0.0010
0.00050 0.020
0.050 0.050 0.050 1.00
0.42 0.051 0.050 1.15
85 101 100 99
70 - 130 70 - 130 70 - 130 70 - 130
0.050 0.050 0.050 1.00
0.41 0.050 0.049 1.13
62* 98 97 97
3 2 3 2
20 20 20 20
GCAL Report#: 215110556
Page 10 of 15
Report#: 215110556
Project ID: LSU Permit Report Date: 11/13/2015
General Chemistry QC Summary
Analytical Batch Client ID
572254 GCAL ID Prep Batch Sample Type 571858 Prep Date Prep Method Analysis Date BOD PREP Matrix
MB571858 1506680 MB 11/06/2015 15:15 11/06/2015 15:15 Water
LCS571858 1506681 LCS 11/06/2015 15:15 11/06/2015 15:15 Water
SM 5210 B-2011 Units
Result mg/L LOQ
Spike Added
Result %R Control
Limits%R
BOD C-002 ND 1 198 195 98 84.5 - 115.5
Analytical Batch Client ID 572254 GCAL ID Prep Batch Sample Type 571858 Prep Date Prep Method Analysis Date BOD PREP Matrix
002 EFFLUENT (COMP) 21511056001 SAMPLE 11/06/2015 15:15 11/06/2015 15:15 Water
1506540DUP 1506682 DUP 11/06/2015 15:15 11/06/2015 15:15 Water
SM 5210 B-2011 Units
Result mg/L LOQ
Result RPD RPD Limit
BOD C-002 15 1 15 0 30
Analytical Batch Client ID 572016 GCAL ID
Sample Type Prep Date
Analysis Date Matrix
MB572016 1507326 MB NA 11/09/2015 08:44 Water
LCS572016 1507327 LCS NA 11/09/2015 08:44 Water
HACH 8000 Units
Result mg/L LOQ
Spike Added
Result %R Control
Limits%R
COD C-004 ND 5.0 75.0 75.2 100 90 - 110
Analytical Batch Client ID 572016 GCAL ID
Sample Type Prep Date
Analysis Date Matrix
OUTFALL 001 21511043701 SAMPLE NA 11/09/2015 08:50 Water
1506018DUP 1507329 DUP NA 11/09/2015 08:51 Water
1506018MS 1507328 MS NA 11/09/2015 08:50 Water
HACH 8000 Units
Result mg/L LOQ
Result RPD RPD Limit
Spike Added
Result %R Control
Limits%R
COD C-004 15.0 5.0 15.5 3 20 75.0 90.4 101 90 - 110
Analytical Batch Client ID 572373 GCAL ID Prep Batch Sample Type 572040 Prep Date Prep Method Analysis Date EPA 420.1 Matrix
MB572040 1507438 MB 11/09/2015 15:20 11/12/2015 17:34 Water
LCS572040 1507439 LCS 11/09/2015 15:20 11/12/2015 17:35 Water
EPA 420.4 Rev. 1 Units
Result mg/L LOQ
Spike Added
Result %R Control
Limits%R
Total Phenolics WET-040 ND 0.0050 0.10 0.10 103 89.5 - 110.5
Analytical Batch Client ID
572373 GCAL ID Prep Batch Sample Type 572040 Prep Date Prep Method Analysis Date EPA 420.1 Matrix
OUTFALL 002 21511061801 SAMPLE 11/09/2015 15:20 11/12/2015 16:41 Water
1506878DUP 1507441 DUP 11/09/2015 15:20 11/12/2015 16:43 Water
1506878MS 1507440 MS 11/09/2015 15:20 11/12/2015 16:42 Water
EPA 420.4 Rev. 1 Units
Result mg/L LOQ
Result RPD RPD Limit
Spike Added
Result %R Control
Limits%R
Total Phenolics WET-040 0.20 0.010 0.21 7 20 0.10 0.32 119* 89.5 - 110.5
GCAL Report#: 215110556
Page 11 of 15
Report#: 215110556
Project ID: LSU Permit Report Date: 11/13/2015
General Chemistry QC Summary
Analytical Batch Client ID 571824 GCAL ID
Sample Type Prep Date
Analysis Date Matrix
11052015-02124 21511055901 SAMPLE NA 11/05/2015 16:30 Water
1506538DUP 1506548 DUP NA 11/05/2015 16:30 Water
SM 4500-H+ B/EPA 9040C Units
Result pH unit
LOQ Result RPD
RPD Limit
pH pH 8.72 1.00 8.73 0 6
Analytical Batch Client ID 571874 GCAL ID Prep Batch Sample Type 571838 Prep Date Prep Method Analysis Date EPA 1664A Matrix
MB571838 1506576 MB 11/06/2015 09:00 11/06/2015 12:25 Water
LCS571838 1506577 LCS 11/06/2015 09:00 11/06/2015 12:25 Water
LCSD571838 1506578 LCSD 11/06/2015 09:00 11/06/2015 12:25 Water
EPA 1664A Units
Result mg/L LOQ
Spike Added
Result %R Control
Limits%R Spike
Added Result %R RPD
RPD Limit
Oil and Grease C-007 ND 5.0 40.0 36.2 90 78 - 114 40.0 43.4 108 18 18
Analytical Batch Client ID 571863 GCAL ID
Sample Type Prep Date
Analysis Date Matrix
MB571863 1506697 MB NA 11/06/2015 11:34 Water
LCS571863 1506698 LCS NA 11/06/2015 11:34 Water
SM 2540 D-2011 Units
Result mg/L LOQ
Spike Added
Result %R Control
Limits%R
Total Suspended Solids C-009 ND 5 50 52 104 80 - 120
Analytical Batch Client ID
571863 GCAL ID Sample Type
Prep Date Analysis Date
Matrix
OUTFALL 001 21511045701 SAMPLE NA 11/06/2015 11:34 Water
1506064DUP 1506699 DUP NA 11/06/2015 11:34 Water
SM 2540 D-2011 Units
Result mg/L LOQ
Result RPD RPD Limit
Total Suspended Solids C-009 35 5 35 0 5.4
Analytical Batch Client ID 571863 GCAL ID
Sample Type Prep Date
Analysis Date Matrix
LAKES @ ST. AMANT 21511052902 SAMPLE NA 11/06/2015 11:34 Water
1506379DUP 1506700 DUP NA 11/06/2015 11:34 Water
SM 2540 D-2011 Units
Result mg/L LOQ
Result RPD RPD Limit
Total Suspended Solids C-009 9 5 10 5 5.4
Analytical Batch Client ID
571845 GCAL ID Sample Type
Prep Date Analysis Date
Matrix
MB571845 1506604 MB NA 11/06/2015 09:24 Water
LCS571845 1506605 LCS NA 11/06/2015 08:37 Water
SM 5310 B-2011 Units
Result mg/L LOQ
Spike Added
Result %R Control
Limits%R
Total Organic Carbon C-012 ND 2.0 50.0 52.3 105 90 - 110
GCAL Report#: 215110556
Page 12 of 15
Report#: 215110556
Project ID: LSU Permit Report Date: 11/13/2015
General Chemistry QC Summary
Analytical Batch Client ID 571845 GCAL ID
Sample Type Prep Date
Analysis Date Matrix
Ave H (004) 21511052303 SAMPLE NA 11/06/2015 16:51 Water
1506358MS 1506608 MS NA 11/06/2015 17:12 Water
1506358MSD 1506609 MSD NA 11/06/2015 17:32 Water
SM 5310 B-2011 Units
Result mg/L LOQ
Spike Added
Result %R Control
Limits%R Spike
Added Result %R RPD
RPD Limit
Total Organic Carbon C-012 5.2 2.0 50.0 58.7 107 80 - 120 50.0 57.2 104 3 20
GCAL Report#: 215110556
Page 13 of 15
Q.
Ill u O <O
G')
.....
"'
- =
.
dlt JHTCltNATSJCJI.Al
CampanyName. Gi [ { Add,ess RkE11r£; +3?'<£
CJiHfit Conlttd : Arn4r1J11 6'6!,
sen! To. ARS lntematlonal ,nc.
Con:11rJ Virge rie M[jligan
Purchase Order _ ArfYes,; 2609 North River Roacl
Phone#·
'd.5'- '"?4' 41 0Q
.lnh #: Pe,mit Ol-02125 Port Allen,LA 70767
Phone: (225)381-2991
Fa•#·---------,..-- Email t'I me.ndt;. CAhbe'J Cti I. (11>111 Turn around time in business days (please check one)
Fax: (225)381-2996
3hr 24hr 48hr 72 hr 5d 10d 21d
- - - MAIN LIFT STATION 8: 0
l;
6 u0
.,, 0 .c
Dale( Tlme Sal'lll)leto u " .. 0 0 ;& 'a. 0.... in "...'.
Q. 111 (.) 'O.u c: 0 ii
0 0 0 =
n > ug "'
1 1/- ',-I',/ JI ,i{J 110-r-,,..., {)';'l.l J> .,,..b > .r v / '1J (/) (')
0 iii "
2 11- - {'/ WI 1 -r - 0..;;2 ,S" 3
4
l.t>·· (,., v v v' ..,- ........... ........... I,
):> t',)
m 0
0....,.
.!>,. 0)
5 0 0 0, 0, CJ)
7
8
9
, 1Q - 11
12
)::,
::0 (/)
3" :::::;;;:;: ro = :"::"J
fB.. ci" :::J
13
14
15
16
1/
16
19
20
Add tnal notes· Y:.:10 4:
!!!!!!!!!!!!!!!
"""""""" !!!..
,,,_,,_:2
6
- Belin, hed Uv (s(!'Jn;;ft11'M) l>dlei Time
11/-'.fr'I 1' •n
• Types of 5ample:
S: solids, AQ: equeous, DW:Drlnkloq Water,Sm· mcar, LT;Leak Test, l\f :ftJr Filter, S1: Sillca Gel, VG: vcgetal1on, Bio:B1oossay
GCAL Report#: 215110556 Page 14 of 15
t6' G-.t.i .lLYTIC"CA,\, L"A'CPJ,T"G.
Ll(!.. LLC SAMPLE RECEMNG CHECKLIST llllll ll llllllllllllll lijlll
"- 2 1 5 1 1 0 S S 6 -"
SAMPLE DELIVERY GROUP 215110556 CHECl<UST YES NO NA
Client PM AEC
4809 - ARS International
Transport Method
GUST
Were all samples received using proper thermal preservation? - ---- -
- - ..._ --· - - .._ -- When used, were all custody seals intact?
Were all samples received in proper containers? -- - ·.---- - -
-
Were all samples received using proper chemical preservation?
---- ---
Was preservative added to any container at the lab? - - Were all containers received in good condition?
-·
Were all voe water samples received without head space? - - -
Do allsample labels match the Chain of Custody?
Did the Chain of Custody fist the sampling technician?
Was the COG maintained i.e. all signatures, dates and time of receipt included?
D
D D
D
0 D D
Profi e Number
244957
Received By
McCune,Dodie N. D D
D D D
Line ltem(s)
1 - Water
Receive
Oate(s)
11/05115
D D
0 0 D D D D
COOLERS
DISCREPANQES LAB PRESERVATIONS
Alrbill Thermometer ID: E24 Temp(°C) None None
4.7
NOTES I Revision 1.4 Page 1of 1
GCAL Report#: 215110556 Page 15 of 15
VERIFICATION OF SAMPLE COLLECTION AND HANDLING PROCEDURES
This signed statement is to verify that all samples collected for analytic a l purposes under Ordina
nce 9195 were collEcted, preserved, stored, and transported in accordance with the City of Baton
Rouge/Parish of East Baton Rouge, the Louisiana Department of Environmenta l Quality and the
Unites States Environmental Protect ion Agency protocols and procedures. I am also aware that
any tampering, falsification or misrepresentation of true values or fa cts will subject me to
possible legal remedies as stipulated in Ordinance 9195 , Title 2, Chapter
5, Section 2:259 .
SAMPLER
(N )
SAMPLER'S ADDRESS
2609 North River Road.
(Street)
Baton Rouge, LA
(City and State)
ARS International LLC 70767
(Company) (Zip)
U - S - t '5 (225)-3 8 1 -2991
(Date) (Telephone Number
La bDue 12.07.30. dot
(rev. 7/30/2012/dec)