Upload
phungnhu
View
214
Download
0
Embed Size (px)
Citation preview
SOLICITATION AMENDMENT fJ/P" washington river f;,,I protectionso/utions
SOLICITATION NO.
RFP-314298 I
I. AMENDMENT SOLICITATION DATE November 12, 2018
AMENDMENT NO.
04 ISSUED BY AND RETURN TO:
AMENDMENT DATE
December 06, 2018
DUE DATE Washington River Protection Solutions, LLC (WRPS) P.O. Box 850 Richland, WA 99352
This amendment does not change the date by which offers are due unless a date and time is inserted below.
Attn: Mark A. Friend DATE TIME
mark a friend:a rl. l!ov (e-mail) January 03, 2019 4:00PMPST
DESCRIPTION OF AMENDMENT
1.) Revise Section 014000 Revision 2, "Quality Assurance," Paragraph 4.1, "Price-Anderson Amendments Act Requirements," of the State of Work, "TOC Tank Farms Construction Blanket Master Agreement (BMA), Revision 0, dated October 10, 2018 to state:
From: 4.1 Price-Anderson Amendments Act Requirements.
a. As a government Subcontractor in a nuclear facility, the Subcontractor ..................... .. Worker Safety and Health Program .......... .
To: 4.1 Price-Anderson Amendments Act Requirements - The subcontractor shall comply with Article 2.11 entitled, Price-Anderson Amendments Act (P AAA), contained in the General Provisions and shall have a process in place to ensure that noncompliance documentation that affects work performed for WRPS, is submitted to WRPSP [email protected]. Subcontractor personnel shall be trained to the nuclear safety rules consistent with their specific position and assigned work.
a. As a government Subcontractor in a nuclear facility, the Subcontractor .............. .. ...... . Worker Safety and Health Program .......... .
2.) Add Professional Management personnel category for "Project Controls Engineer into Rate Schedule A (Base) dated 12/06/18, Rate Schedule A (Option Year 1) dated 12/06/18, and Rate Schedule A (Options Year 2) dated 12/06/18. (See Attachments 1 through3).
3.) Replace Section E On-Site Supplemental Work Provisions Rev. 3 dated 08/09/2016 with Section E On-Site Supplemental Work Provisions Rev. 4 dated 12/03/2018 and add "SUBCONTRACTOR Employee Termination Form," (See Attachments 4 & 5)
4.) Change proposal due date from January 03, 2018 to January 03, 2019@4:00 PM PST in the General Instructions to Offerors, Paragraph 1.4 Proposal Schedule Table and Paragraph 1.6, Proposal Due Date.
Attachments: 1.) Rate Schedule A Base PoP Rev. 01 dated 12-06-18 Excel Sheet 2.) Rate Schedule A Base PoP Rev. 01 dated 12-06-18 Excel Sheet 3.) Rate Schedule A Base PoP Rev. 01 dated 12-06-18 Excel Sheet 4.) Section E On-Site Supplemental Work Provisions Rev. 4 dated 12/03/2018 5.) SUBCONTRACTOR Employee Termination Form," Rev. 0 dated 08/07/18
Note: Email Acknowledgement to the Procurement Specialist, mark a friendfrvrl.1wv Except as provided herein, all terms and conditions of the solicitation remain unchanged and in full force and effect.
PROCURJMENT S!ECIALIST /) DATE
Issue this 6TH day of December, 2018 by: WRPS - 1iN./Al'.rH- -/ / .,,. j z-./ l:,. -1<) I' ~, I V
Pa g e I of2 11/13/2018 Rev2mlm
SOLICITATION AMENDMENT f1P" washington river ~ protection solutions
SOLICITATION NO.
RFP-314298 I
I. AMENDMENT SOLICITATION DATE
November 12, 2018 I AMENDMENT NO.
04
II. ACKNOWLEDGMENT OF AMENDMENT
I AMENDMENT DATE
December 06, 2018
Offerors must acknowledge receipt of this amendment in writing, by the date and time specified for proposal submissions or the revised Due Date above (if revised), whichever is later. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECENED AT THE DESIGNATED LOCATION BY THE SPECIFIED DATE AND TIME MAY RESULT IN REJECTION OF YOUR OFFER. If, by virtue of this amendment you wish to change your offer, such change must make reference to the solicitation and this amendment.
NAME AND ADDRESS OF OFFEROR
OFFEROR (Signature of person authorized to sign)
NAME OF SIGNER
TITLE OF SIGNER
DATE
Page 2of2 11/13/2018 Rev2mlm