57
Warm Welcome Truetech Vision Industry Pvt. Ltd One team …One vision

Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

Warm Welcome

Truetech Vision Industry Pvt. LtdOne team …One vision

Page 2: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

TRUE-TECH VISION INDUSTRY PVT. LTD.Plot No.:-G44, MIDC-Ambad, Nashik.- 422010.

Page 3: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

CONTENT

▪Introduction▪Vision▪Core Activities▪Industries we serve▪Infrastructure & Team▪Machinery & Equipments▪Design Facilities▪Certification▪Annual Turnover▪Ongoing projects.▪Our Achievements▪Valuable Clients▪Why Select Truetech?▪Thank You

Page 4: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

INTRODUCTION

We Truetech Vision Industry Pvt. Ltd. Are a Nasik based company and in

business since last 5 years, During this journey we grow from vision Industry to Truetech Vision Industry Pvt. Ltd. and reached first milestone of success.

Quality and Safety are the top most priority of Truetech Vision. Hard work is our strong foundation. Commitments, On time delivery, Trust and Truth are the most four important pillars of our company. With these values we have built up long term relationship with our clients.

We are in the business of Design, Manufacture, Installation and Commissioning of custom built process Plants/Equipment on turnkey basis.

Page 5: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

To Associate with our Clients

In supply of Quality & Cost

effective Equipment & Project Services

Within the Time frame

With Our Modern Manufacturing Facilities,

Dedicated Work Force & Committed Team Work

In a Safe Environment...

VISION

Page 6: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

▪Design, detail engineering of Process Plants and Piping system as per customer requirement▪Erection and Installation of Plants .▪Supply and Installation of Piping and Storage system. ▪Supply and Installation of Automobile Paint Shop in terms of various components and assemblies like PTEP Tank, Booth, Scrubber, Oven and Piping System▪Supply and Installation of Tyre industry related Components and

Assemblies.▪Manufacturing and supply of custom built Industrial Machinery

and Equipments.

CORE ACTIVITIES

Page 7: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

INDUSTRIES WE SEARVE

•Food & Dairy•Pharmaceutical•Bulk Drugs•Chemicals•Fine chemicals•Agriculture•Sugar refinery•Automobile•Tyre•FMCG•Paint

Page 8: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

INFRASTRUCTER & TEAM

Page 9: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

MANUFACTURING FACILITY AT NASHIK

180 Km from Mumbai – 2.5 Hrs Journey 220 Km from Pune – 3 Hrs Journey 200 Km from nearest port (NHAVA SHEVA) -- 3 Hrs Journey

▪ Location : G44,Ambad-MIDC▪ Total Area : 7500 sq.ft.▪ Covered Area : 5000 sq.ft.

Page 10: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

MANUFACTURING FACILITY PHOTOS

Page 11: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 12: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 13: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 14: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

RESOURCE- MANPOWER

Board of Directors1) Mr. Suresh Badgujar

Managing Director

2) Mr. deepak MateDirector Operations.

3) Mr. Ajay OjhaDirector Marketing.

4) Mr. Onkar LalsareDirector Projects.

Senior Management1) Deepak Niphadkar

Manager Production2) Rahul Dhikle

Manager Project3) Amol Mate

Manager QA-QC4) Vijay Ghevde

Manager marketing & Engineering5) Nilesh Borade

Manager Account & Finance6) Bharat Mahajan

Manager HR & Store

➢TrueTech vision family has 20 plus staff members and more than 80 plus workers with committed efforts

Page 15: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

RESOURCES –WORKERS (SKILLED & SEMI SKILLED)

WORK FORCE

Senior Fabricators

Fitters

Welders(TIG)

Welders(MIG & ARC)

Riggers

M/C Operator

Griender

Gascutters

Electritions

Painters

06

16

12

20

04

0202

06 0616

12

08

04

04

02

02

0608

04

20

TOTAL = 80

Page 16: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

RESOURCE- FINANCIAL

▪ Paid up Capital : 10 million. ▪Reserve & Surplus : 20 million. ▪Cash Credit Limit : 5 million. ▪BG Limit : 10 million.

▪Bank : IDBI Bank ltd.Pathardi Phata Branch, MIDC-Ambad,Nasik-422010.

Page 17: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

MACHINE AND EQUIPMENT

❖CNC Bending Machines- 1 NoMake : JekuarSize : 3.0 Mtr longCapacity : SS up to 6 mm thk

: CS up to 8 mm thkWe have joint venture with separate facility & cost center.

❖CNC Shearing Machines- 1 NoMake : DevsonsSize : 3.0 Mtr longCapacity : SS up to 6 mm thk

CS up to 8 mm thkWe have joint venture with separate facility & cost center.

Page 18: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

❖Lathe Machine- 2 NosCapacity : Up to 300 mm dia

❖Plate Rolling Machine Capacity : 1500 W X 10 Thk – 02 Nos

❖Plasma Cutting Machine-Air Cooled Type:- 02 NosMake : Rilon.Capacity : 25 mm Thk.

❖Welding Machine-Inverter Type:- 20 Nos.Make : Ador & RilonCapacity : up to 400 Amp

❖Overhead Crane:-Capacity : 5 MT X 12 Mtr Span - 1 No.

Page 19: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

❖Hydra – 1 No.Make- ACECapacity-15 Mt

❖For CranesCapacity : 50 Mt to 400 Mt.

We have tie up with M/s Sanghavi, Sanas, Sandeep, Dynamic-Cranes.

❖For Cherry Picker And Scissor LiftCapacity : Up to 120 Ft. And up to 2 Mt.

We have tie up with M/s Manlift, M&T, Shakti & Dynamic.

❖Power Generators -2Nos.Make : Kirloskar

Capacity : 10 KVA - 1 NO/ 62.5 KVA - 1 NO

Page 20: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

DESIGN FACILITIES

We have In House & Extended Arm facilities, as our joint associate for

▪eBase for intelligent P&ID interlinked with Process, Electrical and Instrumentation Engineering ▪Naviswork for 3D modeling▪Caesar II for stress Analysis ▪Cadworx Professional for Piping / Equipment and Structure ▪Isogen for Piping Isometrics ▪Orthogen for Equipment and Piping Layout ▪Pv Elite for Pressure Vessels ▪Solidworks 2016 ▪StaadPro for Structural Analysis ▪Pipeflow for Pressure Drop Calculation/ Network Analysis

Page 21: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

PFD- Provided by Client

Preparation of P&ID

Design & Detail

Engineering

Equipment/ Piping

Manufacturing

Piping & Mechanical Installation

Electrical & Instrumentation

InsulationHVAC and Ducting

Fire Hydrant Engineering

In Process and Final Inspection

and Documentation

Testing and Commissioning

HANDOVER TO CLIENT

EXECUTION FLOWCHART – FOR TRUNKEY SOLUATIONS

Page 22: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

CERTIFICATION

Page 23: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

CERTIFICATE OF

INCORPORATION

Page 24: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

CERTIFICATE OF

REGISTRATION

Page 25: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

CERTIFICATE OF

SERVICE TAX

Page 26: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

ANNUAL TURNOVER

0

5

10

15

20

25

30

35

40

45

2015-16 2016-17 2017-18

Turnover

Turnover

Amounts in Million

20.15

40(TARGETED AT)

10.42

Page 27: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

ONGOING PROJECTS

Page 28: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 29: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 30: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 31: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 32: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 33: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 34: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 35: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 36: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 37: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

OUR ACHIVMENTS

Page 38: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

FBD

HOMOGINISER TANK

Page 39: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

LIQUIFIER TANK

Page 40: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

SS TANKS & KETTALES

Page 41: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

VISIONMILL

Y SHAPED BLENDER

Page 42: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

PLM 50 LTR

PLM 200 LTR

Page 43: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 44: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 45: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 46: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 47: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 48: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

OCTAGONAL BLENDER

SHIFTER

Page 49: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 50: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 51: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 52: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 53: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

OUR VALUABLE CLIENTS

Page 54: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 55: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA
Page 56: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA

Why Select Truetech?

Trunkey Solution Provider

Safety & Quality

Assurance

Maintain Customer

Relationship

Modernized Facility

Capability To Execute

Relevant Expertise With

Committed Delivery

We Have Repeat Orders

Page 57: Warm Welcome - True Tech Vision | Home · MANUFACTURING FACILITY AT NASHIK 180 Km from Mumbai –2.5 Hrs Journey 220 Km from Pune –3 Hrs Journey 200 Km from nearest port (NHAVA