15
- 1 - 11 to 13 September 2013, Bangalore WAN-IFRA India Expo 2013 Exhibitor Advisory www.wan-ifra.org/india2013 1. Important Information I. Important addresses II. Important dates III. General Information IV. Exhibitor briefing, registration and badges, listing in Expo catalogue V. Exhibitor data sheet 2. Technical Services 2.1 Expo hall technical specification 2.2 Stand set-up and dismantling 2.3 Shell Scheme stands 2.4 Raw space and stand construction 2.5 Power supply 2.6 Water and compressed air supply 2.7 Cleaning and waste disposal 3. Structural elements, furniture, stand builders 3.1 Expo stand builders in India 3.2 Rental services for additional furniture 4. Communication 4.1 Internet connection 5. Audio, Video, data application 5.1 Rental services for audio, video and data application 6. Other services 6.1 Import of exhibits, official freight forwarder and onsite handling 6.2 Customs requirement, statutory documents for import and domestic shipment of goods 6.3 Stand security 6.4 Hosts & hostesses 6.5 Travel services 7. General information 7.1 Official hotel

WAN-IFRA India Expo 2013 Raw space and stand construction ... India. Tel: +91-44-4211 0640 Fax: ... WAN-IFRA India Expo 2013 has been approved by India Trade Promotion

  • Upload
    ngodung

  • View
    218

  • Download
    1

Embed Size (px)

Citation preview

- 1 -

11 to 13 September 2013, Bangalore

WAN-IFRA India Expo 2013 Exhibitor Advisory www.wan-ifra.org/india2013 1. Important Information

I. Important addresses II. Important dates

III. General Information IV. Exhibitor briefing, registration and badges, listing in Expo catalogue V. Exhibitor data sheet

2. Technical Services

2.1 Expo hall technical specification 2.2 Stand set-up and dismantling 2.3 Shell Scheme stands 2.4 Raw space and stand construction 2.5 Power supply 2.6 Water and compressed air supply 2.7 Cleaning and waste disposal

3. Structural elements, furniture, stand builders

3.1 Expo stand builders in India 3.2 Rental services for additional furniture

4. Communication

4.1 Internet connection 5. Audio, Video, data application

5.1 Rental services for audio, video and data application

6. Other services

6.1 Import of exhibits, official freight forwarder and onsite handling 6.2 Customs requirement, statutory documents for import and domestic shipment of goods 6.3 Stand security 6.4 Hosts & hostesses 6.5 Travel services

7. General information

7.1 Official hotel

- 2 -

I. Important addresses Organiser

WAN-IFRA South Asia Pvt. Ltd. 54 K B Dasan Road, III Floor, SIET Admn. Bldg. Chennai 600 018, India. Tel: +91-44-4211 0640 Fax: +91-44-2435 9744 Contact persons: V Antony (or) Magdoom Mohamed E-mail: [email protected] / [email protected]

Venue

Bangalore International Exhibition Centre (BIEC) 10th Mile, Tumkur Road, Madavara Post, Dasanapura Hobli, Bangalore 562 123, INDIA Tel: +91.80.66246600 Fax: +91.80.66246661

Official Expo stand contractor

Pavilions & Interiors India Pvt Ltd 53/6, Behind Swamy Service, Madanayabanahally Tumkur road, Bangalore – 562 123, India Tel: +91.80.2371 5333 Fax: +91.80.2371 5444 Contact: Mr. Vinu K K, Mobile: +91.99162.37333 Email: [email protected]

Official Freight Forwarder and onsite handling agency

R.E.Rogers India Pvt Ltd 2383/1, 11th Main, 15th Cross, ‘E’ Block Sahakar Nagar, Bangalore – 560 092 Tel: +91.80.4269 0500 Fax: +91.80.4153 5881 E-mail: [email protected] Contact person: Mr. Ashwin V, Assistant Manager – Sales Mobile # +91.98805.33988

II. Important dates Event: 11 to 13 September 2013. (Wednesday, Thursday & Friday)

Deadline Requirement 1st August 2013 Exhibitor data for

printing the Expo Catalogue

Hi-resolution exhibitor logo in digital format, a brief profile of the exhibitor in not more than 200 words, address with contact name, phone number, email id and website address.

12th August 2013

Exhibitor data sheet See page 4

III. General Information

a. ITPO Approval: WAN-IFRA India Expo 2013 has been approved by India Trade Promotion Organisation vide ITPO approval letter No. 144-ITPO(44)/App/2013 dated 10 May 2013.

b. Climate: The temperature will range from 20 to 30 degrees Centigrade.

c. Airport Information: The Bangalore Airport is 40 kilometres from BIEC. Prepaid taxis are available. The fare from the airport to BIEC is approximately between Rs.750 – Rs. 1000.

d. Currency: The currency is Indian Rupee (INR / Rs.) The exchange rate as on 25 June 2013 is

1 US$ = INR. 60.00

1 Euro = INR. 79.00

e. Voltage for electricity: 220/240V

f. Visa: Most nationalities need a visa for travel to India. Please ensure that you apply for visa well in advance. There is no visa application on arrival.

- 3 -

IV. Exhibitor briefing, registration and badges, listing in Expo Catalogue

a. Exhibitor briefing: A briefing will be held in the meeting room at the adjacent Convention Centre on Tuesday, September 10, at 11.30 a.m. Please make it a point to attend.

b. Fascia wording (for Shell Scheme Stands): Please complete the Exhibitor Data Sheet and return before August 12, 2013.

c. Exhibitor badges/registrations: Exhibitors are entitled to the following number of Delegate Badges and Exhibitor Badges.

Area No. of Conference Delegate passes

No. of Exhibitor passes

9 sq.mtr. 2 2

12 sq.mtr. 3 3

15 sq.mtr. 3 3

16 sq.mtr 4 4

18 sq.mtr. 4 4

20 sq.mtr. 4 4

24 sq.mtr. 5 5

25 sq.mtr. 6 6

30 sq.mtr. 7 7

32 sq.mtr. 7 7

36 sq.mtr. 8 8

40 sq.mtr. 9 9

45 sq.mtr. 10 10

Important:

a. All names should be submitted before August 31, 2013 by email/fax to [email protected] or +91.44.2435.9744

b. Please fill in the Exhibitor Data Sheet in the next page and email / fax to the above contact. Deadline: 12th August 2013

c. Listing in the Expo Catalogue: The Expo catalogue will list out all confirmed exhibitors and a copy will be given to all delegates and visitors. Email the following to [email protected]

I. Exhibitor logo in digital format – jpeg

II. A brief profile of the exhibitor, not more than 200 words.

III. Address with contact name, phone & fax numbers, email ids and website

IV. Deadline: 12th August 2013

d. Expo visitor passes are available free of cost for all qualified visitors at the venue.

e. The exhibitor badges will provide access to lunch and coffee sessions. Delegate badges will provide access to conference sessions, conference kit and conference material at WAN-IFRA website, lunch, coffee and dinner. The badges can be picked up from the organiser's office during the briefing.

f. Substitution is allowed only for the exhibitor's own staff and is not allowed for invited customers and agents.

- 4 -

11 to 13 September 2013

WAN-IFRA India Expo 2013 Exhibitor Data Sheet Deadline for submission – August 12, 2013 The following information is required for alphabetical listing of exhibitors in the Expo documentation, at fascia on the booth and for exhibitor badges. Exhibitors are asked to ensure that this form is accurate and that all entries are typed. Exhibitor Name

(to appear in facia – 24 characters)

Address

Contact Name

Stand No.

Tel # (with code)

Fax no.

Web site & Email

Name Position Delegate / Exhibitor

Nominees (for exhibitor badges and delegate badges)

(You may ignore this if names are already given).

1. 2. 3. 4. 5. 6. 7. 8.

Name & position

Signature & date

Please e-mail/fax to [email protected] or fax to +91.44.2435 9744 Thank you.

- 5 -

2. Technical Services

2.1 Expo Hall technical specification

2.1.1. Carpet area: 3000 sq.mts at Hall - 2 2.1.2. Floor loading capacity: 30 tonnes per sq.mtr. 2.1.3. Epoxy coated concrete floor with anti static treatment 2.1.4. Ceiling height at centre: 14 mtrs 2.1.5. Ceiling height at sides: 9 mtrs 2.1.6. Vehicle Entry : 5 mtr ( wide ) X 9 mtr ( height ) 2.1.7. Ventilation: Centralised air cooling 2.1.8. Car parking: Complimentary

2.2 Stand setup, dismantling and exhibition timing

Handing over of raw space 9-Sep 12:00 Noon

Moving in of machineries / heavy exhibits 9-Sep 12:00 Noon

Handing over of built up stalls 10-Sep 11:00 AM

Stall lighting / socket power supply 10-Sep 4:00 PM

Cut off time for machines, forklift etc to come in 10-Sep 9:00 PM

Cut off time for clearing of passage 10-Sep 9:30 PM

Passage carpetting to start at 10-Sep 10:00 PM

Completion of carpetting & final set up of stalls 11-Sep 7:30 AM

Inauguration of conference 11-Sep 9:00 AM

Inauguration of expo 11-Sep 10:30 AM

Closing of expo 13-Sep 4:00 PM

Removal pf passage carpet 13-Sep 4:30 PM

Dismantling of stalls 13-Sep 6:30 PM

Entry for trucks, forklifts etc. 13-Sep 9:00 PM

Completion of dismantling & handing over of hall 14-Sep 6:00 AM

2.3 Shell Scheme stands

2.3.1. Prefab stalls as per layout using Octonorm system – Aluminium extrusions of powder coated vertical pillars and horizontal channels with panels using locking device.

2.3.2. Panels: Using white color polycom laminated panels of 1 mtr width and 2.5 mtr height.

2.3.3. Drilling / nailing / pasting with adhesives not permitted on the pillars / channels & panels. Only double sided foam tape allowed for fixing the panels on the walls panels.

2.3.4. Fascia: Using colour laminated board fixed in between 2 Nos of horizontal channels at the fascia. Exhibitor name using white vinyl will be fixed on the name board.

2.3.5. Carpet: Providing & laying synthetic needle punch carpet on the floor for stall area and covering it with polythene roll till the inauguration, providing & laying synthetic needle punch carpet for the pathway with old bit carpets for packing the ducts & foam on top of the cables & wires and maintaining the same throughout the exhibition period.

2.3.6. No damage allowed to the carpets inside the booth & the pathway.

- 6 -

2.3.7. List of furniture allotted to various sizes of shell scheme expo stands

Stand Size (in Sq.Mtrs)

Desk Table

Chairs Waste baske

t

Spot lights (100

watts)

Plug point

(5 amps)

9 1 3 1 3 1

12 1 4 1 4 1

15 2 5 2 5 2

16 2 5 2 5 2

18 2 6 2 6 2

20 2 7 2 7 2

24 3 8 3 8 3

25 3 8 3 8 3

30 3 10 3 10 3

32 4 11 4 11 4

36 4 12 4 12 4

40 4 13 4 13 4

45 5 15 5 15 5

2.3.8. For your requirement of additional furniture, please contact the official stand

builder, Pavilion and Interiors [I] Pvt Ltd. The list of items available is attached. (See page 15)

2.4 Raw space & stand construction

a. All exhibitors to send us their stand plans for approval before the expo. Booth designers are particularly requested to avoid designs which block or box-in other exhibitors’ booths, gangways, fire points, extinguishers or emergency exits.

b. Adjacent raw space Booths must be separated by walls with a nominal height of 2.5 mt. Higher separation walls are permitted provided visible part of the back of the wall is finished.

c. Height of the booth can go uptp 4 mtrs. Double-decker booths will only be considered in exceptional circumstances, but a surcharge of 100% of the booth fee will apply.

Mezannine / Double decker construction – design approval from a structural engineer is mandatory. To be produced before commencement of work at the site. Design approval from a structural engineer is required.

d. Exhibitors without a platform are required to ensure that free access is given for the running of necessary cable across their booths.

e. The exhibitors must ensure that aisles are not blocked during erection of their booths, and that the contractor removes his off-cuts and debris from the hall and the booth is completed by 7.30 a.m. on 11h September 2013.

f. All electrical work must be carried out by the official contractor. Temporary power will be given from the nearest DB for working on a chargeable basis.

g. Final power will be given by us as per their requirement @ extra cost

h. The booth designer should clear their material at the site before and after the show.

- 7 -

2.5 Power supply

2.5.1. The electric power supply available at the expo is as follows:

3 Phase : 400 volts +/- 10% Single Phase : 230 volts +/- 10% Frequency : 50 CPS +/- 3% The functions mentioned above are only for reference. Variation can be expected on some occasions. The organisers will not be responsible for any fluctuation in electricity.

2.5.2. Electric load: Exhibitors requiring heavy electrical load for their exhibits should

submit such requirements by 31st August 2013 to the official Expo stand contractor Pavilions & Interiors India Pvt. Ltd. Email to [email protected]

Contact person: Mr. Vinu K K, Mobile +91.99162.37333

2.5.3. Additional power charges: Additional power required by the exhibitor will be made at extra cost as under:

a. Charges for power -

Power CONNECTION charges Price in INR

Temporary connection for stand construction (Per/KW/day)

2500.00

Power Load Single Phase Connection per KW (Excluding consumption)

960.00

Power Load Single Phase Connection per KW (Excluding consumption)

1380.00

Power CONSUMPTION charges INR

Per kW 1380.00

b. Charges for electric isolators – contact the official stand builder prices for various capacities

2.6 Water and compressed air supply

Charges for water connection/drain

Type Price in INR

Inlet connection 8000.00 per connection

outlet connection 8000.00 per connection

Charge for connection pipes & faucets – Contact the official stand builder for various sizes and capacities

Compressed air - please check with the organiser for feasibility

Compressed Air Price

6 Bar INR. 8000

8 Bar INR. 10000

Charge for air connection pipes & different pressures – Contact the official stand builder.

2.7 Cleaning & waste disposal: During the exhibition days, housekeeping personnel will

clean the gangways, carpets and remove waste baskets every morning and evening. During the build-up/dismantling day/s, exhibitors are responsible for the removal of both the building/dismantling materials and waste.

- 8 -

3. Structural elements, furniture, stand builders

3.1 Raw Space: Exhibitors who have opted for raw space can use the services of any Expo stand builder. A few of them is listed below for your reference.

Pavilion & Interiors [I] Pvt Ltd 33, A Block, Parsn Guruprasad Apartments 432, TTK road, Alwarpet, Chennai 600 018, India Tel +91.98401.42039 Email: [email protected] Meroform India Pvt Ltd # 44, Mount Poonamallee Road, Opp. Chennai Trade Centre, Nandambakkam, Chennai – 600 089 Tel. +91.44.2232 2524, 2231 4879, Fax. +91.44.2232 2524 Email: [email protected] Contact Person: Mr. Lakshmanan, Marketing Manager, Mobile: +91.98400-36707 Chennai Trade Fair Services Pvt Ltd 48, Mount Poonamalle road, Nandambakkam, Chennai 600 089 Tel. +91.44.2231 0944, Email: [email protected] Contact person: Mr. Radhakrishnan, Mobile +91.97100.75235, [email protected]

Showbiz Experiential Communications Pvt Ltd New # 47, Ground floor, Dr. PV Cherian Crescent Salai, Egmore, Chennai – 600 008 Tel. +91.44.4214 6619, Fax. +91.44.4214 6623 Contact person: Mr. K Vijayakumar, Manager – Operations Email: [email protected], Mobile: +91.93800-09023, New Delhi office # +91.11.2681 0751 Mumbai # +91.22.2343 0743

Mr. Kamal Rana The Big Fish, Plot # 515, Indira Enclave road Near Junior St, Marys School, Naesarai, New Delhi - 110 068 Mobile: +91.9811764643 Email: [email protected], [email protected]

3.2 Pavilion & Interiors [I] Pvt Ltd has been appointed the official Expo stand contractor. If you

have any additional requirements (See annexure 1 & 2 at the end of this document) please contact Mr. Vinu K K at [email protected] Mobile +91.99162.37333

4. Communication

4.1 Internet connection: USB plug and play wi-fi internet connections are available. Please contact [email protected] before 15-August for your connections.

Price: EUR 65 / INR 3500 for 4 days. Download limit 5 GB.

5. Audio, Video, data applications

5.1 Audio Visual equipments may be hired from any of the following suppliers.

Pavilions & Interiors India Pvt Ltd 53/6, Behind Swamy Service, Madanayabanahally Tumkur road, Bangalore – 562 123, India Tel: +91.80.2371 5333 Fax: +91.80.2371 5444 Contact: Mr. Vinu K K, Mobile: +91.99162.37333 Email: [email protected] Backstage India No. 65, Ix Main Road, Iv C Block, Koramangala Bangalore 560034, India Email: [email protected] Contact Persons: Satish/Niranjan, Mobile Nos: +91 93428 33848 or +91 99866 30555

- 9 -

6. Other services

6.1 Import of Exhibits, official freight forwarder and on-site handling agency: To import your exhibits into India, please contact the R E Rogers Office in your country or at their address given under section I on page 2. The Official Freight Forwarding and Clearing Agents will offer comprehensive service related to movement of your goods from your office/factory to the Expo stand which includes transport, sea/air freight, customs clearance, port handling, transit to venue, unloading, unpacking, movement to stand etc. We advise you to contact the Official Freight Forwarding and Clearing Agents as soon as you book your stand so that your exhibits can be brought in time for the show. The sea cargo transit time from your country to Chennai Port varies between 10 and 40 days depending on the distance from your country to India

6.2 Customs Requirements:

a.) ATA Carnet System: India is a signatory of the ATA CARNET SYSTEM. Goods entering on Carnet will be exempted from guarantee requirements. Please ship your exhibits in good time to avoid any delays in clearance. For further details, contact the official freight forwarders – or their agents in your country. All packages containing consumable items like brochures, leaflets, cassettes or gifts should be declared as such while exporting and as well as delivering the same to the clearing agent. b.) Hand Carried Items On ATA-Carnet: ATA-Carnet can also be used for hand carried goods into India. Exhibitors need to have following documents while they hand carry goods on Carnet into India. (1) Copy of the ITPO Approval Letter. (2) Participation certificate from the Organiser. Instructions : The Carnet has to be in the name of the company which pays the space rent to the organiser in foreign exchange. This also means that the Carnet has to be in the name in which the participation certificate has been issued. If possible, the name of the person carrying carnet and his passport number should appear on the said document. In case of hand carried goods, the exhibitors themselves will have to complete the formalities with the help of customs officials at the immigration point at the Airport c.) Sale of Exhibits: Is allowed subject to the conditions laid down by Customs authorities of Government of India. Please consult the official freight forwarding agent for further details and procedures in this connection. d. ) Shipping Documents: In consultation with the Official Freight Forwarding and Clearing Agents, exhibitors should take care to see that the shipping documents of exhibits are full and complete to satisfy the statutory requirements of the Customs Authorities to avoid any difficulties en route. Participation Certificate will be given to all exhibitors. The exhibits should be consigned in the name of exhibitor themselves and NOT in the name of the Organisers. e.) Insurance: Please insure all your goods before shipping. Organisers are not responsible for damage, pilferage or any other loss, during shipping, transportation and handling at the Exhibition. f.) Transport Documents: Exhibitors should take care to see that the transport documents of exhibits are full and complete to satisfy the statutory requirements of Sales Tax, Central Excise and Customs Authority to avoid any difficulties en route. Participation Certificate will be given to all exhibitors. The exhibits should be consigned in the name of exhibitor themselves or their local agents and NOT in the name of the Organisers. ITPO approval & Karnataka Sales Tax Endorsement attached. (See pages:11 to 13)

6.3 Stand Security: Exhibitors and their staff will not be allowed in the Expo hall after the show hours. Security arrangements will be provided to the Expo hall. Still, exhibitors are requested to have their valuables properly insured.

6.4 Hosts and hostesses: Please contact Sita Travel, our official travel service provider.

- 10 -

6.5 Hotel & travel services: Sita Trave l ( Ind ia) Ltd. , has been appointed as the official travel agent. Please contact them for your travel arrangements and room reservation at various hotels in Bangalore and for post conference tours.

http://www.sita.in

Mr. K.S.S Mani, Dy. Manager Sita Travel 4, first floor – RAMS 9, Dr. Nair road, T-Nagar Chennai 600 017, India Tel: +91.44.2815 1722, Email: [email protected] Mobile: +91.98415.64376

7. General Information

7.1 The official hotel is Taj Vivanta Yeshwantpur. The hotel is 35 kms away from the airport and 8 kms from the Expo/Conference venue.

Vivanta by Taj – Yeshwantpur 2275 Tumkur Road, Yeshwantpur Bangalore 560022, Karnataka, India Telephone: +91 80 6690 0111, Facsimile: +91 80 6690 0009

A limited number of rooms are reserved, at a special price, for delegates and exhibitors at the official hotel on first-come first-served basis. To reserve your room, please write to [email protected] or use the reservation form attached. (see page 14) The special rate is as follows :

Room Category Single Occupancy Double Occupancy

Executive Room INR 6000 INR 7000

The above special rates are exclusive of taxes and inclusive of

Complimentary Buffet Breakfast Complimentary 24 hours Internet access in room Taxes @ 19.42%

WAN-IFRA India Expo 2013 & Publish Asia 2013 Annual Conference --------------------------------------------------------------------------------------------------------

11 to 13 September 2013, Bangalore, India Official Hotel Accommodation BOOKING FORM

Vivanta by Taj - Yeshwantpur 2275 Tumkur Road, Yeshwantpur

Bangalore 560022, India Phone +91.80. 6690 0111

To reserve your hotel accommodation at preferential rates, please fax or email your requirement to: Fax +91.80.6690 0009 or Email: [email protected]

RESERVATION DETAILS

Last Name: First Name:

Organization / Designation:

Email:

Phone: + Fax: +

Check-in date: Arrival Flight # ETA:

Check-out date: Departure Flight # ETD

Room Category Per room Per Night Rate (Single / Double Occupancy)

Room Inclusions

Superior Charm Room INR. 6000 / INR. 7000

Buffet Breakfast 24 hours internet Inclusive of 19.42% room tax Welcome drink on arrival

Room type Single Double Smoking Non-Smoking Remarks:

Airport transfers (charged at INR 2649 one way):

Yes No

TERMS AND CONDITIONS The above room rate is per room per night and is inclusive of buffet breakfast. The transfers will be on a chargeable basis INR 2649 per way inclusive of taxes. Check-in time is 1400 hrs and check out time is 12.00 noon. Early check-in and late check-out will be charged as per hotel policy.

All bills must be settled at the time of departure by an approved credit card or cash. However, a one night room charge will be deducted against the credit card at the time of booking.

Guaranteed reservation The reservation will be held guaranteed only on receipt of a Credit Card Guarantee and one night’s advance deposit. As rooms and tariffs are subject to availability, please make your booking as soon as possible.

Guaranteed by: VISA AMEX MASTERCARD JCB DINERS

Credit Card # Expiry

Signature: Cancellation policy Rooms will be reserved as per availability at the time of receipt of this reservation request and on first come-first served basis. The hotel reserves the right to levy one night’s room charge and taxes applicable thereof, as cancellation or no show charges, unless the reservation is cancelled by 1st September, 2013. Any early departure i.e. departure prior to the check-out date mentioned in the form will be charged retention for one night.

S. NoItem code

Description Size / SpecificationUnit Cost in INR.

Unit Cost in

US$Qty Cost

A

1 PI-01 Executive Chair Black/red 2070 38

2 PI-02 VIP Sofa (1 Seater) Black 2760 50

3 PI-03 VIP Sofa (2 Seater) Black 4830 88 4 PI-04 Visitor Chair Black 690 13 5 PI-05 Fibre Chair Black 414 8 6 PI-06 Wooden Chair Wood color 828 15 7 PI-07 Round Table (Wooden Top) 70CM (dia) x 75CM (H) 1242 23 8 PI-08 Round Table Cross Leg (Glass Top) 90CM (dia) x 75CM (H) 1656 30 p9 PI-09 Bar Stool (Adjustable Chrome leg with Cup) 50CM (H) 1242 23

10 PI-10 Glass Showcase (Big with 2 downlights) 1M x 50CM x 2M (H) 4140 75

11 PI-11 Glass Showcase (Small) 50CM X 50CM X 2M (H) 4140 75

12 PI-12 Glass Counter 1M X 50CM X 1M (H) 3450 63

13 PI-13 Centre Table (Black Glass Top) 1.20M (L) x 45CM (W) 1242 23

14 PI-14 Standing Discussion Table 1.0M (H) x 70CM (Dia) 1242 23

15 PI-15 System Counter (Table) 1.05M X 60CM X 75CM 1242 23

16 PI-16 Side Rack (Lockable) 40CM X 1M X 60CM (H) 3450 63

17 PI-17 System Podium 50CM X 50CM X 1 M (H) 1380 25

18 PI-18 System Podium 50CM X 50CM X 70CM (H) 966 18

19 PI-19 System Podium 50CM x 50CM x 50CM (H) 828 15

20 PI-20 Brochure Rack 828 15

21 PI-21 Round Table (White Top) 80CM (dia) x 75CM (H) 1242 23

22 PI-22 Square Table 1.2M X 45CM 966 18

23 PI-23 Lockable Door 4140 75

24 PI-24 System Panel 1M x 2.5M (H) - White 1656 30

25 PI-25 Glass Shelf (each) 30CM x 1M 414 8

26 PI-26 Wooden Shelf Flat / Adjustable (each) 30CM x 1M 344 6

27 PI-27 Long Arm Halogen Light 150W 690 13 28 PI-28 Spot Lights 75W 552 10 29 PI-29 Metal Halide 150W 2070 38 30 PI-30 5A/13A Power Socket 552 10 31 PI-31 Photo Clip / T-Bolt 28 1

32 PI-32 Waste Basket 68 1 33 PI-33 Plasma T V 42" Rate/day 3000 55 34 PI-34 Plasma T V 50" Rate/day 4800 87 35 PI-35 Lap top computers Rate/day 1656 30

NOTE : Please make the order with the items code & name.

Cheque/DD payment to be made in favour of "Pavilions & Interiors (I) Pvt. Ltd."

Bank DetailsName of Company : Pavilions and Interiors (I) Pvt. Ltd.Account No : 15820200004566Swift Code : FDRL0001582Bank Name : FEDERAL BANKBank Address : 17/1 , Savithri , SM Road , Jalahalli West , Bangalore-560015

Pavilions & Interiors (I) Pvt. Ltd.S.No.53/6, Madanayakanahalli , Behind Swamy Service Station19th KM , Tumkur Road , Bangalore-562123

Tel :+91.80.23715333, Fax +91.80.23715444E-mail : [email protected]

Furniture/System Accessories/Electrical Equipment

Pavilions & Interiors (I) Pvt Ltd