\\gtb1v-fs01\ I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - Plans.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
ISSUE/REVISION
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
NO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Index
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
COVER/INDEX SHEET
December 2017Project 1700458
Consultants
CITY OF MILFORD
MILFORD, CONNECTICUT
PREPARED BY:
PREPARED FOR:
1. DUNE AND BEACH NOURISHMENT PLAN
2. DUNE AND BEACH NOURISHMENT PLAN
3. DUNE AND BEACH NOURISHMENT PLAN
4. DUNE AND BEACH NOURISHMENT PLAN
5. DUNE AND BEACH NOURISHMENT PLAN
6. DUNE AND BEACH NOURISHMENT PLAN
7. DUNE AND BEACH NOURISHMENT PLAN
8. DUNE AND BEACH NOURISHMENT PLAN
9. DUNE AND BEACH NOURISHMENT PLAN
10. DUNE AND BEACH NOURISHMENT PLAN
11. DUNE AND BEACH NOURISHMENT PLAN
12. DUNE AND BEACH NOURISHMENT PLAN
13. WILDEMERE BEACH DUNE & BEACH NOURISHMENT TYPICAL SECTIONS
14. WILDEMERE BEACH DUNE & BEACH NOURISHMENT TYPICAL SECTIONS
15. WILDEMERE BEACH DUNE & BEACH NOURISHMENT TYPICAL SECTIONS
16. STORM DRAIN OUTFALL DETAILS
17. HYDRODYNAMIC SEPARATOR, DIVERSION CHAMBER, AND OUTFALL DETAIL
18. STORM DRAIN DATA TABLE AND OUTFALL DETAILS
19. DUNE PLANTING DETAILS
20. SAND DUNE COIR REINFORCEMENT DETAILS
21. DUNE WALKOVER AND PLANTING DETAILS
22. DUNE CROSS-OVER ANCHORAGE DETAILS
23. EROSION AND SEDIMENT CONTROL DETAILS
24. EROSION AND SEDIMENT CONTROL NOTES
SCHEDULE OF DRAWINGS
STATE MAP REGIONAL MAP
455 WINDING BROOK DRIVE
SUITE 201
GLASTONBURY, CT 06033
(860)368-5300
Consultants
WALNUT & WILDEMERE BEACH
STABILIZATION PROJECT
MILFORD, CONNECTICUT
015mi 30mi 60mi
1" = 30mi
0
SCALE:
2000 4000
1" = 2000'
SITE
NOTE: THESE PLANS HAVE BEEN DEVELOPED SOLELY FOR THE PURPOSE OF PERMIT REVIEW
AND CONTAIN A LEVEL OF DETAIL COMMENSURATE WITH PERMIT REVIEW REQUIREMENTS.
3 07/26/2018 REVISED PER CT DEEP REVIEW JM
Porch
E
x
i
s
t
i
n
g
H
o
u
s
e
E
x
i
s
t
i
n
g
H
o
u
s
e
E
x
i
s
t
i
n
g
H
o
u
s
e
E
x
i
s
t
i
n
g
H
o
u
s
e
E
x
i
s
t
i
n
g
H
o
u
s
e
E
x
i
s
t
i
n
g
H
o
u
s
e
Wracklin
e
Brick Walk
W
o
o
d
S
t
a
i
r
s
C
o
n
c
P
a
v
e
r
s
Brick W
alk
B
r
i
c
k
W
a
l
k
W
o
o
d
S
t
a
i
r
s
W
o
o
d
S
t
a
i
r
s
W
o
o
d
S
t
a
i
r
s
W
o
o
d
S
t
a
i
r
s
Brick W
alk
F
l
a
g
s
t
o
n
e
Conc
Pavers
G
r
a
s
s
C
o
a
s
t
a
l
J
u
r
i
s
d
i
c
t
i
o
n
L
i
n
e
=
4
.
7
'
(
P
e
r
D
E
E
P
)
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
G
r
a
s
s
Bric
k W
alk
Breakw
ater Stone
-2
-1
0
1
2
3
4
5
6
7
8TH
AVEN
UE
EXTEN
SIO
N
SF
5
4
3
2
1
0
6
6
7
WILDEMERE BEACHLAUREL BEACH
0+00
1+00
TURBIDITY CURTAIN
MHW
HTL
\\gtb1v-fs01\ I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - Plans.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
ISSUE/REVISION
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
NO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 1
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
DUNE AND BEACH
NOURISHMENT PLAN
December 2017Project 1700458
Consultants
LEGEND:
TURBIDITY CURTAIN
SEDIMENT FENCE
MANHOLE
COASTAL JURISDICTION LINE +4.7 (CJL)
HIGH TIDE LINE +4.46 (HTL)
MEAN HIGH WATER +3.15 (MHW)
MEAN LOW WATER -3.60 (MLW)
SAND FENCE
WETLAND DELINEATION
PROPERTY LINE
GENERAL NOTES:
1. THESE PLANS ARE INTENDED FOR PERMIT REVIEW AND APPROVAL
PURPOSES ONLY. THEY ARE NOT TO BE USED FOR CONSTRUCTION UNTIL
ALL FINAL DETAILS AND CONDITIONS OF PERMIT APPROVAL HAVE BEEN
INCORPORATED, AND UNTIL THE PLANS ARE ACCOMPANIED BY A SUITABLE
SET OF CONTRACT SPECIFICATIONS THAT FURTHER DEFINE THE WORK.
2. ALL UTILITY INFORMATION SHOWN ON THESE PLANS IS APPROXIMATE IN
NATURE. UNDERGROUND UTILITIES MAY EXIST WHICH ARE NOT DEPICTED
ON THESE PLANS, OR WHICH ARE NOT IN THE LOCATIONS SHOWN. THE
CONTRACTOR ULTIMATELY SELECTED FOR THIS WORK SHALL PERFORM
UTILITY IDENTIFICATION AND LOCATION PRIOR TO CONSTRUCTION USING
CALL-BEFORE-U-DIG (CBUD) AND OTHER PRIVATE UTILITY IDENTIFICATION
SERVICES TO ENSURE THAT ALL UTILITIES ARE LOCATED.
3. PROPERTY LINE INFORMATION SHOWN HAS BEEN OBTAINED FROM CITY OF
MILFORD ASSESSOR RECORDS AND IS CONSIDERED RELEVANT FOR THESE
PERMIT LEVEL DRAWINGS.
4. BASE SURVEY PREPARED BY MILONE & MACBROOM, INC. TO T-2
TOPOGRAPHIC STANDARDS, AND A-2 STANDARDS FOR HORIZONTAL
LOCATIONS.
5. VERTICAL DATUM ON THESE PLANS IS NAVD88.
0
SCALE:
40 80
1" = 40'
SF
X
3 07/26/2018 REVISED PER CT DEEP REVIEW JM
E
x
i
s
t
i
n
g
H
o
u
s
e
E
x
i
s
t
i
n
g
H
o
u
s
e
E
x
i
s
t
i
n
g
H
o
u
s
e
Conc Pad
Wra
ckline
C
o
n
c
P
a
d
Grass
G
r
a
s
s
36" CMP
INV.=2.6
F
P
S
t
o
n
e
S
t
a
i
r
s
W
o
o
d
S
t
a
i
r
s
W
o
o
d
S
t
a
i
r
s
W
o
o
d
S
t
a
i
r
s
S
t
o
n
e
R
e
t
a
i
n
i
n
g
W
a
l
l
P
l
a
n
t
e
r
P
o
t
Pier Ruins
C
o
n
c
36" CM
P
E
x
i
s
t
i
n
g
H
o
u
s
e
E
x
i
s
t
i
n
g
H
o
u
s
e
E
x
i
s
t
i
n
g
H
o
u
s
e
E
x
i
s
t
i
n
g
H
o
u
s
e
E
x
i
s
t
i
n
g
H
o
u
s
e
Porch
Flag Stone
PVC Deck
PVC D
eck
Conc
Grass
Conc
I
P
Conc Curb
G
r
a
n
i
t
e
C
u
r
b
Grass
Grass
Sand
S
t
o
n
e
R
e
t
a
i
n
i
n
g
W
a
l
l
C
o
n
c
/
B
r
i
c
k
R
e
t
a
i
n
i
n
g
W
a
l
l
S
t
o
n
e
R
e
t
a
i
n
i
n
g
W
a
l
l
S
t
o
n
e
P
l
a
n
t
e
r
S
t
o
n
e
P
l
a
n
t
e
r
W
o
o
d
S
t
a
i
r
s
W
o
o
d
S
t
a
i
r
s
C
o
n
c
P
a
v
e
r
s
C
o
a
s
t
a
l
J
u
r
i
s
d
i
c
t
i
o
n
L
i
n
e
=
4
.
7
'
(
P
e
r
D
E
E
P
)
G
r
a
s
s
Flag Stone
PVC Deck
F
l
a
g
S
t
o
n
e
D
e
c
k
Conc Patio
Grass
Grass
B
i
t
Conc
-2
-1
0
1
2
3
4
5
6
7
8
9
-3
OCEAN
STREET
GRAN
T STREET
HAU
SER STREET
(U
NPAVED
PASSW
AY)
7
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF SF
S
F
SF
S
F
S
F
SF
8
10
12
8
10
12
6
6
4
2
0
-2
x12.5
0
x12.5
7
8
7
2+
00
3+00
4+00
5+00
6+006+50
7+50
PR
OP
OS
ED
DU
NE
BEACH TO BE
NOURISHED
TURBIDITY CURTAIN
COASTAL JURISDICTION LINE (CJL)
X
X
X
X
X
X
X
X
X
X
XX
XX
XX
XX
XX
X
XX
SAND FENCE
REPLACE END OF EXISTING STORM DRAIN
PIPE AS NEEDED TO MAKE CONNECTION
NEW OUTFALL PIPE #1
STONE ARMOR
REMOVE EXISTING
OUTFALL PIPE
AND SUPPORTS
PUBLIC WOODEN DUNE
WALKOVER TYPE A
WOODEN DUNE
WALKOVER TYPE B
MHW
HTL
MLW
MHW
NEW OUTFALL CHAMBER
TOP INLET EL. 7.5
HAYBALE SED. CONTROL
ACCESS FOR
MAINTENANCE
VEHICLES
NEW FLOW DIVERSION STRUCTURE
NEW HYDRODYNAMIC SEPARATOR
\\gtb1v-fs01\ I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - Plans.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
ISSUE/REVISION
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
NO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 2
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
DUNE AND BEACH
NOURISHMENT PLAN
December 2017Project 1700458
Consultants
0
SCALE:
40 80
1" = 40'
3 07/26/2018 REVISED PER CT DEEP REVIEW JM
D
e
c
k
B
e
n
c
h
m
a
r
k
M
a
g
N
a
i
l
I
n
C
o
n
c
r
e
t
e
R
e
t
a
i
n
i
n
g
W
a
l
l
E
l
e
v
.
=
9
.
1
6
Pier Ruins
Brick
24" CMP
INV.=1.2
24" CM
P
Wra
ckline
Conc Retain
ing W
all
C
o
n
c
R
e
t
a
i
n
i
n
g
W
a
l
l
C
o
a
s
t
a
l
J
u
r
i
s
d
i
c
t
i
o
n
L
i
n
e
=
4
.
7
'
(
P
e
r
D
E
E
P
)
Pier Ruins
E
x
i
s
t
i
n
g
H
o
u
s
e
E
x
i
s
t
i
n
g
H
o
u
s
e
PVC D
eck
Conc Patio
E
x
i
s
t
i
n
g
H
o
u
s
e
Conc
P
i
l
l
a
r
(
T
y
p
)
Grass
Sand
Conc Patio
C
o
n
c
C
o
n
c
G
rass
-2
-1
0
1
2
3
4
5
6
7
8
9
-3
-4
-5
W
ILD
W
O
O
D
A
V
EN
U
E
FAIRW
OO
D AVEN
UE
S
F
SF
SF
SF
SF
SF
SF
SF
SF
SF
S
F
S
F
SF
SF
SF
SF
SF
SF
6
4
2
0
8
10
12
12
10
8
6
-4
x12.5
6
-2
-4
6
7
8
x
7
.5
8
8+00
9+00
10+00
12+
00
13+
00
7+50
10+50
11+
50
PROPOSED DUNE
BEACH TO BE
NOURISHED
COASTAL
JURISDICTION
LINE (CJL)
TURBIDITY CURTAIN
XX
XX
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SAND FENCE
SA
ND
FE
NC
E
REMOVE/DISPOSE
OF PIER RUINS
NEW OUTFALL CHAMBER
TOP INLET EL. 5.8
REPLACE END OF EXISTING STORM DRAIN
PIPE AS NEEDED TO MAKE CONNECTION
NEW OUTFALL PIPE #2
STONE ARMOR
REMOVE EXISTING OUTFALL
PIPE AND SUPPORTS
HAYBALE SED. CONTROL
PUBLIC WOODEN DUNE
WALKOVER TYPE A
WOODEN DUNE
WALKOVER TYPE B
MHW
HTL
MLW
NEW HYDRODYNAMIC SEPARATOR
NEW FLOW DIVERSION STRUCTURE
\\gtb1v-fs01\ I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - Plans.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
ISSUE/REVISION
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
NO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 3
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
DUNE AND BEACH
NOURISHMENT PLAN
December 2017Project 1700458
Consultants
0
SCALE:
40 80
1" = 40'
3 07/26/2018 REVISED PER CT DEEP REVIEW JM
E
x
i
s
t
i
n
g
F
o
u
n
d
a
t
i
o
n
B
e
n
c
h
m
a
r
k
B
e
n
c
h
-
T
i
e
I
n
U
I
C
O
2
0
4
E
l
e
v
.
=
8
.
5
1
C
o
n
c
P
a
d
P
ie
r R
u
in
s
C
o
n
c
P
o
r
c
h
R
u
i
n
s
M
H
T
F
=
7
.
7
4
M
H
T
F
=
8
.
2
5
U
I
C
O
2
0
4
18" CM
P
INV.=
1.0
1
8
" C
M
P
Conc Retaining Wall
Conc Retain
ing W
all
Conc Retain
ing W
all
Conc Retain
ing W
all
W
r
a
c
k
l
i
n
e
C
o
n
c
R
e
t
a
i
n
i
n
g
W
a
l
l
I
P
I
N
I
P
M
a
g
N
a
i
l
-2
-1
0
1
2
3
4
5
-3
-4
-5
B
I
T
T
E
R
S
W
E
E
T
A
V
E
N
U
E
B
O
T
S
F
O
R
D
A
V
E
N
U
E(U
N
P
A
V
E
D
P
A
S
S
A
G
E
W
A
Y
)
L
O
N
G
I
S
L
A
N
D
S
O
U
N
D
-4
SF
SF
SF
SF
SF
SF
SF
SF
SF
S
F
SF
S
F
S
F
6
4
2
0
8
10
1
2
12
1
0
8
6
x12.5
6
-2
-4
7
x7.5
8
6
7
6
5
6
7
13+00
14+00
15+00
16+00
17+0018+00
19+00
PR
OP
OS
ED
DU
NE
BE
AC
H TO
BE
NO
UR
ISH
ED
TURBIDITY CURTAIN
COASTAL JURISDICTION LINE (CJL)
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SAND FENCE
REMOVE WALL
NEW OUTFALL CHAMBER
TOP INLET EL. 6.5
REPLACE END OF EXISTING STORM DRAIN
PIPE AS NEEDED TO MAKE CONNECTION
NEW OUTFALL PIPE #3
STONE ARMOR
REMOVE EXISTING OUTFALL
PIPE AND SUPPORTS
HAYBALE SED. CONTROL
WOODEN DUNE
WALKOVER TYPE B
WOODEN DUNE
WALKOVER TYPE B
MHW
HTL
MLW
NEW SEAWALL
NEW HYDRODYNAMIC SEPARATOR
NEW FLOW DIVERSION STRUCTURE
REMOVE AND RECONSTRUCT FENCE
AND RETAINING WALL AS REQUIRED
\\gtb1v-fs01\ I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - Plans.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
ISSUE/REVISION
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
NO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 4
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
DUNE AND BEACH
NOURISHMENT PLAN
December 2017Project 1700458
Consultants
0
SCALE:
40 80
1" = 40'
3 07/26/2018 REVISED PER CT DEEP REVIEW JM
E
x
i
s
t
i
n
g
H
o
u
s
e
E
x
i
s
t
i
n
g
H
o
u
s
e
E
x
i
s
t
i
n
g
H
o
u
s
e
B
e
n
c
h
m
a
r
k
D
r
i
l
l
h
o
l
e
I
n
R
e
t
a
i
n
i
n
g
W
a
l
l
E
l
e
v
.
=
6
.
4
5
D
H
I
p
i
n
U
I
C
O
2
0
8
CLCB
T.G.=7.57
1
8
" S
L
C
P
P
18" SLCPP
INV.=3.9
SAN MH
T.F.=7.73
S
Ruins
M
H
T
F
=
7
.
8
4
P
o
r
c
h
O
v
e
r
h
a
n
g
P
o
r
c
h
O
v
e
r
h
a
n
g
P
o
r
c
h
O
v
e
r
h
a
n
g
P
o
r
c
h
O
v
e
r
h
a
n
g
P
o
rch
P
o
rch
C
o
n
c
P
a
d
S
u
p
p
o
r
t
F
o
r
P
i
p
e
W
o
o
d
F
e
n
c
e
I
r
o
n
F
e
n
c
e
P
ie
r R
u
in
s
I
r
o
n
R
a
i
l
i
n
g
M
H
T
F
=
7
.
6
8
S
N
E
T
1
7
2
12" CMP
INV.=1.6
1
2
"
C
M
P
E
xistin
g
H
o
u
se
E
xistin
g
H
ou
se
W
ra
c
k
lin
e
Conc Retaining Wall
Conc R
eta
inin
g W
all
C
o
n
c
R
e
t
a
i
n
i
n
g
W
a
l
l
C
o
n
c
R
e
t
a
i
n
i
n
g
W
a
l
l
W
r
a
c
k
l
i
n
e
W
o
o
d
S
t
a
i
r
s
C
o
n
c
W
a
l
k
C
o
n
c
S
i
d
e
w
a
l
k
C
o
a
s
t
a
l
J
u
r
i
s
d
i
c
t
i
o
n
L
i
n
e
=
4
.
7
'
(
P
e
r
D
E
E
P
)
C
o
a
s
t
a
l
J
u
r
i
s
d
i
c
t
i
o
n
L
i
n
e
=
4
.
7
'
(
P
e
r
D
E
E
P
)
I
P
I
N
S
P
I
K
E
M
a
g
N
a
i
l
I
P
M
O
N
M
a
g
N
a
i
l
C
o
n
c
R
e
t
a
i
n
i
n
g
W
a
l
l
-2
-1
0
1
2
3
4
5
6
7
8
-3
-
3
8
W
ATER
BU
R
Y AVEN
U
E
S
M
IT
H
A
V
E
N
U
E
L
O
N
G
I
S
L
A
N
D
S
O
U
N
D
L
O
N
G
I
S
L
A
N
D
S
O
U
N
D
-4
SF
SF
SF
SF
S
F
S
F
SF
SF
S
F
S
F
SF
S
F
SF
SF
SF
SF
6
4
2
0
8
10
12
12
10
8
6
x12.5
6
-2
-4
5
5
19+00
20+00
22+00
23+00
24+
00
25+
00
21+50
20+50
PR
OP
OS
ED
DU
NE
BE
AC
H TO
BE
NO
UR
ISH
ED
COASTAL
JURISDICTION
LINE (CJL)
TURBIDITY CURTAIN
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SAND FENCE
NEW OUTFALL CHAMBER
REPLACE END OF EXISTING STORM DRAIN
PIPE AS NEEDED TO MAKE CONNECTION
NEW OUTFALL PIPE #4
STONE ARMOR
REMOVE EXISTING OUTFALL
PIPE AND SUPPORTS
NEW OUTFALL CHAMBER
TOP INLET EL. 5.0
REPLACE END OF EXISTING STORM DRAIN
PIPE AS NEEDED TO MAKE CONNECTION
NEW OUTFALL PIPE #5
STONE ARMOR
REMOVE EXISTING OUTFALL
PIPE AND SUPPORTS
HAYBALE SED. CONTROL
PUBLIC WOODEN DUNE
WALKOVER TYPE A
MHW
HTL
MLW
HAYBALE SED. CONTROL
HAYBALE SED. CONTROL
NEW OUTFALL CHAMBER
TOP INLET EL. 5.7
PUBLIC WOODEN DUNE
WALKOVER TYPE B
NEW FLOW DIVERSION STRUCTURE
NEW HYDRODYNAMIC
SEPARATOR
NEW FLOW DIVERSION STRUCTURE
NEW HYDRODYNAMIC
SEPARATOR
\\gtb1v-fs01\ I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - Plans.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
ISSUE/REVISION
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
NO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 5
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
DUNE AND BEACH
NOURISHMENT PLAN
December 2017Project 1700458
Consultants
0
SCALE:
40 80
1" = 40'
3 07/26/2018 REVISED PER CT DEEP REVIEW JM
E
x
i
s
t
i
n
g
B
u
i
l
d
i
n
g
F
F
=
1
0
.
6
B
i
t
P
a
r
k
i
n
g
L
o
t
E
x
i
s
t
i
n
g
H
o
u
s
e
E
x
i
s
t
i
n
g
H
o
u
s
e
(
O
n
S
t
i
l
t
s
)
B
e
n
c
h
m
a
r
k
B
e
n
c
h
-
T
i
e
I
n
F
r
o
n
t
2
7
9
1
E
l
e
v
.
=
8
.
5
3
C
o
n
c
F
o
o
t
i
n
g
F
R
O
N
T
2
7
9
1
S
N
E
T
1
7
2
0 CLCB
T.G.=8.27
CLCB
T.G.=7.90
CLCB
T.G.=7.47
CCB
T.G.=5.67
12" CM
P
12" CMP
INV.=2.4
24" CM
P
24" CMP
INV.=0.7
12" RCP
INV.=3.9
SAN MH
T.F.=7.80
S
P
i
e
r
R
u
i
n
s
6
"
W
o
o
d
P
o
s
t
s
R
u
i
n
s
M
H
T
F
=
7
.
9
4
M
H
T
F
=
6
.
6
4
P
o
r
c
h
O
v
e
r
h
a
n
g
P
o
r
c
h
O
v
e
r
h
a
n
g
W
ra
c
k
lin
e
Conc R
eta
inin
g W
all
Conc Retain
ing W
all
C
o
n
c
R
e
t
a
i
n
i
n
g
W
a
l
l
R
u
i
n
s
W
r
a
c
k
l
i
n
e
I
r
o
n
R
a
i
l
i
n
g
C
o
n
c
P
a
t
i
o
Pavers
W
r
a
c
k
l
i
n
e
C
o
n
c
W
a
l
k
C
o
n
c W
a
lk
C
o
a
s
t
a
l
J
u
r
i
s
d
i
c
t
i
o
n
L
i
n
e
=
4
.
7
'
(
P
e
r
D
E
E
P
)
-2
-1
0
1
2
3
4
5
6
7
8
-3
BR
ID
G
EW
ATER
AVEN
U
E
AN
N
STR
EET
L
O
N
G
I
S
L
A
N
D
S
O
U
N
D
5
6
5
4
3
2
1
0
-1
-3
-3
-2
SF
SF
S
F
SF
S
F
SF
SF
SF
S
F
S
F
S
F
SF
SF
SF
SF
SF
SF
SF
S
F
6
6
4
2
0
8
10
1
2
12
1
0
8
6
x12.5
6
-2
5
6
6
5
25+
00
26+
00
27+
00
29+
00
30+
00
31+
00
28+
50
27+
50
PR
OP
OS
ED
DU
NE
BE
AC
H T
O B
E
NO
UR
ISH
ED
COASTAL
JURISDICTION
LINE (CJL)
TURBIDITY CURTAIN
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SAND FENCE
NEW OUTFALL CHAMBER
TOP INLET EL. 5.5
NEW OUTFALL PIPE #7
STONE ARMOR
REMOVE EXISTING OUTFALL
PIPES AND SUPPORTS
NEW OUTFALL CHAMBER
TOP INLET EL. 5.7
REPLACE END OF EXISTING STORM DRAIN
PIPE AS NEEDED TO MAKE CONNECTION
NEW OUTFALL PIPE #6
STONE ARMOR
REMOVE EXISTING OUTFALL
PIPE AND SUPPORTS
PUBLIC WOODEN DUNE
WALKOVER TYPE A
WOODEN DUNE
WALKOVER TYPE B
MHW
HTL
MLW
REPLACE END OF 2 EXISTING
STORM DRAIN PIPES AND
CONNECT TO NEW CHAMBER
HAYBALE SED. CONTROL
HAYBALE SED. CONTROL
NEW HYDRODYNAMIC
SEPARATOR
NEW FLOW DIVERSION
STRUCTURE (DBL CB TYPE 1)
NEW HYDRODYNAMIC SEPARATOR
NEW FLOW DIVERSION STRUCTURE
\\gtb1v-fs01\ I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - Plans.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
ISSUE/REVISION
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
NO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 6
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
DUNE AND BEACH
NOURISHMENT PLAN
December 2017Project 1700458
Consultants
0
SCALE:
40 80
1" = 40'
3 07/26/2018 REVISED PER CT DEEP REVIEW JM
S
E
x
i
s
t
i
n
g
H
o
u
s
e
F
F
=
1
2
.
0
E
x
i
s
t
i
n
g
H
o
u
s
e
E
x
i
s
t
i
n
g
H
o
u
s
e
F
F
=
1
0
.
3
E
x
i
s
t
i
n
g
H
o
u
s
e
E
x
i
s
t
i
n
g
H
o
u
s
e
E
x
i
s
t
i
n
g
H
o
u
s
e
E
x
i
s
t
i
n
g
H
o
u
s
e
C
o
n
c
P
a
d
C
o
n
c
P
a
d
C
o
n
c
S
i
d
e
w
a
l
k
C
o
n
c
S
id
e
w
a
lk
T
ile
P
a
t
io
B
r
i
c
k
C
o
n
c
S
i
d
e
w
a
l
k
C
o
n
c
P
a
d
U
I
C
O
1
4
7
9
S
N
E
T
1
7
2
7
N
O
#
B
o
u
ld
e
rs
B
o
u
l
d
e
r
s
15" RCP
15" RCP
INV.=3.2
CLCB
T.G.=6.62
1
2
"
S
L
C
P
P
12" SLCPP
INV.=2.1
CLCB
T.G.=7.19
24" SLCPP
INV.=0.8
SAN MH
T.F.=7.14
C
o
n
c
S
l
a
b
C
o
n
c
S
l
a
b
M
H
T
F
=
8
.
4
5
M
H
T
F
=
7
.
6
5
G
r
a
s
s
T
ile
P
a
t
io
P
V
C
A
n
d
W
i
r
e
F
e
n
c
e
W
o
o
d
F
e
n
c
e
C
o
n
c
R
e
ta
in
in
g
W
a
ll
C
o
n
c
R
e
t
a
in
in
g
W
a
ll
C
o
n
c
R
e
t
a
i
n
i
n
g
W
a
l
l
C
o
n
c
R
e
t
a
in
in
g
W
a
ll
C
o
n
c
R
e
t
a
i
n
i
n
g
W
a
l
l
C
o
n
c
R
e
ta
in
in
g
W
a
ll
Pavers
C
o
n
c
R
e
t
a
i
n
i
n
g
W
a
l
l
C
o
a
s
t
a
l
J
u
r
i
s
d
i
c
t
i
o
n
L
i
n
e
=
4
.
7
'
(
P
e
r
D
E
E
P
)
I
P
I
N
-2
-1
0
1
2
3
4
5
6
7
8
9
-3
-4
S
T
O
W
E
A
V
E
N
U
E
L
A
U
R
E
L
A
V
E
N
U
E
P
A
R
K
A
V
E
N
U
E
S
F
S
F
S
F
S
F
S
F
SF
6
4
2
0
8
10
12
12
10
8
6
x12.5
6
-2
8
6
5
5
8
7
6
31+
00
32+
00
33+
00
34+
00
3
5
+
0
0
3
6
+
0
0
3
7
+
0
0
PR
OP
OS
ED
DU
NE
BE
AC
H T
O B
E
NO
UR
ISH
ED
COASTAL
JURISDICTION
LINE (CJL)
TURBIDITY CURTAIN
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SAND FENCE
NEW OUTFALL CHAMBER
TOP INLET EL. 4.5
NEW OUTFALL PIPE #8
STONE ARMOR
REMOVE EXISTING
OUTFALL PIPE
NEW OUTFALL
CHAMBER INLET
EL. 5.5
NEW STORM DRAIN PIPE
NEW OUTFALL PIPE #9
STONE ARMOR
REPLACE END OF EXISTING STORM DRAIN
AS NEEDED TO MAKE CONNECTION
N
EW
S
TO
R
M
D
R
AIN
NEW MH
NEW MH
NEW
MANHOLE
PUBLIC WOODEN DUNE
WALKOVER TYPE A
WOODEN DUNE
WALKOVER TYPE B
PUBLIC WOODEN DUNE
WALKOVER TYPE B
MHW
HTL
MLW
REPLACE END OF EXISTING STORM DRAIN
AS NEEDED TO MAKE CONNECTION
HAYBALE SED. CONTROL
HAYBALE SED. CONTROL
NEW SEAWALL
REMOVE EXISTING
SEAWALLS AND REPLACE
WITH NEW SEAWALL
CONNECT EXISTING
STORM DRAIN PIPE
TO NEW CATCH BASIN
NEW FLOW DIVERSION
STRUCTURE
NEW HYDRODYNAMIC
SEPARATOR
NEW FLOW DIVERSION
STRUCTURE
NEW HYDRODYNAMIC
SEPARATOR
\\gtb1v-fs01\ I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - Plans.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
ISSUE/REVISION
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
NO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 7
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
DUNE AND BEACH
NOURISHMENT PLAN
December 2017Project 1700458
Consultants
0
SCALE:
40 80
1" = 40'
3 07/26/2018 REVISED PER CT DEEP REVIEW JM
E
x
i
s
t
i
n
g
H
o
u
s
e
F
F
=
1
1
.
4
E
x
i
s
t
i
n
g
B
u
i
l
d
i
n
g
E
x
i
s
t
i
n
g
B
u
i
l
d
i
n
g
E
x
i
s
t
i
n
g
B
u
i
l
d
i
n
g
B
e
n
c
h
m
a
r
k
D
r
i
l
l
h
o
l
e
I
n
C
a
t
c
h
b
a
s
i
n
E
l
e
v
.
=
9
.
0
4
Vin
yl Pic
ket Fence
W
o
o
d
F
e
n
c
e
(
D
u
m
p
s
t
e
r
A
r
e
a
)
V
i
n
y
l
P
i
c
k
e
t
F
e
n
c
e
2
4
"
T
r
e
e
3
-
1
2
"
C
h
e
r
r
y
D
u
n
e
CCB
T.G.=7.86
CLCB
T.G.=10.04
4
8
"
R
C
P
48" RCP
INV.=0.4
YD
T.F.=10.31
15" RCP
INV.=3.2
P
i
e
r
R
u
i
n
s
C
o
n
c
D
e
c
k
G
r
a
s
s
Grass
G
r
a
s
s
C
o
n
c
R
e
t
a
i
n
i
n
g
W
a
l
l
R
a
i
l
i
n
g
R
a
i
l
i
n
g
C
o
a
s
t
a
l
J
u
r
i
s
d
i
c
t
i
o
n
L
i
n
e
=
4
.
7
'
(
P
e
r
D
E
E
P
)
E
x
i
s
t
i
n
g
B
u
i
l
d
i
n
g
A
p
p
r
o
x
i
m
a
t
e
S
t
r
e
e
t
L
i
n
e
(
T
y
p
i
c
a
l
)
-2
-1
0
1
2
3
4
5
6
7
8
9
-3
10
11
12
12
N
A
U
G
A
T
U
C
K
A
V
E
N
U
E
L
O
N
G
I S
L
A
N
D
S
O
U
N
D
12
S
F
S
F
S
F
SF
S
F
S
F
S
F
SF
SF
SF
SF
SF
SF
SF
SF
SF
6
4
2
7
8
9
10
11
12
3
1
0
5
13
13
12
-1
-2
x13.5
8
1
3
x13.5
8
13
11
1
3
9
1
0
x
8
.
5
3
7
+
0
0
3
8
+
0
0
3
9
+
0
0
40+00
41+00
42+00
43+00
PROPOSED DUNE
BEACH TO BE
NOURISHED
COASTAL
JURISDICTION
LINE (CJL)
TURBIDITY CURTAIN
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
XSAND FENCE
NEW OUTFALL CHAMBER
TOP INLET EL. 8.5
REPLACE END OF EXISTING
STORM DRAIN PIPE
NEW OUTFALL PIPE #10
STONE ARMOR
REMOVE EXISTING OUTFALL
PIPE AND SUPPORTS
NEW
MANHOLE
PUBLIC WOODEN DUNE
WALKOVER TYPE A
MHW
HTL
MLW
HAYBALE SED. CONTROL
NEW HYDRODYNAMIC SEPARATOR
NEW FLOW DIVERSION STRUCTURE
\\gtb1v-fs01\ I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - Plans.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
ISSUE/REVISION
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
NO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 8
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
DUNE AND BEACH
NOURISHMENT PLAN
December 2017Project 1700458
Consultants
0
SCALE:
40 80
1" = 40'
3 07/26/2018 REVISED PER CT DEEP REVIEW JM
E
x
i
s
t
i
n
g
B
u
i
l
d
i
n
g
E
x
i
s
t
i
n
g
B
u
i
l
d
i
n
g
E
x
i
s
t
i
n
g
B
u
i
l
d
i
n
g
P
a
v
i
l
i
o
n
o
n
C
o
n
c
P
a
d
C
o
n
c
P
a
d
Riprap
1
2
"
T
r
e
e
2
-
2
4
"
O
a
k
2
5
"
M
a
p
l
e
(
D
e
a
d
)
CLCB
T.G.=10.22
CLCB
T.G.=9.01
M
H
T
F
=
1
2
.
1
9
G
r
a
s
s
-2
-1
0
1
2
3
4
5
6
7
8
9
-2
-2
10
L
O
N
G
I S
L
A
N
D
S
O
U
N
D
11
11
12
12
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
S
F
S
F
S
F
8
9
10
11
12
13
12
x13.5
6
4
2
7
3
1
0
5
-1
-2
11
1
0
9
13
1
2
1
1
14
13
44+00
45+00
46+00
47+00
48+00
4
9
+
0
0
BEACH TO BE
NOURISHED
COASTAL
JURISDICTION
LINE (CJL)
TURBIDITY CURTAIN
X
X
X
X
X
X
X
X
SAND FENCE
MHW
HTL
MLW
TOP WIDTH 10' (MIN)
EXISTING STONE REVETMENT TO BE
RAISED (NO ADDITIONAL STONE TO
BE PLACED SEAWARD OF CJL)
\\gtb1v-fs01\ I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - Plans.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
ISSUE/REVISION
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
NO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 9
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
DUNE AND BEACH
NOURISHMENT PLAN
December 2017Project 1700458
Consultants
0
SCALE:
40 80
1" = 40'
3 07/26/2018 REVISED PER CT DEEP REVIEW JM
D
C
o
n
c
S
i
d
e
w
a
l
k
G
r
a
s
s
B
e
n
c
h
O
n
C
o
n
c
P
a
d
(
T
y
p
)
V
o
lly
b
a
ll
N
e
t
V
o
l
l
y
b
a
l
l
N
e
t
V
o
lly
b
a
ll
N
e
t
C
h
a
i
n
l
i
n
k
&
W
o
o
d
C
o
n
c
P
a
d
C
o
n
c
P
a
d
W
o
o
d
D
o
c
k
C
o
n
c
P
a
d
STORM MH
T.F.=7.96
CLCB
T.G.=8.63
Wood Bridge w
/Railing
C
o
a
s
t
a
l
J
u
r
i
s
d
i
c
t
i
o
n
L
i
n
e
=
4
.
7
'
(
P
e
r
D
E
E
P
)
I
.
P
I
N
S
1
0
°
W
0
.
4
'
I
P
CLCB
T.F.=8.53
CLCB
T.G.=9.55
CLCB
T.G.=9.68
CLCB
T.G.=9.06
P
a
r
k
i
n
g
L
o
t
S40°44'52"E
N40°44'52"W
258.34'
N
5
9
°
4
4
'1
6
"
E
-
5
7
2
.
7
7
'
T
I
E
-
L
I
N
E
3
0
'
S
t
o
r
m
S
e
w
e
r
E
a
s
e
m
e
n
t
Wood Bridge w
/Railing
W
o
o
d
B
r
id
g
e
w
/
R
a
ilin
g
-1
0
1
2
3
4
5
6
7
8
9
10
1112
11
10
9
9
S
F
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
S
F
13
11
12
10
9
13
12
11
10
1
3
1
0
1
1
1
2
14
14
5
0
+
0
0
51+
00
52+
00
53+
00
54+
00
55+
00
PROPOSED DUNE
N
E
W
S
T
O
R
M
D
R
A
IN
EXISTING CONC. WALKWAY
EXISTING PARKING LOT
COASTAL
JURISDICTION
LINE (CJL)
TURBIDITY CURTAIN
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SAND FENCE
S
E
W
E
R
E
A
S
E
M
E
N
T
NE
W
ST
O
RM
DR
AIN
RECONSTRUCT EXISTING PUBLIC
WOODEN DUNE WALKOVERS (3) IN KIND
AFTER DUNE CONSTRUCTION
RECONSTRUCT
WALKWAY OVER DUNE
MHW
HTL
\\gtb1v-fs01\ I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - Plans.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
ISSUE/REVISION
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
NO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 10
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
DUNE AND BEACH
NOURISHMENT PLAN
December 2017Project 1700458
Consultants
0
SCALE:
40 80
1" = 40'
3 07/26/2018 REVISED PER CT DEEP REVIEW JM
D
Conc Sidew
alk
Wood G
uardrail
Grass
Grass
Vollyball N
et
Vollyball N
et
Vollyball N
et
Vollyball N
et
C
h
a
i
n
l
i
n
k
&
W
o
o
d
F
e
n
c
e
C
o
n
c
P
a
d
STORM MH
T.F.=7.96
Wood Bridge
Wood
30' Storm
Sew
er Easem
ent
W
O
O
D
S
(
T
o
C
o
a
s
t
a
l
J
u
r
i
s
d
i
c
t
i
o
n
L
i
n
e
)
F
i
e
l
d
3
4
5
6
7
8
9
10
11
11
10
10
2
10
9
9
10
11
ALBERT M
UN
RO
E PIER
SILVER SANDS - WALNUT BEACH BOARDW
ALK
S
F
S
F
S
F
SF S
F
S
F
S
F
S
F
S
F
S
F
SF
SF
SF
13
11
12
10
13
12
11
14
14
13
13
10
11
12
12
9
10
11
14 14
SEWER EASEMENT
PAVED
PARKING
AREA
5
6
+
0
0
57+00
58+00
59+00
60+00
61+00
NE
W S
TO
RM
D
RA
IN
NE
W S
TO
RM
DR
AIN
COASTAL
JURISDICTION
LINE (CJL)
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SAND FENCE
N/F CITY OF
MILFORD
30' STORM
SEWER EASEMENT
STA 57+00 TO 68+50
DUNE CONSTRUCTION TO BE PERFORMED
PRIOR TO STATE/FEDERAL PERMITTED PHASE
UNDER CITY OF MILFORD PERMITTING ONLY
STA 0+00 TO 57+00
DUNE AND BEACH NOURISHMENT TO BE PERFORMED
UNDER STATE AND FEDERAL PERMITTING
EXIST. CONC. SIDEWALK TO BE
RECONSTRUCTED OVER DUNE
NEW STORM
MANHOLE
T.F. 7.96
N
E
W
S
T
O
R
M
D
R
A
IN
NEW INLET STRUCTURE
NEW MANHOLE
RECONSTRUCT
ROADWAY OVER
NEW DUNE
HTL
DUNE TO BE CONSTRUCTED
UNDER CITY OF MILFORD PERMITS
ONLY (NOT SHOWN)
NEW FLOW DIVERSION
STRUCTURE
NEW HYDRODYNAMIC
SEPARATOR
NEW MH
NEW
MANHOLE
NEW STORM DRAIN
EXIST 36" RCP
\\gtb1v-fs01\ I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - Plans.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
ISSUE/REVISION
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
NO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 11
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
DUNE AND BEACH
NOURISHMENT PLAN
December 2017Project 1700458
Consultants
0
SCALE:
40 80
1" = 40'
MATCHLINE FIG. 12
3 07/26/2018 REVISED PER CT DEEP REVIEW JM
D
Vollyball N
et
Vollyball N
et
Vollyball N
et
Vollyball N
et
V
ollyball N
et
C
h
a
i
n
l
i
n
k
&
W
o
o
d
F
e
n
c
e
C
o
n
c
P
a
d
STORM MH
T.F.=7.96
6
0
"
C
M
P
I
N
V
.
=
0
.
0
C
o
a
s
t
a
l
J
u
r
i
s
d
i
c
t
i
o
n
L
i
n
e
=
4
.
7
'
(
P
e
r
D
E
E
P
)
N
4
0
°
4
4
'
5
2
"
W
2
5
8
.
3
4
'
30' Storm
Sew
er Easem
ent
-1
0
1
2
3
4
5
6
7
8
9
ALBERT M
UN
RO
E PIER
P
R
O
P
O
S
E
D
D
U
N
E
NE
W S
TO
RM
D
RA
IN
TURBIDITY CURTAIN
JURISDICTION
X
X
X
X
S
A
N
D
F
E
N
C
E
30' STORM
SEWER EASEMENT
NEW STORM
MANHOLE
T.F. 7.96
NEW STORM DRAIN
OUTFALL #11
STONE ARMOR
(LEAVE EXPOSED)
R
E
C
O
N
S
T
R
U
C
T
E
X
IS
T
IN
G
P
U
B
L
IC
W
O
O
D
E
N
D
U
N
E
W
A
L
K
O
V
E
R
S
(
3
)
IN
K
IN
D
A
F
T
E
R
D
U
N
E
C
O
N
S
T
R
U
C
T
IO
N
REMOVE EXISTING 60"
PIPE AND MANHOLE
R
E
C
O
N
S
T
R
U
C
T
W
A
L
K
W
A
Y
O
V
E
R
D
U
N
E
\\gtb1v-fs01\ I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - Plans.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
ISSUE/REVISION
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
NO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 12
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
DUNE AND BEACH
NOURISHMENT PLAN
December 2017Project 1700458
Consultants
0
SCALE:
40 80
1" = 40'
MATCHLINE FIG. 11
3 07/26/2018 REVISED PER CT DEEP REVIEW JM
140'±
EL. VARIES (-2 TO -4)
10'
30'± 60'±
PROPOSED DUNE
EXISTING BEACH GRADE
EL. +6 EL. +6
EL. +12.5
PROPOSED BEACH GRADE
BA
SE
LIN
E
3:1
3:16:1
EL. +3.15 MHW
EL. +0
EL. +6
EL. -3.60 MLW
CJL (VARIES)
10'
ROCK CORE (5-8 TON STONES)
TEMPORARY
EXCAVATION FACE
PROPOSED
BEACH GRADE
3:1
3:1
8'±
2:1
2:1
2' MIN. SAND COVER
5'±
8"-12" SIZE STONE
TOP OF DUNE EL. 12.5
TOP OF ROCK CORE EL. 10.5
TEMPORARY
EXCAVATION FACE
5' MIN.
4' M
IN
.
2' M
IN
.
2:1
TEMPORARY GEOTEXTILE
BAG COFFERDAM
EXISTING BEACH
GRADE
3' MIN.
---- I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - XSC.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
ISSUE/REVISIONNO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 13
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
WILDEMERE BEACH DUNE
& BEACH NOURISHMENT
TYPICAL SECTIONS
December 2017Project 1700458
Consultants
DUNE & BEACH NOURISHMENT SECTION
TYPICAL STA. 2+00 THRU 39+00
0
SCALE:
10 20
1" = 10'
DUNE CORE DETAIL
TYPICAL STA. 2+00 THRU 39+00
0
SCALE:
20 40
1" = 20'
ROCK CORE DETAIL
DELETED FROM
APPLICATION
195'±
10'
60'± 100'±
EL. -2±
EL. +7
EL. +13.5
PROPOSED BEACH GRADE
EL. +0
3:1
PROPOSED DUNE
3:1
EL. +3.15 MHW
EXISTING BEACH GRADE
EL. +8
10:1
EL. +12
EL. -3.60 MLW
CJL
181'±
10'
50'± 100'±
EL. +7
EL. +13.5
PROPOSED BEACH GRADE
3:1
PROPOSED ENHANCEMENT TO EXISTING STONE REVETMENT
(NO ADDITIONAL STONE TO BE PLACED SEAWARD OF CJL)
3:1
EXISTING BEACH GRADE
EL. +8
10:1
EXISTING
STONE
REVETMENT
EL. +0
EL. +12
EL. -2±
EL. +3.15 MHW
EL. -3.60 MLW
CJL
---- I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - XSC.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
ISSUE/REVISIONNO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 14
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
WILDEMERE BEACH DUNE
& BEACH NOURISHMENT
TYPICAL SECTIONS
December 2017Project 1700458
Consultants
DUNE & BEACH NOURISHMENT SECTION
STA. 41+50
DUNE & BEACH NOURISHMENT SECTION
STA. 45+00
0
SCALE:
20 40
1" = 20'
38'± 42'±
EL. +10
14'
EL. +14.0
3:1
EXISTING BEACH
EL. +9
EL. +10
EXISTING
CONCRETE
SIDEWALK
3:1
PROPOSED DUNE
BA
SE
LIN
E
EXISTING DUNE TO REMAIN
CJL
10'
EL. +14.0
3:1
EXISTING BEACH
EL. +10
EL. +10
3:1
PROPOSED DUNE
BA
SE
LIN
E
PARKING AREA
EXISTING DUNE
CJL
148'±
---- I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - XSC.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
ISSUE/REVISIONNO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 15
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
WILDEMERE BEACH DUNE
& BEACH NOURISHMENT
TYPICAL SECTIONS
December 2017Project 1700458
Consultants
DUNE & BEACH NOURISHMENT SECTION
STA. 51+00
DUNE & BEACH NOURISHMENT SECTION
(CITY OF MILFORD PERMITTED SECTION - INFORMATION ONLY)
STA. 59+50
0
SCALE:
20 40
1" = 20'
150' - 315'
NEW OUTFALL CHAMBER/INLET
STORM DRAIN INLET FROM HYDRODYNAMIC
SEPARATOR AND DIVERSION CHAMBER
EXISTING GRADE AT
OUTLET VARIES (-2 TO 4)
SET OUTLET INVERT 1'±
ABOVE EXISTING GRADE TO
AVOID SHOALING IN PIPE
EL. 12.5
PROPOSED DUNE
NEW RCP STORM DRAIN OUTFALL
2
1 +3.15 MHW
0
-3.60 MLW
SET CHAMBER MIN. 20'
FROM DUNE TOE TO
AVOID SAND INTRUSION
OPTIONAL BACKFLOW TIDE GATE (TYPE T.B.D.)
EXISTING BEACH GRADE
5
1
MIN. 1' SAND COVER
OVER ARMOR STONE
5'±
50'±
3' M
IN
.
MIN
. 2' O
F 8"-12"
ST
ON
E A
RO
UN
D P
IP
E
5-8 TON STONE
(2 LAYERS)
1.5
1
TOP EL. VARIES (+7 TO +11)
EXIST. BEACH
GRADE
2' M
IN
.
3' M
IN
.
RCP STORM OUTFALL
RAMP SAND TO ALLOW
PEDESTRIAN CROSSING
3
1
SET OUTLET INVERT 1'±
ABOVE EXISTING GRADE
3
1
MIN. 1' SAND COVER
OVER ARMOR STONE
5.75'
4.67'
OUTFALL PIPE INLET PIPE
0.5
'
2'
3.3'
UNLESS SPECIFICALLY ORDERED
OTHERWISE, MINIMUM DEPTH
UNDER TRAVELWAY IS 1'-7.5 AND
UNDER UNTRAVELED AREASIS 0'-3" (TYP.)
FINISHED GRADE MAY
VARY ADJACENT TO CATCH
BASIN AS DIRECTED
5.31'
4'
0.66'
INLET PIPE
OUTFALL PIPE
PLAN
SECTION ASECTION B
2.75'
4.2
9'
DOUBLE STEEL GRATE
---- I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - DETL.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
ISSUE/REVISIONNO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 16
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
STORM DRAIN
OUTFALL DETAILS
December 2017Project 1700458
Consultants
OUTFALL CHAMBER/INLET DETAIL
DOT TYPE C-L CATCH BASIN DOUBLE GRATE, TYPE 1
A
-
B
-
OUTFALL PIPE PROFILE (TYP.)
SEE SHEET 21 FOR DETAILS
OUTFALL PIPE CROSS SECTION (TYP.)
SEE SHEET 21 FOR DETAILS
FLOW DIVERSION
CHAMBER
OUTFALL CHAMBER
HIGH LEVEL
BYPASS PIPE
TO
OUTFALL
F
L
O
W
FLOW CONTROL WALL
BAFFLE WALL GROUT TO
FINISHED GRADE
PROVIDE GRADE
RING/RISER
TOP AND SIDES
SEALED TO
VAULT
WEIR AND
ORIFICE PLATES
PERMANENT POOL ELEVATION
(SAME AS INVERT IN & OUT ELEV.)
ALUMINUM
SWIRL CHAMBER
INFLOW
3'
PLAN VIEW
VORTECHS OR EQUAL
SECTION VIEW
VORTECHS OR EQUAL
0 1/2
SCALE: 3" = 1'-0"
1
VARIES
VA
RIE
S
7'±
---- I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - DETL.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
ISSUE/REVISIONNO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 17
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
HYDRODYNAMIC
SEPARATOR,
DIVERSION CHAMBER,
AND OUTFALL DETAIL
December 2017Project 1700458
Consultants
CAST IRON FRAME & COVER
2' M
AX
.
PRECAST OR
SOLID BLOCK
RIS
ER
H
EIG
HT
V
AR
IE
SB
AS
E H
EIG
HT
V
AR
IE
S
5'Ø
8"
1'-6
" C
RU
SH
ED
S
TO
NE
B
AS
E
1'-1
" B
AS
E
S
LA
B
5"
1'
1'-5
" R
ED
UC
ER
6" WALL TYPICAL
5' DIA. PRECAST CONCRETE
MANHOLE DETAILS
---- I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - DETL.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
ISSUE/REVISIONNO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 18
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
STORM DRAIN DATA TABLE
AND OUTFALL DETAILS
December 2017Project 1700458
Consultants
STORM DRAIN DATA TABLE
Outfall Name Location
Existing Outfall
Pipe Size
Proposed Outfall
Pipe Size
Approx.
Length
Proposed Outfall
Invert EL*
Proposed
Pipe Material
Hydrodynamic
Separator Site
and Pipe Inverts
Outfall #1 Hauser St. 36" 36" +/- 150' -1.5 RCP See Note 3
Outfall #2 Wildwood Ave. 24" 24" +/- 160' -3.5 RCP See Note 3
Outfall #3 Bittersweet Ave. 18" 36" +/- 165' -4.0 RCP See Note 3
Outfall #4 Smith Ave. 12" 24" +/- 170' -3.5 RCP See Note 3
Outfall #5
Waterbury Ave.
18" 24" +/- 165' -3.0 RCP See Note 3
Outfall #6
Bridgewater Ave.
12" 24" +/- 170' -3.0 RCP See Note 3
Outfall #7 Ann St. 24" + 12" 30" +/- 170' -2.0 RCP See Note 3
Outfall #8 Stowe Ave. 24" 24" +/- 180' -3.0 RCP See Note 3
Outfall #9 Park Ave. 15" 24" +/- 160' -2.0 RCP See Note 3
Outfall #10
Naugatuck Ave.
48" 48" +/- 200' -1.5 RCP See Note 3
Outfall #11 Viscount Dr.
36" x 58" Squash
48" +/- 315' 0.5 RCP See Note 3
NOTES:
1. INVERT ELEVATIONS SET AT 1'± ABOVE SEA FLOOR.
2. EXISTING OUTFALL PIPES LESS THAN 24" DIAMETER HAVE BEEN UPGRADED TO 24"
DIAMETER MINIMUM FOR CONTRACTIBILITY AND DURABILITY REASONS.
3. SPECIFIC SIZING FOR THE HYDRODYNAMIC SEPARATOR, AS WELL SIZING FOR INLET/OUTLET
& BYPASS PIPING TO BE DETERMINED AS PART OF FINAL DESIGN DRAWINGS.
BACKDUNE:
PLANTING THROUGHOUT DUNE
(Ab, Sos, Lj), SUPPLEMENTED WITH
RANDOMLY DISTRIBUTED MARITIME
SHRUBS (Mp, Pm, Rc, Rv)
AND PLUGS (Pa, Pv, Sn)
DUNECREST & FOREDUNE:
PLANTING ZONE
THROUGHOUT DUNE
(Ab, Sos, Lj)
SAND FENCE (WOODEN
SLATS) INSTALLED IN
ZIG-ZAG PATTERN AT
TOE OF PLANTED ZONE
BEACH
SEDIMENT
FENCE
PLANTING THROUGHOUT DUNE (Ab, Sos, Lj)
SUPPLEMENTED WITH RANDOMLY DISTRIBUTED
MARITIME SHRUBS (Mp, Pm, Rc, Rv) AND PLUGS (Pa, Pv, Sn)
SAND FENCE (WOODEN
SLATS) INSTALLED IN
ZIG-ZAG PATTERN AT
TOE OF PLANTED ZONE
PAVED
PARKING
AREA
SEDIMENT
FENCE
0.6
6'
PLACE 2 DORMANT BEACHGRASS
CULMS IN EACH PLANTING HOLE
SE
T P
LA
NT
P
LU
MB
SURFACE OF SAND DUNE
C
L
---- I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - DETL.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
ISSUE/REVISIONNO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 19
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
DUNE PLANTING DETAILS
December 2017Project 1700458
Consultants
DUNE PLANTING DETAIL
STA. 1+50 TO 56+00
DUNE PLANTING DETAIL
STA. 56+00 TO 68+50
DUNE PLANTING NOTES:
1. DORMANT BEACHGRASS STEMS SHALL BE HELD IN COLD STORAGE PRIOR TO
DELIVERY TO SITE.
2. DELIVER PLANTS IMMEDIATELY PRIOR TO PLANTING ON SITE. STORE ALL PLANT
MATERIALS, NOT INSTALLED IMMEDIATELY AFTER DELIVERY, OUT OF DIRECT
3. EXPOSURE TO SUN AND WIND. MAINTAIN MOISTNESS OF PLANT CONTAINERS OR
ROOT BALLS BY PERIODICALLY COVERING WITH WET STRAW OR CLOTH UNTIL
4. TIME OF PLANTING.
5. DO NOT STACK PLANTS DURING TRANSPORT OR TEMPORARY STORAGE TO
AVOID CRUSHING.
6. INSTALL SAND FENCE PRIOR TO PLANTING DUNE. INSTALL TWO (2) ROWS OF
SAND FENCE PARALLEL TO THE SHORELINE, AS DEPICTED IN THE PLANS.
7. SPACE POSTS 10 FT. APART AND SET POSTS A MINIMUM OF 3 FOOT DEPTH.
WEAVE SAND FENCING IN FRONT OF AND BEHIND ALTERNATING POSTS TO
ATTAIN MAXIMUM STRENGTH, AND ATTACH FENCING TO EACH POST WITH FOUR
(4) WIRE TIES (≥ 12 GA.).
8. STAKE OUT EDGES OF PLANTING ZONE AND CONTACT THE PROJECT ENGINEER
OR LANDSCAPE ARCHITECT FOR INSPECTION PRIOR TO PLANT INSTALLATION.
9. PLANT HARVESTED DORMANT BEACHGRASS STEMS FROM OCTOBER 15th
THROUGH APRIL 15TH; OR NURSERY-GROWN BEACHGRASS PLUGS FROM APRIL
15TH TO May 31st.
10. PLANT THE DUNE STARTING FROM THE SEAWARD SIDE (TOE OF THE DUNE)
TOWARDS THE LANDWARD SIDE.
11. INSTALL TWO (2) DORMANT BEACHGRASS (AMMOPHILA BREVILIGULATA)
STEMS/CULMS, OR ONE PLUG PER PLANTING HOLE, APPROXIMATELY 8"-1 O"
DEEP, SPACED A MAXIMUN OF 12” ON-CENTER.
12. PLANT A MINIMUM OF TEN (10) PARALLEL ROWS, AND STAGGER/OFFSET THE
PLANTS IN ALTERNATING ROWS TO MAXIMIZE PROTECTION.
DUNE PLANTING SCHEDULE
Abv. Botanical Name Common Name Location Size
Spacing Qty.
Shrubs
BhT Baccharis halimifolia Groundselbush
Vegetated rip-rap, Wildemere 2 yr. tubeling
2' O.C.
IfT Iva frutescens Marsh Elder
Vegetated rip-rap, Wildemere 2 yr. tubeling
2' O.C.
Mp Morella pensylvanica Northern Bayberry Backdune & Planting Berm
1 Gal. Cont. 4' O.C.
Pm Prunus maritima Beach Plum
Backdune & Planting Berm
2 Gal. Cont. 4' O.C.
Rc Rosa carolina Carolina Rose
Backdune & Planting Berm
1 Gal. Cont. 2' O.C.
Rv
Rosa virginiana Virginia Rose Backdune & Planting Berm
1 Gal. Cont. 2' O.C.
Herbaceous Plugs
Ab
Ammophila breviligulata American Beachgrass
Foredune & backdune
throughout
Dormant culm 1' O.C.
Pa
Panicum amarulum
"Atlantic" Coastal
Panicgrass
Backdune & Planting Berm
2" Plug
2' O.C.
Pv
Panicum virgatum Switchgrass Backdune & Planting Berm 2" Plug
2' O.C.
Sn
Sorghastrum nutans Indiangrass Backdune & Planting Berm 2" Plug
2' O.C.
Sos
Solidago sempervirens
Seaside Goldenrod
Foredune & backdune
throughout 2" Plug
2' O.C.
Vines
Lj
Lathyrus japonicus var.
maritimus Beach Pea
Foredune & backdune
throughout 2" Plug
2' O.C.
PLANTING TABLE NOTES:
CONT. = CONTAINER
GAL. = GALLON
O.C. = ON CENTER
SAND FENCING REQUIREMENTS:
1. STANDARD FOUR (4) FOOT SLATTED WOOD SNOW
FENCING.
2. WOODEN POSTS:
A. POSTS SHALL BE BLACK LOCUST, EASTERN
REDCEDAR ATLANTIC WHITE CEDAR OR OTHER
SPECIES OF SIMILAR DURABILITY AND STRENGTH.
B. WOODEN POSTS MUST BE GREATER THAN 6 1/2
FEET IN LENGTH (7 TO 8 FT. TYP.).
3. INSTALL POSTS IN A REPEATING ZIG-ZAG PATTERN
SO THAT SAND FENCE SECTIONS ARE PLACED AT A
45 DEGREE ANGLE TO THE SHOREFRONT. THIS
PATTERN WILL MAXIMIZE SAND ENTRAPMENT ALONG
THE BEACHFRONT.
4. SAND WILL TYPICALLY FILL FENCING TO 3/4 OF ITS
TOTAL HEIGHT.
5. REPLACE DAMAGED SAND FENCING AND POSTS
WITHIN ONE MONTH OF STORM DAMAGE TO
MAINTAIN A CONTINUOUS DUNE LINE.
DORMANT CULM PLANTING DETAIL
NOTES:
1. PLACE ROOT ZONE MIN. 8" BELOW SURFACE AND
BACKFILL FIRMLY TO HOLD CULMS IN PLACE.
2. INSTALL AT 2' O.C. IN STAGGERED ROWS.
10'
EXISTING BEACH GRADE
PROPOSED BEACH GRADE
3:1
3:1
TOP OF DUNE EL. 12.5
VEGETATED COVER (TYP)
BIODEGRABLE SAND-FILLED COIR
ENVELOPES. STACK AS NEEDED TO FILL
DUNE CORE (COCONUT FIBER FABRIC)
24"± SAND COVER OVER COIR ENVELOPES
KEY MIN. 4' BELOW
EXIST. BEACH GRADE
FILL WITH SAND APPROVED FOR
DUNE/BEACH NOURISHMENT
OVERLAP COIR FABRIC MINIMUM 2 FEET
AND STITCH WITH BIODEGRADABLE
MATERIAL AS NEEDED
DOUBLE LAYER COIR FABRIC (STITCH
AT LONGITUDINAL JOINTS WITH MIN.
2-FOOT OVERLAP, MAX. 100 FT LENGTH,
STAGGER ADJACENT JOINTS MIN. 20')
18
-2
4" T
YP
10'± TYP
BEACH GRASS AND MISC.
MARINE PLANTINGS
SAND COVER 24"±
NOURISH SURFACE OF
DUNE UNTIL VEGETATIVE
ROOTS ESTABLISH
COIR ENVELOPE
---- I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - DETL.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
ISSUE/REVISIONNO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 20
Crescent Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
SAND DUNE COIR
REINFORCEMENT
DETAILS
December 2017Project 1700457
Consultants
0
SCALE:
10 20
1" = 10'
ALTERNATE
BIO-ENGINEERED SAND DUNE
WITH COIR REINFORCEMENT
CONTINUOUS STA. 2+00 THRU 39+00
(WITH EXCEPTION OF STORM OUTFALL LOCATIONS)
COIR ENVELOPE DETAIL
COCONUT COIR "CONTROL MAT 90" BY GEI WORKS OR EQUAL
VEGETATED COVER DETAIL
N.T.S.
BEACH
LOWESET ROW MARSH
ELDER (If) TUBELINGS
3
'
T
R
I
A
N
G
U
L
A
R
S
P
A
C
I
N
G
UPPER ROWS OF
GROUNDSEL BUSH
(Bh) TUBELINGS
6" DIA. X 4' L SONOTUBE
EMBEDED (TYP)
5-8 TON
ARMOR STONE
GEOTEXTILE
FILTER FABRIC
2' MIN. 12"-18"
STONE
PLACE TUBELINGS AND
BACKFILL SONOTUBE WITH
BEACH OR BUILDER'S SAND
CUT OUT GEOTEXTILE FABRIC
AND "SAND CHOKE" STONE IN
VICINITY OF PLANTINGS
3:1 SLOPE
X
X
X
X
X
X
X
X
6 TO 8 FEET
10' MAX FROM VEGETATION
DUNE
DECK
5 T
O 8 F
EE
T
A
S A
PP
RO
PR
IA
TE
TO THE BEACH
5' CLEAR WIDTH
BETWEEN RAILS
TIE DOWN (TYP.)
5'
2"X8" PT
WOODEN
TREADS
NYLON ROPE
CONNECTED TO
BOTTOM OF PLANKS
DUNE
DUNE
NYLON
ROPE
WOODEN PLANK
WALK OVER
TIE-DOWN
(TYP.)
4'
10' MAX.
WOODEN SLATS
2"x4" OR 3" DIA.
WOOD POST (TYP.)
3'
SAND
FINISHED
GRADE
---- I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - DETL.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
ISSUE/REVISIONNO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 21
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
DUNE WALKOVER
AND PLANTING
DETAILS
December 2017Project 1700458
Consultants
PLANTING DETAIL FOR
ARMORED REVETMENT
NOT TO SCALE
WOODEN WALKOVER DETAIL (TYPE A)
FOR MAJOR PUBLIC CROSSINGS - ADA COMPLIANT
WOODEN WALKOVER DETAIL (TYPE B)
FOR MINOR PUBLIC CROSSINGS AND "PRIVATE" WALK-OVERS
SAND FENCE
CONC. BLOCK
(MIN. 2,000LB)
3' (M
IN
.)
DUNE GRADE
CONTINUOUS 1" Ø
NYLON ROPE
GALV. EYE HOOK
WOODEN DECK
(TYPE A)
3' (M
IN
.)
WOODEN TREADS
(TYPE B)
DUNE GRADE
CONTINUOUS 1" Ø
NYLON ROPE
GALV. EYE HOOK
CONC. BLOCK
(MIN. 2,000LB)
---- I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - DETL.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
ISSUE/REVISIONNO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 22
Crescent Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
DUNE CROSS-OVER
ANCHORAGE DETAILS
December 2017Project 1700457
Consultants
WOODEN WALKOVER TIE-DOWN DETAIL (TYPE A)
WOODEN WALKOVER TIE-DOWN DETAIL (TYPE B)
NOTES:
1. TRACKING PAD 4" MIN. THICK.
2. PLACEMENT/LOCATION OF ANTI-TRACKING
PADS WILL BE CONTAINED IN A CONTRACTOR
SUBMITTED DETAILED EROSION AND
SEDIMENT CONTROL PLAN.
SOURCE: NEW YORK STATE DEPARTMENT
OF ENVIRONMENTAL CONSERVATION.
2
5
F
T
.
4
0
F
T
.
M
I
N
.
P
U
B
L
I
C
R
O
A
D
TURBIDITY CURTAIN NOTES:
1. CURTAIN FABRIC SHALL BE A BRIGHTLY
COLORED, TIGHTLY WOVEN, GEOSYNTHETIC
OR IMPERVIOUS REINFORCED
THERMOPLASTIC MATERIAL.
2. CONTRACTOR SHALL SUBMIT SHOP DRAWING
OF FLOATING SEDIMENT BARRIER TO
ENGINEER FOR REVIEW AND APPROVAL.
3. FLOATING SEDIMENT BARRIER AND ANCHORS
SHALL BE CAREFULLY REMOVED FROM
WATERCOURSE AND ACCUMULATED
SEDIMENT SHALL BE DISPOSED OF IN AN
OFF-SITE UPLAND AREA.
4. FLOATING SEDIMENT BARRIER SHALL BE
INSPECTED DAILY FOR DAMAGE AND
SEDIMENT LOAD. DEPENDING ON THE
DURATION OF THE PROJECT, SEDIMENT SHALL
BE REMOVED WHEN ITS ACCUMULATION
INTERFERES WITH THE FUNCTION OF THE
FLOATING SEDIMENT BARRIER.
WORK AREA
PROTECTED
AREA
SHALLOW INSTALLATION
WORK AREA
PROTECTED
AREA
DEEP INSTALLATION
TOE OF SLOPE OR
LIMIT OF
DISTURBANCE
2"X2" POSTS
FILTER FABRIC
COMPACTED
BACKFILL
WIRE FENCING
4" VERTICAL FACE
ANGLE FIRST STAKE TOWARDS
PREVIOUSLY LAID BALE
A2 RE-BARS, STEEL PICKETS OR
2"X2" STAKES PLACED 1.5' TO 2'
INTO GROUND. DRIVE STAKES
FLUSH WITH TOP OF BALE
NO GAPS TIGHTLY
ABUTTED (TYP)
BALE (TYP)
STAKE (TYP)
BALES
EXCAVATE AS NECESSARY TO
INSTALL ANTI-TRACKING PAD
CONNDOT 2 IN. STONE
SEPARATION FABRIC
DRIVE STAKE FOR
BOTTOM ANCHOR
FLOAT - TYPICAL
FILTER MATERIAL - TYPICAL
WEIGHT - TYPICAL
MAINTAIN 1' OF CLEARANCE TO
STREAM BOTTOM IN TIDAL AREAS
ANCHOR FASTENED
TO FLOAT - TYPICAL
1
0
0
°
2 FT.
1. SET POSTS AND EXCAVATE A 6"x6" TRENCH.
SET POSTS DOWN SLOPE. ANGLE 10° UPSLOPE
FOR STABILITY AND SELF CLEANING
FLOW
FLOW
FLOW
FLOW
2. ATTACH THE WIRE MESH FENCING TO POST.
3. ATTACH FILTER FABRIC TO THE WIRE
FENCING AND EXTEND IT TO THE TRENCH.
4. BACKFILL THE TRENCH AND COMPACT THE
EXCAVATED SOIL.
FLOW
FLOW
NOTES:
1. BALES ARE TO BE PLACED 4 INCHES IN THE
SOIL, TIGHTLY ABUTTING WITH NO GAPS,
STAKED AND BACKFILLED AROUND THE
ENTIRE OUTSIDE PERIMETER.
PLAN
SECTION A-A
CATCH
BASIN
F
L
O
WF
L
O
W
A
A
FILTER FABRIC FENCE SYSTEM
SEDIMENTATION CONTROL SYSTEM INSTALLATION
NOT TO SCALE
ANCHORING DETAIL
SINGLE-STACKED STRAW BALE DIKE DETAIL
NOT TO SCALE
STRAW SEDIMENT
CONTROL AT CATCH BASINS
NOT TO SCALE
TURBIDITY CURTAIN DETAIL
NOT TO SCALE
ANTI-TRACKING PAD
NOT TO SCALE
BEDDING DETAIL
NOT TO SCALE
---- I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - DETL.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
ISSUE/REVISIONNO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 23
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
EROSION AND SEDIMENT
CONTROL DETAILS
December 2017Project 1700458
Consultants
---- I:\Project\Milford City of\CAD\Figures\Wildemere-Walnut Beach\1700458 - DETL.dwg - 1/15/2019
Designed:
Checked:
Drawn:
JM
BG
DE
Approved By: JM
If this scale bar
does not measure
1" then drawing is
not original scale.
Attention:
0 1"
ISSUE/REVISIONNO. DATE APP
JM0 12/12/2017 PERMIT REVIEW
JM1 03/09/2018 REVISIONS PER MILFORD FECB
JM2 03/23/2018 REVISIONS PER MILFORD FECB
JM3 07/26/2018 REVISED PER CT DEEP REVIEW
JM4 11/28/2018 DRAINAGE OUTFALL REVISIONS
JM5 01/16/2019 COIR REINFORCEMENT DETAILS ADDED
Fig. 24
Walnut & Wildemere Beach Stabilization Project
Milford, Connecticut
City of Milford
Milford, Connecticut
EROSION AND SEDIMENT
CONTROL NOTES
December 2017Project 1700458
Consultants
PROJECT NOTES:
1. THE CONTRACTOR ULTIMATELY SELECTED SHALL COMPLY WITH
THE DEEP PERMIT FOR THE DISCHARGE OF STORMWATER AND
DEWATERING WASTEWATERS ASSOCIATED WITH
CONSTRUCTION ACTIVITIES, AND BE RESPONSIBLE FOR
OVERSEEING THE INSTALLATION AND MAINTENANCE OF ALL
SEDIMENTATION AND EROSION CONTROL MEASURES.
CONTRACTOR WILL BE RESPONSIBLE FOR PREPARING AND
OBTAINING THIS PERMIT, AND FOR COMPLIANCE DURING
CONSTRUCTION.
2. THE CONTRACTOR ULTIMATELY SELECTED WILL BE REQUIRED
TO PROVIDE A SUBMITTAL WHICH PROVIDES DETAILS,
PROCEDURES, AND WORK METHODS TO PROPERLY EXECUTE
THE WORK, PROTECT THE ENVIRONMENT, AND MINIMIZE
DISRUPTION TO ADJACENT PROPERTIES AND PUBLIC
FACILITIES. THIS PLAN SHALL INCLUDE, BUT IS NOT LIMITED TO:
· PREPARATION OF VARIOUS PLANS AND OTHER WRITTEN
SUBMITTALS REQUIRED FOR PROPER CONTROLS
DURING CONSTRUCTION.
· IDENTIFICATION OF STAGING AND STOCKPILE AREAS.
· LOCATION AND PLACEMENT OF ANTI TRACKING PADS TO
CONTROL SEDIMENTS.
· SEQUENCING OF PLACEMENT AND REMOVAL OF
TURBIDITY CURTAINS THAT WILL BE INSTALLED IN
PHASES ALONG DUNE AND BEACH NOURISHMENT
SECTIONS IN A “ROLLING” FASHION.
· TRUCK ROUTES AND ACCESS POINTS FOR PORTIONS OF
THE PROJECT REQUIRING OVERLAND DELIVERY OR
REMOVAL OF MATERIAL.
· FOR MATERIAL DELIVERED OR REMOVED FORM SITE
USING WATERBORNE MEANS (BARGES, ETC.) A DETAILED
SUBMITTAL WILL BE REQUIRED.
3. SEDIMENTATION AND EROSION CONTROL MEASURES ARE
PROPOSED TO ADEQUATELY CONTROL THE ACCELERATED
EROSION AND SEDIMENTATION AND REDUCE THE DANGER
FROM STORMWATER RUNOFF AT THE SITE. THE RUNOFF SHALL
BE CONTROLLED BY THE INTERCEPTION, DIVERSION, AND SAFE
DISPOSAL OF PRECIPITATION. RUNOFF SHALL ALSO BE
CONTROLLED BY STAGING CONSTRUCTION ACTIVITY AND
PRESERVING NATURAL VEGETATION WHENEVER POSSIBLE.
4. EXISTING DUNE VEGETATION SHALL BE PROTECTED AND ONLY
THAT CLEARING AND GRUBBING THAT IS ABSOLUTELY
NECESSARY FOR THE PROPOSED DUNE CONSTRUCTION,
DRAINAGE INSTALLATION, AND BEACH NOURISHMENT SHALL BE
PERFORMED. ALL DISTURBED AREAS SHALL BE RESTORED TO
THEIR ORIGINAL CONDITION AND CONTOUR, UNLESS
OTHERWISE INDICATED ON THE PLANS. THE CONTRACTOR
SHALL TAKE SPECIAL CARE WITH HIS DUNE CONSTRUCTION,
BEACH NOURISHMENT, AND DREDGING METHODS AND SHALL
COMPLY WITH SPECIFICATIONS FOR EROSION AND SEDIMENT
CONTROLS.
5. ALL AREAS SHALL BE PROTECTED FROM SEDIMENTATION
DURING AND AFTER DREDGING, INCLUDING THE
CORRESPONDING STORAGE AND HANDLING AREAS FOR
DREDGED SEDIMENT. STOCKPILES MUST BE ADEQUATELY
PROTECTED WITH HAY BALES AND/OR FILTER FABRIC FENCE AS
INDICATED.
6. FREQUENTLY INSPECT EROSION CONTROLS. REPAIR/REPLACE
DEFICIENT EROSIONS CONTROLS PROMPTLY, AS NEEDED.
7. STONE STABILIZED VEHICLE ANTI-TRACKING PADS SHALL BE
LOCATED AT POINTS OF VEHICULAR INGRESS AND EGRESS
FROM THE CONSTRUCTION SITE TO REDUCE TRACKING OR
FLOWING OF SEDIMENT INTO PUBLIC RIGHTS-OF-WAY. FILTER
FABRIC SHALL BE PLACED ON SUBGRADE PRIOR TO
PLACEMENT OF STONE. STONE SHALL BE PLACED TO THE
DIMENSIONS SHOWN ON THE PLAN. PERIODIC TOP DRESSING
WITH ADDITIONAL STONE OR ADDITIONAL LENGTH, AS
CONDITIONS DEMAND, MAY BE REQUIRED TO ENSURE THAT THE
ENTRANCE FUNCTIONS AS INTENDED. PUBLIC ROADWAYS
SHALL BE CLEANED OF DIRT AND DEBRIS AS NECESSARY, OR
AS DIRECTED BY THE ENGINEER.
8. IN ALL AREAS, REMOVAL OF TREES, BUSHES AND OTHER
VEGETATION, AND DISTURBANCE OF THE SOIL, IS TO BE KEPT
TO AN ABSOLUTE MINIMUM WHILE ALLOWING PROPER
DEVELOPMENT OF THE SITE.
9. DURING DREDGING OPERATIONS REQUIRED FOR INSTALLATION
OF DRAINAGE, ROCK CORE BASE, AND OTHER COMPONENTS,
THE AREA AND DURATION OF SEDIMENT EXPOSURE SHALL BE
MINIMIZED, AND THE SEQUENCE OF DREDGING OPERATION
SHALL ACT TO MINIMIZE THE EXPOSURE.
10. ALL SEDIMENTATION AND EROSION CONTROL DEVICES SHALL
BE INSPECTED DURING CONSTRUCTION AND THE CONTRACTOR
SHALL MAINTAIN AND MAKE REPAIRS AND REMOVE SEDIMENT IF
IT HAS ACCUMULATED AND RENDERED THE SEDIMENT
CONTROL NON-FUNCTIONAL. THE CONTRACTOR SHALL IN
ADDITION MAINTAIN AND MAKE REPAIRS AND REMOVE
SEDIMENT AS REQUESTED BY THE ENGINEER. THE
CONTRACTOR SHALL CLEAN SEDIMENT AND DEBRIS FROM ALL
DRAINAGE STRUCTURES AND PIPES AT THE COMPLETION OF
THE DREDGING ACTIVITIES AND AS REQUESTED BY THE
ENGINEER TO KEEP THE DRAINAGE SYSTEM PROPERLY
FUNCTIONING.