RETAINING WALL "I" RETAINING WALL "H" RETAINING WALL "E" RETAINING WALL "D" RETAINING WALL "F" RETAINING WALL "G"

WALLD RETAINING WALLE WALLH RETAINING … Work Progress.pdf · LEGEND Bike Route / Shoulder Improvement Sidewalk New Retaining Wall Construction Staging Areas 300 ft 19-00 15+ 00

  • Upload
    hathu

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

Page 1: WALLD RETAINING WALLE WALLH RETAINING … Work Progress.pdf · LEGEND Bike Route / Shoulder Improvement Sidewalk New Retaining Wall Construction Staging Areas 300 ft 19-00 15+ 00

RETAINING

WALL "I"

RETAINING

WALL "H"

RETAINING

WALL "E"

RETAINING

WALL "D"

RETAINING

WALL "F"

RETAINING

WALL "G"

Page 2: WALLD RETAINING WALLE WALLH RETAINING … Work Progress.pdf · LEGEND Bike Route / Shoulder Improvement Sidewalk New Retaining Wall Construction Staging Areas 300 ft 19-00 15+ 00

6" to 14"

7" to 8"

Temp.Travel

Lane

~11'-0"

Temp.Travel

Lane

~11'-0"

Temp. epTemp. ep Temp. C/L

Temp. Ped.

Walkway

~5'-0"

Roadway Widening Construction Sequence

Step 6: Install Makai Lane Shift & Start Work on Mauka Side

(Waimanalo Stream Bridge to Saddle City Road)

Closed

Construction

Area