56
Models CHB/CCB APPLICATION GUIDE PN 240011074 REV A [08/31/2015] Manufactured for: ECR International, Inc. 2201 Dwyer Avenue, Utica NY 13501 web site: www.ecrinternational.com WALL MOUNTED GAS BOILER This manual has been prepared for use with the appropriate Installation, Operation and Maintenance Manual. For use with CCB/CHB Boilers ONLY.

WALL MOUNTED GAS BOILER - Dunkirk · 2015. 9. 15. · Models . CHB/CCB. APPLICATION GUIDE. PN 240011074 REV A [08/31/2015] Manufactured for: ECR International, Inc. 2201 Dwyer Avenue,

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • Models CHB/CCB

    APPLICATION GUIDE

    PN 240011074 REV A [08/31/2015]

    Manufactured for:ECR International, Inc.

    2201 Dwyer Avenue, Utica NY 13501web site: www.ecrinternational.com

    WALL MOUNTEDGAS BOILER

    This manual has been prepared for use with the appropriate Installation, Operation and Maintenance Manual.

    For use with CCB/CHB Boilers ONLY.

  • 2 PN 240011074 [08/31/2015]

    TABLE OF CONTENTS

    Important Safety Information .....................................................................................................3

    CHB - Hydronic Piping - Quick Reference Chart ...........................................................................4Single Boiler Series Loop, Single Zone, No External Circulator with Optional Indirect Tank (fig. 1) ........................5Series Loop Zoned System WITH ZONE VALVES and Optional Indirect Tank (fig. 2) ...........................................6Single Boiler Primary/Secondary Series Loop Zoned Sys. W/ ZONE VALVES & Optional Indirect Tank (fig. 3)................7Series Loop Zoned WITH ZONE PUMPS and Optional Indirect Tank (fig. 4) .......................................................8Series Loop Zoned WITH ZONE PUMPS NO Indirect Tank (fig. 5) ...................................................................9Single Boiler Primary/Secondary Series Loop Zoned W/ ZONE PUMPS & Optional Indirect Tank (fig. 6)...............10Single Boiler Primary/Secondary Series Loop Zoned WITH ZONE PUMPS - NO Indirect Tank (fig. 7) ...................11Single Boiler PUMPING and Optional Indirect Tank (fig. 8) ............................................................................12Single Boiler Primary/Secondary Series Loop PUMPING and Optional Indirect Tank (fig. 9) ...............................13

    CHB - Wiring Diagrams ..............................................................................................................14Boiler with Optional Supply System Pump (fig. 10) .....................................................................................15Boiler with DHW Tank and Optional System Supply Pump (fig. 11) ................................................................15Boiler Zoned System with Multiple ZONE VALVES and No Indirect Tank (fig. 12) ..............................................17Boiler WITH MULTIPLE ZONE PUMPS With and Without Indirect Tank (DHW) Local Interface (fig. 13) ................19Boiler WITH MULTIPLE ZONE PUMPS and Secondary Pumps WILL Shut Off During DHW Priority (fig. 14) ............20

    CCB - Hydronic Piping - Quick Reference Chart .............................................................................21BURN AND SCALD HAZARD! WARNING Manufacturer Requires Installation Of Field Supplied Anti-Scald Valve....22

    Single Boiler, Series Loop, Single Zone, No External Circulator (fig. 15)..........................................................23Series Loop Zoned System WITH ZONE VALVES (fig. 16) .............................................................................24Single Boiler Primary/Secondary Series Loop Zoned System WITH ZONE VALVES (fig. 17) ................................25Single Boiler Series Loop Zoned WITH ZONE PUMPS (fig. 18) .......................................................................26Single Boiler Primary/Secondary Series Loop Zoned WITH ZONE PUMPS (fig. 19) ............................................27Single Boiler Primary/Secondary Series Loop PUMPING (fig. 20) ...................................................................28

    CCB - Wiring Diagrams ..............................................................................................................29Boiler with Indirect DHW Storage Tank and Optional Supply System Pump (fig. 21) ................................... ......29Boiler with Multiple Zone Valves (fig. 22) ...................................................................................................30Boiler with Multiple Zone Pumps WITHOUT DHW Interface (fig. 23) ...............................................................32Boiler with Multiple Zone Pumps with DHW Interface (fig. 24) .......................................................................33

    Applications Tables For : CHB - W/H2O Indirect Hot Water Tank ..............................................34Optional Equipment ...................................................................................................................36

    Outdoor Air Sensor & Ntc Sensor Data (Chart 1) .........................................................................................36Venting Options .....................................................................................................................................37

    Addendum - InstructionsDomestic Hot Water Sensor Kit Instruction (240010745).....................................................39Instructions And Wiring Diagram For Adding External Pump (615000137)...........................43Sealed Combustion Kit Instructions (37711601) - For Kit #5612601....................................45Control Board Replacement Kit Instructions (615000134)....................................................46Retaining Clip Removal Caution (615000136).......................................................................48Altitude Affects on CHB-100, CHB-130, CHB-150 and CCB-150..............................................50LP Conversion Kit Instructions..............................................................................................51

  • 3 PN 240011074 [08/31/2015]

    IMPORTANT SAFETY INFORMATION

    NOTICEUsed to address practices not related to personal injury.

    CAUTIONIndicates a hazardous situation which, if not avoided, could result in minor or moderate injury.

    !

    WARNINGIndicates a hazardous situation which, if not avoided, could result in death or serious injury.

    !

    DANGERIndicates a hazardous situation which, if not avoided, WILL result in death or serious injury.

    !

    This is the safety alert symbol. Symbol alerts you to potential personal injury hazards. Obey all safety messages following this symbol to avoid possible injury or death.

    2. Become familiar with symbols identifyingpotential hazards.

    1. GeneralBoiler installation shall be completed by qualified agency. See Installation, Operation & Maintenance Manual for additional information.

    WARNINGFire, explosion, asphyxiation and electrical shock hazard. Improper installation could result in death or serious injury. Read this manual and understand all requirements before beginning installation.

    !

    3. Installation shall conform to requirements of authority having jurisdiction or in absence of such requirements:• United States

    • National Fuel Gas Code, ANSI Z223.1/NFPA 54. • National Electrical Code, NFPA 70.

    • Canada • Natural Gas and Propane Installation Code,

    CAN/CSA B149.1.• Canadian Electrical Code, Part I, Safety Standard for

    Electrical Installations, CSA C22.1

    4. Where required by authority having jurisdiction, installation shall conform to Standard for Controls and Safety Devices for Automatically Fired Boilers, ANSI/ASME CSD-1. Additional manual reset low water cutoff may be required.

    5. Requirements for Commonwealth of Massachusetts: Boiler installation must conform to Commonwealth of Massachusetts code 248 CMR which includes but is not limited to:• Installation by licensed plumber or gas fitter.

  • 4 PN 240011074 [08/31/2015]

    CHB - HYDRONIC PIPINGCHB - Piping Legend

    NOTICEIllustrations are meant to show system piping concept only. Installer is responsible for all equipment and detailing required by authority having jurisdiction.NOTICEArrange piping to prevent water dripping onto boiler.

    Quick Reference Chart - CHB Boiler

    CHB - Hydronic Piping Description Page

    Single Boiler Series Loop, Single Zone, No External Circulator with Optional Indirect Tank (Fig. 1) 5

    Series Loop Zoned System With Zone Valves and Optional Indirect Tank (Fig. 2) 6

    Single Boiler Primary/Secondary Series Loop Zoned System With Zone Valves and Optional Indirect Tank (Fig. 3) 7

    Series Loop Zoned With Zone Pumps and Optional Indirect Tank (Fig. 4) 8

    Series Loop Zoned With Zone Pumps No Indirect Tank (Fig. 5) 9

    Single Boiler Primary/Secondary Series Loop Zoned With Zone Pumps and Optional Indirect Tank (Fig. 6) 10

    Single Boiler Primary/Secondary Series Loop Zoned With Zone Pumps - NO Indirect Tank (Fig. 7) 11

    Single Boiler PUMPING and Optional Indirect Tank (Fig. 8) 12

    Single Boiler Primary/Secondary Series Loop PUMPING and Optional Indirect Tank (Fig. 9) 13

    CHB - Wiring Description PageBoiler with Optional Supply System Pump (fig. 10) 14

    Boiler with DHW Tank and Optional System Supply Pump (fig. 11) 15

    Boiler Zoned System with Multiple ZONE VALVES and No Indirect Tank (fig. 12) 17

    Boiler WITH MULTIPLE ZONE PUMPS With and Without Indirect Tank (DHW) Local Interface (fig. 13) 19

    Boiler WITH MULTIPLE ZONE PUMPS and Seconday Pumps WILL Shut Off During DHW Priority (fig. 14) 20

    Applications Tables For : CHB - W/H2O Indirect Hot Water Tank 36

    Piping installation, materials, and joining methods shall conform to requirements of authority having jurisdiction or in absence of such requirements:

    • USA - National Fuel Gas Code, ANSI Z223.1/NFPA 54• Canada - Natural Gas and Propane Installation Code,

    CAN/CSA B149.1Manufacturer requires all domestic hot water (DHW) installations use an anti-scald valve. Local codes may require additional equipment (expansion tank, relief valves, etc.) select and size equipment to suit installation and meet code requirements.

  • 5 PN 240011074 [08/31/2015]

    CHB - HYDRONIC PIPINGFIGURE 1 - CHB - Single Boiler Series Loop, Single Zone, No External Circulator with Optional Indirect Tank

    City

    Sup

    ply

    (Mak

    e-Up

    )

    BOIL

    ER

    Opt

    iona

    l In

    dire

    ct

    DHW

    Ta

    nk*

    Hot W

    ater

    Su

    pply

    Te

    mpe

    red

    Cold

    W

    ater

    Su

    pply

    T &

    P Re

    lief

    Valv

    e to

    D

    rain

    Note

    : Fi

    eld

    supp

    lied

    circ

    ulat

    or r

    equi

    red

    if he

    ad-lo

    ss e

    xcee

    ds 8

    Fe

    et a

    t 6 G

    PM.

    * M

    anuf

    actu

    rer

    requ

    ires

    all d

    omes

    tic h

    ot w

    ater

    (D

    HW)

    inst

    alla

    tions

    use

    an

    ant

    i-sca

    ld v

    alve

    . Lo

    cal c

    odes

    may

    req

    uire

    ad

    ditio

    nal e

    quip

    men

    t (e

    xpan

    sion

    tank

    , rel

    ief

    valv

    es, e

    tc.)

    Sel

    ect a

    nd

    size

    equ

    ipm

    ent t

    o su

    it in

    stal

    latio

    n an

    d m

    eet

    code

    req

    uire

    men

    ts.

    For

    indi

    rect

    tank

    app

    licat

    ions

    usi

    ng b

    oile

    r’s o

    n-bo

    ard

    pum

    p re

    fer

    to p

    ages

    34

    and

    35 A

    pplic

    atio

    ns T

    able

    s fo

    r flo

    w r

    ate

    and

    avai

    labl

    e pu

    mp

    head

    . Co

    nsul

    t in

    dire

    ct ta

    nk m

    anuf

    actu

    rer

    for

    indi

    rect

    tank

    per

    form

    ance

    .

  • 6 PN 240011074 [08/31/2015]

    CHB - WIRING DIAGRAMFIGURE 2 - CHB - Series Loop Zoned System WITH ZONE VALVES and Optional Indirect Tank

    CHB - HYDRONIC PIPING

    City

    Sup

    ply

    (Mak

    e-Up

    )

    BOIL

    ER

    Opt

    iona

    lIn

    dire

    ct

    DHW

    Ta

    nk

    Cold

    W

    ater

    Su

    pply

    CH/S

    yste

    m

    Pum

    p

    T &

    P Re

    lief

    Valv

    e to

    D

    rain

    * Ho

    t Wat

    er

    Supp

    ly

    (Tem

    pere

    d)

    * M

    anuf

    actu

    rer

    requ

    ires

    all d

    omes

    tic h

    ot w

    ater

    (D

    HW)

    inst

    alla

    tions

    use

    an

    ant

    i-sca

    ld v

    alve

    . Lo

    cal c

    odes

    may

    req

    uire

    ad

    ditio

    nal e

    quip

    men

    t (e

    xpan

    sion

    tank

    , rel

    ief

    valv

    es, e

    tc.)

    Sel

    ect a

    nd

    size

    equ

    ipm

    ent t

    o su

    it in

    stal

    latio

    n an

    d m

    eet

    code

    req

    uire

    men

    ts.

    For

    indi

    rect

    tank

    app

    licat

    ions

    usi

    ng b

    oile

    r’s o

    n-bo

    ard

    pum

    p re

    fer

    to p

    ages

    34

    and

    35 A

    pplic

    atio

    ns T

    able

    s fo

    r flo

    w r

    ate

    and

    avai

    labl

    e pu

    mp

    head

    . Co

    nsul

    t in

    dire

    ct ta

    nk m

    anuf

    actu

    rer

    for

    indi

    rect

    tank

    per

    form

    ance

    .

  • 7 PN 240011074 [08/31/2015]

    FIGURE 3 - CHB - Single Boiler Primary/Secondary Series Loop Zoned System WITH ZONE VALVES and Optional Indirect Tank

    CHB - HYDRONIC PIPING

    City

    Sup

    ply

    (Mak

    e-Up

    )

    BOIL

    ER

    Opt

    iona

    l In

    dire

    ct

    DHW

    Ta

    nk*H

    ot W

    ater

    Su

    pply

    (T

    empe

    red)

    Cold

    W

    ater

    Su

    pply

    CH/S

    yste

    m

    Pum

    p

    Lim

    it Le

    ngth

    to

    5ft.

    (1.

    6M)

    1

    T &

    P Re

    lief

    Valv

    e to

    D

    rain

    Not

    e:

    112

    ” (3

    05m

    m)

    Max

    imum

    Se

    para

    tion

    * M

    anuf

    actu

    rer

    requ

    ires

    all d

    omes

    tic h

    ot w

    ater

    (D

    HW)

    inst

    alla

    tions

    use

    an

    ant

    i-sca

    ld v

    alve

    . Lo

    cal c

    odes

    may

    req

    uire

    ad

    ditio

    nal e

    quip

    men

    t (e

    xpan

    sion

    tank

    , rel

    ief

    valv

    es, e

    tc.)

    Sel

    ect a

    nd

    size

    equ

    ipm

    ent t

    o su

    it in

    stal

    latio

    n an

    d m

    eet

    code

    req

    uire

    men

    ts.

    For

    indi

    rect

    tank

    app

    licat

    ions

    usi

    ng b

    oile

    r’s o

    n-bo

    ard

    pum

    p re

    fer

    to p

    ages

    34

    and

    35 A

    pplic

    atio

    ns T

    able

    s fo

    r flo

    w r

    ate

    and

    avai

    labl

    e pu

    mp

    head

    . Co

    nsul

    t in

    dire

    ct ta

    nk m

    anuf

    actu

    rer

    for

    indi

    rect

    tank

    per

    form

    ance

    .

  • 8 PN 240011074 [08/31/2015]

    FIGURE 4 - CHB - Series Loop Zoned WITH ZONE PUMPS and Optional Indirect Tank

    CHB - HYDRONIC PIPING

    1

    T &

    P Re

    lief

    Valv

    e to

    D

    rain

    Cold

    W

    ater

    Su

    pply

    Opt

    iona

    l In

    dire

    ct

    DHW

    Ta

    nk

    BOIL

    ER

    City

    Sup

    ply

    (Mak

    e-Up

    )

    Zone

    Pu

    mp

    * Ho

    t W

    ater

    Su

    pply

    Te

    mpe

    red

    * M

    anuf

    actu

    rer

    requ

    ires

    all d

    omes

    tic h

    ot w

    ater

    (D

    HW)

    inst

    alla

    tions

    use

    an

    ant

    i-sca

    ld v

    alve

    . Lo

    cal c

    odes

    may

    req

    uire

    ad

    ditio

    nal e

    quip

    men

    t (e

    xpan

    sion

    tank

    , rel

    ief

    valv

    es, e

    tc.)

    Sel

    ect a

    nd

    size

    equ

    ipm

    ent t

    o su

    it in

    stal

    latio

    n an

    d m

    eet

    code

    req

    uire

    men

    ts.

    For

    indi

    rect

    tank

    app

    licat

    ions

    usi

    ng b

    oile

    r’s o

    n-bo

    ard

    pum

    p re

    fer

    to p

    ages

    34

    and

    35 A

    pplic

    atio

    ns T

    able

    s fo

    r flo

    w r

    ate

    and

    avai

    labl

    e pu

    mp

    head

    . Co

    nsul

    t in

    dire

    ct ta

    nk m

    anuf

    actu

    rer

    for

    indi

    rect

    tank

    per

    form

    ance

    .

  • 9 PN 240011074 [08/31/2015]

    FIGURE 5 - CHB - Series Loop Zoned WITH ZONE PUMPS NO Indirect Tank

    CHB - HYDRONIC PIPING

    1

    BOIL

    ER

    City

    Sup

    ply

    (Mak

    e-Up

    )

    Zone

    Pu

    mp

  • 10 PN 240011074 [08/31/2015]

    FIGURE 6 - CHB -Single Boiler Primary/Secondary Series Loop Zoned WITH ZONE PUMPS and Optional Indirect Tank

    CHB - HYDRONIC PIPING

    T &

    P Re

    lief

    Valv

    e to

    D

    rain

    Cold

    W

    ater

    Su

    pply

    Opt

    iona

    l In

    dire

    ct

    DHW

    Tan

    k

    BOIL

    ER

    City

    Sup

    ply

    (Mak

    e-Up

    )

    Lim

    it Le

    ngth

    to

    5ft.

    (1.

    6M)

    Zone

    Pu

    mp

    1

    Not

    e:

    112

    ” (3

    05m

    m)

    Max

    imum

    Se

    para

    tion

    * Ho

    t W

    ater

    Su

    pply

    Te

    mpe

    red

    * M

    anuf

    actu

    rer

    requ

    ires

    all d

    omes

    tic h

    ot w

    ater

    (D

    HW)

    inst

    alla

    tions

    use

    an

    ant

    i-sca

    ld v

    alve

    . Lo

    cal c

    odes

    may

    req

    uire

    ad

    ditio

    nal e

    quip

    men

    t (e

    xpan

    sion

    tank

    , rel

    ief

    valv

    es, e

    tc.)

    Sel

    ect a

    nd

    size

    equ

    ipm

    ent t

    o su

    it in

    stal

    latio

    n an

    d m

    eet

    code

    req

    uire

    men

    ts.

    For

    indi

    rect

    tank

    app

    licat

    ions

    usi

    ng b

    oile

    r’s o

    n-bo

    ard

    pum

    p re

    fer

    to p

    ages

    34

    and

    35 A

    pplic

    atio

    ns T

    able

    s fo

    r flo

    w r

    ate

    and

    avai

    labl

    e pu

    mp

    head

    . Co

    nsul

    t in

    dire

    ct ta

    nk m

    anuf

    actu

    rer

    for

    indi

    rect

    tank

    per

    form

    ance

    .

  • 11 PN 240011074 [08/31/2015]

    FIGURE 7 - CHB -Single Boiler Primary/Secondary Series Loop Zoned WITH ZONE PUMPS - NO Indirect Tank

    CHB - HYDRONIC PIPING

    Lim

    it Le

    ngth

    to

    5ft.

    (1.

    6M)

    BOIL

    ER

    City

    Sup

    ply

    (Mak

    e-Up

    )

    Zone

    Pu

    mp

    1

    Not

    e:

    112

    ” (3

    05m

    m)

    Max

    imum

    Se

    para

    tion

  • 12 PN 240011074 [08/31/2015]

    FIGURE 8 - CHB -Single Boiler PUMPING and Optional Indirect Tank

    CHB - HYDRONIC PIPING

    T &

    P Re

    lief

    Valv

    e to

    D

    rain

    Cold

    W

    ater

    Su

    pply

    Opt

    iona

    lIn

    dire

    ct

    DHW

    Tan

    k

    BOIL

    ER

    City

    Su

    pply

    (M

    ake-

    Up)

    CH S

    yste

    m

    Supp

    ly

    Pum

    p

    * Ho

    t W

    ater

    Su

    pply

    Te

    mpe

    red

    Not

    e:

    1

    12”

    (305

    mm

    ) M

    axim

    um

    Sepa

    ratio

    n

    1

    11

    * M

    anuf

    actu

    rer

    requ

    ires

    all d

    omes

    tic

    hot w

    ater

    (D

    HW)

    inst

    alla

    tions

    use

    an

    ant

    i-sca

    ld v

    alve

    . Lo

    cal c

    odes

    m

    ay r

    equi

    re a

    dditi

    onal

    equ

    ipm

    ent

    (exp

    ansi

    on ta

    nk, r

    elie

    f val

    ves,

    et

    c.)

    Sele

    ct a

    nd s

    ize

    equi

    pmen

    t to

    sui

    t ins

    talla

    tion

    and

    mee

    t cod

    e re

    quire

    men

    ts.

    For

    indi

    rect

    tank

    app

    licat

    ions

    usi

    ng

    boile

    r’s o

    n-bo

    ard

    pum

    p re

    fer

    to

    page

    s 34

    and

    35

    Appl

    icat

    ions

    Ta

    bles

    for

    flow

    rat

    e an

    d av

    aila

    ble

    pum

    p he

    ad.

    Cons

    ult i

    ndire

    ct ta

    nk

    man

    ufac

    ture

    r fo

    r in

    dire

    ct ta

    nk

    perf

    orm

    ance

    .

  • 13 PN 240011074 [08/31/2015]

    CHB - HYDRONIC PIPING

    FIGURE 9 - CHB -Single Boiler Primary/Secondary Series Loop PUMPING and Optional Indirect Tank

    CH S

    yste

    m

    Supp

    ly

    Pum

    p

    T &

    P Re

    lief

    Valv

    e to

    D

    rain

    Cold

    W

    ater

    Su

    pply

    * Ho

    t W

    ater

    Su

    pply

    BOIL

    ER

    City

    Su

    pply

    (M

    ake-

    Up)

    Lim

    it Le

    ngth

    to

    5ft.

    (1.

    6M)

    Not

    e:

    1

    Opt

    iona

    lIn

    dire

    ct

    DHW

    Tan

    k

    11

    11

    12”

    (305

    mm

    ) M

    axim

    um

    Sepa

    ratio

    n

    * M

    anuf

    actu

    rer

    requ

    ires

    all d

    omes

    tic

    hot w

    ater

    (D

    HW)

    inst

    alla

    tions

    use

    an

    ant

    i-sca

    ld v

    alve

    . Lo

    cal c

    odes

    m

    ay r

    equi

    re a

    dditi

    onal

    equ

    ipm

    ent

    (exp

    ansi

    on ta

    nk, r

    elie

    f val

    ves,

    et

    c.)

    Sele

    ct a

    nd s

    ize

    equi

    pmen

    t to

    sui

    t ins

    talla

    tion

    and

    mee

    t cod

    e re

    quire

    men

    ts.

    For

    indi

    rect

    tank

    app

    licat

    ions

    usi

    ng

    boile

    r’s o

    n-bo

    ard

    pum

    p re

    fer

    to

    page

    s 34

    and

    35

    Appl

    icat

    ions

    Ta

    bles

    for

    flow

    rat

    e an

    d av

    aila

    ble

    pum

    p he

    ad.

    Cons

    ult i

    ndire

    ct ta

    nk

    man

    ufac

    ture

    r fo

    r in

    dire

    ct ta

    nk

    perf

    orm

    ance

    .

  • 14 PN 240011074 [08/31/2015]

    CHB Boiler Wiring DiagramsAll field wiring shall conform to the Authority having jurisdiction in absence of such in follow :

    USA: National Electrical Code, ANSI/NFPA 70, Canada: Canadian Electrical Code, Part I, CSA C22.1: Safety Standard for Electrical Installations. A. Indirect Storage Tank is not used:• Terminals 7 and 8 (Key 155) on CHB terminal strip,

    shall have two (2) factory supplied resistors wired in parallel.

    • Single room thermostat (Key 72) control internal pump and boiler operation. Remove jumper when connecting thermostat or zone equipment.

    • See Figure 10.

    CHB - WIRING DIAGRAMS

    • Refer to Argo Controller instructions for switch, switch settings, wire legend and operation information.

    B. When System Supply Pump is needed:• External supply system pump connection terminals

    (key307) are being added to the rear of the control box and will be limited to an additional 1 Amp pump operation. Internal control fusing will prevent higher pump operation.

    • If the controller is not equipped with these terminals, or a larger pump capacity is required, install an external pump/relay controller circuit. See page 39, Domestic Hot Water Sensor Kit Instruction.

    C. Use of Indirect Storage Tank (DHW) :• Terminals 7 and 8 (#155 in Key) resistors are

    removed. Attach Indirect Tank Sensor element to terminals #7 and #8 (Key 155) on CHB terminal strip. See Figure 11.

    • If DHW tank is applied to a multi-zone valve or multi-zoned pump application, the indirect tank sensor element is wired to the Argo controller using an isolation relay. See Multi-Zoned and Multi-Pump system wiring.

    Wiring Legend CHB/CCB

    Pump - Zone

    Thermostat

    Indirect Tank (DHW Sensor)

    Resistor

    Valve - Zone

    DHW Flow Switch (CCB only)

    N.O.

    NOTICE

    Important:• Before connecting the room thermostat,

    remove jumper on terminal block. (Key 72)• Before connection optional Indirect Tank

    Sensor, remove two (2) resistors. (Key 155)• Before connecting Low Water Cutoff remove

    jumper on terminal block. (Key 370)

  • 15 PN 240011074 [08/31/2015]

    FIGURE 10 - CHB Boiler with Optional Supply System Pump

    CHB - WIRING DIAGRAMS

    FIGURE 11 - CHB Boiler with DHW Tank and Optional System Supply Pump

    POWER SUPPLY Cord 120V/60HZ

    CHB BOILERL1 (Hot)

    2 43 5 6 8

    KEY 370

    KEY 72T

    10K

    1.8KT

    Key 155GND

    NEU1 7T

    CHB BOILER

    2 43 65 7 8

    KEY 370

    KEY 72

    T T

    T

    Key 155

    CH System Pump

    (If used)

    DHW SensorLow Voltage Room Thermostat

    Jumper

    1

    Indirect Tank

    Remove two (2) factory installed Resistors when using

    Indirect Tank on Key 155.[Use kit 550002958]

    System Supply Pump Connection

    CH System Pump

    (If Used)

    Resistors (Factory wired)Low Voltage Room Thermostat

    Jumper

    Key 307

    POWER SUPPLY Cord 120V/60HZ

    L1 (Hot)

    GND

    NEU

    System Supply Pump Connection

    Key 307

  • 16 PN 240011074 [08/31/2015]

    D. Multi-Zoned Valve System:Boiler call for heat contacts (key 72) are wired to Argo Zone Control (X-X) terminals. Zone thermostats and Zone valves are also wired to the Argo AZ-4CP Zone Controller. See Figure 12.

    CHB - WIRING DIAGRAM

    NOTICE

    Set Argo Priority switch to OFF position. Secondary pumps WILL NOT shutoff during priority operation.

    NOTICE

    Important:• Before connecting the room thermostat,

    remove jumper on terminal block. (Key 72)• Before connection optional Indirect Tank

    Sensor, remove two (2) resistors. ( Key 155)• Before connecting Low Water Cutoff remove

    jumper on terminal block. (Key 370)

  • 17 PN 240011074 [08/31/2015]

    CHB - WIRING DIAGRAMFIGURE 12 - CHB - Boiler Zoned System with Multiple ZONE VALVES with and without Indirect Tank

    CHB BOILER

    CHB BOILER

    Argo AZ- 4CP

    Low Volt Room Thermostats

    VALVE VALVE VALVE VALVEZone Valve(S) Nec Class 2 Low Volt

    Key 155KEY 370

    10K1.8K

    LN

    POWER SUPPLY PLUG 120V/60HZ

    JUMPER

    Factory Supplied Resistors

    Key 72

    Key 72

    KEY 370 Key 155

    GND

    NEU

    POWER SUPPLY PLUG 120V/60HZINDIRECT TANK

    DHW SENSOR

    JUMPER

    TO ARGO X-XTERMINALS

    WITH INDIRECT TANK

    CH SYSTEM PUMP

    (If Used)

    Priority Switch(NOT USED)

    OFF

    External System

    Supply PumpConnection

    External System

    Supply PumpConnection

    L1 (Hot)

    L1 (Hot)

    CH SYSTEM PUMP

    (If Used)

    WITH INDIRECT TANK

    WITHOUT INDIRECT TANK

    NEU

    Key 307

    GNDKey 307

  • 18 PN 240011074 [08/31/2015]

    CHB - WIRING DIAGRAM

    E. Multi-Zone Pump System:Boiler Thermostat contacts (Key 72) are wired to Argo ARM Zone Pump Control terminals (X-X). Zone thermostats and zone pumps are also wired to the Argo Controller as shown on wiring diagrams. See Figures 13 and 14.

    1 - If a tank is applied to a multi-zoned Pump application and the indirect tank sensor element is wired to terminals #7 and #8 (KEY 155) on the CHB Boiler terminal strip - Do not use zone 1 (priority) connections on the Argo Controller or set priority to OFF. See Figure 13.

    The DHW ciruit is controlled by the CHB Boiler control and is the Priority Heat demand.

    2 - If DHW tank is applied to multi-zoned pump application and the following wiring applies - the secondary pump operation is controlled by the Argo priority switch position: (See Figure 14)

    • Rewire two (2) factory supplied resistors.• Connect isolation relay contact (NC) to terminals #7

    and #8 (Key 155) on low voltage terminal strip of boiler.

    • Attach isolation relay coil (24 VAC) to Argo controller zone 1 (Priority) terminal (Hot) and Argo common terminal (NEU) as shown.

    • Wire Indirect tank sensor element to Zone 1 (priority) connections on Argo controller.

    • Wire zone thermostats and zone pumps to Argo controller.

    When Zone 1 (Priority) connections are used to control DHW operation:

    a. Set Argo priority switch to OFF position. Secondary pumps WILL NOT shutoff during DHW priority.

    b. Set Argo priority switch to ON position. Secondary Pumps WILL shutoff during DHW priority.

    NOTICE

    Important:• Before connecting the room thermostat, remove jumper

    on terminal block. (Key 72)• Before connecting Low Water Cutoff remove jumper on

    terminal block. (Key 370)

  • 19 PN 240011074 [08/31/2015]

    CHB - WIRING DIAGRAM

    Low VoltRoom Thermostats

    CHB BOILER

    CHB BOILER

    Priority Switch(NOT USED)

    OFF

    T T

    G

    G G High Voltage Power Supply120V/60Hz

    KEY 72KEY 370 KEY 155

    External System

    Supply Pump(If used)L1

    NEU

    GND

    External Supply Pump Connection

    10K1.8KFactory Supplied

    Resistors

    JUMPER

    JUMPER

    POWER SUPPLY PLUG 120V/60HZ

    POWER SUPPLY PLUG 120V/60HZ

    INDIRECT TANK DHW SENSOR

    KEY 72KEY 370 KEY 155

    External Supply Pump Connection

    L1

    NEU

    GND

    External System Supply Pump

    (If used)

    WITH DHW INDIRECT TANK

    TO ARGO X-X TERMINALS ARM CONTROL

    Argo ARM Zone Pump Control

    Tran

    sform

    er

    24VA

    C

    KEY 307

    KEY 307

    FIGURE 13 - CHB Boiler WITH MULTIPLE ZONE PUMPS With and Without Indirect Tank (DHW) Local Interface

    Zone 1 Not Used

    Zone 1 Not Used

  • 20 PN 240011074 [08/31/2015]

    CHB - WIRING DIAGRAM

    FIGURE 14 - CHB Boiler WITH MULTIPLE ZONE PUMPS and Secondary Pumps Zone Pumps with Indirect Tank WILL Shut Off During DHW Priority

    POWER SUPPLY PLUG 120V/60HZ

    Priority SwitchON

    Power Supply 120V/60HZ

    CHB BOILER

    Tran

    sform

    er

    24VA

    C

    Argo ARM Zone Pump Control

    Isolation Relay (N/C) 24 VAC Coil

    DHW Thermostat

    Low Voltage Room Thermostats

    Zone Pumps

    External Supply Pump Connection

    External System

    Supply Pump(If used)

    L1

    NEUGND

    10K

    1.8KRe-wire Resistors

    (Factory Supplied)

    JUMPER

    KEY 72KEY 370 KEY 155 KEY 307

    NOTICE

    Important:• Before connecting to Argo Control remove jumper on

    terminal block. (Key 72)• Before connecting Low Water Cutoff remove jumper on

    terminal block. (Key 370)

    Zone 1 Not Used

  • 21 PN 240011074 [08/31/2015]

    CCB - HYDRONIC PIPING

    NOTICEArrange piping to prevent water dripping onto boiler.

    A. Piping installation, materials, and joining methods shall conform to requirements of authority having jurisdiction or in absence of such requirements:

    • USA - National Fuel Gas Code, ANSI Z223.1/NFPA 54• Canada - Natural Gas and Propane Installation Code,

    CAN/CSA B149.1B. Manufacturer requires all domestic hot water (DHW) installations use an anti-scald valve. Local codes may require additional equipment (expansion tank, relief valves, etc.) select and size equipment to suit installation and meet code requirements.

    Quick Reference Chart - CCB BoilerCCB - Hydronic Piping Description Page

    ANTI-SCALD WARNING AND PIPING RECOMMENDATION 22

    Single Boiler, Series Loop, Single Zone, No External Circulator (fig. 15) 23

    Series Loop Zoned System WITH ZONE VALVES (fig. 16) 24

    Single Boiler Primary/Secondary Series Loop Zoned System WITH ZONE VALVES (fig. 17) 25

    Single Boiler Series Loop Zoned WITH ZONE PUMPS (fig. 18) 26

    Single Boiler Primary/Secondary Series Loop Zoned WITH ZONE PUMPS (fig. 19) 27

    Single Boiler Primary/Secondary Series Loop PUMPING (fig. 20) 28

    CCB - Wiring Description PageBoiler with Indirect DHW Storage Tank and Optional Supply System Pump (fig. 21) 29

    Boiler with Multiple Zone Valves (fig. 22) 30

    Boiler with Multiple Zone Pumps WITHOUT DHW Interface (fig. 23) 32

    Boiler with Multiple Zone Pumps with DHW Interface (fig. 24) 33

  • 22 PN 240011074 [05/30/2015]

    WARNINGBurn and scald hazard!

    Manufacturer requires installation of field supplied anti-scald valve.

    Failure to follow these instructions could result in death or serious injury.

    !

    PN 615000152 REV A [07/20/2015]

    CCB-150 DHW ANTI-SCALD PIPING

    Boiler

    Cold Water Supply

    Piping Legend

    CH Return

    HotWater Supply

    (Tempered)

    CH Supply

    DHW Outlet

    DHW Inlet

    Tempering Valve

  • 23 PN 240011074 [08/31/2015]

    CCB - HYDRONIC PIPING

    FIGURE 15 - CCB Single Boiler, Series Loop, Single Zone, No External Circulator

    Dom

    estic

    Hot

    Wat

    er

    BOIL

    ER

    City

    Sup

    ply

    (Mak

    e-U

    p)

    Usa

    ge

    Note

    : Fi

    eld

    supp

    lied

    circ

    ulat

    or

    requ

    ired

    if he

    ad-lo

    ss e

    xcee

    ds

    8 Fe

    et a

    t 6 G

    PM.

    *

    * M

    anuf

    actu

    rer

    requ

    ires

    all d

    omes

    tic h

    ot w

    ater

    (D

    HW)

    inst

    alla

    tions

    use

    an

    anti-

    scal

    d va

    lve.

    Loc

    al c

    odes

    may

    re

    quire

    add

    ition

    al e

    quip

    men

    t (ex

    pans

    ion

    tank

    , rel

    ief v

    alve

    s,

    etc.

    ) Se

    lect

    and

    siz

    e eq

    uipm

    ent t

    o su

    it in

    stal

    latio

    n an

    d m

    eet

    code

    req

    uire

    men

    ts.

  • 24 PN 240011074 [08/31/2015]

    FIGURE 16 - CCB Series Loop Zoned System WITH ZONE VALVES

    CCB - HYDRONIC PIPING

    Dom

    estic

    Hot

    Wat

    er

    BOIL

    ER

    City

    Sup

    ply

    (Mak

    e-U

    p)

    Usa

    ge

    CH/S

    yste

    m

    Pum

    p

    *

    * M

    anuf

    actu

    rer

    requ

    ires

    all d

    omes

    tic h

    ot w

    ater

    (D

    HW)

    inst

    alla

    tions

    use

    an

    anti-

    scal

    d va

    lve.

    Loc

    al c

    odes

    may

    re

    quire

    add

    ition

    al e

    quip

    men

    t (ex

    pans

    ion

    tank

    , rel

    ief v

    alve

    s,

    etc.

    ) Se

    lect

    and

    siz

    e eq

    uipm

    ent t

    o su

    it in

    stal

    latio

    n an

    d m

    eet

    code

    req

    uire

    men

    ts.

  • 25 PN 240011074 [08/31/2015]

    CCB - HYDRONIC PIPINGFIGURE 17 - CCB Single Boiler Primary/Secondary Series Loop Zoned System WITH ZONE VALVES

    Dom

    estic

    Hot

    Wat

    er

    BOIL

    ER

    City

    Sup

    ply

    (Mak

    e-U

    p)

    Lim

    it Le

    ngth

    to

    5ft

    . (1

    .6M

    )

    1

    Usa

    ge

    CH/S

    yste

    m

    Pum

    p

    Not

    e:

    112

    ” (3

    05m

    m)

    Max

    imum

    Se

    para

    tion

    * M

    anuf

    actu

    rer

    requ

    ires

    all d

    omes

    tic h

    ot w

    ater

    (D

    HW)

    inst

    alla

    tions

    use

    an

    anti-

    scal

    d va

    lve.

    Loc

    al c

    odes

    may

    re

    quire

    add

    ition

    al e

    quip

    men

    t (ex

    pans

    ion

    tank

    , rel

    ief v

    alve

    s,

    etc.

    ) Se

    lect

    and

    siz

    e eq

    uipm

    ent t

    o su

    it in

    stal

    latio

    n an

    d m

    eet

    code

    req

    uire

    men

    ts.

    *

  • 26 PN 240011074 [08/31/2015]

    FIGURE 18 - CCB -Single Boiler Series Loop Zoned WITH ZONE PUMPS

    CCB - HYDRONIC PIPING

    Dom

    estic

    Hot

    Wat

    er

    BOIL

    ER

    City

    Su

    pply

    (M

    ake-

    Up)

    Usa

    ge

    Zone

    Pum

    p

    **

    Man

    ufac

    ture

    r re

    quire

    s al

    l dom

    estic

    hot

    wat

    er (

    DHW

    ) in

    stal

    latio

    ns u

    se a

    n an

    ti-sc

    ald

    valv

    e. L

    ocal

    cod

    es m

    ay

    requ

    ire a

    dditi

    onal

    equ

    ipm

    ent (

    expa

    nsio

    n ta

    nk, r

    elie

    f val

    ves,

    et

    c.)

    Sele

    ct a

    nd s

    ize

    equi

    pmen

    t to

    suit

    inst

    alla

    tion

    and

    mee

    t co

    de r

    equi

    rem

    ents

    .

  • 27 PN 240011074 [08/31/2015]

    FIGURE 19 - CCB -Single Boiler Primary/Secondary Series Loop Zoned WITH ZONE PUMPS

    CCB - HYDRONIC PIPING

    Dom

    estic

    Hot

    Wat

    er

    BOIL

    ER

    City

    Su

    pply

    (M

    ake-

    Up)

    Lim

    it Le

    ngth

    to

    5ft

    . (1

    .6M

    )

    1

    Usa

    ge

    Zone

    Pum

    p

    Not

    e:

    112

    ” (3

    05m

    m)

    Max

    imum

    Se

    para

    tion

    Optio

    nal F

    low

    Se

    nsor

    **

    Man

    ufac

    ture

    r re

    quire

    s al

    l dom

    estic

    hot

    wat

    er (

    DHW

    ) in

    stal

    latio

    ns u

    se a

    n an

    ti-sc

    ald

    valv

    e. L

    ocal

    cod

    es m

    ay

    requ

    ire a

    dditi

    onal

    equ

    ipm

    ent (

    expa

    nsio

    n ta

    nk, r

    elie

    f val

    ves,

    et

    c.)

    Sele

    ct a

    nd s

    ize

    equi

    pmen

    t to

    suit

    inst

    alla

    tion

    and

    mee

    t co

    de r

    equi

    rem

    ents

    .

  • 28 PN 240011074 [08/31/2015]

    CCB - HYDRONIC PIPING

    FIGURE 20 - CCB -Single Boiler Primary/Secondary Series Loop PUMPING

    Dom

    estic

    Hot

    Wat

    er

    BOIL

    ER

    City

    Sup

    ply

    (Mak

    e-Up

    )

    Lim

    it Le

    ngth

    to

    5ft.

    (1.

    6M)

    Usag

    e

    CH/S

    yste

    m

    Pum

    p

    Not

    e:

    112

    ” (3

    05m

    m)

    Max

    imum

    Se

    para

    tion

    Optio

    nal F

    low

    Se

    nsor

    *

    1

    1

    * M

    anuf

    actu

    rer

    requ

    ires

    all d

    omes

    tic

    hot w

    ater

    (D

    HW)

    inst

    alla

    tions

    use

    an

    ant

    i-sca

    ld v

    alve

    . Lo

    cal c

    odes

    m

    ay r

    equi

    re a

    dditi

    onal

    equ

    ipm

    ent

    (exp

    ansi

    on ta

    nk, r

    elie

    f val

    ves,

    et

    c.)

    Sele

    ct a

    nd s

    ize

    equi

    pmen

    t to

    sui

    t ins

    talla

    tion

    and

    mee

    t cod

    e re

    quire

    men

    ts.

    1

  • 29 PN 240011074 [08/31/2015]

    CCB BOILER - WIRING DIAGRAMS

    1. CCB Boiler Wiring DiagramsAll field wiring must conform to the Authority having jurisdiction in absence of such in follow :

    USA: National Electrical Code, ANSI/NFPA 70, Canada: Canadian Electrical Code, Part I, CSA C22.1: Safety Standard for Electrical Installations. 2. CCB/Single Zone Single room thermostat (Key 72) will control the internal pump and boiler operation. Remove jumper when connecting the thermostat or zone equipment.

    FIGURE 21 - CCB Boiler with Indirect DHW Storage Tank and Optional Supply System Pump

    3. CCB When System Supply Pump is Needed:

    • External system supply pump connection terminals (Key307) are being added to the rear of the control box and will be limited to an additional 1 AMP pump operation. Internal fusing will prevent higher pump operation.

    • If the Controller is not equipped with these terminals, or a larger pump capacity is required. You will need to install an external pump/relay controller circuit. See Instructions And Wiring Diagram For Adding External Pump (615000137) provided with this manual.

    NOTICE

    Important:• Before connecting to room thermostat

    remove jumper on terminal block. (Key 72)• Before connecting Low Water Cutoff, remove

    jumper on terminal block. (Key 370)

    See Figure 21.

    Wiring Legend CHB/CCB

    Pump - Zone

    Thermostat

    Indirect Tank (DHW Sensor)

    Resistor

    Valve - Zone

    DHW Flow Switch (CCB only)

    N.O.

    CCB BOILER

    2 43 65 7 8

    KEY 370

    KEY 72

    T T

    T

    Low Voltage Room Thermostat

    Jumper

    1

    CH System Pump

    (If used)

    POWER SUPPLY Cord 120V/60HZ

    L1 (Hot)

    GND

    NEU

    System Supply Pump Connection

    Key 307

  • 30 PN 240011074 [08/31/2015]

    CCB BOILER - WIRING DIAGRAMS

    4. CCB - Using Multi-Zone Valve System

    Boiler call for heat contracts (Key 72) are wired to Argo Zone Control (x-x) terminals. Zone thermostats and zone valves are to be wired to the Argo Controller. See Figure 22.

    Set Argo Priority Switch to OFF position. Secondary pumps Will Not shutoff during priority operation. Refer to Argo Controller instructions for switch setting and operation information.

    NOTICE

    Important:• Before connecting to room thermostat remove

    jumper on terminal block. (Key 72)• Before connecting Low Water Cutoff, remove

    jumper on terminal block. (Key 370)

    FIGURE 22 - CCB Boiler with Multiple Zone Valves

    Argo AZ - 4CPSET

    PRIORITY TO OFF

    LOW VOLTAGE ZONE VALVE(S)

    Key 307

    JUMPER

    Key 72

    POWER SUPPLY PLUG 120V/60HZ

    CCB BOILERL1

    (Hot)

    NEU

    GND

    2 43 5 7 8

    KEY 370

    1

    SYSTEM PUMP (If used)

    SYSTEM SUPPLY PUMP CONNECTION

    6

  • 31 PN 240011074 [08/31/2015]

    5. CCB Using Multi-Zone Pump System

    Wiring of Argo Control may include Priority Zone Control.

    Boiler thermostat contacts (Key 72) are wired to Argo ARM Zone Pump Control terminals (x-x). Use Argo ARM Zone Pump Controller as shown in Figure 23.

    1. When priority zone control is not desired. Wire zone pumps and thermostats as shown in Figure 23. Do Not use Zone 1 (Priority) connections on Argo Controller or set Priority to off. Secondary pumps Will Not shutoff during DHW priority.

    2. When priority zone control is desired, wire zone pumps and thermostats as shown in Figure 24. Wire priority flow controller (not supplied ) across Zone 1 (Priority) thermostat connections. Zone 1 pump terminals are not used, unless a Primary Pump if being applied. Set the Argo Priority switch to ON, secondary pumps Will shutoff during DHW priority.

    NOTICE

    Important:• Before connecting to room thermostat

    remove jumper on terminal block. (Key 72)• Before connecting Low Water Cutoff, remove

    jumper on terminal block. (Key 370)

    CCB BOILER - WIRING DIAGRAMS

  • 32 PN 240011074 [08/31/2015]

    FIGURE 23 - CCB Boiler with Multiple Zone Pumps WITHOUT DHW Interface

    Argo ARM Zone Pump Control

    JUMPER

    Key 307

    POWER SUPPLY PLUG 120V/60HZ

    CCB BOILER

    SYSTEM PUMP (If used)

    SYSTEM SUPPLY PUMP CONNECTION

    POWER SUPPLY 120V/60HZ

    Key 72

    SECONDARY PUMPS WILL NOT SHUTOFF DURING DHW PRIORITY WHEN ARGO PRIORITY

    SWITCH IS ON.

    SET PRIORITY TO OFF

    ZONE PUMPS

    L N G

    ZONE 1 NOT USED

    LOW VOLTAGE ROOM THERMOSTATS

    L1 (Hot)

    NEU

    GND

    Tran

    sform

    er

    24VA

    C

    ZONE 1 NOT USED

    CCB BOILER - WIRING DIAGRAMS

    2 43 5 7 81

    KEY 370

    66

  • 33 PN 240011074 [08/31/2015]

    FIGURE 24 - CCB Boiler with Multiple Zone Pumps WITH DHW Interface

    CCB BOILER - WIRING DIAGRAMS

    N.O.

    Argo ARM Zone Pump Control

    POWER SUPPLY 120V/60HZ

    SET PRIORITY

    TO ON

    ZONE PUMPS

    L N G

    ZONE 1 NOT USED

    DHW FLOW

    SWITCH

    LOW VOLTAGE

    Key 307

    POWER SUPPLY PLUG 120V/60HZ

    CCB BOILER

    SYSTEM PUMP (If used)

    SYSTEM SUPPLY PUMP CONNECTION

    Key 72

    JUMPERPOWER SUPPLY PLUG 120V/60HZ

    2 43 5 7 8KEY 370

    1

    L1 (Hot)

    NEU

    GND

    SECONDARY PUMPS WILL SHUTOFF DURING DHW PRIORITY WHEN ARGO PRIORITY SWITCH

    IS ON.

    6

    Tran

    sform

    er

    24VA

    C(0.50 GPM)

  • 34 PN 240011074 [08/31/2015]

    APPLICATION TABLES FOR : CHB - W/H2O INDIRECT HOT WATER TANK

    CHB 100, CHB130, CHB150

    Ava

    ilab

    le P

    um

    p H

    ead

    [fe

    et w

    .c.]

    3/4" PIPE EQUIV. INTERNAL

    PIPE LENGTH PUMP(FEET) (GPM)10 FT. 7.430 FT. 6.950 FT. 6.5

    1" PIPE EQUIV. INTERNAL

    PIPE LENGTH PUMP(FEET) (GPM)20 FT. 7.550 FT. 7.3

    100 FT. 6.9

    1- 1/4" PIPE EQUIV. INTERNAL

    PIPE LENGTH PUMP(FEET) (GPM)50 FT. 7.5

    100 FT. 7.4200 FT. 7.3

    CONTINUOUS RATING @ MAXIMUM INPUT(GAL/HR.)

    INDIRECT TANK - H2O30 / H2O40 / H2O40 L / H2O50H2O60 / H2O60 L / H2O80 / H2O115

    GPM 140 °F 115 °F 140 °F 115 °F 140 °F 115 °F7.5 113 156 146 202 151 / 169 209 / 2347.3 110 152 142 197 147 / 164 203 / 2287.0 106 146 136 189 141 / 158 195 / 2186.5 98 135 127 175 131 / 146 181 / 203

    CHB-100 CHB-130 CHB-150

    2.63.03.5

    FROM BOILER

    FROM BOILER

    FROM BOILER

    (FT - H2O)2.53.65.2

    PRESS. HEAD

    (FT - H2O)

    PRESS. HEAD

    PRESS. HEAD

    (FT - H2O)3.05.26.8

  • 35 PN 240011074 [08/31/2015]

    APPLICATION TABLES FOR : CHB - W/H2O INDIRECT HOT WATER TANK

    Tabl

    e B

    ased

    on

    BO

    ILER

    OU

    TPU

    T (B

    TUH

    /HR

    )M

    AX.

    BO

    ILER

    OU

    TPU

    T (B

    TUH

    /HR

    )M

    AX.

    BO

    ILER

    OU

    TPU

    T (B

    TUH

    /HR

    )M

    AX.

    Boi

    ler F

    low

    Rat

    e =

    7.5

    GPM

    50,0

    0060

    ,000

    80,0

    0085

    ,000

    50,0

    0060

    ,000

    80,0

    0010

    0,00

    011

    0,00

    050

    ,000

    60,0

    0080

    ,000

    100,

    000

    120,

    000

    128,

    000

    140

    F94

    107

    134

    140

    9410

    713

    416

    017

    394

    107

    134

    160

    170

    170

    115

    F11

    913

    817

    418

    311

    913

    817

    421

    122

    911

    913

    817

    421

    122

    522

    514

    0 F

    6780

    107

    113

    6780

    107

    133

    146

    6780

    107

    133

    143

    143

    115

    F92

    111

    147

    156

    9211

    114

    718

    420

    292

    111

    147

    184

    198

    198

    H2O

    40 /

    H2O

    40L

    140

    F10

    311

    614

    314

    910

    311

    614

    316

    918

    210

    311

    614

    316

    918

    7 / 1

    8018

    7 / 1

    8011

    5 F

    128

    147

    183

    192

    128

    147

    183

    220

    238

    128

    147

    183

    220

    245

    / 235

    245

    / 235

    140

    F67

    8010

    711

    367

    8010

    713

    314

    667

    8010

    713

    315

    1 / 1

    4415

    1 / 1

    4411

    5 F

    9211

    114

    715

    692

    111

    147

    184

    202

    9211

    114

    718

    420

    9 / 1

    9920

    9 / 1

    99

    H2O

    5014

    0 F

    112

    125

    152

    158

    112

    125

    152

    178

    191

    112

    125

    152

    178

    187

    190

    115

    F13

    715

    619

    220

    113

    715

    619

    222

    924

    713

    715

    619

    222

    924

    825

    214

    0 F

    6780

    107

    113

    6780

    107

    133

    146

    6780

    107

    133

    160

    163

    115

    F92

    111

    147

    156

    9211

    114

    718

    420

    292

    111

    147

    184

    221

    225

    140

    F12

    113

    416

    116

    712

    113

    416

    118

    720

    012

    113

    416

    118

    719

    6 / 1

    8720

    5 / 1

    8711

    5 F

    146

    165

    201

    210

    146

    165

    201

    238

    256

    146

    165

    201

    238

    257

    / 245

    270

    / 245

    140

    F67

    8010

    711

    367

    8010

    713

    314

    667

    8010

    713

    316

    0 / 1

    5116

    9 / 1

    5111

    5 F

    9211

    114

    715

    692

    111

    147

    184

    202

    9211

    114

    718

    422

    1 / 2

    0923

    4 / 2

    09

    H2O

    8014

    0 F

    139

    152

    179

    185

    139

    152

    179

    205

    218

    139

    152

    179

    205

    187

    190

    115

    F16

    418

    321

    922

    816

    418

    321

    925

    627

    416

    418

    321

    925

    624

    825

    214

    0 F

    6780

    107

    113

    6780

    107

    133

    146

    6780

    107

    133

    160

    163

    115

    F92

    111

    147

    156

    9211

    114

    718

    420

    292

    111

    147

    184

    221

    225

    H2O

    115

    140

    F17

    018

    321

    021

    617

    018

    321

    023

    624

    917

    018

    321

    023

    619

    620

    511

    5 F

    195

    214

    250

    259

    195

    214

    250

    287

    305

    195

    214

    250

    287

    257

    270

    140

    F67

    8010

    711

    367

    8010

    713

    314

    667

    8010

    713

    316

    016

    911

    5 F

    9211

    114

    715

    692

    111

    147

    184

    202

    9211

    114

    718

    422

    123

    4N

    OTE

    S:

    (GAL

    /HR

    )

    CH

    B-1

    00 B

    OIL

    ER

    (100

    ,000

    BTU

    H

    MAX

    IMU

    M IN

    PUT

    RAT

    E)

    H2O

    30

    CH

    B-1

    30 B

    OIL

    ER

    (130

    ,000

    BTU

    H M

    AXIM

    UM

    IN

    PUT

    RAT

    E)

    1st H

    OU

    R R

    ATIN

    G(G

    AL/H

    R)

    CO

    NTI

    NU

    OU

    SR

    ATIN

    G (G

    AL/H

    R)

    1st H

    OU

    R R

    ATIN

    G

    CH

    B-1

    50 B

    OIL

    ER

    (150

    ,000

    BTU

    H M

    AXIM

    UM

    INPU

    T R

    ATE)

    1st H

    OU

    R R

    ATIN

    G(G

    AL/H

    R)

    CO

    NTI

    NU

    OU

    SR

    ATIN

    G (G

    AL/H

    R)

    CO

    NTI

    NU

    OU

    S

    1st H

    OU

    R R

    ATIN

    G(G

    AL/H

    R)

    RAT

    ING

    (GAL

    /HR

    )

    1st H

    OU

    R R

    ATIN

    G(G

    AL/H

    R)

    CO

    NTI

    NU

    OU

    SR

    ATIN

    G (G

    AL/H

    R)

    H2O

    60 /

    H2O

    60L

    1st H

    OU

    R R

    ATIN

    G(G

    AL/H

    R)

    CO

    NTI

    NU

    OU

    SR

    ATIN

    G (G

    AL/H

    R)

    180

    °F B

    oile

    r Sup

    ply

    Wat

    er T

    empe

    ratu

    reAH

    RI R

    atin

    g C

    ondi

    tions

    - 50

    °F In

    let W

    ater

    CO

    NTI

    NU

    OU

    SR

    ATIN

    G (G

    AL/H

    R)

  • 36 PN 240011074 [08/31/2015]

    SENSORS - OPTIONAL EQUIPMENT

    Optional Equipment

    1. Outdoor Air Sensor, if used.A. See Chart 1 for sensor data. Sensor part number FE013018X0.B. Locate outdoor sensor to protect against wind and direct sunlight. Mounting instructions provided with sensor.C. Maximum wire length is 100 ft (30m) for 22 ga. wire, or 150 ft (45m) for 18 ga. wire.D. Connect wires to OUTDOOR SENSOR terminals. Wires are interchangeable.

    2. NTC Sensor for DHW tank, if used.A. Recommend part number - FE043005X0

    See Chart 1 for sensor data. See Installation, Operation and Maintenance Manual for wiring diagram for connections.

    CHART 1 - OUTDOOR AIR SENSOR & NTC SENSOR DATA

    °F R Ω °F R Ω °F R Ω °F R Ω-4 96125 32 32505 68 12483 104 5332

    -2.2 90743 33.8 30898 69.8 11935 105.8 5123-0.4 85694 35.6 29381 71.6 11414 107.6 49231.4 80959 37.4 27946 73.4 10919 109.4 47323.2 76510 39.2 26590 75.2 10447 111.2 45495 72335 41 25308 77 9999 113 4374

    6.8 68412 42.8 24094 78.8 9572 114.8 42078.6 64725 44.6 22946 80.6 9166 116.6 404710.4 61259 46.4 21859 82.4 8779 118.4 389412.2 57999 48.2 20829 84.2 8411 120.2 374814 54932 50 19854 86 8060 122 3608

    15.8 52045 51.8 18930 87.8 7726 123.8 347317.6 49327 53.6 18054 89.6 7407 125.6 334519.4 46767 55.4 17223 91.4 7103 127.4 322221.2 44354 57.2 16436 93.2 6813 129.2 310423 42080 59 15689 95 6537 131 2991

    24.8 39936 60.8 14980 96.8 6273 132.8 288226.6 37914 62.6 14306 98.6 6021 134.6 277828.4 36006 64.4 13667 100.4 5781 136.4 267930.2 34205 66.2 13060 102.2 5551 138.2 2583

  • 37 PN 240011074 [08/31/2015]

    VENTING OPTIONSTYPE I - VENTING (ACCEPTABLE) TYPE I- VENTING (ACCEPTABLE)

    TYPE I - VENTING (NON-ACCEPTABLE) TYPE I- VENTING (NON-ACCEPTABLE)

    CHIMNEY

    DHW Tank

    Boiler

    Outside Air Optional

    DHW Tank

    DHW Tank

    DHW Tank

    Boiler

    Boiler

    Boiler

    Outside Air Optional

    B

    VENT

    Outside Air Optional

    Outside Air Optional

    B

    VENTC

    HIMNEY

  • 38 PN 240011074 [08/31/2015]

    ADDENDUM - INSTRUCTIONS

    Addendum - Instructions

    Following Section Includes: Page #(s)

    Domestic Hot Water Sensor Kit Instruction (240010745)..........................................39-42

    Instructions And Wiring Diagram For Adding External Pump (615000137)...............43-44

    Sealed Combustion Kit Instructions (37711601) - For Kit #5612601.........................45

    Control Board Replacement Kit Instructions (615000134).........................................46-47

    Retaining Clip Removal Caution (615000136)............................................................48-49

    Altitude Affects on CHB-100, CHB-130, CHB-150 and CCB-150...................................50

    LP Conversion Kit Instructions...................................................................................51-53

  • 39

    DOMESTIC HOT WATER SENSOR KITINSTRUCTIONS FOR CHB-100, CHB-130, CHB-150

    Kit #550002958

    WARNINGFire, explosion, asphyxiation and electrical shock hazard. Improper installation could result in death or serious injury. Read this instruction and understand all requirements, including requirements of authority having jurisdiction, before beginning installation. Installation not complete until appliance operation verified per Installation, Operation & Maintenance Manual provided with boiler.

    !

    Sensor can be used on a standard Indirect Hot Water tank. When it is connected to the boiler, sensor will control Indirect Tank temperature.

    1. Follow instructions To TURN OFF GAS TO APPLIANCE found on Operating Instructions label on boiler or in Installation, Operation & Maintenance Manual. Verify all electrical power to boiler is turned off.

    WARNINGElectrical shock hazard. Turn OFF electrical power supply at service panel.

    !

    2. Remove front jacket.

    WARNINGBurn hazard. Verify heat exchanger has cooled or use appropriate personal protection equipment.

    !

    3. Before inserting sensor into Indirect tank well, thoroughly coat sensor with Thermopaste supplied with sensor kit.

    4. Slide sensor into well until it bottoms out. See Figure 1.

    5. Secure sensor wire to well with included clip. See Figures 1, 2 and 3.

    6. Route sensor wire to boiler low voltage terminal block. Remove the two resistors on terminals 7 & 8 of 8-pin terminal strip, key #155. See Figure 4 - wiring diagram.

    7. Install sensor wires onto terminals 7 & 8. See Figures 5 and 6.

    8. Secure sensor wire, provide adequate strain relief and anti-shorting protection.

    P/N 240010745 Rev. D [08/31/2015]

    Figure 1 - Slide Sensor Into well of Indirect TankKit installation shall be completed by qualified agency.

    Figure 2 - Secure Sensor Wire to Well With Clip

    Figure 3 - Sensor Wire Secured to Well With Clip

  • 40

    9. Restore power to boiler. Boiler will automatically recognize the sensor.

    10. See Installation, Operation & Maintenance Manual for adjusting DHW tank temperature and operation.

    11. Resume operation using Installation, Operation & Maintenance Manual.

    12. Verify proper operation by following START UP PROCEDURE in Installation, Operation & Maintenance Manual.

    13. Install front cover.

    DOMESTIC HOT WATER SENSOR KIT

    DOMESTIC HOT WATER SENSOR KIT FOR CHB-100/ CHB-130/ CHB150

    #550002958DESCRIPTION PART # QTYDHW Tank Sensor - 1Clip - 1Thermopaste - 1Instructions 240010745 1

    P/N 240010745 Rev. D [08/31/2015]

  • 41

    37 EN

    1k81

    32

    95

    278

    1

    4

    120V60Hz

    138

    5 6 7 83 41 2

    1644

    N L

    138

    370

    95

    278 TT

    297

    47

    114

    GND+15VOUT

    155

    72

    X1X2AUX

    X4

    X4

    X11X7X

    5

    X7

    X6

    X9

    L LN N1 1

    DBM34

    WIRING DIAGRAM

    Key

    16 Modulating fan32 Heating circulating pump42 DHW temperature sensor (see kit)44 Gas valve47 Modulation Regulator (24V)72 Room thermostat (field sourced)81 Ignition/detection electrode114 Water pressure switch138 External probe (not fitted)

    155 Hot water tank temperature probe (field sourced)278 Double sensor (safety + Heating)297 Air pressure transducer307 Heating system second circulating pump (not supplied)370 Low Water Cutoff (LWCO) - (field sourced)

    Important: Before connecting the room thermostat, remove the jumper on terminal block.

    138 Optional Outdoor Sensor155 Optional Indirect Tank Sensor370 Field Source LWCO

    307

    10kOhm

    1,8kOhmM

    N G L1

    *138 - Optional Outdoor Sensor*155 - Optional Indirect Tank Sensor*307 - CH System Pump (if used)*370 - Field Source LWCO

    Key 16 Modulating fan 32 Heating circulating pump 42 DHW temperature sensor (see kit) 44 Gas valve 47 Modulation Regulator (24V)*72 Room thermostat (field sourced) 81 Ignition/detection electrode 114 Water pressure switch*138 Optional Outdoor Sensor (field sourced) *155 Optional Indirect Tank Sensor

    (See parts list) 278 Double sensor (Safety + Heating) 297 Air pressure transducer*307 CH Sysetm Pump - (if applicable) *370 Low Water Cutoff (LWCO) - (field sourced)

    *

    *

    *

    NOTICE*Important: • Before connecting the room thermostat, remove jumper on terminal block. (Key 72)

    • Before connecting optional Indirect Tank Sensor, remove two resistors. (Key 155)

    • Before connecting the Low Water Cutoff, remove the jumper on terminal block. (Key 370)

    *

    Figure 4 - Wiring Diagram

    If Key 155 is used remove both resistors

    and wire Indirect Tank Sensor to

    termimals 7 and 8.

    DOMESTIC HOT WATER SENSOR KIT

    P/N 240010745 Rev. D [08/31/2015]

  • 42

    DOMESTIC HOT WATER SENSOR KIT

    Figure 5 - Low Voltage Terminal Strip, CHB-130 Shown

    Figure 6 - Low Voltage Terminal Strip Removed from Boiler, CHB -130 Shown

    Low Voltage Terminal Strip

    Low Voltage Terminal Strip

    Removed

    Temperature Deg F Resistance in Ohms32 3250560 1568970 1193577 10000100 8060110 4732120 3748130 3104

    Check our website frequently for updates: www.ecrinternational.comP/N 240010745 Rev. D [08/31/2015]

  • 43

    INSTRUCTIONS AND WIRING DIAGRAM FOR ADDING EXTERNAL PUMP TO

    CHB/CCB BOILERS(Without Factory Pump Terminals)

    P/N 615000137, Rev. C [06/09/2015]

    1. Follow instructions to TURN OFF GAS TO APPLIANCE found on Operation Instructions label on boiler or in Installation, Operation & Maintenance Manual. Verify all electrical power to boiler is turned off.

    WARNINGElectric shock hazard. Turn OFF electrical power supply at service panel.

    2. Verify all power to boiler is turned OFF at service panel.3. Follow Installation, Operation & Maintenance manual to

    remove front jacket panel(s).

    WARNINGBurn hazard. Verify heat exchanger has cooled or use appropriate personal protection equipment.

    !

    4. Inspect combustion chamber through sight glass. Verify flame is not present.

    5. See wiring as shown in Figure 1.6. Resume operation using OPERATING INSTRUCTIONS

    found on Operating Instructions label on boiler or in Installation, Operation & Maintenance Manual.

    7. Verify proper operation by following START UP PROCEDURE in Installation, Operation & Maintenance Manual.

    8. Follow Installation, Operation & Maintenance manual to install front jacket panel(s).

    Installation shall be completed by qualified agency.

    WARNINGFire, explosion, asphyxiation and electrical shock hazard. Improper installation could result in death or serious injury. Read this instruction and understand all requirements, including requirements of authority having jurisdiction, before beginning installation. Installation not complete until appliance operation verified per Installation, Operation & Maintenance Manual provided with boiler.

    ! An external pump is necessary for the following conditions:

    • The central heating circuit exceeds 8 ft of total head loss.

    • When using an indirect tank with a high head loss.

  • 44

    ARGO Controller AR822-II

    Figure 1 - Optional External Pump/Relay Wiring

    Factory Installed Jumper [DO NOT REMOVE]

    Call for Heat

    15VA Transformer Relay

    External Circulator Pump

    Ref. Key 72Important: Before connecting the Argo Controller, remove supplied jumper on

    terminal block.

    Field Installed Wiring

    Argo contact rating = 7 Amp Maximum

  • 45

    Sealed Combustion Termination Kit # 5612601

    Installation Instructions

    WARNINGFire, explosion, asphyxiation and electrical shock hazard. Improper installation could result in death or serious injury. Read this instruction and understand all requirements, including requirements of authority having jurisdiction, before beginning installation. Installation not complete until appliance operation is verified per Installation, Operation & Maintenance Manual provided with boiler.

    !

    P/N 37711601 Rev. A [05/2015]

    Kit installation shall be completed by qualified agency.

    Horizontal (Category III) venting systems installation shall conform to the requirements of the authority having jurisdiction or, in the absence of such requirements:

    • National Fuel Gas Code, ANSI Z223.1/NFPA 54,

    and/or• Natural Gas and Propane Installation Code, CAN/CSA

    B149.1

    Figure 1 - Sealed Combustion Termination

    Installation Instructions:1. Use supplied template to cut a hole through the wall.

    Secure template to inside wall.

    NOTICEIf installing through non-combustible wall, remove termination thimble. Make two (2) 3½" ±1" holes on center through the wall.

    2. Install vent termination assembly to outside wall.3. Install PVC pipe from vent termination assembly to

    boiler's air inlet.4. Assemble vent pipe following vent pipe manufacturer's

    instructions.5. Install vent pipe through termination assembly and

    extend 3" beyond the assembly.6. Install termination deflector using four (4) provided

    screws.7. Install draw collar around vent pipe. Tighten nut and

    screw until secured tightly.8. Secure termination tee according to vent pipe

    manufacturer's instructions.

    Termination Thimble

    Termination Assembly

    Termination Deflector

    Draw Collar

    #10-24 Hex Nut

    3" Termination Tee (Purchased Separately)

    Screw #10-24x1½" RH

    4 Screws #10 x½ HX HD

    (8" X 12") Template

    3" Stainless Steel Vent Pipe (Purchased Separately)

    3" PVC Pipe Air Intake(Purchased Separately)

    Wall

    To Boi

    ler

  • 46

    Kit installation shall be completed by qualified agency.

    WARNINGFire, explosion, asphyxiation and electrical shock hazard. Improper installation could result in death or serious injury. Read this instruction and understand all requirements, including requirements of authority having jurisdiction, before beginning installation. Installation not complete until appliance operation verified per Installation, Operation & Maintenance Manual provided with boiler.

    !

    1. Follow instructions TO TURN OFF GAS TO APPLIANCE found on Operating Instructions label on boiler or in Installation, Operation & Maintenance Manual. Verify all electrical power to boiler is turned off.

    WARNINGElectrical shock hazard. Turn OFF electrical power supply at service panel.

    !

    2. Remove front jacket casing per instructions found in Installation, Operation & Maintenance Manual.

    WARNINGBurn hazard. Verify heat exchanger has cooled or use appropriate personal protection equipment.

    !

    3. Remove (2) screws on lower part of control housing. See Figure 1.

    4. Slide control housing forward. Control housing will fold down on the built in hinge. See Figure 2.

    5. Remove two back cover screws.

    6. Disconnect all wiring connectors

    7. Remove two (2) screws holding board in place. Slide board out. See Figure 3.

    8. Replace board and wiring connectors.

    9. Replace back cover.

    10. Fold control housing up. Slide control housing back into position. Secure with screw.

    11. Remove any call for heat or hot water.

    12. Turn gas to appliance On following proceedure found on boiler or in Installation, Operation & Maintenance Manual.

    13. Apply power to boiler.

    14. Configure control for proper boiler size and type.

    CONTROL BOARD (DBM34) KIT #FE3980B850REPLACEMENT INSTRUCTIONS

    Figure 1

    Figure 2

    Figure 3

    Control Housing Hinge

    Remove Screws

    PN 3541F680REF #615000134, REV B [08/2015]

    Remove (2) Screws

  • 47

    To access to “tS” parameter:A. Press and hold Reset button for 10 seconds. Display

    will read “tS”. Release button.B. Press Reset button for 1 second. Display will read

    “P01”.C. Press Heating buttons to scroll parameter list. Press

    DFHW buttons to view or change a parameter. Set two (2) parameters “P01” and “P02” as shown in Table 1 below and Figure 4.

    Table - 1tS Menu CCB-150 CHB-100 CHB-130 CHB-150

    P01 Gas Type0 = Natural Gas

    1 = LP Gas

    P02 Boiler Type 1 2 2 2

    To access Configuration menu:A. Press (DHW) + and - , hold both buttons for 10

    seconds; “b01” appears and flashes.B. Press Heating buttons to scroll Configuration list.

    Press DHW buttons to view or change a setting.C. Change only the Configuration “b01” per Table 2.

    Remaining parameters are factory defaulted to the correct value, verify value. See Table 3.

    D. Select proper size, press and hold (DHW) + and -, both buttons for 10 seconds to exit, or turn power off then on, or wait two (2) minutes for auto exit.

    15. Replace jacket casing.16. Verify proper operation by following START UP

    PROCEDURE in Installation, Operation & Maintenance Manual.

    Table - 2Parameter Description Setting

    b01 Curve Selection Default = 2

    b01 CHB-100 0

    b01 CHB-130 1b01 CHB-150/ CCB-150 2

    CONTROL BOARD REPLACEMENT INSTRUCTIONS

    Table - 3Configuration Menu CCB-150 CHB-150 CHB-130 CHB-100

    b01 Power Selection 2 2 1 0

    b02 Offset max. setpoint air signal 0 0 0 0

    b03 Burner selection 0 0 0 0

    b04 Offset min. setpoint air signal 40 40 40 40

    Figure 4

    CH

    DHW

    PN 3541F680REF #615000134, REV B [08/2015]

  • CAUTIONDO NOT remove retaining clips on field installed

    water fittings. Removed fittings CANNOT be

    reinstalled.

    DO NOT solder on threaded joints. Heating the

    fitting will cause O-ring joint failure causing leaks.

    Boiler shown with jacket removed

    Control is folded forward

    and down

    RIGHT SIDE CLIP - INSIDE BOILER JACKET

    LEFT SIDE CLIP - INSIDE BOILER JACKET

    DO NOT REMOVE CLIP

    DO NOT REMOVE CLIP

    See reverse page for manufacturer recommended piping method.

    DO NOT REMOVE RETAINING CLIPS ON

    WATER FITTINGS

    PN 615000136 REV B, [02/06/2015]

    48

  • PN 615000136 REV B, [02/06/2015]

    Manufacturer recommended piping method:1. Use piping accessories as shown in diagram below.2. Do any necessary soldering away from the boiler, then thread soldered assembly to Boiler

    connections.

    Female Copper Fitting

    Copper Pipe (6” min. length manufacturer

    recommended)

    Union

    PIPING DIAGRAMS

    Copper Pipe

    Union

    49

  • Altitude Affects on CHB-100, CHB-130, CHB 150 and CCB-150

    Above curves show affect altitude will have on boiler delivery.

    Manufacturer has tested this boiler at altitude (sea level to 8,000 ft.) and determined that standard (ANSI) derate input practices of re-orificing are not required for these models.

    50

  • 51

  • 52

  • 53

  • NOTES

  • NOTES

  • ECR International, Inc.2201 Dwyer Avenue

    Utica . NY . 13501www.ecrinternational.com