84

Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 2: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 3: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

( ) Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ).

Page 4: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 5: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 6: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

( ) Horgan M. and Roulston f."Project Control Of Engineering Contracts "( E& F.USA –NY, ) ,P. .

(٢) Dave Hall and David Hulett “Universal Risk Project” (Risk Management Institute, February ٢٠٠٢), P.٢٤. ( ) Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ).

Page 7: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

RankRisks

Finanical and Economic RisksInflation and Interest RatesIn-house Cash ShortageForeign Exchange and ConvertibilityCompetition

Construction and Design RisksImproper Project ManagementImproper DesignResources UnavailabilityDefective WorkDefective MaterialLow Construction ProductivitySite SafetyConstructability

Political / Government RisksExpropriationApprovals and PermitsChange in LowsCorruptionPolitical Instability

Clients Financial AbilityResponse to ClaimsClient Changing NeedsPossession of Site

Subcontractors Technical QualificationsSubcontractors variation of Bids Subcontractors Financial Ability

Miscellaneous RiskPartnershipe RisksForce majeureDiffering Site ConditionsEnvironmental Site ConditionsPhysical Damage

Page 8: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 9: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

( ) The institution of Civil Engineers “An Introduction to Engineering Economics " (GB,William

Clowes&Sons.Ltd., ) , P. .

( ) An Introduction to Engineering Economics , Ibid , P. .

Page 10: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

( ) An Introduction to Engineering Economics , Ibid , P. .

Page 11: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 12: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 13: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

-

-

-

-

Page 14: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

-

-

Page 15: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 16: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

( Time ) (( Cost )

(Safety )

Page 17: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 18: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 19: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 20: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

" Building a Construction Project Management Plan "

Briefing StageB

Page 21: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

Design, Tender & Procurement Stage

Page 22: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

Construction Stage

Start up & Commission StageS

Page 23: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 24: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

-

-

Page 25: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 26: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

SODIC

PALM HILLS ( PHD ) TMG

Page 27: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

.

Page 28: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

Compound C

Page 29: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 30: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 31: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

.

((

Page 32: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 33: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

(SWOT ANALYSIS )(

StrengthsWeaknesses

OpportunitiesThreats

(SWOT ANALYSIS )(

Page 34: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 35: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

-

-

-

-

-

-

Page 36: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 37: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

SODICS

SODIC

.

beverly hillsbWESTOWN CAIROWCASACCAllegriaA

EASTOWN CAIROE

Kattameya PlazaKK

www.SODIC.com

Page 38: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

( Allegria ) (

Page 39: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

( Kattamya Plaza ) (

Page 40: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

( Westtown ) (

Page 41: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

SHAREHOLDING STRUCTURE

- HERMESH

-

-

-

Page 42: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

SWOTSSODIC

Strengths Weaknesses

HERMES

MIXED-USEM

Opportunities Threats

(SWOT ANALYSIS)(

Page 43: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

PHDP

PHD

MIXED –USE)M

Page 44: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

( Palm Hills – October ) (

( Golf View - October ) (

Page 45: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 46: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

( Palm Hills – Kattamya ) (

CASA - Cairo / Alex Road ) C

Page 47: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

North Coast Projects ) N

SHAREHOLDING STRUCTURE

-

-

-

Page 48: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

SWOTSStrengths Weaknesses

COLDWELL BANKERC

Opportunities Threats

UK

(SWOT ANALYSIS )(

Page 49: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

TMGT

TMGT

::

Page 50: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

Madinaty-Cairo / Suez Road M

Page 51: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

El-Rehab -Cairo / Suez Road E

Page 52: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

(Four Sesons – San Stefano – Nile Plaza)(

Page 53: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

SHAREHOLDING STRUCTURE

-

-

-

-

Page 54: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

SWOTS

Strengths Weaknesses

Opportunities Threats

(SWOT ANALYSIS )(S

Page 55: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 56: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 57: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 58: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 59: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

(MONT-CARLO)

Page 60: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 61: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

( MONT-CARL , CRYSTAL BALL,@RISK & @ RISK PLUS …ect )

Page 62: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

( Value Engineering ) (

-

-

Page 63: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 64: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 65: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 66: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 67: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 68: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 69: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

//

//

Page 70: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

//

Page 71: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

-

-

-

-

Page 72: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

-

-

-

-

Page 73: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

-

Page 74: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 75: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 76: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 77: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 78: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 79: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 80: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 81: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce
Page 82: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

١. A Guide to the Project Management Body of Knowledge p.٣٥-٢٧ PMI (٢٠١٠).

٢. A Process Approach To Project Risk Management, Adam Greene; Loughborough University.

٣. A review of techniques for risk management in projects, Ammar Ahmed, Berman Kayis, Sataporn Amornsawadwatana.

٤. Ahuja, H N (١٩٨٤) Project Management – Techniques in Planning and Controlling onstruction Projects, John Wiley & Sons, New York.

٥. Albert Hamilton (٢٠٠٤). Handbook of Project Management Procedures. TTL Publishing, Ltd. ISBN ٧-٣٢٥٨-٧٢٧٧-٠.

٦. American Chamber of Commerce in Egypt "The Construction Sector In Egypt – Development and Competitiveness".

٧. An Introduction to Engineering Economics , Ibid ٨. Andersen, E S, Grude, K V and Haug, T (١٩٨٨) Goal Directed Project

Management (with Turner, J R); (١٩٩٨) Goal Directed Project Management, ٢nd edn, Kogan Page/Coopers & Lybrand, London.

٩. Artto, K., Kähkönen, K. , Management of Uncertainty. ١٠. Barrie, D S and Paulson, J R (١٩٧٨) Professional Construction Management,

McGraw- Hill, New York. ١١. Bernhard Schlagheck (٢٠٠٠). Objektorientierte Referenzmodelle für das

Prozess- und Projektcontrolling. Grundlagen– Konstruktionen – Anwendungsmöglichkeiten. ISBN ١-٧١٦٢-٨٢٤٤-٣-٩٧٨. p.١٣١.

١٢. Bjarne Kousholt (٢٠٠٧). Project Management –. Theory and practice.. Nyt Teknisk Forlag. ISBN ٨-٢٦٠٣-٥٧١-٨٧. p.٥٩.

١٣. Body of Knowledge ٥th edition, Association for Project Management, ٢٠٠٦, ISBN ٣-١٣-٩٠٣٤٩٤-١.

١٤. Chapman, Chris - Project Risk Management Processes, Techniques and Insights – ٢٠٠٦.

١٥. Chatfield, Carl. "A short course in project management". Microsoft http://office.microsoft.com/en-us/project/HA١٠٢٣٥٤٨٢١٠٣٣.aspx.

١٦. Dave Hall and David Hulett “Universal Risk Project” (Risk Management Institute,February ٢٠٠٢).

١٧. David I. Cleland, Roland Gareis (٢٠٠٦). Global Project Management Handbook. "Chapter ١: "The evolution of project management". McGraw-Hill Professional, ٢٠٠٦. ISBN ٤-١٤٦٠٤٥-٠٧-٠.

١٨. David I. Cleland, Roland Gareis (٢٠٠٦). Global Project Management Handbook. McGraw-Hill Professional, ٢٠٠٦. ISBN ٤-١٤٦٠٤٥-٠٧-٠. p.٤-١ states: "It was in the ١٩٥٠s when project management was formally recognized as a distinct contribution arising from the management discipline".

١٩. Dennis Lock (٢٠٠٧) Project Management (٩th ed.) Gower Publishing, Ltd., ٢٠٠٧. ISBN ٣-٠٨٧٧٢-٥٦٦-٠.

٢٠. Department Of Information Resources "Process for Analyzing and Managing Project Risk " State of Taxes, Jan ٢٠٠٢.

Page 83: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

٢١. Department of Information Resources “Process for Analyzing and Managing Risk” (State of Texas, January ٢٠٠٢).

٢٢. Edward R. Marsh (١٩٧٥). "The Harmonogram of Karol Adamiecki". In: The Academy of Management Journal. Vol. ١٨, No. ٢ (Jun., ١٩٧٥), p. ٣٥٨. (online)

٢٣. European Union Project Cycle Management Guidelines, March ٢٠٠٤. ٢٤. Guide to the Project Management Body of Knowledge (PMBOK® Guide). ٢٥. Harold Kerzner (٢٠٠٣). Project Management: A Systems Approach to

Planning, Scheduling, and Controlling (٨th Ed. ed.). Wiley. ISBN ٤٧١-٠-٠-٢٢٥٧٧.

٢٦. Horgan M. and Roulston f. "Project Control Of Engineering Contracts "( E& F.USA –NY, ١٩٩٨.

٢٧. J. Heeny "Protection against non-commercial risks in Patent Licensing of World Trade Law.

٢٨. James P. Lewis (٢٠٠٠). The project manager's desk reference:: a comprehensive guide to project planning, scheduling, evaluation, and systems. p.١٨٥

٢٩. Jason Westland - The_Project_Management_Life_Cycle_٢٠٠٦. ٣٠. Jörg Becker, Martin Kugeler, Michael Rosemann (٢٠٠٣). Process

management: a guide for the design of business processes. ISBN ٥٤٠-٣-٩٧٨-٣-٤٣٤٩٩. p.٢٧.

٣١. Joseph Phillips (٢٠٠٣). PMP Project Management Professional Study Guide. McGraw-Hill Professional, ٢٠٠٣. ISBN ٢-٢٢٣٠٦٢-٠٧-٠ p.٣٥٤.

٣٢. Lewis R. Ireland (٢٠٠٦) Project Management. McGraw-Hill Professional, ٢٠٠٦. ISBN ١٤٧١٦٠-٠٧-٠-X. p.١١٠.

٣٣. Management: a structured approach . Gower Publishing, Ltd., ٢٠٠٤. ISBN ٠-٨-٠٧٨٢٢-٥٦٦. p.٣٤.

٣٤. Martin Stevens (٢٠٠٢). Project Management Pathways. Association for Project Management. APM Publishing Limited, ٢٠٠٢ ISBN ٠١-٩٠٣٤٩٤-١-X p.xxii.

٣٥. Morgen Witzel (٢٠٠٣). Fifty key figures in management . Routledge, ٢٠٠٣. ISBN ٠-٣٦٩٧٧-٤١٥-٠. p. ١٠١-٩٦.

٣٦. O'Neill Michael "Contractual Risk Transfer "(International Risk Management Institute, ٢٠٠٢.

٣٧. Organization des Nations – Units pour le Development Industrial , Vienne , L'industrie de la Construction ,New York , ١٩٧١.

٣٨. Paul C. Dinsmore et al (٢٠٠٥) The right projects done right! John Wiley and Sons, ٢٠٠٥. ISBN ٨-٧١١٣-٧٨٧٩-٠. p.٣٥ and further.

٣٩. Peter Nathan, Gerald Everett Jones (٢٠٠٣). PMP certification for dummies. p.٦٣.

٤٠. Prichard Ron “The Limits Of Planning” (International Risk Management Institute, ٢٠٠٢).

٤١. Project Management Institute (١٩٩٨) ١٩٩٧ PMI Annual report – a time of transition, PM Network, August, ١٢.

٤٢. Project Management Institute “Guide to the Project Management Body of Knowledge”-(Newtown square, Pennsylvania,USA,٢٠٠٠).

Page 84: Walid Oraby “Risk Management Process Planning” Part - 2.pdf · Walid Oraby “Risk Management Process Planning” (AUC, Master thesis December, ٢٠٠٣). ٥٢. Winston W. Royce

٤٣. Project Risk Management-David T.Hulett,senior Vice President, Schedule Risk Analysis Simplified.

٤٤. Risk Management in Construction Project Networks, Anna Klemetti. ٤٥. Risk management in the conceptual phase of a project, Thomas E Uher and

A Ray Toakley. ٤٦. Rodger Chris and Jason Petch “Uncertainty&Risk Analysis” (UK,Price

Water House, April ١٩٩٩). ٤٧. Royer, P.S., Risk Management: The Undiscovered Dimension of Project

Management, Project Management Journal, ٢٠٠٠, Vol.٣١, No.١, pp. ١٣-٦. ٤٨. Stellman, Andrew; Greene, Jennifer (٢٠٠٥). Applied Software Project

Management. O'Reilly Media. ISBN ٩-٠٠٩٤٨-٥٩٦-٠-٩٧٨. ٤٩. The Definitive Guide to Project Management. Nokes, Sebastian. ٢nd Ed.n.

London (Financial Times / Prentice Hall): ٢٠٠٧. ISBN ٤-٧١٠٩٧-٢٧٣-٠-٩٧٨. ٥٠. The institution of Civil Engineers “An Introduction to Engineering

Economics " (GB, William Clowes & Sons. Ltd., ١٩٧٦). ٥١. Walid Oraby “Risk Management Process Planning” (AUC, Master

thesis December, ٢٠٠٣). ٥٢. Winston W. Royce (١٩٧٠). "Managing the Development of Large

Software Systems" in: Technical Papers of Western Electronic Show and Convention (WesCon) August ١٩٧٠ ,٢٨–٢٥, Los Angeles, USA.

٥٣. World Bank The Construction Industry ;" Issues and strategies in countries " (Washington D.C. ١٩٨٤ ).

٥٤. Young-Hoon Kwak (٢٠٠٥). "A brief History of Project Management". In: The story of managing projects. Elias G. Carayannis et al. (٩ eds), Greenwood Publishing Group, ٢٠٠٥. ISBN ٢-٥٠٦-٥٦٧٢٠-١.

: المواقع اإللكترونية

١. http://new.talaatmoustafa.com,date: ١٠.٨.٢٠١٢

٢. http://www.palmhillsdevelopments.com, date: ١٠.٨.٢٠١٢ .

٣. http://www.sodic.com,date:١٠.٨.٢٠١٢

٤. http://www.palisade.com/decisiontools_suite date: ٢٠.٦.٢٠١٢

٥. http://en.wikipedia.org/wiki/Project_management date: ١٥.٣.٢٠١٢

٦. http://www.stellman-greene.com/aspm/. Date:١٩.٣.٢٠١١

٧. http://www.alexbank.com/AR_index.aspx -date:١٠.٩.٢٠١٢

٨. http://greenprojectmanagement.org/certification,date:٢٥.٦.٢٠١٠

٩. http://www.mpm-me.com date:٧.١٠.٢٠٠٩

١٠. http://www.theirm.org/publications/documents/Risk_Management_Standard

_٠٣٠٨٢٠.pdf.date: ٢٦.٢.٢٠١٠