Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
Slide 1
Waldorf Urban Redevelopment
Area (WURC)
March 10, 2020
Presenters
Jason Groth, Planning Director
Taylor Yewell, Redevelopment Manager
Plans & Challenges
Slide 2
WURC: Plans & Challenges
Summary of the issue:
The WURC Zoning has created challenges for property
owners in the area for:
• Commercial/Light Industrial Uses
• Expansion of Non-conforming Uses
• New Uses/Leases of Existing Buildings
• New construction to a lesser degree
• Requirements placed upon new users of an existing building
• Concerns over parking improvements and new sidewalks
Slide 3
Evolution of the WURC
Quick History
✓ 1992 & 1997 Comprehensive Plans establish Waldorf
as our area to focus development intensity
✓ 2004 Waldorf Sub-Area Plan designates a Transit
Oriented Development (TOD) Corridor along MD 925
✓ 2008 Waldorf Urban Design Study (WUDS) refines
the boundary of the Waldorf Redevelopment Area
✓ 2010 Waldorf Urban Redevelopment Corridor
established creating two new zoning districts
• Waldorf Center (WC) & Acton Urban Center (AUC) zones
• Infrastructure Plan Developed 2013
• ~$30 Million Capital Improvement Program established
Slide 7
Challenges for Today
Existing Buildings and Re-use of
Developed Properties
• Non-Conforming Uses in the WURC Zones
• Time Limitations to keep “Grandfathered” Status
• Mix of compatible uses - Surrounding uses tend to
be Commercial/Light Industrial
• Lack of marketability and Inability to lease existing
buildings
• Requirements to enhance the existing property or
Public Amenities
Slide 8
Challenges for Today
New Development
• Reduced Front Setbacks / Parking in rear of Building
• Frontage along Street (80% Minimum)
• Minimum Building Height (# of Stories)
• Parking Requirements
• Urban Design Requirements
• Larger Sidewalks, Street Trees, Street Lights, etc.
Slide 9
Previous Transitional Zoning
Changes for the WURC
Zoning Text Amendment (ZTA 13-132)
• Identified problems with meeting
redevelopment codes adopted in 2010 (size,
design-height, mix of uses, parking)
• Urban vs. Suburban Standards
• Met with property owners for over a year
• Drafted interim regulations
• Keep ability to meet overall vision, relief for
small development
Slide 10
Previous Transitional Zoning
Changes for the WURC
Details of Zoning Text Amendment (ZTA 13-132):
• Assist small business and property owners to
continue their operations while we transition over time
to a mixed use, TOD center
• Provides for a transitional time period based on sewer
availability
• Allows expansion of existing uses on site
• Permits projects to be phased in over time
• Keeps overall vision in place – allows smooth
transition
Slide 11
Previous Transitional Zoning
Changes for the WURC
ZTA 13-132 - Transitional Criteria
• Time: Two(2) years from when sewer is
available
• Uses can continue as permitted vs. non-
conforming
• Reduces building frontage on the street
• One (1) story height in north (AUC), Two (2)
story in south (WC)
• No floor area (lot coverage) restrictions
• Flexible parking
Slide 12
Recent Concerns Raised:
• Continued inability to lease existing property
• Non-confirming Status limiting ability to expand
• Sidewalks required for re-use of a property/building
Slide 13
Recommended Actions:
• Review the specific cases raised
• Determine if there is a need to accommodate changes
If needed…
• Develop modifications to the Transition Provisions
• Process resulting Text Amendments
Slide 14
Presented By:
Charles County Government
Department of Planning & Growth
Management(301) 645-0692 • [email protected]
200 Baltimore Street – La Plata, MDMD Relay Service: 7-1-1
Equal Opportunity EmployerIt is the policy of Charles County to provide equal employment opportunity to all persons regardless of race,
color, sex, age, national origin, religious or political affiliation or opinion, disability, marital status, sexual
orientation, genetic information, gender identity or expression, or any other status protected by law.
www.CharlesCountyMD.gov