1. INTRODUCTION

1.1 This Hearing Statement is prepared on behalf of Newmarket Lane

Limited in respect of Matter no. 14.

1.2 Newmarket Lane Limited has extensive land holdings at

Newmarket within and adjacent to the existing ES10 allocation. A

large part of the ES10 allocation is substantially built out, or is in

the process of being built out, with other parts of it and the adjacent

land the subject of current planning applications. Newmarket Lane

Limited is working alongside the other substantial Landowner at

Newmarket, Network Space Limited. Network Space Limited and

Newmarket Lane Limited have entered into an agreement in which

they will mutually exchange areas of land at Newmarket in order to

facilitate comprehensive development of land within and outwith of

the ES10 allocation for employment use. Newmarket Lane Limited

and Network Space Limited are working together, both in respect

of development proposals and also in respect of local plan

representations

1.3 This document addresses the Inspector’s issues and questions and

should be read in conjunction with Newmarket Lane Limited’s

December 2020 representations to the publication Wakefield Local

Plan 2036. Newmarket Lane Limited wishes to attend and

participate in the hearing in relation to his matter.

2. MATTER 14 - KNOTTINGLEY INCLUDING FERRYBRIDGE

DEVELOPMENT SITES

Issue

49569527.1

2

Are the proposed housing allocation, employment allocations and

special policy areas in Knottingley justified, effective,

developable/deliverable and in line with national policy.

2.1 LP75 – land at Ferrybridge C Power Station, Strang Land Lane

(Employment)

2.1.1 Colliers International on behalf of Newmarket Lane Ltd

have reviewed the allocation of LP75 which was originally

allocated in the Wakefield District Local Development

Framework Adopted 12th September 2012 in relation to

the same site:

“EZ 18 LAND AT FERRYBRIDGE POWER STATION,

FERRYBRIDGE - Within this zone permissible

development proposals will be restricted to employment

development directly associated with power generation

and related infrastructure, including the generation of

renewable energy. Future development proposals must

recognise, conserve and enhance the Fryston Park Wood

Local Wildlife Site, which is situated in this zone.

Development must also take full account of the parts of

the site affected by flood zones. ……The site coincides

with an area of high archaeological potential therefore a

desk-based archaeological assessment will be required,

but if this cannot assess the interest a field evaluation will

be required. The site has potential ecological value and

an ecological survey is required. The creation of an

Employment Zone on part of the operational land at

Ferrybridge Power Station, for power generation and

associated uses related infrastructure only will encourage

49569527.1

3

investment in power generation, including generation from

renewable energy sources.”

2.1.2 In 2012 construction began of a new 68MW low-carbon

power station known as ‘Ferrybridge Multifuel 1’. It

occupied 16.8 ha (41.5 ha) of land within the larger

Ferrybridge site and was opened three years later. The

plant is operated by a joint venture between the site owner

SSE and Wheelabrator Technology Inc.

2.1.3 In 2014, the same joint venture partners submitted a

Development Consent Order (DCO) application to gain

consent to develop a second larger (50MW) Multifuel

project at the Ferrybridge Power Station site, known as

Ferrybridge Multifuel 2 (FM2). Following the receipt of the

necessary consent, construction was undertaken, the

plant being formally opened in December 2019.

2.1.4 In July 2019 SSE’s contractors began demolition of the

first of eight cooling towers at the Ferrybridge site with

demolition of 5 of them due to complete by mid-2021.

2.1.5 More recently SSE instructed agents JLL to seek a

purchaser for the remaining land at the Ferrybridge site

comprising two separate parcels:

Phase 1 – 68 ha (168 acres) located to the east of the

power plant and abutting the River Aire. The site is

split into three irregular shaped plots of land

dissected by operational rail infrastructure. This will

limit the size and shape of the industrial units able to

be accommodated on site and we estimate that only

around 75% of the site will be developable, equating

49569527.1

4

to 51 ha (126 acres). Of this area 10.1 ha (25 acres)

is already occupied as a plasterboard factory (leased

to the tenant till 2056) suggesting a net developable

area of 40.9 ha (101 acres). Using the industry

standard measure of development density this land

area would be expected to accommodate circa

162,580 m2 (1.75m sq ft) of industrial buildings. The

agent’s particulars (see Appendix 3) state that the

site is being remediated but that structures adjacent

to the riverside are still to be cleared.

Phase 2 – approximately 8.1 ha (20 acres) of land

located at the centre of the site and split into two

irregular shaped areas. The agent’s state that Phase

2 ‘maybe offered to the preferred purchaser in due

course’. Our estimate is that the site is unlikely to be

able to accommodate a unit over 9,290m2 (100,000

sq ft) if it is to be offered for sale at a later stage.

2.1.6 The site represents a significant development opportunity,

but it is very complex:

(i) As part of its dialogue with the public prior to the formal

stage of consultations regarding the new power station in

late 2018, SSE issued the following plan which shows

significant areas of the site affected by proposed ‘gas

corridors’. The effect of these corridors may severely

restrict the layout and size of development on the vacant

land resulting in a significant reduction in the net

development compared with our calculations above. We

are unsure of the current status of these corridors.

49569527.1

5

(ii) The agent’s particulars suggest that three of the existing

cooling towers will be left on site for use by the new

combined cycle gas turbine (CCGT) power plants. The

presence of the cooling towers and the new CCGT

facilities may deter potential market interest as the towers

are considered unattractive and there may be concerns

regarding the air quality and noise produced by the plants.

(iii) Development of the site is restricted by its existing Local

Plan allocation under policy EZ18 which states

“Within this zone permissible development proposals will

be restricted to employment development directly

associated with power generation and related

infrastructure, including the generation of renewable

energy”.

With this policy restriction in place, it would severely

restrict the likelihood of the site being of interest to the

general development market. It is understood why there

is a strategic need to keep the permissible development

restriction in place for this site, although it may be beyond

49569527.1

6

the Plan period before another power related occupier is

identified for it.

(iv) In their details (Appendix 3), the agent’s state that the

large former coal yards within Phase 1 contain made

ground and also falls within Flood Zone 2 (medium risk);

however, the lower extents of the area fall within Flood

Zone 3 (high risk). These are factors which also may

impact on both the viability of development on the site and

its deliverability.

(v) The need to preserve the Fryston Park Wood Local

Wildlife site identified on the Draft Plan significantly

reduces the developable area of the site and fragments it.

(vi) There is a Safeguarding Mineral Protection area along the

eastern edge of the site which may not be compatible with

commercial development occurring immediately adjacent

to it, further reducing the developable area.

(vii) The agents state that the purchaser is expected to

assume the responsibility for the operational railway line

running through the Phase 1 land and which serves the

existing plaster board plant. Some developers, funder and

investors may not be comfortable with any potential

liabilities associate with this responsibility.

(viii) It is not clear whether the existing highway infrastructure,

both on-site and off-site, is capable of fully

accommodating any proposed development without

significant upgrading works.

49569527.1

7

(ix) The site is at the eastern extremity of the Wakefield

District. It is relatively remote from the main built up areas

of the West Yorkshire conurbation. Operators considering

the site for B2/B8 development will almost certainly wish

to test the labour availability if they were to locate at the

site, particularly given the significant impact on workforce

availability of the nearby existing 111,500 m2 (1.2m sq ft)

TKMaxx development and the 47,840 m2 (515,000 sq ft)

Wakefield 515 development which has just begun to be

constructed on site on the remainder of the Trinity Farm

site. Given the availability of deliverable site options closer

to the M1/M62 interchange, many operators would prefer

it in terms of its increased labour catchment, proximity to

the West and South Yorkshire markets and improved

public transport availability.

2.1.7 In view of our comments it is uncertain how much, if any

of the SSE site will be able to realistically respond to

general (non-power related) demand for employment land

during the emerging Local Plan period and, in particular,

to respond to the forecast demand for large B2/B8 units

identified in Cushman & Wakefield’s Industrial Land

Market Assessment of March 2018.

2.1.8 The Ferrybridge site was being brought to the market by

JLL representing SSE with bids sought before 6th

November 2019. We understand that the sale to a

potential purchaser has been stopped and that it is SSE’s

intention to remarket the site later this year. We are

49569527.1

8

uncertain as to the reason for an existing sale not

progressing.

2.1.9 Since then we have spoken with parties who were

interested in the site but were deterred from considering it

because of the site issues identified above and the

conflicting requirements of the landowner’s operational

strategy with private sector development of the site for the

general industrial market.

2.1.10 We remain of the opinion that this is a secondary site

which, at best might see development of up to 62ha (154

acres). However, it is only likely to be attractive to heavy

industrial users and there is no guarantee that the reduced

site area would be developed out within the plan period.

Given the problems that this site has and the uncertainties

over its deliverability and availability it should not be

allocated at this stage.

3. LP227 – LAND AT SHILLING HILL (EMPLOYMENT)

Site LP 227 is the largest 21.7 ha (53.62 acres) of a cluster of sites

at Shilling Hill. It is the only site likely to be capable of

accommodating large scale warehousing and distribution units.

The land is dissected by the route of the South Knottingley Relief

Road (LP777) which we understand is a confirmed route but is not

programmed or funded. Uncertainty over the delivery of the new

road, which we understand to be necessary to open up the land for

development, will constrain its ability to contribute towards

Wakefield’s employment land supply within the plan period. The

49569527.1

9

cost of the new highway infrastructure may also constrain delivery

of the site.

The site has not to our knowledge been marketed although it was

allocated as part of Wakefield’s adopted Core Strategy Policy Map

2012.

4. LP537 – LAND SOUTH OF KNOTTINGLEY (EMPLOYMENT)

This large site of 168ha (415 acres) represents one of the most

significant employment allocations in the emerging plan. The site is

level and in the control of a developer. However, if allocated, its

deliverability and capacity are likely to be determined by a series of

factors:

4.1 Approximately 50% of the combined LP537/LP1278 site

South of Knottingley appears to be safeguarded for mineral

production as identified on the Initial Draft Policies Map. It

isn’t clear what elements of the site would therefore be able

to realistically respond to the future demand for employment

development within the Local Plan period given the potential

lack of compatibility between mineral extraction/production

and modern commercial development.

4.2 The access to the site from the motorway network appears

to be via the Leys Road exit from the A1 and then via

Havercroft Lane leading to Hedgewood Lane into part of the

site. Alternatively, Leys Road may provide access. In either

case the existing highway infrastructure appears to require

significant upgrading, probably including alterations to the

access to and from the A1. In its representations in respect

of the emerging Plan, Highways England state:

49569527.1

10

“The site is located adjacent to the SRN, namely M62

Junction 33. In addition, the site forms part of a wider

cumulative impact within the Knottingley area / cluster of

sites adjacent to M62 Junction 33 that could severely impact

the SRN, and this cumulative impact will need to be

considered by the Council. It is considered that the site will

severely impact upon the capacity, operation and safety of

the SRN, and this will be identified through the transport

evidence base being prepared by the Council / the individual

assessment of the transport implications of the site by the

site’s promoters.”

Costs associated with any off-site highway requirements

could be significant and may affect the site’s viability and

deliverability.

4.3 There is a significant exclusion from the site which contains

two clusters of farm buildings, (both including a farmhouse)

together with a cluster of other residences. It is not clear

what the impact on these residences would be in terms of

the proposed commercial development on the land adjacent.

Certainly, the farms and houses (accessed by a private

road) fragments the site and, in conjunction with the mineral

production safeguarded area may result in parts of the site

being difficult to access and develop.

4.4 The 2102 Local Plan Review references the possible loss of

good quality agricultural land and the potential for

archaeology as considerations in determining future

planning application at any of the adjoining sites. There is

therefore a good possibility that similar concerns may apply

49569527.1

11

to site LP 537/LP 1278 which may slow the potential delivery

of the site or result in development not being possible at all.

4.5 The site is at the eastern extremity of the Wakefield District.

It is relatively remote from the main built up areas of the

West Yorkshire conurbation. Operators considering the site

for B2/B8 development will almost certainly wish to test the

labour availability if they were to locate at the site,

particularly given the significant impact on workforce

availability of the massive TKMaxx and Wakefield 515

developments on the former Trinity Farm site close by.

Given the availability of deliverable site options closer to the

M1/M62 interchange than this site, it is our opinion that many

operators may prefer them given their increased labour catchment,

proximity to the West and South Yorkshire markets and improved

public transport availability.

5. PROPOSED CHANGES

• Site LP75 (Ferrybridge Sea Power Station) should be

removed from being allocated as it is not deliverable within

the plan period.

• Site LP227 – land at Shillinghill should be removed from

the allocation as its delivery is not proven.

• Site LP537 – land south of Knottingley should be

safeguarded rather than allocated given there are clear

uncertainties over its deliverability.

49569527.1

12

APPENDIX

EE

EE

E E E E E E EE

E

E

E E

EE

EE

E

E E E E E E E E E

EE

EE

EE

EE

EEE

EE

EEE

EE

E

EE

EE

EE

EE

EE

EE

EE

EE

1 in 40 Longfall1 in 20 Longfall (max) 1 in 40 Longfall1 in 20 Longfall (max)

E E

E E

E E E E E E E E E E EEEEEEEEEEEE

EEEEE

EEE

E

EEEEEEEEEEE

E

E

E

6

3

6

4

7

3

49

28.0m

1

1

3

2

9

3

2

S

T

P

E

T

E

R

'S

C

R

E

S

C

E

N

T

1

M

O

O

R

H

O

U

S

E

T

E

R

R

A

C

E

6

8

1

1

1

1

Smallholding

N

E

T

T

L

E

T

O

N

S

T

R

E

E

T

3

9

H

O

L

M

F

I

E

L

D

C

H

A

S

E

1

0

8

8

7

5

2

3

8

3

7

7

24.7m

M

E

A

D

O

W

F

IE

L

D

R

IS

E

The

1

1

3

M

O

O

R

H

O

U

S

E

A

V

E

N

U

E

S

C

A

R

T

H

T

E

R

R

A

C

E

6

77

3

1

0

0

1

3

1

1

2

4

2

6

2

4

9

5

3

2

5

3

3

6

5

B

A

R

K

E

R

S

T

R

E

E

T

El Sub Sta

1

1

2

7

6

2

1

65

S

T

P

E

T

E

R

'S

C

R

E

S

C

E

N

T

4

8

7

12

7

7

2

C

H

A

R

L

E

S

W

O

R

T

H

P

L

7

3

5

8

6

1

5

0

2

4

1

22.3m

17.4m

1

6

15.5m

2

23.5m

2

5

1

Altofts Ings

20.7m

1

6

5

23.2m

B

o

tto

m

B

o

a

t

1

9

9

T

r

a

c

k

D

r

a

i

n

FB

1

5

7

R

e

a

c

h

2

0

9

1

3

9

1

4

9

15.8m

7

4

1

6

7

14.9m

F

o

x

h

o

le

s

Cringlesworth

R

e

a

c

h

16.2m

8

2

4

10

14

16

1

8

1

9

2

1

3

5

2

3

2

9

3

0

4

2

C

R

C

R

7

1

0

4

3

3

4

8

3

5

4

5

5

5

9

6

4

M

O

O

R

H

O

U

S

E

G

R

O

V

E

5

4

9

1

6

4

TCB

8

3

4

LB

2

9

3

2

0

4

4

7

3

1

2

4

6

3

2

4

2

A 642

2

1

7

8

6

1

2

6

4

1

1

3

3

7

1

1

2

2

1

4

5

.

4

m

2

9

M

O

O

R

H

O

U

S

E

C

L

5

1

C

A

S

T

L

E

G

A

T

E

55.9m

2

5

5

6

1

B

6

1

3

5

43.7m

The Bungalow

2

6

Sinks

31.7m

Issues

Cottage

8

0

Dra

in

Sinks

1

3

9

The Lanes

Issues

D

r

a

i

n

ET

L

1

3

0

31.0m

Sinks

Garden

1

2

0

29.9m

1

4

1

D

r

a

in

Issues

44.4m

Issues

1

3

2

Issues

22.0m

Sinks

8

7

FB

9

4

D

r

a

in

Sinks

D

r

a

i

n

D

r

a

i

n

D

r

a

in

Farm

Cringlesworth

7

1

Methley Lanes

P

a

th

(

u

m

)

3

1

LB

8

1

4

9

D

ra

in

2

1

ET

L

15.2m

Savile Park

6

3

Shafts

3

9

Bight

Foxholes

21.2m

5

1

1

4

0

The Old School House

EK

U

n

d

C

F

C

P

U

n

d

CF

CFCo Const Bdy

Und

Boro Const & Met Dist Bdy

C

F

C

F

Und

U

n

d

C

F

R

iv

e

r C

a

ld

e

r

Pond

B

O

T

T

O

M

B

O

A

T

R

O

A

D

R

i

v

e

r

C

a

l

d

e

r

T

r

a

c

k

8

M

O

O

R

H

O

U

S

E

V

I

E

W

5

6

M

O

O

R

H

O

U

S

E

A

V

E

N

U

E

5

1

A

B

E

R

F

O

R

D

R

O

A

D

B

6

1

3

5

Springs Wood

M 62

NE

WM

AR

KE

T L

AN

E

H

U

N

G

A

T

E

L

A

N

E

R

i

v

e

r

C

a

l

d

e

r

N

E

W

M

A

R

K

E

T

L

A

N

E

B

6

1

3

5

Pond

C

o

C

o

n

s

t

&

W

a

r

d

B

d

y

C

o

C

o

n

s

t &

W

a

rd

B

d

y

C

o

C

o

n

s

t

&

M

e

t

D

i

s

t

B

d

y

C

o C

onst &

W

ard B

dy

LB

House

Farm

5

5

5

West Hall

El Sub Sta

5

5

1

Newmarket

T

r

a

c

k

L

a

y

-

b

y

Spring Cottage

Meadow House

2

3

3

2

4

9

D

is

m

a

n

t

le

d

R

a

ilw

a

y

D

is

m

a

n

tle

d

R

a

ilw

a

y

1

2

5

D

is

m

a

n

t

le

d

R

a

ilw

a

y

Workings (dis)

Ford

Gantry

Pond

P

a

t

h

(

u

m

)

Bottom Boat

7

2

b

7

2

a

6

8

7

2

Heap

(dis)

West Hall Villa

B 6135

Lay-by

Lay-by

ESS

Power Station

P

a

th

(

u

m

)

D

r

a

i

n

Pond

Pond

T

r

a

c

k

P

o

n

d

P

a

t

h

(

u

m

)

P

a

t

h

(

u

m

)

Posts

Mast

(Telecommunication)

Play Area

Pond

Playing Field

Shelter

Shelter

3

1

5

9

T

r

a

c

k

215

T

ra

c

k

Stoney Lane

M

6

2

Play Area

P

a

th

(

u

m

)

Path (um

)

El Sub Sta

Cottage

Kingsland Primary School

3

7

Rising Sun

Tank

Pond

N

Scale Bar & North Arrow

SCALE 1:2500

0 50 100 150 200

LOCATION PLAN: NOTES:

REVISIONS

Do not scale this drawingashton smith to be notified of discrepancies in figured dimensions

Contractors must check all dimensions from siteThis drawing is copyright and is for use on this site only

This drawing is to be used solely for information as entitledFor other information refer to the latest revision of any cross referenced drawing

DESCRIPTIONDATEREV DRAWN BY CHECK BY

CLIENT

JOB

NO

.

Ashton Smith, Belvedere House, 2 Victoria Avenue, Harrogate, North Yorkshire, HG1 1ELTel: 01423 522882 Fax: 01423 565104

www.ashtonsmith.co.uk

PROJECT TITLE

DRAWING TITLE

DRAWING NO.

REVISION

STATUS DRAWN BY CHECKED BY

SCALE

RIBA STAGE

SHEET SUITABILITYDATE

A1 P1

ADAAPLANNING2

LAND PROPOSED FOR ALLOCATION IN THEWAKEFIELD LOCAL PLAN BY NEWMARKET LANELIMITED

S005/10/2021

2108

7

NML1 - ASA - VS - VS.ZZ - D - A - PL100 _ (S0 - P1)

NEWMARKET LANE, WAKEFIELD

1 : 2500

PROPOSED SITE PLANSCALE - 1:2500

LAND PROPOSED FOR ALLOCATION IN THE WAKEFIELD LOCAL PLAN BYNEWMARKET LANE LIMITED

P1 05/10/2021 FIRST ISSUE AA AD

NEWMARKET LANE

PLOT 7ANEWCOLD

PLOT 7BKITWAVE

PLOT 8

PLOT 6

PLOT 4AMAZON

A642

WAK

EFIE

LD R

OAD

NEWMARKET LANE

PLOT 7C