Upload
sarah-dean
View
215
Download
2
Embed Size (px)
DESCRIPTION
Work at height
Citation preview
Sheet1FALL HAZARD CONTROLACTVITIES (needs working above ground level)1Changing of tubelight/bulb in offices2Painting & cleaning inside & outside office3A/c maitenance/installation4faade cleaning5Online connections by plumber6Riser installation7MCV, copper tubing & meter installation inside kitchen8compressor maintenance9keeping files/things inside the cubborad10painting/maintenance of tanks (water tanks in CGS)11To tie the rope of zoola/ harness on permanent structure on roof top12Excavation of trench on roads and societies13Riser regulator and meter installation with piping for I&C customers14Steel valve chamber cleaning15Steel piping upstream and downstream of compressor16Logistic of materials outside and inside of godown17Overhead safety and other sundry item installation
Sheet2
Sheet3