FALL HAZARD CONTROL ACTVITIES (needs working above ground level) 1 Changing of tubelight/bulb in offices 2 Painting & cleaning inside & outside office 3 A/c maitenance/installation 4 façade cleaning 5 Online connections by plumber 6 Riser installation 7 MCV, copper tubing & meter installation inside kitchen 8 compressor maintenance 9 keeping files/things inside the cubborad 10 painting/maintenance of tanks (water tanks in CGS) 11 To tie the rope of zoola/ harness on permanent structure o 12 Excavation of trench on roads and societies 13 Riser regulator and meter installation with piping for I&C 14 Steel valve chamber cleaning 15 Steel piping upstream and downstream of compressor 16 Logistic of materials outside and inside of godown 17 Overhead safety and other sundry item installation

WAH Activities

Embed Size (px)

DESCRIPTION

Work at height

Citation preview

Sheet1FALL HAZARD CONTROLACTVITIES (needs working above ground level)1Changing of tubelight/bulb in offices2Painting & cleaning inside & outside office3A/c maitenance/installation4faade cleaning5Online connections by plumber6Riser installation7MCV, copper tubing & meter installation inside kitchen8compressor maintenance9keeping files/things inside the cubborad10painting/maintenance of tanks (water tanks in CGS)11To tie the rope of zoola/ harness on permanent structure on roof top12Excavation of trench on roads and societies13Riser regulator and meter installation with piping for I&C customers14Steel valve chamber cleaning15Steel piping upstream and downstream of compressor16Logistic of materials outside and inside of godown17Overhead safety and other sundry item installation

Sheet2

Sheet3