1. Length over Headstock (mm) 10034
2. Length over couplers (mm) 10963
3. Width inside/Width overall (mm) 3345 / 3450
4. Height inside/Height max. from R.L.
(mm)
3024 / 4305
5. Axle Load (T) 22.9
6. Tare Weight (T) 20.8
7. Pay Load (T) 70.8
8. Gross Load (Pay+Tare) 91.6
7/29/2019 Wagon Training
3/51
BOXNHL
7/29/2019 Wagon Training
4/51
BOXNHL
7/29/2019 Wagon Training
5/51
BOSTHS
7/29/2019 Wagon Training
6/51
BOSTHS
7/29/2019 Wagon Training
7/51
BOSTHS
7/29/2019 Wagon Training
8/51
BOXNHS
7/29/2019 Wagon Training
9/51
BCNHS
7/29/2019 Wagon Training
10/51
BTPN
7/29/2019 Wagon Training
11/51
1 Track Gauge 1676 mm
2 Axle Load 20.32 T
3 Carrying Capacity 54.28 T
4 Tare 27.00 T
(approx.)
5 Volumetric Capacity 70.40 Cu.m
6 Length over Coupler Faces 12420 mm
7 Diameter of Barrel (inside) 2850 mm
8 Overall Width 3126 mm
9 Overall Height 4265 mm
7/29/2019 Wagon Training
12/51
BRNAHS
7/29/2019 Wagon Training
13/51
BOBRNHS
7/29/2019 Wagon Training
14/51
BOBRNHS
1. Length over Headstock (mm) 9671
2. Length over couplers (mm) 10600
3. Width inside/Width overall (mm) 3340 / 3500
4. Height inside/Height max. from R.L.
(mm)
2466 / 3735
5. Axle Load (T) 22.32
6. Tare Weight (T) 25.61
7. Pay Load (T) 63.67
8. Gross Load (Pay+Tare) 89.28
7/29/2019 Wagon Training
15/51
BLCA
7/29/2019 Wagon Training
16/51
BLCA
1. Length over Headstock (mm) 13625
2. Length over couplers (mm) 14566
3. Width over Headstock/Width over Bolster(mm)
2100 / 2200
4. Under frame height max/ Under frame floor
height from R.L. (mm)
1269 / 1009
5. Axle Load (T) 20.32
6. Tare Weight (T) 19.10
7. Pay Load (T) 61.0
8. Gross Load (Pay+Tare) (T) 80.10
7/29/2019 Wagon Training
17/51
BLC B Wagons
7/29/2019 Wagon Training
18/51
BLC B Wagons
1. Length over Headstock (mm) 12212
2. Length over Drawbars (mm) 13165
3. Width over Headstock/Width over Bolster(mm)
2100 / 2200
4. Under frame floor height from R.L. (mm) 1009
5. Axle Load (T) 20.32
6. Tare Weight (T) 18.00
7. Pay Load (T) 61.0
8. Gross Load (Pay+Tare) 79.00
7/29/2019 Wagon Training
19/51
MAIN COMPONENT OF A WAGON
UNDERFRAME
CENTRE SILL CRF SECTION
HEAD STOCK
BOLSTER
SOLE BAR CRF SECTION
STIKER CASTING
DRAFT GEAR BOX
7/29/2019 Wagon Training
20/51
DETAIL OF COMPONENT
CENTRESILL
CRF SECTION
DRAFT GEAR
STIKERCASTING
BOLSTER
CENTERPIVOT
FABRICATEDSTRUCTURE
7/29/2019 Wagon Training
21/51
SIDEWALL
STANCHIONCHANNEL
TOP COPINGANGLE &
SHT
ROOF
ROOFANGLE
SHT
7/29/2019 Wagon Training
22/51
ENDWALL
SHEET
STANCHIONCHANNEL
BOGIE
CASNUB
FABRICATED
7/29/2019 Wagon Training
23/51
7/29/2019 Wagon Training
24/51
Bogie and Wheel Arrangement
7/29/2019 Wagon Training
25/51
Centre Filler Arrangement of BCN HL
7/29/2019 Wagon Training
26/51
Centre Filler Arrangement of BCN HL
7/29/2019 Wagon Training
27/51
Bogie
7/29/2019 Wagon Training
28/51
JOURNAL BOX
7/29/2019 Wagon Training
29/51
Bearing of Wheel
7/29/2019 Wagon Training
30/51
Roof Fitting Arrangement
7/29/2019 Wagon Training
31/51
Roof Fitting Arrangement
7/29/2019 Wagon Training
32/51
Cross Bar at Fixture
7/29/2019 Wagon Training
33/51
Center Pivot
7/29/2019 Wagon Training
34/51
HULK BOLT
7/29/2019 Wagon Training
35/51
Bolster In Fabrication Stage
7/29/2019 Wagon Training
36/51
Door of Hopper Wagon
7/29/2019 Wagon Training
37/51
End Wall In Fabrication Stage
7/29/2019 Wagon Training
38/51
Stanchion Channel For
7/29/2019 Wagon Training
39/51
CRF SECTION FOR CENTRE SILL
7/29/2019 Wagon Training
40/51
Main Pull Road Long
7/29/2019 Wagon Training
41/51
Coupler
7/29/2019 Wagon Training
42/51
7/29/2019 Wagon Training
43/51
Coupler
7/29/2019 Wagon Training
44/51
Coupler in use
7/29/2019 Wagon Training
45/51
Draft Gear
7/29/2019 Wagon Training
46/51
Draft Gear
7/29/2019 Wagon Training
47/51
Draft Gear
7/29/2019 Wagon Training
48/51
Brake Cylinder
7/29/2019 Wagon Training
49/51
Brake Cylinder
7/29/2019 Wagon Training
50/51
Arrangement of Brake System
7/29/2019 Wagon Training
51/51
Brake Diagram