Wagon Loader System

Embed Size (px)

Citation preview

  • 8/12/2019 Wagon Loader System

    1/12

    Study on

    Utilization of Wagon loading system

    at

    OCL INDIA LIMITED

    Studied & submitted by

    UDAYKUMAR SASTURE

    Date of Visit: 23rdto25th Jan-2013

    TECHNICAL SERVICES

    NEW DELHI

  • 8/12/2019 Wagon Loader System

    2/12

    EXECUTIVE SUMMARY

    The study on wagon loading system has been carried out in order to see the

    feasibility in increasing of no. of cement rakes from the present level 60 nos per

    month.

    During the study the following bottlenecks force to increase the number of

    shunting:

    1. Subhash chowk and Railway gate, people and vehicle traffic obstructingthe shunting of rake.

    2. The single track line at railway gate restricted the entry of rakes (Clinker.Gysum,slag, cement, coal and furnace oil wagon) one at a time

    3. The curvature of track line is more than 12 degree as against the std. 6 to7 degree hence the no. of shunting will be more.

    Based on the time study it is found and possible to load the rakes up to 75 to 80

    (potential 85 nos.) nos every monthas against the present level 60nos with the

    following recommendation:

    Rake arrangement :Presently there is a gap time in receipt of rakes for loading and it works

    out to 260 hrs to 359 hrs in a month.

    It is recommended to arrange the rakes at an interval of every 6 to 7hrs in

    liaison with railway authority so as to ensure the availability of rakes for

    loading.

    Packer feed rate :It is observed that the present packer feed rate works out to 157TPH as

    against the designed capacity 240 TPH. This requires discussion withPacker supplier M/s ENEXCO and study to improve the packer output

    rate further.

    Wagon Tippler line -11 :There is a space for extension of track by another 100 to 150 meters

    which facilitates to accommodate 10 or12 no. of wagons more in addition

    to the present 24nos ( Total-34 to36), thereby the shunting will reduce to

    2 times per rake. This help in availability of loco for cement rake loading.

  • 8/12/2019 Wagon Loader System

    3/12

    Seek line in exchange yard:The extension of the existing seek line track facilitates to convert this

    track to use for stable rake formation in case the power of railway

    authority delays in taking the entire rake formed earlier in turn affect the

    other rake formation as the no. of line available is two.

    Fly over at railway gate:The flyover at railway gate help in shunting of the wagons at a faster rate

    as this is the junction point, without hindering public moment.

    As a result of above the no. of rake loading shall increase to 80nos from presentlevel of 60 Avg./month, thereby the Sales volume and value increases to 54000

    tons and 1.62 crore (approx.) respectively on monthly basis.

  • 8/12/2019 Wagon Loader System

    4/12

    Study on Utilization of Wagon loading system

    at OCL INDIA LIMITED

    1.0OBJECTIVE:To study the utilization of packing machines and its associated activities right from the

    receipt of Railway wagon, wagon placement and loading in order to suggest

    improvement actions for further increase in the no. of Cement Rake loading

    2.0Methodology:Time study

    To arrive at the cycle time of the wagon loader. Basic data of last six month. Identification of bottleneck

    3.0OBSERVATIONs & RECOMMENDATION:The finished Product (cement) of different grades is being dispatched by

    Rail and Road

    Based on the six month data analysis it is works out that about 70% of cement being

    dispatched through Rail and rest by road.

    The rake of cement and other raw materials( Slag, Gypsum, coal)to be loaded/unloaded

    are bringing to the exchange yard from the main station ( Rajgangpur) located at

    distance of 2.0 km away.

    The intimation of receipt of railway wagon is being received 2 hrs. Well in advance.

    The cement Rakes comprises of the following types of cement wagon

    BCN, BCNA & BCNAH :Each rake consists of 42 nos, of wagon of mixed combination of above types.

    The no. of cement bags to be loaded in wagons varies from 1238 to 1278.

    EXCHANGE YARD:

    The cement wagons to be loaded of 42nos is being brought to exchange yard or

    directly to the packer loading platform from railway station depending on the

    loading platform empty condition by our power loco only.

  • 8/12/2019 Wagon Loader System

    5/12

    There are four lines in exchange yard being used as junction:

    To form the stable cement rake after being loaded, to handover the railwayauthority.

    To bring the Raw materials wagons to be unloaded from railway station.The time taken to bring the wagons from railway main station to the exchange Yard

    is as follows: Min.

    Move with the loco to railway station in case of cement wagon : 07.00 Attached to the rake and coupling : 02.50 Awaiting for Vacuum Pressure build up to 6kg and Release : 15.00 Start move to exchange yard : 17.00

    Total (Min.) : 41.50

    The cement rake of 42 wagons is divided in to three parts at exchange yard as:

    - Wagons 12 nos- Wagons 12nos and- Wagons 18nos

    Bottlenecks in exchange yard:

    1. Subash chowk which is heavy public moment road, the no. of wagonswill accommodating on the approved line of railway authority is

    limited to 36 nos as against the 42nos cement wagons/ 59 nos of raw

    material wagons.

    2. The line-1 and line 2 are critical line cannot be used for keeping thewagons for longer time. These lines are main shunting lines of

    wagons to be loaded / unloaded, are taken inside and outside plant.

    3. There is only one rail line available to take rail wagons inside &outside the plant from the exchange yard through rail gate.

    - Cement for loading and,

    - Slag, Gypsum & Coal for unloading inside the plantThere is also a public cross road between exchange yard and main rail

    entry gate of the plant.

    The entire cement rake is divided in to three parts and taken inside the plant in the

    shortest time (2 to 3 minutes) for the convenience of the public movement to avoid the

    agitation at Railway gate as well as Subhash chowk.

  • 8/12/2019 Wagon Loader System

    6/12

    OPERATION OF RAKES INSIDE THE PLANT:

    The cement wagons to be loaded are taken inside plant (packing plant) at the four loading

    platform as follows:

    Track Line -4:

    The no. of cement wagons to be loaded is allocated 12 or 14 nos as against Max

    20nos. The wagon positioned in the form 3-3-3-3 and time taken to position the

    Same is 15 to 17 minutes.

    Track Line -5 :The no, of cement wagons to be loaded is allocated 12 or 14nos as against Max

    20nos. The wagon positioned in the form 3-3-3-3 and time taken to position the

    Same is 15 to 17 minutes.

    The line 4 and 5 is used for loading of cement wagon by the packers -1 and 2.

    Track Line -1 :The no. of cement wagons to be loaded is allocated 8 or 9 nos as against the 19

    nos. Max. The wagon positioned in the form 2-2-2-3 and time taken to position

    the same is 15 to 17 minutes.

    Track Line -1A :The no, of cement wagons to be loaded is allocated 8 or 9 nos as against 19 nos.

    max. The wagon positioned in the form 2-2-2-3 and time taken to position the

    same is 15 to 17 minutes

    The line 1and 1A is being used for cement wagon loading using the packers -4 and 5.

    Sl.No Packers No. of loaders Platform

    01 Packing Machine-1, 16

    spouts, and discharges on

    two side. Make Enexco,

    DesignCapa-240TPH,5rpm

    Total 4nos - 2 nos for each belt

    discharge of packers

    Track Line -4

    & 5

    02 Packing Machine-2, 16

    spouts, discharge on two

    side. Make Enexco ,Design

    capa-240TPH,5rpm

    Total 4nos - 2 nos for each belt

    discharge of packers

    Track Line -4

    & 5

    03 Packing Machine-3, 16

    spouts, discharge on two

    side. Make Enexco,240tph

    Design,5rpm

    Total 4nos - 2 nos for each belt

    discharge of packers

    Track Line -1

    & 1A

    04 Packing Machine-3, 16

    spouts, discharge on two

    side. Make Enexco,240TPH

    ,5rpm

    Total 4nos - 2 nos for each belt

    discharge of packers

    Track Line -1

    & 1A

  • 8/12/2019 Wagon Loader System

    7/12

    GAP TIME BETWEEN THE RAKES:

    Presently the cement rakes being received one after another and thereby it is observed that

    a gap time between the two rakes. The gap time works out to 260 to 359 hrs every month

    out of total available 720 hrs to 744 hrs. in a month. During this time the packer machine

    are mostly ideal utilizing for loading of trucks. The manpower engaged for loading of

    cement is on rake basis.

    It is recommended to plan the arrangement of the rakes on continues basis in consultation

    with the railway authority to reduce the gap time ( an Avg. 4 hrs to 5 hrs.).

    The time between receipts of one rake to another should be of 6 hrs. This will help to

    increase no. of cement rakes loading by another 15 to 20 nos more. Thereby the no. of

    rakes shall increase from Present level 60 nos to 75 - 80 on every month.

    There will be increase in dispatch quantity further by 54000 tons-Max by following the same

    pattern of loading

    Presently the no. of rakes presently handling/month on an avg. 95 to 101 as follows :

    Cement 62 Rakes Slag- 11 rakes Coal - 13 rakes Gypsum- 04 rakes Clinker 11 rakes

    PACKER FEED RATE:

    Based on the time study the loading of cement wagon using the loader has been carried out

    at the feed rate of 157 TPH as against the rated capacity of 240 TPH. This is due to because

    of the following:

    Problem in the nozzle. Early filling of bag. No falling of the bag. Higher Cement blain

    Further the productivity level can be improved by closely attending the nozzle

    related problem. Further this helps in reduction of loading time of cement

    wagon.

  • 8/12/2019 Wagon Loader System

    8/12

    TWO RAKE LOADING AT A TIME:

    The loading of two rakes, one each at loading platform is possible but the cycle time

    increases to 480 minutes as the number of loading point at a time will be reduced to 4times

    from earlier 8 times. The total cycle time required for handing over to railway authority will

    be 10hrs with including the shunting time as against the permissible time 9 hrs. .This shall

    force us in to the demurrages threshold. This could be tried after improving the feed rate

    of packer more than 175 to 180 TPH.

    TRACH LINE 2 an 10:

    These line tracks are buried with the slag about 35% of its total length. It suggested to clear

    off the track line from slag so as to utilize these entire length of track lines for keeping of the

    empty wagons.

    SEEK LINE IN EXCHANGE YARD:

    In exchange yard the seek line length may be extended to use for stable rake formation, as

    this would help in handling no. of rakes in case when the power engine of railway authority

    delays to take the stable rake from Exchange yard.

    RAW MATERIAL UNLOADING LINE-11:

    The wagon tippler line 11 to be extended further by 100 to 150 meter towards boundary

    wall in order to accommodate more no. of empty wagons of coal/wagon/slag would

    facilitates in handling of raw material n type wagons.

    CLINKER LOADING LINELINE-9:

    The clinker wagon loading system requires loco permanently which is also restricts the non-

    availability of loco for cement wagon SHUNTING. The existing side arm charger is not in

    operation. The track length of clinker wagon line 9 is limited to 13 to 14nos which

    prolonging the loading time and multiple handling of the N-type -wagons.

    The following bottlenecks are in the inside the railway gate:

    1. The upward gradient of the railway track limit the pulling of the loaded wagons up to18 nos.

    2. The track line curves are 15 degree which is more than the standard 6 to 8 degree,this further increases the handling of wagons in shorter length.

    3. If clinker wagons to be loaded the wagons from raw material track line-11 to Line-9is to be carried out at railway gate junction only

  • 8/12/2019 Wagon Loader System

    9/12

    Wagon loading Cycle time:

    Based on the time study the cycle time of the wagon loader has been works out as

    follows:

    Placement and preparatory work: Actual

    Placement of wagon on the Line 4 15 .0 minmin

    Placement of wagon on the line 5 14.24 minPreparatory work of wagon loader 03.45 min

    Cycle time: Wagon loader.

    Loader 1stcycle 14.04 Min 13.56 min 2NDCycle 07.06 Min 06.50 min. 3rdcycle 05.37 Min 05.46 min.

    Total A 26.47 Min 26.52 min

    Changeover of loader to second door is being done without the stoppage of packer

    operation

    Loader 1stcycle 10.10 Min 08.00 Min 2ndCycle 06.10 Min 06.52 Min 3rdcycle 05.50 min 06.00 Min

    Total B 22.10 Min 20.52 Min

    Avg cycle time per Wagon 48.57 Min 47.44 Min

    Total time taken for loading of the entire rake : 280 Min.

    Product change over 05 Min

    Stoppage hrs 130 Min*

    Rake shunting 20 Min

    Move to Exchange yard 24Min

    Form a stable rake line 10 Min

    Total rake cycle time work out to: 501 minutes

    * 0.20 W/l 3 Telescopic problem

    0.30 RP-1 NZ-12 Ventilation fault

    0.30 RP-1,NZ-7 Pressure pipe problem

    0.20 W/L 8 Belt problems.

    0.20 W/L 5 bag diverter

    0.20 W/l 9+10 discharge belt jammed

    0.70 W/L 13 and 14 electrical prob

  • 8/12/2019 Wagon Loader System

    10/12

    WAGON LOADING SYSTEM AT OCL INDIA LTD.

    SL.NO. Observation Recommendations Tar

    gate

    date

    Respons

    ibility

    S/s

    Remarks

    01 Based on the time

    study, Packer feed rate

    works out to157 TPH

    as against the Design

    capacity 240 TPH. Avg.

    It should be 190 TPH.

    Wagon loader 9 to 16

    needs attention to

    smoothen the

    operation

    Make Functioning of16 spouts

    effectively.

    Bag falling afterattaining the

    required weight of

    50kg

    No bag falling. The RPM of the

    packer is found 2

    rpm as against the

    design 5 rpm

    02 Rake Arrangement:

    Presently it is found

    that there is a gap time

    in arrival of rake to

    rake works out to 8hrs

    to 10 hrs i.e varies

    from 260hrs to 360 hrs

    in month

    The rake to be arranged in

    consultation with Railway

    authority at an interval of

    every 6 to 7th

    Hr one each.

    This helps in loading of

    rakes by 15 to 20 more i.e

    54000 tons per month by

    following FIFO basis. There

    will be increase in the sale

    quantity by 54000 ton per

    month.

    03 SEEK LINE EXTENTION

    IN EXCHANGE YARD:

    This line is used for

    keeping the wagon to

    be repaired.

    The extension of seek line

    help to utilize in stable rake

    formation in case power of

    railway authority delays in

    taking the stable rake from

    the exchange yard

    04 Track line -11:

    Raw materialunloading has

    limitation to

    accommodate 24

    wagons after

    unloading by wagon

    tippler

    There is a space available toextend by 100 to 150

    meters will help to keep 10

    to 14 wagons more

    continuously to reduce the

    shunting frequency.

  • 8/12/2019 Wagon Loader System

    11/12

    WAGON LOADING SYSTEM AT OCL INDIA LTD.

    SL.NO. Observation

    Recommendations

    Tar

    gate

    date

    Responsibility

    S/s

    Remarks

    05 Clinker loading wagon :

    It is found that the loco

    is engaged exclusivelytill

    the rake is loaded.

    Shunting is required for

    every 24 nos of wagons.

    It means three time

    shunting. The extention

    of rake length is possible

    but we have to procure

    land .

    WINCH Machine

    working to be

    made to release

    the loco for other

    wagon shunting

    06 Track lines -2 and 10:

    These lines of some

    length are buried with

    the slag, the same could

    be cleared off to keep

    empty wagons in

    emergency case

    07 Two Rake loading:

    Possible but it will

    increase the loadingcycle time to double due

    to reduction in no. of

    loading point to 4 as

    against earlier 8.

    No. of wagon can be

    placed on 4 & 5 to the

    extent of 20Max on each

    line and on line 1 &1a 19

    wagons each side

    No of gangs will

    increase frompresent 2 nos to 3

    or 4

    Two rake loading

    could be tried after

    improvement in

    the packer feed

    rate to at least 190

    TPH

    08 Railway gate :There is a Single track

    line to take all type of

    wagon inside the plant.

    The public and vehicle

    moment affected largely

    to the shunting wagons.

    Sometime entire rake is

    divided in to three parts

    It is proposed tohave a flyover at

    railway gate

    facilitates in

    smooth operation

    of the wagon

    shunting without

    the interruption of

    the public moment,

  • 8/12/2019 Wagon Loader System

    12/12