October 10, 2000
2000 Gasification Technologies Conference
Wabash River Energy, Ltd. Project Update
Wabash River Energy Ltd.
Project Update
An Overview of the Past Year’s Activities for the
Wabash River Repowering Project
RICHARD PAYONK
GENERAL MANAGER, WABASH RIVER ENERGY, LTD.
GLOBAL ENERGY INC.
October 10, 2000
2000 Gasification Technologies Conference
Wabash River Energy, Ltd. Project Update
Wabash River Energy Ltd. Project Update
• Project Overview & Description
• Operating Experience
• Performance & Milestones
• Market-Based Operations
October 10, 2000
2000 Gasification Technologies Conference
Wabash River Energy, Ltd. Project Update
Project Overview• DOE Clean Coal Technology (Round IV) Program
• Global Energy / PSI Energy (CINergy)
• Coal Gasification Combined Cycle Repowering ofUnit #1 at PSI Energy’s Wabash River GeneratingStation in operation since 1995
• E-Gas™ Technology
• High Sulfur Bituminous Coal or Pet Coke
• 262MWe
October 10, 2000
2000 Gasification Technologies Conference
Wabash River Energy, Ltd. Project Update
Facility Location
OxygenPlant
GasificationPlant
CombustionTurbine
SteamTurbine
October 10, 2000
2000 Gasification Technologies Conference
Wabash River Energy, Ltd. Project Update
Recycle Slurry Water
ProductSyngasCoal SlurryMilling,
Heating &Feeding
High Temp.Heat
Recovery
GasificationCOS Hydrolysis,Moisturization &Condensate Heat
SourWater
CharRemoval
DischargeWater
HotBFW
SaturatedHP Steam
AirSeparation
Unit
SulfurRecovery
Unit
CoolSour
Syngas
Acid GasRemoval
SweetSyngas
Acid Gas
SulfurProduct
TailGas
SlagHandling
Char
QuenchWater
SlagSlurry
Air
Nitrogen
Oxygen
SlagProduct
Gasification ProcessSour WaterTreatment
October 10, 2000
2000 Gasification Technologies Conference
Wabash River Energy, Ltd. Project Update
2000 Performance & Milestones
• 85% Product Syngas Availability in 2000• 95% Product Syngas Availability on Pet Coke
• Demonstrated in Current Campaign:– 100 days of syngas delivery since June 14– Over 2200 operating hours and counting– 3Q00: 2.9 trillion Btus produced in over 2082 hrs– No gasification technology related downtime
October 10, 2000
2000 Gasification Technologies Conference
Wabash River Energy, Ltd. Project Update
Year 2000 Downtime & Availability Analysis
Principle Area Availability
Air Separation Unit 93.80%Fuel Handling 98.80%Gasification 92.50%Gasification Block Totals 85.10%
Power Block 89.89%
Overall Totals 74.99%
October 10, 2000
2000 Gasification Technologies Conference
Wabash River Energy, Ltd. Project Update
Year 2000 Downtime & Availability Analysiswith Industry Standard Projections
Principle Area Availability
Air Separation Unit 98.00%Fuel Handling 98.80%Gasification 92.50%
Gasification Block Totals 89.30%
Power Block 95.00%
Overall Totals 84.31%
October 10, 2000
2000 Gasification Technologies Conference
Wabash River Energy, Ltd. Project Update
Year 2000 Operating Experience
• Air Separation Unit
– MAC inlet guide vane upgraded Oct ‘99
– Longest unplanned outage caused by ASU
October 10, 2000
2000 Gasification Technologies Conference
Wabash River Energy, Ltd. Project Update
Oxygen Compressor motorterminal box damage caused bymoisture related ground fault
Comparisonphotos of
like-new andpost-ground-fault terminal
connections
October 10, 2000
2000 Gasification Technologies Conference
Wabash River Energy, Ltd. Project Update
Year 2000 Operating Experience
• Fuel Handling
– Typical system availability exceeds 99.99%
– Failed storage tank agitator blade coatingduring summer ‘00
October 10, 2000
2000 Gasification Technologies Conference
Wabash River Energy, Ltd. Project Update
Year 2000 Operating Experience
• Gasification– No technology-related outages in 2000
– No single syngas interruption exceeding 39 hrs
– Current slurry mixers over 2200 hours ofoperation, no sign of failure
October 10, 2000
2000 Gasification Technologies Conference
Wabash River Energy, Ltd. Project Update
Year 2000 Operating Experience
• Sub-Systems with 100% Availability in 2000– Rod Mill System– Particulate Removal System– Chloride Scrubbing System– COS Catalyst System– AGR– Sour Water Treatment System
October 10, 2000
2000 Gasification Technologies Conference
Wabash River Energy, Ltd. Project Update
Year 2000 Operating Experience
• Power Block– Power Block availability impacted by HRSG
tube failures
– Over 19 days of unscheduled downtime
– Failures are related to expansion issues withbottom supported unit
– CINergy continues to discuss HRSGperformance with OEM
October 10, 2000
2000 Gasification Technologies Conference
Wabash River Energy, Ltd. Project Update
Market-Based Operations
• History• Market Drivers
• Commercial Structure• Outlook
October 10, 2000
2000 Gasification Technologies Conference
Wabash River Energy, Ltd. Project Update
Market-Based Operations History
• March 1998 - Dynegy pursues sale of gasification assets
• September 1998 - Dynegy/PSI agree to contract buyout
• October 1998 - Dynegy announces agreement to sellgasification assets to Global Energy Inc.
• December 1999 - Dynegy/Global complete sale
• March 2000 - Operation under original contract ends
• June 2000 - Operation resumes under new market-basedagreement
October 10, 2000
2000 Gasification Technologies Conference
Wabash River Energy, Ltd. Project Update
Market-Based Operation Drivers
• PSI Energy• Contract buyout included gas turbine conversion
• Operation on natural gas would be peaking
• Operation on syngas must be best economical choice
• Global Energy• Maximize dispatch - Base load
October 10, 2000
2000 Gasification Technologies Conference
Wabash River Energy, Ltd. Project Update
Market-Based Operations Commercial Structure
• PricingüSyngas indexed to market power priceüSteam for power generation sold separately
• TermüEffective June 2000 through August 2003
• Other Key ElementsüGuaranteed annual availabilityüGlobal is responsible for feedstock
October 10, 2000
2000 Gasification Technologies Conference
Wabash River Energy, Ltd. Project Update
Gasification Plant Performance
4
5
6
7
8
9
1998 1999 2000
O&
M C
ost
(%
Cap
ex/Y
r)
20
30
40
50
60
70
80
90
Syn
gas
Ava
ilab
ility
October 10, 2000
2000 Gasification Technologies Conference
Wabash River Energy, Ltd. Project Update
Market-Based Operations Performance
• 89% product syngas availability under new contract
• Operation since August 14, 2000 on 100% petroleumcoke feedstock
• 95% product syngas availability on petroleum coke
October 10, 2000
2000 Gasification Technologies Conference
Wabash River Energy, Ltd. Project Update
Market-Based Operations Outlook
• Influenced by power and natural gas price volatility
• Expect to be profitable under current arrangement
• Continued focus to reduce feedstock costs
• Operation on pet coke allows “extra” syngas forincremental capacity additions; co-productionopportunities
• Longer term vision of multiple feedstock, multipleproducts facility