2
Waa Uy Borat Wifeyney Fa / on 0752 . Het / E-mail : nhaitvm@gmail. (ase URaed ote worart Aare) me piratory National Highways Authority of India (Ministry of Road Transport & Highways) ay aemeen (rata) we wa Pee a arate URaSrT GRE Tg Office of the Deputy General Manager (Tech) cum Project Director Project Implementation Unit SX. 36/414(3), OH eT erSeeRTe realesPaes Sh UA, TregReTAT,PST ALCH- 695 024,AeA. No.36/414(3}, Near NSS Higher Secondary School, Palkulangara, Thiruvananthapuram - 695 024, Kerala. NHAI/PIU-TVM/ADANI-NOC/Utility Laying/ 1914 19.11.2020 INVITATION OF PUBLIC COMMENTS Sub: Four Laning of Mukkola Junction to Kerala/Tamilnadu Border (Km.26+500 to Km.43+000) of NH-66 in the State of Kerala under NHDP Phase-III on EPC mode-Right of way permissions for Temporary laying of 33 KV cable in Underground manner by Horizontal Directional Drilling (HDD) Method between Km.26.450 to Km.26.540(LHS) on NH-66 and crossing at Km.26.540 near Vizhinjam International Seaport-Reg.. The proposal is regarding permission sought by M/s. Adani Vizhinjam Port Pvt Ltd for laying of 33 KV cable by Horizontal Directional Drilling (HDD) Method between Km.26.450 to Km.26.540 (LHS) on NH-66 and crossing at Km.26.540 near Vizhinjam International Seaport. 2: M/s.Adani Vizhinjam Port Pvt Ltd has furnished an undertaking to shift the laying of 33 KV cable underground manner at their own cost at an alternate location whenever NHAI or any other road authorities make a request for shifting of the same within 60 days from the date of receipt. Further, the applicant has undertaken for payment of rent/fee as mentioned in the Ministry’s Circular No. RW/NH-33044/29/2015-S&R dated 22.11.2016. 3. Further, M/s.Adani Vizhinjam Port Pvt Ltd has undertaken that they will not damage any other utility during the process on laying and in case, if damaged, then to pay the losses either to NHAI or to the agency concerned. M/s.Adani Vizhinjam has also undertaken not to obstruct the drainage of the road and to ensure adequate safety measures during the execution of the work. n— Page I of 2 = Ww oRine wiafery : vis Ta 6, Haeeto, aver, we Peet - 110075. FRAT : 011-2507 4100/4200 SATE ; ww.nhai.gov.in Corporate Office: G-5 & 6, Sector-10, Dwarka, New Delhi-110075. Tel:011-2507 4100/4200 Website: www.nhai.gov.in

Waa Uy Borat Wifeyn ey Fa / on 0752 (ase URaed ote worart

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Waa Uy Borat Wifeyn ey Fa / on 0752 (ase URaed ote worart

Waa Uy Borat Wifeyn ey Fa / on 0752 . Het / E-mail : nhaitvm@gmail.

(ase URaed ote worart Aare) me piratory National Highways Authority of India (Ministry of Road Transport & Highways) ay aemeen (rata) we wa Pee a arate URaSrT GRE Tg Office of the Deputy General Manager (Tech) cum Project Director Project Implementation Unit

SX. 36/414(3), OH eT er SeeRTe reales Paes Sh UA, TregReTAT, PST ALCH- 695 024, AeA. No.36/414(3}, Near NSS Higher Secondary School, Palkulangara, Thiruvananthapuram - 695 024, Kerala.

NHAI/PIU-TVM/ADANI-NOC/Utility Laying/ 1914 19.11.2020

INVITATION OF PUBLIC COMMENTS

Sub: Four Laning of Mukkola Junction to Kerala/Tamilnadu Border (Km.26+500 to

Km.43+000) of NH-66 in the State of Kerala under NHDP Phase-III on EPC

mode-Right of way permissions for Temporary laying of 33 KV cable in

Underground manner by Horizontal Directional Drilling (HDD) Method between

Km.26.450 to Km.26.540(LHS) on NH-66 and crossing at Km.26.540 near

Vizhinjam International Seaport-Reg..

The proposal is regarding permission sought by M/s. Adani Vizhinjam Port Pvt

Ltd for laying of 33 KV cable by Horizontal Directional Drilling (HDD) Method between

Km.26.450 to Km.26.540 (LHS) on NH-66 and crossing at Km.26.540 near Vizhinjam

International Seaport.

2: M/s.Adani Vizhinjam Port Pvt Ltd has furnished an undertaking to shift the

laying of 33 KV cable underground manner at their own cost at an alternate

location whenever NHAI or any other road authorities make a request for shifting of

the same within 60 days from the date of receipt. Further, the applicant has

undertaken for payment of rent/fee as mentioned in the Ministry’s Circular No.

RW/NH-33044/29/2015-S&R dated 22.11.2016.

3. Further, M/s.Adani Vizhinjam Port Pvt Ltd has undertaken that they will not

damage any other utility during the process on laying and in case, if damaged, then to

pay the losses either to NHAI or to the agency concerned. M/s.Adani Vizhinjam has also

undertaken not to obstruct the drainage of the road and to ensure adequate safety

measures during the execution of the work.

n— Page I of 2 = Ww

oRine wiafery : vis Ta 6, Haeeto, aver, we Peet - 110075. FRAT : 011-2507 4100/4200 SATE ; ww.nhai.gov.in Corporate Office: G-5 & 6, Sector-10, Dwarka, New Delhi-110075. Tel:011-2507 4100/4200 Website: www.nhai.gov.in

Page 2: Waa Uy Borat Wifeyn ey Fa / on 0752 (ase URaed ote worart

4, As per the guidelines issued by the Ministry vide letter No.RW/NH-

33044/29/2015/S&R(R) dated 22.11.2016, the proposal submitted by , M/s.Adani

Vizhinjam Port Pvt Ltd will be made available for 30 days seeking public

Comments/objections and the comments shall be furnished within 30 days from the day

of closure of public objections.

5. In view of the above, comments of public on the above proposal are invited and

may be sent to the below mentioned address:-

Copy to:

The Project Director, National Highways Authority of India

(Ministry of Road, Transport & Highways) T.C. 36/414 (3), Near NSS Higher

Secondary School, Palkulangara,

Thiruvananthapuram

Kerala-695 024

Yours faithfully,

P. EP,

Deputy General Manager(Tech), NHAI,

Project Implementation Unit,

Thiruvananthapuram, Kerala

1. NHAI Website 2. The NIC, New Delhi - for uploading in the Ministry's Website

3. RO-Kerala, Thiruvananthapuram NHAI, PIU-Thiruvananthapuram - for kind information

Page 2 of 2