83
SECTION 23 09 00 – BUILDING AUTOMATION SYSTEM PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control equipment and installation for HVAC systems and components, including control components for terminal heating and cooling units not supplied with factory- furnished controls. B. See "Sequences of Operation" for requirements that relate to this Section. 1.2 RELATED DOCUMENTS A. Drawings and Specification Sections of the Contract, including General and Supplementary Conditions, apply to this Section. 1. General Requirements Section 01 00 00 2. Section 01 00 00 – General and Special Requirements 3. Section 01 33 00 – Submittal Requirements 4. Section 27 05 26 – Commissioning of HVAC 5. Section 05 45 19 – Commissioning of Integrated Automation 6. Section 23 31 03 – Detection and Alarm (Fire and Smoke Alarm Systems) 7. Section 01 60 00 – Materials and Equipment 8. Section 23 05 00 – Common Work Results for HVAC 9. Section 23 05 93 – Testing, Adjusting, and Balancing for HVAC 10. Section 26 01 00 – General Electrical Provisions for Electrical Work 11. Section 26 05 00 – Common Work Results for Electrical 12. Section 26 05 19 – Low Voltage Electrical Power Conductors and Cables 13. Section 26 05 29 – Hangers and Supports for Electrical Systems 14. Section 26 05 33 – Raceway and Boxes for Electrical Systems 15. Section 26 05 53 – Identification for Electrical Systems 16. Section 26 27 26 – Wiring Devices Project Name 230900 - 1 BAS AND CONTROL FOR HVAC Date

w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

  • Upload
    trandan

  • View
    215

  • Download
    1

Embed Size (px)

Citation preview

Page 1: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

SECTION 23 09 00 – BUILDING AUTOMATION SYSTEM

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes control equipment and installation for HVAC systems and components, including control components for terminal heating and cooling units not supplied with factory-furnished controls.

B. See "Sequences of Operation" for requirements that relate to this Section.

1.2 RELATED DOCUMENTS

A. Drawings and Specification Sections of the Contract, including General and Supplementary Conditions, apply to this Section.1. General Requirements Section 01 00 00 2. Section 01 00 00 – General and Special Requirements 3. Section 01 33 00 – Submittal Requirements4. Section 27 05 26 – Commissioning of HVAC5. Section 05 45 19 – Commissioning of Integrated Automation6. Section 23 31 03 – Detection and Alarm (Fire and Smoke Alarm Systems)7. Section 01 60 00 – Materials and Equipment8. Section 23 05 00 – Common Work Results for HVAC9. Section 23 05 93 – Testing, Adjusting, and Balancing for HVAC10. Section 26 01 00 – General Electrical Provisions for Electrical Work11. Section 26 05 00 – Common Work Results for Electrical12. Section 26 05 19 – Low Voltage Electrical Power Conductors and Cables13. Section 26 05 29 – Hangers and Supports for Electrical Systems14. Section 26 05 33 – Raceway and Boxes for Electrical Systems 15. Section 26 05 53 – Identification for Electrical Systems 16. Section 26 27 26 – Wiring Devices

1.3 DEFINITIONS

A. BACnet: An industry standard data communication protocol for Building Automation and Control Networks. Refer to AHSRAE standard 135-2010

B. BIBB: BACnet Interoperability Building Blocks

C. DDC: Direct digital controls

D. IP: Internet Protocol

E. I/O: Input/Output

F. LAN: Local area network.Project Name 230900 - 1 BAS AND CONTROL FOR HVAC Date

Page 2: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

G. MS/TP: Master-slave/token-passing. Refer to AHSRAE standard 135-2010

H. TCP: Transfer Control Protocol

I. Scope Terminology1. Provide = Furnish equipment, engineer, program and install2. Furnish = Furnish equipment, engineer and program3. Mount = securely fasten or pipe4. Install = mount and wire5. Wire = wire only

1.4 SYSTEM DESCRIPTION

A. The Building Automation System (BAS) contractor shall furnish and install a networked system of HVAC controls. The contractor shall incorporating direct digital control (DDC) for central plant equipment, building ventilation equipment, supplemental heating and cooling equipment, and terminal units.

B. Provide networking to new DDC equipment using communication standards. System shall be capable of BACnet communication according to ASHRAE standard ANSI/ASHRAE 135-2010 for interoperability with smart equipment and for the main IP communication trunk to the BAS Server. The system shall not be limited to only standard protocols, but shall also be able to integrate to a wide variety of third-party devices and applications via drivers and gateways.

C. Provide standalone controls where called for on the drawings or sequences.

1.5 WORK INCLUDED

A. The installation of the control system shall be performed under the direct supervision of the controls manufacturer with the shop drawings, flow diagrams, bill of materials, component designation, or identification number and sequence of operation all bearing the name of the manufacturer.

B. Furnish a complete distributed direct digital control system in accordance with this specification section. This includes all system controllers, logic controllers, and all input/output devices. Items of work included are as follows:1. Provide a submittal that meets the requirements below for approval. 2. Coordinate installation schedule with the mechanical contractor and general contractor.3. Provide installation of all panels and devices unless otherwise stated.4. Provide power for panels and control devices. 5. Provide all low voltage control wiring for the DDC system.6. Provide miscellaneous control wiring for HVAC and related systems regardless of

voltage.7. Provide engineering and technician labor to program and commission software for each

system and operator interface. Submit commissioning reports for approval.8. Participate in commissioning for all equipment that is integrated into the BAS (Refer to

Commissioning sections of the equipment or systems in other parts of this specification.)9. Provide testing, demonstration and training as specified below.

Project Name 230900 - 2 BAS AND CONTROL FOR HVAC Date

Page 3: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

1.6 SYSTEM PERFORMANCE

A. Comply with the following performance requirements:1. Graphic Display: Display graphic with minimum 20 dynamic points with current data

within 5 seconds.2. Graphic Refresh: Update graphic with minimum 20 dynamic points with current data

within 5 seconds.3. Object Command: Reaction time of less than 5 seconds between operator command of a

binary object and device reaction.4. Object Scan: Transmit change of state and change of analog values to control units or

workstation within 5 seconds.5. Alarm Response Time: Annunciate alarm at workstation within 2 seconds. Multiple

workstations must receive alarms within five seconds of each other.6. Program Execution Frequency: Programmable controllers shall execute DDC PI control

loops, and scan and update process values and outputs at least once per second.7. Reporting Accuracy and Stability of Control: Report values and maintain measured

variables within tolerances as follows:a. Water Temperature: Plus or minus 1 deg F.b. Water Flow: Plus or minus 5 percent of full scale.c. Water Pressure: Plus or minus 2 percent of full scale.d. Space Temperature: Plus or minus 1 deg F.e. Ducted Air Temperature: Plus or minus 1 deg F.f. Outside Air Temperature: Plus or minus 2 deg F.g. Dew Point Temperature: Plus or minus 3 deg F.h. Temperature Differential: Plus or minus 0.25 deg F.i. Relative Humidity: Plus or minus 2 percent.j. Airflow (Pressurized Spaces): Plus or minus 3 percent of full scale.k. Airflow (Measuring Stations): Plus or minus 5 percent of full scale.l. Airflow (Terminal): Plus or minus 10 percent of full scale.m. Air Pressure (Space): Plus or minus 0.01-inch wg.n. Air Pressure (Ducts): Plus or minus 0.1-inch wg.o. Carbon Monoxide: Plus or minus 5 percent of reading.p. Carbon Dioxide: Plus or minus 50 ppm.q. Electrical: Plus or minus 5 percent of reading.

1.7 SUBMITTALS

A. Provide submittals for fast track items that need to be approved and released to meet the schedule of the project. Provide submissions for the following items separately:1. Valve schedule and cut sheets2. Factory mounting and wiring diagrams and cut sheets3. Thermostat locations

B. Provide BIM symbols (Revit) for control devices that are to be shown on the coordinated BIM model.

C. Provide a complete submittal with all controls system information for approval before construction starts. Include the following:

Project Name 230900 - 3 BAS AND CONTROL FOR HVAC Date

Page 4: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

1. Schematic flow diagrams showing fans, pumps, coils, dampers, valves, and control devices.

2. Wiring Diagrams: Power, signal, and control wiring.3. Details of control panel faces, including sizes, controls, instruments, and labeling.4. Schedule of dampers and actuators including size, leakage, and flow characteristics.5. If dampers are furnished by other, submit a damper actuator schedule coordinating

actuator sizes with the damper schedule.6. Schedule of valves including leakage and flow characteristics.7. Written description of the Sequence of Operations.8. Network riser diagram showing wiring types, network protocols, locations of floor

penetrations and number of control panels. Label control panels with network addresses and BACnet device instance numbers. Show all routers, switches, hubs and repeaters.

9. Point list for each system controller including both inputs and outputs (I/O), point numbers, controlled device associated with each I/O point, and location of I/O device.

10. Starter and variable frequency drive wiring details of all automatically controlled motors.11. Reduced size floor plan drawings showing locations of control panels, thermostats and

any devices mounted in occupied space.

D. Wireless Communication: If wireless sensors and / or network are used, submit a radio signal layout showing the signal reach of every wireless mesh device. Show where repeaters are needed so that a wireless signals overlap

E. Product Data: Include manufacturer's technical literature for each control device indicated, labeled with setting or adjustable range of control. Indicate dimensions, capacities, performance characteristics, electrical characteristics, finishes for materials, and installation and startup instructions for each type of product indicated. Submit a write-up of the application software that will be used on the operator workstation including revision level, functionality and software applications required to meet the specifications.

F. Submit PICS statements for all direct digital controllers and interfaces.

G. 1Submit a description of the application software that will be used on the operator workstation including revision level, functionality and software applications required to meet the specifications.

H. Wiring Diagrams: Detail the wiring of the control devices and the panels. Show point-to-point wiring from field devices to the control panel. Show point-to-point wiring of hardwired interlocks. Show a ladder diagram or schematic of wiring internal to the panels, including numbered terminals. Clearly designate wiring that is done at a factory, at a panel shop or in the field.

I. Submit blank field check-out and commissioning test reports, customized for each panel or system, which will be filled out by the technician during start-up.

J. Submit sample graphics for approval before starting system commissioning.

K. Variance letter: Submit a letter detailing each item in the submission that varies from the contract specification or sequence of operation in any way.

L. After the BAS system is approved for construction, submit sample operator workstation graphics for typical systems for approval. Print and submit the graphics that the operator will

Project Name 230900 - 4 BAS AND CONTROL FOR HVAC Date

Page 5: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

use to view the systems, change setpoints, modify parameters and issue manual commands. Programming shall not commence until typical graphics are approved.

1.8 QUALITY ASSURANCE

A. Codes1. Perform all wiring in accordance with Division 26, NEC, local codes and Owner’s

requirements.2. Uniform Building Code (UBC)3. Electrical Components, Devices, and Accessories: Listed and labeled as defined in

NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

4. Comply with NFPA 90A, "Installation of Air Conditioning and Ventilation Systems."5. Comply with ASHRAE 135-2010 BACNet: A Data Communication Protocol for

Building Automation and Control Networks. 6. All equipment shall be UL listed and approved and shall meet with all applicable NFPA

standards, including UL 916 - PAZX Energy Management Systems, 7. Provide UL 864 – UUKL Smoke Control, where controllers and networks are used for

that purpose.a. Provide written approvals and certifications after installation has been completed.

8. All electronic equipment shall conform to the requirements of FCC Regulation, Part 15, Governing Radio Frequency Electromagnetic Interference and be so labeled.

9. The manufacturer of the building automation system shall provide documentation supporting compliance with ISO-9002 (Model for Quality Assurance in Production, Installation, and Servicing) and ISO-140001 (The application of well-accepted business management principles to the environment). The intent of this specification requirement is to ensure that the products from the manufacturer are delivered through a Quality System and Framework that will assure consistency in the products delivered for this project.

B. Qualifications1. 1Installing contractor shall be in the business of installing and servicing DDC controls for

mechanical systems, temperature and ventilation control, environmental control, lighting control, access and security controls, and energy automation as their primary business. 1Installer Qualifications: An experienced installer who is the authorized representative of the automatic control system manufacturer for both installation and maintenance of controls required for this Project.

2. 1Engineering, drafting, programming, and graphics generation shall be performed by the local branch engineers and technicians directly employed by the Building Automation System Contractor.

3. Supervision, checkout and commissioning of the system shall be by the local branch engineers and technicians directly employed by the Building Automation System Contractor. They shall perform commissioning and complete testing of the BAS system.

C. The BMS contractor shall maintain a service organization consisting of factory trained service personnel and provide a list of ten (10) projects, similar in size and scope to this project, completed within the last five years.

D. Final determination of compliance with these specifications shall rest solely with the Engineers and Owner who will require proof of prior satisfactory performance.

Project Name 230900 - 5 BAS AND CONTROL FOR HVAC Date

Page 6: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

E. For any BAS system and equipment submitted for approval, the BAS contractor shall state what, if any, specific points of system operation differ from these specifications.

1.9 DELIVERY, STORAGE, AND HANDLING

A. Factory-Mounted Components: Where control devices specified in this Section are indicated to be factory mounted on equipment, arrange for shipping of control devices to unit manufacturer.

1.10 COORDINATION

A. Coordinate location of thermostats, humidistats, panels, and other exposed control components with plans and room details before installation.

B. Coordinate equipment with Section 26 00 00 "Fire Alarm" to achieve compatibility with equipment that interfaces with that system.

C. Coordinate power for control units and operator workstation with electrical contractor.

D. Coordinate equipment with provider of starters and drives to achieve compatibility with motor starter control coils and VFD control wiring.

E. Coordinate scheduling with the mechanical contractor and general contractor. Submit a schedule for approval based upon the installation schedule of the mechanical equipment.

F. Products Furnished but Not Installed Under This Section 1. Hydronic Piping:

a. Control Valvesb. Temperature Sensor Wells and Socketsc. Flow Switchesd. Flow Meters

2. Refrigerant Pipinga. Pressure and Temperature Sensor Wells and Sockets

3. Sheetmetal accessoriesa. Dampersb. Airflow Stationsc. Terminal Unit Controls

G. Products Installed but Not Furnished Under This Section 1. Refrigeration Equipment:

a. Refrigerant Leak Detection Systemb. Proof of flow pressure switches

2. Rooftop Air Handling Equipment:a. Thermostatsb. Duct Static Pressure Sensors

H. Products Integrated To but Not Furnished or Installed Under This Section1. Heat pumps2. Packaged rooftops3. Packaged AC units

Project Name 230900 - 6 BAS AND CONTROL FOR HVAC Date

Page 7: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

4. Computer room AC units5. Geothermal water pumping system6. Pre-fabricated AHUs7. Chillers8. Boilers9. VFDs10. ATS11. PDU12. UPS13. Emergency Generators14. Lighting Control panels15. Fire Alarm monitoring

1.11 WARRANTY

A. Conform to the warranty requirement of the Contract Documents, General Requirements and this section or a minimum of 12 months. Provide the strictest.

B. Warranty shall cover all costs for parts, labor, associated travel, and expenses for a period of one year from completion of system demonstration.

C. Hardware and software personnel supporting this warranty agreement shall provide on-site or off-site service in a timely manner after failure notification to the vendor. The maximum acceptable response time to provide this service at the site shall be 24 hours.

D. During normal building occupied hours, failure of items that are critical for system operation shall be provided within 4 hours of notification from the Owner’s Representative.

E. This warranty shall apply equally to both hardware and software.

PART 2 - PRODUCTS

2.1 ACCEPTABLE SYSTEMS

A. Provide a Building Automation System based upon the following:1. Siemens APOGEE System as installed by the Siemens Industry branch office

B. The vendors and products listed shall comply with these specifications. It shall not be assumed that standard products and methods will be acceptable without prior approval. Exceptions shall be noted during the bid process and documented in the submittal process.

2.2 BAS NETWORK

A. 1All networked control products provided for this project shall be comprised of an industry standard open protocol internetwork. Communication involving control components (i.e. all types of controllers and operator interfaces) shall conform to ASHRAE 135-2010 BACnet

Project Name 230900 - 7 BAS AND CONTROL FOR HVAC Date

Page 8: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

standard. Networks and protocols proprietary to one company or distributed by one company are prohibited.

B. Access to system data shall not be restricted by the hardware configuration of the building management system. The hardware configuration of the BMS network shall be totally transparent to the user when accessing data or developing control programs. 1. Software applications, features, and functionality, including administrative

configurations, shall not be separated into several network control engines working together.

C. Provide at a minimum 1 operator interface to be designated as the BAS Server with server application software. Additional operator interfaces shall use operator workstation licenses or connect via a thick or thin-client application.

D. BAS Server shall be capable of simultaneous direct connection and communication with BACnet/IP, OPC and TCP/IP corporate level networks without the use of interposing devices.

E. Any break in Ethernet communication from the PC to the controllers on the Primary Network shall result in a notification at the PC.

F. Any break in Ethernet communication between the standard client and server workstations on the Primary Network shall result in a notification at each workstation.

G. The network architecture shall consist of three levels of networks:1. The Management level shall utilize BACnet/IP over Ethernet along with other

standardized protocol, such as web services, html, JAVA, SOAP, XML, etc., to transmit data to non-BAS softwares and databases.

2. The Automation level network shall be BACnet/IP over Ethernet. It shall network the Automation Server, Operator workstations, and BC level controllers. Provide network media converters, routers and switches as necessary for a complete network.

3. The Floor level network shall be BACnet over MS/TP. It shall network to all of the DDC controlled equipment on a floor or in a system and network to a router that connects to the Automaton level BAS backbone. Controllers for the central plant and large infrastructure air handlers shall reside on the backbone BACnet/IP network.

H. The primary backbone network between the building level controllers, BAS Server and Operator Workstations shall be based upon BACnet/IP. Ethernet Network switches shall be strategically placed through the building to cover several floors or several mechanical rooms that are within 300 ft wiring-feet of each other.

I. The Building Level Controllers shall be able to support subnetwork protocols that may be needed depending on the type of equipment or application. Subnetworks shall be limited to :1. BACnet MS/TP2. Apogee FLN3. Modbus

J. BACnet MSTP Setup rules1. Addressing for the MSTP devices shall start at 00 and continue sequentially for the

number of devices on the subnetwork.2. No gaps shall be allowed in the addresses. 3. Set the MaxMaster property to the highest address of the connected device.

Project Name 230900 - 8 BAS AND CONTROL FOR HVAC Date

Page 9: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

4. MaxMaster property shall be adjusted when devices are added to the subnetwork.

K. Application specific controllers for smaller single zone, supplemental or special systems can reside on the BACnet/IP network or on a subnetwork.

L. Floor level controllers, terminal units, package AC units, auxiliary equipment, VFDs, meters shall reside on one of the subnetworks above.

M. 11Provide all communication media, connectors, repeaters, bridges, switches, and routers necessary for the internetwork.

N. Use fiber optic cabling for all Ethernet runs longer than 300 ft.

O. 1Controllers and software shall be BTL listed at the time of installation.

P. 1Provide all communication media, connectors, repeaters, bridges, switches, and routers necessary for the internetwork.

Q. The system shall meet 1peer-to-peer communication services such that the values in any one BC or AAC level controller can be read or changed from all other controllers with the need for intermediary devices. The software shall provide transparent transfer of all data, control programs, schedules, trends, and alarms from any one controller through the internetwork to any other controller, regardless of subnetwork routers.

R. 11Systems that use variations of BACnet using Point-to-Point (PTP) between controllers, gateways, bridges or networks that are not peer-to-peer are not allowed.

S. 1Remote Communications: 1Provide a TCP/IP compatible communication port for connection to the Owner’s network for remote communications. Provide coordination with the Owner for addressing and router configuration on both ends of the remote network.

T. Where a smoke control application is required, provide UUKL listed network switches, and NFPA approved cabling, enclosures and installation methods.

U. The system shall be installed with a 10% spare capacity on each subnetwork for the addition of future controllers.

2.3 DISTRIBUTED CONTROL REQUIREMENTS

A. The loss of any one DDC controller shall not affect the operation of other HVAC systems, only for the points connected to the DDC controller.

B. The system shall be scalable in nature and shall permit expansion of both capacity and functionality through the addition of sensors, actuators, DDC Controllers, and operator devices.

C. System architectural design shall eliminate dependence upon any single device for alarm reporting and control execution. Each DDC Controller shall operate independently by performing its own specified control, alarm management, operator I/O, and data collection. The failure of any single component or network connection shall not interrupt the execution of any

Project Name 230900 - 9 BAS AND CONTROL FOR HVAC Date

Page 10: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

control strategy, reporting, alarming and trending function, or any function at any operator interface device.

D. DDC Controllers shall be able to access any data from, or send control commands and alarm reports directly to, any other DDC Controller on the network without dependence upon a central processing device. DDC Controllers shall also be able to send alarms to multiple operator workstations without dependence upon a central or intermediate processing device.

E. The DDC control panel shall be mounted in the same mechanical room as the equipment being controlled, or an adjacent utility room.

F. Multiple systems can be programmed on the same controller as long as they are in the same room. Systems on separate floors shall have separate controllers.

G. VAV boxes subnetworks shall be connected to the AHU controller that feeds those boxes. If multiple subnetworks are needed, then the VAV shall be grouped into subnetworks in an orderly method, such as per floor, per wing, etc.

H. Remote sensors shall be wired to the control panel of the equipment it is controlling, not across the network.

I. Signals to remote motor control centers shall be hard wired to the control panel, not across the network.

J. Terminal units shall each have their own controller. Only exceptions are:1. Groups of reheat coils2. Groups of exhaust fans3. Groups of chilled beams serving same zone or several adjacent zones

2.4 BUILDING AUTOMATION SERVER HARDWARE

A. Provide a PC for the BAS Server database. Provide the latest model of the nominal speed, RAM and memory for a commercial office grade PC from a named brand manufacturer. Minimum requirements and accessories shall be:1. Processor: Intel 7 series or AMD equal2. 3GHz processor speed minimum 6M cache3. 20GB Ram, Dual Channel, DDR3 SDRam at 1333MHz minimum4. 16x R/W CD and DVD5. 320GB Hard disk space, 7200RPM6. Video Card with 512 MB RAM 7. USB Ports8. NIC Card9. 101 key enhanced keyboard, Mouse, power strip10. UPS for 15 minute backup

B. Provide a wide screen, active matrix LCD, flat panel type monitor that supports a minimum display resolution of no less than 1920 × 1080 pixels, Energy Star compliant 32-bit color. The display shall have a minimum of 21-inch visible area in diagonal measurement. Separate controls shall be provided for color, contrasts and brightness. The screen shall be non-reflective.

Project Name 230900 - 10 BAS AND CONTROL FOR HVAC Date

Page 11: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

C. Printer: Provide a compatible inkjet or laser printer for alarms, operator transactions and system reports. Provide drivers.

D. Printer2: Provide a color printer for printing of dynamic trend graph report, Excel reports, graphics and any other screen displays. Printer shall include as a minimum Okidata Microline 590 or equivalent.

E. Locate the BAS Server in a clean, secure, dry and temperature controlled environment

F. The server shall reside on the same BACnet/IP protocol network as the System Controllers.

G. Provide software licenses for interfacing to the BAS. Load software, configure and setup for viewing the BAS system.

H. Provide with the PC an operating system, such asWindows 7 64-bit or Windows 2008 R2.

I. Software: Provide the following application software licenses, preloaded on the laptop for the Owner: MS Office Professional, PC anywhere or terminal services, Internet Explorer or equal browser, MS Outlook, Acrobat Reader, CAD Viewer, Micrographx Designer. Set up an icon on the desktop to take the Owner directly to the BAS system login page.

2.5 OPERATOR WORKSTATIONS HARDWARE

A. The Server hardware shall be of equal or better capability as that of Workstation and shall be equipped as follows.

B. Locate server as located on plans.

C. Provide a minimum 16 GB RAM, with hard drive of 320 GB available space, with a video card with 256 MB RAM capable of supporting a minimum of 1920 x 1080 resolution with a minimum of 32 Bit color, DVD-RW Drive, mouse and 101-key enhanced keyboard. Server shall be a Windows 2008 R2 Server, and shall include a dual core processor or better.

D. Provide a monitor of flat panel type and shall support a minimum display resolution of no less than 1920 x 1080 pixels. The display shall have a minimum of 21-inch visible area in diagonal measurement. Separate controls shall be provided for color, contrasts and brightness. The screen shall be non-reflective.

E. Locate the Operator Workstations in a clean, secure, dry and temperature controlled environment

F. Provide software licenses for interfacing to the BAS. Load software, configure and setup for viewing the BAS system.

G. Provide the PC with an operating system, such as Windows XP/Vista or Windows Server 2003/2008 or other operating systems compatible with the BAS software.

Project Name 230900 - 11 BAS AND CONTROL FOR HVAC Date

Page 12: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

H. Software: Provide the following application software licenses, preloaded on the laptop for the Owner: MS Office Professional, PC anywhere or terminal services, Internet Explorer or equal browser, MS Outlook, Acrobat Reader, CAD Viewer. Set up an icon on the desktop to take the Owner directly to the BAS system login page.

2.6 OPERATOR SERVER SOFTWARE

A. Server-Client connections1. The Web based interface shall provide the same functionalities as those available at any

other workstation, including operation and configuration capabilities.

2. The Web server client licensing shall be from the same pool of client licenses available or installed client consoles or Windows desktop app clients.

3. Internet connections, ISP services, as well as necessary firewalls or proxy servers shall be provided by the owner as required to support the Web access feature.

B. Client access to client-server workstation configurations over the Intranet or Internet shall be available via 3 client options: 1. Web Browser. Client runs in a browser as a Full Trust client application. 2. Dedicated Installed Application. Client runs as a fully installed software installation that

can lockdown desktop space and prevent the ability for the software to be minimized or covered by other applications.

3. Windows Desktop App. An app that is downloaded to the client from the server PC, that runs like an installed application, and is automatically updated whenever new apps are available at the server.

C. Graphics creation – user shall be able to add/delete/modify system graphics from standard user interface without the need of any external or specialized tools.

2.7 SERVER HOSTED WEB BASED OPERATOR SOFTWARE

A. The BMS shall provide a Web-based graphical interface that allows users to access the BMS data via the Internet, extranet, or Intranet. Functionality of web-based clients shall provide the same functionality and user interface provided by installed client consoles.

B. A Web server computer will be supplied. The Web server shall use Microsoft’s IIS server with Windows 2008 R2 Server, or later, and support browser access via Microsoft Internet Explorer.

C. All information exchanged over Internet shall be optionally encrypted and secure via SSL (provided by Owner).

D. Web interfaces shall require the use of certificates to ensure safe secure connectivity to the server.

E. Access to the Web interface may be password protected. Users’ rights and privileges to points and graphics may be the same as those assigned at any other workstation, or may be differentiated from privileges at installed workstations.

Project Name 230900 - 12 BAS AND CONTROL FOR HVAC Date

Page 13: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

F. The Web interface shall not require modification or creation of HTML or ASP pages using an HTML editor. All graphics shall be available with the same look and functionality whether they are displayed at an installed client console or in a browser.

G. The Web based interface shall provide the same functionalities as those available at any other workstation, including operation and configuration capabilities.

H. The Web server client licensing shall be from the same pool of client licenses available or installed client consoles or Windows desktop app clients.

I. Internet connections, ISP services, as well as necessary firewalls or proxy servers shall be provided by the owner as required to support the Web access feature.

2.8 OPERATOR INTERFACE APPLICATION SOFTWARE

A. Graphical User Interface (GUI): The GUI shall provide a completely interactive user interface and must offer the following features as a minimum:1. View Trending2. View Scheduling3. Downloading Memory to field devices4. Real time ‘live’ Graphic Programs with auto refresh5. System Name and Geographic Navigation methods6. Parameter changes of all adjustable object properties7. Setpoint Adjustments8. Viewing Alarms and Events9. Operators’ Usage10. Hyperlinks11. On line help menus

B. BACNET: 1. The BAS server and Operator Workstations shall meet the BACnet device profile of an

Advanced Workstation Server (B-AWS) and Operator Workstation (B-OWS) and shall support the following BACnet BIBBs:a. Data Sharing

1) Data Sharing-Read Property-Initiate, Execute (DS-RP-A,B)2) Data Sharing-Read Property Multiple-Initiate, Execute (DS-RPM-A,B)3) Data Sharing-Write Property-Initiate, Execute (DS-WP-A,B)4) Data Sharing-Write Property Multiple-Initiate (DS-WPM-A)5) Data Sharing-COV-Initiate (DS-COV-A)

b. Scheduling1) Scheduling-Initiate (SCHED-A)

c. Trending1) Trending-Viewing and Modifying Trends-Initiate (T-VMT-A)2) Trending-Automated Trend Retrieval-Initiate (T-ATR-A)

d. Network Management1) Network Management-Connection Establishment-Initiate (NM-CE-A)

e. Alarming1) Alarm and Event-Notification-Initiate (AE-N-A)2) Alarm and Event-ACK-Initiate (AE-ACK-A)3) Alarm and Event –Alarm Summary-Initiate (AE-ASUM-A)

Project Name 230900 - 13 BAS AND CONTROL FOR HVAC Date

Page 14: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

4) Alarm and Event –Enrollment Summary-Initiate (AE-ESUM-A)5) Alarm and Event –Information-Initiate (AE-INFO-A)

f. Device Management1) Device Management-Dynamic Device Binding- Initiate, Execute (DM-

DDB-A, B)2) Device Management-Dynamic Object Binding- Initiate, Execute (DM-

DOB-A,B)3) Device Management-Device Communication Control- Initiate (DM-DCC-

A)4) Device Management-Private Transfer- Initiate, Execute (DM-PT-A,B)5) Device Management-Text Message-Execute (DM-TM-B)6) Device Management-Time Synchronization- Initiate (DM-TS-A)7) Device Management-UTC Time Synchronization- Initiate (DM-UTC-A)8) Device Management-Reinitialize Device- Initiate (DM-RD-A)9) Device Management-Backup and Restore- Initiate (DM-BR-A)10) Device Management-List Manipulation- Initiate, Execute (DM-LM-A,B)11) Device Management-Object Creation and Deletion- Initiate (DM-OCD-A)

2. The BAS Server and Workstations shall support the following Data Link Layers:a. BACnet IP Annex Jb. BACnet IP Annex J Foreign Devicec. ISO 8802-3, Ethernet (Clause 7)

3. The BAS Server and Workstations shall be able to interact with all of the BACnet objects in the controllers. In addition, the software shall be able to support the following objects as they relate to features in the workstation software:a. Calendar – Creatable, Deletableb. Command – Creatable, Deletablec. Event Enrollment – Creatable, Deletabled. Notification Class – Creatable, Deletablee. Schedule - Creatable, Deletable

4. The BAS Server and Workstations shall support transmitting and receiving segmented messages.

5. The BAS Server and Workstation shall have the capability to be the BACnet/IP Broadcast Management Device (BBMD) and support foreign devices.

C. System shall be capable of OPC client communicating according to OPC Data Access 2.0

D. Provide a copy of the software (or all software’s if there are multiple) used to program and download sequences to controllers. Provide a backup of the all of the programs used in the system for storage by the Owner.

2.9 Basic Interface Description

A. All operator interface functions must be available in clients running in a browser, installed client console, or Windows desktop app.

B. Operator interface software shall minimize operator training through the use of user-friendly and interactive graphical applications, 256-character English language point identification, on-line help, and industry standard Windows application software. Interface software shall

Project Name 230900 - 14 BAS AND CONTROL FOR HVAC Date

Page 15: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

simultaneously communicate with and share data between Ethernet-connected building level networks.

C. The user interface shall display relevant information for a selection in multiple panes of a single window without the need for opening multiple overlapping windows on the desktop

D. Provide a graphical user interface that shall minimize the use of keyboard through the use of a mouse or similar pointing device, with a "point and click" approach to menu selection and a “drag and drop” approach to inter-application navigation.

E. The navigation shall be user friendly by utilizing “forward & back” capability between screens and embedded links to graphics, documents, drawings, trends, schedules, as well as external documents (.doc, .pdf, .xls, etc.) or web addresses that are related to any selected object.

F. Primary selection of objects in the operator interface software shall be available from user defined hierarchical Views, from graphics, or from events in an Event List.

G. Secondary selection of objects in the operator interface software shall be available from links to any objects or external documents related to the primary selection. Links to related items shall be automatically defined based on where an object is used in the system.

H. The operator workstation shall be capable of displaying web pages and common document formats (.doc, .xls, .pdf) within the operator workstation application.

I. The Operator Workstation Software shall be capable of BACnet IP communications. The BACnet Advanced Workstation (B-AWS) shall have demonstrated interoperability during at least one BTL Interoperability Workshop, have demonstrated compliance to BTL B-AWS device classification through BTL listing as specified in ANSI/ASHRAE 135.

J. The software shall provide a multi-tasking type environment that allows the user to run several applications simultaneously. BMS software clients shall run on a Windows XP, Windows 7 or comparable 32/64-bit operating system. System database parameters shall be stored within an object-oriented database. Standard Windows applications shall run simultaneously with the BMS software. The mouse or Alt-Tab keys shall be used to quickly select and switch between multiple applications. The operator shall be able to work in Microsoft Word, Excel, and other Windows based software packages, while concurrently annunciating on-line BMS alarms and monitoring information.

K. The software shall provide, as a minimum, the following functionality:

Project Name 230900 - 15 BAS AND CONTROL FOR HVAC Date

Page 16: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

1. Real-time graphical viewing and control of the BMS environment.

2. Reporting of both real-time and historical information.

3. Scheduling and override of building operations.

4. Collection and analysis of historical data.

5. Point database editing, storage and downloading of controller databases.

6. Configuration of and navigation through default and personalized hierarchical “tree” views that include workstation and control system objects.

7. Event reporting, routing, messaging, and acknowledgment.

8. Definition and construction of dynamic color graphic displays.

9. Online, context-sensitive help, including an index, glossary of terms, and the capability to search help via keyword or phrase.

10. On-screen access to User Documentation, via online help or PDF-format electronic file.

11. Automatic database backup at the operator interface for database changes initiated at Building Controllers.

12. Display dynamic trend data graphical plot.

a. Must be able to run multiple plots simultaneously.

b. Each plot must be capable of supporting 10 pts/plot minimum.

c. Must be able to command points from selection on dynamic trend plots.

d. Must be able to plot real-time data without prior configuration.

e. Must be able to plot both real-time and historical trend data simultaneously.

13. Program editing.

14. Transfer trend data to third-party spreadsheet software

15. Scheduling reports

16. Operator Activity Log

L. Security

1. Operator-specific password access protection shall be provided to allow the administrator/manager to limit users’ workstation control, display and data base

Project Name 230900 - 16 BAS AND CONTROL FOR HVAC Date

Page 17: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

manipulation capabilities as deemed appropriate for each user, based upon an assigned password.

2. Operator privileges shall "follow" the operator to any workstation logged onto.

3. The administrator or manager shall be able to further limit operator privileges based on which console an operator is logged on to.

4. The administrator or manager shall be able to grant discrete levels of access and privileges, per user, for each point, graphic, report, schedule, and BMS workstation application.

M. The operator interface software shall include reports to track the actions of each individual operator. The application shall allow querying based on object name, operator, action, or time range.

N. Dynamic Color Graphics application shall include the following:

1. Must include graphic editing and modifying capabilities.

2. All necessary tools and procedures for the user to create their own graphics

3. A library of standard control application graphics and symbols must be included.

4. Must be able to command points directly off graphics application.

5. Graphic display shall include the ability to depict real-time point values dynamically with text or animation.

6. Navigation through various graphic screens shall be optionally achieved through a hierarchical “tree” structure.

7. Graphics viewing shall include dynamic pan zoom capabilities.

8. Graphics viewing shall include the ability to switch between multiple layers with different information on each layer.

9. Graphics shall include a decluttering capability that allows layers to be programmatically hidden and displayed based on zoom level.

10. Graphics shall be capable of displaying the status of points that have been overridden by a field HAND switch, for points that have been designed to provide a field HAND override capability.

11. Ability to create dashboard views that graphically display system and/ or energy performance. Dashboards will consist of gauges and charts.

O. Reports shall be generated on demand or via pre-defined schedule. As a minimum, the system shall allow the user to easily obtain the following types of reports:

Project Name 230900 - 17 BAS AND CONTROL FOR HVAC Date

Page 18: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

1. A general listing of all or selected points in the network

2. List of all points currently in alarm

3. List of all points currently in override status

4. List of all disabled points

5. System diagnostic reports including, list of Building panels on line and communicating, status of all Building terminal unit device points

6. List of alarm strategy definitions

7. List of Building Control panels

8. Point totalization report

9. Point Trend data listings

10. Initial Values report

11. User activity report

12. Event history reports

P. Scheduling and override

1. Provide a calendar type format for simplification of time and date scheduling and overrides of building operations. Schedule definitions reside in the PC workstation and in the Building Controller to ensure time equipment scheduling when PC is off-line, PC is not required to execute time scheduling. Provide override access through menu selection, graphical mouse action or function key. Provide the following capabilities as a minimum:

a. Fully support all BACnet Schedule, Calendar, and Command objects.

b. Daily and Weekly schedules

c. Ability to combine multiple points into a logical Command Groups for ease of scheduling (e.g., Building 1 lights)

d. Schedule predefined reports.

e. Ability to schedule for a minimum of up to ten (10) years in advance.

2. Additionally, the scheduling application shall:

a. Provide filtering capabilities of schedules, based on name, time, frequency, and schedule.

Project Name 230900 - 18 BAS AND CONTROL FOR HVAC Date

Page 19: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

b. Provide sorting capabilities of schedules, based on name, time and type of schedule.

Q. Collection and Analysis of Historical Data

1. Provide trending capabilities that allow the user to easily monitor and preserve records of system activity over an extended period of time. Any system point may be trended automatically at time-based intervals or change of value, both of which shall be user-definable. Trend data shall be collected and stored on hard disk for future diagnostics and reporting. Automatic Trend collection may be scheduled at regular intervals through the same scheduling interface as used for scheduling of equipment. Additionally, trend data may be archived to network drives or removable disk media for future retrieval.

2. System shall support trending in the same device as the monitor point or in an external device.

3. Panels shall have a trending level above which the data will be automatically uploaded to the BMS server to prevent overwriting the data in the field panel. The trending level will be user defined in % of available space (e.g., automatically upload when the trend buffer is at 75% of allocated space).

4. Trend data reports shall be provided to allow the user to view all trended point data. Reports may be customized to include individual points or predefined groups of selected points.

5. Provide additional functionality that allows the user to view real-time trend data on trend graphical plot displays. A minimum of ten points may be plotted, of either real-time or historical data. The dynamic graphs shall continuously update point values. At any time the user may redefine sampling times or range scales for any point. In addition, the user may pause the display and take "snapshots" of plot screens to be stored on the workstation disk for future recall and analysis. Exact point values may be viewed and the graphs may be printed. A minimum of ten (10) dynamic graphs shall run simultaneously. Operator shall be able to command points by selecting them on the trend plot. Operator shall be able to zoom in on a specific time range within a plot.

R. Dynamic Color Graphic Displays

1. Capability to create color graphic floor plan displays and system schematics for each piece of mechanical equipment, including, but not limited to, air handling units, chilled water systems, hot water boiler systems, and room level terminal units.

2. The operator interface shall allow users to access the various system schematics and floor plans via a graphical penetration scheme, menu selection, point alarm association, or. Graphics software shall permit the importing of AutoCAD or scanned pictures for use in the system.

3. Dynamic temperature values, humidity values, flow values and status indication shall be shown in their actual respective locations within the system schematics or graphic floor plan displays, and shall automatically update to represent current conditions without operator intervention and without pre-defined screen refresh rates.

Project Name 230900 - 19 BAS AND CONTROL FOR HVAC Date

Page 20: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

a. Provide the user the ability to display real-time point values by animated motion or custom picture control visual representation. Animation shall depict movement of mechanical equipment, or air or fluid flow. Provide users the ability to depict various positions in relation to assigned point values or ranges. A library (set) of animated symbols shall be included within the operator interface software’s graphics application. Animation shall reflect, ON or OFF conditions, and shall also be optionally configurable for animation speed.

b. Ability to add custom gauges and charts to graphic pages.

c. Equipment state or values can be changed by clicking on the associated point block or graphic symbol and selecting the new state (on/off) or setpoint.

d. State text for digital points can be user-defined.

4. Colors or other visual changes shall be available to indicate status and change as the status of the equipment changes. The state colors shall be user definable.

5. The Windows environment of the PC operator workstation shall allow the user to simultaneously view several applications at a time to analyze total building operation or to allow the display of a graphic associated with an alarm to be viewed without interrupting work in progress.

6. All required software shall be provided to allow the user to add, modify or delete system graphic background displays.

7. A clipart library of HVAC application and automation symbols shall be provided including fans, valves, motors, chillers, AHU systems, standard ductwork diagrams and laboratory symbols. The user shall have the ability to add custom symbols to the clipart library. The clipart library shall include a minimum of 400 application symbols. In addition, a library consisting of a minimum of at least100 graphic background templates shall be provided.

8. The Graphics application shall include a set of standard Terminal Equipment controller application-specific background graphic templates. Templates shall provide the automatic display of a selected Terminal Equipment controller’s control values and parameters, without the need to create separate and individual graphic files for each controller.

9. The Graphics application shall be capable of automatically assigning the appropriate symbol for an object (point) selected to be displayed on the graphic based on what the object represents (fan, duct sensor, damper, etc.)

S. System Configuration & Definition

1. The system shall be fully configurable from clients running in a browser, installed client console, or Windows desktop app.

2. Users must be able to build multiple, separate, personalized hierarchical “tree” views that represent the workstation, control systems, geographical facility layouts, and mechanical equipment relationships.

Project Name 230900 - 20 BAS AND CONTROL FOR HVAC Date

Page 21: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

3. Network wide control strategies shall not be restricted to a single Building Controller, but shall be able to include data from any and all other network panels to allow the development of Global control strategies.

4. Provide automatic backup and restore of all Building Controller databases on the workstation hard disk. In addition, all database changes shall be performed while the workstation is on-line without disrupting other system operations. Changes shall be automatically recorded and downloaded to the appropriate Building Controller. Changes made at the user-interface of Building Controllers shall be automatically uploaded to the workstation, ensuring system continuity.

5. System configuration, programming, editing, graphics generation shall be performed on-line from the operator workstation software.

6. User shall be able to edit point configuration online within a dedicated editor application. The editor shall allow the user to create, view existing, modify, copy, and delete points from the database.

7. User shall be able to edit point configuration of any configurable BACnet point that resides in a devices that supports external editing.

8. The software shall also allow the user to configure the alarm management strategy for each point. The editor shall provide the ability for editing the point database directly online with the Building Controllers.

9. The operator interface software shall also provide the capability to perform bulk modification of point definition attributes to a single or multiple user-selected points.

10. Control program configuration shall be available to the user within a dedicated control program editor application. The editor shall allow for creation, modification and deletion of control programs. The editor shall also include the ability to automatically compile the program to ensure its compatibility with the Building Controllers. The editor shall provide the ability to selectively enable or disable the live program execution within the Building Controllers.

11. Users shall have the ability to view the program(s) that is\are currently running in a Building Controller. The display shall mark the program lines with the following: disabled, comment, unresolved, and trace bits.

T. Event Management

1. Event Routing shall allow the user to send event notification to selected printers or workstation location(s) based on event severity, or point type.

2. Event Notification shall be presented to each workstation in a tabular format application, and shall include the following information for each event: name, value, event time and date, event status, priority, acknowledgement information, and alarm count. Each event shall have the ability to sound an audible notification based on the category of the event.

Project Name 230900 - 21 BAS AND CONTROL FOR HVAC Date

Page 22: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

3. Event List shall have the ability to list and sort the events based on event status, point name, ascending or descending activation time.

4. Directly from the Event List, the user shall have the ability to acknowledge, silence the event sound, print, or erase each event. The interface shall also have the option to inhibit the erasing of active acknowledged events, until they have returned to normal status. The user shall also have the ability to navigate to all information related to a selected point in order to command, launch an associated graphic or trended graphical plot, or run a report on a selected point directly from the Event List.

5. Each event shall have a direct link from the Event List to further user-defined point informational data. The user shall have the ability to also associate real-time electronic annotations or notes to each event.

U. Remote Notification Software (RENO)1. Workstations shall be configured to send out messages to numeric pagers, alphanumeric

pagers, phones (via text to speech technology), SMS (Simple Messaging Service, text messaging) Devices, and email accounts based on a point's alarm condition.

2. There shall be no limit to the number of points that can be configured for remote notification of alarm conditions and no limit on the number of remote devices which can receive messages from the system.

3. On a per point basis, system shall be configurable to send messages to an individual or group and shall be configurable to send different messages to different remote devices based on alarm message priority level.

4. Remote devices may be scheduled as to when they receive messages from the system to account for operators' work schedules.

5. System must be configurable to send messages to an escalation list so that if the first device does not respond, the message is sent on to the next device after a configurable time has elapsed.

6. Message detail shall be configurable on a per user basis. 7. During a "flood" of alarms, remote notification messages shall have the ability to

optimize several alarms into an individual remote notification message.8. Workstation shall have the ability to send manual messages allowing an operator to type

in a message to be sent immediately.9. Workstation shall have a feature to send a heartbeat message to periodically notify users

that they have communication with the system.

2.10 ADDITIONAL USER LICENSES

A. Provide additional concurrent user licenses as called for here or in the Sequence of Operations. Every Operator Interface called for or shown on the Network Architecture shall have its own concurrent user license such that all can be on-line at the same time.

B. Provide at least __________ additional concurrent user licenses.

C. A user license shall have the same features and capabilities as the Server license. Usernames and passwords shall control the access to these features.

Project Name 230900 - 22 BAS AND CONTROL FOR HVAC Date

Page 23: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

2.11 ELECTRONIC DOCUMENTATION

A. Provide software applications and files to view documentation through the GUI.

B. Provide a CAD viewer to view all project AutoCAD documents that are made available by the Architect and Owner.

C. Provide all controls cut sheets in PDF format. Make them available to any user accessing the system over the Internet.

D. Provide a text version of the sequence of operation. Make the written sequence available from the graphic that represents each system. The sequence shall pop up in a printable format such as HTML or PDF.

2.12 CONTROLLER SOFTWARE (i.e. Building Controller software, , DDC software, Field Panel software)

A. Provide a full capability user license to the owner for the operator to be able to see, modify, create, upload, download and save control programs to the DDC controllers.

B. The software program shall be provided as an integral part of DDC Controllers and shall not be dependent upon any higher level computer or another controller for execution.

C. The software application shall be accessible from a PC using the Windows environment, but shall use all of its own services and data files so as to not be susceptible to Microsoft Windows operating systems based viruses.

D. The software shall be provided with an interactive HELP function to assist operators with syntax, abbreviations, commands and saving programs.

E. Point naming and communication format:1. All points, panels, and programs shall be identified by a 30-character name. All points

shall also be identified by a 16-character point descriptor. The same names shall be displayed at both Building Controller and the Operator Interface.

2. All digital points shall have a consistent, user-defined, two-state status indication with 8 characters minimum (e.g., Summer, Enabled, Disabled, Abnormal).

3. The Building Controller Software shall be capable of BACnet communications. The BACnet Building Controller (B-BC) shall have demonstrated interoperability during at least one BTL Interoperability Workshop, have demonstrated compliance to BTL through BTL listing and shall substantially conform to BACnet Building Controller (B-BC) device profile as specified in ANSI/ASHRAE 135-2004, Annex L.

F. System Security1. User access shall be secured using individual security passwords and user names.2. Passwords shall restrict the user to the objects, applications, and system functions as

assigned by the system manager.3. Building Controllers shall be able to assign a minimum of 50 passwords access and

control priorities to each point individually. The logon password (at any Operator Interface or portable operator terminal) shall enable the operator to monitor, adjust and control only the points that the operator is authorized for. All other points shall not be

Project Name 230900 - 23 BAS AND CONTROL FOR HVAC Date

Page 24: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

displayed at the Operator Interface or portable terminal. Passwords and priorities for every point shall be fully programmable and adjustable.

4. User Log On/Log Off attempts shall be recorded.5. The system shall protect itself from unauthorized use by automatically logging off

following the last keystroke. The delay time shall be user-definable.6. Use of workstation resident security as the only means of access control is not an

acceptable alternative to resident system security in the DDC controller software.

G. User Defined Control Applications: The applications software shall program DDC routines to meet the sequences of operations. 1. Building Controllers shall have the ability to perform energy management routines

including but not limited to time of day scheduling, calendar-based scheduling, holiday scheduling, temporary schedule overrides, start stop time optimization, automatic daylight savings time switch over, night setback control, enthalpy switch over, peak demand limiting, temperature-compensated duty cycling, heating/cooling interlock, supply temperature reset, priority load shedding, and power failure restart.

2. The Building Controllers shall have the ability to perform the following pre tested control algorithms:a. Two position with differential control and time delaysb. Floating controlc. Proportional controld. Proportional plus integral controle. Proportional, integral, plus derivative controlf. Automatic tuning of control loopsg. Model-free adaptive control

3. Controllers shall be able to execute custom, job-specific processes defined by the user, to automatically perform calculations and special control routines.

4. Each controller shall support plain language text comment lines in the operating program to allow for quick troubleshooting, documentation, and historical summaries of program development.

H. Peer-to-peer access to other DDC controllers1. It shall be possible to use any actual or virtual point data or status, any system calculated

data, a result from any process, or any user-defined constant in any controller in the system.

2. Any process shall be able to issue commands to points in any and all other controllers in the system.

3. Processes shall be able to generate operator messages and advisories to other operator I/O devices. A process shall be able to directly send a message to a specified device or cause the execution of an advanced annunciation feature, such as:a. Generate a report b. Annunciate an alarmc. Issue a text message or email

I. Alarm Management1. Alarm management shall be provided within the controller software to monitor and direct

alarm information to operator devices. 2. Each Building Controller shall perform distributed, independent alarm analysis, minimize

network traffic and prevent alarms from being lost. At no time shall the Building Controllers ability to report alarms be affected by either operator or activity at a PC workstation, local I/O device or communications with other panels on the network.

Project Name 230900 - 24 BAS AND CONTROL FOR HVAC Date

Page 25: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

3. Conditional alarming shall allow generation of alarms based upon user defined multiple criteria.

4. An Alarm “shelving” feature shall be provided to disable alarms during testing. (Pull the Plug, etc.).

5. Binary Alarms. Each binary alarm object shall be set to alarm based on the operator-specified state. Provide the capability to automatically and manually disable alarming.

6. Analog Alarms. Each analog alarm object shall have both high and low alarm limits. Alarming must be able to be automatically and manually disabled.

7. All alarm shall include the point's user-defined language description and the time and date of occurrence.

8. Alarm reports and messages shall be routed to user-defined list of operator workstations, or other devices based on time and other conditions. An alarm shall be able to start programs, print reports, be logged in the event log, generate custom messages, and display graphics.

9. The user shall be able to add a 200-character alarm message to each alarm point to more fully describe the alarm condition or direct operator response. Each Building Controller shall be capable of storing a library of at least 50 alarm messages. Each message may be assigned to any number of points in the Controller.

10. Operator-selected alarms shall be capable of initiating a trigger to an advanced annunciation, such as text, email, etc.

11. An alarm history log shall report the start of the alarm condition, acknowledgement by a user and return of the alarm to normal condition.

J. Scheduling:1. Provide a comprehensive menu driven program to automatically start and stop designated

multiple objects or events in the system according to a stored time.2. Schedules shall reside in the building controller and shall not rely on external processing

or network.3. It shall be possible to define a group of objects as a custom event (i.e., meeting, athletic

activity, etc.). Events can then be scheduled to operate all necessary equipment automatically.

4. For points assigned to one common load group, it shall be possible to assign variable time delays between each successive start and/or stop within that group.

5. The operator shall be able to define the following information:a. Time, dayb. Commands such as on, off, auto, etc.c. Time delays between successive commands.d. There shall be provisions for manual overriding of each schedule by an authorized

operator.6. It shall be possible to schedule calendar-based events up to one year in advance based on

the following:a. Weekly Schedule. Provide separate schedules for each day of the week. Each of

these schedules should include the capability for start, stop, optimal start, optimal stop, and night economizer. When a group of objects are scheduled together as an Event, provide the capability to adjust the start and stop times for each member.

b. Exception Schedules. Provide the ability for the operator to designate any day of the year as an exception schedule. Exception schedules may be defined up to a year in advance. Once an exception schedule is executed, it will be discarded and replaced by the standard schedule for that day of the week.

K. Peak Demand Limiting (PDL):Project Name 230900 - 25 BAS AND CONTROL FOR HVAC Date

Page 26: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

1. The Peak Demand Limiting (PDL) program shall limit the consumption of electricity to prevent electrical peak demand charges.

2. PDL shall continuously track the amount of electricity being consumed, by monitoring one or more electrical kilowatt-hour/demand meters. These meters may measure the electrical consumption (kWh), electrical demand (kW), or both.

3. PDL shall sample the meter data to continuously forecast the demand likely to be used during successive time intervals.

4. If the PDL forecasted demand indicates that electricity usage is likely to exceed a user preset maximum allowable level, then PDL shall automatically shed electrical loads.

5. Once the demand peak has passed, loads that have been shed shall be restored and returned to normal control.

L. Temperature-compensated duty cycling1. User defined conditions shall be able to initiate a Duty Cycle Control Program. 2. The Duty Cycle Control Program (DCCP) shall be configured to periodically stop and

start loads according to various patterns.3. The loads shall be cycled such that there is a net reduction in both the electrical demands

and the energy consumed.

M. Automatic Daylight Savings Time Switchover. The system shall provide automatic time adjustment for switching to/from Daylight Savings Time.

N. Night setback control. The system shall provide the ability to automatically adjust setpoints for night control.

O. Enthalpy switchover (economizer). The Building Controller Software (BCS) shall control the position of the air handler relief, return, and outside air dampers. If the outside air dry bulb temperature falls below changeover setpoint the BCS will modulate the dampers to provide 100 percent outside air. The user will be able to quickly change over to an economizer system based on dry bulb temperature and will be able to override the economizer cycle and return to minimum outside air operation at any time.

P. Control Loop Algorithm1. Provide a PID (proportional-integral-derivative) closed-loop control algorithm with direct

or reverse action and anti-windup. The algorithm shall calculate a time-varying analog value that is used to position an output or stage a series of outputs. The controlled variable, setpoint, and weighting parameters shall be accessible from the operator workstation.

Q. Adaptive Loop Tuning1. Building Controllers shall also provide high resolution sampling capability for

verification of DDC control loop performance. Documented evidence of tuned control loop performance shall be provided on a monthly, seasonal, quarterly, annual period.

2. For Model-Free Adaptive Control loops, evidence of tuned control loop performance shall be provided via graphical plots or trended data logs. Graphical plots shall minimally include depictions of setpoint, process variable (output), and control variable (e.g., temperature). Other parameters that may influence loop control shall also be included in the plot (e.g., fan on/off, mixed-air temp).

3. For PID control loops, operator-initiated automatic and manual loop tuning algorithms shall be provided for all operator-selected PID control loops. Evidence of tuned control loop performance shall be provided via graphical plots or trended data logs for all loops.

Project Name 230900 - 26 BAS AND CONTROL FOR HVAC Date

Page 27: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

a. In automatic mode, the controller shall perform a step response test with a minimum one-second resolution, evaluate the trend data, calculate the new PID gains and input these values into the selected LOOP statement.

b. Loop tuning shall be capable of being initiated either locally at the Building Controller, from a network workstation or remotely using dial-in modems. For all loop tuning functions, access shall be limited to authorized personnel through password protection.

R. Logic programming: Provide a software routine that can build ladder logic to control using many conditional statements. 1. The logic programming syntax shall be able to combine ladder logic with other software

features, such as combining status, scheduling, PDL and alarm conditions into one conditional decision.

2. Logic programming shall be able to reference conditions in any other controller in the system.

S. Staggered Start:1. This application shall prevent all controlled equipment from simultaneously restarting

after a power outage. The order in which equipment (or groups of equipment) is started, along with the time delay between starts, shall be user definable in an application and shall not require written scripts or ladder logic.

2. Upon the resumption of power, each Building Controller shall analyze the status of all controlled equipment, compare it with normal occupancy scheduling and turn equipment on or off as necessary to resume normal operations.

T. Totalization Features:1. Run-Time Totalization. Building Controllers shall automatically accumulate and store

run-time hours for all digital input and output points. A high runtime alarm shall be assigned, if required, by the operator.

2. Consumption totalization. Building Controllers shall automatically sample, calculate and store consumption totals on a daily, weekly or monthly basis for all analog and digital pulse input type points.

3. Event totalization. Building Controllers shall have the ability to count events such as the number of times a pump or fan system is cycled on and off. Event totalization shall be performed on a daily, weekly or monthly basis for all points. The event totalization feature shall be able to store the records associated with events before reset.

U. Data Collection:1. A variety of historical data collection utilities shall be provided to manually or

automatically sample, store, and display system data for all points.2. Building Controllers shall store point history data for selected analog and digital inputs

and outputs:3. Any point, physical or calculated may be designated for trending. Any point, regardless

of physical location in the network, may be collected and stored in each Building Controllers point group.

4. Two methods of collection shall be allowed: either by up to four pre-defined time intervals or upon a pre-defined change of value. Sample intervals of l minute to 7 days shall be provided.

5. Each Building Controller shall have a dedicated RAM-based buffer for trend data and shall be capable of storing a minimum of 10,000 data samples.

Project Name 230900 - 27 BAS AND CONTROL FOR HVAC Date

Page 28: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

6. Trend data shall be stored at the Building Controllers and uploaded to the workstation when retrieval is desired. Uploads shall occur based upon either user-defined interval, manual command or when the trend buffers are full. All trend data shall be available for use in third-party personal computer applications.

2.13 BUILDING CONTROLLERS (B-BC)

A. Provide all necessary hardware for a complete operating system as required. The Building Controller shall be able to operate as a standalone panel and shall not be dependent upon any higher level computer or another controller for operation.

B. Basis of design is Siemens PX Modular and Compact Controllers (PXC).

C. This controller shall have the BTL listing and meet the BACnet device profile of a Building Controller (B-BC) and shall support the following BACnet BIBBs:1. Data Sharing

a. Data Sharing-Read Property-Initiate, Execute (DS-RP-A,B)b. Data Sharing-Read Property Multiple- Initiate, Execute (DS-RPM-A,B)c. Data Sharing-Write Property- Initiate, Execute (DS-WP-A,B)d. Data Sharing-Write Property Multiple- Execute (DS-WPM-B)e. Data Sharing-COV- Initiate, Execute (DS-COV-A,B)f. Data Sharing-COV-Unsolicited- Initiate, Execute (DS-COVU-A,B)

2. Schedulinga. Scheduling-Internal- Execute (SCHED-I-B)b. Scheduling-External- Execute (SCHED-E-B)

3. Trendinga. Trending-Viewing and Modifying Trends - Initiate (T-VMT-A)b. Trending-Viewing and Modifying Trends Internal- Execute (T-VMT-I-B)c. Trending-Viewing and Modifying Trends-External- Execute (T-VMT-E-B)d. Trending-Automated Trend Retrieval- Execute (T-ATR-B)

4. Network Managementa. Network Management-Connection Establishment- Initiate (NM-CE-A)

5. Alarminga. Alarm and Event-Notification- Initiate (AE-N-A)b. Alarm and Event-Notification Internal- Execute (AE-N-E-B)c. Alarm and Event-Notification External- Execute (AE-N-E-B)d. Alarm and Event-ACK- Initiate, Execute (AE-ACK-A,B)e. Alarm and Event –Alarm Summary- Execute (AE-ASUM-B)f. Alarm and Event –Enrollment Summary- Execute (AE-ESUM-A,B)g. Alarm and Event –Information- Initiate, Execute (AE-ESUM-A,B)

6. Device Managementa. Device Management-Dynamic Device Binding- Initiate, Execute (DM-DDB-A,B)b. Device Management-Dynamic Object Binding- Initiate, Execute (DM-DOB-A,B)c. Device Management-Device Communication Control- Execute (DM-DCC-B)d. Device Management-Private Transfer- Initiate, Execute (DM-PT-A,B)e. Device Management-Text Message- Initiate, Execute (DM-TM-A,B)f. Device Management-Time Synchronization- Execute (DM-TS-B)g. Device Management-Reinitialize Device- Execute (DM-RD-B)h. Device Management-Backup and Restore- Execute (DM-RD-B)i. Device Management-List Manipulation- Execute (DM-RD-B)

Project Name 230900 - 28 BAS AND CONTROL FOR HVAC Date

Page 29: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

j. Device Management-Object Creation and Deletion- Execute (DM-OCD-B)7. The Building Level Controller shall support the following Data Link Layers:

a. BACnet IP Annex Jb. BACnet IP Annex J Foreign Devicec. MS/TP Master (Claus 9)

8. The Building Level Controller shall be able to interact with all of the BACnet objects in the controllers. In addition, the software shall be able to support the following objects as they relate to features in the workstation software:a. Calendar – Creatable, Deletableb. Command – Creatable, Deletablec. Event Enrollment – Creatable, Deletabled. Notification Class – Creatable, Deletablee. Schedule - Creatable, Deletable

9. The Building Level Controller shall support transmitting and receiving segmented messages.

10. The Building Level Controller shall have the capability to be the BACnet/IP Broadcast Management Device (BBMD) and support foreign devices.

11. The Building Level Controller shall have the capability to act as a BACnet router between MS/TP subnetworks and BACnet/IP.

D. This level of controller shall be used for the following types of systems:1. Chiller plant systems2. Heating plant systems3. Cooling Towers4. Pumping systems5. VAV air handlers6. Air handlers over 15,000 cfm7. Systems with over 24 input/output points

E. Computing power and memory minimum:1. A 32-bit, stand-alone, multi-tasking, multi-user, real-time 100MHz digital control

microprocessor module.2. Inputs shall be 16-bit minimum analog-to-digital resolution 3. Outputs shall be 10-bit minimum digital-to-analog resolution4. Memory module (24 Megabyte, minimum) to accommodate all Primary Control Panel

software requirements, including but not limited to, its own operating system and databases (see Controllers Software section), including control processes, energy management applications, alarm management applications, historical/trend data for points specified, maintenance support applications, custom processes, operator I/O, dial-up communications.

5. Real time clock and battery6. Data collection/ Data Trend module sized for 10,000 data samples.7. Flash Memory Firmware: Each Building Level Control Panel shall support firmware

upgrades without the need to replace hardware.

F. Onboard or Modular hardware and connections:1. Primary Network communication module, if needed for primary network

communications.2. Secondary Network communication module, if needed for secondary network

communications.3. RJ45 port 10/100Mbaud

Project Name 230900 - 29 BAS AND CONTROL FOR HVAC Date

Page 30: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

4. RS485 ports for subnetworks and point expansion5. Man to Machine Interface port (MMI)6. USB Port

G. Input and Output Points Hardware1. Input/output point modules as required including spare capacity.2. Monitoring of the status of all hand-off-auto switches. 3. Monitoring of all industry standard types of analog and digital inputs and outputs,

without the addition of equipment to the primary control panel.4. Local status indication for each digital input and output for constant, up-to-date

verification of all point conditions without the need for an operator I/O device. Each primary control panel shall perform diagnostics on all inputs and outputs and a failure of any input or output shall be indicated both locally and at the operator workstation.

5. Graduated intensity LEDs or analog indication of value for each analog output.

H. Code compliance1. Approvals and standards: UL916; CE; FCC2. Provide UL864-UUKL where called for in the sequences of operations.

I. Accessories:1. Appropriate NEMA rated metal enclosure.2. Power supplies as required for all associated modules, sensors, actuators, etc.

J. Keypad. 1. Where called for in the sequence of operation, or on the plans, a local keypad and display

shall be provided for each controller. The keypad shall be provided for interrogating and editing data. An optional system security password shall be available to prevent unauthorized use of the keypad and display.

K. The operator shall have the ability to manually override automatic or centrally executed commands at the primary control panels via local, point discrete, on-board hand/off/auto operator override switches. If on board switches are not available, provide separate control panels with HOA switches. Mount panel adjacent to primary control panel. Provide hand/off/auto switch for each digital output, including spares.

L. Each Building Level Control Panel shall continuously perform self-diagnostics on all hardware modules and network communications. The System Level Control Panel shall provide both local and remote annunciation of any detected component failures, low battery conditions or repeated failure to establish communication with any system.

M. Panel setup, point definitions and sequencing diagrams shall be backed up on EEPROM memory.

N. Power loss. In the event of the loss of power, there shall be an orderly shutdown of all Building Controllers to prevent the loss of database or operating system software. Non-volatile memory shall be incorporated for all critical controller configuration data and battery backup shall be provided to support the real-time clock and all volatile memory for a minimum of 30 days.

O. Building Level control panels shall provide at least two serial data communication ports for operation of operator I/O devices such as industry standard printers, operator terminals, modems and portable laptop operator's terminals. Primary control panels shall allow temporary use of

Project Name 230900 - 30 BAS AND CONTROL FOR HVAC Date

Page 31: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

portable devices without interrupting the normal communications, operation of permanently connected modems, printers or terminals.

P. Building Level Controllers shall have the capability to serve as a gateway between Modus subnetworks and BACnet objects. Provide software, drives and programming.

Q. Isolation shall be provided at all primary control panel terminations, as well as all field point terminations to suppress induced voltage transients consistent with IEEE Standards 587-1980.

R. Spare Capacity: Provide enough inputs and outputs to handle the equipment shown to be “future” on drawings and 10% more of each point type. Provide all hardware modules, software modules, processors, power supplies, communication controllers, etc. required to ensure adding a point to the spare point location only requires the addition of the appropriate sensor/actuator and field wiring/tubing.

S. Environment. 1. Controller hardware shall be suitable for the anticipated ambient conditions.2. Controllers used outdoors and/or in wet ambient conditions shall be mounted within

waterproof enclosures and shall be rated for operation at 0°C to 49°C (32°F to 120°F).3. Controllers used in conditioned space shall be mounted in dust-proof enclosures and shall

be rated for operation at 0°C to 49°C (32°F to 120°F).

T. Immunity to power and noise. 1. Controller shall be able to operate at 90% to 110% of nominal voltage rating and shall

perform an orderly shutdown below 80% nominal voltage. 2. Operation shall be protected against electrical noise of 5 to 120 Hz and from keyed radios

up to 5 W at 1 m (3 ft). 3. Isolation shall be provided at all primary network terminations, as well as all field point

terminations to suppress induced voltage transients consistent with:a. RF-Conducted Immunity (RFCI) per ENV 50141 (IEC 1000-4-6) at 3V.b. Electro Static Discharge (ESD) Immunity per EN 61000-4-2 (IEC 1000-4-2) at 8

kV air discharge, 4 kV contact.c. Electrical Fast Transient (EFT) per EN 61000-4-4 (IEC 1000-4-4) at 500V signal,

1 kV power.d. Output Circuit Transients per UL 864 (2,400V, 10A, 1.2 Joule max).

4. Isolation shall be provided at all Building Controller’s AC input terminals to suppress induced voltage transients consistent with:a. IEEE Standard 587 1980b. UL 864 Supply Line Transientsc. Voltage Sags, Surge, and Dropout per EN 61000-4-11 (EN 1000-4-11)

2.14 ADVANCED APPLICATION CONTROLLERS

A. Provide all necessary hardware for a complete operating system as required. The Advanced Application level control panel shall be able to operate as a standalone panel and shall not be dependent upon any higher level computer or another controller for operation.

B. Basis of design is Unitary Equipment Controller (PXCxx-UCM).

Project Name 230900 - 31 BAS AND CONTROL FOR HVAC Date

Page 32: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

C. The Advanced Application Controller Software shall be capable of BACnet communications. The BACnet Advanced Application Controller (B-AAC) shall have demonstrated compliance to BTL through BTL listing and shall substantially conform to BACnet Advanced Application Controller (B-AAC) device profile as specified in ANSI/ASHRAE 135-2004 or ANSI/ASHRAE 135-2008. Supported BIBBS shall include:1. Data Sharing

a. Data Sharing-Read Property-Initiate, Execute (DS-RP-A,B)b. Data Sharing-Read Property Multiple- Initiate, Execute (DS-RPM-A,B)c. Data Sharing-Write Property- Initiate, Execute (DS-WP-A,B)d. Data Sharing-Write Property Multiple- Execute (DS-WPM-B)e. Data Sharing-COV- Initiate, Execute (DS-COV-A,B)

2. Schedulinga. Scheduling-Internal- Execute (SCHED-I-B)

3. Trendinga. Trending-Viewing and Modifying Trends Internal- Execute (T-VMT-I-B)b. Trending-Automated Trend Retrieval- Execute (T-ATR-B)

4. Network Managementa. Network Management-Connection Establishment- Initiate (NM-CE-A)

5. Alarminga. Alarm and Event-Notification Internal- Execute (AE-N-I-B)b. Alarm and Event-ACK- Initiate, Execute (AE-ACK-A,B)c. Alarm and Event –Enrollment Summary- Execute (AE-ESUM-B)d. Alarm and Event –Information- Execute (AE-INFO-B)

6. Device Managementa. Device Management-Dynamic Device Binding- Initiate, Execute (DM-DDB-A,B)b. Device Management-Dynamic Object Binding- Initiate, Execute (DM-DOB-A,B)c. Device Management-Device Communication Control- Execute (DM-DCC-B)d. Device Management-Time Synchronization- Execute (DM-TS-B)e. Device Management-Reinitialize Device- Execute (DM-RD-B)f. Device Management-Backup and Restore- Execute (DM-BR-B)g. Device Management-List Manipulation- Execute (DM-LM-B)h. Device Management-Object Creation and Deletion- Execute (DM-OCD-B)

7. The Advanced Application Controller shall be able to interact with all of the BACnet objects in the controllers. In addition, the software shall be able to support the following objects as they relate to features in the workstation software:a. Calendar – Creatable, Deletableb. Command – Creatable, Deletablec. Event Enrollment – Creatable, Deletabled. Notification Class – Creatable, Deletablee. Schedule - Creatable, Deletable

8. The Advanced Application Controller shall support transmitting and receiving segmented messages.

D. Communication:1. BAS Network: The Advanced Application Controller shall support the following Data

Link Layers:a. MS/TP Master

2. Serial Communication: Temporary use of portable devices shall not interrupt the BAS communication, nor the normal operation of permanently connected printers or terminals.

Project Name 230900 - 32 BAS AND CONTROL FOR HVAC Date

Page 33: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

a. Provide at least one EIA-232C serial data communication port for operation of operator I/O devices such as industry standard printers, operator terminals, and portable laptop operator's terminals.

b. A USB port shall alternatively be available to support local HMI tools connection.

E. Software1. The software programs specified in this section shall be provided as an integral part of

Advanced Application Controllers and shall not be dependent upon any higher level computer or another controller for execution.

2. Advanced Application Controllers shall have the ability to perform energy management routines including but not limited to a. scheduling, calendar-based scheduling, holiday scheduling, temporary schedule

overrides b. automatic daylight savings time switch over c. night setback control d. economizer switch over using enthalpy, dry bulb or a combinatione. peak demand limiting,f. temperature-compensated duty cycling g. heating/cooling interlock h. supply temperature reset i. priority load sheddingj. power failure restart

3. The software shall have a routine for automatic tuning of control loops4. System Security in the Field Panel

a. User access shall be secured using individual security passwords and user names.b. Passwords shall restrict the user to the objects, applications, and system functions

as assigned by the system manager.c. The system shall protect itself from unauthorized use by automatically logging off

following the last keystroke. The delay time shall be user-definable.d. Use of workstation resident security as the only means of access control is not an

acceptable alternative to resident system security in the field panel.5. User Defined Control Applications:

a. Controllers shall be fully-programmable. Controllers shall execute custom, job-specific sequences to automatically perform calculations and special control routines. Factory installed or pre-configured sequences shall only be allowed if they exactly match the sequence specified herein.

b. Programs shall combine control logic, control loop algorithms, and energy management routines

c. Each controller shall support plain language text comment lines in the operating program to allow for quick troubleshooting, documentation, and historical summaries of program development.

d. Controller shall provide a HELP function key, providing enhanced context sensitive on-line help with task oriented information from the user manual.

F. Adaptive Loop Control. 1. Each AAC controller shall come standard with an Adaptive Control Loop Algorithm

a. Tuning parameter shall automatically adjust for non-linear applications 2. Model-Free Adaptive (MFA) algorithm

a. The algorithm shall not require modeling of the non-linear system in order to maintain control at all points of the non-linear load.

Project Name 230900 - 33 BAS AND CONTROL FOR HVAC Date

Page 34: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

b. The controlled variable, setpoint, and weighting parameters shall be user-selectable.

3. Output shall be analog or shall stage a series of outputs. 4. Adaptive Control shall take the place of Proportional, Proportional + Integral, and PID

type algorithms for non-linear applications. Adaptive Control routines shall :a. Improve response time b. Improve System efficiencyc. Improve Stabilityd. Result in Consistent outputse. Reduce cycling and repositioningf. Reduce wear and tear on actuators

5. Adaptive control shall auto-adjust to compensate for a. mode changes b. load changes c. seasonal changesd. Heating and cooling changeovere. Heating or cooling capacity changes on the primary sidef. Flow changes on the primary or secondary side g. Airflow changes across coilh. Flow across a heat exchanger

6. Adaptive control shall auto-adjust to compensate fora. Non-linear coils and heat exchangersb. Hot water and chilled water reset routinesc. Water flow reset routinesd. Duct Static reset routines

7. Auto-Tune PID loops are not acceptable substitutions. 8. If Adaptive Loop Control is not available, then the BAS contractor shall provide re-

tuning of the control loops for coils and heat exchangers for each of the following conditions:a. Low heating supply water, high heating supply waterb. Low load on steam coil, high load on steam coilc. Chilled water coil, non dehumidification and condensingd. Chilled water coil, low airflow, high airflow, economizere. Dual temperature systems tune for heating and cooling modesf. Each of 4 seasons

G. This level of controller shall be used for the following types of systems:1. Systems with custom sequences that meet all of the criteria below:2. No primary pumping systems3. Secondary Pumping systems that are remote from Central Plants4. Air handlers up to 15,000 cfm 5. Systems up to 20 input/output points6. Room control sequences that do not fit into an ASC controller7. BAS Network or Architecture or Sequences do not require the system to be on an IP

network8. No systems that require integration to meters, VFDs or other smart equipment9. Integration to smart thermostats is allowed

H. Input/Outputs 1. Inputs shall be 16-bit minimum digital resolution 2. Outputs shall be 10-bit minimum digital resolution

Project Name 230900 - 34 BAS AND CONTROL FOR HVAC Date

Page 35: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

3. The following I/O port types shall be available on the controllera. Universal Input (software configurable):

1) Digital Input choices: a) Pulse Accumulatorb) Contact Closure Sensingc) Dry Contact/Potential Free inputs onlyd) Digital Input (10 ms settling time)e) Counter inputs up to 20 Hz, minimum pulse duration 20 ms (open or

closed)2) Analog Input Choices:

a) 0-10 Vdc b) 4-20 mAc) 1K Ni RTD @ 32°F (Siemens, JCI, DIN Ni 1K) d) 1K Pt RTD (375 or 385 alpha) @ 32°F e) 10K NTC Type 2 or Type 3 Thermistor f) 100K NTC Type 2 Thermistor

b. Universal Input or Output (software configurable): 1) All of the above input types2) Analog Output Types:

a) 0 to 10 Vdc @ 1 mA maxc. Super Universal Input or Output (software configurable):

1) All of the above input types2) All of the above output types3) Super digital output type:

a) 0 to 24 Vdc, 22 mA max. (for controlling pilot relay)4) Super Analog Output Choices:

a) 0 to 20 mA @ 650 Ω max. 4. Provide software configurable I/O ports such that a programmer make a port either an

input or an output

I. Each System Level Control Panel shall, at a minimum, be provided with:1. Appropriate NEMA rated metal enclosure.2. A 32-bit,multi-tasking, real-time 100 MHz digital control microprocessor with plug-in,

enclosed processors.3. Each Advanced Application Controller shall have sufficient memory, a minimum of 24

megabyte, to support its own operating system and databases, including control processes, energy management applications, alarm management applications, historical/trend data for points specified, maintenance support applications, custom processes, and operator I/O.

4. Real time clock and battery5. Data collection/ Data Trend module sized for 10,000 data samples.6. Power supplies as required for all associated modules, sensors, actuators, etc.7. Monitoring of all industry standard types of analog and digital inputs and outputs,

without the addition of equipment to the primary control panel.8. Local status indication for each digital input and output for constant, up-to-date

verification of all point conditions without the need for an operator I/O device. 9. Each control panel shall perform diagnostics on all inputs and outputs and a failure of any

input or output shall be indicated both locally and at the operator workstation.10. Graduated intensity LEDs or analog indication of value for each analog output.

Project Name 230900 - 35 BAS AND CONTROL FOR HVAC Date

Page 36: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

J. Power loss. In the event of the loss of power, there shall be an orderly shutdown of all controllers to prevent the loss of database or operating system software. Non-volatile memory shall be incorporated for the operating system software and firmware. 1. Controller shall be able to operate at 90% to 110% of nominal voltage rating and shall

perform an orderly shutdown below 80% nominal voltage. 2. Brownout protection and power recovery circuitry protect the controller board from

power fluctuations.3. Battery backup shall be provided to support the real-time clock for 10 years 4. The program and database information stored SDRAM memory shall be battery backed

for a minimum of 30 days and up to 60 days. This eliminates the need for time consuming program and database re-entry in the event of an extended power failure.

K. Database Restore: Each AAC controller shall automatically save the latest programmed database. The controller shall be able to automatically restore a lost or corrupt database without involvement from the operator.

L. Each System Level Control Panel shall continuously perform self-diagnostics on all hardware modules and network communications. The System Level Control Panel shall provide both local and remote annunciation of any detected component failures, low battery conditions or repeated failure to establish communication with any system.

M. Each Control Panel shall support firmware upgrades without the need to replace hardware.1. The AAC level controller shall be upgradable to a BC level controller with a flash

upgrade of the firmware.

N. System Level control panels shall provide at least two RS-232C serial data communication ports for operation of operator I/O devices such as operator terminals, and additional memory. Control panels shall allow temporary use of portable operator interface devices without interrupting the normal communications.

O. Immunity to noise. 1. Operation shall be protected against electrical noise of 5 to 120 Hz and from keyed radios

up to 5 W at 1 m (3 ft). 2. Isolation shall be provided at all primary network terminations, as well as all field point

terminations to suppress induced voltage transients consistent with:a. RF-Conducted Immunity (RFCI) per ENV 50141 (IEC 1000-4-6) at 3V.b. Electro Static Discharge (ESD) Immunity per EN 61000-4-2 (IEC 1000-4-2) at 8

kV air discharge, 4 kV contact.c. Electrical Fast Transient (EFT) per EN 61000-4-4 (IEC 1000-4-4) at 500V signal,

1 kV power.d. Output Circuit Transients per UL 864 (2,400V, 10A, 1.2 Joule max).

3. Isolation shall be provided at all Advanced Application Controller’s AC input terminals to suppress induced voltage transients consistent with:a. IEEE Standard 587 1980b. Voltage Sags, Surge, and Dropout per EN 61000-4-11 (EN 1000-4-11)

P. Agency Compliance1. UL UL916 PAZX (all models)2. UL916 PAZX7 (all models)3. FCC Compliance CFR47 Part 15, Subpart B, Class B4. Australian EMC Framework

Project Name 230900 - 36 BAS AND CONTROL FOR HVAC Date

Page 37: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

5. European EMC Directive (CE)6. European Low Voltage Directive (LVD)7. BACnet Testing Laboratories (BTL) Certified

Q. Spare Capacity: Provide enough inputs and outputs to handle the equipment shown to be “future” on drawings and 10% more of each point type. Provide all hardware modules, software modules, processors, power supplies, communication controllers, etc. required to ensure adding a point to the spare point location only requires the addition of the appropriate sensor/actuator and field wiring/tubing.

R. Local Operator Interfaces: Provide if called for elsewhere in the specification or the sequences of operations.1. Controllers shall support an optional Operator Interface Module.

2.15 APPLICATION SPECIFIC CONTROLLERS

A. Each Application Level Control Panel shall operate as a stand-alone controller capable of performing its user selectable control routines independently of any other controller in the system. Each application specific controller shall be a microprocessor-based, multi-tasking, real-time digital control processor.

B. Basis of design is Siemens BTEC controller.

C. This controller shall have the BTL listing and meet the BACnet device profile of an Application Specific Controller and shall support the following BACnet BIBBs:1. Data Sharing

a. Data Sharing-Read Property-B (DS-RP-B)b. Data Sharing-Read Property Multiple-B (DS-RPM-B)c. Data Sharing-Write Property-B (DS-WP-B)

2. Device Managementa. Device Management-Dynamic Device Binding-B (DM-DDB-B)b. Device Management-Dynamic Object Binding-B (DM-DOB-B)c. Device Management-Device Communication Control-B (DM-DCC-B)

3. The Advanced Application Controller shall support the following Data Link Layers:a. MS/TP Master or Slave (Claus 9)

D. Provide a Application Specific Control Panel for each of the following types of equipment (if applicable): 1. Constant Air Volume (CAV) boxes2. Chilled beams3. Duct mounted reheat coils4. Fan coil Units5. Fan Powered Variable Air Volume (VAV) Boxes6. Reheat Coils7. Supplemental AC units8. Variable Air Volume (VAV) Boxes9. Other terminal equipment

E. Each Application Specific Controller shall, at a minimum, be provided with:1. Appropriate NEMA rated enclosure

Project Name 230900 - 37 BAS AND CONTROL FOR HVAC Date

Page 38: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

2. Floor Level network communications ability3. Power supplies as required for all associated modules, sensors, actuators, etc.4. Software as required for all sequences of operation, logic sequences and energy

management routines. 5. A portable operator terminal connection port6. Auxiliary enclosure for analog output transducers, isolation relays, etc. Auxiliary

enclosure shall be part of primary enclosure or mounted adjacent primary enclosure7. Each controller measuring air volume shall include provisions for manual and automatic

calibration of the differential pressure transducer in order to maintain stable control and insuring against drift over time

8. Each controller measuring air volume shall include a differential pressure transducer 9. Approvals and standards: UL916; CE; FCC

F. Each Application Specific Controller shall continuously perform self-diagnostics on all hardware and secondary network communications. The Application Specific Controller shall provide both local and remote annunciation of any detected component failures, low battery conditions, or repeated failure to establish communication to the system.

G. Provide each Application Specific Controller with sufficient memory to accommodate point databases, operating programs, local alarming and local trending. All databases and programs shall be stored in non-volatile EEPROM, EPROM and PROM. The controllers shall be able to return to full normal operation without user intervention after a power failure of unlimited duration. Provide uninterruptible power supplies (UPSs) of sufficient capacities for all terminal controllers that do not meet this protection requirement. Operating programs shall be field-selectable for specific applications. In addition, specific applications may be modified to meet the user's exact control strategy requirements, allowing for additional system flexibility. Controllers that require factory changes of all applications are not acceptable.

H. The Application Specific Controller shall be powered from a 24 VAC source provided by this contractor and shall function normally under an operating range of 18 to 28 VAC (-25% to +17%), allowing for power source fluctuations and voltage drops. Install plenum data line and sensor cable in accordance with local code and NEC. The controllers shall also function normally under ambient conditions of 32 to 122 F (0 to 50 C) and 10% to 95%RH (non-condensing). Provide each controller with a suitable cover or enclosure to protect the intelligence board assembly.

2.16 ROUTERS

A. Provide a router for each subnetwork to connect the floor level network to the base building backbone level network. The router shall connect BACnet MS/TP subnetworks to BACnet over Ethernet.

B. The router shall be capable of handling all of the BACnet BIBBs that are listed for the controller that reside on the subnetwork.

2.17 BASE BUILDING BACKBONE PORTS

A. On each floor, wing or major mechanical room provide an Ethernet RJ45 connection that allows connection to the BACnet network. An open port shall always be available and shall not

Project Name 230900 - 38 BAS AND CONTROL FOR HVAC Date

Page 39: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

require any part of the network to be disconnected. The location shall be accessible to the base building personnel and not in a location where the tenant can restrict the access.

2.18 CONTROL PANELS

A. Controllers in mechanical rooms shall be mounted in NEMA 1 enclosures.

B. Mount on walls at an approved location or provide a free standing rack.

C. Panels shall be constructed of 16 gauge, furniture-quality steel, or extruded-aluminum alloy, totally enclosed, with hinged doors and keyed lock and with ANSI 61 gray polyester-powder painted finish, UL listed. Provide common keying for all panels.

D. Provide power supplies for control voltage power.

E. Dedicate 1 power supply to the DDC controller. Other devices shall be on a separate power supply, unless the power for the control device is derived from the controller terminations.

F. Power supplies for controllers shall be a transformer with a fuse or circuit breaker. Power supplies for other devices can be plain transformers.

G. All power supplies for 24V low voltage wiring shall be class 2 rated and less than 100VA. If low voltage devices require more amps, then provide multiple power supplies. If a single device requires more amps, then provide a dedicated power supply in a separate enclosure and run a separate, non-class 2 conduit to the device.

H. Surge transient protection shall be incorporated in design of system to protect electrical components in all DDC Controllers and operator’s workstations.

I. All devices in a panel shall be permanently mounted, including network switches, modems, media converters, etc.

J. Provide a pocket to hold documentation.

2.19 GENERAL SPECIFICATIONS FOR DEVICES

A. Provide mounting hardware for all devices, including actuator linkages, wells, installation kits for insertion devices, wall boxes and fudge plates, brackets, etc.

B. If a special tool is required to mount a device, provide that tool.

2.20 SENSORS

A. Terminal Unit Space Thermostats1. Each controller performing space temperature control shall be provided with a matching

room temperature sensor. a. Plain Space Temperature Sensors – Wired: Where called for in the sequences or on

the drawings, provide sensors with plain covers.

Project Name 230900 - 39 BAS AND CONTROL FOR HVAC Date

Page 40: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

b. The sensing element for the space temperature sensor shall be thermistor type providing the following.1) Element Accuracy: + /- 1.0°F 2) Operating Range: 55 to 95°F3) Set Point Adjustment Range: 55 to 95°F 4) Calibration Adjustments: None required5) Installation: Up to 100 ft. from controller6) Auxiliary Communications Port: as required7) Local LCD Temperature Display: as required8) Setpoint Adjustment Dial as required9) Occupancy Override Switch as required

c. Auxiliary Communication Port. Each room temperature sensor shall include a terminal jack integral to the sensor assembly. The terminal jack shall be used to connect a portable operator's terminal to control and monitor all hardware and software points associated with the controller. RS-232 communications port shall allow the operator to query and modify operating parameters of the local room terminal unit from the portable operator’s terminal.

2. Digital Display temperature sensor specifications – Wired: a. As called for in the sequences of operations or on the drawings, provide

temperature sensors with digital displays.b. The sensing element for the space temperature sensor must be IC-based and

provide the following.1) Digitally communicating with the Application Specific Controller.2) Mountable to and fully covering a 2 x 4 electrical junction box without the

need for an adapter wall plate.3) IC Element Accuracy: +/- 0.9°F 4) Operating Range: 55 to 95°F5) Setpoint Adjustment Range: User limiting, selectable range between 55

and 95°F 6) Display of temperature setpoint with numerical temperature values7) Display of temperature setpoint graphically, with a visual Hotter/Colder

setpoint indication 8) Calibration: Single point, field adjustable at the space sensor to +/- 5°F9) Installation: Up to 100 ft. from controller10) Auxiliary Communications Port: included11) Local OLED Temperature Display: included12) Display of Temperature to one decimal place13) Temperature Setpoint Adjustment included14) Occupancy Override Function included

c. Auxiliary Communication Port. Each room temperature sensor shall include a terminal jack integral to the sensor assembly. The terminal jack shall be used to connect a portable operator's terminal to control and monitor all hardware and software points associated with the controller. RS-232 communications port shall allow the operator to query and modify operating parameters of the local room terminal unit from the portable operator’s terminal.

3. Provide the following options as they are called for in the sequences or on the drawings: a. Setpoint Adjustment. The setpoint adjustment function shall allow for modification

of the temperature by the building operators. Setpoint adjustment may be locked out, overridden, or limited as to time or temperature through software by an

Project Name 230900 - 40 BAS AND CONTROL FOR HVAC Date

Page 41: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

authorized operator at any central workstation, Building Controller, room sensor two-line display, or via the portable operator's terminal.

b. Override Switch. An override button shall initiate override of the night setback mode to normal (day) operation when activated by the occupant and enabled by building operators. The override shall be limited to two (2) hours (adjustable.) The override function may be locked out, overridden, or limited through software by an authorized operator at the operator interface, Building Controller, room sensor two-line display or via the portable operator's terminal.

c. Space Combination Temperature and Humidity Sensors. Each controller performing space temperature control shall be provided with a matching room temperature sensor, which also includes the ability to measure humidity for either monitoring or control purposes. The combination temperature and humidity sensors shall have the same appearance as the space temperature sensors. Humidity elements shall measure relative humidity with a +/- 2% accuracy over the range of 10 to 90% relative humidity. Humidity element shall be an IC (integrated circuit) sensing element. Humidity sensing elements shall be removable and field replaceable if needed.

B. Temperature Sensors1. All temperature sensors shall meet the following specifications:

a. Accuracy: Plus or minus 0.2 percent at calibration point.b. Wire: Twisted, shielded-pair cable.c. Vibration and corrosion resistant

2. Space temperature sensors shall meet the following specifications:a. 10k ohm type 2 thermisters

3. Insertion Elements in Ducts shall meet the following specifications: a. Single point 10k ohm thermisterb. Use where not affected by temperature stratificationc. The sensor shall reach more that 1/3 the distance from the duct walld. Junction box for wire splices

4. Averaging Elements in Ducts shall meet the following specifications: a. 72 inches (183 cm) longb. Flexiblec. Use where prone to temperature stratification, in front of coils, or where ducts are

larger than 9 sq. ft.d. Junction box for wire splices

5. Insertion Elements for Liquids shall meet the following specifications: a. Platinum RTD with 4-20mA transmitterb. Threaded mounting with matching wellc. Brass well with minimum insertion length of 2-1/2 inches for pipes up to 4”

diameterd. Brass well with insertion length of 6 inches for pipes up to 10” diametere. Junction box for wire splices

6. Outside-Air Sensors Platinum RTD with 4-20mA transmitter: a. Watertight enclosure, shielded from direct sunlightb. Circulation fanc. Watertight conduit fitting

C. Where called for in the sequences of operations, provide the following feature on space sensors and thermostats:1. Security Sensors: Stainless-steel cover plate with insulated back and security screws

Project Name 230900 - 41 BAS AND CONTROL FOR HVAC Date

Page 42: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

2. Space sensors with setpoint adjust: Plain white plastic cover with slide potentiometer to signal a setpoint adjustment to the DDC

3. Space Sensors with LCD display: a. Operator buttons for adjusting setpoints, setting fans speeds and overriding unit to

on/offb. Graphical LCD icons for signaling heating/cooling mode, fans speed, schedule

mode, actual temperature and current setpoint

D. Humidity Sensors shall meet the following specifications: 1. Bulk polymer sensor element2. Accuracy: 2 percent full range with linear output3. Room Sensors: With locking cover matching room thermostats, span of 0 to 100 percent

relative humidity4. Duct and Outside-Air Sensors: With element guard and mounting plate, range of 0 to

100 percent relative humidity

E. Air Static Pressure Transmitter shall meet the following specifications: 1. Non-directional sensor with suitable range for expected input, and temperature

compensated.2. Accuracy: 2 percent of full scale with repeatability of 0.5 percent.3. Output: 4 to 20 mA.4. Building Static-Pressure Range: 0 to 0.25 inches wg.5. Duct Static-Pressure Range: 0 to 5 inches wg.

F. Pressure Transmitters: Direct acting for gas, liquid, or steam service; range suitable for system; proportional output 4 to 20 mA.

G. Equipment operation sensors as follows:

1. Status Inputs for Fans: Differential-pressure switch with adjustable range of 0 to 5 inches wg.

2. Status Inputs for Pumps: Differential-pressure switch piped across pump with adjustable pressure-differential range of 8 to 60 psig.

3. Status Inputs for direct drive electric motors: Current-sensing relay with current transformers, adjustable and sized for 175 percent of rated motor current.

4. Status inputs for belt drive electric motors: Current sensing transmitter with linear 4-20mA output

H. Electronic Valve/Damper Position indication: Visual scale indicating percent of travel and 0 to 10 V dc, feedback signal.

I. Water-Flow Switches: Pressure-flow switches of bellows-actuated mercury or snap-acting type, with appropriate scale range and differential adjustment, with stainless-steel or bronze paddle. For chilled-water applications, provide vapor proof type.

J. Air Differential Pressure Switches: Diaphragm type air differential pressure switches with die cast aluminum housing, adjustable setpoint, minimum 5 amp switch rating at 120VAC, SPDT switches, and the switch pressure range shall be suited for the application. Provide Dwyer or equal. These switches shall be utilized for filter status.

Project Name 230900 - 42 BAS AND CONTROL FOR HVAC Date

Page 43: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

K. Leak detectors: Provide spot leak detectors that can be secured to the floor or secured to a drain pan. The detection shall used a microchip controlled energized probes. The detector shall operate on 24Vor less. Provide a way to adjust the height of the leak probes. The SPDT contacts shall be inside a watertight enclosure.

2.21 ELECTRO-MECHANICAL THERMOSTATS

A. Fire-Protection Thermostats: UL listed with fixed or adjustable settings to operate at not less than 75 deg F above normal maximum operating temperature, with the following:

1. Reset: Automatic with control circuit arranged to require manual reset at central control panel, with pilot light and reset switch on panel labeled to indicate operation.

B. Electric Low-Limit Duct Thermostat: Snap-acting, single-pole, single-throw, manual- or automatic-reset switch that trips if temperature sensed across any 12 inches of bulb length is equal to or below set point. Setpoint shall be adjustable.

1. Bulb Length: Minimum 20 feet.2. Quantity: One thermostat for every 20 sq. ft. of coil surface.

C. Electric space thermostats: Provide a charged element type stat with snap acting SPDT switch. The switch shall be rated for 16A or 1HP at 120V.

D. Aquastat: Provide a charged element type stat with snap acting SPDT switch. The switch shall be rated for 16A or 1HP at 120V.

2.22 SMOKE DETECTORS

A. Provide a smoke detector for each unit above 2000 cfm. Turn it over to the mechanical contractor for installation. Wire it to stop the fan upon sensing smoke.

2.23 AUTOMATIC CONTROL VALVES

A. General:1. All automatic control valves shall be fully proportioning, unless specified otherwise. The

valves shall be quiet in operation and fail-safe in either normally open or normally closed position in the event of control air failure. All valves shall be capable of operating at varying rates of speed to correspond to the exact dictates of the controllers and variable load requirements. The valves shall be capable of operating in sequence with other valves and/or dampers when required by the sequence of operation. All control valves shall be sized by the control vendor and shall be guaranteed to accommodate the flow rates as scheduled. All control valves shall be suitable for the pressure conditions and shall close against the differential pressures involved. Body pressure rating and connec-tion type construction shall conform to fitting and valve schedules. Control valve operators shall be sized to close against a differential pressure equal to the design pump heads plus 10 percent.

2. Cold water, hot water and steam valves, throttling type, and bypass valves shall have equal percentage flow characteristics.

Project Name 230900 - 43 BAS AND CONTROL FOR HVAC Date

Page 44: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

3. Unless otherwise specified, control valves 2 inches and smaller shall have cast iron or bronze bodies with screwed NPT connections.

4. Valves between 2-1/2 inch and 4 inch shall have cast iron bodies with flanged connections.

5. All automatic control valves installed exposed to the elements shall be provided with electric actuators with operating characteristics and accessories as described in herein. Coordinate with electrical contractor for power availability and point of connection.

6. All automatic control valves controlled by the BAS shall be furnished by the controls contractor unless noted otherwise in these documents.

7. All automatic control valves shall be installed by the mechanical trade.8. The controls contractor shall provide wiring as follows:

a. All line voltage power for electric valve actuators shall be wired by the controls contractor from the nearest available power panel. Coordinate with electrical trade.

b. All wiring between the central control system (ATC/BMS) and the valve actuator shall be wired by the controls contractor.

c. All wiring between the valve actuator and their associated thermostats, pressure switches, control devices, etc. shall be wired by the controls contractor.

d. All wiring shall comply with code requirements. Segregate high and low voltage wiring & circuits and segregate the FAS and controls (BMS) terminals.

B. Hot Water / Condenser Water / Control Valves1. Single-seated.2. Fully proportioning with modulating plug or V-port inner valves.3. Body pressure rating and connection type construction shall conform to fitting and valve

schedules. The ANSI rating of the valve shall match the ANSI rating of the piping in which the valve is installed. Minimum ANSI rating shall be ANSI 125.

4. Stainless steel stems and trim.5. Spring loaded Teflon packing6. Quiet in operation.7. Fail-safe in either normally open or normally closed position in the event of power

failure.8. Capable of operating in sequence with other valves and/or dampers when required by the

sequence of operation. 9. Capable of operating at varying rates of speed to correspond to the exact dictates of the

controller and variable load requirements.

C. Differential Pressure Control Valves :1. Provide for all water systems where modulating water flow conditions are required to

prevent excessive pump pressure build-up. Provide a valve for each closed loop water system. Valve to be globe type. Provide valves 2" and smaller with screwed end bodies and provide valves 2-1/2" and larger with flanged ends.

D. Butterfly Valves1. Furnish automatic butterfly valves for isolation requirements as shown on the drawings

or required herein.2. Butterfly valves shall have body ratings in accordance with the piping specifications.3. Valves that are in high static locations or where flanges are ANSI300 per the piping

design shall be high performance, fully lugged with carbon steel body ANSI 300 as required by pipe specifications.

Project Name 230900 - 44 BAS AND CONTROL FOR HVAC Date

Page 45: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

4. Valves that are in locations where ANSI150 flanges are allowed shall be ANSI 150 valves.

5. Valves shall be bubble tight with 316 stainless steel disc, stainless steel shaft and reinforced Teflon seat.

6. Actuators shall be fail in place with factory mounted open and closed position limit switches mounted.

7. Provide fail in place, electric actuators with waterproof enclosure and crankcase heater for actuator and accessories mounted outside.

8. Provide manual override hand wheels for each valve.9. Butterfly valves will only be approved for cooling tower bypass and all two-position

(open or close) applications.10. Valves must have full lug type body connections.

E. Steam Valves:

1. Steam control valves shall be of linear flow characteristics for modulating service.

2. Sizing Criteria:a. 15 psig or less; pressure drop 80% of inlet psig. b. 16 to 50 psig; pressure drop 50% of inlet psig. c. Over 50 psig; pressure drop as scheduled on plans. d. Steam valves shall fail normally open or closed, as scheduled on plans, or as

follows: 1) Heating coils in air handlers: normally open.2) Steam to hot water heat exchanger: normally closed.3) Other applications: as required by sequences of operation.

2.24 ELECTRONIC ACTUATOR SPECIFICATION

A. ELECTRONIC VALVE ACTUATORS1. Actuator shall be fully modulating, floating (tri-state), two position, and/or spring return

as indicated in the control sequences. Specified fail safe actuators shall require mechanical spring return.

2. Modulating valves shall be positive positioning, responding to a 2-10VDC or 4-20mA signal. There shall be a visual valve position indicator.

3. The actuator shall have the capability of adding auxiliary switches or feedback potentiometer if specified.

4. Actuator shall provide minimum torque required for proper valve close-off. The actuator shall be designed with a current limiting motor protection. A release button (clutch) or handle on the actuator shall be provided to allow for manual override (except when actuator is spring return type).

5. Actuators shall be UL listed.

B. ELECTRONIC DAMPER ACTUATORS1. Actuator shall be direct coupled (over the shaft), enabling it to be mounted directly to the

damper shaft without the need for connecting linkage. The actuator-to-shaft clamp shall use a "V" bolt and "V" shaped, toothed cradle to attach to the damper shaft for maximum holding strength. Single bolt or set screw type fasteners are not acceptable.

Project Name 230900 - 45 BAS AND CONTROL FOR HVAC Date

Page 46: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

2. Actuator shall have electronic overload or digital rotation sensing circuitry to prevent damage to the actuator throughout the rotation of the actuator. End switches to deactivate the actuator at the end of rotation or magnetic clutch are not acceptable.

3. For power-failure/safety applications, a mechanical, spring return mechanism shall be used.

4. Actuators with spring return mechanisms shall be capable of either clockwise or counterclockwise spring return operation by simply changing the mounting orientation.

5. Proportional actuators shall accept a 2-10VDC, 4-20mA signal, or be of the 2 point floating type and provide a 2-10VDC actuator position feedback signal.

6. All actuators shall have an external manual gear release (clutch) or manual crank to aid in installation and for allowing manual positioning when the actuator is not powered.

7. All actuators shall have an external direction of rotation switch to aid in installation and to allow proper control response.

8. Actuators shall be provided with a factory-mounted 3-foot electrical cable and conduit fitting to provide easy hook-up to an electrical junction box.

9. Actuators shall be listed under Underwriters Laboratories Standard 873 and Canadian Standards Association. They must be manufactured under ISO 9001.

PART 3 - EXECUTION

3.1 EXAMINATION

A. The project plans shall be thoroughly examined for control device and equipment locations. Any discrepancies, conflicts, or omissions shall be reported to the architect/engineer for resolution before rough-in work is started.

B. The contractor shall inspect the site to verify that equipment may be installed as shown. Any discrepancies, conflicts, or omissions shall be reported to the engineer for resolution before rough-in work is started.

C. The contractor shall examine the drawings and specifications for other parts of the work. If head room or space conditions appear inadequate—or if any discrepancies occur between the plans and the contractor’s work and the plans and the work of others—the contractor shall report these discrepancies to the engineer and shall obtain written instructions for any changes necessary to accommodate the contractor’s work with the work of others.

3.2 INSTALLATION

A. Provide all relays, switches, sources of emergency and UPS battery back-up electricity and all other auxiliaries, accessories and connections necessary to make a complete operable system in accordance with the sequences specified. All field wiring shall be by this contractor.

B. Install controls so that adjustments and calibrations can be readily made. Controls are to be installed by the control equipment manufacturer.

C. Mount surface-mounted control devices on brackets to clear the final finished surface on insulation.

Project Name 230900 - 46 BAS AND CONTROL FOR HVAC Date

Page 47: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

D. Install equipment level and plumb.

E. Install control valves horizontally with the power unit up.

F. Unless otherwise noted, install wall mounted thermostats and humidistat 60” above the floor measured to the center line of the instrument, or as otherwise directed by the Architect.

G. Install averaging elements in ducts and plenums in horizontal crossing or zigzag pattern.

H. Install outdoor sensors in perforated tube and sunshield.

I. Install damper motors on outside of duct in protected areas, not in locations exposed to outdoor temperatures.

J. Install labels and nameplates on each control panel listing the name of the panel referenced in the graphics and a list of equipment numbers served by that panel.

K. Furnish hydronic instrument wells, valves, and other accessories to the mechanical contractor for installation.

L. Furnish automatic dampers to mechanical contractor for installation.

3.3 ELECTRICAL WIRING SCOPE

A. This contractor shall be responsible for power that is not shown on the electrical drawings, to controls furnished by this contractor. If power circuits are shown on the electrical drawings, this contractor shall continue the power run to the control device. If power circuits are not shown, this contractor shall coordinate with the electrical contractor to provide breakers at distribution panels for power to controls. This contractor is then responsible for power from the distribution panel. 1. Coordinate panel locations. If enclosures for panels are shown on the electrical drawings,

furnish the enclosures according to the electrician’s installation schedule.

B. This contractor shall not be responsible for power to control panels and control devices that are furnished by others, unless it is part of the control interlock wiring.

C. Refer to Coordination section for what devices this contractor is responsible to mount and which are turned over to others to mount.

D. This contractor shall be responsible for wiring of any control device that is furnished as part of this section of specification.

E. Wiring for controls furnished by others:1. Provide control wiring for HVAC controls furnished by others. Wiring may include, but

not limited to, the following items:a. Thermostats b. Condensersc. Chiller control devices shipped loosed. Leak detectorse. Humidifier controls

Project Name 230900 - 47 BAS AND CONTROL FOR HVAC Date

Page 48: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

f. Refrigerant leak monitoring systemsg. Exhaust or Purge fansh. Manual switches for HVAC equipment (not shown on electrical drawings)i. Emergency ventilation switches (not shown on electrical drawings)j. Emergency shutdown switches (not shown on electrical drawings)

2. Provide control wiring for the following non-HVAC controls furnished by others if they are called for in this project:a. Electrical vault fansb. Emergency generator dampersc. Water treatmentd. Interlock to fire suppression systeme. Leak detection systemf. Fuel oil monitoring systemg. Fuel oil fill system

F. Interlock wiring shall be run in separate conduits from BAS associated wiring.

G. Provide network wiring for equipment that is called to be integrated to the BAS.

3.4 ELECTRICAL WIRING AND CONNECTION INSTALLATION

A. All low voltage control wiring shall be class 2. Control wiring that is not class 2 shall be run in separate conduits from class 2 wiring.

B. Floor level network wiring between terminal units can be combined with thermostat and other low voltage wiring in the same conduit. All other network wiring shall be in dedicated conduits.

C. Install raceways, boxes, and cabinets according to Division 26 Section "Raceways and Boxes."

D. Install building wire and cable according to Division 26 Section "Conductors and Cables."

E. Installation shall meet the following requirements:

1. Conceal cable and conduit, except in mechanical rooms and areas where other conduit and piping are exposed.

2. Install exposed cable in raceway or conduit.3. Install concealed cable using plenum rated cable.4. Bundle and harness multiconductor instrument cable in place of single cables where

several cables follow a common path.5. Fasten flexible conductors, bridging cabinets and doors, along hinge side; protect against

abrasion. Tie and support conductors.6. Number-code or color-code conductors for future identification and service of control

system, except local individual room control cables.7. All wiring in lab areas shall be in conduit. 8. All unsupported risers shall be rigid steel conduit. Supported risers shall be EMT.

F. Rigid conduit shall be steel, hot dip galvanized, threaded with couplings, ¾ inch minimum size, manufactured in accordance with ANSI C-80-1. Electrical metallic tubing (EMT) with

Project Name 230900 - 48 BAS AND CONTROL FOR HVAC Date

Page 49: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

compression fittings or intermediate metallic conduit (IMC) may be used as conduit or raceway where permitted by the NEC.

G. Concealed control conduit and wiring shall be provided in all spaces except in the Mechanical Equipment Rooms and in unfinished spaces. Install in parallel banks with all changes in directions made at 90 degree angles.

H. Install conduit adjacent to machine to allow service and maintenance.

I. Connect manual-reset limit controls independent of manual-control switch positions. Automatic duct heater resets may be connected in interlock circuit of power controllers.

J. Connect hand-off-auto selector switches to override automatic interlock controls when switch is in hand position.

K. Ground equipment.

3.5 COMMUNICATION WIRING

A. All cabling shall be installed in a neat and workmanlike manner. Follow manufacturer’s installation recommendations for all communication cabling.

B. Do not install communication wiring in raceway and enclosures containing Class 1 wiring.

C. Maximum pulling, tension, and bend radius for cable installation, as specified by the cable manufacturer, shall not be exceeded during installation.

D. Contractor shall verify the integrity of the entire network following the cable installation. Use appropriate test measures for each particular cable.

E. Cable bundling:1. RS485 cabling run open air in accessible areas can be bundled with other class 2 low

voltage cabling.2. RS485 cabling run between terminal units in conduits above ceilings or under floors or in

inaccessible areas can be bundled with other class 2 low voltage cabling.3. RS485 cabling run between floors shall be in a communication only conduit.4. RS485 conduit run long distances between utility rooms or between buildings shall be in

a communication only conduit. 5. Ethernet cabling shall be in a communication only conduit. 6. Ethernet and RS485 can be run together.7. Fiber optics can be run with Ethernet and RS485 cabling as long as the conduit is bent to

fiber optic standards and junction boxes are sized for fiber optic use.

F. RS485 Cabling1. RS485 cabling shall be used for BACnet MS/TP networks. 2. RS485 shall use low capacitance, 20-24 gauge, twisted shielded pair. 3. The shields shall be tied together at each device.4. The shield shall be grounded at one end only and capped at the other end. 5. Provide end of line (EOL) termination devices at each end of the RS485 network or

subnetwork run, to match the impedance of the cable, 100 to 120ohm.

Project Name 230900 - 49 BAS AND CONTROL FOR HVAC Date

Page 50: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

G. Ethernet Cabling1. Ethernet shall not be run with any Class 1 or low voltage Class 2 wiring.2. CAT6, unshielded twisted pair (UTP) cable shall be used for BAS Ethernet.3. Solid wire shall be used for long runs, between mechanical rooms and between floors.

Stranded cable can be used for patch cables and between panels in the same mechanical room up to 50 feet away.

4. When the BAS Ethernet connects to an Owner’s network switch, document the port number on the BAS As-builts.

H. When a cable enters or exits a building, a lightning arrestor must be installed between the lines and ground. The lighting arrestor shall be installed according to the manufacturer’s instructions.

I. All runs of communication wiring shall be unspliced length when that length is commercially available.

J. All communication wiring shall be labeled to indicate origination and destination data.

K. Grounding of coaxial cable shall be in accordance with NEC regulations article on “Communications Circuits, Cable, and Protector Grounding.”

3.6 Fiber Optic Cable System:

A. Maximum pulling tensions as specified by the cable manufacturer shall not be exceeded during installation. Post-installation residual cable tension shall be within cable manufacturer’s specifications.

B. All cabling and associated components shall be installed in accordance with manufacturers’ instructions. Minimum cable and unjacketed fiber bend radii, as specified by cable manufacturer, shall be maintained.

C. All terminations shall to be made into a patch panel, designed for such use. Free air terminations with patch panels are prohibited.

3.7 IDENTIFICATION

A. Permanent warning labels shall be affixed to all equipment that can be automatically started by the DDC system.1. Labels shall use white lettering (12-point type or larger) on a red background.2. Warning labels shall read as follows: C A U T I O N This equipment is operating

under automatic control and may start or stop at any time without warning. Switch disconnect to “Off” position before servicing.

B. Permanent warning labels shall be affixed to all motor starters and all control panels that are connected to multiple power sources utilizing separate disconnects.1. Labels shall use white lettering (12-point type or larger) on a red background.2. Warning labels shall read as follows: C A U T I O N This equipment is fed from more

than one power source with separate disconnects. Disconnect all power sources before servicing.

Project Name 230900 - 50 BAS AND CONTROL FOR HVAC Date

Page 51: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

C. Control Equipment and Device labeling:1. Labels and tags shall match the unique identifiers shown on the as-built drawings. 2. All Enclosures shall be labeled to match the as-built drawing by either control panel

name or the names of the DDC controllers inside. 3. All sensors and actuators not in occupied areas shall be tagged. 4. Airflow measurement arrays shall be tagged to show flow rate range for signal output

range, duct size, and pitot tube AFMS flow coefficient. 5. Duct static pressure taps shall be tagged at the location of the pressure tap. 6. Each device inside enclosures shall be tagged. 7. Terminal equipment need only have a tag for the unique terminal number, not for each

device. Match the unique number on:a. First, the design drawings, orb. Second, the control as-builts, or c. Third, the DDC addressing scheme

8. Tags on the terminal units shall be displayed on the Operator Workstation Graphics.

D. Tags shall be mechanically printed on permanent adhesive backed labeling strips, 12 point height minimum.

E. Manufacturers’ nameplates and UL or CSA labels are to be visible and legible after equipment is installed.

F. Identification of Wires1. Tag each wire with a common identifier on each end of the wire, such as in the control

panel and at the device termination. 2. Tag each network wire with a common identifier on each end. 3. Tag each 120V power source with the panel and breaker number it is fed by.

G. Identification of Conduits:1. Identify the low voltage conduit runs as BAS conduit, power feeds not included. 2. Identify each electric box, junction box, utility box and wiring tray with a blue paint mark

or blue permanent adhesive sticker. 3. For conduit runs that run more than 8 ft between junction boxes in 1 room, place a blue

identifier at least every 8 feet.4. Place a blue identifier on each side of where a conduit passed through a wall or other

inaccessible path. 5. Identify all BAS communication conduits the same as above.

3.8 FIELD QUALITY CONTROL

A. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect field-assembled components and equipment installation, including piping and electrical connections. Report results in writing.

1. Operational Test: After electrical circuitry has been energized, start units to confirm proper unit operation. Remove malfunctioning units, replace with new units, and retest.

2. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment, and retest.

3. Calibration test controllers by disconnecting input sensors and stimulating operation with compatible signal generator.

Project Name 230900 - 51 BAS AND CONTROL FOR HVAC Date

Page 52: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

B. Engage a factory-authorized service representative to perform startup service.

C. Replace damaged or malfunctioning controls and equipment.

1. Start, test, and adjust control systems.2. Demonstrate compliance with requirements, including calibration and testing, and control

sequences.3. Adjust, calibrate, and fine tune circuits and equipment to achieve sequence of operation

specified.

3.9 SYSTEM CHECKOUT AND STARTUP

A. Inspect each termination in the MER control panels and devices to make sure all wires are connected according to the wiring diagrams and all termination are tight.

B. After the controls devices and panels are installed and power is available to the controls, perform a static checkout of all the points, including the following:1. Inspect the setup and reading on each temperature sensor against a thermometer to verify

its accuracy.2. Inspect the setup and reading on each humidity sensor against a hygrometer to verify its

accuracy. 3. Inspect the reading on each CO2 sensor using a calibration kit to verify the sensor range

accuracy matches the DDC setup.4. Inspect the reading of each status switch to verify the DDC reads the open and close

correctly.5. Command each relay to open and close to verify its operation.6. Command each 2-position damper actuator to open and close to verify operation.7. Command each 2-position valve to open and close to verify operation.8. Ramp each modulating actuator to 0%, 25%, 50%, 75% and 100% to verify its operation.9. Ramp each modulating output signal, such as a VFD speed, to verify its operation. 10. Test each safety device with a real life simulation, for instance check freezestats with ice

water, water detectors with water, etc.

C. Document that each point was verified and operating correctly. Correct each failed point before proceeding to the dynamic startup.

D. Verify that each DDC controller communicates on its respective network correctly.

E. After all of the points are verified, and power is available to the mechanical system, coordinate a startup of each system with the mechanical contractor. Include the following tests:1. Start systems from DDC.2. Verify that each setpoint can be met by the system.3. Change setpoints and verify system response.4. Change sensor readings to verify system response.5. Test safety shutdowns.6. Verify time delays.7. Verify mode changes.8. Adjust filter switches and current switches for proper reactions.9. Adjust proportional bands and integration times to stabilize control loops.

Project Name 230900 - 52 BAS AND CONTROL FOR HVAC Date

Page 53: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

F. Perform all program changes and debugging of the system for a fully operational system.

G. Verify that all graphics at the operator workstations correspond to the systems as installed. Verify that the points on the screens appear and react properly. Verify that all adjustable setpoints and manual commands operate from the operator workstations.

H. After the sequence of operation is verified, setup the trends that are listed in the sequence of operations for logging and archiving for the commissioning procedure.

3.10 SYSTEM COMMISSIONING, DEMONSTRATION AND TURNOVER

A. The BAS Contractor shall prepare and submit for approval a complete acceptance test procedure including submittal data relevant to point index, functions, sequence, inter-locks, and associated parameters, and other pertinent information for the operating system. Prior to acceptance of the BAS by the Owner and Engineer, the BAS contractor shall completely test the BAS using the approved test procedure.

B. After the BAS contractor has completed the tests and certified the BAS is 100% complete, the Engineer shall be requested, in writing, to approve the satisfactory operation of the system, sub-systems and accessories. The BAS contractor shall submit Maintenance and Operating manuals at this time for approval. An acceptance test in the presence of the Engineer and Owner's representative shall be performed. The Owner will then shake down the system for a fixed period of time (30 days).

C. The BAS contractor shall fix punch list items within 30 days of acceptance.

D. When the system performance is deemed satisfactory in whole or in part by these observers, the system parts will be accepted for beneficial use and placed under warranty.

3.11 PROJECT RECORD DOCUMENTS

A. Project Record Documents: Submit three (3) copies of record (as-built) documents upon completion of installation. Submittal shall consist of:1. Project Record Drawings. As-built versions of the submittal shop drawings provided as

AutoCAD compatible files in electronic format and as 11 x 17 inch prints.2. Testing and Commissioning Reports and Checklists. Completed versions of reports,

checklists, and trend logs used to meet requirements in the Control System Demonstration and Acceptance section of this specification.

3. Operation and Maintenance (O & M) Manual. a. As-built versions of the submittal product data.b. Names, addresses, and 24-hour telephone numbers of installing contractors and

service representatives for equipment and control systems.c. Operator’s Manual with procedures for operating control systems, logging on and

off, handling alarms, producing point reports, trending data, overriding computer control, and changing setpoints and variables.

d. Programming manual or set of manuals with description of programming language and of statements for algorithms and calculations used, of point database creation and modification, of program creation and modification, and of editor use.

Project Name 230900 - 53 BAS AND CONTROL FOR HVAC Date

Page 54: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

e. Engineering, installation, and maintenance manual or set of manuals that explains how to design and install new points, panels, and other hardware; how to perform preventive maintenance and calibration; how to debug hardware problems; and how to repair or replace hardware.

f. Documentation of all programs created using custom programming language, including setpoints, tuning parameters, and object database.

g. Graphic files, programs, and database on electronic media. h. List of recommended spare parts with part numbers and suppliers.i. Complete original-issue documentation, installation, and maintenance information

for furnished third-party hardware, including computer equipment and sensors.j. Complete original original-issue copies of furnished software, including operating

systems, custom programming language, operator workstation software, and graphics software.

k. Licenses, guarantees, and warranty documents for equipment and systems.

B. Operating manual to serve as training and reference manual for all aspects of day-to-day operation of the system. As a minimum include the following:1. Sequence of operation for automatic and manual operating modes for all building

systems. The sequences shall cross-reference the system point names.2. Description of manual override operation of all control points in system.3. BMS system manufacturers complete operating manuals.

C. Provide maintenance manual to serve as training and reference manual for all aspects of day-to-day maintenance and major system repairs. As a minimum include the following:1. Complete as-built installation drawings for each building system.2. Overall system electrical power supply schematic indicating source of electrical power

for each system component. Indicate all battery backup provisions.3. Photographs and/or drawings showing installation details and locations of equipment.4. Routine preventive maintenance procedures, corrective diagnostics troubleshooting

procedures, and calibration procedures.5. Parts list with manufacturer's catalog numbers and ordering information.6. Lists of ordinary and special tools, operating materials supplies and test equipment

recommended for operation and servicing.7. Manufacturer's operation, set-up, maintenance and catalog literature for each piece of

equipment.8. Maintenance and repair instructions.9. Recommended spare parts.

D. Provide Programming Manual to serve as training and reference manual for all aspects of system programming. As a minimum include the following:1. Complete programming manuals, and reference guides.2. Details of any custom software packages and compilers supplied with system.3. Information and access required for independent programming of system.

3.12 TRAINING

A. During System commissioning and at such time as acceptable performance of the Building Automation System hardware and software has been established, the BAS contractor shall provide on-site operator instruction to the owner's operating personnel. Operator instruction during normal working hours shall be performed by a competent building automation contractor

Project Name 230900 - 54 BAS AND CONTROL FOR HVAC Date

Page 55: w3.usa.siemens.comw3.usa.siemens.com/buildingtechnologies/us/en...  · Web viewSystems that use variations of BACnet using Point ... of the nominal speed, ... electrical contractor

representative familiar with the Building Automation System's software, hardware and accessories.

B. At a time mutually agreed upon, during System commissioning as stated above, the BAS contractor shall give 16-hours of onsite training on the operation of all BAS equipment. Describe its intended use with respect to the programmed functions specified. Operator orientation of the automation system shall include, but not be limited to:1. Explanation of drawings and operator’s maintenance manuals.2. Walk-through of the job to locate all control components.3. Operator workstation and peripherals.4. DDC Controller and ASC operation/sequence.5. Operator control functions including scheduling, alarming, and trending. 6. Explanation of adjustment, calibration and replacement procedures.

C. Additional 8-hours of training shall be given after the 30 day shakedown period.

D. Since the Owner may require personnel to have more comprehensive understanding of the hardware and software, additional training must be available from the Contractor. If the Owner requires such training, it will be contracted at a later date. Provide description of available local and factory customer training. Provide costs associated with performing training at an off-site classroom facility and detail what is included in the manufacturer’s standard pricing such as transportation, meals, etc.

END OF 23 09 00

Project Name 230900 - 55 BAS AND CONTROL FOR HVAC Date