23
W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

Embed Size (px)

Citation preview

Page 1: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

W. Shannon BlackManager, Standards Processes

Results Based Drafting 2013

Page 2: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

2

• Who?oDefine the DT

The team is subject to open

• What?oDraft a WECC Regional Reliability

Standard• When?oSix months or six years

The Basics

Page 3: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

3

• Where?oRarely face-to-faceoUsually Webinar

• Why?oReliabilityoWear your “WECC Hat” not your “Firm Hat”

• How?o In accordance with the “Procedures” and NERC

Rules

Why are we Here?

Page 4: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

Who Does What?

Page 5: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

5

• Chairo Primary

Create work product Ensure the team keeps moving forward Facilitate within the four-corners of the Procedures “Voice” of the team

o Secondary Subject Matter Expert

• Team Memberso SME with a WECC purpose

The Chair and the Team

Page 6: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

6

• WECC StaffoManage the Procedures

Stay within the Procedures Keep the team moving

oManage the document Document control First tier quality review Facilitator plus Technical Writer Language and Procedure SME

oManage the website

WECC Staff

Page 7: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

7

• Procedural OversightoNeed approval for most everything

Scope Posting of work product (Versions/Response) Forward to WECC Board

• The Standing Committee no longer control the development process.

The WSC

Page 8: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

8

• NERCoQuality Review

• Boardo Approves, remands or rejects

• NERC – againo Board of Trusteeso Legal – multiple reviews of the filing

• FERCo Approve, remand or rejecto Their own calendar

Board / NERC / FERC

Page 9: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

“Procedures” And

Principles

Page 10: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

10

• WECC/NERC/FERC Approved Document• Exhibit “C” of the Delegation Agreement

o Basically a ContractoContains specifics of delegated authorityo Is not all inclusive

Needs interpretation Staff will assist

The “Procedures”

Page 11: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

11

• Meetings require 15 days notice• Comment

o 45 days followed by 30 days – until done

• Responseo 30 days to respond

• Impact Statemento Addresses Costs & “Other”

• Don’t forget the WSCo Allow WSC “Time”

Procedural Mandates

Page 12: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

12

• Posted 30 days before a Ballot Pool • Posted 30 days before the Board• Ballot Body/Ballot Pool• Joint Session – 3 days notice• Vote “at least” 7 days after Session• Vote covers 15 “Business” days• “No” votes require a reason

o Added to the record

Procedural Mandates

Page 13: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

13

• Each Comment oRequires a ResponseoCan be aggregated

• Forwarded to WSCo They officially approve and posto 30 days to get Responses posted

• Repeat until done

Responses

Page 14: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

14

• Requires 2/3 quorum of “Pool”o Abstentions and incomplete votes counto Vote “at least” 7 days after Sessiono Vote 15 calendar days or extended as needed

• If acceptedo To the Board “via” the WSC

• If rejectedoWSC can rewrite, re-ballot or recycle to

Session, terminate

Vote

Page 15: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

Development Principles

Page 16: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

16

• The Procedures do not require a quorum of the DT to be present before a DT vote is taken.

• The Procedures do not require notice that a DT subset group will meet.

• It takes only a simple majority to carry a vote on any DT issue.

Development Principles

Page 17: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

17

• All meetings of the DT shall be open to the public and broad participation is encouraged.

• Nothing in these Development Principles shall infringe on an individual’s rights to appeal o Among other reasons…

Can appeal for procedural or technical error

• All DT members are encouraged to always be present; proxy voting by a DT member is not allowed.

Development Principles

Page 18: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

18

• DT voting may take place face-to-face, electronically, in real-time or within a scheduled window.

• Voting on which position to adopt on a drafting issue is reserved for the DT members.

• Voting on inclusion or exclusion of specific language in the document under development is reserved for the DT members.

• Voting on minutes and related business motions is reserved for the DT members.

• Straw Polls are of excellent advisory value but the DT is not obligated to abide by a straw poll.

Development Principles

Page 19: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

A Note on Drafting

Page 20: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

20

• Follow the ERO or RRO templates• Applicable Entities

oNERC Functional Model dictates

• Requirement and Measureso Each X shall do Y. Evidence may include…

• Avoido Adjective, pronouns, adverbsoDo not incorporate by referenceoDon’t use “C”aps unless defined

Regulatory - Speak

Page 21: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

21

• Review the SAR and other documents• Draft the Purpose

o This overall document is designed to…. Fill in that blank The body should match the Purpose statement

• Draft a set of goalso Things we want entities to do

• Draft the tasks that need to be doneo Can assign entities later

• Draft the sequence of those tasks

Where do we start?

Page 22: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

22

oNow we can draft

Pen to Paper

Page 23: W. Shannon Black Manager, Standards Processes Results Based Drafting 2013

Questions?